1) The document provides step-by-step assembly instructions for a 1 drawer, 1 door frameless blind corner base cabinet. It details 21 steps to assemble the cabinet base and additional steps for attaching doors and drawers.
2) Drawer assembly requires locating drawer parts including sides, aprons, and bottoms, and joining them using wood glue and a rubber mallet by fitting the dovetailed joints together. Drawer glides are then attached.
3) Upon completing all assembly steps, plastic stoppers are installed on drawers and doors before final inspection and installation of the cabinet.
Here is a user guide for one of the screens from Elite
Elite screens are available from Dukane.
Dukane is an American company serving the education, corporate, government and house of worship markets for over 85 years.
For more information contact Dukane AV :
Phone: 800-676-2485
Fax: (630) 584-5156
Email: AVSales@Dukane.com
Website: www.Dukane.com/AV
Dukane AV
2900 Dukane Drive
St. Charles, IL 60174
This document based on the Architectural (Interior Work) . During final inspection time client or client representative provide some outstanding work(Punch List) that kind activity .
Chocolate RTA Vanity Cabinets come with butt-joint drawers and standard side mount drawer glides. The sides of the cabinets are finished with a wood composite veneer and a skin is not necessary but highly recommend for any ends that will be exposed once the cabinets are installed.
If you are planning to redesign your kitchen or want to add a modern look to your kitchen. Then go through the tips we have suggested and renovate your kitchen & add a modern look to it. For more information Visit At Domaincabinetsdirect.com
Chestnut Maple RTA Base Cabinets come with dovetailed drawers and under mount soft closing drawer glides. The sides of the cabinets are finished with a wood composite veneer and a skin is not necessary but highly recommend for any ends that will be exposed once the cabinets are installed.
Merlot Birch RTA Vanity Cabinets are frameless and made with 3/4" plywood. By design frameless cabinets are sturdier and more appealing as they allow for full overlay drawers fronts and doors. These cabinets will require finish panel for any side that will be exposed once it is put into place. The drawers use 5 piece construction and utilize dovetailed joints.
Coffee Bean RTA Vanity Cabinets come with butt-joint drawers and standard side mounted full extension drawer glides. The sides of the cabinets are finished with a wood composite veneer and a skin is not necessary but highly recommend for any ends that will be exposed once the cabinets are installed.
Here is a user guide for one of the screens from Elite
Elite screens are available from Dukane.
Dukane is an American company serving the education, corporate, government and house of worship markets for over 85 years.
For more information contact Dukane AV :
Phone: 800-676-2485
Fax: (630) 584-5156
Email: AVSales@Dukane.com
Website: www.Dukane.com/AV
Dukane AV
2900 Dukane Drive
St. Charles, IL 60174
This document based on the Architectural (Interior Work) . During final inspection time client or client representative provide some outstanding work(Punch List) that kind activity .
Chocolate RTA Vanity Cabinets come with butt-joint drawers and standard side mount drawer glides. The sides of the cabinets are finished with a wood composite veneer and a skin is not necessary but highly recommend for any ends that will be exposed once the cabinets are installed.
If you are planning to redesign your kitchen or want to add a modern look to your kitchen. Then go through the tips we have suggested and renovate your kitchen & add a modern look to it. For more information Visit At Domaincabinetsdirect.com
Chestnut Maple RTA Base Cabinets come with dovetailed drawers and under mount soft closing drawer glides. The sides of the cabinets are finished with a wood composite veneer and a skin is not necessary but highly recommend for any ends that will be exposed once the cabinets are installed.
Merlot Birch RTA Vanity Cabinets are frameless and made with 3/4" plywood. By design frameless cabinets are sturdier and more appealing as they allow for full overlay drawers fronts and doors. These cabinets will require finish panel for any side that will be exposed once it is put into place. The drawers use 5 piece construction and utilize dovetailed joints.
