SlideShare a Scribd company logo
1 of 27
Welcome to
the meeting
Agenda
•   GAAP and its implications
•   How do we object?
•   Open forum
•   Next steps and offers of help
•   Timeline
•   End
What is the GAAP?
• The Grantham Area Action Plan (GAAP) will drive
  regeneration and growth for the town and will serve as
  a vehicle to deliver Grantham’s status as a Growth
  Point. It sets out the Council’s vision for the town
  together with objectives, a policy framework and
  proposals to guide future development over the next
  15 years up to 2026. It seeks to enhance Grantham’s
  historic environment and improve the quality and
  range of facilities and services available to residents
  and businesses. The GAAP identifies and allocates sites
  for specific types of development including
  employment, retail, housing, open space and green
  infrastructure networks and will play a key role in
  delivering the future development requirements for
  Grantham town.
The GAAP will result in:
A strong local economic focus that will provide high quality housing, employment and a strong
retail offer
New road infrastructure, which will assist in reducing traffic in the town centre enabling a traffic
calmed environment to be created
A vibrant and visually attractive town
An enhanced environment with striking architecture, spaces, waterways and green networks
An attractive shopping area with new retail and mixed use developments
A centre for strong community culture and historic environment
Improved accessibility, particularly for pedestrians and cyclists


The GAAP is based upon:
A number of background studies providing robust evidence to support the approach proposed
(see below)
A sustainability appraisal to make sure the approach will have the best environmental, social and
economic outcomes possible
Technical and viability assessments of key development sites

The preparation of the GAAP has involved consultation with the local community and other key
stakeholders not only on the overall policy approach of the GAAP but also specific proposals for
key development sites.
Key issues which are considered relevant to this plan include:
To direct development to locations which meets the strategic requirements set out by
                                    the Core Strategy
    Delivering housing, employment and retail requirements of the Core Strategy
Delivering Green infrastructure networks and protecting and enhancing existing open
           spaces and meeting open space standards for new development
  To identify the town centre as a focus for development including retail, mixed use
        development, employment, housing and other other town centre uses
                To avoid development in areas of high risk from flooding
     To consider locations that have existing or potential infrastructure to support
                                      development
                To protect against detrimental impact on historic assets
                            The need for affordable housing.

House prices are relatively low compared to elsewhere in South Kesteven District and
 the wider Lincolnshire area. Yet despite this, Grantham has relatively low levels of
owner occupancy and high rates of social housing and private sector renting. There is
        a shortage of affordable housing compared to the level of demand.

By 2026, Grantham will be a vibrant and key economic centre in Lincolnshire. It will be
      an economically, socially, environmentally and physically connected town.
Social housing   Timescale




Total housing
Poplar Farm
Planned points of entry to the site
Beaumont Drive and Applewood Close
Potential other points of access in case of objection
          Lynden Avenue / Vernon Avenue
Conservative estimates are
                                                         for 600 new houses to be
                                                             added to the daily
                                                         throughflow on the three
                                                                   roads




  Only points of access to the estate will be through
Stephenson Avenue, Cliffe Road and Hazelwood Drive
Objectives of note
Objective 7
• To locate development within Grantham where it will provide the
   opportunity for people to satisfy their day-to-day needs for employment,
   shopping, education and other services locally or in locations which
   minimise the need to travel and where there are modes of transport
   available in addition to the motor car.

Objective 9
• To conserve and enhance Grantham’s heritage, respecting historic
   buildings and their settings, links and views.

Objective 10
• To provide a network of multi-functional green spaces which secures a net
   gain in biodiversity, provides for the sporting and recreational needs of the
   population, promotes healthy lifestyles and enhances the quality of the
   natural and built environment.
Implications
There is no planning for making the access to the
 site better through highway development. The
 only plan is to put more roads and identify the
potential for a cycle path (it is not clear where this
          could legally and physically go)
There is NO planning for development of the infrastructure on the estates

There is NO planning for the allocation of any further informal open space

There are NO plans to amend the electricity provision on site

There is NO planning for improvement of the foul sewerage on the estate –
there are rumours that the sewerage system on the estate has been deemed
to be full for its present purpose.

Any information on this would be very useful.

There is planning for a three form entry school in this area which will cost £9
million to build.

