SlideShare a Scribd company logo
A Short Story About Energy 
-only two (2) chapters- 
The Title of the Story is: 
“The GHEX and The Third Industrial 
Revolution (TIR)” 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
1
There are two paths to go by, but in the long run; there 
is still time to change the road you are on! 
• Utility Incentives 
– Do they really do anyone good; or 
just raise the price to the 
consumer? 
• Manufacturer Rebates 
– Why would a manufacturer extend 
discounts? 
• Contractor Discounts 
– Is the trade (HVAC/R) that slow? 
• Federal Tax Credits 
– Tax Credits expire at the end of 
2016 for our industry! 
11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 2
The First Chapter: 
“The Engineers Explanation” using 
the Big Picture 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
3
Comparing Darcy’s Law (flow of water) with Fourier’s (flow of heat) and Ohm’s (flow of current) 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
4 
Parameter Flow of water Flow of heat Flow of current 
Quantity Volume- V (m3) Heat- Q (J) Electric charge (C) 
Potential Head- ht (m) Temperature- T (K) Voltage (V) 
Gradient Hydraulic- ih (unitless) Temperature- it (K/m) Electric field- E (V/m) 
Flux Flow rate- Q (m3/s) Heat transfer rate- H (J/s) Current flow (C/s) 
Flux density Velocity- ν (m/s) Heat flow- q (J/s.m2) Electrical flux density (C/m2) 
Conductivity Hydraulic conductivity- κ (m/s) Thermal conductivity- κ 
(J/s.K.m) 
Electrical conductivity- σ 
(S/m) 
Storage Compressibility Specific heat- ϲ (J/kg.K) Capacitance/Inductance 
Decay coefficient Coefficient of consolidation- ϲν 
(m2/s) 
Thermal diffusivity- α (m2/s) Electrical diffusivity- D 
(m2/s) 
Law Darcy Fourier Ohm 
Heat, Q, is a quantity of energy (classical) measured in Joules (N x m), (ft x lb), or 
BTUs. Power is the rate of usage in kW·hr or MCF (BTUs prior to combustion) per 
unit time {Citation: Jean-Luis Briaud, Geotechnical Engineering}
11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 5
There are two paths to go by, but in the long run; there 
is still time to change the road you are on! 
What is this 
3.23 increase 
all about? 
11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 6
There are two paths to go by, but in the long run; there 
is still time to change the road you are on! 
Energy in 
the form 
of BTUs 
65.4% 
11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 7
There are two paths to go by, but in the long run; there 
is still time to change the road you are on! 
Energy in the form 
of BTUs 
60% 
11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 8
Consider Only the Residential and 
Commercial Markets 
• Quadrillions of BTUs by GHEXs 
– Together Residentially and Commercially: 
• How big is this number???? Position as Energy Storage 
– Collective Energy Supply by others, i.e., site 
sourced and stored renewable energy, onsite 
power generation (fueled), Electric Utility supply 
• Jeremy Rifkin? Energy Internet? The Third Industrial 
Revolution? The Second Great Electrification? 
• Remember the 3.23 to 1 loss? 
11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 9
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 10 
Geo Testing, LLC
Residential and commercial combine for a 
total of 19.99 Quadrillion BTUs of energy 
usage. 
*What are Power and Electric utilities really 
good at? “Managing Energy” is their core 
competence. 
*What customers really want from Power 
and Electric utilities is advice on “how to 
implement energy systems that are more 
efficient and use less energy”. Energy costs 
are eclipsing labor costs in some markets. 
*{Citation: Jeremy Rifkin, The Third 
Industrial Revolution} 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 11 
Geo Testing, LLC
What would this look like if GSHPs and GHEXs 
were used to meet all the space conditioning 
and water heating (SC&DHW) needs in 
Residential and Commercial Markets? 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 12 
Geo Testing, LLC
What would this look like if GSHPs and GHEXs 
were used to meet all the space conditioning 
and water heating (SC&DHW) needs in 
Residential and Commercial Markets? 
Residential 65% of 11.4 = 7.4 for SC&DHW Leaving 
4 Quads 
Commercial 60 % of 8.59 = 5.15 for SC&DHW 
Leaving 3.44 Quads 
That is a total of 12.55 Quads for 
SC&DHW from Ground Source HVAC/R 
Since a GHEX is direct use and a GSHP 
requires on 20% Electrical Power INPUT 
