The document provides instructions for assembling Endura Force5 door units. It lists the required components which include frames, weatherstripping, doors, and other hardware. It then outlines 13 steps for assembly, including assembling the frame at the header, sill, and mullion. It provides details on installing fixed panels, cutting and attaching door bottoms, and inserting weatherstripping. The instructions apply to single doors, sidelites, patio doors, and French doors.
The document provides instructions for installing a sliding door. It includes a parts list and descriptions of hardware supplied. The instructions describe how to assemble the door frame and install it in the opening. Steps are provided for installing the stationary and operator panels along with attaching hardware like handles. The summary is completed in 3 sentences or less as requested.
This document provides installation instructions for compact laminate toilet partitions using Bobrick hardware. It includes diagrams of common partition layouts and details on anchoring partitions to floors, ceilings and walls. The instructions are organized into sections covering preparation, layout, installation of anchors, brackets and panels, and finishing. Proper safety gear and tools are recommended.
This document provides specifications for sliding and pocket door hardware designed for ANSI 161 door preparations. It includes details on tubular and mortise hardware options for sliding doors, pocket doors, and passage pocket doors. Hardware components include cases, thumb turn hubs, strikes, armor fronts, pulls, flush pulls, locks, and edge pulls. Finishing and ordering information is also provided.
This document provides installation instructions for a Bright Covers patio cover system. It begins with general recommendations to fully read and understand the instructions before installation. The document then lists required tools and system components. It provides details on laying out the system, including minimum pitch requirements and height measurements. Instructions are given for installing the hanging rail to the house or roof, as well as for installing the posts and I-beam. Diagrams illustrate hanging rail connection details. The document aims to ensure a successful standard installation of the Bright Covers system.
1) The document provides instructions for installing door seals and mass dampening to improve soundproofing of solid core doors. It describes cutting felt strips and slots in the door edges and frame to create a tight seal when closed.
2) Steps include measuring gaps, installing a threshold, cutting felt to size, gluing felt into slots, adjusting for a tight fit, and adding foam pads over hinges.
3) For mass dampening, the instructions describe laying strips and squares of soundproofing material on the door, attaching moisture-resistant sheetrock on top, and optional trim molding.
This document contains design portfolio drawings for various interior design projects including:
1. Drawings showing design details for carved leather wall panels with a flower pattern.
2. Plans and sections for a mirror wall installation with wooden frames and 6mm mirrored panels.
3. Elevations, sections and details for a media wall design featuring marble, glass and cabinets.
4. Door and sliding wall system plans and details showing designs for bedroom doors.
This document is a floor plan for a hotel showing room layouts and dimensions. On the first floor it includes a main lobby, breakfast area, pool room, fitness center, meeting rooms, guest laundry, and 30 guest rooms of various configurations including king studios, king rooms, double queen rooms, and accessible rooms. Stairwells, elevators, and mechanical rooms are also indicated. The second floor plan shows similar guest room layouts along with linen storage and an elevator shaft. Dimensions and notes provide additional information about construction materials and accessibility features.
The document provides instructions for installing a sliding door. It includes a parts list and descriptions of hardware supplied. The instructions describe how to assemble the door frame and install it in the opening. Steps are provided for installing the stationary and operator panels along with attaching hardware like handles. The summary is completed in 3 sentences or less as requested.
This document provides installation instructions for compact laminate toilet partitions using Bobrick hardware. It includes diagrams of common partition layouts and details on anchoring partitions to floors, ceilings and walls. The instructions are organized into sections covering preparation, layout, installation of anchors, brackets and panels, and finishing. Proper safety gear and tools are recommended.
This document provides specifications for sliding and pocket door hardware designed for ANSI 161 door preparations. It includes details on tubular and mortise hardware options for sliding doors, pocket doors, and passage pocket doors. Hardware components include cases, thumb turn hubs, strikes, armor fronts, pulls, flush pulls, locks, and edge pulls. Finishing and ordering information is also provided.
This document provides installation instructions for a Bright Covers patio cover system. It begins with general recommendations to fully read and understand the instructions before installation. The document then lists required tools and system components. It provides details on laying out the system, including minimum pitch requirements and height measurements. Instructions are given for installing the hanging rail to the house or roof, as well as for installing the posts and I-beam. Diagrams illustrate hanging rail connection details. The document aims to ensure a successful standard installation of the Bright Covers system.
