How DOORS Helps JPL Get to
    Mars and Beyond

   Best Practices in Metrics,
     V&V and Traceability
              Margaret H. Smith
               Jim M. Grimes
               Ross M. Jones
               Trisha Jansma

           Jet Propulsion Laboratory
       California Institute of Technology
Outline

            Overview of DOORS Use at JPL
             Topic 1 Metrics
             Topic 2 Verification and Validation (V&V)
             Topic 3 Traceability




5/24/2012               Caltech – Jet Propulsion Laboratory   M. Smith - 2
JPL use of DOORS at JPL
                      Statistics
      – 800+ users
      – 600+ users have taken our in-house DOORS training.
      – 50 DOORS licenses
      – 50 projects have used DOORS, 22 are active
      – 15 years using DOORS, preceded by 8 years using in-
        house TRACER tool.
      – 5 years of a standard process with in-house training
      – 2 System Analysts for daily project support
      – 1 Full-time Equivalent (FTE) Systems Engineer for
        defining the method, teaching and project
        consultation

5/24/2012               Caltech – Jet Propulsion Laboratory   M. Smith - 3
DOORS Provenance – According to JPL




    Source code and User Guide were         QSS                      Telelogic   IBM Rational
distributed from NASA COSMIC site from    DOORS                       DOORS        DOORS
1990 to ~1995. Developed by the Cassini
    Project and used by JPL and ESA        (1996)                      (2000)       (2008)


           JPL                JPL TRACER            DOORS
         TRACER                mothballed         adopted at
          (1988)                 (1995)            JPL(1996)
       5/24/2012                           Caltech – Jet Propulsion Laboratory    M. Smith - 4
Sample Project Sizes
                                                                    installed
                  Project    # objects       # links     # Modules TTT website
                                                                    size (GB)
               DSN                98995          5709          125          1.9       Large legacy infrastructure project
               SMAP               17278         13311            91         1.9       Medium complexity earth orbiting mission
               GRAIL              36031         30650          123          2.7       Smaller complexity lunar mission (JPL managed)
               SES_JUNO           84844         43526          227          3.6       Large complexity deep space mission (JPL managed)
               MSL                25641          5808          106          1.2       Flagship mission


                                       # Modules                                           Measurements were generated by
                                                                                           the JPL Trace Tree Tool (TTT)
                       0     50       100     150        200      250

                MSL

            SES_JUNO
                                                                          # links
               GRAIL                                                      # objects
                                                                          # Modules
               SMAP

                DSN

                       0    20      40       60       80    100   120
                                  # Links, Objects (Thousands)
                Note: Number of objects includes all objects in formal modules: table cells,
                headers, regular objects with or without text or OLE content. The number of
                          requirements is about one-third the number of objects.
5/24/2012                                     Caltech – Jet Propulsion Laboratory                                      M. Smith - 5
Why Have a Standard Process?
     • DOORS is a general purpose tool and there are many possible ways
       to use it.
     • For the first 15 years we used DOORS, each new project reinvented
       the wheel.
            – Big projects could afford to invent their own method and have internal support.
                • We learned a lot from what the big projects did wrong and did right.
            – We now have more small projects and fewer big projects.
                • Small projects cannot afford to reinvent. Need a ready-made solution.
     • The most common mistake: trying to run the old document-centric
       process in DOORS and not taking advantage of the tool’s
       capabilities.
     • Projects were making mistakes, blaming DOORS, and delaying
       import of requirements into tool as late as possible.
            – Managing requirements in spreadsheets and not getting the benefits of early
              sharing and collaboration.


5/24/2012                           Caltech – Jet Propulsion Laboratory                 M. Smith - 6
What Has and Hasn’t Been Standardized?
Has
•   Ownership, allocation and negotiation mechanism
•   Attributes and their definitions – for requirements and V&V planning/tracking
•   Views – requirements traceability, allocation status, requirements to V&V traceability
•   High-level requirements template, boilerplate material
•   Scripts – Requirement Maturity Metrics, and V&V Burndown and Statistics, and numerous housekeeping
    scripts used by DOORS System Analysts (SAs).
•   Tools – Trace Tree Tool for graphically displaying individual requirements traceability and project
    requirements flow-down.
•   Practices – the JPL Systems Engineering practices that culminate in requirements.
•   Licensing and Support – the JPL institution purchases DOORS licenses for use by all projects and funds two
    Systems Analysts (support).
•   Training/Deployment – Engineers who are involved in requirements work attend a JPL developed course
    that teaches basic DOORS skills and the JPL standard method for development requirements and tracking
    verification in DOORS.
Hasn’t
•   Requirements levels and element decomposition
•   Detailed requirements templates
•   DOORS collaboration method with partners and subcontractors

    We owe the success of the JPL Institutional Requirements and V&V Tracking process and training
     program to Richard Stoller (retired), and Karen Boyle (who sadly passed away in February, 2011).

5/24/2012                               Caltech – Jet Propulsion Laboratory                         M. Smith - 7
Topic 1                       Metrics

•   Maturity Definition:
      +     V&V Method/Approach defined
      +     Rationale defined
      +     Linked to parent(s)
      +     Links exist to this requirement from Satisfiers (including V&V activities)
      +     Satisfier (lower level owner) accepts allocated requirement
      –     TBD, TBR, TBCs

•   Requirement Maturity Metric script:
      – Implemented in DOORS Extension Language (DXL)
      – Generates per module statistics across all modules in a Project, one module per
        row
      – Produces .csv file of statistics.
      – Project can customize output to suit their Project Management/reporting needs.
      – Provides a quick summary of requirement progress and facilitates comparison
        between modules.



5/24/2012                             Caltech – Jet Propulsion Laboratory                M. Smith - 8
Example
            Unknown                           Allocations
            capability?     Gold           undecided or under
                            plating?          negotiation




                                 3
                              219




5/24/2012     Caltech – Jet Propulsion Laboratory               M. Smith - 9
What Has Changed Today?
             Daily email to Project’s requirements owner
            Assessing Requirements activity and churn




               Module name


              Requirement number


            Type of change
              Requirements are marked Modified if any
              attribute, with the setting Affect change dates
              turned on, has been changed since the last time
              this report was generated.




5/24/2012                   Caltech – Jet Propulsion Laboratory   M. Smith - 10
Topic 2
                                 Verification
                            Planning and Tracking

                                                                                                 Other benefits:
•   JPL Projects have                                                                            • Lower tooling cost–
                                                                                                    use existing
    been recording
                                                                                                    institutionally
    Verification                                                                                    supported tool and
    information in                                                                                  support
    DOORS for the last
    10 years.                                                                          •   Enables useful views of
                                                                                           requirements, verification
•   Initial benefit -- requirements                                                        planning & status, and
    changes were immediately visible                                                       verification events.
    to engineers responsible for                                                •   Projects can use as-is or customize a
    verifying requirements because                                                  generic DXL script to generate
    verification activity artifacts and                                             verification statistics and graphics.
    verification events were now
    linked directly to requirements                                   •   Saves projects money through reuse of
                                                                          tooling and method.