(with good design)…….. 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 13 
Geo Testing, LLC
Since a GHEX is direct use and a GSHP 
requires on 20% Electrical Power INPUT 
from utility generation or on-site solar PV 
or wind kW…….. 
65% of 11.4 = 7.4 x 80% =5.92 direct 
supplied Leaving 7.4-5.92 = 2.2 Quads 
inputs by electric powering GSHPs 
60 % of 8.59 = 5.15 x 80% = 4.12 direct 
supplied Leaving 5.15-4.12 = 1.03 Quads 
inputs by electric powering GSHPs 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 14 
Geo Testing, LLC
65% of 11.4 = 7.4 x 80% =5.92 direct supplied Leaving 4 
+ (7.4-5.92) or 5.48 Quads for the utilities 
60 % of 8.59 = 5.15 x 80% = 4.12 direct supplied 
Leaving 3.44 + (5.15-4.12) = 4.47 Quads for utilities 
Since a GHEX is direct use and a GSHP 
requires only 20% Electrical Power INPUT 
from generation or solar PV…….. 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 15 
Geo Testing, LLC
Since a GHEX is direct use and a GSHP requires 
on 20% Electrical Power INPUT from generation 
or solar PV or wind kW…….. 
65% of 11.4 = 7.4 x 80% =5.92 supplied by GHEX Leaving 7.4-5.92 
= 1.48 Quads by Utility; Plus the 11.4-7.4 = 4, + 1.48 or 5.48 
Quads for the Utility (up from the 4.75 originally supplied and 
without customer fuel switching; a year round customer) 
60 % of 8.59 = 5.15 x 80% = 4.12 supplied by GHEX Leaving 5.15- 
4.12 = 1.03 Quads by Utility; Plus the 8.59-5.15 = 3.44, + 1.03 or 
4.47 Quads for the Utility (from the 4.57 originally supplied and 
without customer fuel switching; a year round customer) 
A real opportunity for electric utilities 
by switching to renewables 
to increase customer market share, 
revenue, and reduce CO2e and 
particulates emissions 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 16 
Geo Testing, LLC
Since a GHEX is direct use and a GSHP 
requires on 20% Electrical Power INPUT from 
generation or solar PV or wind kW…….. 
A real opportunity for 
electric utilities-- 
To increase market share, 
revenue, investment, and 
reduce CO2e and particulate 
emissions and this DOES 
NOT address the reduction 
in REJECTED energy! 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 17 
Geo Testing, LLC
A real opportunity for electric 
utilities: 
To increase market share, revenue, 
investment, and reduce CO2e and 
particulate emissions and this DOES 
NOT address the reduction in 
REJECTED energy! 
And guess where the market battle 
is--renewables are taking utilities 
market growth and share with site 
sourced and stored energy (consider 
in Oklahoma SB 1456) 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 18 
Geo Testing, LLC
So Where has the Proceeding 
Taken the Market? 
Maevelle Energy, Scott Emery, 18th November 2014 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
19
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
20
The Second Chapter: 
“Positioning and Marketing for Ground 
Source Systems” 
--ADVOCACY-- 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
21
First Cost Barrier 
Currently only those capable to 
purchase Ground Sourced systems do 
How do we make it “affordable”? 
How do those with a modest income 
get a GSHP system? 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 22 
Geo Testing, LLC
First Cost Barrier 
• Would you invest in the following? 
• None of the heat pump manufacturers are 
using their federal tax dollars to invest in 
GHEXs; or their employees 401Ks. 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
23
The 10% commercial ITC and depreciation are only available to commercial entities when they 
install Ground Source Heat Pump (GSHP) Energy Property in buildings they own or in buildings 
owned by others *if* the installation is done in such a way that the commercial entity is considered 
the owner, for tax purposes, by the IRS. 
In order to establish "tax ownership" of the property, the actual (tax) owner must establish that the 
installed equipment has a market value to someone other than the owner of the building for which it 
is installed. 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
24
There are a number of ways to accomplish this: 
•If the equipment is either shared between, or might be shared between, multiple buildings with distinct 
owners, (for instance, in a mini-district heating or mini-thermal grid scheme), the equipment will not be 
considered "limited use property." This would be uncommon. 
•If the installer can show that the equipment can be removed at the end of any lease or contact and 