1) The document provides instructions for installing door seals and mass dampening to improve soundproofing of solid core doors. It describes cutting felt strips and slots in the door edges and frame to create a tight seal when closed.
2) Steps include measuring gaps, installing a threshold, cutting felt to size, gluing felt into slots, adjusting for a tight fit, and adding foam pads over hinges.
3) For mass dampening, the instructions describe laying strips and squares of soundproofing material on the door, attaching moisture-resistant sheetrock on top, and optional trim molding.
This document contains design portfolio drawings for various interior design projects including:
1. Drawings showing design details for carved leather wall panels with a flower pattern.
2. Plans and sections for a mirror wall installation with wooden frames and 6mm mirrored panels.
3. Elevations, sections and details for a media wall design featuring marble, glass and cabinets.
4. Door and sliding wall system plans and details showing designs for bedroom doors.
This document is a floor plan for a hotel showing room layouts and dimensions. On the first floor it includes a main lobby, breakfast area, pool room, fitness center, meeting rooms, guest laundry, and 30 guest rooms of various configurations including king studios, king rooms, double queen rooms, and accessible rooms. Stairwells, elevators, and mechanical rooms are also indicated. The second floor plan shows similar guest room layouts along with linen storage and an elevator shaft. Dimensions and notes provide additional information about construction materials and accessibility features.
The document provides installation instructions for a MySpot 200 parking barrier system on an asphalt surface. It describes four mounting options for securing the base plates to asphalt, and provides step-by-step instructions for installing the base plates, pods, barrier, and testing the system using the remote controls.
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
The document provides installation instructions for an Australian roller door. It begins with safety instructions and lists the tools and measurements needed for installation. It then provides step-by-step instructions for installing brackets, placing the door onto brackets, tensioning springs, pinning excess curtain, fixing tracks, fitting locks, and making final adjustments. It concludes with the product warranty, noting the warranty period and exclusions such as damage from weather or lack of maintenance.
French Door Pairs – Assembly InstructionsHelen Smith
Read more about French door pairs assembly instructions by visiting this section. Emerald Doors are specialist suppliers of internal doors, external doors, oak doors, contemporary doors, fire doors, french doors & bi-fold doors.
This document provides guidelines for identifying components and installing a flood gate unit. It identifies the gate, gate pan, installation bracket, and gate unit. It then lists 18 steps for installation, including identifying rough opening dimensions, excavating, placing structural footing and drain, setting and leveling the gate unit, anchoring it, and finishing with concrete, grout, and paint. Proper installation is estimated to take a 4 person crew 3 days, with setting and anchoring the gate unit taking 1.5 days. Contact information is provided for technical assistance.
1) The document provides step-by-step assembly instructions for a 1 drawer, 1 door frameless blind corner base cabinet. It details 21 steps to assemble the cabinet base and additional steps for attaching doors and drawers.
2) Drawer assembly requires locating drawer parts including sides, aprons, and bottoms, and joining them using wood glue and a rubber mallet by fitting the dovetailed joints together. Drawer glides are then attached.
3) Upon completing all assembly steps, plastic stoppers are installed on drawers and doors before final inspection and installation of the cabinet.
The document provides step-by-step installation instructions for a MySpot 200 parking barrier system on a concrete surface. It details locating and preparing the installation site, unpacking and identifying parts, drilling anchor holes, inserting anchors, aligning and securing mounting plates, attaching the barrier and pod units, testing functionality with remote controls, and troubleshooting tips.
This document provides instructions for installing furnace elements. It describes:
1) Testing elements for continuity before installation and preparing a work area with the necessary tools and materials.
2) Handling elements carefully by their wooden stability blocks and laying them gently on the table during preparation.
3) Removing one wooden block from each element by slicing tape, then inserting the element into ceramic bricks while keeping the other block in place.
The instructions emphasize safely preparing and installing one element at a time to reduce breakage risks during the process.
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
This document provides installation instructions for a furnace. It includes steps for unpacking the furnace from its pallet and crate, setting up the crucible, assembling the door, preparing and installing the heating elements, and taking electrical measurements with a multimeter. Safety precautions are outlined for handling fragile elements and taking electrical readings. Diagrams illustrate the furnace components and proper element assembly.
This document provides instructions for installing new guttering on a house. It describes measuring and planning the job, removing the old guttering, fitting brackets and outlets, installing the gutters and downpipes, and optional extras like guards and rain diverters. Care is needed in accurately setting out and fitting the guttering, but with the right products and tools, changing your own guttering can be a straightforward job.