It appears to use that looking at the plan this estate is planned to be built in
the 2016-2021 window yet there are minimal plans to develop the
infrastructure until the 2021-2028 window. We appear to be an afterthought
The arguments used by the residents of the Manthorpe Estate regarding the proposed development on the other side of the railway line and border




                                                 Biodiversity
       • The current national planning policy framework for the
         natural environment, countryside and landscape is set out
         in PPS 1 (Delivering Sustainable Development), PPS7
         (Sustainable Development in Rural Areas) and PPS 9
         (Biodiversity and Geological Conservation). The policies are
         aimed at sustainable development which protects and
         enhances biodiversity, and provides for access to the
         countryside.

       • Grantham’s green infrastructure network comprises both
         green spaces within urban areas, such as Wyndham Park,
         and larger spaces in the countryside around the town, such
         as Belton Park.
Heritage
• It is clear from reading a range
  of documents that we should target the
  proximity of the land to Belton House.
• English Heritage and National Trust have
  objections to aspects of the plan.
• We should focus on the Belton House and
  Park Setting Study and Policy Development
  document commissioned by SKDC.
Highways
• Concerns expressed in original statement by
  highways about suitability of roads
• Change in use of access roads
• Side roads being turned into main access
  roads
• Safety of the roads in the winter
• Overload of the town’s roads
Planning objections
            Object to this allocation. We consider that the
            provision made for a reserve site at Grantham is      GRAH1 (Land North of Peachwood
            unnecessary and highly questionable whether it        Close) is relatively close to Belton Park
            could achieve its stated purpose. Request that the    and development here could harm the
            provision made for a reserve site be deleted.         setting of and views from the
            - Commercial Estates Group                            registered park and garden. This needs
                                                                  to be identified as a key constraint and
                                                                  carefully considered before the site is
                                                                  brought forward. - English Heritage
Object to the allocation. The
Representor considers that the site is
subject to highway access constraints.
The development of the Site would also              Object to the policy. Access is an issue and
have implications for the setting of                distance from local services. Obviously
Belton House and Garden. Reserve sites              expanding the area of GRAH2 would be
should enjoy the same qualities as                  preferable. - P and B Lely
primary allocations.
- Antony Asbury Associates
Planning supporters
                                                        Support the policy. It is Buckminster
 Support the policy. We have noted with interest        Estates' view that the proposed housing
that part of our clients' landholding (crosshatched)    supply figures for Grantham are too finely
is included within the GAAP and has been identified     balanced and that an additional reserve
as a reserve site for residential development. We       site should be allocated. The Buckminster
support the identification of the land as potential     Estate proposed through the SHLAA a
residential development land and will take              housing site adjacent to 205 Bridgend
whatever actions are necessary to facilitate the        Road/A52 Somerby Hill. By only having
early and effective release of the land for such uses   one reserve site there is not enough
subject to all other general planning policies.         contingency built into the GAAP. The land
 - Trustees of Sir Thomas White’s Charity               at Somerby Hill to be added as an
                                                        additional housing reserve site.
                                                        - Buckminster Estates
The land is owned by The Charity of Sir Thomas White whose trustees are duty bound
to maximise the potential of their investment. Therefore we can only expect that they
                 will push to sell the land for the maximum amount.
Grounds for objection

•   Impact on landscape
•   Highways
•   Infrastructure
•   Impact on Grantham Heritage
•   Biodiversity
•   Greenbelt vs Brownfield
How do we object?
• SKDC planning website
• Individual letters of
  objection
• Collective letter of
  objection
The planning website is difficult to navigate and use – you will need to
  log into the site to do so as well. We advise that is easier to write
  letters.

Individual letters need to be posted or emailed to the Planning Policy
  & Partnerships department at South Kesteven District Council
 A collective letter will show that we have widescale support within the
  community – there were 250 comments on the whole plan in March
  it would be a massive show of strength if we could massively outdo
  that. It will only count as one letter but is an important statement to
  make.

