HRVS-DN Sizing & Calculations
ΔM
=J
dw/dt
Time
Voltage Ramp-up Time
Un
U start
30 sec2
SOLCON
HRVS-DN Sizing & Calculations
Data Required for correct Starter Sizing
• Application data (Pump , Fan , Compressor , Conveyer)
• Single start – Multi start
• Motor data
• Load data
• Network requirements
• Environmental conditions
SOLCON
HRVS-DN Sizing & Calculations
Motor Data
• Rated Power (KW)
• Rated Voltage (V)
• Rated Speed (RPM)
• Rated Current (A)
• Rotor Inertia J or GD2
/4 (Kgm2
)
• Motor Starting Curves (Torque & Current vs. Speed)
SOLCON
HRVS-DN Sizing & Calculations
Load Data
• Application
• Inertia J or GD2
/4 (Kgm2
)
• Gear Ratio
• Torque vs. Speed Curve
• Starting Conditions (Open/Closed Valve , dampers ect.)
• Rated Load Power (KW)
SOLCON
HRVS-DN Sizing & Calculations
Gear Ratio considerations
• Gear ratio = wM/wL ,
• Where wM = motor speed & wL= load speed
• Power , PM = PL
• MM x wM = ML x wL (for load torque scaling)
• Kinetic Energy , EKM = EKL
• 1/2JLMwM
2
= 1/2JLwL
2
• MLM= MLx wL/ wM
• JLM/JL= wL
2
/wM
2
• Important!!! – All values of Torque , Power & Inertia must
be reflected to motor shaft scale. (PU of motor values)
SOLCON
HRVS-DN Sizing & Calculations
Typical Motor Starting Curves
DOL Current
@ 100% V
DOL Current
@ 80% V
Motor Torque
@ 100% V
Motor Torque
@ 80% V
Load Torque
SOLCON
HRVS-DN Sizing & Calculations
Typical Pump Starting Curve
Note: Data are NOT
scaled to motor shaft
values!!!
Open valve curve
Closed valve curve
SOLCON
HRVS-DN Sizing & Calculations
Typical Pump Starting Curve
• Zero Speed - Friction Torque = 10-15% , Hydraulic Torque = 0
• Full Speed - Friction Torque = 0 , Hydraulic Torque = Full Rated
• With Closed Valves Starting Torque will be Low. (Such curve is
being given by manufacturer!)
• Note Full Rated Pump Torque Ratio to Motor Rated Torque.
• For Starting Calculations Pump (Load) Torque Must be scaled
to Motor’s Value (PU of motor torque)
SOLCON
HRVS-DN Sizing & Calculations
Pump Torque Scaling
(No Gear)
• PP ~ w3
• MP ~ w2
• Pump Torque (PU) = PP/ PM
• PU of Motor Scale.
• Starting Conditions : Open or Closed Valves
SOLCON
HRVS-DN Sizing & Calculations
Constant Torque Applications
• Torque is Constant at Any Speed
• Applications : Mixers , Extruders , Conveyers
• Main Problem : Motor Reduced Starting Torque
SOLCON
HRVS-DN Sizing & Calculations
Angular Motion Equations
MKS Units
• ΔM =J dw/dt , ΔM = Mm (w) – ML(w)
• Mm(w)= MDOL X (ICL/IDOL(w))2
• t start= JΣΔw/ΔM(w) , ΔM(w)> 0!!!
• w - is the speed in Rad/Sec , w = N(RPM)x2π/60
• J - is the moment of inertia in Kgm2
or GD2
/4
• ΔM(w) is the net acceleration torque (soft starter reduced)
• J = GD2
/4
• M - is the torque in NM
SOLCON
HRVS-DN Sizing & Calculations
Motor Torque Factor (MTF)
• Takes into account the torque reduction factor at full
DOL starting conditions
• Factor is calculated at 70% motor speed
• Can be calculated if starting curves are given at 100% &
80% (65%) voltage.
• MTF = (Mr/Mn)/(Ir/In)2
, Normally < 1
• Mnet = Mc x MTF
• Where :
-Mn – Motor Torque at rated voltage
-Mr – Motor Torque at reduced voltage
-In – Starting Current at rated voltage
-Ir – Starting Current at reduced voltage
SOLCON
HRVS-DN Sizing & Calculations
Starting Calculations Chart -10 Segments
Project: Igel Saudi Application : Chiller
Motor Rated Voltage = 4000 [V] Motor Sn = 1732 [KVA]
Motor Rated Current = 250 [A]
Motor Rated Power = 1500 [KW]
Motor Rated Torque = 3980.89172 [NM]
Motor+Load Inertia= 12.96 [KG*m^2] Motor Inertia 10.12 Load Inertia 2.84
Motor Sync. Speed = 3600 [RPM]
Motor Torque Factor = 1 Note: Taken from motor curve acording to T/Tn and I/In at 0.7 Sync. Speed
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]
Speed Tmot[p.u] Tload[p.u] In [p.u] min C.L. Net Torque @ C.L. Acceleration @ C.L. TIME @ C.L.
2.7 2.8 2.9 2.7 2.8 2.9 2.7 2.8 4
0 1.000 0.040 5.900 1.18 674 737 803 52.04 56.89 61.92 0.72 0.66 0.61
0.1 1.000 0.020 5.800 0.82 783 848 916 60.42 65.44 70.65 0.62 0.58 0.53
0.2 1.000 0.040 5.700 1.14 734 801 871 56.63 61.83 67.22 0.67 0.61 0.56
0.3 1.050 0.080 5.650 1.56 636 708 783 49.08 54.64 60.40 0.77 0.69 0.62
0.4 1.100 0.160 5.600 2.14 381 458 537 29.40 35.32 41.47 1.28 1.07 0.91
0.5 1.140 0.200 5.500 2.30 297 380 466 22.95 29.32 35.92 1.64 1.29 1.05
0.6 1.180 0.250 5.400 2.49 179 268 360 13.82 20.66 27.74 2.73 1.82 1.36
0.7 1.300 0.300 5.300 2.55 149 250 355 11.48 19.30 27.40 3.28 1.95 1.38
0.8 2.000 0.350 5.180 2.17 770 933 1102 59.40 71.99 85.04 0.63 0.52 0.44
0.9 2.400 0.350 4.500 1.72 2046 2306 2575 157.88 177.91 198.66 0.24 0.21 0.19
minimum current limit setting > 2.55 total start time[sec] = 12.58 9.40 7.65
[1] - Relative Speed
[2] - Motor Torque at Rated Voltage
[3] - Load Torque
[4] - Motor Current at Rated Voltage
[5] - Minimum Current Limit required (at each segment and total) to overcom load. Current limit must be set to higher value.
[6],[7],[8] - Net torque (Motor Torque at specified Current Limit - Load Torque) available for acceleration
[9],[10],[11] - Acceleration (Rad / Sec^2) at Specified Current Limit
[12],[13],[14] - Time at each Segment and Total Time at Specified Current Limit
SOLCON
HRVS-DN Sizing & Calculations
Verifying Starting Calculations
• If Starting Time at 100% & 80% or 65% is given with data
• Insert to table as CL I DOL Value
• Insert to table as CL IDOL Value x 0.8 (or 0.65)
• Compare with Manufacturer calculated acceleration time
SOLCON
HRVS-DN Sizing & Calculations
General Sizing Criteria
• Starter FLC > Motor FLA !!! (around 15%)
• Starting Conditions of CL < 4XIn & tST < 30 Sec. – OK
• Starting Conditions of CL > 4XIn , < 4XIFLC & tST < 30 Sec –OK
• Starting Conditions of CL > 4XIFLC may require a higher size unit
• Starting Conditions of Low CL & tST >> 30 Sec.
• Needs to be Re-evaluated - Multi – Starting Applications
SOLCON
HRVS-DN Sizing & Calculations
Special Applications
• Ball Mills
• Crushers
• Conveyers
Inertia and Torque vary with angular position & speed
Starter Sizing - FLC > 1.8 – 2.0 Motor FLA
SOLCON
HRVS-DN Sizing & Calculations
Standard Applications W/O Data
• Sizing can be provided for :
• Standard Application (pump , fan)
• Motor rated current , starting & critical torque must be
known
• Low power rating (up to 400KW)
SOLCON
HRVS-DN Sizing & Calculations
Voltage Drop Considerations (Transformer)
• Voltage drop limit specified by customer
• Motor minimum CL to be calculated
• Transformer voltage drop: I = ICL
ΔV = IrTCOSφ + IxTSINφ
where r is the resistance of the transformer and x is the reactance.
Assuming : rT is very low , COSφ is very low also (about 0.17) so we
can omit the resistive voltage drop. The equation becomes
ΔV = IxTSINφ ,
SINφ = SIN (ARC COS(0.17) = 0.98.
SOLCON
HRVS-DN Sizing & Calculations
Generators Power Plants Supply Starting
• Generator KW rating must be > 1.6-1.8 x Motor KW rating
• Motor minimum CL to be calculated
• Generator impedance is XG
• Motor starting current (first instant) = 0.8 x IFLA
• Allow a reasonable acceleration time
• Generator AVR recovers the voltage once current increases
• Generator specified short time over current to withstand
motor CL and starting time – IGx tG > ICL x tST
SOLCON
HRVS-DN Sizing & Calculations
Network Supply Voltage Drop
• Given Data - Mains SCC (Short Circuit Capacity) (MVA)
• Mains Impedance XM= V2
/S (Ω) , S = SCC
• ΔVPh = ICL x XM (V/Ph)
• ΔV(PU) = (ΔVPhx √3)/V
• ΔV(%) = ΔV(PU) x 100