     5/24/2012                            Caltech – Jet Propulsion Laboratory                             M. Smith - 11
Verification Process
       Project
     Verification
      Planning

  Get DOORS                 Verification                      Verification                        Verification
   Training /                 Activity                          Activity                            Status
  consulting                 Planning                          Execution                           Reporting

                               Verification                    Execute VA
                              Activity Groups              procedure, analyze                     Generate V&V
    Requirements                  defined                results and determine                   burndown charts
    Development                                                   status                         and statistics and
                                                                                                    present at
                      Reqmts to VA                                    Record status of             management
                        mapping                                      the VA (procedure)              meetings
                        captured                                        run and create
  Develop V&V
  method, venue                                                        problem/failure
  and approach                                                       reports (if needed)
                              Schedule VA                                                               Take corrective
                                activity                                                                   action (if
                            completion (need                                                              necessary)
                                by) date
                                                              Cognizant person
                                                                approves VA
                                                              execution result
                           Plans and procedures
                            developed outside
                            DOORS and hyper-                                 Cognizant person
                         linked from the DOORS                               approves that the
                                    VA                                        requirement has
                                                                                been verified
5/24/2012                    Caltech – Jet Propulsion Laboratory                                   M. Smith - 12
Verification Elements
Definitions
VI – Verification Item, is anything that needs to be verified. All requirements
become Vis when they are being verified.

VA – Verification Activity. The testing activities described in a single Test
Plan, Procedure or Analysis. A group of associated VAs are a VA Group (VAG)                  Test Data Directory
                                                                                                       1
VE – Verification Event. A run or execution of a VA.

                                                                                                              1
                                                      0..1                Test
                                 Test Plan                                                   Activity Report (AR)
                                                                                                        1
                                                             1..M      Procedure
                                           0..1                                                        1
       In Other Tools                                                 0..M
       In DOORS
                                                  1                    1                                      1
                             1..M                                                1
   Verification Item (VI)                     Verification Activity (VA)                    Verification Event (VE)
                                    1..M                                             1..M
                                                                                            VE data elements originate in the AR
                                                  Verification Activity                     and are pushed to VE to complete
                                                                                            the status picture.
                                                     Group (VAG)
   5/24/2012                               Caltech – Jet Propulsion Laboratory                             M. Smith - 13
Verification Attributes
                                                                                                     Test Data Directory
                                                                                                            1

                                    Test Plan            0..1            Test Procedure                           1
                              • version                         1..M • version                       Activity Report (AR)
                                           0..1                          0..M
                                                     1               1
                                                                VA                                           1
        VI or ITL item                            • activity name or activity                                      1
•object identifier (ID)                             group name
•statement of requirement                         • VA priority                                                  VE
•rationale                                        • VA status                                    •   VA id (a reference)
•….                                  1..M         • VA owner                              0..M   •   …. data imported from AR
•method                      1..M                 • venue                                        •   url of Activity Report
                                                                                 1
•verification approach                            • date scheduled (for                          •   url of test data directory
•audit status                                       completion)
•audit completed on (date)                        • date completed
•audited by                                       • plans and procedures
                                                  • PFRs


 Requirements
                                          V&V Activity Planning                                  V&V Activity Execution
 Development

                                                    V&V Status Reporting


   5/24/2012                                 Caltech – Jet Propulsion Laboratory                                  M. Smith - 14
Project Module Configurations
VIM – Verification Item (Requirements) Module
VAM – Verification Activity Module
VEM – Verification Event Module


             VIM                                      VAM
                                                                                   Multiple VAMs reflecting the
       VIM          VIM                         VAM         VAM              VEM   Project’s requirements
                                                                                   structure or V&V organization.
 VIM          VIM      VIM             VAM        VAM         VAM


             VIM
                                                                                   A single VAM for the Project’s
                                                                                   complete requirement tree
       VIM          VIM                               VAM                    VEM   • partition VAM to give owners
                                                                                     granular write access
 VIM          VIM      VIM


              VIM
                                                                                   Combined VAM and VEM for
                                                                                   projects that only need
        VIM         VIM                                     VAM     /   VEM        information on the latest
                                                                                   run/execution.
5/24/2012
  VIM         VIM         VIM               Caltech – Jet Propulsion Laboratory                    M. Smith - 15
Verification Item (VI) Burndown
                                 250




                                                                                                                                                                                               Current date
                                                                                                              Not Confirmed
Number of Items to be Verified




                                 200
                                                                                                                                                      Actual
                                                                                                                                                      (auto status)

                                                  A pick list allows selection of
                                 150
                                                  any group of VIMs for this
                                                  chart.

                                 100                                                                                                                                                                                                                                               Scheduled


                                                                     Not Scheduled
                                 50




                                   0
                                                                                                               4/1/2008
                                       1/8/2008



                                                                2/5/2008



                                                                                       3/4/2008




                                                                                                                                                                                                              7/8/2008



                                                                                                                                                                                                                                     8/5/2008



                                                                                                                                                                                                                                                            9/2/2008




                                                                                                                                                                                                                                                                                                                                                   12/9/2008



                                                                                                                                                                                                                                                                                                                                                                            1/6/2009
                                                    1/22/2008



                                                                           2/19/2008



                                                                                                  3/18/2008



                                                                                                                          4/15/2008

                                                                                                                                      4/29/2008

                                                                                                                                                   5/13/2008

                                                                                                                                                               5/27/2008

                                                                                                                                                                           6/10/2008

                                                                                                                                                                                       6/24/2008



                                                                                                                                                                                                                         7/22/2008



                                                                                                                                                                                                                                                8/19/2008



                                                                                                                                                                                                                                                                       9/16/2008

                                                                                                                                                                                                                                                                                   9/30/2008

                                                                                                                                                                                                                                                                                               10/14/2008

                                                                                                                                                                                                                                                                                                            10/28/2008

                                                                                                                                                                                                                                                                                                                         11/11/2008

                                                                                                                                                                                                                                                                                                                                      11/25/2008



                                                                                                                                                                                                                                                                                                                                                               12/23/2008
                                                                              Count of VIs (modules included selected from pick list):
                                                                              Scheduled
                                                                              Scheduled       = total number of VIs remaining to be completed per schedule
                                                                              Not Completed = total number of VIs remaining to be completed actually
                                                                              Actual                          Interval End Date
                                                                              Not Confirmed = total number of VIs remaining to be Confirmed-Final
                                                                              Not Confirmed
                                                                              Not Scheduled   = total number of VIs remaining to be completed but not scheduled