still retain sufficient economic value, this is enough. Note: This may work for the actual heat pumps but 
won't work for the ground heat exchanger since it typically can't be removed. (i.e. it is a hole in the 
ground.) 
•If the installer can demonstrate that at the end of a lease, contract or whatever, the equipment will 
have value to someone other than the owner of the building in which it is installed, the need is 
satisfied... Do this: 
First, obtain a permanent easement of record for the ground in which the heat exchanger is 
installed. (This gives you a real property interest, distinct from the building owner's, in which to 
install the heat exchanger.) 
Second, ensure that the contract with the building owner allows for ownership of the equipment 
and/or easement to be transferred and also that on non-payment or end of contract, the building 
is not permitted to use the equipment or interfere with the easement until a new contract is 
accepted. 
Third, provide "energy services" to the building, not a capital lease on the equipment. (i.e. sell a 
Power Purchase Agreement (PPA). Do not "finance" the gear.) Also, assert that there are other 
companies who might be willing to purchase the equipment and easement in order to provide the 
same "energy services" to the building in the future. (Not difficult since there are many ESCOs 
and property management firms that would be willing to do so.) This establishes a market for the 
equipment that includes someone other than the building owner. As such, the tax ownership of 
the equipment remains with the actual owner. 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
25
If the equipment is installed in such a way that the installer/owner of the 
equipment is not considered the owner for tax purposes, the building owner, 
not the equipment owner, will receive the tax incentives. (10% ITC + 5 yr 
MACRS on remaining 90% if commercial; 30% ITC if residential). In some 
cases, third-party installers who haven't done it "right" have insisted that the 
building owners pay them amounts equivalent to the tax incentives the building 
owners receive. In this rather cumbersome manner, they "capture" some of the 
tax benefits as taxable income. 
11/19/2014 
© copyright Garen N. Ewbank and Ewbank 
Geo Testing, LLC 
26
First Cost Barrier 
• Just pay for the GHEX if you are capable, and what is the payback? 
• Incentives 
– Utility Incentives 
• Do they really do anyone good; or just raise the price to the consumer? 
– Manufacturer Rebates 
• Why would a manufacturer extend discounts? 
– Contractor Discounts 
• Is the trade (HVAC/R) that slow? 
– Federal Tax Credits 
• Tax Credits expire at the end of 2016 for our industry!? 
• On-Bill financing by Utility 
• On-Bill payments through Utility 
• Utility Tariff for the GHEX (AEEOK is ready to help, NESI, others?) 
• 3rd Party financing for the GHEX (requires sophisticated financiers) 
– PACE (FHFA removed their objections (Investor Confidence Project)) 
– Debt 
– Operating lease 
– Capital lease 
– Thermal Services Agreements, PPA 
– LPs, MLPs, REITs (the GHEX is essential to space conditioning water heating) 
– Rural Electric Coops using USDA Energy Efficiency and Loan Program 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 27 
Geo Testing, LLC
The Plan 
• How to differentiate between “capable”, 
“affordable”, and “best” (should be our 
playbook—remember IGSHPA Tulsa in 2008?) 
• Earth Storage, a GHEX, the best of all batteries 
and/or storage, BTU to BTU, no kW or MCF 
conversions 
• Turn Neighbor Hoods into Geo Hoods using 3rd 
party financing 
• Energy Internet (TIR? SGE?) 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 28 
Geo Testing, LLC
The Plan is to Join the 
Third Industrial Revolution (TIR) by Participating in the 
“The Second Great Electrification (SGE)” 
1. Get the OSU Spears School of Business, the marketing 
types, not the accountants, to write the “GHEX play 
book within the TIR and SGE” (what is a GHEX worth 
in 10 yrs?) 
2. Demonstrate, with the grant from the DoE (DoE 
Grant), the idea of turning a neighborhood into a 
“GeoHood” 
3. Use Energy Wise (Energy Wise Partners ) to capture 
“big data” from the GeoHood 
4. Engage a “Google” to explain the GeoHood’s “energy 
value to an energy internet” from the big data 
5. Partner with a sophisticated financier 
© copyright Garen N. Ewbank and Ewbank 
11/19/2014 29 
Geo Testing, LLC

