SlideShare a Scribd company logo
STRATEGIC LAND INVESTMENT
Greenhithe, Kent, UK

Investment Opportunity                                                                                                               Timelines
Our latest strategic land investment site is close to Greenhithe, Kent. On successful
                                                                                                                                    November / December 2010
allocation of the site for residential use, it is projected that the plot owners will enjoy
                                                                                                                                    Consultation on draft Core Strategy Document
in excess of 38% net returns over an 18 month period. This equates to approximately
25% annualised return.                                                                                                              March 2011
                                                                                                                                    Core Strategy Public Examination
Site and Location                                                                                                                   April to September 2011
                                                                                                                                    Prepare formal application for planning permission
The Greenhithe Strategic Development Area lies within the built up area of Knockhall
to the south east of Greenhithe. The site consists of a small bowling green and pavil-                                              September 2011
ion that is still in use, a large area of overgrown redundant car parking and a derelict                                            Adoption of the Core Strategy
football club pavilion and pitch that was formerly the privately owned Empire Sports                                                October 2011
Ground but which has not been used for several years. The site lies within a predomi-                                               Submission of the application permission
nantly residential area characterised by two storey terraced housing. An existing large
recreational ground with children’s play equipment and formal sports pitch lies im-                                                 Early 2012
mediately to the north of the site.                                                                                                 Proposed date for the application to achieve permission
                                                                                                                                    Mid 2012
Planning Report                                                                                                                     Forecasted sale of the site

The Local Plan adopted in April 1995 is now out of date but the Secretary of State
saved a number of Adopted Local Plan policies beyond September 2007 until such                                                       Site Facts
time that the Local Development Framework (LDF) is adopted. The site is identified                                                  Total investment: £57,600
on the Proposals Map as within the existing built up area but there are no specific
housing or open space allocations relating to the site.                                                                             Timeline: Approximately 18 months

                                                                                                                                    Total expected return: £75,000 and above
The Core Strategy is currently at Pre-submission stage. A Pre-submission Core Strat-
egy Document was published for public consultation on the 2nd September 2010 for                                                    Approx size: 300 sqm
a six-week period running until the 14th October 2010. It is expected that the Core
                                                                                                                                    Region: Dartford, Kent
Strategy will be submitted to the Secretary of State in November 2010, with Examina-
tion then expected in March 2011 and formal Adoption in September 2011.                                                             Tenure: Freehold

The Core Strategy Submission Draft Document at Policy CS10 sets out key locations                                                   •      M25 Junction—2 miles
for residential development to address the 17,340 new dwellings target and these                                                    •      London City Airport—10 miles
sites include Eastern Quarry to the south of the site. Policy CS4 promotes a chain of                                               •      Dartford Tunnel—3.8 miles
distinctive and individual but linked communities, existing and new within the Priority
                                                                                                                                    •      Dartford Centre—4.7 miles
Area. The Policy also promotes the making of existing open spaces including Cray-
lands Gauge publically available, which would provide improved and direct links be-                                                 •      Ebbsfleet International Railway Station—2.7 miles

tween the site and Craylands Lane area to the east, and Eastern Quarry to the south.                                                •      Greenhithe Train Station—1 mile



Aerial Map                                                                                                                           Company Details

                                                                                                                                    SJ Capital Group

                                                                                                                                    1st Floor Sandton City Office Tower
                                                                                                                                    158 Fifth Street
                                                                                                                                    Sandton
                                                                                                                                    Johannesburg
                                                                                                                                    2146
                                                                                                                                    South Africa

                                                                                                                                    Tel:           +27 (0)11 303 8800
                                                                                                                                    Fax:           +27 (0)11 303 8808

                                                                                                                                    Ground Floor, South Wing
                                                                                                                                    2 Cranbrook Crescent
                                                                                                                                    La Lucia Ridge, Durban
                                                                                                                                    4019
                                                                                                                                    South Africa

                                                                                                                                    Tel:           +27 (0)31 566 5552
                                                                                                                                    Fax:           +27 (0)31 566 5221