                           5/24/2012                                                                                                              Caltech – Jet Propulsion Laboratory                                                                                                                               R. Stoller, K. Boyle - 16
Verification Activity Burndown
                                      16
                                                                                                Actual
                                      14
Number of Activities to be Verified




                                      12
                                                                                                Scheduled
                                      10


                                       8               Not Scheduled
                                       6
                                             A pick list allows selection of
                                       4     any group of VAs for this
                                             chart.
                                       2


                                       0




                                                       Scheduled Scheduled - Count of notof VAs remaining to be completed per schedule
                                                                    = total number completed linked VAs scheduled to be completed
                                                       Actual     Not Completed - Count ofof VAs remaining to be completed actually
                                                                    = total number not completed linked VAs remaining to be
                                                                  completed                                             (Actual)
                                                       Not Scheduled = total number of VAsnot scheduled completed and are not
                                                                  Not Scheduled - completed-NF or that are not
                                                                        scheduled

                                       5/24/2012                               Caltech – Jet Propulsion Laboratory                  R. Stoller, K. Boyle - 17
Verification Item Statistics                                                                                     "Bad" if > 0
                                                                                                                                         "Neutral"
                                                                                                                                         "Good"
                        from V&V Burndown Script that generates data to Excel                                                            "Normal"

Count of VIs in VIMs (shall statements only)
    A:         B:       C:        D:         E:           F:         G:         H:         I:         J:         K:           L          M:             N:

                        VIs       VIs       VIs                       VIs Not     VIs     VIs Not VIs Not                   VIs Not VIs Not V&V Engr
  VIM                Linked to Linked to Linked to VIs Auto VIs Conf Linked to Linked to Linked to Auto                      Conf Verif and Responsible
 NAME       Total VIs VAM        VAGs       VAs      Verif   Verif     VAM       Reject     a VA   Verif                     Verif   Late for this VIM

VIM1            625       600          15     575          200        150            25         10         50     425          450             5 John
                                                                                                                                                 Jones

VIM2            500       500          10     485          100            75          0          5         15     400             etc          5 Susie
                                                                                                                                                 Jones

VIM3           1000     1000            0    1000               0          0          0          0          0    1000             etc          0 Mary
                                                                                                                                                 Smith
…                   …        …         etc        etc          etc        etc        etc        etc        etc        etc         etc       etc

VIM n           200       200           5     190              25          5          0          5         10     175             etc          0

    Total      2325     2300           30    2250          325        230            25         20         75    1975             etc         10


Relationships: B=C+H; I is not included in D; E=C-I-D; J=B-E=H+I+D; K=B-F; L=B-G
M = VIs not auto verified AND scheduled completion date is missed or has not been scheduled or is not
linked. Any object containing the word “shall” enclosed in quotes (“shall”) is not included in any statistic.
5/24/2012                                               Caltech – Jet Propulsion Laboratory                                       R. Stoller, K. Boyle - 18
Verification Activity Statistics                                                                       "Bad" if > 0
                        from V&V Burndown Script that generates data to Excel                                          "Neutral"
                                                                                                                       "Good"
                                                                                                                       "Normal"


             # of VI    Are VAs Fully                            ** Is there a VA Are there any    Schedule Days
   VA        Parent     Linked to VIs                   VA Sched- Plan &/or a     Suspicious VI   Remaining (if not   V&V Engineer /
 NAME*        Links          ?            VA Status       uled?    Procedure?        Links?         completed)         Owner of VA

VA-x               25       Yes         Blank           08/10/09          No                Yes                   10 Jack Jones




VA-y               20       Yes         Completed-NF 07/26/09             Yes               No                    -5 Mary Jones




VA-z              100       Yes         Completed       No                Yes               No                        Susie Que

…                 350        …          Blank           No                No                No            Not Sched Tom Smith




VA-n               55       Yes         Blank           08/20/09          Yes               Yes                   20 Susie Smith




    * VAs are organized in VAM under VAGs and sub-header VAGs, but tabulated separately here.
    ** Identifies if there is an http entry in the Plan and Procedure attribute.

 5/24/2012                                            Caltech – Jet Propulsion Laboratory                    R. Stoller, K. Boyle -19
Topic 3      DOORS Trace Tree Tool (T3)
JPL has parent-to-child requirements relationships where a parent has 1 to tens of
children, and links between levels can be many-to-many. We have trouble seeing the
forest for the trees and navigating requirements flow within DOORS.

• Primary Motivations
      – Provide JPL users with an alternative graphical presentation of
        requirement flow (links)
      – Allows navigation of requirements based on hierarchy or flow
      – Enables seamless navigation between modules following flow-
        down/links
      – Provides easy access via Web-based, platform independent interface
• Secondary Motivation - evolved with implementation
      – Provide an indication of timeliness of requirements flow-down
      – Provide an efficient way to checkout verification planning
• History
      – Conceived and developed by a JPL Software Systems Engineer (James
        Grimes) in 2006
      – Enthusiastically used by 8 JPL Flight Projects

5/24/2012                    Caltech – Jet Propulsion Laboratory          J. Grimes - 20
Trace Tree Tool View – Example Index Page




    ProjX
    ProjX
    ProjX
    ProjX
    ProjX
   •••




5/24/2012      Caltech – Jet Propulsion Laboratory   J. Grimes - 21
Project Map




               Number of links/flowed-down requirements appear on edges




5/24/2012    Caltech – Jet Propulsion Laboratory             M. Smith - 22
Module Page
            ProjX




  •••




            …….
5/24/2012           Caltech – Jet Propulsion Laboratory   J. Grimes - 23
Requirement Page




                            ………………….                         ……..