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsiMovR
1. The document provides assembly instructions for the Xtend 7818J Series monitor arm.
2. It includes a parts list and diagrams showing how to assemble the arm components, mount monitors, and attach the base to a work surface using either a clamp or grommet mounting system.
3. Adjustments can be made to the arm tension, joint torque, and tilt to correctly position the monitor.
1. The document provides assembly instructions for the Xtend 7818J Series monitor arm. It includes a parts list and diagrams showing how to assemble, mount, adjust, and use the arm and its components.
2. The instructions describe how to mount the base assembly to a work surface using either a clamp or grommet mounting system, attach the arm assembly to the base, and mount a monitor to the arm using a VESA plate.
3. Additional sections cover adjusting the arm tension, joint torque, and tilt, as well as using the cable managers to route cables.
This document provides assembly instructions for mounting multiple monitor displays on an adjustable arm system. It includes the following:
1. Instructions are given for assembling the base pole mount, extension arms, and dual monitor hubs to attach displays at the desired heights and locations.
2. Directions are provided for mounting the pole to surfaces using either a clamp or grommet system, as well as mounting to a wall or slat wall.
3. Steps are outlined for adjusting the tension on movable arm joints and height adjustable segments to properly counterbalance attached monitors.
This document provides instructions for replacing the front door lock actuator on a BMW E39 over 21 steps. It is a moderately difficult DIY project that took the author 4 hours to complete, including troubleshooting. Safety precautions like disconnecting the battery before handling airbags are advised. Tools needed include various screwdrivers, a socket set, and flashlight. Referenced is the replacement part number and additional drawings available online for guidance. Proper reassembly of the actuator is critical for the lock button to function correctly.
This document provides installation instructions for assembling an adjustable-height desk system. It includes a parts list with pictures and quantities of each part. The instructions describe how to assemble the desk base by attaching feet, crossbars, and support arms. It explains how to align the base with the desk top and secure them together. Additional steps cover installing the control box, up/down controller, keyboard platform, fence, and bumpers. Diagrams illustrate each step in the assembly process.
The document provides installation instructions for a MySpot 200 parking barrier system on an asphalt surface. It describes four mounting options for securing the base plates to asphalt, and provides step-by-step instructions for installing the base plates, pods, barrier, and testing the system using the remote controls.
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
The document provides installation instructions for an Australian roller door. It begins with safety instructions and lists the tools and measurements needed for installation. It then provides step-by-step instructions for installing brackets, placing the door onto brackets, tensioning springs, pinning excess curtain, fixing tracks, fitting locks, and making final adjustments. It concludes with the product warranty, noting the warranty period and exclusions such as damage from weather or lack of maintenance.
French Door Pairs – Assembly InstructionsHelen Smith
Read more about French door pairs assembly instructions by visiting this section. Emerald Doors are specialist suppliers of internal doors, external doors, oak doors, contemporary doors, fire doors, french doors & bi-fold doors.
This document provides guidelines for identifying components and installing a flood gate unit. It identifies the gate, gate pan, installation bracket, and gate unit. It then lists 18 steps for installation, including identifying rough opening dimensions, excavating, placing structural footing and drain, setting and leveling the gate unit, anchoring it, and finishing with concrete, grout, and paint. Proper installation is estimated to take a 4 person crew 3 days, with setting and anchoring the gate unit taking 1.5 days. Contact information is provided for technical assistance.
1) The document provides step-by-step assembly instructions for a 1 drawer, 1 door frameless blind corner base cabinet. It details 21 steps to assemble the cabinet base and additional steps for attaching doors and drawers.
2) Drawer assembly requires locating drawer parts including sides, aprons, and bottoms, and joining them using wood glue and a rubber mallet by fitting the dovetailed joints together. Drawer glides are then attached.
3) Upon completing all assembly steps, plastic stoppers are installed on drawers and doors before final inspection and installation of the cabinet.
The document provides step-by-step installation instructions for a MySpot 200 parking barrier system on a concrete surface. It details locating and preparing the installation site, unpacking and identifying parts, drilling anchor holes, inserting anchors, aligning and securing mounting plates, attaching the barrier and pod units, testing functionality with remote controls, and troubleshooting tips.
This document provides instructions for installing furnace elements. It describes:
1) Testing elements for continuity before installation and preparing a work area with the necessary tools and materials.