More Related Content

What's hot

Ice c-21 to 41 fundamentals
Ice c-21 to 41 fundamentalsIce c-21 to 41 fundamentals
Ice c-21 to 41 fundamentalsjahanzaibkhawja
 
CFD analysis of a cycloid hydro-turbine
CFD analysis of a cycloid hydro-turbineCFD analysis of a cycloid hydro-turbine
CFD analysis of a cycloid hydro-turbineSaugata Chowdhury
 
Cfd analysis in an ejector of gas turbine engine test bed
Cfd analysis in an ejector of gas turbine engine test bedCfd analysis in an ejector of gas turbine engine test bed
Cfd analysis in an ejector of gas turbine engine test bedIAEME Publication
 
ETAP - Power system modeling
ETAP - Power system modelingETAP - Power system modeling
ETAP - Power system modelingHimmelstern
 
ETAP - 09 motor-acceleration
ETAP - 09 motor-accelerationETAP - 09 motor-acceleration
ETAP - 09 motor-accelerationHimmelstern
 
ETAP - csd - Control System Diagram
ETAP - csd - Control System DiagramETAP - csd - Control System Diagram
ETAP - csd - Control System DiagramHimmelstern
 
ETAP - Harmonics Analysis
ETAP - Harmonics AnalysisETAP - Harmonics Analysis
ETAP - Harmonics AnalysisHimmelstern
 
ETAP - Ac networks
ETAP - Ac networksETAP - Ac networks
ETAP - Ac networksHimmelstern
 