            Attributes continue below
5/24/2012                      Caltech – Jet Propulsion Laboratory   J. Grimes - 24
Object Text Graphic



                                                                                  ………………………
    …………..                                                                        ………………………
………………………                                  …………..                ……………………….
………………..                                ………………..
                                           …………..                ………………………




            Attributes continue below




5/24/2012                                   Caltech – Jet Propulsion Laboratory        J. Grimes - 25
Verification Approach Graphic




                                                                                    ……………
                                                                              ……………………………
                                                                              ……………………………
                                                                              ……………………………
                                                                              ……………………………

                            ……………
                      ……………………………
                      ……………………………
                      ……………………………
                      ……………………………
                      ……


            Attributes continue below




5/24/2012                               Caltech – Jet Propulsion Laboratory          J. Grimes - 26
Typical DOORS T3 User Scenarios
 • Quickly obtain the contents of a requirement with a known ID
       – Main page      Module page          Requirement number
 • Scan a particular Project module for a specific requirement
       – Main page Module page, then
          • Scroll up and down at web browser speeds
          • Use browser’s find capability (not as flexible as DOORS, but faster)
 • Trace requirements flow-down starting at any requirement
       – Click on boxes in graph going up- or downstream in requirements flow
       – Go from there to text, attributes
 • Obtain immediate visual indication of timeliness of flow-down
       – E.g., has upstream requirement X been updated more recently than my
         requirement? If yes, then it’s red. Actual date is shown on X’s page.
       – Is flow-down complete? Does the requirement have a parent?
 • Provide supportive evidence during Project Reviews
       – Quickly show existence of flow-down
       – Quickly show V&V attribute, implementation status (if in attribute)
5/24/2012                       Caltech – Jet Propulsion Laboratory            J. Grimes - 27
DOORS Trace Tree Tool (T3)
            High-Level Process/Execution Flow




5/24/2012             Caltech – Jet Propulsion Laboratory   T. Jansma - 28
Development Tools Used
• DXL – DOORS eXtension Language, a DOORS proprietary C-like, object-
    oriented language available within the DOORS client
• Perl – a scripting language widely available on UNIX, Mac OS X, Linux,
    Windows
• Graphviz – open source Graph Visualization software developed at AT&T
    that includes the Dot language and dot program for drawing directed
    graphs
•   XML and Perl/C-based XML parsing software – open source software
•   Java for processing images
•   Standard UNIX utilities such as date, rm, ls, rsync, etc.
•   SVN – Subversion open-source version control tool



5/24/2012                   Caltech – Jet Propulsion Laboratory     J. Grimes - 29
JPL’s Direction with DOORS
•    Systems Engineers on JPL Projects are starting to infuse Model Based
     Systems Engineer / SysML.
      – Modeling includes architecture, behavior and resources.
      – Many pockets of discipline specific modeling tools exist in the Spacecraft
        subsystem organizations
      – Vision is to use a central, standards based repository to interconnect and
        exchange model data.
      – Requirements will still be important but there is now an opportunity to
        augment requirements with more extensive and formal designs.
•    Small and technology development Projects may need a lighter weight
     DOORS-based process.
                                                                                       Aimed at
•    JPL is working on more partnership projects. Module exchange needs to be          influencing,
     negotiated and piloted early.                                                     sharing
                                                                                       Lessons
•    We are piloting a Requirements Architecture, table-top review that will           Learned and
     occur before Project and System requirements are developed.                       emerging best
                                                                                       practices.
•    We have begun teaching just-in-time DOORS and process classes directly
     to and with Flight Projects.

    5/24/2012                          Caltech – Jet Propulsion Laboratory           M. Smith - 30

More Related Content

Similar to How DOORS Helps JPL Get to Mars & Beyond

geecon 2013 - Standards for the Future of Java Embedded
geecon 2013 - Standards for the Future of Java Embeddedgeecon 2013 - Standards for the Future of Java Embedded
geecon 2013 - Standards for the Future of Java EmbeddedWerner Keil
 
Saurabh_Mainframe_7_years_Resume
Saurabh_Mainframe_7_years_ResumeSaurabh_Mainframe_7_years_Resume
Saurabh_Mainframe_7_years_ResumeSaurabh Chaurasia
 
M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)
M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)
M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)Werner Keil
 
Ramesh_LTE(2)
Ramesh_LTE(2)Ramesh_LTE(2)
Ramesh_LTE(2)Ramesh M
 
System Development Life Cycle Overview.ppt
System Development Life Cycle Overview.pptSystem Development Life Cycle Overview.ppt
System Development Life Cycle Overview.pptKENNEDYDONATO1
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectivePraveen Srivastava
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectivePraveen Srivastava
 
Model based engineering tutorial thomas consulting 4_sep13-1
Model based engineering tutorial thomas consulting 4_sep13-1Model based engineering tutorial thomas consulting 4_sep13-1
Model based engineering tutorial thomas consulting 4_sep13-1seymourmedia
 
Randall.taylor
Randall.taylorRandall.taylor
Randall.taylorNASAPMC
 
Internet of Things Environment for Service Creation and Testing (IoT.est)
Internet of Things Environment for Service Creation and Testing (IoT.est)Internet of Things Environment for Service Creation and Testing (IoT.est)
Internet of Things Environment for Service Creation and Testing (IoT.est)iotest
 
The Eclipse M2M IWG and Standards for the Internet of Things
The Eclipse M2M IWG and Standards for the Internet of ThingsThe Eclipse M2M IWG and Standards for the Internet of Things
The Eclipse M2M IWG and Standards for the Internet of ThingsWerner Keil
 
M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013
M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013
M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013Werner Keil
 
Atul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul Kumar
 
Ameya_Kasbekar_Resume
Ameya_Kasbekar_ResumeAmeya_Kasbekar_Resume
Ameya_Kasbekar_ResumeAmeya Kasbekar
 

Similar to How DOORS Helps JPL Get to Mars & Beyond (20)

Madhu_Resume
Madhu_ResumeMadhu_Resume
Madhu_Resume
 
geecon 2013 - Standards for the Future of Java Embedded
geecon 2013 - Standards for the Future of Java Embeddedgeecon 2013 - Standards for the Future of Java Embedded
geecon 2013 - Standards for the Future of Java Embedded
 
Resume
ResumeResume
Resume
 
smrutikanta jena
smrutikanta jenasmrutikanta jena
smrutikanta jena
 
Saurabh_Mainframe_7_years_Resume
Saurabh_Mainframe_7_years_ResumeSaurabh_Mainframe_7_years_Resume
Saurabh_Mainframe_7_years_Resume
 
M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)
M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)
M4M 2 the Rescue of M2M (Eclipse DemoCamp Trondheim)
 
Ramesh_LTE(2)
Ramesh_LTE(2)Ramesh_LTE(2)
Ramesh_LTE(2)
 
System Development Life Cycle Overview.ppt
System Development Life Cycle Overview.pptSystem Development Life Cycle Overview.ppt
System Development Life Cycle Overview.ppt
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Model based engineering tutorial thomas consulting 4_sep13-1
Model based engineering tutorial thomas consulting 4_sep13-1Model based engineering tutorial thomas consulting 4_sep13-1
Model based engineering tutorial thomas consulting 4_sep13-1
 