2) Handling elements carefully by their wooden stability blocks and laying them gently on the table during preparation.
3) Removing one wooden block from each element by slicing tape, then inserting the element into ceramic bricks while keeping the other block in place.
The instructions emphasize safely preparing and installing one element at a time to reduce breakage risks during the process.
CoFold is the ultimate in exterior folding systems and opens up a wealth of new design possibilities.
The CoFold System has been designed to maximise the flexibility of a room’s living space, removing barriers and enabling the user to have an indoor/outdoor experience by fully opening up exterior walls.
The system which operates with effortless ease combines the benefits of folding doors with the ability to keep out the weather with no corrosion worries. This modern, contemporary feature will increase available living space whilst allowing natural light to envelop the room.
System Capacity
Maximum leaf height - 3300mm
Maximum leaf weight - 100kg
Maximum leaf width - 1000mm
Leaf thickness - 35-68mm*
* For thicker or thinner doors please contact Coastal Technical Team
For doors between 35-47mm use an alternative flush bolt
Applications
Residential and commercial timber exterior folding applications
Specially suited to coastal environments made from 316 stainless steel.
End folding timber doors folding to one or both sides
Standard folding configuration features doors folding outward.
Inward folding doors can be used where the doors are not directly
exposed to the weather.
Premium security features
Recognised weather resistance
The folding unit is not hinged to post, but is pivoted in the track and floor. All door leaves are of equal width. A swing leaf can be included by incorporating an odd number of leaves. For full weather protection, doors, frame and track should incorporate the seals provided in the CoFold range.
Cill and frame construction should be in accordance with the CoFold fixing instructions. Intermediate hangers and hinges are non rebated.
www.coastal-group.com
This document provides installation instructions for a furnace. It includes steps for unpacking the furnace from its pallet and crate, setting up the crucible, assembling the door, preparing and installing the heating elements, and taking electrical measurements with a multimeter. Safety precautions are outlined for handling fragile elements and taking electrical readings. Diagrams illustrate the furnace components and proper element assembly.
This document provides instructions for installing new guttering on a house. It describes measuring and planning the job, removing the old guttering, fitting brackets and outlets, installing the gutters and downpipes, and optional extras like guards and rain diverters. Care is needed in accurately setting out and fitting the guttering, but with the right products and tools, changing your own guttering can be a straightforward job.
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsiMovR
1. The document provides assembly instructions for the Xtend 7818J Series monitor arm.
2. It includes a parts list and diagrams showing how to assemble the arm components, mount monitors, and attach the base to a work surface using either a clamp or grommet mounting system.
3. Adjustments can be made to the arm tension, joint torque, and tilt to correctly position the monitor.
1. The document provides assembly instructions for the Xtend 7818J Series monitor arm. It includes a parts list and diagrams showing how to assemble, mount, adjust, and use the arm and its components.
2. The instructions describe how to mount the base assembly to a work surface using either a clamp or grommet mounting system, attach the arm assembly to the base, and mount a monitor to the arm using a VESA plate.
3. Additional sections cover adjusting the arm tension, joint torque, and tilt, as well as using the cable managers to route cables.
This document provides assembly instructions for mounting multiple monitor displays on an adjustable arm system. It includes the following:
1. Instructions are given for assembling the base pole mount, extension arms, and dual monitor hubs to attach displays at the desired heights and locations.
2. Directions are provided for mounting the pole to surfaces using either a clamp or grommet system, as well as mounting to a wall or slat wall.
3. Steps are outlined for adjusting the tension on movable arm joints and height adjustable segments to properly counterbalance attached monitors.
This document provides instructions for replacing the front door lock actuator on a BMW E39 over 21 steps. It is a moderately difficult DIY project that took the author 4 hours to complete, including troubleshooting. Safety precautions like disconnecting the battery before handling airbags are advised. Tools needed include various screwdrivers, a socket set, and flashlight. Referenced is the replacement part number and additional drawings available online for guidance. Proper reassembly of the actuator is critical for the lock button to function correctly.
This document provides installation instructions for assembling an adjustable-height desk system. It includes a parts list with pictures and quantities of each part. The instructions describe how to assemble the desk base by attaching feet, crossbars, and support arms. It explains how to align the base with the desk top and secure them together. Additional steps cover installing the control box, up/down controller, keyboard platform, fence, and bumpers. Diagrams illustrate each step in the assembly process.
