Company Profile
www.Dtpt.com
Data Point’s domain expertise
• Civil engineering/ Dams/ Construction/
Real Estate/ Infrastructure projects
• Surveying
• Architecture
• Water Resources
• Ecology & Environment (land, soil,
water, pollution, energy, coastal & marine
environment, biodiversity, demography,
physical climate, govt. policy)
• Oil & Gas
• Cadastral/ Land Records
• Urban & Municipal Engineering
• Energy, Power, Utilities
• Transportation
• Hospitality
• Heritage & tourism
• Public Sector
• Police
• Resettlement & Rehabilitation
• Government (eGovernance)
• Engineering
• Manufacturing
• Investment Banking, Banking, Finance
Mandar Mehta - CEO
• IT Consultant, Advisor, Project Manager & Trainer with 25+ years experience in IT/GIS/ERP
solutions.
• Consultant to World Bank and United States Agency for International Development (USAID)
funded projects.
• Carried out GIS/ GPS projects for ADB funded APDRP and R-APDRP projects in the power
sector.
• IT Advisor to State Government organisations, University and Government of India Projects.
• Visiting Professor to M.S.University for 5 years. Served in the capacities as Solution
Developer, Advisor, Consultant, Project Manager, Vice President & CEO.
• First hand experience in offering corporate enterprise solutions as well as in Civil engg, GIS,
GPS, Surveying, Water Resources, Oil & Gas, Ecology & Environment (land, soil, surface/
ground water, forest, agriculture, pollution, energy, coastal & marine environment, biodiversity,
demography, physical climate, govt. policy), Rehabilitation & Resettlement Emergency
Response Systems (Disaster Management), Asset Management/ Facilities Management
(AM/FM), Cadastral/ Land Records, Police/ Crime, Urban/ Municipal Administration/
Engineering and e-Governance. He has indepth knowledge of business processes of utility
companies (like power, water, oil & gas), manufacturing companies & construction/ real estate/
infrastructure companies and financial services industry.
Mandar Mehta - CEO
• More than 8 years Business Development, Customisation & Consulting experience in ERP
• Known for offering excellent Business and ERP solutions. Conversant SAP. R/3 One year
experience in Finance (FI) and Controlling (CO). Working knowledge of ABAP/4. Exposure of
other modules like SD, MM, PP, HR etc.
• Architected and co-developed a 100% webbased, workflow & DMS embedded ERP software
covering modules like Customer Relationship Management (CRM), Supply Chain Management
(SCM), Manufacturing Resources Planning (MRP), Financial Resources Management including
Finance, Controlling & Accounting (FRM), Human Resources Management (HRM), Quality
Management (QM) and IT Resources Management (ITM).
Mandar Mehta - CEO
• He started his career as Civil Engineer in Sardar Sarovar (Narmada) Project - a $ 4 billion
multi purpose river valley project involving 4 states of India.
• As designer, he designed 4 Rockfill dams (cost Rs. 64 crores) on the right side of the main dam.
The design software was developed by him.
• He was a leader of the team which carried out Finite Element Analysis (FEA) of the foundation
treatment design of the main dam. The FEA design of the foundation treatment was reviewed
and appreciated by the expert committee appointed by World Bank.
• He did pioneering work in computerisation at the Sardar Sarovar Project. He has worked on
several projects on water resources design, planning and management.
Mandar Mehta - CEO
• In the domain of Banking, Finance & Securities(BFSI) industry, Mr Mehta has been
a Financial Advisor,Investment Banker & Equity Analyst (technical analyst).
• He was involved in raising Rs 30 crores through Initial Public Offerings (IPOs).
• He was a member providing vital inputs to a core team advising a $ 50 million country fund.
• He also developed software for financial services & Mutual Fund.
• He has implemented software solutions in Co-operative Banks.
• He has exposure to International Investment Banking for about 8 years.
• He is currently in touch with investors, banks, financial institutions, venture capital/ private
equity funds and investment bankers globally for raising funding of US$ 100 mn for various
projects
Mandar Mehta – CEO
Seminars, workshops & Papers
• “Use of 3D GIS for visualisation of Infrastructure project” at the 1st National Conference on Geo-
Visualisation jointly organized by NRDMS (Dept of Science & Tech, Govt. of India) & National Institute of
Design (NID) - Nov 2007.
• “Mathematical modeling using GIS for Utilities” funded under DST Schools (Dept of Science & Tech, Govt.
of India) on Mathematical Modeling in Earth System Sciences Programme at CEPT University, Ahmadabad –
Nov 2007.
• "GIS for utilities", at a Seminar on "GIS, GPR, GPS & Remote Sensing in Urban Planning & Municipal
Information System", organised by Indian Society of Geomatics and Vadodara Municipal Corporation -
September 2005.
• Optimisation & privatisation of city bus network using GIS: A case study of Vadodara city in Gujarat State by
Nipa Desai, B. D. Vashi, Mandar Mehta
• "Computerised MIS for Water Management in Dangs District" at National Seminar on Water Resources - Dr.
C.R.Shah, Dr. P.P.Patel, Mandar Mehta
• "Power Sector - A Remarkable performance" , Special issue on private sector participation in Infrastructure
Projects, Financial Express, 1996
• Trained hundreds of students, professionals, engineers, chartered accountants, managers and executives in
Computer applications. Conducted corporate IT training in several organizations.
• Participated in panel discussions at Computer Society of India
Mandar Mehta – CEO
Seminars, workshops & Papers
• Conducted ZOPP (a German method for Objectives Oriented Project Planning) workshop for NGOs,
Environment Consultants, Government Officers
• Voted Best Speaker for “Use of Commercial Applications using PCs” at Seminar in Municipalities held by
Operations Research Group (ORG) for Gujarat Municipal Finance Board (GMFB) 1991
• MIS Consultant for Database Management at Water and Land Management Institute, 1991
• Lectured on GIS topics at refresher programs of M. S. University under University Grants Commission
(UGC)
• Seminar on GIS for oil & gas industry, ONGC, 2002.
• Organizer & Panelist, Gujarat’s Environment, World Environment Day, 5th June 2003
• Interviewed hundreds of candidates for recruitment, admission to Government IT courses etc.
• Project Guide for several students of Undergraduate & Postgraduate studies: Bachelor of Engineering
(Computer Science) B.E. Comp. Science, Bachelor of Science (Environment Science), Master of Comp.
Applications (MCA), Masters in Engineering M.E.(Civil), Master in Business Administration MBA(Finance)
etc.