We have been advised that the council have called for people to
 comment through the website but this is only to make it more
 efficient for the planning policy department and they are happy for
 us to use the other methods

It is important that we do use both of the other two methods and that
   the individual letters are not round robins.
We cannot object
    on grounds of:
• Impact on personal
  circumstances
• House price values
• Objection to development
  of the town
Timeline

More Related Content

What's hot

First suburbs consortium slide assembly
First suburbs consortium  slide assemblyFirst suburbs consortium  slide assembly
First suburbs consortium slide assemblyThe Port
 
2015 Fenway Urban Village Plan
2015 Fenway Urban Village Plan2015 Fenway Urban Village Plan
2015 Fenway Urban Village PlanKenneth Comia
 
Enquiry by Design day 1 summary notes, 19 January 2017
Enquiry by Design day 1 summary notes, 19 January 2017Enquiry by Design day 1 summary notes, 19 January 2017
Enquiry by Design day 1 summary notes, 19 January 2017Chalgrove Airfield
 
Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017Chalgrove Airfield
 
Lisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 ActionsLisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 ActionsTheresa O'Donohoe
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsJohnny Browaeys - 庄博闻
 
Benefits of Open Space Planning
Benefits of Open Space PlanningBenefits of Open Space Planning
Benefits of Open Space PlanningTRACT Consulting
 
Community Event Slideshow
Community Event SlideshowCommunity Event Slideshow
Community Event Slideshowpnpgroup
 
Reconsider North Cowichan RCMP detachment 2020
Reconsider North Cowichan RCMP detachment 2020Reconsider North Cowichan RCMP detachment 2020
Reconsider North Cowichan RCMP detachment 2020Hajo Meijer
 
Stratford np forum presentation david lowe wcc
Stratford np forum presentation david lowe wccStratford np forum presentation david lowe wcc
Stratford np forum presentation david lowe wccTanworth Development Plan
 
West Central Neighborhoods Student Housing
West Central Neighborhoods Student HousingWest Central Neighborhoods Student Housing
West Central Neighborhoods Student Housingbeccahenry
 
Brownfields Case Studies
Brownfields Case Studies Brownfields Case Studies
Brownfields Case Studies nado-web
 
Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015Chris Cutts
 
Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017Fairfax County
 
City council presentation 05.14.12 revised
City council presentation 05.14.12 revisedCity council presentation 05.14.12 revised
City council presentation 05.14.12 revisedcityofevanston
 
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...Fairfax County
 
15P-031 - CC Staff Report (2)
15P-031 - CC Staff Report (2)15P-031 - CC Staff Report (2)
15P-031 - CC Staff Report (2)GalvestonPlanning
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportBrendan O'Connor
 

What's hot (20)

First suburbs consortium slide assembly
First suburbs consortium  slide assemblyFirst suburbs consortium  slide assembly
First suburbs consortium slide assembly
 
2015 Fenway Urban Village Plan
2015 Fenway Urban Village Plan2015 Fenway Urban Village Plan
2015 Fenway Urban Village Plan
 
Enquiry by Design day 1 summary notes, 19 January 2017
Enquiry by Design day 1 summary notes, 19 January 2017Enquiry by Design day 1 summary notes, 19 January 2017
Enquiry by Design day 1 summary notes, 19 January 2017
 
Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017
 
Lisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 ActionsLisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 Actions
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case Descriptions
 
Benefits of Open Space Planning
Benefits of Open Space PlanningBenefits of Open Space Planning
Benefits of Open Space Planning
 
Community Event Slideshow
Community Event SlideshowCommunity Event Slideshow
Community Event Slideshow
 
Reconsider North Cowichan RCMP detachment 2020
Reconsider North Cowichan RCMP detachment 2020Reconsider North Cowichan RCMP detachment 2020
Reconsider North Cowichan RCMP detachment 2020
 
Stratford np forum presentation david lowe wcc
Stratford np forum presentation david lowe wccStratford np forum presentation david lowe wcc
Stratford np forum presentation david lowe wcc
 
West Central Neighborhoods Student Housing
West Central Neighborhoods Student HousingWest Central Neighborhoods Student Housing
West Central Neighborhoods Student Housing
 
Brownfields Case Studies
Brownfields Case Studies Brownfields Case Studies
Brownfields Case Studies
 
Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015Kinneil Estate Masterplan final draft Feb 2015
Kinneil Estate Masterplan final draft Feb 2015
 
Open Space Strategy
Open Space StrategyOpen Space Strategy
Open Space Strategy
 
Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017
 
City council presentation 05.14.12 revised
City council presentation 05.14.12 revisedCity council presentation 05.14.12 revised
City council presentation 05.14.12 revised
 
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
Baileys Crossroads Shelter: July 20, 2016 Presentation to the Fairfax County ...
 