My C.V
My C.VMy C.V
My C.V
 
Randall.taylor
Randall.taylorRandall.taylor
Randall.taylor
 
Internet of Things Environment for Service Creation and Testing (IoT.est)
Internet of Things Environment for Service Creation and Testing (IoT.est)Internet of Things Environment for Service Creation and Testing (IoT.est)
Internet of Things Environment for Service Creation and Testing (IoT.est)
 
The Eclipse M2M IWG and Standards for the Internet of Things
The Eclipse M2M IWG and Standards for the Internet of ThingsThe Eclipse M2M IWG and Standards for the Internet of Things
The Eclipse M2M IWG and Standards for the Internet of Things
 
Muruganandam_7years
Muruganandam_7yearsMuruganandam_7years
Muruganandam_7years
 
M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013
M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013
M4M 2 the Rescue of M2M - Eclipse DemoCamps Fall 2013
 
Atul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS Consultant
 
Ameya_Kasbekar_Resume
Ameya_Kasbekar_ResumeAmeya_Kasbekar_Resume
Ameya_Kasbekar_Resume
 
Resume shaik ahamed_ali_tousif upd
Resume shaik ahamed_ali_tousif updResume shaik ahamed_ali_tousif upd
Resume shaik ahamed_ali_tousif upd
 

More from Bill Duncan

Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...
Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...
Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...Bill Duncan
 
Ibm bluemix—from idea to application by karim abousedera
Ibm bluemix—from idea to application by karim abousederaIbm bluemix—from idea to application by karim abousedera
Ibm bluemix—from idea to application by karim abousederaBill Duncan
 
IBM Federal Systems Integrator Forum at InterConnect
IBM Federal Systems Integrator Forum at InterConnectIBM Federal Systems Integrator Forum at InterConnect
IBM Federal Systems Integrator Forum at InterConnectBill Duncan
 
Create software builds with jazz team build
Create software builds with jazz team buildCreate software builds with jazz team build
Create software builds with jazz team buildBill Duncan
 
Space Quarterly: September 2011
Space Quarterly:  September 2011Space Quarterly:  September 2011
Space Quarterly: September 2011Bill Duncan
 
Tutorial: Create a custom work item in Rational Team Concert
Tutorial: Create a custom work item in Rational Team ConcertTutorial: Create a custom work item in Rational Team Concert
Tutorial: Create a custom work item in Rational Team ConcertBill Duncan
 
How to implement access restrictions to your EA artifacts using Rational Syst...
How to implement access restrictions to your EA artifacts using Rational Syst...How to implement access restrictions to your EA artifacts using Rational Syst...
How to implement access restrictions to your EA artifacts using Rational Syst...Bill Duncan
 
Speed delivery of Android devices and applications with model-driven development
Speed delivery of Android devices and applications with model-driven developmentSpeed delivery of Android devices and applications with model-driven development
Speed delivery of Android devices and applications with model-driven developmentBill Duncan
 
Optimize load handling for high-volume tests with IBM Rational Performance Te...
Optimize load handling for high-volume tests with IBM Rational Performance Te...Optimize load handling for high-volume tests with IBM Rational Performance Te...
Optimize load handling for high-volume tests with IBM Rational Performance Te...Bill Duncan
 
Improve software development project success with better information
Improve software development project success with better informationImprove software development project success with better information
Improve software development project success with better informationBill Duncan
 
Automate document generation from SysML models with Rational Rhapsody Reporte...
Automate document generation from SysML models with Rational Rhapsody Reporte...Automate document generation from SysML models with Rational Rhapsody Reporte...
Automate document generation from SysML models with Rational Rhapsody Reporte...Bill Duncan
 
Automate document generation from sys ml models with rational rhapsody report...
Automate document generation from sys ml models with rational rhapsody report...Automate document generation from sys ml models with rational rhapsody report...
Automate document generation from sys ml models with rational rhapsody report...Bill Duncan
 
Inadequate Security Practices Expose Key NASA Network to Cyber Attack
Inadequate Security Practices Expose Key NASA Network to Cyber AttackInadequate Security Practices Expose Key NASA Network to Cyber Attack
Inadequate Security Practices Expose Key NASA Network to Cyber AttackBill Duncan
 
Integrate Rational DOORS and Rational Team Concert change management
Integrate Rational DOORS and Rational Team Concert change managementIntegrate Rational DOORS and Rational Team Concert change management
Integrate Rational DOORS and Rational Team Concert change managementBill Duncan
 
IBM Rational Harmony Deskbook rel 3.1.2
IBM Rational Harmony Deskbook rel 3.1.2IBM Rational Harmony Deskbook rel 3.1.2
IBM Rational Harmony Deskbook rel 3.1.2Bill Duncan
 
Advanced Rational Performance Tester reports
Advanced Rational Performance Tester reportsAdvanced Rational Performance Tester reports
Advanced Rational Performance Tester reportsBill Duncan
 
Developing service component architecture applications using rational applica...
Developing service component architecture applications using rational applica...Developing service component architecture applications using rational applica...
Developing service component architecture applications using rational applica...Bill Duncan
 
Managing requirements across Analysis and Design phases using System Architec...
Managing requirements across Analysis and Design phases using System Architec...Managing requirements across Analysis and Design phases using System Architec...
Managing requirements across Analysis and Design phases using System Architec...Bill Duncan
 
What's New in Rational Team Concert 3.0
What's New in Rational Team Concert 3.0What's New in Rational Team Concert 3.0
What's New in Rational Team Concert 3.0Bill Duncan
 
Automatic Proactive Troubleshooting with IBM Rational Build Forge
Automatic Proactive Troubleshooting with IBM Rational Build ForgeAutomatic Proactive Troubleshooting with IBM Rational Build Forge
Automatic Proactive Troubleshooting with IBM Rational Build ForgeBill Duncan
 

More from Bill Duncan (20)

Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...
Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...
Red Hat Accredited Professional - Red Hat Sales Specialist Infrastructure as ...
 
Ibm bluemix—from idea to application by karim abousedera
Ibm bluemix—from idea to application by karim abousederaIbm bluemix—from idea to application by karim abousedera
Ibm bluemix—from idea to application by karim abousedera
 
IBM Federal Systems Integrator Forum at InterConnect
IBM Federal Systems Integrator Forum at InterConnectIBM Federal Systems Integrator Forum at InterConnect
IBM Federal Systems Integrator Forum at InterConnect
 
Create software builds with jazz team build
Create software builds with jazz team buildCreate software builds with jazz team build
Create software builds with jazz team build
 
Space Quarterly: September 2011
Space Quarterly:  September 2011Space Quarterly:  September 2011
Space Quarterly: September 2011
 
Tutorial: Create a custom work item in Rational Team Concert
Tutorial: Create a custom work item in Rational Team ConcertTutorial: Create a custom work item in Rational Team Concert
Tutorial: Create a custom work item in Rational Team Concert
 
How to implement access restrictions to your EA artifacts using Rational Syst...
How to implement access restrictions to your EA artifacts using Rational Syst...How to implement access restrictions to your EA artifacts using Rational Syst...
How to implement access restrictions to your EA artifacts using Rational Syst...
 