Testimonials
• “Mandar is a high caliber professional having a deep knowledge and understanding of multidisciplinary
sectors and processes” – Sam Pitroda, Chairman, National Knowledge Commission & Advisor to the Prime
Minister of India
• "Mr. Mandar Mehta, CEO, Data Point Computer Services and his team has worked out an action plan for next
2 Phases of e-Governance which include comprehensive workflow and creation of Portals. We are happy with
the work carried out by Data Point. Their people have the necessary skills, know-how, understanding of
government processes, culture and behaviour."- Bhagyesh Jha, District Collector, Vadodara
• "Mandar can visualize the changing trends and apply appropriate technology."- Sanat Mehta, Ex-Member of
Parliament /Ex Finance Minister (Gujarat State)
• "Mandar’s process reengineering skills have been extremely useful."- V. K. Babbar, CEO & Commissioner
(SSPA), Additional Chief Secretary, Govt of Gujarat
• "We have found Mandar to be knowledgeable, innovative and sensitive to public interest."-Hasmukh Shah,
Chairman, Gujarat Ecology Commission
• "Mandar facilitated buildup of inhouse GIS capacity in natural resources, ecology & environment database
management.He has good understanding in eGovernance too." - Vilasini Ramachandran, Member Secretary,
Gujarat Ecology Commission & Former Municipal Commissioner, Vadodara City.
Testimonials
• "Mandar Mehta has worked assiduously in creating a Web Based GIS Enabled Environment Database for
Gujarat under the Gujarat State Environment Action Program (World Bank supported Environment
Management Capacity Building Project). The dissemination of this information is first of its kind in India and
required special skills." - Dr. Smita Misra, Sr. Environmental Economist, World Bank
• "A pioneer in the city, he has been a big help." - Bharti Vyas, Mayor, Vadodara
• "Mandar’s depth and breadth of involvement amazes me." - Sunil Parekh, Sr Director Confed. of Indian Ind
(CII)
• "I rely on Data Point for all my computer aided water engineering analysis and design."- (Late) Dr. C. R.
Shah, Water Resources Consultant
• "Mandar Mehta is a pioneer and a fine IT professional."- (Late) Mayank Dholakia, Dean, Faculty of Mngmnt,
MSU
• "Data Point completed several overseas GIS projects within cost and time without compromising quality." -
(Late) Sandeep Modi, 2M Software
• "Data Point provided prompt services in survey drawings and cadastral mapping for many of our projects." -
Prakash Patel, MD, Mascon
• "Mr Mehta greatly contributed to our CAD efforts." - Robert Every, GE Motors
GIS Projects
Statewide GIS
based Web
enabled
Environment
Database of
Gujarat
• Gujarat Ecology Commission (GEC) prepared a State Environmental Action
Program (SEAP) funded by World Bank.
• 8 Technical Working Groups (TWGs) worked on specific aspects of the State
ecology and have collected a huge information base over a period of 3 years.
• The data was collected through in-depth study of specific components of
Gujarat’s environment over a period of 5 years by some of the well-known
Institutions of India including Tata Energy Research Institute (TERI), Tata
Consultancy Services (TCS), Operation Research Group (ORG), National
Environmental Engineering Institute (NEERI), Centre for Environmental
Planning & Technology (CEPT), Gujarat Ecology Society etc.
• This Statewide Environmental database is put on the web for the first time in
India.
• Consists of data on Industrial Pollution, Urbanization, Degradation of Land,
Water, Biodiversity, Coastal and Marine Environment, Wetlands and Energy
• The Web based GIS enabled Environment Database is one of the first and
largest of its kind in India.
• The project included environmental mapping of Gujarat State (more than 300
maps with around 2000 attribute tables) + Maps of 26 districts, 274 talukas, &
18000+ villages of Gujarat State
• The project was a 75-man month effort. The URL is www.gec.gov.in
GIS Projects
GIS based
Cultural
Resources
Information
System for
UNESCO
declared
World
Heritage Site
• The Champaner-Pavagadh Heritage project taken up by the
Heritage Trust in Gujarat has been declared as top World
Heritage Site by UNESCO in 2004.
• The GIS system will help visualise the project site in an
integrated manner and will enable retrieval/ analysis of cultural
history, trends and patterns in a spatial (graphical) dimension.
• The GIS will provide the project planners a powerful modelling
tool and will form the backbone upon which a Management
Plan will be developed.
• The GIS system also includes high resolution (61 cms)
Quickbird satellite imagery of 80 sqkms of Champaner-
Pavagadh area.
• The project included database creation and digitization of 91
villages including about 25000 land parcel boundaries
• The project was inaugurated and GIS was appreciated His
Excellency President A P J Abdul Kalam
GIS Projects
GIS mapping
and GPS
survey for
APDRP
projects
• Global Position System (GPS) Survey, data collection,
mapping, consumer indexing, developing GIS software
for transmission and distribution (T&D) power network
analysis for State Public Utility for 13 cities having
2,000,000 Poles and 500,000 Consumers and 5000 KMs
length of the network
• Development of Data Power – a GIS software solution
for power network optimization and T&D loss
calculation software developed by Data Point under R-
APDRP project of ADB comprising of AM/FM and
handling of very large databases
• Global Position System (GPS) Survey, data collection,
mapping, consumer indexing, GIS based transmission
and distribution network analysis for a State Power
Utility for 5 cities having 60,000 Poles and 150,000
Consumer and 1200 KMs length of the network
GIS Projects
3D GIS, DTM
and
animation
Contour map
3D Animation
Satellite imagery
• 3D GIS terrain (DTM) and animation model with
Quickbird – world’s highest resolution commercially
available satellite imagery, NASA’s Shuttle Radar
Topography Mission (SRTM) data and creating site
contours for a 810 Million Omani Riyal (OR) Beach
Development Infrastructure project (8 kms long) south of
Muscat, for one of the largest Real Estate Companies in
Oman
• The purpose was to ascertain pre-feasibility level
engineering analysis and a visual model for potential
investors for the project.
GIS Projects
GIS based
AM/FM cum
Emergency
Response
System
including
citywide
survey
• A citywide 160 km long x 12 km wide corridor survey of industrial gas
pipeline for New Delhi city having an area of more than 1400 sq. km.
was carried out using Total Station, GPS etc. for Gas Authority of India
Ltd. (GAIL) - a leading oil & gas utility company in India. The base map
of New Delhi city was at a scale of 1:20,000.
• The objectives of this project were: 1) Effective Operation and
Maintenance (O&M) 2) Aid in emergencies (Emergency Response
System) like pipeline leak or burst. 3) Disaster Management. 4) Apart
from GAIL the information from this system will be of use to other
departments like Telecommunications, DDA, GDA (for laying water,
sewage-lines), Delhi Electricity Supply Undertaking.
• About 150 feature themes were included in the GIS.
• This was a 60-manmonth exercise and was a first in the country.
• A 50 m wide corridor survey was conducted for land and other structures
along the entire stretch of 160 kms. The pipeline and other structures are
identified in Latitude and Longitude and in meters also in x, y plot in the
map. The pipeline position is indicated in the maps from the nearest
roads, structures, landmarks etc.
• The purpose was to serve as a) GIS based Emergency Response System
& b) Operation & Maintenance System (O&M)
GIS Projects
GIS for
Resettlement
&
Rehabilitatio
n (R&R) MIS
for US$ 12
billion
rivervalley
project
• A GIS based MIS for Sardar Sarovar Punarvasvat Agency
(SSPA) was carried out in association with TCS.
• The aim was to have an MIS which would cater to Supreme
Court reporting requirements at the same time give a tool for
planning as well as honourable judges to visualise the
implications on number of villages and the population affected
by submergence due to progressive clearance for construction of
the Sardar Sarovar (Narmada) dam upto specific heights.
