Six grid-connected solar PV power plants have been commissioned in India under a demonstration program announced in 2008. The plants range in size from 1-5 MW and use different PV technologies. Four of the plants have been operating for over a year. Their capacity utilization factors range from 12.29% to 18.8%, with the highest being the 5 MW plant in Rajasthan. In general, plant performance has been best from March to May, with capacity utilization factors as high as 23.63%. The lowest performance months tended to be the first few months after commissioning. Detailed monthly generation data is provided for each plant in Tables V through X.