Turning moment diagram
Turning moment diagramTurning moment diagram
Turning moment diagramMohan Kumar S
 
engine characteristics
engine characteristics engine characteristics
engine characteristics mp poonia
 
ETAP - unbalanced load flow
ETAP - unbalanced load flowETAP - unbalanced load flow
ETAP - unbalanced load flowHimmelstern
 
Variable Frequency Drives . Are they worth it?
Variable Frequency Drives . Are they worth it?Variable Frequency Drives . Are they worth it?
Variable Frequency Drives . Are they worth it?blenrayaust
 
NatSat INSPIRE Presenation
NatSat INSPIRE Presenation NatSat INSPIRE Presenation
NatSat INSPIRE Presenation Linda Schmidt
 
Aircraft design lab report converted
Aircraft design lab report convertedAircraft design lab report converted
Aircraft design lab report convertedPramod Yadav
 
Engine testing & storage
Engine testing & storageEngine testing & storage
Engine testing & storageMal Mai
 
ETAP - dc lf and dc sc | DC Load Flow & DC short-Circuit
ETAP - dc lf and dc sc | DC Load Flow & DC short-CircuitETAP - dc lf and dc sc | DC Load Flow & DC short-Circuit
ETAP - dc lf and dc sc | DC Load Flow & DC short-CircuitHimmelstern
 
Axial compressor theory - stage-by-stage approach - 28th January 2010
Axial compressor theory - stage-by-stage approach - 28th January 2010Axial compressor theory - stage-by-stage approach - 28th January 2010
Axial compressor theory - stage-by-stage approach - 28th January 2010CangTo Cheah
 

What's hot (19)

Ice c-21 to 41 fundamentals
Ice c-21 to 41 fundamentalsIce c-21 to 41 fundamentals
Ice c-21 to 41 fundamentals
 
CFD analysis of a cycloid hydro-turbine
CFD analysis of a cycloid hydro-turbineCFD analysis of a cycloid hydro-turbine
CFD analysis of a cycloid hydro-turbine
 
Cfd analysis in an ejector of gas turbine engine test bed
Cfd analysis in an ejector of gas turbine engine test bedCfd analysis in an ejector of gas turbine engine test bed
Cfd analysis in an ejector of gas turbine engine test bed
 
ETAP - Power system modeling
ETAP - Power system modelingETAP - Power system modeling
ETAP - Power system modeling
 
ETAP - 09 motor-acceleration
ETAP - 09 motor-accelerationETAP - 09 motor-acceleration
ETAP - 09 motor-acceleration
 
ETAP - csd - Control System Diagram
ETAP - csd - Control System DiagramETAP - csd - Control System Diagram
ETAP - csd - Control System Diagram
 
ETAP - Harmonics Analysis
ETAP - Harmonics AnalysisETAP - Harmonics Analysis
ETAP - Harmonics Analysis
 
Ais 041(rev.1)
Ais 041(rev.1)Ais 041(rev.1)
Ais 041(rev.1)
 
ETAP - Ac networks
ETAP - Ac networksETAP - Ac networks
ETAP - Ac networks
 
Turning moment diagram
Turning moment diagramTurning moment diagram
Turning moment diagram
 
engine characteristics
engine characteristics engine characteristics
engine characteristics
 
ETAP - unbalanced load flow
ETAP - unbalanced load flowETAP - unbalanced load flow
ETAP - unbalanced load flow
 
Variable Frequency Drives . Are they worth it?
Variable Frequency Drives . Are they worth it?Variable Frequency Drives . Are they worth it?
Variable Frequency Drives . Are they worth it?
 
NatSat INSPIRE Presenation
NatSat INSPIRE Presenation NatSat INSPIRE Presenation
NatSat INSPIRE Presenation
 
Motor drive
Motor driveMotor drive
Motor drive
 
Aircraft design lab report converted
Aircraft design lab report convertedAircraft design lab report converted
Aircraft design lab report converted
 
Engine testing & storage
Engine testing & storageEngine testing & storage
Engine testing & storage
 
ETAP - dc lf and dc sc | DC Load Flow & DC short-Circuit
ETAP - dc lf and dc sc | DC Load Flow & DC short-CircuitETAP - dc lf and dc sc | DC Load Flow & DC short-Circuit
ETAP - dc lf and dc sc | DC Load Flow & DC short-Circuit
 
Axial compressor theory - stage-by-stage approach - 28th January 2010
Axial compressor theory - stage-by-stage approach - 28th January 2010Axial compressor theory - stage-by-stage approach - 28th January 2010
Axial compressor theory - stage-by-stage approach - 28th January 2010
 

Similar to Giulianno bozzo-moncada-hvrvs-dn sizing &amp; calculations s 05-06

Practical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control SystemsPractical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control SystemsLiving Online
 
LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)
LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)
LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)Tsuyoshi Horigome
 
4.5 assessment of motors n
4.5 assessment of  motors n4.5 assessment of  motors n
4.5 assessment of motors npriya3757
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industriesravindradatar
 
Variable Frequency Drives.pptx
Variable Frequency Drives.pptxVariable Frequency Drives.pptx
Variable Frequency Drives.pptxYogesh Patel
 
INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ
INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ
INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ RAJKUMAR TIWARI
 
Fire Pump Motor Starting
Fire Pump Motor StartingFire Pump Motor Starting
Fire Pump Motor StartingJames S Nasby
 
Harmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheetHarmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheetElectromate
 