• A GIS based MIS for Resettlement & Rehabilitation of Project
Affected Families due to submergence of villages of Sardar
Sarovar Project was developed. The project area covered 88000
sq.km. of catchment area (450 SOI maps) and about 120
downstream R&R (community) sites.
• The project was done in capacity as GIS Advisor, SSPA,
Government of Gujarat.
GIS Projects
Revenue Land
Records &
Right of Use
(ROU) for
1000 km oil
pipeline
project
• Thousands of land records of more than 500 villages were
verified and field (joint measurement) books created in CAD
after Total Station/ GPS survey on site for about 1000 kms oil
pipeline project from Mundra to Bhatinda.
• The records were updated for acquiring Right of Use (ROU)
under Petroleum, Mining & Pipeline (PMP) Act of Govt. of
India.
• The compensation was to be paid to the owners after observing
the legal notification procedure laid down by the Act.
GIS Projects
Soil mapping &
GIS
• Soil mapping & GIS for Sardar Sarovar Narmada Nigam
Ltd. was done for soils covering an area of 75000
hectares of Phase I.
• The database included parameters like borehole no,
borehole details, including soil parameters like EC, Soil
texture, class, etc.
GIS Projects
Academic
Project:
Sustainable
Urban
Drainage -
Vadodara
• To understand and analyse the flooding pattern in the
city.
• To identify the reasons and factors leading to choking of
drains and flooding in different areas of Baroda City.
• To study the drainage system and find or establish
relationship with the natural slope.
• To workout probable long term and short term measures
for the city.
• Formulate a sustainable drainage system by taking into
consideration the natural slope, groundwater and
minimizing the damages due to floods.
• The academic study was carried out by Dwiti Shah,
CEPT University student under the guidance of Prof
Saswat Bandyopadhyay and Mandar Mehta.
8.5 SQ KM
20.7 SQ KM
10.7 SQ KM
13 SQ
KM
Vishwamitri
river
Nagarwada
Kaans
Ruparel
kaans
Mashia
kaans
TBH-Vasna-
Banco
kaans
Under-Gorti
kaans
GIS Projects
GIS for villages • GIS for Revenue records updation & ROU mapping of
Gas Authority of India's HBJ pipeline was done for a
stretch of 6 kms in Madhya Pradesh (Agar Tehsil).
GIS Projects
District mapping
for law &
order
monitoring
(police/
security)
• A GIS project for preparation of Vadodara district map having
1639 villages spread over 7794 sq kms was carried out under a
project assigned by the District Superintendent of Police
(Rural).
• Certain high security/ strategic locations throughout the district
were marked by the help of GPS.
• The talukawise GIS mapping included police jurisdictions,
sensitive locations, police stations and their contact details,
roads, railways, bridges, schools, colleges, water bodies,
hospitals, primary health centres, community health centres,
dispensaries, Gujarat Electricity Board switchyards locations,
company locations, bus stands, helipad, airport, census data,
other infrastructural facilities etc.
• The GIS map was to be linked up with a GPS based vehicle
tracking system for online monitoring, strategic planning and
quick response to crimes.
GIS Projects
Sea shoreline
change
detection
• GIS based Shoreline change detection study for shoreline at
Suvali village near Surat on behalf of University of Cambridge
• The study was to understand changes in the shoreline and infer
whether there was a city buried under the sea
• For the study use of 18th century French, 19th century Indian and
21st century Survey of India maps as well as prior period and
present day satellite imageries were used.
GIS Projects
GIS/ MIS for
Drinking
Water
Mission,
Government
of India
• Computer based MIS/ GIS model for Water Management for
drinking water submitted to Rajiv Gandhi National Technology
Mission on drinking Water, Govt. of India
• The model district selected was Dangs in Gujarat
• An MIS model was mooted and developed.
• The report was appreciated by the World Bank
GIS Projects
GIS based oil &
gas mapping
• Mapping of 400+ Oil Wells of a large Oil & Gas Company
• The region included wells in Gandhar, Jambusar, Dahej, Nada
and Jolwa. The feeder collector pipelines included W.I.Lines,
Oil lines, Gas lines, Gas lift link, Water inlet, Effluent,
installations like GGS, CPF, YC, EPS, etc.
GIS Projects
Urban Transport
Network
Analysis of
Vadodara city
• Optimisation & Privatisation Of City Bus Network Using GIS
was undertaken to study the existing trend for intra-city
transport metrics of Vadodara, to evaluate performance of
existing GSRTC (Gujarat State Road Transport Corporation )
bus service.
• Prepare and suggest optimisation of bus fleet so as to satisfy the
needs of Vadodara commuters and to assess way & means to
make the bus service profitable.
• Digitised and geo-referenced maps were prepared using GIS
software Arc View -3.1.
• O.D matrices were prepared and new zone system was
proposed. Financial analysis was also carried out.
• Privatisation was suggested for implementation and also
guidelines for implementation were proposed.
• The study was done in association with Nipa Desai, a Masters
Degree student & B D Vashi, Reader, Highways Department, M
S University
GIS Projects
GIS based model
for
identification
of probable
zones for
ground water
propecting in
Sasutan
watershed
• The study focuses on the identification of probable ground
water potential zone of Sasutan watershed located in Dharampur
taluka of Valsad Dist., Gujarat.
• The occurrence of groundwater is dependent on the various
interrelated geo – environmental parameters, viz., lithology,
lineament, drainage, slope and landuse.
• GIS is a very powerful tool for identifying potential zones.
• A multi-criteria evaluation is used in GIS to get resultant
thematic map for probable groundwater potential zone of
Sasutan watershed.
• The map indicates very high potentiality of groundwater in
western part of the basin, high in the central part of the basin,
moderate in the eastern part and poor in the northern part of the
basin.
• The study was done in association with Dr Bhushan Deota,
Reader, Geology Department, M S University
GIS Projects
Well log
digitization –
pilot project
• Pilot project for digitization of oil well logs for a NASDAQ
listed company
• Supervision by geologists or geotechnical experts
• Qualified Well Logging expert verified the accuracy of the
Logs
• Each curve was digitized one at a time using automatic and
manual digitization software with thinning algorithms for more
accuracy.
• Color separations used for different curves.
• Log Header information was encapsulated
• Output delivered in LIS, LAS, XLS, XML or ASCII formats
GIS Projects
GIS mapping for
a Telecom
Utility
• GIS mapping/ digitization of cable records covering Telecom
District which includes digitization, geocoding, customization
and implementation of Telephone cable network for
approximately 1,30,000 lines (area=75 sqkms) for a Telecom
Utility
GIS Projects
GIS mapping
and water
resources
projects
• GIS Mapping of 1000 sq.km of city/ urban areas. Maps of 26
districts, 274 talukas & thousands of village boundaries
• 5 projects for USA based companies
• Computer studies for analysis of Canal Distribution System
• Computerised Stability Analysis of earth dams in Nigeria
• Design and analysis of weirs
• Backwater and submergence studies of weir using HEC-2
program of Hyrology Engg. Centre (HEC),USA
• Siltation(Sedimentation) study of weir using HEC-6 program of
Hydrologic Engg. Centre (HEC), USA
Survey Equipment
• 2 DGPS survey base stations and 2 rovers
• 15 Garmin GPS (5 meters accuracy)
• Additional equipments like Total Stations and DGPS’s available
through associated subvendors
• More equipments can be procured based on project demand
Data Point’s Associate 1
Diversified group: Nigeria, India, Indonesia, Singapore, Estonia
• The company ( a part of multi million dollar group) is in the Business of providing
IT solutions and consultancy services to Power Sector in the areas of GIS, GPS &
Asset management, Institutional capacity building and Network Studies, Customer
billing and Customer Care, Network Automation and Energy Management
• GPS Survey of Network and Land based Features
• Processing and Digitization of Satellite Imagery and Arial Photogrammetry for
preparation of Base Maps of Area.
