o   Engineering is the professional art of organizing
    resources and applying science and materials in
    technical design areas for the benefit of society.



Background, Skills,Values, & Project Assignments

Greg Sleeper
Mobile: 802-338-0108

Principal Electrical Hardware
& Systems Design Engineer
Background
          Born and raised in Vermont
           • Grew up in the beautiful Champlain valley
           • Graduated from University of Vermont and
             Wentworth Institute of Technology in Boston

          Years of engineering experience
           • Electrical, systems, software, quality, and test
           • Experience in commercial industry, military
             contracts, and academic medical research

          Personal Values
           •   Having a happy family
           •   Integrity & honesty
           •   Trustworthy & kind
           •   Staying physically fit
           •   Committed to a goal
Career Values
Experience:
 To apply acquired knowledge in electrical
  engineering toward a challenging career in areas
  of product development, automation, control
  system design or test equipment.
Growth:
 Stay current on the emergent technologies.
 Develop design solutions through
  teamwork, communication & continuous
  improvement.
Professional Attributes
   Goal oriented - Can be either self-directed or
    promote teamwork to meet company needs.
   Diligent - Able to maintain a work flow from
    managing parts procurement, PCB design &
    assembly, box design and assembly, cable harness
    design, mechanical fab, and build.
   Detailed - Develops quality products and
    validates performance & margins to include EMI,
    reliability, safety, FMEA, & parts stress.
   Passionate – Able to solve problems with a
    hands-on mentality and a desire for success.
Project Skills
   Leadership
     •   Project leader on controls design for ammunition handling system.
     •   Led product quality improvements on aircraft Rounds Limit Switches.
     •   Provides organizational design direction to deliver a compliant product.

   Highly-motivated
     •   Worked 60 plus hour weeks to get TOW test equipment integrated.
     •   Provided management of project milestones to meet company goals.
     •   Maintains and develops relationships with suppliers & manufacturers.

   Communicator
     •   Excellent writing skills for component specs, test plans and test reports.
     •   Excellent verbal skills for designs presented internally and to customer.
     •   Works well with project design team, buyers, management and quality.
Engineering Design Skills
   Circuit design for analog and digital signals.
   Box assembly designs with military connectors.
   PCB design, component selection, and build.
   Cable harness sizing, system power analysis.
   Embedded digital servo motion control drives.
   Development of specs for sensors & motors.
   Budget, cost, schedule and quality conscious.
   Engineering Tool Set:
     •   GD&T, MS Visual BASIC, MS Visio, MS Office, MS Project, Team Center.
     •   Cadence OrCAD, PSpice, AutoCAD, C++, Agile, SDLC Methodology.
     •   Understanding of NFPA, NEC, ANSI, IPC specs, Mil Specs, Lean, FMEA.
Project Assignment & Result
Task 1. Obsolescence - Rounds Limit Switches (RLS)
Evaluated current specification drawings and existing designs
to improve material selections and developed Pro-E designs
for assembly build-to-print drawings to meet environmental
and the part performance requirements for Warner Robins
Air Logistics Command. Performed product qualification by
analysis and verification by cycle test and fire test. Designed
new mechanical 5 rounds reverse clearing hysteresis for A-10
RLS. Also, completed new designs for F-16 and F-15 aircraft.
Project Assignment & Result
Task 2. Specification of Servo System Components
Evaluated mechanical dynamic loads of ammunition handling
control systems to determine effects of system inertia and
acceleration & speed requirements to meet time lines for the
test case scenarios. Optimized servo motor performance for
size and weight. Performance met gun firing timeline on the
Crusader Self-propelled Howitzer and the ammo field supply
mission of the Resupply Vehicle. Also, designed custom brakes
and clutches for x-y-x ammunition supply shuttles and custom
transmitter and receiver optical sensor pair to determine the
ammo position on the conveyors.
Project Assignment & Result
Task 3. JSF Aircraft Cables for Lockheed Martin
Designed aircraft military interface cables to meet customer
requirements for light-weight construction materials while
meeting the high temperature specs, the functional electrical
system performance, and the EMI test requirements. Cables
met EMI under electrical system loads. Also, designed other
dynamic cables (based on my own method for isolating the
cable components to allow independent movement) for the
JSF 20mm Gatling guns to meet rigors of gun firing and recoil.
Project Assignment & Result
Task 4. Create EFV Software Test Plan & Test Cases
Based on EFV turret system specifications for ammo handling
system, developed the software test plan and test cases for
the embedded control unit firmware to meet system level
and derived requirements.Validated the bench-top system
performance using servo motor loads. System improvements
made in incremental releases. Part of electrical project team
that developed the electronic digital control unit, firmware,
motors, cables, and test equipment for ammo feed system.
The embedded control unit worked successfully on the EFV.
Project Assignment & Result
Task 5. Debugged and Repaired Test Equipment
Performed troubleshooting on inoperable CIWS production
test panel that was severely damaged during transportation.
Rebuilt cables and also ruggedized the design.Verified signal
timing functionality with a digital storage scope. Performed
validation to QC Acceptance Procedures. The test panel was
returned for production verification of CIWS circuit cards.
Also debugged AV-8B test set, with its case severely damaged
from years of field use. Specified and quoted parts BOM for
repairs. Performed validation to QC Acceptance Procedures.