How to Start your Large Motors- typical Solutions or new motor design?
How to Start your Large Motors- typical Solutions or new motor design?How to Start your Large Motors- typical Solutions or new motor design?
How to Start your Large Motors- typical Solutions or new motor design?Delcho Penkov
 
UNIT-IV-EV .pptx
UNIT-IV-EV .pptxUNIT-IV-EV .pptx
UNIT-IV-EV .pptxSengolrajan
 
Control of Switched Reluctance Generator in Wind Energy System
Control of Switched Reluctance Generator in Wind Energy SystemControl of Switched Reluctance Generator in Wind Energy System
Control of Switched Reluctance Generator in Wind Energy SystemNereus Fernandes
 
Varaible Speed Drives for Motor Driven Fire Pumps
Varaible Speed Drives for Motor Driven Fire PumpsVaraible Speed Drives for Motor Driven Fire Pumps
Varaible Speed Drives for Motor Driven Fire PumpsJames S Nasby
 
Whats new in Medium Voltage Drives
Whats new in Medium Voltage Drives Whats new in Medium Voltage Drives
Whats new in Medium Voltage Drives Juan Cordova
 
555 Timer presentation - 2022.pptx
555 Timer presentation - 2022.pptx555 Timer presentation - 2022.pptx
555 Timer presentation - 2022.pptxJanPastor1
 
3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd
3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd
3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsdTemesgenErena
 

Similar to Giulianno bozzo-moncada-hvrvs-dn sizing &amp; calculations s 05-06 (20)

EEE.pptx
EEE.pptxEEE.pptx
EEE.pptx
 
pwm for speed control
pwm for speed controlpwm for speed control
pwm for speed control
 
Practical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control SystemsPractical Variable Speed Drives for Instrumentation and Control Systems
Practical Variable Speed Drives for Instrumentation and Control Systems
 
LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)
LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)
LED電源回路アプリケーションガイド 浜松プレゼン資料(浜松プレゼン)
 
solar car
solar carsolar car
solar car
 
4.5 assessment of motors n
4.5 assessment of  motors n4.5 assessment of  motors n
4.5 assessment of motors n
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industries
 
Variable Frequency Drives.pptx
Variable Frequency Drives.pptxVariable Frequency Drives.pptx
Variable Frequency Drives.pptx
 
INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ
INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ
INTERVIEW QUESTIONS ON POWER ELECTRONICS BY RAJ
 
Fire Pump Motor Starting
Fire Pump Motor StartingFire Pump Motor Starting
Fire Pump Motor Starting
 
Harmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheetHarmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheet
 
Actuators
ActuatorsActuators
Actuators
 
How to Start your Large Motors- typical Solutions or new motor design?
How to Start your Large Motors- typical Solutions or new motor design?How to Start your Large Motors- typical Solutions or new motor design?
How to Start your Large Motors- typical Solutions or new motor design?
 
UNIT-IV-EV .pptx
UNIT-IV-EV .pptxUNIT-IV-EV .pptx
UNIT-IV-EV .pptx
 
Control of Switched Reluctance Generator in Wind Energy System
Control of Switched Reluctance Generator in Wind Energy SystemControl of Switched Reluctance Generator in Wind Energy System
Control of Switched Reluctance Generator in Wind Energy System
 
Varaible Speed Drives for Motor Driven Fire Pumps
Varaible Speed Drives for Motor Driven Fire PumpsVaraible Speed Drives for Motor Driven Fire Pumps
Varaible Speed Drives for Motor Driven Fire Pumps
 
Whats new in Medium Voltage Drives
Whats new in Medium Voltage Drives Whats new in Medium Voltage Drives
Whats new in Medium Voltage Drives
 
555 Timer presentation - 2022.pptx
555 Timer presentation - 2022.pptx555 Timer presentation - 2022.pptx
555 Timer presentation - 2022.pptx
 
boost driver
boost driverboost driver
boost driver
 
3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd
3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd
3-chapter-2.fgpdfffffgggggfsssfgggdfgfgggsd
 

More from GiulianoBozmmdf

Giuliano Bozzo Moncada perfil gerente de proyectos
Giuliano Bozzo Moncada perfil gerente de proyectosGiuliano Bozzo Moncada perfil gerente de proyectos
Giuliano Bozzo Moncada perfil gerente de proyectosGiulianoBozmmdf
 
Giuliano Bozzo Moncada memoria
Giuliano Bozzo Moncada memoriaGiuliano Bozzo Moncada memoria
Giuliano Bozzo Moncada memoriaGiulianoBozmmdf
 
Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1
Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1
Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1GiulianoBozmmdf
 
Giuliano bozzo-moncada-hrvs-dn s 05-06
Giuliano bozzo-moncada-hrvs-dn s 05-06Giuliano bozzo-moncada-hrvs-dn s 05-06
Giuliano bozzo-moncada-hrvs-dn s 05-06GiulianoBozmmdf
 
Giuliano bozzo-moncada-h istoria
Giuliano bozzo-moncada-h istoriaGiuliano bozzo-moncada-h istoria
Giuliano bozzo-moncada-h istoriaGiulianoBozmmdf
 
Giuliano bozzo-moncada-cloro camiones cisterna
Giuliano bozzo-moncada-cloro camiones cisternaGiuliano bozzo-moncada-cloro camiones cisterna
Giuliano bozzo-moncada-cloro camiones cisternaGiulianoBozmmdf
 
Giuliano bozzo-moncada-clase-practica-dig silent
Giuliano bozzo-moncada-clase-practica-dig silentGiuliano bozzo-moncada-clase-practica-dig silent
Giuliano bozzo-moncada-clase-practica-dig silentGiulianoBozmmdf
 