How to Build a Module in Odoo 17 Using the Scaffold MethodCeline George
Odoo provides an option for creating a module by using a single line command. By using this command the user can make a whole structure of a module. It is very easy for a beginner to make a module. There is no need to make each file manually. This slide will show how to create a module using the scaffold method.
A workshop hosted by the South African Journal of Science aimed at postgraduate students and early career researchers with little or no experience in writing and publishing journal articles.
The simplified electron and muon model, Oscillating Spacetime: The Foundation...RitikBhardwaj56
Discover the Simplified Electron and Muon Model: A New Wave-Based Approach to Understanding Particles delves into a groundbreaking theory that presents electrons and muons as rotating soliton waves within oscillating spacetime. Geared towards students, researchers, and science buffs, this book breaks down complex ideas into simple explanations. It covers topics such as electron waves, temporal dynamics, and the implications of this model on particle physics. With clear illustrations and easy-to-follow explanations, readers will gain a new outlook on the universe's fundamental nature.
How to Setup Warehouse & Location in Odoo 17 InventoryCeline George
In this slide, we'll explore how to set up warehouses and locations in Odoo 17 Inventory. This will help us manage our stock effectively, track inventory levels, and streamline warehouse operations.
A review of the growth of the Israel Genealogy Research Association Database Collection for the last 12 months. Our collection is now passed the 3 million mark and still growing. See which archives have contributed the most. See the different types of records we have, and which years have had records added. You can also see what we have for the future.
Executive Directors Chat Leveraging AI for Diversity, Equity, and InclusionTechSoup
Let’s explore the intersection of technology and equity in the final session of our DEI series. Discover how AI tools, like ChatGPT, can be used to support and enhance your nonprofit's DEI initiatives. Participants will gain insights into practical AI applications and get tips for leveraging technology to advance their DEI goals.
Walmart Business+ and Spark Good for Nonprofits.pdfTechSoup
"Learn about all the ways Walmart supports nonprofit organizations.
You will hear from Liz Willett, the Head of Nonprofits, and hear about what Walmart is doing to help nonprofits, including Walmart Business and Spark Good. Walmart Business+ is a new offer for nonprofits that offers discounts and also streamlines nonprofits order and expense tracking, saving time and money.
The webinar may also give some examples on how nonprofits can best leverage Walmart Business+.
The event will cover the following::
Walmart Business + (https://business.walmart.com/plus) is a new shopping experience for nonprofits, schools, and local business customers that connects an exclusive online shopping experience to stores. Benefits include free delivery and shipping, a 'Spend Analytics” feature, special discounts, deals and tax-exempt shopping.
Special TechSoup offer for a free 180 days membership, and up to $150 in discounts on eligible orders.
Spark Good (walmart.com/sparkgood) is a charitable platform that enables nonprofits to receive donations directly from customers and associates.
Answers about how you can do more with Walmart!"
How to Fix the Import Error in the Odoo 17Celine George
An import error occurs when a program fails to import a module or library, disrupting its execution. In languages like Python, this issue arises when the specified module cannot be found or accessed, hindering the program's functionality. Resolving import errors is crucial for maintaining smooth software operation and uninterrupted development processes.
Main Java[All of the Base Concepts}.docxadhitya5119
This is part 1 of my Java Learning Journey. This Contains Custom methods, classes, constructors, packages, multithreading , try- catch block, finally block and more.
हिंदी वर्णमाला पीपीटी, hindi alphabet PPT presentation, hindi varnamala PPT, Hindi Varnamala pdf, हिंदी स्वर, हिंदी व्यंजन, sikhiye hindi varnmala, dr. mulla adam ali, hindi language and literature, hindi alphabet with drawing, hindi alphabet pdf, hindi varnamala for childrens, hindi language, hindi varnamala practice for kids, https://www.drmullaadamali.com
1. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
1
Notes:
1. This instruction applies to both inswing and outswing
doors, except where noted inswing is shown.
2. For caulking requirements Endura recommends
polyurethane, polymer based or 100% silicon sealant.
