1. AL RAMZ BUILDING CONTRACTING
SWIMMING POOL DIVISIONSWIMMING POOL DIVISIONSWIMMING POOL DIVISIONSWIMMING POOL DIVISION
hamsaswimmingpool@gmail.com
Tel.06-5638866 , Fax 06-5638668-P,O BOX 3677,SHARJHA
055 38 800 38
Designing:
1. .First process is to design or to formulate
the Architectural drawing into working
drawing from structural point of view.
2. The safety and associated utilities of the
building are considered as required such
as balancing tanks, filter rooms, overflow
channel etc.
2. Civil Construction :
1. Excavation and compaction of soil is the most important part
of any pool to be constructed. Loose soil is one of the
main reasons of sinking of swimming pools.
2. Plain concrete cement for footings and floor of swimming
pool of desired thickness and mix.
3. Wall in brickwork for desired shapes and elevations. The wall
provides support and construction of work as shuttering
(permanent).
4. The steel work is slightly different from the normal concrete
work. Two- three layers of steel tor and wielded mesh is
provided for RCC or short create. The short creed is the
method of RCC with water proofing with micro silica
5. After water proofing the pool is tested for water retention for
100% water proofing .
3. Mechanical work:
1. In overflow channel method we uses the piping during
civil work with co - ordination of overflow channel,
balancing tank and filter room.
2. If we are going for Pipeless filters, multifunctional filters
or wall hung filter that remove the need of piping at
all.(in those cases any agency can perform the civil
work).
3. The filters are designed as per the requirement, all
valves and valve chambers are provided.
4. The filtration plant with filter, pump ,chemical dozer
etc. are placed and fixed
4. Finishing work :
1. 1. After concreting work and water proofing the most
important work is to select the tiles and stone for
outer finishing as these are the main finishes of
swimming pool.
2. The tiles are of three types: Glass mosaic 20x20mm
size, Hand made tiles usually 25 x25 mm and
ceramic tiles. Some time the stone is also the finishing
of swimming pool.
3. On deck area the planters and foot decking is provided.
The stone, granite or tiles or it can be the finish wood is
also great idea, but wood needs timely maintenance.
1. Swimming pool ladders should be anti-slippery. The
side bars are fixed for safety. Water out let nozzles,
overflow grating are the items which are fixed after
finishing completes.
2. Swimming pool is a activity area which should be
designed with various add on features.
3. The pool can have Jacuzzi, kids pool area, whirl pool,
water slides, bar stools, water fall or fountains add to
the utility and aesthetic to swimming pool.
5. Pool Maintenance:
1. Making swimming pool is a easier work than maintaining it. No pool looks good if not
filled.
2. So the after sales and the maintenance is the important part of any swimming pool.
3. The owner should be aware of maintenance part of swimming pool weather he want to
maintain his pool himself or he will engage the person to maintain it.
4. All things should be decided prior to start building the swimming pool.
5. There are three types of treatment and methods of water treatment. Physical is taken
care by Water filter, chemical- by keeping the correct ph value and the biological which is
the disinfection of pool with anti bacterial products i.e. Chlorine, ozone or UV.