Giuliano bozzo-moncada-cinematica del trauma
Giuliano bozzo-moncada-cinematica del traumaGiuliano bozzo-moncada-cinematica del trauma
Giuliano bozzo-moncada-cinematica del traumaGiulianoBozmmdf
 
Giuliano bozzo-moncada-cicloconversores
Giuliano bozzo-moncada-cicloconversores Giuliano bozzo-moncada-cicloconversores
Giuliano bozzo-moncada-cicloconversores GiulianoBozmmdf
 
Giuliano bozzo-moncada-checklist de documentación para carpeta de subcontrato
Giuliano bozzo-moncada-checklist de documentación para carpeta de subcontratoGiuliano bozzo-moncada-checklist de documentación para carpeta de subcontrato
Giuliano bozzo-moncada-checklist de documentación para carpeta de subcontratoGiulianoBozmmdf
 
Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010
Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010
Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010GiulianoBozmmdf
 
Giuliano bozzo-moncada-acreditacion
Giuliano bozzo-moncada-acreditacionGiuliano bozzo-moncada-acreditacion
Giuliano bozzo-moncada-acreditacionGiulianoBozmmdf
 
Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...
Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...
Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...GiulianoBozmmdf
 
Giuliano david bozzo moncada tema1 resistividadyelectrodosdepat
Giuliano david bozzo moncada tema1 resistividadyelectrodosdepatGiuliano david bozzo moncada tema1 resistividadyelectrodosdepat
Giuliano david bozzo moncada tema1 resistividadyelectrodosdepatGiulianoBozmmdf
 
Giuliano david bozzo moncada taller de componentes de control industrial
Giuliano david bozzo moncada taller de componentes de control industrialGiuliano david bozzo moncada taller de componentes de control industrial
Giuliano david bozzo moncada taller de componentes de control industrialGiulianoBozmmdf
 
Giuliano david bozzo moncada t315 03 engineering workplace - rev c1
Giuliano david bozzo moncada t315 03 engineering workplace - rev c1Giuliano david bozzo moncada t315 03 engineering workplace - rev c1
Giuliano david bozzo moncada t315 03 engineering workplace - rev c1GiulianoBozmmdf
 
Giuliano david bozzo moncada suncontratacion y suministro
Giuliano david bozzo moncada suncontratacion y suministroGiuliano david bozzo moncada suncontratacion y suministro
Giuliano david bozzo moncada suncontratacion y suministroGiulianoBozmmdf
 
Giuliano david bozzo moncada presentación bodegapallet
Giuliano david bozzo moncada presentación   bodegapalletGiuliano david bozzo moncada presentación   bodegapallet
Giuliano david bozzo moncada presentación bodegapalletGiulianoBozmmdf
 

More from GiulianoBozmmdf (20)

Giuliano Bozzo Moncada perfil gerente de proyectos
Giuliano Bozzo Moncada perfil gerente de proyectosGiuliano Bozzo Moncada perfil gerente de proyectos
Giuliano Bozzo Moncada perfil gerente de proyectos
 
Giuliano Bozzo Moncada memoria
Giuliano Bozzo Moncada memoriaGiuliano Bozzo Moncada memoria
Giuliano Bozzo Moncada memoria
 
Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1
Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1
Giuliano bozzo-moncada-presentación logro obra 05-04-2016 area1
 
Giuliano bozzo-moncada-hrvs-dn s 05-06
Giuliano bozzo-moncada-hrvs-dn s 05-06Giuliano bozzo-moncada-hrvs-dn s 05-06
Giuliano bozzo-moncada-hrvs-dn s 05-06
 
Giuliano bozzo-moncada-h istoria
Giuliano bozzo-moncada-h istoriaGiuliano bozzo-moncada-h istoria
Giuliano bozzo-moncada-h istoria
 
Giuliano bozzo-moncada-cloro camiones cisterna
Giuliano bozzo-moncada-cloro camiones cisternaGiuliano bozzo-moncada-cloro camiones cisterna
Giuliano bozzo-moncada-cloro camiones cisterna
 
Giuliano bozzo-moncada-clase-practica-dig silent
Giuliano bozzo-moncada-clase-practica-dig silentGiuliano bozzo-moncada-clase-practica-dig silent
Giuliano bozzo-moncada-clase-practica-dig silent
 
Giuliano bozzo-moncada-cinematica del trauma
Giuliano bozzo-moncada-cinematica del traumaGiuliano bozzo-moncada-cinematica del trauma
Giuliano bozzo-moncada-cinematica del trauma
 
Giuliano bozzo-moncada-cicloconversores
Giuliano bozzo-moncada-cicloconversores Giuliano bozzo-moncada-cicloconversores
Giuliano bozzo-moncada-cicloconversores
 
Giuliano bozzo-moncada-checklist de documentación para carpeta de subcontrato
Giuliano bozzo-moncada-checklist de documentación para carpeta de subcontratoGiuliano bozzo-moncada-checklist de documentación para carpeta de subcontrato
Giuliano bozzo-moncada-checklist de documentación para carpeta de subcontrato
 
Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010
Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010
Giuliano bozzo-moncada-adjudicación presentación directorio aca oct 2010
 
Giuliano bozzo-moncada-acreditacion
Giuliano bozzo-moncada-acreditacionGiuliano bozzo-moncada-acreditacion
Giuliano bozzo-moncada-acreditacion
 
Giuliano bozzo-lamina 3
Giuliano bozzo-lamina 3Giuliano bozzo-lamina 3
Giuliano bozzo-lamina 3
 
Giuliano bozzo-lamina 1
Giuliano bozzo-lamina 1Giuliano bozzo-lamina 1
Giuliano bozzo-lamina 1
 
Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...
Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...
Giuliano remodelacion edificio administrativo y cabaña de mantenimiento tunel...
 