More Related Content

What's hot

Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Karim Osseiran
 
Metering and Regulating the Electricity Grid
Metering and Regulating the Electricity GridMetering and Regulating the Electricity Grid
Metering and Regulating the Electricity Grid
Anirudh Ramesh
 
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Green Parking Council
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
EMEX
 
Baby Smart Grid 11/09
Baby Smart Grid 11/09Baby Smart Grid 11/09
Baby Smart Grid 11/09
jessmillar
 
VGB PowerTech 2016-04 Neumann
VGB PowerTech 2016-04 NeumannVGB PowerTech 2016-04 Neumann
VGB PowerTech 2016-04 NeumannJürgen Neumann
 
Energy Storage Technoecon Final Report_Revised March 2014
Energy Storage Technoecon Final Report_Revised March 2014Energy Storage Technoecon Final Report_Revised March 2014
Energy Storage Technoecon Final Report_Revised March 2014Puneet Mannan
 
2016 03-11 PHOTOVOLTAICS REPORT
2016 03-11 PHOTOVOLTAICS REPORT2016 03-11 PHOTOVOLTAICS REPORT
2016 03-11 PHOTOVOLTAICS REPORT
Mario Albarrán Mendoza
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundationguest17a0764
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE
 
Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20
Stefan Larsson
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CC
GE코리아
 
Energy Systems Optimization
Energy Systems OptimizationEnergy Systems Optimization
Energy Systems Optimization
AristotelisGiannopoulos
 
Optimization Poster
Optimization PosterOptimization Poster
Optimization PosterBrock Taute
 
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Stefan Larsson
 
Elec Pwr Conf Baltimore 2012 5-17-2012 SJ FINAL
Elec Pwr Conf Baltimore 2012 5-17-2012 SJ FINALElec Pwr Conf Baltimore 2012 5-17-2012 SJ FINAL
Elec Pwr Conf Baltimore 2012 5-17-2012 SJ FINALSuresh Jambunathan
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
Gensol Engineering Limited
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
Loren Schwappach
 
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteOngoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
IEA-ETSAP
 
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Michael Willemot, Msc, MBA
 

What's hot (20)

Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
 
Metering and Regulating the Electricity Grid
Metering and Regulating the Electricity GridMetering and Regulating the Electricity Grid
Metering and Regulating the Electricity Grid
 
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
 
Baby Smart Grid 11/09
Baby Smart Grid 11/09Baby Smart Grid 11/09
Baby Smart Grid 11/09
 
VGB PowerTech 2016-04 Neumann
VGB PowerTech 2016-04 NeumannVGB PowerTech 2016-04 Neumann
VGB PowerTech 2016-04 Neumann
 
Energy Storage Technoecon Final Report_Revised March 2014
Energy Storage Technoecon Final Report_Revised March 2014Energy Storage Technoecon Final Report_Revised March 2014
Energy Storage Technoecon Final Report_Revised March 2014
 
2016 03-11 PHOTOVOLTAICS REPORT
2016 03-11 PHOTOVOLTAICS REPORT2016 03-11 PHOTOVOLTAICS REPORT
2016 03-11 PHOTOVOLTAICS REPORT
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundation
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CC
 
Energy Systems Optimization
Energy Systems OptimizationEnergy Systems Optimization
Energy Systems Optimization
 
Optimization Poster
Optimization PosterOptimization Poster
Optimization Poster
 
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
 
Elec Pwr Conf Baltimore 2012 5-17-2012 SJ FINAL
Elec Pwr Conf Baltimore 2012 5-17-2012 SJ FINALElec Pwr Conf Baltimore 2012 5-17-2012 SJ FINAL
Elec Pwr Conf Baltimore 2012 5-17-2012 SJ FINAL
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
 
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteOngoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
 
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
 

Similar to Ground Heat Exchangers Market 2014

Understanding the New Jersey electricity bill
Understanding the New Jersey electricity billUnderstanding the New Jersey electricity bill
Understanding the New Jersey electricity bill
CALMAC Manufacturing Corporation
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalRobert Potter
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon
 