Gregory d sleeper profile

  • 1.
    o Engineering is the professional art of organizing resources and applying science and materials in technical design areas for the benefit of society. Background, Skills,Values, & Project Assignments Greg Sleeper Mobile: 802-338-0108 Principal Electrical Hardware & Systems Design Engineer
  • 2.
    Background  Born and raised in Vermont • Grew up in the beautiful Champlain valley • Graduated from University of Vermont and Wentworth Institute of Technology in Boston  Years of engineering experience • Electrical, systems, software, quality, and test • Experience in commercial industry, military contracts, and academic medical research  Personal Values • Having a happy family • Integrity & honesty • Trustworthy & kind • Staying physically fit • Committed to a goal
  • 3.
    Career Values Experience:  Toapply acquired knowledge in electrical engineering toward a challenging career in areas of product development, automation, control system design or test equipment. Growth:  Stay current on the emergent technologies.  Develop design solutions through teamwork, communication & continuous improvement.
  • 4.
    Professional Attributes  Goal oriented - Can be either self-directed or promote teamwork to meet company needs.  Diligent - Able to maintain a work flow from managing parts procurement, PCB design & assembly, box design and assembly, cable harness design, mechanical fab, and build.  Detailed - Develops quality products and validates performance & margins to include EMI, reliability, safety, FMEA, & parts stress.  Passionate – Able to solve problems with a hands-on mentality and a desire for success.
  • 5.
    Project Skills  Leadership • Project leader on controls design for ammunition handling system. • Led product quality improvements on aircraft Rounds Limit Switches. • Provides organizational design direction to deliver a compliant product.  Highly-motivated • Worked 60 plus hour weeks to get TOW test equipment integrated. • Provided management of project milestones to meet company goals. • Maintains and develops relationships with suppliers & manufacturers.  Communicator • Excellent writing skills for component specs, test plans and test reports. • Excellent verbal skills for designs presented internally and to customer. • Works well with project design team, buyers, management and quality.
  • 6.
    Engineering Design Skills  Circuit design for analog and digital signals.  Box assembly designs with military connectors.  PCB design, component selection, and build.  Cable harness sizing, system power analysis.  Embedded digital servo motion control drives.  Development of specs for sensors & motors.  Budget, cost, schedule and quality conscious.  Engineering Tool Set: • GD&T, MS Visual BASIC, MS Visio, MS Office, MS Project, Team Center. • Cadence OrCAD, PSpice, AutoCAD, C++, Agile, SDLC Methodology. • Understanding of NFPA, NEC, ANSI, IPC specs, Mil Specs, Lean, FMEA.
  • 7.
    Project Assignment &Result Task 1. Obsolescence - Rounds Limit Switches (RLS) Evaluated current specification drawings and existing designs to improve material selections and developed Pro-E designs for assembly build-to-print drawings to meet environmental and the part performance requirements for Warner Robins Air Logistics Command. Performed product qualification by analysis and verification by cycle test and fire test. Designed new mechanical 5 rounds reverse clearing hysteresis for A-10 RLS. Also, completed new designs for F-16 and F-15 aircraft.
  • 8.
    Project Assignment &Result Task 2. Specification of Servo System Components Evaluated mechanical dynamic loads of ammunition handling control systems to determine effects of system inertia and acceleration & speed requirements to meet time lines for the test case scenarios. Optimized servo motor performance for size and weight. Performance met gun firing timeline on the Crusader Self-propelled Howitzer and the ammo field supply mission of the Resupply Vehicle. Also, designed custom brakes and clutches for x-y-x ammunition supply shuttles and custom transmitter and receiver optical sensor pair to determine the ammo position on the conveyors.
  • 9.
    Project Assignment &Result Task 3. JSF Aircraft Cables for Lockheed Martin Designed aircraft military interface cables to meet customer requirements for light-weight construction materials while meeting the high temperature specs, the functional electrical system performance, and the EMI test requirements. Cables met EMI under electrical system loads. Also, designed other dynamic cables (based on my own method for isolating the cable components to allow independent movement) for the JSF 20mm Gatling guns to meet rigors of gun firing and recoil.
  • 10.
    Project Assignment &Result Task 4. Create EFV Software Test Plan & Test Cases Based on EFV turret system specifications for ammo handling system, developed the software test plan and test cases for the embedded control unit firmware to meet system level and derived requirements.Validated the bench-top system performance using servo motor loads. System improvements made in incremental releases. Part of electrical project team that developed the electronic digital control unit, firmware, motors, cables, and test equipment for ammo feed system. The embedded control unit worked successfully on the EFV.
  • 11.
    Project Assignment &Result Task 5. Debugged and Repaired Test Equipment Performed troubleshooting on inoperable CIWS production test panel that was severely damaged during transportation. Rebuilt cables and also ruggedized the design.Verified signal timing functionality with a digital storage scope. Performed validation to QC Acceptance Procedures. The test panel was returned for production verification of CIWS circuit cards. Also debugged AV-8B test set, with its case severely damaged from years of field use. Specified and quoted parts BOM for repairs. Performed validation to QC Acceptance Procedures.