• Building Asset Registers ,asset tracking, asset retirement plan and asset valuation
• Asset Outage management
• The company’s GIS software has been used to track 120,000 Km of Network and
mapped 2.6 Million assets across about 100 towns and cities in 8 states in India and
34 states in Nigeria- Africa. Also the software has been used to index 5.0 Million
customers in 8 states of India.
Survey Projects carried out by Data
Point Associate 2
•Cadastral Survey for ROU / ROW of BORLProject, Gujarat Section (15.00 k.m.)
•Cadastral Survey for ROU / ROW of BORLProject, M.P. Section (100.00 k.m.)
•DESU Terminal (Delhi) to Maruti Udyog (Gurgaon - Haryana) Cadastral & Engineering Survey for GIS
Mapping (33.20 k.m.)
•MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. ( 0 to -13 k.m.) Cadastral & Engineering
Survey. (Gujarat Section @ Mundra Terminal)
•MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. ( 0 to -13 k.m.) Cadastral & Engineering
•Survey for Re-Routing in Bhinmal Dist. Jalor. State : Rajasthan (15 k.m.)
•Plane Table Survey for Planning of C.A. Patel Sports Complex @ Village Mota Fofadia Ta. Sinor Dist.
Vadodara.
•MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi.
•Forest Verification Social & Reserved. (Gujarat Section - 350 k.m.)
•Karjan Nagarpalika Drainage Project -Engineering Survey.
•Gujarat Refinery - IOC Dumad Terminal Pipeline Project - Plane Table Survey
•MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi.
•Demarcation for C.P. / I.P. / S.P. / T.S. station (Gujarat Section)
•MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi.
•Preparing FMB & Field Verification (Gujarat Section - 350 k.m.)
•Contour Survey of command area of canal of Narmada Project Ta. Dholka Dist. Anand. (12000 Hectare )
Survey Projects carried out by Data
Point Associate 2 (contd.)
•Contour & Grid Survey of L & T Cement project at piplav, Ta. Rajula, Dist. Amreli. (150 Hectare)
•Contour survey for salt project of Maredia Chemical Dahej, Dist. Baroda. (80 Hactare)
•Field to Field Survey of Block No. D8, D9, D10, D11 of SSNNL. (15000 Hactare)
•Demarcation & J. M. works of Sub Minors for Block No.8. (P.II)
•Work of Repairs and maintanance to R. & M to Distry & Minors for Block No. 9A-1.
•Demarcation & J. M. works of Sub Minors for Block No. 9A-1.
•Demarcation & J. M. works of Sub Minors for Block No. 9B-2.
•Topography Survey of Gujarat Petronet Ltd., LNG Petronet terminal @ Dahej.
•Demarcation & Join Measurement work of Sub Minor for Block No. – 12
•Consultancy Services for Cadastral Survey including field measurement, collecting FMB & Revenue record for
Mumbai -Manmad pipe line project. 310Kms
•MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. Preparing FMB & Field Verification
(Rajsthan & Hariyana Section - 837 k.m.)
•Other large data entry and manpower intensive projects
•The company has handled database capturing, creation, verification and Election Card issue of over 2 crore
citizens/ voters in Gujarat. They are one of the main pillars of the Election Commission’s data gathering
exercise.
Survey Projects carried out by Data
Point Associate 3
(approx 18000 kms HT/ LT GPS survey & 10 lakh consumers indexing)
Sr
No
Customer Details of project Location Man-
power
Work Order
Qty
Unit Mths Status
1Kalpataru Power Transmission Ltd. Gauthan HT/ LT Feeder separation Yojana Pune, Aurangabad, Satara, Kolhapur, Ahmednagar 60 10000kms 6 6000 kms
Completed
2ABB RGGY Yojana - Consumer indexing and GPS based
survey of HT/ LT feeder lines (existing & proposed)
superimposed over village maps for BPL families.
Bhilwada District, Rajasthan 50 600
100000
kms
Consumers
7 Completed
3SPIC SMO, Chennai RGGY Yojana - Consumer indexing and GPS based
survey of HT/ LT feeder lines (existing & proposed)
superimposed over village maps for BPL families.
Jhalawad District, Rajasthan 50 700
50,000
kms
Consumers
4 Completed
4Shyama Power Pvt. Ltd. RGGY Yojana - Consumer indexing and GPS based
survey of HT/ LT feeder lines (existing & proposed)
superimposed over village maps for BPL families.
Bharatpur District, Rajasthan 40 500
40,000
kms
Consumers
4 Completed
5Oswal Cable Pvt. Ltd. RGGY Yojana - Consumer indexing and GPS based
survey of HT/ LT feeder lines (existing & proposed)
superimposed over village maps for BPL families.
Nagor District, Rajasthan 25 300
15,000
kms
Consumers
3 Completed
6Jyoti Structures Ltd. HT/ LT Feeder separation Yojana Udaipur, Banswada, Dungarpur Districts, Rajasthan 35 1000kms 5 Completed
7Sintex Ltd. HT/ LT Feeder separation Yojana & material
reconciliation
Rajsamand, Nathdwara, Chittorgarh, Rajasthan 25 700kms 4 Completed
8GEC HT/ LT Feeders GPS survey, Consumer indexing, Bhopal, Murena, Gwalior Districts, Madhya Pradesh 20 150
45000
kms
Consumers
4 Completed
9Diamond Cables RGGY Yojana - Consumer indexing and GPS based
survey of HT/ LT feeder lines (existing & proposed)
superimposed over village maps for BPL families.
Bhavnagar, Mehsana, Patan, Palanpur, Anand
Districts, Gujarat
50 2000
400000
kms
Consumers
7 Completed
10W S Industries Ltd. RGGY Yojana - Consumer indexing and GPS based
survey of HT/ LT feeder lines (existing & proposed)
superimposed over village maps for BPL families.