Rev 2.8.16
8817 W. Market St., Colfax, NC 27235
1.800.334.2006 www.enduraproducts.com
Required components for Endura Force5 Door Units include the following:
For single doors:
For sidelite and patio doors, in addition to components needed for single doors:
For French doors, in addition to components needed for single doors:
• Composite Z-Series Sill
• Hinge Jamb
• Strike Jamb
• Header
• Force5 Weatherstrip
• Hinges
• Door Frame Alignment Bracket
• Force5 Door Bottom (Inswing Units Only)
• Force5 Door Top (Outswing Units Only)
• One-piece Mullion(s)
• Continuous Header
• Continuous Sill
• Fixed or Sidelite Panel(s)
• Force5 Tested Composite Sidelite Seat(s)
• Ultimate Astragal
• Passive Panel
• Header Plate- Standard or Hurricane
• Sill Cup- Inswing or Outswing
• Sill Plate (Outswing Hurricane Only)
Required Components
2. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
2
Step 2: Assembling the Frame and Mull at the Header
Step 1: Checking Installation of Z-End Bases (Articulating Cap Sills Only)
Step 3: Assembling the Frame at the Sill
Step 5: Inserting Weatherstrip
Step 6: Fixed Panel Assembly
Step 7: Cutting Door Bottom to Length (If Needed)
Step 9: Attaching the Door Bottom
Step 11: Attaching Astragals to the Inactive Panel. (French Units Only)
Step 12: Hinged Panel Assembly
Step 4: Assembling the Mull at the Sill
Endura Force5 Door Unit Assembly Instructions
Table of Contents
Step 13: Attach Alignment Bracket
Step 10: Attaching Door Top (Outswing Units Only)
Step 8: Attaching the Door Bottom Gasket
3. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
3
Step 1: Checking Installation of Z-End Bases (Articulating Cap Sills Only)
If assembling a door unit with a Z-Articulating Cap Sill, be sure to check the installation prior to beginning the installation process.
Align the Z-End Base with the of end of the
sill and Z-Articulating Cap then attach.
Secure Z-End Base to the sill with staples.
Repeat at other end of sill if no Sidelite Cap
is present.
a. a. a.
b. b. b.
Installing the Z-End Base Installing the Z-End Base Mull StiffenerInstalling the Z-End Base Sidelite Gasket
Align the Z-End Base Sidelite Gasket with the
of end of the sill and Sidelite Cap then attach.
Secure Z-End Base Sidelite Gasket to sill with
staples. Repeat at other end of sill if a Sidelite
Cap is present.
Insert the Z-End Base Mull Stiffener into the sill channel
between the Z-Articulating Cap and Sidelite Seat.
Ensure that the Z-End Base Mull Stiffener contacts the
end of the Z-Articulating Cap. Repeat at the other end of
the cap if necessary.
Single, French Sills, Sidelite & Hinged Patio Sills Sidelite & Hinged Patio Sills
b b b
a a a
4. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
4
Step 2: Assembling the Frame and Mull at the Header
For All Door Units
Jamb to header
For Sidelite/ Patio Door Units Only
Mull to Header
For All Door Units
Sidelite/Patio Only
Jamb/Header
Mullion/Header
Sidelite/Patio Only
Note: 3 fasteners are required
in mullion for high wind zone
applications
Mull Assembly - Sill (Cont.) Weatherstrip Insertion
• Insert
weatherstrip
leg fully into
frame kerf
slot
Note: 3 fasteners are required in mull for high wind zone applications.
Use (3) #8 x 1-5/8" or longer
screws to attach the jamb to the
header.
Optional fastener type: 16 ga, 7/16"
x 2" crown staple.
Use (2) #8 x 3" screws to attach
mull to header.
3 fasteners 2 fasteners
Step 3: Assembling the Frame at the Sill
a2: Do not use any caulk on the
bottom of the jamb.
Caulking
under the
tennon is
optional
Option 1: Using three #8x1-5/8"
or longer screws, secure jamb
to sill.
Option 2: Using one #8x1-5/8"
or longer Screw and three 16 ga
7/16"x2" crown staples, secure
jamb to sill.
Note: Assembly applies to both Adjustable and Z- Articulating Caps.
a1: Caulk bottom and side of jamb
tenon.
b: Secure jamb to sill.
Adjustable Sills Only
Adjustable and Articulating Cap Sills/ All Sills
Articulating Cap Sills Only
a1. a2.
5. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
5
For Sidelite/ Patio Door Units Only
Note: Assembly applies to both Adjustable and Z-Articulating Caps, unless otherwise noted.
Step 4: Assembling the Mull at the Sill
If a Mull Boot is used, follow separately issued Mull Boot Instructions
Caulk thoroughly in dam
haunch as shown by dotted
lines above.
b
Caulk mull bottom surfaces
bottom as shown by dotted
lines above.