This document is provided for the purpose of information only. The opinions expressed here represent the views of SJ Capital Group at the time of preparation and should not be interpreted as investment advice. The
information and opinions contained in the document are recorded and expressed in good faith and in reliance on sources believed to be reliable. However, no representation, warranty, undertaking or guarantee of
whatever nature is made or given concerning the accuracy and/or completeness of such opinions. Any investment is speculative and involves significant risks and in making any investment decision, you will rely solely
on your own review and examination of the facts and the records relating to such investment. The contents of this document are based on current legislation which may be subject to change. SJ Capital Group shall
have no liability of whatever nature in respect of any claim, damages, loss or expense arising out of or in connection with the reliance by you, on the contents of this documents.
Greenhithe Site Map

More Related Content

Viewers also liked

SJ Capital Group Sept 2013 Presentation
SJ Capital Group Sept 2013 PresentationSJ Capital Group Sept 2013 Presentation
SJ Capital Group Sept 2013 Presentation
CRAIG BRITS
 
Savills Land Report - Feb 2013
Savills Land Report - Feb 2013Savills Land Report - Feb 2013
Savills Land Report - Feb 2013
CRAIG BRITS
 
Nabil el ghanaoui práctica 7
Nabil el ghanaoui práctica 7Nabil el ghanaoui práctica 7
Nabil el ghanaoui práctica 7Nabil Lefrisa
 
Bursledon 2nd Formal Submissions to the Draft Local Plan
Bursledon 2nd Formal Submissions to the Draft Local PlanBursledon 2nd Formal Submissions to the Draft Local Plan
Bursledon 2nd Formal Submissions to the Draft Local Plan
CRAIG BRITS
 
Total film
Total filmTotal film
Total film
kannkarry
 
Greenhithe Outline Design and Access Statement
Greenhithe Outline Design and Access StatementGreenhithe Outline Design and Access Statement
Greenhithe Outline Design and Access Statement
CRAIG BRITS
 
Olabi Maker Party Rio de Janeiro - September 2014
Olabi Maker Party Rio de Janeiro - September 2014Olabi Maker Party Rio de Janeiro - September 2014
Olabi Maker Party Rio de Janeiro - September 2014
Marcela Sabino
 
Land West Bursledon Promotion Doc - Savills Planning & Regeneration
Land West Bursledon Promotion Doc - Savills Planning & RegenerationLand West Bursledon Promotion Doc - Savills Planning & Regeneration
Land West Bursledon Promotion Doc - Savills Planning & Regeneration
CRAIG BRITS
 

Viewers also liked (8)

SJ Capital Group Sept 2013 Presentation
SJ Capital Group Sept 2013 PresentationSJ Capital Group Sept 2013 Presentation
SJ Capital Group Sept 2013 Presentation
 
Savills Land Report - Feb 2013
Savills Land Report - Feb 2013Savills Land Report - Feb 2013
Savills Land Report - Feb 2013
 
Nabil el ghanaoui práctica 7
Nabil el ghanaoui práctica 7Nabil el ghanaoui práctica 7
Nabil el ghanaoui práctica 7
 
Bursledon 2nd Formal Submissions to the Draft Local Plan
Bursledon 2nd Formal Submissions to the Draft Local PlanBursledon 2nd Formal Submissions to the Draft Local Plan
Bursledon 2nd Formal Submissions to the Draft Local Plan
 
Total film
Total filmTotal film
Total film
 
Greenhithe Outline Design and Access Statement
Greenhithe Outline Design and Access StatementGreenhithe Outline Design and Access Statement
Greenhithe Outline Design and Access Statement
 
Olabi Maker Party Rio de Janeiro - September 2014
Olabi Maker Party Rio de Janeiro - September 2014Olabi Maker Party Rio de Janeiro - September 2014
Olabi Maker Party Rio de Janeiro - September 2014
 
Land West Bursledon Promotion Doc - Savills Planning & Regeneration
Land West Bursledon Promotion Doc - Savills Planning & RegenerationLand West Bursledon Promotion Doc - Savills Planning & Regeneration
Land West Bursledon Promotion Doc - Savills Planning & Regeneration
 

Similar to Greenhithe Factsheet

TAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAILTAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAIL
Geoff Whitten
 