15P-031 - CC Staff Report (2)
15P-031 - CC Staff Report (2)15P-031 - CC Staff Report (2)
15P-031 - CC Staff Report (2)
 
Long Beach IN Comp Plan
Long Beach IN Comp PlanLong Beach IN Comp Plan
Long Beach IN Comp Plan
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final Report
 

Viewers also liked

Gaap, assumptions, principles & constraints
Gaap, assumptions, principles & constraintsGaap, assumptions, principles & constraints
Gaap, assumptions, principles & constraintsMohammad Robiul
 
GAAP (Generally Accepted Accounting Principles)
GAAP (Generally Accepted Accounting Principles)GAAP (Generally Accepted Accounting Principles)
GAAP (Generally Accepted Accounting Principles)Syed Behroz Ali Rizvi
 
Scope, importance of gaap, concepts & conventions
Scope, importance of gaap, concepts & conventionsScope, importance of gaap, concepts & conventions
Scope, importance of gaap, concepts & conventionsPercy Poonegar
 
IFRS vs. GAAP
IFRS vs. GAAPIFRS vs. GAAP
IFRS vs. GAAPmkosinsk
 
Generally accepted accounting principles
Generally accepted accounting principlesGenerally accepted accounting principles
Generally accepted accounting principlesJay Armocilla
 
Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)Muhammad Sher
 
Accounting Concepts and Principles with Examples
Accounting Concepts and Principles with ExamplesAccounting Concepts and Principles with Examples
Accounting Concepts and Principles with ExamplesRahul's Ventures
 

Viewers also liked (8)

Gaap, assumptions, principles & constraints
Gaap, assumptions, principles & constraintsGaap, assumptions, principles & constraints
Gaap, assumptions, principles & constraints
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
GAAP (Generally Accepted Accounting Principles)
GAAP (Generally Accepted Accounting Principles)GAAP (Generally Accepted Accounting Principles)
GAAP (Generally Accepted Accounting Principles)
 
Scope, importance of gaap, concepts & conventions
Scope, importance of gaap, concepts & conventionsScope, importance of gaap, concepts & conventions
Scope, importance of gaap, concepts & conventions
 
IFRS vs. GAAP
IFRS vs. GAAPIFRS vs. GAAP
IFRS vs. GAAP
 
Generally accepted accounting principles
Generally accepted accounting principlesGenerally accepted accounting principles
Generally accepted accounting principles
 
Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)
 
Accounting Concepts and Principles with Examples
Accounting Concepts and Principles with ExamplesAccounting Concepts and Principles with Examples
Accounting Concepts and Principles with Examples
 

Similar to Gaap info

Park of Keir Proposal Presentation
Park of Keir Proposal PresentationPark of Keir Proposal Presentation
Park of Keir Proposal Presentationgeoffmartyn
 
Irish Hills Ranch Specific Plan
Irish Hills Ranch Specific PlanIrish Hills Ranch Specific Plan
Irish Hills Ranch Specific PlanMichael Gibbons
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]Michael Walton
 
Planning documents relevant to Countryside
Planning documents relevant to CountrysidePlanning documents relevant to Countryside
Planning documents relevant to CountrysideCity of Roanoke
 
Comments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersComments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersGabrielleDondero
 
North Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationNorth Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationPAS_Team
 
$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.docDavid Twigg
 
Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
Ecoforum 2011 Dave Johnson Brownfield Regeneration In NswEcoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nswdavidjrca
 
Preferred growth strategy summary presentation
Preferred growth strategy   summary presentationPreferred growth strategy   summary presentation
Preferred growth strategy summary presentationJuliaADowding
 
Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8kieran rose
 
Land Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. SouthLand Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. SouthCity of College Station
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnershipDennisChurch
 
Informal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 FinalInformal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 FinalDavid Twigg
 
Old Pune Development Plan — Suggestions+Objections
Old Pune Development Plan — Suggestions+ObjectionsOld Pune Development Plan — Suggestions+Objections
Old Pune Development Plan — Suggestions+ObjectionsMudra Shirvaikar
 