Session 3A - Samuel Sanchez
Session 3A - Samuel SanchezSession 3A - Samuel Sanchez
Session 3A - Samuel Sanchez
Reenergize
 
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTSUNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTSSuat Furkan ISIK
 
2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...
2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...
2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...
Masanori HIRANO
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and Tunisia
Insulin Angel
 
16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf
16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf
16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf
Mohamed Salah
 
Patricio Mansilla - PPPs in Power Generation
Patricio Mansilla - PPPs in Power GenerationPatricio Mansilla - PPPs in Power Generation
Patricio Mansilla - PPPs in Power GenerationPublic-PrivatePartnership
 
[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution
[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution
[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution
Joonhee Lee
 
PES Wind Magazine - Analysis of optimal wind turbine topology up to 15MW
PES Wind Magazine - Analysis of optimal wind turbine topology up to 15MWPES Wind Magazine - Analysis of optimal wind turbine topology up to 15MW
PES Wind Magazine - Analysis of optimal wind turbine topology up to 15MW
Ingeteam Wind Energy
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET Journal
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdfAvijit Choudhury
 
The value of Guarantees of Origin: empowering consumers in the energy transition
The value of Guarantees of Origin: empowering consumers in the energy transitionThe value of Guarantees of Origin: empowering consumers in the energy transition
The value of Guarantees of Origin: empowering consumers in the energy transition
Leonardo ENERGY
 
The Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus WheatlyThe Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus Wheatly
catherinewall
 
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Matthew Behrens
 

Similar to Ground Heat Exchangers Market 2014 (20)

Understanding the New Jersey electricity bill
Understanding the New Jersey electricity billUnderstanding the New Jersey electricity bill
Understanding the New Jersey electricity bill
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 Final
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro Fertilizer
 
Session 3A - Samuel Sanchez
Session 3A - Samuel SanchezSession 3A - Samuel Sanchez
Session 3A - Samuel Sanchez
 
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTSUNDERSTANDING THE LICENSING PROCESS FOR  LARGE SCALE SOLAR PROJECTS
UNDERSTANDING THE LICENSING PROCESS FOR LARGE SCALE SOLAR PROJECTS
 
2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...
2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...
2022/11/17 PRIMA2022: Analysis of Carbon Neutrality Scenarios of Industrial C...
 
Infinite Efficiency ReGenX Performance Testing RE: Revised Hillcrest Petroleu...
Infinite Efficiency ReGenX Performance Testing RE: Revised Hillcrest Petroleu...Infinite Efficiency ReGenX Performance Testing RE: Revised Hillcrest Petroleu...
Infinite Efficiency ReGenX Performance Testing RE: Revised Hillcrest Petroleu...
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and Tunisia
 
16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf
16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf
16_Economic_assessment_of_PV_and_wind_for_energy_planning_Cairo_Egypt.pdf
 
Two difficulties
Two difficultiesTwo difficulties
Two difficulties
 
Patricio Mansilla - PPPs in Power Generation
Patricio Mansilla - PPPs in Power GenerationPatricio Mansilla - PPPs in Power Generation
Patricio Mansilla - PPPs in Power Generation
 
[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution
[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution
[Green Fund Investment Strategy] Jeju Island Wind Power Curtailment Solution
 
Emex Conference
Emex ConferenceEmex Conference
Emex Conference
 
Agham Feed-in Tariff system Briefer
Agham Feed-in Tariff system BrieferAgham Feed-in Tariff system Briefer
Agham Feed-in Tariff system Briefer
 
PES Wind Magazine - Analysis of optimal wind turbine topology up to 15MW
PES Wind Magazine - Analysis of optimal wind turbine topology up to 15MWPES Wind Magazine - Analysis of optimal wind turbine topology up to 15MW
PES Wind Magazine - Analysis of optimal wind turbine topology up to 15MW
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdf
 
The value of Guarantees of Origin: empowering consumers in the energy transition
The value of Guarantees of Origin: empowering consumers in the energy transitionThe value of Guarantees of Origin: empowering consumers in the energy transition
The value of Guarantees of Origin: empowering consumers in the energy transition
 
The Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus WheatlyThe Electric Grid 2.0 - Fergus Wheatly
The Electric Grid 2.0 - Fergus Wheatly
 