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
latrobeuni
 
PORTFOLIO T.SEGAKISE
PORTFOLIO T.SEGAKISEPORTFOLIO T.SEGAKISE
PORTFOLIO T.SEGAKISE
Tebogo Segakise
 
Gaap info
Gaap infoGaap info
Gaap info
Bill Lord
 
Tony Brun Geographical Association Of Western Australia Conference Presen...
Tony Brun   Geographical Association Of Western Australia   Conference Presen...Tony Brun   Geographical Association Of Western Australia   Conference Presen...
Tony Brun Geographical Association Of Western Australia Conference Presen...
Curtin University Sustainability Policy (CUSP) Institute
 
Preferred growth strategy summary presentation
Preferred growth strategy   summary presentationPreferred growth strategy   summary presentation
Preferred growth strategy summary presentation
JuliaADowding
 
Land pooling mpd 2021 summary
Land pooling mpd 2021 summaryLand pooling mpd 2021 summary
Land pooling mpd 2021 summary
CERTES REALTY LIMITED
 
Appendix 1 - Strategic Asset Management Plan-property.pdf
Appendix 1 - Strategic Asset Management Plan-property.pdfAppendix 1 - Strategic Asset Management Plan-property.pdf
Appendix 1 - Strategic Asset Management Plan-property.pdf
ssuser3901ab
 
Selected Projects
Selected ProjectsSelected Projects
Selected Projects
robinsstephen1
 
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Development
 
Cradle City Master Plan 30 June 08 Phase 1
Cradle City Master Plan 30 June 08   Phase 1Cradle City Master Plan 30 June 08   Phase 1
Cradle City Master Plan 30 June 08 Phase 1
ldavids
 
Getting the best from our land - A land use stategy for Scotland Action Plan ...
Getting the best from our land - A land use stategy for Scotland Action Plan ...Getting the best from our land - A land use stategy for Scotland Action Plan ...
Getting the best from our land - A land use stategy for Scotland Action Plan ...
scottishgovernment
 
CIMB Research - Nailing an urban redevelopment project
CIMB Research - Nailing an urban redevelopment  projectCIMB Research - Nailing an urban redevelopment  project
CIMB Research - Nailing an urban redevelopment project
iProperty Malaysia
 
Middlesbrough ELR
Middlesbrough ELRMiddlesbrough ELR
Middlesbrough ELR
Adam Price
 
RP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for online
Roger Pearson
 
State Highway 47 Land Use Change
State Highway 47 Land Use ChangeState Highway 47 Land Use Change
State Highway 47 Land Use Change
City of College Station
 
CV Bothma Bernice_05_2016
CV Bothma Bernice_05_2016CV Bothma Bernice_05_2016
CV Bothma Bernice_05_2016
Bernice Bothma
 
SK Plantation(Cambodia) Pte ltd
SK Plantation(Cambodia) Pte ltdSK Plantation(Cambodia) Pte ltd
SK Plantation(Cambodia) Pte ltd
Anand Khetan
 
The in the norther corridor of etm compressed 190814
The in the norther corridor of etm compressed 190814The in the norther corridor of etm compressed 190814
The in the norther corridor of etm compressed 190814
Durban Chamber of Commerce and Industry
 
PPT to BPC.pptx
PPT to BPC.pptxPPT to BPC.pptx
PPT to BPC.pptx
AshBahadurSubba2
 

Similar to Greenhithe Factsheet (20)

TAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAILTAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAIL
 
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
 
PORTFOLIO T.SEGAKISE
PORTFOLIO T.SEGAKISEPORTFOLIO T.SEGAKISE
PORTFOLIO T.SEGAKISE
 
Gaap info
Gaap infoGaap info
Gaap info
 
Tony Brun Geographical Association Of Western Australia Conference Presen...
Tony Brun   Geographical Association Of Western Australia   Conference Presen...Tony Brun   Geographical Association Of Western Australia   Conference Presen...
Tony Brun Geographical Association Of Western Australia Conference Presen...
 
Preferred growth strategy summary presentation
Preferred growth strategy   summary presentationPreferred growth strategy   summary presentation
Preferred growth strategy summary presentation
 
Land pooling mpd 2021 summary
Land pooling mpd 2021 summaryLand pooling mpd 2021 summary
Land pooling mpd 2021 summary
 
Appendix 1 - Strategic Asset Management Plan-property.pdf
Appendix 1 - Strategic Asset Management Plan-property.pdfAppendix 1 - Strategic Asset Management Plan-property.pdf
Appendix 1 - Strategic Asset Management Plan-property.pdf
 
Selected Projects
Selected ProjectsSelected Projects
Selected Projects
 
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009
 
Cradle City Master Plan 30 June 08 Phase 1
Cradle City Master Plan 30 June 08   Phase 1Cradle City Master Plan 30 June 08   Phase 1
Cradle City Master Plan 30 June 08 Phase 1
 
Getting the best from our land - A land use stategy for Scotland Action Plan ...
Getting the best from our land - A land use stategy for Scotland Action Plan ...Getting the best from our land - A land use stategy for Scotland Action Plan ...
Getting the best from our land - A land use stategy for Scotland Action Plan ...
 
CIMB Research - Nailing an urban redevelopment project
CIMB Research - Nailing an urban redevelopment  projectCIMB Research - Nailing an urban redevelopment  project
CIMB Research - Nailing an urban redevelopment project
 
Middlesbrough ELR
Middlesbrough ELRMiddlesbrough ELR
Middlesbrough ELR
 
RP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for online
 
State Highway 47 Land Use Change
State Highway 47 Land Use ChangeState Highway 47 Land Use Change
State Highway 47 Land Use Change
 
CV Bothma Bernice_05_2016
CV Bothma Bernice_05_2016CV Bothma Bernice_05_2016
CV Bothma Bernice_05_2016
 
SK Plantation(Cambodia) Pte ltd
SK Plantation(Cambodia) Pte ltdSK Plantation(Cambodia) Pte ltd
SK Plantation(Cambodia) Pte ltd
 
The in the norther corridor of etm compressed 190814
The in the norther corridor of etm compressed 190814The in the norther corridor of etm compressed 190814
The in the norther corridor of etm compressed 190814
 
PPT to BPC.pptx
PPT to BPC.pptxPPT to BPC.pptx
PPT to BPC.pptx
 

More from CRAIG BRITS

Bursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal ReportBursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal Report
CRAIG BRITS
 
Sj capital presentation brits0113
Sj capital presentation brits0113Sj capital presentation brits0113
Sj capital presentation brits0113
CRAIG BRITS
 
West of hamble lane concept masterplan rev c3 (2)
West of hamble lane concept masterplan rev c3 (2)West of hamble lane concept masterplan rev c3 (2)
West of hamble lane concept masterplan rev c3 (2)
CRAIG BRITS
 
Land east of love lane burnham
Land east of love lane burnhamLand east of love lane burnham
Land east of love lane burnhamCRAIG BRITS
 
Bos fact sheet v2
Bos fact sheet v2Bos fact sheet v2
Bos fact sheet v2CRAIG BRITS
 
Bursledon factsheet 27000
Bursledon factsheet 27000 Bursledon factsheet 27000
Bursledon factsheet 27000
CRAIG BRITS
 
Bursledon plot map
Bursledon plot mapBursledon plot map
Bursledon plot mapCRAIG BRITS
 
Yateley Factsheet
Yateley FactsheetYateley Factsheet
Yateley Factsheet
CRAIG BRITS
 

More from CRAIG BRITS (8)

Bursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal ReportBursledon Buro Happold Site Appraisal Report
Bursledon Buro Happold Site Appraisal Report
 
Sj capital presentation brits0113
Sj capital presentation brits0113Sj capital presentation brits0113
Sj capital presentation brits0113
 
West of hamble lane concept masterplan rev c3 (2)
West of hamble lane concept masterplan rev c3 (2)West of hamble lane concept masterplan rev c3 (2)
West of hamble lane concept masterplan rev c3 (2)
 
Land east of love lane burnham
Land east of love lane burnhamLand east of love lane burnham
Land east of love lane burnham
 