Kheda, Dahod Districts, Gujarat 40 1200
350000
kms
Consumers
4 Ongoing
11ERDA Meter caliberation & testing Bangalore, Karnataka 10 700Consumers 12 Ongoing
12ABB (Thru MBH Power) Erection of HT/ LT cables & transformers for RGGY
project
Bhilwada District, Rajasthan 100 50kms 10 Completed
13Kalpataru Power Transmission Ltd. Erection of Gauthan HT/ LT Feeder separation Yojana Kolhapur District, Maharasthra 40 35kms 6 Completed
14Jyoti Structures Ltd. Erection of HT/ LT Feeder separation Yojana Udaipur District, Rajasthan 35 15kms 3 Ongoing
15Kalpataru Power Transmission Ltd. Labour supply Pune, Kolhapur, Maharashtra 50 Ongoing
ADVISORY PANEL
Sunil Parekh
 B Tech & a rank holder from IIT, Delhi in Mechanical Engineering & Computer
Programming, graduated in 1976
 Worked abroad for 15 years with working relationships in Africa, Europe and US.
 Worked with CII for 5 years in Western Region office, as Senior Director. Conceived and
implemented CII's Kutch rebuilding Initiative in 2002.
 Associated briefly with Asian Development Bank, Manila in 2004-05 as a consultant for
Industrial Development Projects.
 Currently: Advisor - Zydus Group, Crisil Infrastructure Advisory, Suzlon Energy Ltd.
 Member: First Honorary member of Indo American Chamber of Commerce IACC, Founder Member:
"Gujarat First“, Chief Mentor: Gujarat Electronics & Software Industry Association GESIA, CII &
FICCI Gujarat Council
 Governing Council Member & Trustee: Pharma Export Council of India: Pharmexcil,
Consumer Education and Research Centre, Gujarat Institute of Development Research, Ahmedabad,
GRIMS Institute of Management, Indus Valley Civilization Initiative, Baroda, Museum of Medicine,
Ahmedabad Management Association: AMA
ADVISORY PANEL
A B Singh
 Former Executive Director, GAIL (India) Ltd.
 Held positions as Sr Vice President, Mahanagar Gas Ltd., Addl Chief Engr, FCI, RCF,
HFCL.
 A veteran technocrat with solid experience of 38 years in leadership positions with world-
class companies in Fertilizer, Oil & Gas sectors including Natural gas Transmission and
City Gas Distribution, in managing large pipelining and CNG, Industrial and commercial
gas supply distribution projects.
 Adjudged as one of the strongest and committed leaders across GAIL in rising to the
challenge of distribution /transmission of Complex commingled gas involving APM gas,
gas from private entities to the Re gasified LNG (RLNG) , a pioneer work of this sort in
India that started during 2004
 Technical Advisor, GERMANISCHER LLYOLD, GERMANY, Jan 2006 – current
ADVISORY PANEL
Dr. P.P.Patel
 Expert on geology, hydrogeology, environment, ecology and Climate Change
 Former Head Geology Department, M.S.University, Baroda
 Member, Dam Safety Review Panel appointed by World Bank for Medium
Irrigation Projects in Gujarat. (1985 till date)
 Member, Sub-Committee on Salinity Ingress Prevention in Banni area of
Kuchchh (1986-1989)
 Vice President, Gujarat Regional Centre, Indian Society of Engineering Geology,
Calcutta (1990 till date)
 Organising Secretary, 13th Annual Convention of the Association of Exploration
Geophysicists. (1987)
 Convener, Workshop on Geo-Environmental Management in Gujarat, Gujarat
Science Academy (1984)
 Organising Secretary, National Seminar on Quaternary Environments (MSU-
SAC) at Baroda (1982)
 Member, Board of Governors, Gujarat Ecology Society, Baroda
 About 44 papers in national and international journals
ADVISORY PANEL
J C Marathe
 Former Joint Managing Director, Madhya Gujarat Vij Company Ltd. (MGVCL)
 Implemented GIS system and SCADA in Vadodara city
 Successfully implemented APDRP-I in Gujarat
 Experience of more than 35 years in distribution, generation &
transmission of power
 Executive committee member, Society of Power Engineers, Vadodara
Chapter
 Pioneer of special design transformers for single phase supply for
residential purpose on agriculture feeders
 Pivotal role in successfully spinning off seven power generation,
distribution and transmission companies from Gujarat Electricity Board
(GEB)
 Streamlined consumer billing and metering system to achieve 100%
billing efficiency in Gujarat.
ADVISORY PANEL
Mr. V.M.Patel
 Worked as Joint Director Bureau of Economics & Statistics, Directo
(Perspective Panning) , Officer on Special Duty & subsequent Advisor to
Narmada Planning Group, Government of Gujarat
 Conducted Evaluation Surveys of irrigation projects
 Contributed extensively in preparation of Economic Appraisal of Sardar
Sarovar Project
 Conducted and guided several Socio-Economic Surveys mounted by
Narmada Planning Group
 Contributed extensively in preparation of Socio-Economic maps required
for planning for Gujarat State
 Contributed several research papers on State Income Estimates
 Contributed articles related to Socio-Economic aspects of irrigation
projects
Thank you
Mandar Mehta
16/A, Ajay Colony, Opp. Jain Temple, Nizampura, Vadodara - 390 002
 +919898873233 e-mail: mandarmehta@Dtpt.com

GIS profile of Data Point

  • 1.
  • 2.
    Data Point’s domainexpertise • Civil engineering/ Dams/ Construction/ Real Estate/ Infrastructure projects • Surveying • Architecture • Water Resources • Ecology & Environment (land, soil, water, pollution, energy, coastal & marine environment, biodiversity, demography, physical climate, govt. policy) • Oil & Gas • Cadastral/ Land Records • Urban & Municipal Engineering • Energy, Power, Utilities • Transportation • Hospitality • Heritage & tourism • Public Sector • Police • Resettlement & Rehabilitation • Government (eGovernance) • Engineering • Manufacturing • Investment Banking, Banking, Finance
  • 3.
    Mandar Mehta -CEO • IT Consultant, Advisor, Project Manager & Trainer with 25+ years experience in IT/GIS/ERP solutions. • Consultant to World Bank and United States Agency for International Development (USAID) funded projects. • Carried out GIS/ GPS projects for ADB funded APDRP and R-APDRP projects in the power sector. • IT Advisor to State Government organisations, University and Government of India Projects. • Visiting Professor to M.S.University for 5 years. Served in the capacities as Solution Developer, Advisor, Consultant, Project Manager, Vice President & CEO. • First hand experience in offering corporate enterprise solutions as well as in Civil engg, GIS, GPS, Surveying, Water Resources, Oil & Gas, Ecology & Environment (land, soil, surface/ ground water, forest, agriculture, pollution, energy, coastal & marine environment, biodiversity, demography, physical climate, govt. policy), Rehabilitation & Resettlement Emergency Response Systems (Disaster Management), Asset Management/ Facilities Management (AM/FM), Cadastral/ Land Records, Police/ Crime, Urban/ Municipal Administration/ Engineering and e-Governance. He has indepth knowledge of business processes of utility companies (like power, water, oil & gas), manufacturing companies & construction/ real estate/ infrastructure companies and financial services industry.
  • 4.
    Mandar Mehta -CEO • More than 8 years Business Development, Customisation & Consulting experience in ERP • Known for offering excellent Business and ERP solutions. Conversant SAP. R/3 One year experience in Finance (FI) and Controlling (CO). Working knowledge of ABAP/4. Exposure of other modules like SD, MM, PP, HR etc. • Architected and co-developed a 100% webbased, workflow & DMS embedded ERP software covering modules like Customer Relationship Management (CRM), Supply Chain Management (SCM), Manufacturing Resources Planning (MRP), Financial Resources Management including Finance, Controlling & Accounting (FRM), Human Resources Management (HRM), Quality Management (QM) and IT Resources Management (ITM).