Coffee Bean RTA Vanity Cabinets come with butt-joint drawers and standard side mounted full extension drawer glides. The sides of the cabinets are finished with a wood composite veneer and a skin is not necessary but highly recommend for any ends that will be exposed once the cabinets are installed.
Soft Close Drawer Glide Installation - Domaincabinetsdirect.comDomain CabinetsDirect
Soft Close Drawer Glide Installation - Domaincabinetsdirect.com
For more information visit us @ http://www.domaincabinetsdirect.com/documents/Soft%20Close%20Drawer%20Glide%20Installation.pdf
Dukane is an American company serving the education, corporate, government and house of worship markets for over 85 years.
Elite screens are available from Dukane.
I am an authorized consultant for Dukane
Bill McIntosh
SchoolVision Inc ( my consulting company)
Authorized Dukane/Convey Consultant
Dukane Website : www.Dukaneav.com
Phone :843-442-8888
Email :WKMcIntosh@Comcast.net
Twitter : @OtisTMcIntosh
SchoolVision Website on Facebook: https://www.facebook.com/WKMIII
Elite screens are available from Dukane.
Dukane is an American company serving the education, corporate, government and house of worship markets for over 85 years.
For more information contact Dukane AV :
Phone: 800-676-2485
Fax: (630) 584-5156
Email: AVSales@Dukane.com
Website: www.Dukane.com/AV
Dukane AV
2900 Dukane Drive
St. Charles, IL 60174
Dukane is an American company serving the education, corporate, government and house of worship markets for over 85 years.
Elite screens are available from Dukane.
I am an authorized consultant for Dukane
Bill McIntosh
SchoolVision Inc ( my consulting company)
Authorized Dukane/Convey Consultant
Dukane Website : www.Dukaneav.com
Phone :843-442-8888
Email :WKMcIntosh@Comcast.net
Twitter : @OtisTMcIntosh
SchoolVision Website on Facebook: https://www.facebook.com/WKMIII
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
How to assemble a base blind corner 1 drawer 1 door cabinet
1. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 1 | P a g e
Blind Corner Base Cabinet
Assembly Instructions for 1 Drawer, 1 Door Frameless Blind Corner Base Cabinets
(For 39”, 42”, and 45” Blind Corner Base Cabinets)
BEFORE YOU START
STEP 1: Collect your tools. For this project you will need:
Phillips head Power Drill
Nail gun or Staple gun
Common/Flathead screwdriver
Rubber mallet
Wood glue
Box cutter
STEP 2: Place the box on a sturdy work surface.
STEP 3: Open the box by carefully cutting the tape on the ends of the box. Lift the box from the contents on
one side when cutting along the center seam of tape to avoid damaging the pieces.
STEP 4: Pull back the packaging and carefully lift each piece out of the box, inspecting them for damage. Place
them against a wall.
STEP 5: Remove the box of hardware from the packaging. Separate the types of hardware into small piles and
place them in a plastic box.
PRO TIP: Hardware can get lost, placing it in a box can keep it organized, easy to reach, and prevent small pieces
from getting misplaced.
STEP 6: Locate your model number on the website and click the Packing List link to open a PDF version of the
exploded view Packing List, print. Make sure all parts are accounted for, checking them off the part list.
BEGINNING ASSEMBLY
CABINET BASE
These cabinets are designed to be interchangeable; meaning that the drawer/door side and the blind side can be
switched depending upon your needs. Decide which side you need for the blind section of the cabinet and which
you need for the drawers and door then proceed to STEP 1 of the assembly.
STEP 1: Take the drawer side (Part A) and lay it flat on your work surface with the interior side facing up.
*NOTE: If you want your drawers on the left side of the cabinet as you face it, select the left side
Part A. If you want the drawers on the right side of the cabinet, select the right side Part A.
For drawers on Left side. For drawers on Right side.