Bos fact sheet v2
Bos fact sheet v2Bos fact sheet v2
Bos fact sheet v2
 
Bursledon factsheet 27000
Bursledon factsheet 27000 Bursledon factsheet 27000
Bursledon factsheet 27000
 
Bursledon plot map
Bursledon plot mapBursledon plot map
Bursledon plot map
 
Yateley Factsheet
Yateley FactsheetYateley Factsheet
Yateley Factsheet
 

Greenhithe Factsheet

  • 1. STRATEGIC LAND INVESTMENT Greenhithe, Kent, UK Investment Opportunity Timelines Our latest strategic land investment site is close to Greenhithe, Kent. On successful November / December 2010 allocation of the site for residential use, it is projected that the plot owners will enjoy Consultation on draft Core Strategy Document in excess of 38% net returns over an 18 month period. This equates to approximately 25% annualised return. March 2011 Core Strategy Public Examination Site and Location April to September 2011 Prepare formal application for planning permission The Greenhithe Strategic Development Area lies within the built up area of Knockhall to the south east of Greenhithe. The site consists of a small bowling green and pavil- September 2011 ion that is still in use, a large area of overgrown redundant car parking and a derelict Adoption of the Core Strategy football club pavilion and pitch that was formerly the privately owned Empire Sports October 2011 Ground but which has not been used for several years. The site lies within a predomi- Submission of the application permission nantly residential area characterised by two storey terraced housing. An existing large recreational ground with children’s play equipment and formal sports pitch lies im- Early 2012 mediately to the north of the site. Proposed date for the application to achieve permission Mid 2012 Planning Report Forecasted sale of the site The Local Plan adopted in April 1995 is now out of date but the Secretary of State saved a number of Adopted Local Plan policies beyond September 2007 until such Site Facts time that the Local Development Framework (LDF) is adopted. The site is identified Total investment: £57,600 on the Proposals Map as within the existing built up area but there are no specific housing or open space allocations relating to the site. Timeline: Approximately 18 months Total expected return: £75,000 and above The Core Strategy is currently at Pre-submission stage. A Pre-submission Core Strat- egy Document was published for public consultation on the 2nd September 2010 for Approx size: 300 sqm a six-week period running until the 14th October 2010. It is expected that the Core Region: Dartford, Kent Strategy will be submitted to the Secretary of State in November 2010, with Examina- tion then expected in March 2011 and formal Adoption in September 2011. Tenure: Freehold The Core Strategy Submission Draft Document at Policy CS10 sets out key locations • M25 Junction—2 miles for residential development to address the 17,340 new dwellings target and these • London City Airport—10 miles sites include Eastern Quarry to the south of the site. Policy CS4 promotes a chain of • Dartford Tunnel—3.8 miles distinctive and individual but linked communities, existing and new within the Priority • Dartford Centre—4.7 miles Area. The Policy also promotes the making of existing open spaces including Cray- lands Gauge publically available, which would provide improved and direct links be- • Ebbsfleet International Railway Station—2.7 miles tween the site and Craylands Lane area to the east, and Eastern Quarry to the south. • Greenhithe Train Station—1 mile Aerial Map Company Details SJ Capital Group 1st Floor Sandton City Office Tower 158 Fifth Street Sandton Johannesburg 2146 South Africa Tel: +27 (0)11 303 8800 Fax: +27 (0)11 303 8808 Ground Floor, South Wing 2 Cranbrook Crescent La Lucia Ridge, Durban 4019 South Africa Tel: +27 (0)31 566 5552 Fax: +27 (0)31 566 5221 This document is provided for the purpose of information only. The opinions expressed here represent the views of SJ Capital Group at the time of preparation and should not be interpreted as investment advice. The information and opinions contained in the document are recorded and expressed in good faith and in reliance on sources believed to be reliable. However, no representation, warranty, undertaking or guarantee of whatever nature is made or given concerning the accuracy and/or completeness of such opinions. Any investment is speculative and involves significant risks and in making any investment decision, you will rely solely on your own review and examination of the facts and the records relating to such investment. The contents of this document are based on current legislation which may be subject to change. SJ Capital Group shall have no liability of whatever nature in respect of any claim, damages, loss or expense arising out of or in connection with the reliance by you, on the contents of this documents.