  • 5.
    Mandar Mehta -CEO • He started his career as Civil Engineer in Sardar Sarovar (Narmada) Project - a $ 4 billion multi purpose river valley project involving 4 states of India. • As designer, he designed 4 Rockfill dams (cost Rs. 64 crores) on the right side of the main dam. The design software was developed by him. • He was a leader of the team which carried out Finite Element Analysis (FEA) of the foundation treatment design of the main dam. The FEA design of the foundation treatment was reviewed and appreciated by the expert committee appointed by World Bank. • He did pioneering work in computerisation at the Sardar Sarovar Project. He has worked on several projects on water resources design, planning and management.
  • 6.
    Mandar Mehta -CEO • In the domain of Banking, Finance & Securities(BFSI) industry, Mr Mehta has been a Financial Advisor,Investment Banker & Equity Analyst (technical analyst). • He was involved in raising Rs 30 crores through Initial Public Offerings (IPOs). • He was a member providing vital inputs to a core team advising a $ 50 million country fund. • He also developed software for financial services & Mutual Fund. • He has implemented software solutions in Co-operative Banks. • He has exposure to International Investment Banking for about 8 years. • He is currently in touch with investors, banks, financial institutions, venture capital/ private equity funds and investment bankers globally for raising funding of US$ 100 mn for various projects
  • 7.
    Mandar Mehta –CEO Seminars, workshops & Papers • “Use of 3D GIS for visualisation of Infrastructure project” at the 1st National Conference on Geo- Visualisation jointly organized by NRDMS (Dept of Science & Tech, Govt. of India) & National Institute of Design (NID) - Nov 2007. • “Mathematical modeling using GIS for Utilities” funded under DST Schools (Dept of Science & Tech, Govt. of India) on Mathematical Modeling in Earth System Sciences Programme at CEPT University, Ahmadabad – Nov 2007. • "GIS for utilities", at a Seminar on "GIS, GPR, GPS & Remote Sensing in Urban Planning & Municipal Information System", organised by Indian Society of Geomatics and Vadodara Municipal Corporation - September 2005. • Optimisation & privatisation of city bus network using GIS: A case study of Vadodara city in Gujarat State by Nipa Desai, B. D. Vashi, Mandar Mehta • "Computerised MIS for Water Management in Dangs District" at National Seminar on Water Resources - Dr. C.R.Shah, Dr. P.P.Patel, Mandar Mehta • "Power Sector - A Remarkable performance" , Special issue on private sector participation in Infrastructure Projects, Financial Express, 1996 • Trained hundreds of students, professionals, engineers, chartered accountants, managers and executives in Computer applications. Conducted corporate IT training in several organizations. • Participated in panel discussions at Computer Society of India
  • 8.
    Mandar Mehta –CEO Seminars, workshops & Papers • Conducted ZOPP (a German method for Objectives Oriented Project Planning) workshop for NGOs, Environment Consultants, Government Officers • Voted Best Speaker for “Use of Commercial Applications using PCs” at Seminar in Municipalities held by Operations Research Group (ORG) for Gujarat Municipal Finance Board (GMFB) 1991 • MIS Consultant for Database Management at Water and Land Management Institute, 1991 • Lectured on GIS topics at refresher programs of M. S. University under University Grants Commission (UGC) • Seminar on GIS for oil & gas industry, ONGC, 2002. • Organizer & Panelist, Gujarat’s Environment, World Environment Day, 5th June 2003 • Interviewed hundreds of candidates for recruitment, admission to Government IT courses etc. • Project Guide for several students of Undergraduate & Postgraduate studies: Bachelor of Engineering (Computer Science) B.E. Comp. Science, Bachelor of Science (Environment Science), Master of Comp. Applications (MCA), Masters in Engineering M.E.(Civil), Master in Business Administration MBA(Finance) etc.
  • 9.
    Testimonials • “Mandar isa high caliber professional having a deep knowledge and understanding of multidisciplinary sectors and processes” – Sam Pitroda, Chairman, National Knowledge Commission & Advisor to the Prime Minister of India • "Mr. Mandar Mehta, CEO, Data Point Computer Services and his team has worked out an action plan for next 2 Phases of e-Governance which include comprehensive workflow and creation of Portals. We are happy with the work carried out by Data Point. Their people have the necessary skills, know-how, understanding of government processes, culture and behaviour."- Bhagyesh Jha, District Collector, Vadodara • "Mandar can visualize the changing trends and apply appropriate technology."- Sanat Mehta, Ex-Member of Parliament /Ex Finance Minister (Gujarat State) • "Mandar’s process reengineering skills have been extremely useful."- V. K. Babbar, CEO & Commissioner (SSPA), Additional Chief Secretary, Govt of Gujarat • "We have found Mandar to be knowledgeable, innovative and sensitive to public interest."-Hasmukh Shah, Chairman, Gujarat Ecology Commission • "Mandar facilitated buildup of inhouse GIS capacity in natural resources, ecology & environment database management.He has good understanding in eGovernance too." - Vilasini Ramachandran, Member Secretary, Gujarat Ecology Commission & Former Municipal Commissioner, Vadodara City.
  • 10.
    Testimonials • "Mandar Mehtahas worked assiduously in creating a Web Based GIS Enabled Environment Database for Gujarat under the Gujarat State Environment Action Program (World Bank supported Environment Management Capacity Building Project). The dissemination of this information is first of its kind in India and required special skills." - Dr. Smita Misra, Sr. Environmental Economist, World Bank • "A pioneer in the city, he has been a big help." - Bharti Vyas, Mayor, Vadodara • "Mandar’s depth and breadth of involvement amazes me." - Sunil Parekh, Sr Director Confed. of Indian Ind (CII) • "I rely on Data Point for all my computer aided water engineering analysis and design."- (Late) Dr. C. R. Shah, Water Resources Consultant • "Mandar Mehta is a pioneer and a fine IT professional."- (Late) Mayank Dholakia, Dean, Faculty of Mngmnt, MSU • "Data Point completed several overseas GIS projects within cost and time without compromising quality." - (Late) Sandeep Modi, 2M Software • "Data Point provided prompt services in survey drawings and cadastral mapping for many of our projects." - Prakash Patel, MD, Mascon • "Mr Mehta greatly contributed to our CAD efforts." - Robert Every, GE Motors
  • 11.