Giuliano david bozzo moncada tema1 resistividadyelectrodosdepat
Giuliano david bozzo moncada tema1 resistividadyelectrodosdepatGiuliano david bozzo moncada tema1 resistividadyelectrodosdepat
Giuliano david bozzo moncada tema1 resistividadyelectrodosdepat
 
Giuliano david bozzo moncada taller de componentes de control industrial
Giuliano david bozzo moncada taller de componentes de control industrialGiuliano david bozzo moncada taller de componentes de control industrial
Giuliano david bozzo moncada taller de componentes de control industrial
 
Giuliano david bozzo moncada t315 03 engineering workplace - rev c1
Giuliano david bozzo moncada t315 03 engineering workplace - rev c1Giuliano david bozzo moncada t315 03 engineering workplace - rev c1
Giuliano david bozzo moncada t315 03 engineering workplace - rev c1
 
Giuliano david bozzo moncada suncontratacion y suministro
Giuliano david bozzo moncada suncontratacion y suministroGiuliano david bozzo moncada suncontratacion y suministro
Giuliano david bozzo moncada suncontratacion y suministro
 
Giuliano david bozzo moncada presentación bodegapallet
Giuliano david bozzo moncada presentación   bodegapalletGiuliano david bozzo moncada presentación   bodegapallet
Giuliano david bozzo moncada presentación bodegapallet
 

Recently uploaded

Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...
Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...
Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...Sheetaleventcompany
 
On Starlink, presented by Geoff Huston at NZNOG 2024
On Starlink, presented by Geoff Huston at NZNOG 2024On Starlink, presented by Geoff Huston at NZNOG 2024
On Starlink, presented by Geoff Huston at NZNOG 2024APNIC
 
(+971568250507 ))# Young Call Girls in Ajman By Pakistani Call Girls in ...
(+971568250507  ))#  Young Call Girls  in Ajman  By Pakistani Call Girls  in ...(+971568250507  ))#  Young Call Girls  in Ajman  By Pakistani Call Girls  in ...
(+971568250507 ))# Young Call Girls in Ajman By Pakistani Call Girls in ...Escorts Call Girls
 
VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...
VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...
VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...SUHANI PANDEY
 
Real Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtReal Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtrahman018755
 
Russian Call Girls Pune (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
Russian Call Girls Pune  (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...Russian Call Girls Pune  (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
Russian Call Girls Pune (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...SUHANI PANDEY
 
Lucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRL
Lucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRLLucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRL
Lucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRLimonikaupta
 
GDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark Web
GDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark WebGDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark Web
GDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark WebJames Anderson
 
Moving Beyond Twitter/X and Facebook - Social Media for local news providers
Moving Beyond Twitter/X and Facebook - Social Media for local news providersMoving Beyond Twitter/X and Facebook - Social Media for local news providers
Moving Beyond Twitter/X and Facebook - Social Media for local news providersDamian Radcliffe
 
Top Rated Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Call Girls in Nagpur High Profile
 
Al Barsha Night Partner +0567686026 Call Girls Dubai
Al Barsha Night Partner +0567686026 Call Girls  DubaiAl Barsha Night Partner +0567686026 Call Girls  Dubai
Al Barsha Night Partner +0567686026 Call Girls DubaiEscorts Call Girls
 
Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.soniya singh
 
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024APNIC
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
AWS Community DAY Albertini-Ellan Cloud Security (1).pptx
AWS Community DAY Albertini-Ellan Cloud Security (1).pptxAWS Community DAY Albertini-Ellan Cloud Security (1).pptx
AWS Community DAY Albertini-Ellan Cloud Security (1).pptxellan12
 

Recently uploaded (20)

Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...
Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...
Call Girls Service Chandigarh Lucky ❤️ 7710465962 Independent Call Girls In C...
 
On Starlink, presented by Geoff Huston at NZNOG 2024
On Starlink, presented by Geoff Huston at NZNOG 2024On Starlink, presented by Geoff Huston at NZNOG 2024
On Starlink, presented by Geoff Huston at NZNOG 2024
 
(+971568250507 ))# Young Call Girls in Ajman By Pakistani Call Girls in ...
(+971568250507  ))#  Young Call Girls  in Ajman  By Pakistani Call Girls  in ...(+971568250507  ))#  Young Call Girls  in Ajman  By Pakistani Call Girls  in ...
(+971568250507 ))# Young Call Girls in Ajman By Pakistani Call Girls in ...
 
VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...
VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...
VIP Model Call Girls NIBM ( Pune ) Call ON 8005736733 Starting From 5K to 25K...
 
Real Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtReal Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirt
 
Russian Call Girls in %(+971524965298 )# Call Girls in Dubai
Russian Call Girls in %(+971524965298  )#  Call Girls in DubaiRussian Call Girls in %(+971524965298  )#  Call Girls in Dubai
Russian Call Girls in %(+971524965298 )# Call Girls in Dubai
 
Russian Call Girls Pune (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
Russian Call Girls Pune  (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...Russian Call Girls Pune  (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
Russian Call Girls Pune (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
 
Lucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRL
Lucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRLLucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRL
Lucknow ❤CALL GIRL 88759*99948 ❤CALL GIRLS IN Lucknow ESCORT SERVICE❤CALL GIRL
 
Low Sexy Call Girls In Mohali 9053900678 🥵Have Save And Good Place 🥵
Low Sexy Call Girls In Mohali 9053900678 🥵Have Save And Good Place 🥵Low Sexy Call Girls In Mohali 9053900678 🥵Have Save And Good Place 🥵
Low Sexy Call Girls In Mohali 9053900678 🥵Have Save And Good Place 🥵
 