Left Side
Part A
Right Side
Part A
Pre-drilled holes for
Drawer Glides
2. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 2 | P a g e
STEP 2: Locate the Drawer Slides and remove them from any packaging. Fully extend each slide. The furthest
segment of each slide is the Drawer Box Segment. Pressing the black plastic pin of the Drawer Box
Segment upward, pull it from the remaining segments of the Drawer Slide and place it aside for later.
STEP 3: Place the flat side of the remaining Drawer Slide on Part A, aligning it with the pre-
drilled holes ensuring that the slide extends to the front of the cabinet. To get
access to the drill holes, you will need to slide the inner track until the holes are
visible. Using the 12mm Slide Screws, gently screw the drawer slides to Part A.
Repeat as needed.
NOTE: You will only install one Drawer Slide on this section of Part A. Save the remaining slide for Part J.
STEP 4: Locate Part B (Bottom Panel). As an interchangeable
model, find the side of Part B that correlates with your drawer
base. For example, a cabinet with the drawers on the left (as
you face it) will have pre-drilled holes on the middle left section
in order to meet Part M (Center Stile Bottom) and Part O (Center
Stile Bottom Side).
STEP 5: With the Drawer Slides attached to Part A, attach Part A to Part B
(Bottom Panel) fitting wood dowels into the dowel holes. Secure
Part A to Part B using four 50mm screws and ensure that the grove
at the back of Part A meets the groove on Part B.
NOTE: The grooves must align as they serve as the track to slide in the back panel later in the assembly process.
STEP 6: Once Part A is attached to Part B, attach the other side of Part A to Part B and lay the unit on its back.
PRO TIP: Many assemblers use wood glue to secure the dowels and create added strength. Any excess wood
glue can be removed with a damp towel.
STEP 7: Locate Part L (Toe Kick) and fit it between the two Part As, aligning the pre-drilled screw holes. Using
four 50mm screws, secure the toe kick to Part A (Left) and Part A (Right).
STEP 8: Set the unit aside.
STEP 9: Locate Part J (Center Divider) and place it flat on your work surface. If you chose a
left side drawer orientation, attach the remaining Drawer Slides to Pre-drilled
Drawer Slide holes on the left side of Part J. If you chose a right side drawer
orientation, attach slides to the right side of Part J as described in STEP 3.
STEP 10: Locate Part N (Center Stile Top). Add a dab of wood glue to the
dowel holes and connect Part J (Center Divider) to Part N (Center Stile Top) using
wood dowels. Set aside.
Part B
(Bottom Panel)
Pre-drilled
Screw Holes
Pre-drilled
Dowel Holes
Back Panel Groove
Part J
(Center Divider)
Part A
(Side Panel)
Part B
(Bottom Panel)
Left side drawer base
orientation shown.
Part J
Part N
3. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 3 | P a g e
STEP 11: Locate Part M (Center Stile Bottom) and Part O (Center Stile
Bottom Side). Apply a small dab of glue to the dowel holes and attach Part
O to Part M using the provided wood dowels. Placing a dab of wood glue
in the dowel holes, fit the joined pieces (Part M and Part O) to Part B
(Bottom Panel) using wood dowels.
NOTE: When using wood glue to secure dowels, remember to also add a bead of glue to their corresponding
holes in Part A and Part B. Remember – what you do on one side, do on the other.
STEP 12: Locate the two Part Is (Top Front Connecting Beams). One of the
Part Is is a support bridge between Part M and Part N and the
other serves as a support bridge at the top of the cabinet. Using
50mm screws, secure one of the Part Is between the two Part As
and on top of Part M. Set the other Part I aside.
STEP 13: Place the unit in its back so that you can access the underside of
the cabinet easily. Using three 50mm screws, secure Part O (1
screw) and Part M (2 screws) by drilling through Part B (Bottom Panel).
STEP 14: Locate the joined Part J and Part N. Place a small bead of wood glue in the dowel holes and secure the
joined Part J and Part N to Part I using wood dowels.