    GIS Projects Statewide GIS basedWeb enabled Environment Database of Gujarat • Gujarat Ecology Commission (GEC) prepared a State Environmental Action Program (SEAP) funded by World Bank. • 8 Technical Working Groups (TWGs) worked on specific aspects of the State ecology and have collected a huge information base over a period of 3 years. • The data was collected through in-depth study of specific components of Gujarat’s environment over a period of 5 years by some of the well-known Institutions of India including Tata Energy Research Institute (TERI), Tata Consultancy Services (TCS), Operation Research Group (ORG), National Environmental Engineering Institute (NEERI), Centre for Environmental Planning & Technology (CEPT), Gujarat Ecology Society etc. • This Statewide Environmental database is put on the web for the first time in India. • Consists of data on Industrial Pollution, Urbanization, Degradation of Land, Water, Biodiversity, Coastal and Marine Environment, Wetlands and Energy • The Web based GIS enabled Environment Database is one of the first and largest of its kind in India. • The project included environmental mapping of Gujarat State (more than 300 maps with around 2000 attribute tables) + Maps of 26 districts, 274 talukas, & 18000+ villages of Gujarat State • The project was a 75-man month effort. The URL is www.gec.gov.in
  • 12.
    GIS Projects GIS based Cultural Resources Information Systemfor UNESCO declared World Heritage Site • The Champaner-Pavagadh Heritage project taken up by the Heritage Trust in Gujarat has been declared as top World Heritage Site by UNESCO in 2004. • The GIS system will help visualise the project site in an integrated manner and will enable retrieval/ analysis of cultural history, trends and patterns in a spatial (graphical) dimension. • The GIS will provide the project planners a powerful modelling tool and will form the backbone upon which a Management Plan will be developed. • The GIS system also includes high resolution (61 cms) Quickbird satellite imagery of 80 sqkms of Champaner- Pavagadh area. • The project included database creation and digitization of 91 villages including about 25000 land parcel boundaries • The project was inaugurated and GIS was appreciated His Excellency President A P J Abdul Kalam
  • 13.
    GIS Projects GIS mapping andGPS survey for APDRP projects • Global Position System (GPS) Survey, data collection, mapping, consumer indexing, developing GIS software for transmission and distribution (T&D) power network analysis for State Public Utility for 13 cities having 2,000,000 Poles and 500,000 Consumers and 5000 KMs length of the network • Development of Data Power – a GIS software solution for power network optimization and T&D loss calculation software developed by Data Point under R- APDRP project of ADB comprising of AM/FM and handling of very large databases • Global Position System (GPS) Survey, data collection, mapping, consumer indexing, GIS based transmission and distribution network analysis for a State Power Utility for 5 cities having 60,000 Poles and 150,000 Consumer and 1200 KMs length of the network
  • 14.
    GIS Projects 3D GIS,DTM and animation Contour map 3D Animation Satellite imagery • 3D GIS terrain (DTM) and animation model with Quickbird – world’s highest resolution commercially available satellite imagery, NASA’s Shuttle Radar Topography Mission (SRTM) data and creating site contours for a 810 Million Omani Riyal (OR) Beach Development Infrastructure project (8 kms long) south of Muscat, for one of the largest Real Estate Companies in Oman • The purpose was to ascertain pre-feasibility level engineering analysis and a visual model for potential investors for the project.
  • 15.
    GIS Projects GIS based AM/FMcum Emergency Response System including citywide survey • A citywide 160 km long x 12 km wide corridor survey of industrial gas pipeline for New Delhi city having an area of more than 1400 sq. km. was carried out using Total Station, GPS etc. for Gas Authority of India Ltd. (GAIL) - a leading oil & gas utility company in India. The base map of New Delhi city was at a scale of 1:20,000. • The objectives of this project were: 1) Effective Operation and Maintenance (O&M) 2) Aid in emergencies (Emergency Response System) like pipeline leak or burst. 3) Disaster Management. 4) Apart from GAIL the information from this system will be of use to other departments like Telecommunications, DDA, GDA (for laying water, sewage-lines), Delhi Electricity Supply Undertaking. • About 150 feature themes were included in the GIS. • This was a 60-manmonth exercise and was a first in the country. • A 50 m wide corridor survey was conducted for land and other structures along the entire stretch of 160 kms. The pipeline and other structures are identified in Latitude and Longitude and in meters also in x, y plot in the map. The pipeline position is indicated in the maps from the nearest roads, structures, landmarks etc. • The purpose was to serve as a) GIS based Emergency Response System & b) Operation & Maintenance System (O&M)
  • 16.
    GIS Projects GIS for Resettlement & Rehabilitatio n(R&R) MIS for US$ 12 billion rivervalley project • A GIS based MIS for Sardar Sarovar Punarvasvat Agency (SSPA) was carried out in association with TCS. • The aim was to have an MIS which would cater to Supreme Court reporting requirements at the same time give a tool for planning as well as honourable judges to visualise the implications on number of villages and the population affected by submergence due to progressive clearance for construction of the Sardar Sarovar (Narmada) dam upto specific heights. • A GIS based MIS for Resettlement & Rehabilitation of Project Affected Families due to submergence of villages of Sardar Sarovar Project was developed. The project area covered 88000 sq.km. of catchment area (450 SOI maps) and about 120 downstream R&R (community) sites. • The project was done in capacity as GIS Advisor, SSPA, Government of Gujarat.
  • 17.
    GIS Projects Revenue Land Records& Right of Use (ROU) for 1000 km oil pipeline project • Thousands of land records of more than 500 villages were verified and field (joint measurement) books created in CAD after Total Station/ GPS survey on site for about 1000 kms oil pipeline project from Mundra to Bhatinda. • The records were updated for acquiring Right of Use (ROU) under Petroleum, Mining & Pipeline (PMP) Act of Govt. of India. • The compensation was to be paid to the owners after observing the legal notification procedure laid down by the Act.
  • 18.
    GIS Projects Soil mapping& GIS • Soil mapping & GIS for Sardar Sarovar Narmada Nigam Ltd. was done for soils covering an area of 75000 hectares of Phase I. • The database included parameters like borehole no, borehole details, including soil parameters like EC, Soil texture, class, etc.
  • 19.
    GIS Projects Academic Project: Sustainable Urban Drainage - Vadodara •To understand and analyse the flooding pattern in the city. • To identify the reasons and factors leading to choking of drains and flooding in different areas of Baroda City. • To study the drainage system and find or establish relationship with the natural slope. • To workout probable long term and short term measures for the city. • Formulate a sustainable drainage system by taking into consideration the natural slope, groundwater and minimizing the damages due to floods. • The academic study was carried out by Dwiti Shah, CEPT University student under the guidance of Prof Saswat Bandyopadhyay and Mandar Mehta. 8.5 SQ KM 20.7 SQ KM 10.7 SQ KM 13 SQ KM Vishwamitri river Nagarwada Kaans Ruparel kaans Mashia kaans TBH-Vasna- Banco kaans Under-Gorti kaans
  • 20.
    GIS Projects GIS forvillages • GIS for Revenue records updation & ROU mapping of Gas Authority of India's HBJ pipeline was done for a stretch of 6 kms in Madhya Pradesh (Agar Tehsil).
  • 21.
    GIS Projects District mapping forlaw & order monitoring (police/ security) • A GIS project for preparation of Vadodara district map having 1639 villages spread over 7794 sq kms was carried out under a project assigned by the District Superintendent of Police (Rural). • Certain high security/ strategic locations throughout the district were marked by the help of GPS. • The talukawise GIS mapping included police jurisdictions, sensitive locations, police stations and their contact details, roads, railways, bridges, schools, colleges, water bodies, hospitals, primary health centres, community health centres, dispensaries, Gujarat Electricity Board switchyards locations, company locations, bus stands, helipad, airport, census data, other infrastructural facilities etc. • The GIS map was to be linked up with a GPS based vehicle tracking system for online monitoring, strategic planning and quick response to crimes.