VVVIP Call Girls In Connaught Place ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Connaught Place ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Connaught Place ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Connaught Place ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
GDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark Web
GDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark WebGDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark Web
GDG Cloud Southlake 32: Kyle Hettinger: Demystifying the Dark Web
 
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
 
Moving Beyond Twitter/X and Facebook - Social Media for local news providers
Moving Beyond Twitter/X and Facebook - Social Media for local news providersMoving Beyond Twitter/X and Facebook - Social Media for local news providers
Moving Beyond Twitter/X and Facebook - Social Media for local news providers
 
Top Rated Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Daund ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
 
Al Barsha Night Partner +0567686026 Call Girls Dubai
Al Barsha Night Partner +0567686026 Call Girls  DubaiAl Barsha Night Partner +0567686026 Call Girls  Dubai
Al Barsha Night Partner +0567686026 Call Girls Dubai
 
Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.
Call Now ☎ 8264348440 !! Call Girls in Rani Bagh Escort Service Delhi N.C.R.
 
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7
(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7
(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7
 
AWS Community DAY Albertini-Ellan Cloud Security (1).pptx
AWS Community DAY Albertini-Ellan Cloud Security (1).pptxAWS Community DAY Albertini-Ellan Cloud Security (1).pptx
AWS Community DAY Albertini-Ellan Cloud Security (1).pptx
 

