High Density Computing For Your Technology
Train Set of 3D Computer Arrays
of Processors or Clusters
HextraDense technology iscoveredby U.S.Patent US9220180B2
THECOST OF DATACENTER DOWNTIME IS RISING
Problem: Downtime costs for the most data center-dependent
businesses are rising faster than average.
Cost: The average cost of a data center outage has steadily
increased from $505,502 in 2010 to $740,357.
Failure: UPS system failure continues to be the number one cause
of unplanned data center outages, accounting for one-quarter of all
such events. Cybercrime represents 22% of data center outages.
Impact: Maximum downtime costs increased 32 percent since
2013 and 81 percent since 2010. Maximum downtime costs for 2016
are $2,409,991.
Solution: Investing in improved equipment was the top way
respondents indicated they could prevent unplanned outages in the
future.
Loss: The average cost of a data center outage rose from $690,204
in 2013 to $740,357 in this report, a 7 percent increase. The cost of
downtime has increased 38 percent since the first study in 2010.
Ponemon Institute 2016 Study sponsored by EmersonNetwork Power http://www.emersonnetworkpower.com/Downtime
Key Advantages of HEXTRADENSE
HPC, Big Data & IoT: Scalable modules for servers
or clusters from one module to acreage and beyond.
Higher Component Density
Planar and multi-planar configurations reduce real estate requirements.
Ease of Maintenance
System delivers modules for repair replacement and modification with hot-swap.
System Availability
Multi-planar module and hotspot with. g ghosting helps eliminate unplanned
outages.
Interconnection Enhancements
•Improved data connection features.
•Dynamic configuration of system structure elements allowing hot-swap.
addition/removal of CPU, GPU, and FEP modules – enhanced utility model.
•Total or incremental reconfiguration of system by 3D train set from spur lines.
Cost Savings
•Fluid/gas/air heat exchange options that achieve flow rates comparable to some
carburetors and help reduce thermal management costs.
•Construction cost savings by using many industry standard components.
•Designed in-heat transfer.
Enclosure Mechanics
Conventional cabinet rack systems with pizza box enclosures
A typical data center is composed of non-optimized rows of cabinet
racks with dead space aisles and limited vertical expansion.
Each enclosure rack slot generally contains one component, e.g.,
motherboard with processors.
A typical data enclosure when stacked in 3D doesn’t allow access or
heat transfer from the modules in the middle.
Computer processors, clustersor other assembliesare assembled into HextraDense
modules.
HextraDense 3d arrays with optional track system.
Reduces realestate acreage andattendantcosts by anominaltwo-thirds depending on
the3Darrayconfigurationwithtracksystems;includingcolumndepth.
The fabrication of modules for integration as 3D arrays.
Integrationof3Darraymoduleswithrailsystemstoincludesupporting
infrastructure.Thisstage includes prototype development, initial trials,
and firstclient installation.
Integrate direct connectivity withoperating systems.
HPC, Big Data & IoT: Scalablemodulesforserversorclustersfrom
onemoduletoacreageandbeyond.
System Development
License standard andcustom
enclosure/array systemsand
infrastructure.
Develop software applications for
network configurationand
maintenance management with
an emphasis on open source.
Partner with existing intelligent
rack providers, e.g., HP,IBM to
design datacenters.
Licensepatented design
methodology to hardware
manufacturers.
Consulting & Licensing
RichardA. Dunn,Jr.
I started out asa stock boy. employed as a inventor, purchasing agent, contract
administrator, estimator, production control, IT manager, programmer, system
builder and teacher. I enjoyed machine shop courses and engineering with a
degree in marketing. My objective is to advance sustainable technology to
increase the pie for all.
781.986.3604
richdunn@gmail.com
ABOUT

More Related Content

Similar to HEXTRADENSE - High Density Computing For Your Technology

PlanningDataCenterFacilities
PlanningDataCenterFacilitiesPlanningDataCenterFacilities
PlanningDataCenterFacilities
Joseph Kassl
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
paul_mathews
 
Need of green computing measures for indian it industry
Need of green computing measures for indian it industryNeed of green computing measures for indian it industry
Need of green computing measures for indian it industry
Alexander Decker
 
11.need of green computing measures for indian it industry
11.need of green computing measures for indian it industry11.need of green computing measures for indian it industry
11.need of green computing measures for indian it industry
Alexander Decker
 
BLOG-POST_DATA CENTER INCENTIVE PROGRAMS
BLOG-POST_DATA CENTER INCENTIVE PROGRAMSBLOG-POST_DATA CENTER INCENTIVE PROGRAMS
BLOG-POST_DATA CENTER INCENTIVE PROGRAMS
Daniel Bodenski
 

Similar to HEXTRADENSE - High Density Computing For Your Technology (20)

Green IT
Green IT Green IT
Green IT
 
Green IT @ STRATO - Rene Weinholtz
Green IT @ STRATO - Rene WeinholtzGreen IT @ STRATO - Rene Weinholtz
Green IT @ STRATO - Rene Weinholtz
 
PlanningDataCenterFacilities
PlanningDataCenterFacilitiesPlanningDataCenterFacilities
PlanningDataCenterFacilities
 
Green cloud computing
Green cloud computingGreen cloud computing
Green cloud computing
 
Data Center Optimization
Data Center OptimizationData Center Optimization
Data Center Optimization
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEYDATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
 
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEYDATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
 
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEYDATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
 
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEYDATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
 
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEYDATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
DATACENTRE TOTAL COST OF OWNERSHIP (TCO) MODELS: A SURVEY
 
CoolSim Overview
CoolSim OverviewCoolSim Overview
CoolSim Overview
 
introduction to it sustainability
introduction to it  sustainabilityintroduction to it  sustainability
introduction to it sustainability
 
Cfm for datacentres_v9_gb
Cfm for datacentres_v9_gbCfm for datacentres_v9_gb
Cfm for datacentres_v9_gb
 
Need of green computing measures for indian it industry
Need of green computing measures for indian it industryNeed of green computing measures for indian it industry
Need of green computing measures for indian it industry
 
11.need of green computing measures for indian it industry
11.need of green computing measures for indian it industry11.need of green computing measures for indian it industry
11.need of green computing measures for indian it industry
 
What Makes Software Green?
What Makes Software Green?What Makes Software Green?
What Makes Software Green?
 
Edge Computing.docx
Edge Computing.docxEdge Computing.docx
Edge Computing.docx
 
Design of green data center
Design of green data centerDesign of green data center
Design of green data center
 
BLOG-POST_DATA CENTER INCENTIVE PROGRAMS
BLOG-POST_DATA CENTER INCENTIVE PROGRAMSBLOG-POST_DATA CENTER INCENTIVE PROGRAMS
BLOG-POST_DATA CENTER INCENTIVE PROGRAMS
 

Recently uploaded

Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
FIDO Alliance
 
CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
Wonjun Hwang
 

Recently uploaded (20)

Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
Vector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptxVector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptx
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
الأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهلهالأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهله
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cf
 
CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 

HEXTRADENSE - High Density Computing For Your Technology

  • 1. © 2014All rights reserved. RichardA. Dunn, Jr. High Density Computing For Your Technology Train Set of 3D Computer Arrays of Processors or Clusters HextraDense technology iscoveredby U.S.Patent US9220180B2
  • 2. THECOST OF DATACENTER DOWNTIME IS RISING Problem: Downtime costs for the most data center-dependent businesses are rising faster than average. Cost: The average cost of a data center outage has steadily increased from $505,502 in 2010 to $740,357. Failure: UPS system failure continues to be the number one cause of unplanned data center outages, accounting for one-quarter of all such events. Cybercrime represents 22% of data center outages. Impact: Maximum downtime costs increased 32 percent since 2013 and 81 percent since 2010. Maximum downtime costs for 2016 are $2,409,991. Solution: Investing in improved equipment was the top way respondents indicated they could prevent unplanned outages in the future. Loss: The average cost of a data center outage rose from $690,204 in 2013 to $740,357 in this report, a 7 percent increase. The cost of downtime has increased 38 percent since the first study in 2010. Ponemon Institute 2016 Study sponsored by EmersonNetwork Power http://www.emersonnetworkpower.com/Downtime
  • 3. Key Advantages of HEXTRADENSE HPC, Big Data & IoT: Scalable modules for servers or clusters from one module to acreage and beyond. Higher Component Density Planar and multi-planar configurations reduce real estate requirements. Ease of Maintenance System delivers modules for repair replacement and modification with hot-swap. System Availability Multi-planar module and hotspot with. g ghosting helps eliminate unplanned outages. Interconnection Enhancements •Improved data connection features. •Dynamic configuration of system structure elements allowing hot-swap. addition/removal of CPU, GPU, and FEP modules – enhanced utility model. •Total or incremental reconfiguration of system by 3D train set from spur lines. Cost Savings •Fluid/gas/air heat exchange options that achieve flow rates comparable to some carburetors and help reduce thermal management costs. •Construction cost savings by using many industry standard components. •Designed in-heat transfer.
  • 4. Enclosure Mechanics Conventional cabinet rack systems with pizza box enclosures A typical data center is composed of non-optimized rows of cabinet racks with dead space aisles and limited vertical expansion. Each enclosure rack slot generally contains one component, e.g., motherboard with processors. A typical data enclosure when stacked in 3D doesn’t allow access or heat transfer from the modules in the middle.
  • 5. Computer processors, clustersor other assembliesare assembled into HextraDense modules. HextraDense 3d arrays with optional track system. Reduces realestate acreage andattendantcosts by anominaltwo-thirds depending on the3Darrayconfigurationwithtracksystems;includingcolumndepth.
  • 6. The fabrication of modules for integration as 3D arrays. Integrationof3Darraymoduleswithrailsystemstoincludesupporting infrastructure.Thisstage includes prototype development, initial trials, and firstclient installation. Integrate direct connectivity withoperating systems. HPC, Big Data & IoT: Scalablemodulesforserversorclustersfrom onemoduletoacreageandbeyond.
  • 7. System Development License standard andcustom enclosure/array systemsand infrastructure. Develop software applications for network configurationand maintenance management with an emphasis on open source. Partner with existing intelligent rack providers, e.g., HP,IBM to design datacenters. Licensepatented design methodology to hardware manufacturers. Consulting & Licensing
  • 8. RichardA. Dunn,Jr. I started out asa stock boy. employed as a inventor, purchasing agent, contract administrator, estimator, production control, IT manager, programmer, system builder and teacher. I enjoyed machine shop courses and engineering with a degree in marketing. My objective is to advance sustainable technology to increase the pie for all. 781.986.3604 richdunn@gmail.com ABOUT