Document Finished
Document FinishedDocument Finished
Document FinishedGregg Boyd
 
CBREPlacemakingResearch190610
CBREPlacemakingResearch190610CBREPlacemakingResearch190610
CBREPlacemakingResearch190610Trevor Nicholson
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Crosstown TO
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)SQSY
 

Similar to Gaap info (20)

Park of Keir Proposal Presentation
Park of Keir Proposal PresentationPark of Keir Proposal Presentation
Park of Keir Proposal Presentation
 
Irish Hills Ranch Specific Plan
Irish Hills Ranch Specific PlanIrish Hills Ranch Specific Plan
Irish Hills Ranch Specific Plan
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]
 
Planning documents relevant to Countryside
Planning documents relevant to CountrysidePlanning documents relevant to Countryside
Planning documents relevant to Countryside
 
Comments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersComments on the Draft Plan and Sewers
Comments on the Draft Plan and Sewers
 
North Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentationNorth Dorset DC Neighbourhood Planning presentation
North Dorset DC Neighbourhood Planning presentation
 
$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc$introduction by d twigg to local plan.doc
$introduction by d twigg to local plan.doc
 
State Highway 47 Land Use Change
State Highway 47 Land Use ChangeState Highway 47 Land Use Change
State Highway 47 Land Use Change
 
EPCALpaper
EPCALpaperEPCALpaper
EPCALpaper
 
Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
Ecoforum 2011 Dave Johnson Brownfield Regeneration In NswEcoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
 
Preferred growth strategy summary presentation
Preferred growth strategy   summary presentationPreferred growth strategy   summary presentation
Preferred growth strategy summary presentation
 
Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8
 
Land Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. SouthLand Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. South
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
 
Informal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 FinalInformal Parish Council Meeting 150413 Final
Informal Parish Council Meeting 150413 Final
 
Old Pune Development Plan — Suggestions+Objections
Old Pune Development Plan — Suggestions+ObjectionsOld Pune Development Plan — Suggestions+Objections
Old Pune Development Plan — Suggestions+Objections
 
Document Finished
Document FinishedDocument Finished
Document Finished
 
CBREPlacemakingResearch190610
CBREPlacemakingResearch190610CBREPlacemakingResearch190610
CBREPlacemakingResearch190610
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
 

More from Bill Lord

Long Sutton Careers book
Long Sutton Careers bookLong Sutton Careers book
Long Sutton Careers bookBill Lord
 
Tim rylands flyer final
Tim rylands flyer finalTim rylands flyer final
Tim rylands flyer finalBill Lord
 
Long Sutton CPS OFSTED report May 2014
Long Sutton CPS OFSTED report May 2014Long Sutton CPS OFSTED report May 2014
Long Sutton CPS OFSTED report May 2014Bill Lord
 
The day the Night Zoo Keeper came to our school.
The day the Night Zoo Keeper came to our school.The day the Night Zoo Keeper came to our school.
The day the Night Zoo Keeper came to our school.Bill Lord
 
Gamification example
Gamification exampleGamification example
Gamification exampleBill Lord
 
Mixed text types introduction
Mixed text types introductionMixed text types introduction
Mixed text types introductionBill Lord
 
Choice cards for narrative with text types inside
Choice cards for narrative with text types insideChoice cards for narrative with text types inside
Choice cards for narrative with text types insideBill Lord
 
Blogging presentation
Blogging presentationBlogging presentation
Blogging presentationBill Lord
 
Giraffe Twitter Presentation
Giraffe Twitter PresentationGiraffe Twitter Presentation
Giraffe Twitter PresentationBill Lord
 

More from Bill Lord (9)

Long Sutton Careers book
Long Sutton Careers bookLong Sutton Careers book
Long Sutton Careers book
 
Tim rylands flyer final
Tim rylands flyer finalTim rylands flyer final
Tim rylands flyer final
 
Long Sutton CPS OFSTED report May 2014
Long Sutton CPS OFSTED report May 2014Long Sutton CPS OFSTED report May 2014
Long Sutton CPS OFSTED report May 2014
 
The day the Night Zoo Keeper came to our school.
The day the Night Zoo Keeper came to our school.The day the Night Zoo Keeper came to our school.
The day the Night Zoo Keeper came to our school.
 