Giulianno bozzo-moncada-hvrvs-dn sizing &amp; calculations s 05-06

  • 1. SOLCON HRVS-DN Sizing & Calculations ΔM =J dw/dt Time Voltage Ramp-up Time Un U start 30 sec2
  • 2. SOLCON HRVS-DN Sizing & Calculations Data Required for correct Starter Sizing • Application data (Pump , Fan , Compressor , Conveyer) • Single start – Multi start • Motor data • Load data • Network requirements • Environmental conditions
  • 3. SOLCON HRVS-DN Sizing & Calculations Motor Data • Rated Power (KW) • Rated Voltage (V) • Rated Speed (RPM) • Rated Current (A) • Rotor Inertia J or GD2 /4 (Kgm2 ) • Motor Starting Curves (Torque & Current vs. Speed)
  • 4. SOLCON HRVS-DN Sizing & Calculations Load Data • Application • Inertia J or GD2 /4 (Kgm2 ) • Gear Ratio • Torque vs. Speed Curve • Starting Conditions (Open/Closed Valve , dampers ect.) • Rated Load Power (KW)
  • 5. SOLCON HRVS-DN Sizing & Calculations Gear Ratio considerations • Gear ratio = wM/wL , • Where wM = motor speed & wL= load speed • Power , PM = PL • MM x wM = ML x wL (for load torque scaling) • Kinetic Energy , EKM = EKL • 1/2JLMwM 2 = 1/2JLwL 2 • MLM= MLx wL/ wM • JLM/JL= wL 2 /wM 2 • Important!!! – All values of Torque , Power & Inertia must be reflected to motor shaft scale. (PU of motor values)
  • 6. SOLCON HRVS-DN Sizing & Calculations Typical Motor Starting Curves DOL Current @ 100% V DOL Current @ 80% V Motor Torque @ 100% V Motor Torque @ 80% V Load Torque
  • 7. SOLCON HRVS-DN Sizing & Calculations Typical Pump Starting Curve Note: Data are NOT scaled to motor shaft values!!! Open valve curve Closed valve curve
  • 8. SOLCON HRVS-DN Sizing & Calculations Typical Pump Starting Curve • Zero Speed - Friction Torque = 10-15% , Hydraulic Torque = 0 • Full Speed - Friction Torque = 0 , Hydraulic Torque = Full Rated • With Closed Valves Starting Torque will be Low. (Such curve is being given by manufacturer!) • Note Full Rated Pump Torque Ratio to Motor Rated Torque. • For Starting Calculations Pump (Load) Torque Must be scaled to Motor’s Value (PU of motor torque)
  • 9. SOLCON HRVS-DN Sizing & Calculations Pump Torque Scaling (No Gear) • PP ~ w3 • MP ~ w2 • Pump Torque (PU) = PP/ PM • PU of Motor Scale. • Starting Conditions : Open or Closed Valves
  • 10. SOLCON HRVS-DN Sizing & Calculations Constant Torque Applications • Torque is Constant at Any Speed • Applications : Mixers , Extruders , Conveyers • Main Problem : Motor Reduced Starting Torque
  • 11. SOLCON HRVS-DN Sizing & Calculations Angular Motion Equations MKS Units • ΔM =J dw/dt , ΔM = Mm (w) – ML(w) • Mm(w)= MDOL X (ICL/IDOL(w))2 • t start= JΣΔw/ΔM(w) , ΔM(w)> 0!!! • w - is the speed in Rad/Sec , w = N(RPM)x2π/60 • J - is the moment of inertia in Kgm2 or GD2 /4 • ΔM(w) is the net acceleration torque (soft starter reduced) • J = GD2 /4 • M - is the torque in NM
  • 12. SOLCON HRVS-DN Sizing & Calculations Motor Torque Factor (MTF) • Takes into account the torque reduction factor at full DOL starting conditions • Factor is calculated at 70% motor speed • Can be calculated if starting curves are given at 100% & 80% (65%) voltage. • MTF = (Mr/Mn)/(Ir/In)2 , Normally < 1 • Mnet = Mc x MTF • Where : -Mn – Motor Torque at rated voltage -Mr – Motor Torque at reduced voltage -In – Starting Current at rated voltage -Ir – Starting Current at reduced voltage
  • 13. SOLCON HRVS-DN Sizing & Calculations Starting Calculations Chart -10 Segments Project: Igel Saudi Application : Chiller Motor Rated Voltage = 4000 [V] Motor Sn = 1732 [KVA] Motor Rated Current = 250 [A] Motor Rated Power = 1500 [KW] Motor Rated Torque = 3980.89172 [NM] Motor+Load Inertia= 12.96 [KG*m^2] Motor Inertia 10.12 Load Inertia 2.84 Motor Sync. Speed = 3600 [RPM] Motor Torque Factor = 1 Note: Taken from motor curve acording to T/Tn and I/In at 0.7 Sync. Speed [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] Speed Tmot[p.u] Tload[p.u] In [p.u] min C.L. Net Torque @ C.L. Acceleration @ C.L. TIME @ C.L. 2.7 2.8 2.9 2.7 2.8 2.9 2.7 2.8 4 0 1.000 0.040 5.900 1.18 674 737 803 52.04 56.89 61.92 0.72 0.66 0.61 0.1 1.000 0.020 5.800 0.82 783 848 916 60.42 65.44 70.65 0.62 0.58 0.53 0.2 1.000 0.040 5.700 1.14 734 801 871 56.63 61.83 67.22 0.67 0.61 0.56 0.3 1.050 0.080 5.650 1.56 636 708 783 49.08 54.64 60.40 0.77 0.69 0.62 0.4 1.100 0.160 5.600 2.14 381 458 537 29.40 35.32 41.47 1.28 1.07 0.91 0.5 1.140 0.200 5.500 2.30 297 380 466 22.95 29.32 35.92 1.64 1.29 1.05 0.6 1.180 0.250 5.400 2.49 179 268 360 13.82 20.66 27.74 2.73 1.82 1.36 0.7 1.300 0.300 5.300 2.55 149 250 355 11.48 19.30 27.40 3.28 1.95 1.38 0.8 2.000 0.350 5.180 2.17 770 933 1102 59.40 71.99 85.04 0.63 0.52 0.44 0.9 2.400 0.350 4.500 1.72 2046 2306 2575 157.88 177.91 198.66 0.24 0.21 0.19 minimum current limit setting > 2.55 total start time[sec] = 12.58 9.40 7.65 [1] - Relative Speed [2] - Motor Torque at Rated Voltage [3] - Load Torque [4] - Motor Current at Rated Voltage [5] - Minimum Current Limit required (at each segment and total) to overcom load. Current limit must be set to higher value. [6],[7],[8] - Net torque (Motor Torque at specified Current Limit - Load Torque) available for acceleration [9],[10],[11] - Acceleration (Rad / Sec^2) at Specified Current Limit [12],[13],[14] - Time at each Segment and Total Time at Specified Current Limit
  • 14. SOLCON HRVS-DN Sizing & Calculations Verifying Starting Calculations • If Starting Time at 100% & 80% or 65% is given with data • Insert to table as CL I DOL Value • Insert to table as CL IDOL Value x 0.8 (or 0.65) • Compare with Manufacturer calculated acceleration time
  • 15. SOLCON HRVS-DN Sizing & Calculations General Sizing Criteria • Starter FLC > Motor FLA !!! (around 15%) • Starting Conditions of CL < 4XIn & tST < 30 Sec. – OK • Starting Conditions of CL > 4XIn , < 4XIFLC & tST < 30 Sec –OK • Starting Conditions of CL > 4XIFLC may require a higher size unit • Starting Conditions of Low CL & tST >> 30 Sec. • Needs to be Re-evaluated - Multi – Starting Applications
  • 16. SOLCON HRVS-DN Sizing & Calculations Special Applications • Ball Mills • Crushers • Conveyers Inertia and Torque vary with angular position & speed Starter Sizing - FLC > 1.8 – 2.0 Motor FLA
  • 17. SOLCON HRVS-DN Sizing & Calculations Standard Applications W/O Data • Sizing can be provided for : • Standard Application (pump , fan) • Motor rated current , starting & critical torque must be known • Low power rating (up to 400KW)
  • 18. SOLCON HRVS-DN Sizing & Calculations Voltage Drop Considerations (Transformer) • Voltage drop limit specified by customer • Motor minimum CL to be calculated • Transformer voltage drop: I = ICL ΔV = IrTCOSφ + IxTSINφ where r is the resistance of the transformer and x is the reactance. Assuming : rT is very low , COSφ is very low also (about 0.17) so we can omit the resistive voltage drop. The equation becomes ΔV = IxTSINφ , SINφ = SIN (ARC COS(0.17) = 0.98.
  • 19. SOLCON HRVS-DN Sizing & Calculations Generators Power Plants Supply Starting • Generator KW rating must be > 1.6-1.8 x Motor KW rating • Motor minimum CL to be calculated • Generator impedance is XG • Motor starting current (first instant) = 0.8 x IFLA • Allow a reasonable acceleration time • Generator AVR recovers the voltage once current increases • Generator specified short time over current to withstand motor CL and starting time – IGx tG > ICL x tST
  • 20. SOLCON HRVS-DN Sizing & Calculations Network Supply Voltage Drop • Given Data - Mains SCC (Short Circuit Capacity) (MVA) • Mains Impedance XM= V2 /S (Ω) , S = SCC • ΔVPh = ICL x XM (V/Ph) • ΔV(PU) = (ΔVPhx √3)/V • ΔV(%) = ΔV(PU) x 100