Speed delivery of Android devices and applications with model-driven development
Speed delivery of Android devices and applications with model-driven developmentSpeed delivery of Android devices and applications with model-driven development
Speed delivery of Android devices and applications with model-driven development
 
Optimize load handling for high-volume tests with IBM Rational Performance Te...
Optimize load handling for high-volume tests with IBM Rational Performance Te...Optimize load handling for high-volume tests with IBM Rational Performance Te...
Optimize load handling for high-volume tests with IBM Rational Performance Te...
 
Improve software development project success with better information
Improve software development project success with better informationImprove software development project success with better information
Improve software development project success with better information
 
Automate document generation from SysML models with Rational Rhapsody Reporte...
Automate document generation from SysML models with Rational Rhapsody Reporte...Automate document generation from SysML models with Rational Rhapsody Reporte...
Automate document generation from SysML models with Rational Rhapsody Reporte...
 
Automate document generation from sys ml models with rational rhapsody report...
Automate document generation from sys ml models with rational rhapsody report...Automate document generation from sys ml models with rational rhapsody report...
Automate document generation from sys ml models with rational rhapsody report...
 
Inadequate Security Practices Expose Key NASA Network to Cyber Attack
Inadequate Security Practices Expose Key NASA Network to Cyber AttackInadequate Security Practices Expose Key NASA Network to Cyber Attack
Inadequate Security Practices Expose Key NASA Network to Cyber Attack
 
Integrate Rational DOORS and Rational Team Concert change management
Integrate Rational DOORS and Rational Team Concert change managementIntegrate Rational DOORS and Rational Team Concert change management
Integrate Rational DOORS and Rational Team Concert change management
 
IBM Rational Harmony Deskbook rel 3.1.2
IBM Rational Harmony Deskbook rel 3.1.2IBM Rational Harmony Deskbook rel 3.1.2
IBM Rational Harmony Deskbook rel 3.1.2
 
Advanced Rational Performance Tester reports
Advanced Rational Performance Tester reportsAdvanced Rational Performance Tester reports
Advanced Rational Performance Tester reports
 
Developing service component architecture applications using rational applica...
Developing service component architecture applications using rational applica...Developing service component architecture applications using rational applica...
Developing service component architecture applications using rational applica...
 
Managing requirements across Analysis and Design phases using System Architec...
Managing requirements across Analysis and Design phases using System Architec...Managing requirements across Analysis and Design phases using System Architec...
Managing requirements across Analysis and Design phases using System Architec...
 
What's New in Rational Team Concert 3.0
What's New in Rational Team Concert 3.0What's New in Rational Team Concert 3.0
What's New in Rational Team Concert 3.0
 
Automatic Proactive Troubleshooting with IBM Rational Build Forge
Automatic Proactive Troubleshooting with IBM Rational Build ForgeAutomatic Proactive Troubleshooting with IBM Rational Build Forge
Automatic Proactive Troubleshooting with IBM Rational Build Forge
 

Recently uploaded

Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 

Recently uploaded (20)

Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 

How DOORS Helps JPL Get to Mars & Beyond

  • 1. How DOORS Helps JPL Get to Mars and Beyond Best Practices in Metrics, V&V and Traceability Margaret H. Smith Jim M. Grimes Ross M. Jones Trisha Jansma Jet Propulsion Laboratory California Institute of Technology
  • 2. Outline Overview of DOORS Use at JPL Topic 1 Metrics Topic 2 Verification and Validation (V&V) Topic 3 Traceability 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 2
  • 3. JPL use of DOORS at JPL Statistics – 800+ users – 600+ users have taken our in-house DOORS training. – 50 DOORS licenses – 50 projects have used DOORS, 22 are active – 15 years using DOORS, preceded by 8 years using in- house TRACER tool. – 5 years of a standard process with in-house training – 2 System Analysts for daily project support – 1 Full-time Equivalent (FTE) Systems Engineer for defining the method, teaching and project consultation 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 3
  • 4. DOORS Provenance – According to JPL Source code and User Guide were QSS Telelogic IBM Rational distributed from NASA COSMIC site from DOORS DOORS DOORS 1990 to ~1995. Developed by the Cassini Project and used by JPL and ESA (1996) (2000) (2008) JPL JPL TRACER DOORS TRACER mothballed adopted at (1988) (1995) JPL(1996) 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 4
  • 5. Sample Project Sizes installed Project # objects # links # Modules TTT website size (GB) DSN 98995 5709 125 1.9 Large legacy infrastructure project SMAP 17278 13311 91 1.9 Medium complexity earth orbiting mission GRAIL 36031 30650 123 2.7 Smaller complexity lunar mission (JPL managed) SES_JUNO 84844 43526 227 3.6 Large complexity deep space mission (JPL managed) MSL 25641 5808 106 1.2 Flagship mission # Modules Measurements were generated by the JPL Trace Tree Tool (TTT) 0 50 100 150 200 250 MSL SES_JUNO # links GRAIL # objects # Modules SMAP DSN 0 20 40 60 80 100 120 # Links, Objects (Thousands) Note: Number of objects includes all objects in formal modules: table cells, headers, regular objects with or without text or OLE content. The number of requirements is about one-third the number of objects. 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 5
  • 6. Why Have a Standard Process? • DOORS is a general purpose tool and there are many possible ways to use it. • For the first 15 years we used DOORS, each new project reinvented the wheel. – Big projects could afford to invent their own method and have internal support. • We learned a lot from what the big projects did wrong and did right. – We now have more small projects and fewer big projects. • Small projects cannot afford to reinvent. Need a ready-made solution. • The most common mistake: trying to run the old document-centric process in DOORS and not taking advantage of the tool’s capabilities. • Projects were making mistakes, blaming DOORS, and delaying import of requirements into tool as late as possible. – Managing requirements in spreadsheets and not getting the benefits of early sharing and collaboration. 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 6
  • 7. What Has and Hasn’t Been Standardized? Has • Ownership, allocation and negotiation mechanism • Attributes and their definitions – for requirements and V&V planning/tracking • Views – requirements traceability, allocation status, requirements to V&V traceability • High-level requirements template, boilerplate material • Scripts – Requirement Maturity Metrics, and V&V Burndown and Statistics, and numerous housekeeping scripts used by DOORS System Analysts (SAs). • Tools – Trace Tree Tool for graphically displaying individual requirements traceability and project requirements flow-down. • Practices – the JPL Systems Engineering practices that culminate in requirements. • Licensing and Support – the JPL institution purchases DOORS licenses for use by all projects and funds two Systems Analysts (support). • Training/Deployment – Engineers who are involved in requirements work attend a JPL developed course that teaches basic DOORS skills and the JPL standard method for development requirements and tracking verification in DOORS. Hasn’t • Requirements levels and element decomposition • Detailed requirements templates • DOORS collaboration method with partners and subcontractors We owe the success of the JPL Institutional Requirements and V&V Tracking process and training program to Richard Stoller (retired), and Karen Boyle (who sadly passed away in February, 2011). 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 7
  • 8. Topic 1 Metrics • Maturity Definition: + V&V Method/Approach defined + Rationale defined + Linked to parent(s) + Links exist to this requirement from Satisfiers (including V&V activities) + Satisfier (lower level owner) accepts allocated requirement – TBD, TBR, TBCs • Requirement Maturity Metric script: – Implemented in DOORS Extension Language (DXL) – Generates per module statistics across all modules in a Project, one module per row – Produces .csv file of statistics. – Project can customize output to suit their Project Management/reporting needs. – Provides a quick summary of requirement progress and facilitates comparison between modules. 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 8
  • 9. Example Unknown Allocations capability? Gold undecided or under plating? negotiation 3 219 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 9
  • 10. What Has Changed Today? Daily email to Project’s requirements owner Assessing Requirements activity and churn Module name Requirement number Type of change Requirements are marked Modified if any attribute, with the setting Affect change dates turned on, has been changed since the last time this report was generated. 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 10
  • 11. Topic 2 Verification Planning and Tracking Other benefits: • JPL Projects have • Lower tooling cost– use existing been recording institutionally Verification supported tool and information in support DOORS for the last 10 years. • Enables useful views of requirements, verification • Initial benefit -- requirements planning & status, and changes were immediately visible verification events. to engineers responsible for • Projects can use as-is or customize a verifying requirements because generic DXL script to generate verification activity artifacts and verification statistics and graphics. verification events were now linked directly to requirements • Saves projects money through reuse of tooling and method. 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 11
  • 12. Verification Process Project Verification Planning Get DOORS Verification Verification Verification Training / Activity Activity Status consulting Planning Execution Reporting Verification Execute VA Activity Groups procedure, analyze Generate V&V Requirements defined results and determine burndown charts Development status and statistics and present at Reqmts to VA Record status of management mapping the VA (procedure) meetings captured run and create Develop V&V method, venue problem/failure and approach reports (if needed) Schedule VA Take corrective activity action (if completion (need necessary) by) date Cognizant person approves VA execution result Plans and procedures developed outside DOORS and hyper- Cognizant person linked from the DOORS approves that the VA requirement has been verified 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 12
  • 13. Verification Elements Definitions VI – Verification Item, is anything that needs to be verified. All requirements become Vis when they are being verified. VA – Verification Activity. The testing activities described in a single Test Plan, Procedure or Analysis. A group of associated VAs are a VA Group (VAG) Test Data Directory 1 VE – Verification Event. A run or execution of a VA. 1 0..1 Test Test Plan Activity Report (AR) 1 1..M Procedure 0..1 1 In Other Tools 0..M In DOORS 1 1 1 1..M 1 Verification Item (VI) Verification Activity (VA) Verification Event (VE) 1..M 1..M VE data elements originate in the AR Verification Activity and are pushed to VE to complete the status picture. Group (VAG) 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 13
  • 14. Verification Attributes Test Data Directory 1 Test Plan 0..1 Test Procedure 1 • version 1..M • version Activity Report (AR) 0..1 0..M 1 1 VA 1 VI or ITL item • activity name or activity 1 •object identifier (ID) group name •statement of requirement • VA priority VE •rationale • VA status • VA id (a reference) •…. 1..M • VA owner 0..M • …. data imported from AR •method 1..M • venue • url of Activity Report 1 •verification approach • date scheduled (for • url of test data directory •audit status completion) •audit completed on (date) • date completed •audited by • plans and procedures • PFRs Requirements V&V Activity Planning V&V Activity Execution Development V&V Status Reporting 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 14