Gamification example
Gamification exampleGamification example
Gamification example
 
Mixed text types introduction
Mixed text types introductionMixed text types introduction
Mixed text types introduction
 
Choice cards for narrative with text types inside
Choice cards for narrative with text types insideChoice cards for narrative with text types inside
Choice cards for narrative with text types inside
 
Blogging presentation
Blogging presentationBlogging presentation
Blogging presentation
 
Giraffe Twitter Presentation
Giraffe Twitter PresentationGiraffe Twitter Presentation
Giraffe Twitter Presentation
 

Recently uploaded

Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 

Recently uploaded (20)

Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 

Gaap info

  • 2. Agenda • GAAP and its implications • How do we object? • Open forum • Next steps and offers of help • Timeline • End
  • 3. What is the GAAP? • The Grantham Area Action Plan (GAAP) will drive regeneration and growth for the town and will serve as a vehicle to deliver Grantham’s status as a Growth Point. It sets out the Council’s vision for the town together with objectives, a policy framework and proposals to guide future development over the next 15 years up to 2026. It seeks to enhance Grantham’s historic environment and improve the quality and range of facilities and services available to residents and businesses. The GAAP identifies and allocates sites for specific types of development including employment, retail, housing, open space and green infrastructure networks and will play a key role in delivering the future development requirements for Grantham town.
  • 4. The GAAP will result in: A strong local economic focus that will provide high quality housing, employment and a strong retail offer New road infrastructure, which will assist in reducing traffic in the town centre enabling a traffic calmed environment to be created A vibrant and visually attractive town An enhanced environment with striking architecture, spaces, waterways and green networks An attractive shopping area with new retail and mixed use developments A centre for strong community culture and historic environment Improved accessibility, particularly for pedestrians and cyclists The GAAP is based upon: A number of background studies providing robust evidence to support the approach proposed (see below) A sustainability appraisal to make sure the approach will have the best environmental, social and economic outcomes possible Technical and viability assessments of key development sites The preparation of the GAAP has involved consultation with the local community and other key stakeholders not only on the overall policy approach of the GAAP but also specific proposals for key development sites.
  • 5. Key issues which are considered relevant to this plan include: To direct development to locations which meets the strategic requirements set out by the Core Strategy Delivering housing, employment and retail requirements of the Core Strategy Delivering Green infrastructure networks and protecting and enhancing existing open spaces and meeting open space standards for new development To identify the town centre as a focus for development including retail, mixed use development, employment, housing and other other town centre uses To avoid development in areas of high risk from flooding To consider locations that have existing or potential infrastructure to support development To protect against detrimental impact on historic assets The need for affordable housing. House prices are relatively low compared to elsewhere in South Kesteven District and the wider Lincolnshire area. Yet despite this, Grantham has relatively low levels of owner occupancy and high rates of social housing and private sector renting. There is a shortage of affordable housing compared to the level of demand. By 2026, Grantham will be a vibrant and key economic centre in Lincolnshire. It will be an economically, socially, environmentally and physically connected town.
  • 6. Social housing Timescale Total housing
  • 8.
  • 9. Planned points of entry to the site Beaumont Drive and Applewood Close
  • 10. Potential other points of access in case of objection Lynden Avenue / Vernon Avenue
  • 11. Conservative estimates are for 600 new houses to be added to the daily throughflow on the three roads Only points of access to the estate will be through Stephenson Avenue, Cliffe Road and Hazelwood Drive
  • 12. Objectives of note Objective 7 • To locate development within Grantham where it will provide the opportunity for people to satisfy their day-to-day needs for employment, shopping, education and other services locally or in locations which minimise the need to travel and where there are modes of transport available in addition to the motor car. Objective 9 • To conserve and enhance Grantham’s heritage, respecting historic buildings and their settings, links and views. Objective 10 • To provide a network of multi-functional green spaces which secures a net gain in biodiversity, provides for the sporting and recreational needs of the population, promotes healthy lifestyles and enhances the quality of the natural and built environment.
  • 14. There is no planning for making the access to the site better through highway development. The only plan is to put more roads and identify the potential for a cycle path (it is not clear where this could legally and physically go)
  • 15. There is NO planning for development of the infrastructure on the estates There is NO planning for the allocation of any further informal open space There are NO plans to amend the electricity provision on site There is NO planning for improvement of the foul sewerage on the estate – there are rumours that the sewerage system on the estate has been deemed to be full for its present purpose. Any information on this would be very useful. There is planning for a three form entry school in this area which will cost £9 million to build. It appears to use that looking at the plan this estate is planned to be built in the 2016-2021 window yet there are minimal plans to develop the infrastructure until the 2021-2028 window. We appear to be an afterthought
  • 16. The arguments used by the residents of the Manthorpe Estate regarding the proposed development on the other side of the railway line and border Biodiversity • The current national planning policy framework for the natural environment, countryside and landscape is set out in PPS 1 (Delivering Sustainable Development), PPS7 (Sustainable Development in Rural Areas) and PPS 9 (Biodiversity and Geological Conservation). The policies are aimed at sustainable development which protects and enhances biodiversity, and provides for access to the countryside. • Grantham’s green infrastructure network comprises both green spaces within urban areas, such as Wyndham Park, and larger spaces in the countryside around the town, such as Belton Park.
  • 17. Heritage • It is clear from reading a range of documents that we should target the proximity of the land to Belton House. • English Heritage and National Trust have objections to aspects of the plan. • We should focus on the Belton House and Park Setting Study and Policy Development document commissioned by SKDC.
  • 18. Highways • Concerns expressed in original statement by highways about suitability of roads • Change in use of access roads • Side roads being turned into main access roads • Safety of the roads in the winter • Overload of the town’s roads
  • 19. Planning objections Object to this allocation. We consider that the provision made for a reserve site at Grantham is GRAH1 (Land North of Peachwood unnecessary and highly questionable whether it Close) is relatively close to Belton Park could achieve its stated purpose. Request that the and development here could harm the provision made for a reserve site be deleted. setting of and views from the - Commercial Estates Group registered park and garden. This needs to be identified as a key constraint and carefully considered before the site is brought forward. - English Heritage Object to the allocation. The Representor considers that the site is subject to highway access constraints. The development of the Site would also Object to the policy. Access is an issue and have implications for the setting of distance from local services. Obviously Belton House and Garden. Reserve sites expanding the area of GRAH2 would be should enjoy the same qualities as preferable. - P and B Lely primary allocations. - Antony Asbury Associates
  • 20. Planning supporters Support the policy. It is Buckminster Support the policy. We have noted with interest Estates' view that the proposed housing that part of our clients' landholding (crosshatched) supply figures for Grantham are too finely is included within the GAAP and has been identified balanced and that an additional reserve as a reserve site for residential development. We site should be allocated. The Buckminster support the identification of the land as potential Estate proposed through the SHLAA a residential development land and will take housing site adjacent to 205 Bridgend whatever actions are necessary to facilitate the Road/A52 Somerby Hill. By only having early and effective release of the land for such uses one reserve site there is not enough subject to all other general planning policies. contingency built into the GAAP. The land - Trustees of Sir Thomas White’s Charity at Somerby Hill to be added as an additional housing reserve site. - Buckminster Estates
  • 21. The land is owned by The Charity of Sir Thomas White whose trustees are duty bound to maximise the potential of their investment. Therefore we can only expect that they will push to sell the land for the maximum amount.
  • 22. Grounds for objection • Impact on landscape • Highways • Infrastructure • Impact on Grantham Heritage • Biodiversity • Greenbelt vs Brownfield
  • 23.
  • 24. How do we object? • SKDC planning website • Individual letters of objection • Collective letter of objection
  • 25. The planning website is difficult to navigate and use – you will need to log into the site to do so as well. We advise that is easier to write letters. Individual letters need to be posted or emailed to the Planning Policy & Partnerships department at South Kesteven District Council A collective letter will show that we have widescale support within the community – there were 250 comments on the whole plan in March it would be a massive show of strength if we could massively outdo that. It will only count as one letter but is an important statement to make. We have been advised that the council have called for people to comment through the website but this is only to make it more efficient for the planning policy department and they are happy for us to use the other methods It is important that we do use both of the other two methods and that the individual letters are not round robins.
  • 26. We cannot object on grounds of: • Impact on personal circumstances • House price values • Objection to development of the town

