The document provides information on the regeneration plans for the High Path estate in phases 3 through 7, including:
- Phase 3 will include up to 374 new homes and part of a new neighbourhood park. Phases 4-7 will include up to 568 additional homes.
- Existing residents will be relocated to new homes within the estate, with all residents housed by the completion of phase 4.
- The regeneration aims to create a more sustainable, connected neighbourhood with new affordable housing and public spaces including a new park.
Amex Corporation has set a vision to create a master planned community within the heart of Ripley Valley on the urban outskirts of Brisbane - A progressive, vibrant and modern new town, that brings back true neighbourhood living.
For more information, visit: http://www.providenceripley.com.au/resources/grand-vista-resources
Greenwood by Nakheel boasts tranquil surroundings that provide an escape from the hustle and bustle of the city. A perfect retreat for those seeking a peaceful oasis in Dubai.
Visit- https://nakheel.buildersprojects.com/
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Amex Corporation has set a vision to create a master planned community within the heart of Ripley Valley on the urban outskirts of Brisbane - A progressive, vibrant and modern new town, that brings back true neighbourhood living.
For more information, visit: http://www.providenceripley.com.au/resources/grand-vista-resources
Greenwood by Nakheel boasts tranquil surroundings that provide an escape from the hustle and bustle of the city. A perfect retreat for those seeking a peaceful oasis in Dubai.
Visit- https://nakheel.buildersprojects.com/
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
In the Adani-Hindenburg case, what is SEBI investigating.pptxAdani case
Adani SEBI investigation revealed that the latter had sought information from five foreign jurisdictions concerning the holdings of the firm’s foreign portfolio investors (FPIs) in relation to the alleged violations of the MPS Regulations. Nevertheless, the economic interest of the twelve FPIs based in tax haven jurisdictions still needs to be determined. The Adani Group firms classed these FPIs as public shareholders. According to Hindenburg, FPIs were used to get around regulatory standards.
In the Adani-Hindenburg case, what is SEBI investigating.pptx
High Path Regeneration Update
1. NOVEMBER 2022
Phases 4-7
Phase 3
Phases 1-2
Phase 2
Phases 1-2
High Path was given outline
planning permission by Merton
Council in April 2019 but we
are constantly working to make
improvements to:
Welcome to our final exhibition for the detailed plans of High Path Phase 3
and the revised masterplan of Phases 4 to 7.
The regeneration is already well underway. With the help and support of residents
and the wider community, we can transform the neighbourhood making it:
• a better place to live.
• more connected to its surroundings, with
• homes that meet the needs of residents now and in the future.
Better respond to climate change.
Integrate new and improved design
standards.
Apply the lessons learned during the
pandemic.
Build more new homes, including
more affordable homes available for
Merton residents.
What is happening
and when
The detailed design of
Phase 3
The new neighbourhood
and park
The latest design for
Phases 4 to 7
Aerial view of the existing High Path estate.
Nelson Grove Road
Rodney Place
Merantun Way
High Path
South Wimbledon
Station
M
or
de
n
Ro
ad
St. John
the Divine
Church
Merton Abbey
Primary School
Sure Start
Nursery
Harris
Academy
Wimbledon
Pin
cot
t
Roa
d
A
b
b
e
y
R
o
a
d
Merton High Street
Ha
yw
ard
Clo
se
Welcome
What is an outline planning application?
An outline planning application confirms the
key aspects of the masterplan including:
•The location, size and height of the buildings.
•Position of streets and open spaces.
•The overall number of homes.
Detailed design such as façades and internal
layouts will be covered in future reserved
matters planning applications.
The information presented at this event explains:
What is a reserved matters planning application?
Reserved matters includes details not covered
in an outline planning application. It includes
details about:
•The façades and materials to be used.
•The layouts of the new homes.
•The detailed landscape design.
Phases
4 to 7
Phase
3
NOVEMBER 2022
Our commitments to existing High Path residents
“I used to live in the tower
block next to the new blocks and I
watched from the beginning as they
were being built. I attended all the
consultations and kept in touch with
the Regeneration Manager because I
didn’t want to miss out.”
Testimonial from a High Path Phase 1 resident
Putting our residents first
Photos of completed Phase 1 and community engagement
Clarion has committed to keeping the existing
community intact and in situ. We will work
with residents to keep what is good about
High Path and improve what needs to change.
Together we will create a neighbourhood
that offers a great place to live and enjoy for
generations to come.
Our High Path Residents Offer in 2015
committed us to:
Consult with residents, consider their
interests at all times, and address concerns
fairly.
Offer a fair deal to homeowners.
Rehouse tenants in a new home that
meets their housing need, including larger
homes for families who are overcrowded.
Maintain existing tenancy rights and
agreements.
Ensure, where possible, that residents
only have to move once, directly into a
new home we build for them.
Provide extra help and support for older
and/or residents with disabilities.
Parking will be provided for existing
households moving into a new home on
High Path.
Continue to maintain the existing homes
of residents.
Reinvest any surplus to provide
more homes or improve existing
neighbourhoods.
Build new high-quality, energy-efficient
homes.
Provide new community spaces, play
areas and better access to local transport
links.
Create new jobs, training and
employment opportunities for local
people.
1
2
3
4
5
6
7
8
9
10
11
12
2. NOVEMBER 2022
Phase 1
Completed in 2022
New homes for existing residents from:
• Marsh Court
• Gilbert Close
• Hayward Close
• Stane Close
Phase 2
Completion in 2025
New homes for existing residents from:
• Deburgh House
• Will Miles Court
• Dowman Close
• Tanner House
Phase 3
Completion in 2027
Phase 3 will deliver the first homes for sale
to help part-fund the affordable homes. This
phase will include the first quarter of the new
neighbourhood park.
Phase 4
Completion in 2029
New homes for existing residents from:
• Merton Place
• Ramsey House
• Doel Close
• Eleanor House
Phase 5
Completion in 2031
Phase 6
Completion in 2035
Phase 7
Completion in 2036
• Lovell House
• Pincott Road
• Becket Close
• Hilborough Close
• Mychell House
• Norfolk House
• Vanguard House
• Hudson Court
• Ryder House
• May Court
• Priory Close
Please note that all dates are indicative
and could change.
What’s happening and when
High Path indicative phasing plan
The drawing below shows where each
phase is and when construction is likely
to be completed.
We expect the next new homes for existing
residents (Phase 2) will be ready in 2025.
Once Phase 4 is complete, all existing
residents will have their new home.
When will I move?
N
“It’s been a long time
coming. I love it here, I know all
my neighbours and my new flat is
comfortable and light, it’s just right.”
Testimonial from a High Path Phase 1 resident
3. NOVEMBER 2022
The neighbourhood vision
New homes
that meet or
exceed modern
design and space
standards.
Developing
energy efficient
homes that do
not use fossil
fuels.
A new
neighbourhood
park for everyone
to enjoy.
Up
to 2,272
new homes
including 564 new
affordable homes
for Merton
residents. South Wimbledon station
Merton High Street
High Path
M
erantun
W
ay
M
o
r
d
e
n
R
o
a
d
Revised illustrative masterplan
Phase 3 update
A reserved matters planning application for up to 374
new private homes, ground floor commercial space,
public spaces and the energy centre will be submitted
in the coming weeks.
This phase will include part of the new neighbourhood
park - the arrival square, creating a new public space
for everyone to enjoy.
Phases 4 to 7 update
A new outline planning application for Phases 4 to 7
will be submitted in the coming weeks.
The revised masterplan for Phases 4 to 7 will deliver
up to 568 additional new homes, meaning existing
residents will get their new homes on the estate sooner
and there will be more affordable homes available for
Merton residents.
Phase 1 update
Phase 1 is now complete
and provides 134 new
homes.
The first residents have
moved or are in the process
of moving into their new
homes.
Phase 2 update
Planning approval has
been secured for Phase 2.
This phase will deliver 113
homes, ground floor com-
mercial spaces and a new
ball court.
Our vision is to create a new sustainable
neighbourhood that better connects with
its surroundings for the current and future
residents of High Path.
New facilities, public and private spaces will
provide an improved standard of living for all.