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 

Ground Heat Exchangers Market 2014

  • 1. A Short Story About Energy -only two (2) chapters- The Title of the Story is: “The GHEX and The Third Industrial Revolution (TIR)” 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 1
  • 2. There are two paths to go by, but in the long run; there is still time to change the road you are on! • Utility Incentives – Do they really do anyone good; or just raise the price to the consumer? • Manufacturer Rebates – Why would a manufacturer extend discounts? • Contractor Discounts – Is the trade (HVAC/R) that slow? • Federal Tax Credits – Tax Credits expire at the end of 2016 for our industry! 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 2
  • 3. The First Chapter: “The Engineers Explanation” using the Big Picture 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 3
  • 4. Comparing Darcy’s Law (flow of water) with Fourier’s (flow of heat) and Ohm’s (flow of current) 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 4 Parameter Flow of water Flow of heat Flow of current Quantity Volume- V (m3) Heat- Q (J) Electric charge (C) Potential Head- ht (m) Temperature- T (K) Voltage (V) Gradient Hydraulic- ih (unitless) Temperature- it (K/m) Electric field- E (V/m) Flux Flow rate- Q (m3/s) Heat transfer rate- H (J/s) Current flow (C/s) Flux density Velocity- ν (m/s) Heat flow- q (J/s.m2) Electrical flux density (C/m2) Conductivity Hydraulic conductivity- κ (m/s) Thermal conductivity- κ (J/s.K.m) Electrical conductivity- σ (S/m) Storage Compressibility Specific heat- ϲ (J/kg.K) Capacitance/Inductance Decay coefficient Coefficient of consolidation- ϲν (m2/s) Thermal diffusivity- α (m2/s) Electrical diffusivity- D (m2/s) Law Darcy Fourier Ohm Heat, Q, is a quantity of energy (classical) measured in Joules (N x m), (ft x lb), or BTUs. Power is the rate of usage in kW·hr or MCF (BTUs prior to combustion) per unit time {Citation: Jean-Luis Briaud, Geotechnical Engineering}
  • 5. 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 5
  • 6. There are two paths to go by, but in the long run; there is still time to change the road you are on! What is this 3.23 increase all about? 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 6
  • 7. There are two paths to go by, but in the long run; there is still time to change the road you are on! Energy in the form of BTUs 65.4% 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 7
  • 8. There are two paths to go by, but in the long run; there is still time to change the road you are on! Energy in the form of BTUs 60% 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 8
  • 9. Consider Only the Residential and Commercial Markets • Quadrillions of BTUs by GHEXs – Together Residentially and Commercially: • How big is this number???? Position as Energy Storage – Collective Energy Supply by others, i.e., site sourced and stored renewable energy, onsite power generation (fueled), Electric Utility supply • Jeremy Rifkin? Energy Internet? The Third Industrial Revolution? The Second Great Electrification? • Remember the 3.23 to 1 loss? 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 9
  • 10. © copyright Garen N. Ewbank and Ewbank 11/19/2014 10 Geo Testing, LLC
  • 11. Residential and commercial combine for a total of 19.99 Quadrillion BTUs of energy usage. *What are Power and Electric utilities really good at? “Managing Energy” is their core competence. *What customers really want from Power and Electric utilities is advice on “how to implement energy systems that are more efficient and use less energy”. Energy costs are eclipsing labor costs in some markets. *{Citation: Jeremy Rifkin, The Third Industrial Revolution} © copyright Garen N. Ewbank and Ewbank 11/19/2014 11 Geo Testing, LLC
  • 12. What would this look like if GSHPs and GHEXs were used to meet all the space conditioning and water heating (SC&DHW) needs in Residential and Commercial Markets? © copyright Garen N. Ewbank and Ewbank 11/19/2014 12 Geo Testing, LLC
  • 13. What would this look like if GSHPs and GHEXs were used to meet all the space conditioning and water heating (SC&DHW) needs in Residential and Commercial Markets? Residential 65% of 11.4 = 7.4 for SC&DHW Leaving 4 Quads Commercial 60 % of 8.59 = 5.15 for SC&DHW Leaving 3.44 Quads That is a total of 12.55 Quads for SC&DHW from Ground Source HVAC/R Since a GHEX is direct use and a GSHP requires on 20% Electrical Power INPUT (with good design)…….. © copyright Garen N. Ewbank and Ewbank 11/19/2014 13 Geo Testing, LLC