Remove the protective shipping clip securing the mull stiffener in place.
a Caulking this area
is Optional
e
Mull
Stiffener
2 fasteners
Note: FrameSaver mullions can be pre-drilled
for easier screw attachment.
Note: 3 fasteners are required in mullion for
high wind zone applications.
Note For Articulating Cap Sill Applications:
Carefully insert mullion in place to avoid
damaging Mull Stiffener.
Note: Avoid caulk squeeze out on the Z-End
Base Gasket
d
Caulk inside edge of sill
dam. Caulk substrate joint if
present.
Articulating Cap Sills Only All Sills All Sills
2 fasteners
Apply caulked mull to sill as shown. Use #8 x 3" screws to mount mull to
sill.
Adjustable Sill Shown Articulating Cap Sill Shown
e
All Sills
6. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
6
Step 5: Inserting the Weatherstrip
Insert weatherstrip by fully installing/placing leg fully into frame kerf slot.a.
Note: Do not use weather strip that is too
short or too long.
Note: Do not fold or wrinkle weatherstrip.
• Ends should lightly touch frame face or mating
weatherstrip.
For All Door Units
a
7. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
7
Step 6: Fixed Panel Assembly
Secure to frame with #8 x 2-
1/2" screws.
-Two at the header
-One at the jamb at each
hinge position
-First through the mullion
at each hinge position.
-Next through the jamb at
each hinge position
-Finally through the header
at the center.
- 1 at the center of the
sidelite panels
- 2 evenly spaced for full
sized panels.
a.
b.
c.
d.
Note: For high wind zone
applications, apply #8 x 3"
screw through the bottom of
the sill into the panel.
c. Squeeze extra caulk into the kerf slot in front of sidelite cap to ensure that a proper seal is
created.
a. Apply a continuous bead of caulk
to the stop of the jamb, mull and
head where the sidelite will rest.
b.Apply caulk to the inactive cap as shown. Caulk
throughly in both corners
Caulking for the Fixed Panel Installing Fixed Panels
1/8" Spacers
#8 x 1-1/2" Screws
#8 x 1-1/2" Screws
For Sidelite/ Patio Door Units Only
a
c c
b Place panel into frame opening.
Set tight sidelite seat & mullion
Apply 1/8”spacers
8. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
8
Step 7: Cut Door Bottom to Length (If needed) Step 8: Apply New Door Bottom Gasket
b)
a)
Cut Line
Cut Line
X
Align the Door Bottom with the
panel and mark cut line.
Apply Door Bottom Gasket to
Door Bottom.
• Ensure that the Gasket’s
Solid Edge is aligned flush
with the edge of the Z-AC
Door Bottom, and that the
Door Bottom’s Kerfs are
protruding through the Relief
Slits of the Gasket.
Cut down the Door Bottom to
match the length of the panel
within 1/32".
a)
a)
a)
b)
b)
c)
c1.
c2.
Z- Articulating Cap Sill Kerfed Door Bottoms
For All Door Units
If less than a 1-1/4" notch is left
after cutting down the Door
Bottom, re-notch the Kerfs to
1-1/4" by clipping the kerf legs
Measure and mark the
Kerf legs at 1-1/4" from the
edge of the Door Bottom.
Cut the Kerf leg down
to the base of the door
bottom.
From the edge of the
Door Bottom, trim the
kerf legs at the base back
to the cut made in the
previous step.
c)
Align the Door Bottom Gasket
with the Z-AC Door Bottom.
• The edge with the Kerf Relief
Slots should be facing the
Door Bottom’s Kerfs, while
the solid edge should be
aligned with the outer edge
of the door bottom.
If the Door Bottom Gasket was trimmed off in step 7, apply a NEW Door Bottom
Gasket to the trimmed end of the Z-AC Door Bottom.
Z-AC Door Bottom Gasket
Kerf Relief Slits
Flush
Door Bottom Kerfs
Solid Edge
Kerf Relief Slits
b)
1-1/4" or Greater
1-1/4"
Cut Line
Cut Line
c1. c2.
BE CAREFUL NOT CUT INTO
THE DOOR BOTTOM.
9. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
9
b. Attach Door Bottom with
two 1/2" crown staples and
80 PSI of air pressure at ends
between the rigid ramp and flex
fins.
b. Attach Door Bottom with two 1/2" crown
staples and 80 PSI of air pressure at ends
between the rigid ramp and flex fins.
c. Staple on both sides approximately every 6" along the length of the
door.