STEP 15: Locate the remaining Part I (Top Front Connecting Beam). Place
the remaining Part I on top of the joined Part J and Part N. Secure Part I to
Part J and Part N using three 50mm through the pre-drilled screw hole as
well as on the sides using two 50mm screws on each side.
STEP 16: Locate Part C (Back Panel). IF YOU CHOOSE NOT TO INSTALL
PART C, PROCEED TO STEP 16.
NOTE: Many RTA assemblers/installers choose not to use the back panel. Omitting the back panel doesn’t
compromise the strength of your cabinet.
STEP 17: To install the back panel, face the finished side of Part C towards the front of
the cabinet and carefully slide it along the groves at the rear of the unit. Be
sure that the panel sits securely in the groves along the base as well as the
sides. You may need to give the panel a few gentle taps with your hand to seat
the panel in the grooves.
STEP 18: Locate Part D (Top Back Connecting Beam) and place it at the top of the unit over the back section just
as you did with Part I in STEP 14 matching the pre-drilled holes in the midsection of Part J with those at
the top of Part D. Secure Part D to Part J with two 50mm screws.
Part I
Part A
Part D
Part C
(Back Panel)
Part O
Part M
Part I
Part J
Part N
4. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 4 | P a g e
NOTE: IF YOU INSTALLED THE BACK PANEL, make sure to fit the groves of Part D over the top edge of the back
panel, framing the back panel.
STEP 19: Using four 50mm screws, secure Part D to each Part A as in STEP 14 for Part I.
STEP 20: Locate the two Part Fs (Back Reinforcement Beam). These support
beams secure the cabinet to the wall and (if you install the back panel) secures the
back panel in place. Fit one Part F along the back of the cabinet at the top with the
angled pre-drilled hole in the center pointed upwards and secure it using one of the
30mm screws. Use 50mm screws to attach Part F at the sides of Part A.
STEP 21: Repeat STEP 19 for the second Part F, securing it at the
lower back section of the unit and ensuring the angled pre-
drilled hole points downward.
STEP 22: Locate the Part E (Shelf) and install at the desired height
using the four shelf pins.
This completes the cabinet base assembly. For door and drawer assembly & instructions, set the cabinet base aside
and please continue.
Part F
(Back Reinforcement Beams)
Part E
(Shelf)
5. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 5 | P a g e
DOOR ATTACHMENT
STEP 1: Locate the cabinet door and door hinges and place them on a sturdy work
surface.
STEP 2: With the door facing downward, insert the body of the hinge into the pre-cored
holes on the door and secure using the screws included in the hinge kit.
NOTE: Although the door comes pre-cored you should use a pocket level to align the hinges and make sure it is
straight.
STEP 3: Decide in which direction you want the door to open then
attach the door to the drawer/door side of the cabinet
using the screws included in the hinge kit and aligning the
hinges with the pre-drilled holes located on Part A or on
Part O.
STEP 4: After setting the cabinet doors, they can be aligned (top to
bottom, left to right) using the hinge position screws. The
rear hinge position screw aligns top to bottom, the front
position screw aligns the door from side to side.
This concludes the door attachment instructions, for information on drawer assembly please continue.
DRAWER ASSEMBLY
Drawer assembly is simple yet precise. As all of the drawers use dovetail joining, it is important to be very careful
during assembly and not to use unnecessary force as it could cause damage to the joiners.
Each drawer consists of 2 Drawer Sides (Part G), 2 Drawer Aprons (Part H – for soft closing drawers the rear and
back drawer aprons will vary slightly – the rear apron will have a notch at the base of each side whereas the front
apron has a straight base and will contain two pre-drilled holes in order to attach the Door Face), 1 Drawer Bottom
(Part K), and the Drawer Front (not shown in the exploded view of the part list).
STEP 1: Collect your tools. For this project you will need:
Power Drill with Phillips
screwdriver tip
Wood glue
Rubber mallet
2 x 4 piece of scrap wood
STEP 2: For each drawer, locate 2 Drawer Sides (Part G), 2 Drawer Aprons (Part H – one notched as well as one
straight bottom with pre-drilled holes), 1 Drawer Bottom (Part K), and the Drawer Front and set them
on a secure work surface bottom groove side facing upward.
STEP 3: Set aside one of the drawer aprons (Part H) and one of the drawer
sides (Part G). Place a small bead of wood glue between the
dovetail joiners on one side of the front drawer apron (Part H).
Cabinet
Door
Hinges
Part H
(Drawer Apron)
Part G
(Drawer Side)
Door
6. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 6 | P a g e
Part H
(Drawer Apron)
Drawer Front
STEP 4: Align the drawer side (Part G) with the glued side of the front drawer apron (Part H), ensuring the
groves at the base of each piece align, and that the dovetail joiners align. Tap gently with the rubber
mallet.
PRO TIP: To fit the pieces together and avoid damage to the box and joiners, use the scrap 2 x 4 by placing it over
the dovetail joint. Tap the mallet firmly but carefully. The 2 x 4 distributes the pressure of the mallet
evenly and also keeps the mallet from leaving impressions in the wood. Remember – Although dovetail
makes a very secure joining the dovetail tongues are vulnerable to damage until the sides are
assembled, be careful and try not to force pieces together.
STEP 5: Locate Part K (Drawer Bottom). Slide the drawer bottom into place along the grooves.
STEP 6: Place a small bead of wood glue between the dovetail joiners on
opposite side of the front drawer apron (Part H) already joined to the drawer
side (Part G). Take the other drawer side (Part G) and slide it into place, aligning
it with the glued dovetail joiners and the drawer base. Tap gently with the
rubber mallet as described in STEP 4 and as listed in the above PRO TIP.
STEP 7: Locate Part G (the back Drawer Side). Apply small beads of wood glue on
both dovetail joiner sides. Align the back drawer apron (Part H) to the
drawer sides (Part G) and drawer base, gently tapping it into place with
the mallet. Repeat the instructions listed in the above PRO TIP.
Repeat for all drawers STEP 2 – STEP 7 for all drawers.
STEP 8: Locate the Drawer Box Segment of the drawer glides set aside earlier during the cabinet base assembly.
STEP 9: Placing the assembled drawer box on its side, positioning the drawer
box segment of the drawer glides so that the break end faces the front of the
box and the pinched end faces the rear. Be sure to align the pre-drilled holes on
the drawer sides with holes on the drawer slide. Secure using the 12mm slide
screws. Repeat for each side of the drawer.
STEP 10: Attaching Drawer Fronts: Use a
piece of scribe molding as a spacer to align
the fronts then attach from the back, inside
the drawer, using 30mm screws. Clamps come in handy to hold the
pieces in place during drilling. Keep in mind you won’t necessarily
attach the drawer fronts to the drawer aprons at the pre-drilled
holes. Each style is different. As a rule, ALWAYS attach aprons to
the “meat” of the drawer front to avoid drawer front damage.
NOTE: When attaching handles, be sure not to over-tighten screws as it could damage the front. You may wish
to attach hardware to the “meat” of the drawer front (such as the frame on a shaker-style cabinet).
Part G
(Drawer Side)
Part H
(Drawer Apron)
Drawer Glide
(End)
Part H
(Front Drawer
Apron)
7. Domain Cabinets Direct
888-US-CABINETS
Domain Cabinets Direct 7 | P a g e
FINISHING UP
Congratulations, you have just assembled your Blind Corner Base Cabinet! To finish up, place the adhesive plastic
stoppers at the corners of the drawers and doors to keep them from banging upon closing.
Before installing, take a moment to re-inspect your work a final time, looking for any screws that could be
tightened or hinges that could be adjusted slightly.