  • 14. Since a GHEX is direct use and a GSHP requires on 20% Electrical Power INPUT from utility generation or on-site solar PV or wind kW…….. 65% of 11.4 = 7.4 x 80% =5.92 direct supplied Leaving 7.4-5.92 = 2.2 Quads inputs by electric powering GSHPs 60 % of 8.59 = 5.15 x 80% = 4.12 direct supplied Leaving 5.15-4.12 = 1.03 Quads inputs by electric powering GSHPs © copyright Garen N. Ewbank and Ewbank 11/19/2014 14 Geo Testing, LLC
  • 15. 65% of 11.4 = 7.4 x 80% =5.92 direct supplied Leaving 4 + (7.4-5.92) or 5.48 Quads for the utilities 60 % of 8.59 = 5.15 x 80% = 4.12 direct supplied Leaving 3.44 + (5.15-4.12) = 4.47 Quads for utilities Since a GHEX is direct use and a GSHP requires only 20% Electrical Power INPUT from generation or solar PV…….. © copyright Garen N. Ewbank and Ewbank 11/19/2014 15 Geo Testing, LLC
  • 16. Since a GHEX is direct use and a GSHP requires on 20% Electrical Power INPUT from generation or solar PV or wind kW…….. 65% of 11.4 = 7.4 x 80% =5.92 supplied by GHEX Leaving 7.4-5.92 = 1.48 Quads by Utility; Plus the 11.4-7.4 = 4, + 1.48 or 5.48 Quads for the Utility (up from the 4.75 originally supplied and without customer fuel switching; a year round customer) 60 % of 8.59 = 5.15 x 80% = 4.12 supplied by GHEX Leaving 5.15- 4.12 = 1.03 Quads by Utility; Plus the 8.59-5.15 = 3.44, + 1.03 or 4.47 Quads for the Utility (from the 4.57 originally supplied and without customer fuel switching; a year round customer) A real opportunity for electric utilities by switching to renewables to increase customer market share, revenue, and reduce CO2e and particulates emissions © copyright Garen N. Ewbank and Ewbank 11/19/2014 16 Geo Testing, LLC
  • 17. Since a GHEX is direct use and a GSHP requires on 20% Electrical Power INPUT from generation or solar PV or wind kW…….. A real opportunity for electric utilities-- To increase market share, revenue, investment, and reduce CO2e and particulate emissions and this DOES NOT address the reduction in REJECTED energy! © copyright Garen N. Ewbank and Ewbank 11/19/2014 17 Geo Testing, LLC
  • 18. A real opportunity for electric utilities: To increase market share, revenue, investment, and reduce CO2e and particulate emissions and this DOES NOT address the reduction in REJECTED energy! And guess where the market battle is--renewables are taking utilities market growth and share with site sourced and stored energy (consider in Oklahoma SB 1456) © copyright Garen N. Ewbank and Ewbank 11/19/2014 18 Geo Testing, LLC
  • 19. So Where has the Proceeding Taken the Market? Maevelle Energy, Scott Emery, 18th November 2014 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 19
  • 20. 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 20
  • 21. The Second Chapter: “Positioning and Marketing for Ground Source Systems” --ADVOCACY-- 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 21
  • 22. First Cost Barrier Currently only those capable to purchase Ground Sourced systems do How do we make it “affordable”? How do those with a modest income get a GSHP system? © copyright Garen N. Ewbank and Ewbank 11/19/2014 22 Geo Testing, LLC
  • 23. First Cost Barrier • Would you invest in the following? • None of the heat pump manufacturers are using their federal tax dollars to invest in GHEXs; or their employees 401Ks. 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 23
  • 24. The 10% commercial ITC and depreciation are only available to commercial entities when they install Ground Source Heat Pump (GSHP) Energy Property in buildings they own or in buildings owned by others *if* the installation is done in such a way that the commercial entity is considered the owner, for tax purposes, by the IRS. In order to establish "tax ownership" of the property, the actual (tax) owner must establish that the installed equipment has a market value to someone other than the owner of the building for which it is installed. 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 24