1/4" Crown
Staple
1/2" Crown
Staple
Incorrect Size Staple Correct Size Staple
1/2" crown staples should be used to secure the door bottom to the panel.The
use of staples with a shorter crown such as crown 1/4" staples will result in
cracking and damage to the door bottom.
Use 80 PSI of
air pressure
to insert
staples. Endura
suggest using
an air pressure
regulator for best
results.
Staple Position Along the Length of Panel
6”
6”
6”
6”
6”
6”
1/4" 1/2"
PSI
Required Air Pressure
Apply
caulking
along the
bottom
exterior
side kerf leg.
Thoroughly caulk each
end. Secure ends with each with
1/2” x 1/2” light gauge staples
Adjustable or Fixed Sill Door Bottoms
Z- Articulating Cap Sill Staple-On Door Bottoms
Z- Articulating Cap Sill Kerfed Door Bottoms
DO NOT USE ANY CAULK
DO NOT USE ANY CAULK
a. Align door bottom flush with the lock side of the panel and hold in place.
DO NOT USE ANY CAULK
a. Align door bottom flush with the lock side of the panel and insert kerfs into
slots on door. DO NOT USE ANY CAULK
The insertion of staples at an
angle or in the wrong location
will result in damage to the
door bottom
Rigid
Ramp
Rigid
Ramp
Flex Fins
Staples
Note: When stapling the Z-AC Door
bottom to the panel, staples should
be inserted between the Rigid Ramp
and Flex Fins. On all Door bottom
applications, staples should be
aimed away from the kerf slots in
the bottom of the panel to prevent
cracking of the door bottom, or
damage to the kerfs.
CORRECT
Wrong
staple
location
Wrong
staple
location Angled into
kerf
INCORRECT
Step 9: Attaching the Door Bottom
a
a
b
b
c
10. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
10
Step 10: Attaching Door Top. (Outswing Units Only)
Align rigid
lip of Door
Top Seal
with
exterior
face .
Aligh seal
with hinge
stile face.
Attach with light
gauge staples.
Do not staple
flexable fin
Door Top Seal.
Press Door Top Seal firmly
on to the panel along entire
length.
Align rigid
lip of Door
Top Seal
with
exterior
with Hinge
stile face.
8b. Attach Door Top (For Steel Edge Panels)
Note: For Steel Edge Doors skip to 8b.
12. E N D U R A P R O D U C T S > I N S T R U C T I O N S > F O R C E 5 D O O R U N I T A S S E M B L Y I N S T R U C T I O N S
12
Step 13: Attach Alignment Bracket
Attach Spacers
Step 12 Hinged Panel Assembly
Attach hinges
- Top two holes closest to the weatherstrip
- Other hinges on top hole closest to the weatherstrip
• Insert 1/8" Spacers between
the panel and frame at top of
strike corner of active opening
in two locations.
Apply Endura's Door Frame Alignment Bracket to prevent the door frame
from racking and breaking the caulked seals during shipping and installation.
b.
a.
b.
c.
a.
Attaching Hinge on MullAttaching Hinge on Jamb
#10 x 3/4"
Screws
#8 x 2- 1/2"
Screws
If you have any questions, please contact your Endura Sales Representative or call Customer Service: 1-800-334-2006
8817 W. Market St., Colfax, NC 27235
1.800.334.2006 www.enduraproducts.com
The information contained in this document is the confidential and proprietary information and trade secrets of Endura Products, Inc. Any disclosure, use or dissemination of such information
without the express written permission of Endura Products,Inc.is strictly prohibited.Endura Products,Inc.also owns any and all intellectual property rights embodied in such information,including
patent rights, copyrights, and trademark rights, and no license of any intellectual property right is intended, nor should any license be implied, as a result of the receipt of this document.
US Patents: 6,789,358; 7,350,336; 8,522,483; 8,991,100; 8,991,101; D722,388; D638,958; D722,387; D722,388; D713,976 and Patents Pending.
Canadian Patents: 2,771,705; D139,250 and Canadian Patents Pending.
For All Door UnitsFor All Door Units
Secure to panel with #10 x 1" screws
Secure to jamb with #10 x 3/4" screws
For hinge on mull use # 8 x 2- 1/2 screws at: