Over a decade of experience in the field of civil engineering, real-estate and construction of large-
scale, high profile residential and commercial projects, I was involved in all phases of a project’s life
cycle, ranging from the initiation and engagement of stakeholders, planning, execution and closure. I’ve
worked as part of large multi-disciplinary teams granting a smooth execution of project; slashing the cost &
time needed for execution development by introducing new means of construction to achieve a smooth,
error free construction with little to no conflicts between various disciplines. I have also implemented interior
and exterior finishes for many projects & oversaw the work of subcontractors Knowledgeable of
construction principles and problems solving techniques to ensure compliance with standards used in the
project.
→Education________________________________________________________
Bachelor of civil engineering, 2008. | Shoubra Faculty of Engineering, Banha University, Cairo Branch.
→Affiliations_______________________________________________________
Egyptian Syndicate of Engineers, 2008 | No. 26/3502821/2008/3
→Employment Summary
Company Project Place From To
● Pinnacle Hrghada Hilton Plaza Hotel Hurghada City, Red Sea. Mar-19 Current
● HSCB
Sabbour Consultant
1- Layan Compound __ 5th settlement New Cairo. Nov-16 Feb-19
2- Piacera Resort ___ Al-Ain Al-Sokhna, Red Sea. Sep-14 Oct-16
3- Topaz Resort ___ Al-Ain Al-Sokhna, Red Sea. Sep-14 Oct-16
4- Square Compound ___ 5th settlement New Cairo. Dec-12 Aug-14
●Alakkad
For Engineering Works
Al-safaa wa Al-rabee Resort 5th settlement New Cairo. Apr-10 Jun-12
●talaatMustafa
Alex For Construction
1- Madinaty First Stage Madinaty City
Sep-08 Mar-10
2- Al-Rehab Second Stage Al-Rehab City
Autodesk Microsoft Office Courses
● AutoCAD - 2D ● MS Project ● Project Management Life Cycle
● SAP ● Word ● Managing Building Adaptation
● Excel ● GIS, Geographic Information System
●Power Point
With
Hany Eid Abd el-Tawab Mahmoud | Civil Engineer
Email: Eng.Hani25@Yahoo.Com
Tel: 01120725462
2. Eng. Hany Abd el-Tawab Page 2
Experience Highlights_______________________________
Project & Construction Management.
Job Title: Deputy Project Manager.
Duties & Responsibilities;
1. Support in the performance of quality reviews and audits.
2. Develop a strategy for the particular handover process to client for all kind of
documents hard and / or soft copies according to contracts and norms.
3. Check the incoming documents / submittals for readiness and validity prior
processing.
4. Administer the document life cycle (author, approve, publish, revise, archive)
engineering construction documents and the other business policies and
procedures.
5. Manage the document controllers on site and monitor the performance duties.
6. Comply with the company’s document control procedures and requirements,
control deviations and follow up their correction if needed.
7. Distribute documents by hard copy and electronic means including, arranging
copies in accordance to internal communication matrix and project requirement /
criteria.
_______________________________________________________________________________________
Hussein Sabbour Consultant Bureau. HSCB.
Job Title: Site Supervision engineer.
Duties & Responsibilities;
1. Sustainable site inspections to ensure that the execution of project works is
accordance with terms & specifications.
2. Supervising implementation of the project works along its phases in details.
3. Shop drawings preview as coordinating either civil, architectural, basic electrical
and basic mechanic drawings.
4. Check and Release contractors’ submittals for example; IRS & MIRs& RFI, SI and
Invoices.
5. Ensure the quality control system procedures are done in its due time.
6. Check and study experimental readings & statics as it’s a standard prospective on
the project status against quality assurance System and how much that reading is
impact on the project in general.
7. Monitoring QC systems and ensuring effectiveness and efficiency.
8. Ensure a Healthy and safety standard as assuring that the project is running in a safe
environment.
3. Eng. Hany Abd el-Tawab Page 3
Al-Akkad.For Real-Estate & Engineering Works.
Job Title: Site Civil engineer.
Duties & Responsibilities;
1. Responsible for the execution of all civil & architectural works in my scope of
work.
2. Assist the Project Manager in the management of Subcontractor works & point
out technical deviation.
3. Explain drawings to contractor, sub-contractor, commands and workers as
focusing on specifications.
4. Resolving any unexpected technical difficulties and other problems that may
arise.
5. Ensure that all drawings and documents are reviewed & approved by the
consultant.
6. Ensure the implementation of the Project Quality Plan.
7. Coordinate with officials QC to implement stated testes.
8. Specify& arrange the work of machines needed to the work in site.
9. Evaluate quality of materials and ensuring the economical and efficient
utilization.
10.Supervise and coordinate the subcontractors and monitor their productivity rate.
________________________________________________________________________________________
Tallaat Mustfa Group / Alexandria for Constructions.
Job Title: Site Civil engineer.
Duties & Responsibilities;
1. Study the project technical specification documents and (time schedule, project
design drawings, etc.).
2. Prepare RFIs (Request for Information) for clarify any technical issue.
3. Daily reports on site progress with list of work requirements.
4. Study & Specify All requirements which needed for execution (Equipment,
Machines, Materials, tools and Human Resources).
5. Resolving any problems that may arise during construction.
6. Receive & deliver the achieved works to the consultants after my owned check.
7. Liaising with the general workforce involved in the project.
8. Acting as the main technical adviser on the site for subcontractors.
9. Attend all pouring concrete times ensuring the related testes and standards.
10.Prepare BOQ of the needed Materials for the site such as (cement, sand, gravel,
brick, steel, etc.