  • 25. There are a number of ways to accomplish this: •If the equipment is either shared between, or might be shared between, multiple buildings with distinct owners, (for instance, in a mini-district heating or mini-thermal grid scheme), the equipment will not be considered "limited use property." This would be uncommon. •If the installer can show that the equipment can be removed at the end of any lease or contact and still retain sufficient economic value, this is enough. Note: This may work for the actual heat pumps but won't work for the ground heat exchanger since it typically can't be removed. (i.e. it is a hole in the ground.) •If the installer can demonstrate that at the end of a lease, contract or whatever, the equipment will have value to someone other than the owner of the building in which it is installed, the need is satisfied... Do this: First, obtain a permanent easement of record for the ground in which the heat exchanger is installed. (This gives you a real property interest, distinct from the building owner's, in which to install the heat exchanger.) Second, ensure that the contract with the building owner allows for ownership of the equipment and/or easement to be transferred and also that on non-payment or end of contract, the building is not permitted to use the equipment or interfere with the easement until a new contract is accepted. Third, provide "energy services" to the building, not a capital lease on the equipment. (i.e. sell a Power Purchase Agreement (PPA). Do not "finance" the gear.) Also, assert that there are other companies who might be willing to purchase the equipment and easement in order to provide the same "energy services" to the building in the future. (Not difficult since there are many ESCOs and property management firms that would be willing to do so.) This establishes a market for the equipment that includes someone other than the building owner. As such, the tax ownership of the equipment remains with the actual owner. 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 25
  • 26. If the equipment is installed in such a way that the installer/owner of the equipment is not considered the owner for tax purposes, the building owner, not the equipment owner, will receive the tax incentives. (10% ITC + 5 yr MACRS on remaining 90% if commercial; 30% ITC if residential). In some cases, third-party installers who haven't done it "right" have insisted that the building owners pay them amounts equivalent to the tax incentives the building owners receive. In this rather cumbersome manner, they "capture" some of the tax benefits as taxable income. 11/19/2014 © copyright Garen N. Ewbank and Ewbank Geo Testing, LLC 26
  • 27. First Cost Barrier • Just pay for the GHEX if you are capable, and what is the payback? • Incentives – Utility Incentives • Do they really do anyone good; or just raise the price to the consumer? – Manufacturer Rebates • Why would a manufacturer extend discounts? – Contractor Discounts • Is the trade (HVAC/R) that slow? – Federal Tax Credits • Tax Credits expire at the end of 2016 for our industry!? • On-Bill financing by Utility • On-Bill payments through Utility • Utility Tariff for the GHEX (AEEOK is ready to help, NESI, others?) • 3rd Party financing for the GHEX (requires sophisticated financiers) – PACE (FHFA removed their objections (Investor Confidence Project)) – Debt – Operating lease – Capital lease – Thermal Services Agreements, PPA – LPs, MLPs, REITs (the GHEX is essential to space conditioning water heating) – Rural Electric Coops using USDA Energy Efficiency and Loan Program © copyright Garen N. Ewbank and Ewbank 11/19/2014 27 Geo Testing, LLC
  • 28. The Plan • How to differentiate between “capable”, “affordable”, and “best” (should be our playbook—remember IGSHPA Tulsa in 2008?) • Earth Storage, a GHEX, the best of all batteries and/or storage, BTU to BTU, no kW or MCF conversions • Turn Neighbor Hoods into Geo Hoods using 3rd party financing • Energy Internet (TIR? SGE?) © copyright Garen N. Ewbank and Ewbank 11/19/2014 28 Geo Testing, LLC
  • 29. The Plan is to Join the Third Industrial Revolution (TIR) by Participating in the “The Second Great Electrification (SGE)” 1. Get the OSU Spears School of Business, the marketing types, not the accountants, to write the “GHEX play book within the TIR and SGE” (what is a GHEX worth in 10 yrs?) 2. Demonstrate, with the grant from the DoE (DoE Grant), the idea of turning a neighborhood into a “GeoHood” 3. Use Energy Wise (Energy Wise Partners ) to capture “big data” from the GeoHood 4. Engage a “Google” to explain the GeoHood’s “energy value to an energy internet” from the big data 5. Partner with a sophisticated financier © copyright Garen N. Ewbank and Ewbank 11/19/2014 29 Geo Testing, LLC