4. NOVEMBER 2022
The new neighbourhood explained
Parking
Key
Indicative enclosed residents-only parking location
Indicative wheelchair on-street parking
Indicative on-street standard parking
Indicative car club space
Indicative on-plot standard parking
Indicative wheelchair adaptable on-street parking
Building heights
Key
Up to 13 storey
Up to 12 storeys
Up to 11 storeys
Up to 10 storeys
Up to 9 storeys
Up to 8 storeys
Up to 7 storeys
Up to 6 storeys
Up to 5 storeys
Up to 4 storeys
Up to 3 storeys
Up to 2 storeys
Single storey
podium courtyards
Ground floor non-residential uses
Vehicular and cycle routes
Key
Proposed designated cycle route
Existing designated cycle route
Pedestrian priority
Quiet mews street
New roads
Re-designed existing roads
New vehicle access
Existing vehicle access
Pedestrian route
7 6 1-2
P
in
co
tt
R
o
ad
Phase 3
Phases 4-7
South Wimbledon
Station
Ha
yw
ard
Cl
os
e
Mo
rde
n
Ro
ad
St. John
the Divine
Church
Merton Abbey
Primary School
P
in
c
o
tt
R
o
a
d
A
b
b
ey
R
o
ad
Merton High Street
Rodney Place
Nelson Grove Road
High Path
Harris Academy
Wimbledon
190m
2 minutes*
120m
2 minutes*
320m
4 minutes*
470m
6 minutes*
290m
4 minutes*
470m
6 minutes*
5
4
Key
Primary commercial location
Commercial location (Nelson’s Yard)
Energy Centre
Potential secondary commercial location
Potential replacement Church Hall
Revised illustrative masterplan showing walking distances to South Wimbledon tube station
* Approximate walking distance and time to South Wimbledon Station
N
N
N
N
N
8. NOVEMBER 2022
A neighbourhood park full of things to do
P
IN
C
O
T
T
R
O
A
D
A place of arrival A place to sit and relax
A place to play A place of activity
Illustrative plan of the new neighbourhood park
Example images
Example images Example images
Example images
1
1
2
2
3
3
1 1
1
1
2 2
2
2
3 3
3
3
5 5
4 4
4
4
6 6
3
1
2
4
6
5
3
1 2
4
6
5
N
Amenity lawn, a quiet and intimate space to sit and relax.
Physical activities/ fitness trail with different play values for
all age groups.
Opportunities to explore natural play elements, physical activities/fitness.
A public realm with a flexible space providing opportunities for
multifunctional activities, playable spaces to get the community together.
9. NOVEMBER 2022
Phase 3 in detail
Block 3E
Block 3A
Block 3B
Block 3C
Block 3D
Lady Emma’s Way
Nelsons Yards
Merton High Street
M
o
rd
e
n
R
o
a
d
South Wimbledon
Station
Rowland Way
Stane Lane
Pincott
Road
Downman
Cl
Hayward
Close
Diverted cycle route
The square
Lady Emma’s Way
Summary of Phase 3 (reserved matters application)
3B
3C
3D
3A
3E
Private Sale Block
3B
3C
3D
3A
3E
nt
In preparations for the Reserved Matters
Application for Phase 3 we want to share our vision
and latest detailed design work for the north-
western part of the estate.
Up to 374 new
private tenure
homes
An energy centre
for High Path
Commercial
spaces
The plan for Lady Emma’s way is to create
a pleasant and vibrant pedestrian link
that enhances the ground floor uses of the
proposed building, including workshop
spaces and cafe areas.
The Phase 3 landscape takes into
consideration the overall masterplan and
sensitively addresses the edges of the other
phases. Phase 3 will create vibrant pedestrian
routes, accommodate parking areas, loading
bays, URS and food waste bins. These areas
are then layered with a generous amount of
planting.
The passageway is further enhanced
by improving the existing lighting,
surveillance and a green wall.
A gateway square visible from
Merton High Street will provide
space for community activities,
wayfinding features and an active
area with the provision of play
facilities to be agreed.
Particular attention has been paid
to the integration of cycle route
within the design of the square.
The aim is to create a space
that is shared with pedestrian
priority.
M
o
rd
en
R
o
ad
Hayward
Close
CCTV camera
Building mounted road lighting
Illustrative sketch view along Lady Emma’s Way
Example of a green wall
Lady Emma’s Way setting
Opportunity for seating and spill-out spaces from the commercial units along this route
Phase 3 site boundary and proposed blocks plan
Distinct new sustainable quarter around South Wimbledon Station, seen from Merton High Street Play re-provision
Feature tree, seating area and water jets
Flexible space welcoming community events
A public platform to showcase creativity, provide innovation opportunities, show film screening
N
10. NOVEMBER 2022
Nelson Yards
Lady Emma’s
Way
Park
New pedestrian lane
Energy centre
Horse &
Groom Pub
Substation Retail facilities
A new energy centre is proposed in one of the
buildings along Morden Road that will facilitate
High Path with local energy and heating. There
are opportunities to make the centre partly
visible from the street with an educational
approach of the features.
A pocket green at the end of Rowland Way
is proposed with a seating area to welcome
pedestrians into the estate.
Rowland Way
Morden
Road
Private Sale Block
3B
3C
3D
3A
3E
Communal garden (located
on ground floor)
Communal garden (located
on first floor)
Amenity area including play
for under 5yrs old
Green roof
Amenity area including
play for under 5yrs old
Green roof
Communal garden
Amenity area including
play for under 5yrs old
Roof level
Fifth level - communal terraces and green roofs
Ground floor and first level - podium gardens
Example images Example images Example images
Communal amenities and green roofs
Ground floor uses
Phase 3 will cater for a wide range of age
groups and will offer a range of retail and
other amenities to the community, and
will contribute to the creation of a new
Local Centre at South Wimbledon.
The non-residential floorspace is
expected to provide non-residential
ground floor uses along Merton High
Street, Hayward Close, Lady Emma’s
Way and Nelson Yards.
Morden Road and a new energy centre
Phase 3 in detail
Illustrative view of Rowland Way looking towards blocks 3BCD
Example images of pocket green Zoom-in illustrative masterplan of Morden Road/Rowland Way
Location for
energy centre
(ground floor)
Example images of artwork
11. NOVEMBER 2022
BLOCK 3A - MERTON HIGH STREET
Private Sale Block
3B
3C
3D
3A
3E
ILLUSTRATIVE ELEVATION
Private Sale Block
3B
3C
3D
3A
3E
ILLUSTRATIVE ELEVATION
ILLUSTRATIVE BAY STUDIES AND
BRICK DETAIL
3B
3C
3D
3A
3E
Block 3B, 3C and 3D
Phase 3 look and feel
Block 3A Block 3E
ILLUSTRATIVE ELEVATION
ILLUSTRATIVE BAY STUDY
AND BRICK DETAIL
REFERENCE TO LOCAL VERNACULAR
ARCHITECTURE
Illustrative view of Rowland Way looking towards blocks 3BCD
Merton High Street and Hardy Road, buff brick and windows
surrounds expressed
Illustrative view of Merton High Street towards Block 3A and South Wimbledon Station Illustrative view of Merton High Street towards South Wimbledon Station with Block 3E and the new square
ILLUSTRATIVE BAY STUDY
AND BRICK DETAIL
REFERENCE TO LOCAL VERNACULAR
ARCHITECTURE
Merton High Street and Hamilton Road, brick tones and details
Southey Road, corner detail and
contrasting brick
REFERENCE TO LOCAL
VERNACULAR ARCHITECTURE
12. NOVEMBER 2022
November
2022
WINTER
2022
SPRING
2023
FINAL EXHIBITION LONDON
BOROUGH
OF MERTON
PLANNING
APPLICATION
COMMITTEE
We are here
SUBMISSION
OF PLANNING
APPLICATIONS
You can also join our online
webinar on Tuesday 22
November.
We are preparing to submit the planning applications for
High Path Phase 3 and Phases 4-7 in the coming weeks.
Please visit the High Path project website and keep up
to date via the High Path newsletter to hear the latest
news of the regeneration and future events.
Please contact us if you have any questions or feedback:
Donna Brown
Regeneration Manager
myclarionhousing.com/highpath
WWW
Fabio Schifano
Development Manager
(Phases 4 to 7)
mertonregen@clarionhg.com
07557 846825
Next steps
Thank you for coming
James Clarke
Development Mannager
(Phase 3)
Scan this QR code to
find out more about
Phase 3 and Phases 4- 7,
where you can register
for the upcoming
webinar.
NOVEMBER 2022
Typical floor plan of a 1-bed apartment
Indicative example from High Path Phase 2
Typical floor plan of a 3-bed maisonette
Indicative example from High Path Phase 2
Typical floor plan of a 2-bed apartment
Indicative example from High Path Phase 2
Typical 1 Bedroom Flat
Minimum area 50m2
Typical 2 Bedroom Flat (b)
Minimum area 70m2
Typical 2 Bedroom Flat (a)
Minimum area 61m2
air Accessible Flat
cal internal layouts...
e been designed to provide flexibility and variety, especially
dining/living spaces.
e a dedicated room for utilities including a washing machine. There
ongside enclosed cycle stores.
ms or more will have a toilet and wash basin in additional to the
Bedroom
Patio
Balcony
Balcony
Balcony
Bedroom
Bedroom Bedroom
Bedroom
Bedroom
Bathroom
Bathroom
Bathroom
Living/
Dining/
Kitchen
Dashed line indicates potential separated kitchen arrangement (where possible)
Living
Dining/
Kitchen
Living/
Dining/
Kitchen
e Storage
Storage
Storage
Storage
Utility
Utility
Utility
Cycle
Storage
Cycle
Storage
Cycle
Storage
Typical
internal
layouts...
Typical
3
Bedroom
Duplex
Minimum
area
102m
2
Upper
Floor
Typical
3
Bedroom
Flat
Minimum
area
86m
2
Typical
2
Bedroom
Maisonette
Minimum
area
79m
2
Ground
Floor
Upper
Floor
Balcony
t
o
b
e
u
p
d
a
t
e
d
Ground
Floor
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Kitchen
Kitchen
Bathroom
Bathroom
Bathroom
Living/
Dining/
Kitchen
Living/
Dining
Living/
Dining
WC
WC
WC
Utility
Utility
Utility
Terrace
Balcony
Dashed
line
indicates
potential
separated
kitchen
arrangement
(where
possible)
Main
Entrance
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Cycle
Storage
Cycle
Storage
Cycle
Storage
t Typical 2 Bedroom Flat (b)
Minimum area 70m2
Typical 2 Bedroom Flat (a)
Minimum area 61m2
l layouts...
variety, especially
washing machine. There
n in additional to the
Balcony
Balcony
Bedroom
Bedroom Bedroom
Bedroom
Bedroom
Bathroom
Bathroom
Bathroom
Living/
Dining/
Kitchen
ated kitchen arrangement (where possible)
Living
Dining/
Kitchen
Living/
Dining/
Kitchen
Storage
Storage
Storage
Utility
Utility
Utility
Cycle
Storage
Cycle
Storage
Cycle
Storage
Typical
internal
layouts...
Typical
3
Bedroom
Duplex
Minimum
area
102m
2
Upper
Floor
Typical
3
Bedroom
Flat
Minimum
area
86m
2
Typical
2
Bedroom
Maisonette
Minimum
area
79m
2
Ground
Floor
Upper
Floor
Balcony
t
o
b
e
u
p
d
a
t
e
d
Ground
Floor
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Kitchen
Kitchen
Bathroom
Bathroom
Bathroom
Living/
Dining/
Kitchen
Living/
Dining
Living/
Dining
WC
WC
WC
Utility
Utility
Utility
Terrace
Balcony
Dashed
line
indicates
potential
separated
kitchen
arrangement
(where
possible)
Main
Entrance
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Storage
Cycle
Storage
Cycle
Storage
Cycle
Storage
“I was excited about
moving in and sitting on my balcony
in the summer watching the London
skyline. My sons have their own
rooms now and they love it.”
Testimonial from a High Path Phase 1 resident
New Homes
Homes will meet or exceed all the latest design,
sustainability and space standards. To help
ensure homes remain adaptable and suitable for
all stages of life, we will include wider doors,
corridors and other best practice measures. This
will enhance the look, feel and accessibility of
homes and communal spaces.
The illustrative floorplans on this board show the layouts of High
Path Phase 2, which starts in 2023. These examples show how the
future new homes in High Path Phases 4 to 7 could look.