  • 15. Project Module Configurations VIM – Verification Item (Requirements) Module VAM – Verification Activity Module VEM – Verification Event Module VIM VAM Multiple VAMs reflecting the VIM VIM VAM VAM VEM Project’s requirements structure or V&V organization. VIM VIM VIM VAM VAM VAM VIM A single VAM for the Project’s complete requirement tree VIM VIM VAM VEM • partition VAM to give owners granular write access VIM VIM VIM VIM Combined VAM and VEM for projects that only need VIM VIM VAM / VEM information on the latest run/execution. 5/24/2012 VIM VIM VIM Caltech – Jet Propulsion Laboratory M. Smith - 15
  • 16. Verification Item (VI) Burndown 250 Current date Not Confirmed Number of Items to be Verified 200 Actual (auto status) A pick list allows selection of 150 any group of VIMs for this chart. 100 Scheduled Not Scheduled 50 0 4/1/2008 1/8/2008 2/5/2008 3/4/2008 7/8/2008 8/5/2008 9/2/2008 12/9/2008 1/6/2009 1/22/2008 2/19/2008 3/18/2008 4/15/2008 4/29/2008 5/13/2008 5/27/2008 6/10/2008 6/24/2008 7/22/2008 8/19/2008 9/16/2008 9/30/2008 10/14/2008 10/28/2008 11/11/2008 11/25/2008 12/23/2008 Count of VIs (modules included selected from pick list): Scheduled Scheduled = total number of VIs remaining to be completed per schedule Not Completed = total number of VIs remaining to be completed actually Actual Interval End Date Not Confirmed = total number of VIs remaining to be Confirmed-Final Not Confirmed Not Scheduled = total number of VIs remaining to be completed but not scheduled 5/24/2012 Caltech – Jet Propulsion Laboratory R. Stoller, K. Boyle - 16
  • 17. Verification Activity Burndown 16 Actual 14 Number of Activities to be Verified 12 Scheduled 10 8 Not Scheduled 6 A pick list allows selection of 4 any group of VAs for this chart. 2 0 Scheduled Scheduled - Count of notof VAs remaining to be completed per schedule = total number completed linked VAs scheduled to be completed Actual Not Completed - Count ofof VAs remaining to be completed actually = total number not completed linked VAs remaining to be completed (Actual) Not Scheduled = total number of VAsnot scheduled completed and are not Not Scheduled - completed-NF or that are not scheduled 5/24/2012 Caltech – Jet Propulsion Laboratory R. Stoller, K. Boyle - 17
  • 18. Verification Item Statistics "Bad" if > 0 "Neutral" "Good" from V&V Burndown Script that generates data to Excel "Normal" Count of VIs in VIMs (shall statements only) A: B: C: D: E: F: G: H: I: J: K: L M: N: VIs VIs VIs VIs Not VIs VIs Not VIs Not VIs Not VIs Not V&V Engr VIM Linked to Linked to Linked to VIs Auto VIs Conf Linked to Linked to Linked to Auto Conf Verif and Responsible NAME Total VIs VAM VAGs VAs Verif Verif VAM Reject a VA Verif Verif Late for this VIM VIM1 625 600 15 575 200 150 25 10 50 425 450 5 John Jones VIM2 500 500 10 485 100 75 0 5 15 400 etc 5 Susie Jones VIM3 1000 1000 0 1000 0 0 0 0 0 1000 etc 0 Mary Smith … … … etc etc etc etc etc etc etc etc etc etc VIM n 200 200 5 190 25 5 0 5 10 175 etc 0 Total 2325 2300 30 2250 325 230 25 20 75 1975 etc 10 Relationships: B=C+H; I is not included in D; E=C-I-D; J=B-E=H+I+D; K=B-F; L=B-G M = VIs not auto verified AND scheduled completion date is missed or has not been scheduled or is not linked. Any object containing the word “shall” enclosed in quotes (“shall”) is not included in any statistic. 5/24/2012 Caltech – Jet Propulsion Laboratory R. Stoller, K. Boyle - 18
  • 19. Verification Activity Statistics "Bad" if > 0 from V&V Burndown Script that generates data to Excel "Neutral" "Good" "Normal" # of VI Are VAs Fully ** Is there a VA Are there any Schedule Days VA Parent Linked to VIs VA Sched- Plan &/or a Suspicious VI Remaining (if not V&V Engineer / NAME* Links ? VA Status uled? Procedure? Links? completed) Owner of VA VA-x 25 Yes Blank 08/10/09 No Yes 10 Jack Jones VA-y 20 Yes Completed-NF 07/26/09 Yes No -5 Mary Jones VA-z 100 Yes Completed No Yes No Susie Que … 350 … Blank No No No Not Sched Tom Smith VA-n 55 Yes Blank 08/20/09 Yes Yes 20 Susie Smith * VAs are organized in VAM under VAGs and sub-header VAGs, but tabulated separately here. ** Identifies if there is an http entry in the Plan and Procedure attribute. 5/24/2012 Caltech – Jet Propulsion Laboratory R. Stoller, K. Boyle -19
  • 20. Topic 3 DOORS Trace Tree Tool (T3) JPL has parent-to-child requirements relationships where a parent has 1 to tens of children, and links between levels can be many-to-many. We have trouble seeing the forest for the trees and navigating requirements flow within DOORS. • Primary Motivations – Provide JPL users with an alternative graphical presentation of requirement flow (links) – Allows navigation of requirements based on hierarchy or flow – Enables seamless navigation between modules following flow- down/links – Provides easy access via Web-based, platform independent interface • Secondary Motivation - evolved with implementation – Provide an indication of timeliness of requirements flow-down – Provide an efficient way to checkout verification planning • History – Conceived and developed by a JPL Software Systems Engineer (James Grimes) in 2006 – Enthusiastically used by 8 JPL Flight Projects 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 20
  • 21. Trace Tree Tool View – Example Index Page ProjX ProjX ProjX ProjX ProjX ••• 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 21
  • 22. Project Map Number of links/flowed-down requirements appear on edges 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 22
  • 23. Module Page ProjX ••• ……. 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 23
  • 24. Requirement Page …………………. …….. Attributes continue below 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 24
  • 25. Object Text Graphic ……………………… ………….. ……………………… ……………………… ………….. ………………………. ……………….. ……………….. ………….. ……………………… Attributes continue below 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 25
  • 26. Verification Approach Graphic …………… …………………………… …………………………… …………………………… …………………………… …………… …………………………… …………………………… …………………………… …………………………… …… Attributes continue below 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 26
  • 27. Typical DOORS T3 User Scenarios • Quickly obtain the contents of a requirement with a known ID – Main page Module page Requirement number • Scan a particular Project module for a specific requirement – Main page Module page, then • Scroll up and down at web browser speeds • Use browser’s find capability (not as flexible as DOORS, but faster) • Trace requirements flow-down starting at any requirement – Click on boxes in graph going up- or downstream in requirements flow – Go from there to text, attributes • Obtain immediate visual indication of timeliness of flow-down – E.g., has upstream requirement X been updated more recently than my requirement? If yes, then it’s red. Actual date is shown on X’s page. – Is flow-down complete? Does the requirement have a parent? • Provide supportive evidence during Project Reviews – Quickly show existence of flow-down – Quickly show V&V attribute, implementation status (if in attribute) 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 27
  • 28. DOORS Trace Tree Tool (T3) High-Level Process/Execution Flow 5/24/2012 Caltech – Jet Propulsion Laboratory T. Jansma - 28
  • 29. Development Tools Used • DXL – DOORS eXtension Language, a DOORS proprietary C-like, object- oriented language available within the DOORS client • Perl – a scripting language widely available on UNIX, Mac OS X, Linux, Windows • Graphviz – open source Graph Visualization software developed at AT&T that includes the Dot language and dot program for drawing directed graphs • XML and Perl/C-based XML parsing software – open source software • Java for processing images • Standard UNIX utilities such as date, rm, ls, rsync, etc. • SVN – Subversion open-source version control tool 5/24/2012 Caltech – Jet Propulsion Laboratory J. Grimes - 29
  • 30. JPL’s Direction with DOORS • Systems Engineers on JPL Projects are starting to infuse Model Based Systems Engineer / SysML. – Modeling includes architecture, behavior and resources. – Many pockets of discipline specific modeling tools exist in the Spacecraft subsystem organizations – Vision is to use a central, standards based repository to interconnect and exchange model data. – Requirements will still be important but there is now an opportunity to augment requirements with more extensive and formal designs. • Small and technology development Projects may need a lighter weight DOORS-based process. Aimed at • JPL is working on more partnership projects. Module exchange needs to be influencing, negotiated and piloted early. sharing Lessons • We are piloting a Requirements Architecture, table-top review that will Learned and occur before Project and System requirements are developed. emerging best practices. • We have begun teaching just-in-time DOORS and process classes directly to and with Flight Projects. 5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 30