Editor's Notes

  1. The GAAP will result in: A strong local economic focus that will provide high quality housing, employment and a strong retail offer New road infrastructure, which will assist in reducing traffic in the town centre enabling a traffic calmed environment to be created A vibrant and visually attractive townAn enhanced environment with striking architecture, spaces, waterways and green networksAn attractive shopping area with new retail and mixed use developmentsA centre for strong community culture and historic environmentImproved accessibility, particularly for pedestrians and cyclistsThe  GAAP is based upon: A number of background studies providing robust evidence to support the approach proposed (see below) A sustainability appraisal to make sure the approach will have the best environmental, social and economic outcomes possible Technical and viability assessments of key development sitesThe preparation of the GAAP has involved consultation with the local community and other key stakeholders not only on the overall policy approach of the GAAP but also specific proposals for key development sites.Key issues which are considered relevant to this plan include: To direct development to locations which meets the strategic requirements set out by the Core Strategy Delivering housing, employment and retail requirements of the Core StrategyDelivering Green infrastructure networks and protecting and enhancing existing open spaces and meeting open space standards for new development To identify the town centre as a focus for development including retail, mixed use development, employment, housing and other other town centre uses To avoid development in areas of high risk from floodingTo consider locations that have existing or potential infrastructure to support developmentTo protect against detrimental impact on historic assetsThe need for affordable housing.House prices are relatively low compared to elsewhere in South Kesteven District and the wider Lincolnshire area. Yet despite this, Grantham has relatively low levels of owner occupancy and high rates of social housing and private sector renting. There is a shortage of affordable housing compared to the level of demand. By 2026, Grantham will be a vibrant and key economic centre in Lincolnshire. It will be an economically, socially, environmentally and physically connected town.
  2. There is NO planning for development of the infrastructure on the estatesThere is NO planning for the allocation of any further informal open spaceThere are NO plans to amend the electricity provision on siteThere is NO planning for improvement of the foul sewerage on the estate – there are rumours that the sewerage system on the estate has been deemed to be full for its present purpose.Any information on this would be very useful.There is planning for a three form entry school in this area which will cost £9 million to build.It appears to use that looking at the plan this estate is planned to be built in the 2016-2021 window yet there are minimal plans to develop the infrastructure until the 2021-2028 window. We appear to be an afterthought
  3. It is key to note that the map already denotes the farmland as an ‘informal open space’ in Figure 10 in 3.5.1.7 Policy OSS2: Protecting Existing Open Spaces, Sports and Recreational Facilities Add Comments for Policy OSS2: Protecting Existing Open Spaces, Sports and Recreational Facilities View Comments (0) for Policy OSS2: Protecting Existing Open Spaces, Sports and Recreational Facilities All existing open space including, parks, equipped play space, sport pitches and informal natural open space, route ways and corridors will be protected.Development proposals on existing open spaces will only be permitted where it is demonstrated that:(i) The proposal will provide increased or improved open space and /or recreational facilities, or(ii) The site is not required to meet the local standard set out in Policy OSS1 or;(iii) Equivalent (or better) replacement provision is to be made within the same catchment area.This policy contributes towards achieving Objectives 8 and 10.We have contacted the Bat Conservation Trust to find out where the bats which fly in the middle area of the building area roost.We will need someone to volunteer to follow this up as soon as possible in order to use it in the letter
  4. There are plans for a £31-33 million by-pass to the north Outline plans for a new roundabout at the Barrowby A1 junction
  5. The planning website is difficult to navigate and use – you will need to log into the site to do so as well.Individual letters to be sent to the Planning Policy & Partnerships department at South Kesteven District Council or emailed to them A collective letter will show that we have widescale support within the community – there were 250 comments on the whole plan in March it would be a massive show of strength if we could massively outdo that.We have been advised that the council have called for people to comment through the website but this is only to make it more efficient for the planning policy department and they are happy for us to use the other methodsIt is important that we do use both of the other two methods and that the individual letters are not round robins.
  6. The planning website is difficult to navigate and use – you will need to log into the site to do so as well.Individual letters to be sent to the Planning Policy & Partnerships department at South Kesteven District Council or emailed to them A collective letter will show that we have widescale support within the community – there were 250 comments on the whole plan in March it would be a massive show of strength if we could massively outdo that.We have been advised that the council have called for people to comment through the website but this is only to make it more efficient for the planning policy department and they are happy for us to use the other methodsIt is important that we do use both of the other two methods and that the individual letters are not round robins.