  • 22.
    GIS Projects Sea shoreline change detection •GIS based Shoreline change detection study for shoreline at Suvali village near Surat on behalf of University of Cambridge • The study was to understand changes in the shoreline and infer whether there was a city buried under the sea • For the study use of 18th century French, 19th century Indian and 21st century Survey of India maps as well as prior period and present day satellite imageries were used.
  • 23.
    GIS Projects GIS/ MISfor Drinking Water Mission, Government of India • Computer based MIS/ GIS model for Water Management for drinking water submitted to Rajiv Gandhi National Technology Mission on drinking Water, Govt. of India • The model district selected was Dangs in Gujarat • An MIS model was mooted and developed. • The report was appreciated by the World Bank
  • 24.
    GIS Projects GIS basedoil & gas mapping • Mapping of 400+ Oil Wells of a large Oil & Gas Company • The region included wells in Gandhar, Jambusar, Dahej, Nada and Jolwa. The feeder collector pipelines included W.I.Lines, Oil lines, Gas lines, Gas lift link, Water inlet, Effluent, installations like GGS, CPF, YC, EPS, etc.
  • 25.
    GIS Projects Urban Transport Network Analysisof Vadodara city • Optimisation & Privatisation Of City Bus Network Using GIS was undertaken to study the existing trend for intra-city transport metrics of Vadodara, to evaluate performance of existing GSRTC (Gujarat State Road Transport Corporation ) bus service. • Prepare and suggest optimisation of bus fleet so as to satisfy the needs of Vadodara commuters and to assess way & means to make the bus service profitable. • Digitised and geo-referenced maps were prepared using GIS software Arc View -3.1. • O.D matrices were prepared and new zone system was proposed. Financial analysis was also carried out. • Privatisation was suggested for implementation and also guidelines for implementation were proposed. • The study was done in association with Nipa Desai, a Masters Degree student & B D Vashi, Reader, Highways Department, M S University
  • 26.
    GIS Projects GIS basedmodel for identification of probable zones for ground water propecting in Sasutan watershed • The study focuses on the identification of probable ground water potential zone of Sasutan watershed located in Dharampur taluka of Valsad Dist., Gujarat. • The occurrence of groundwater is dependent on the various interrelated geo – environmental parameters, viz., lithology, lineament, drainage, slope and landuse. • GIS is a very powerful tool for identifying potential zones. • A multi-criteria evaluation is used in GIS to get resultant thematic map for probable groundwater potential zone of Sasutan watershed. • The map indicates very high potentiality of groundwater in western part of the basin, high in the central part of the basin, moderate in the eastern part and poor in the northern part of the basin. • The study was done in association with Dr Bhushan Deota, Reader, Geology Department, M S University
  • 27.
    GIS Projects Well log digitization– pilot project • Pilot project for digitization of oil well logs for a NASDAQ listed company • Supervision by geologists or geotechnical experts • Qualified Well Logging expert verified the accuracy of the Logs • Each curve was digitized one at a time using automatic and manual digitization software with thinning algorithms for more accuracy. • Color separations used for different curves. • Log Header information was encapsulated • Output delivered in LIS, LAS, XLS, XML or ASCII formats
  • 28.
    GIS Projects GIS mappingfor a Telecom Utility • GIS mapping/ digitization of cable records covering Telecom District which includes digitization, geocoding, customization and implementation of Telephone cable network for approximately 1,30,000 lines (area=75 sqkms) for a Telecom Utility
  • 29.
    GIS Projects GIS mapping andwater resources projects • GIS Mapping of 1000 sq.km of city/ urban areas. Maps of 26 districts, 274 talukas & thousands of village boundaries • 5 projects for USA based companies • Computer studies for analysis of Canal Distribution System • Computerised Stability Analysis of earth dams in Nigeria • Design and analysis of weirs • Backwater and submergence studies of weir using HEC-2 program of Hyrology Engg. Centre (HEC),USA • Siltation(Sedimentation) study of weir using HEC-6 program of Hydrologic Engg. Centre (HEC), USA
  • 30.
    Survey Equipment • 2DGPS survey base stations and 2 rovers • 15 Garmin GPS (5 meters accuracy) • Additional equipments like Total Stations and DGPS’s available through associated subvendors • More equipments can be procured based on project demand
  • 31.
    Data Point’s Associate1 Diversified group: Nigeria, India, Indonesia, Singapore, Estonia • The company ( a part of multi million dollar group) is in the Business of providing IT solutions and consultancy services to Power Sector in the areas of GIS, GPS & Asset management, Institutional capacity building and Network Studies, Customer billing and Customer Care, Network Automation and Energy Management • GPS Survey of Network and Land based Features • Processing and Digitization of Satellite Imagery and Arial Photogrammetry for preparation of Base Maps of Area. • Building Asset Registers ,asset tracking, asset retirement plan and asset valuation • Asset Outage management • The company’s GIS software has been used to track 120,000 Km of Network and mapped 2.6 Million assets across about 100 towns and cities in 8 states in India and 34 states in Nigeria- Africa. Also the software has been used to index 5.0 Million customers in 8 states of India.
  • 32.
    Survey Projects carriedout by Data Point Associate 2 •Cadastral Survey for ROU / ROW of BORLProject, Gujarat Section (15.00 k.m.) •Cadastral Survey for ROU / ROW of BORLProject, M.P. Section (100.00 k.m.) •DESU Terminal (Delhi) to Maruti Udyog (Gurgaon - Haryana) Cadastral & Engineering Survey for GIS Mapping (33.20 k.m.) •MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. ( 0 to -13 k.m.) Cadastral & Engineering Survey. (Gujarat Section @ Mundra Terminal) •MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. ( 0 to -13 k.m.) Cadastral & Engineering •Survey for Re-Routing in Bhinmal Dist. Jalor. State : Rajasthan (15 k.m.) •Plane Table Survey for Planning of C.A. Patel Sports Complex @ Village Mota Fofadia Ta. Sinor Dist. Vadodara. •MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. •Forest Verification Social & Reserved. (Gujarat Section - 350 k.m.) •Karjan Nagarpalika Drainage Project -Engineering Survey. •Gujarat Refinery - IOC Dumad Terminal Pipeline Project - Plane Table Survey •MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. •Demarcation for C.P. / I.P. / S.P. / T.S. station (Gujarat Section) •MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. •Preparing FMB & Field Verification (Gujarat Section - 350 k.m.) •Contour Survey of command area of canal of Narmada Project Ta. Dholka Dist. Anand. (12000 Hectare )
  • 33.
    Survey Projects carriedout by Data Point Associate 2 (contd.) •Contour & Grid Survey of L & T Cement project at piplav, Ta. Rajula, Dist. Amreli. (150 Hectare) •Contour survey for salt project of Maredia Chemical Dahej, Dist. Baroda. (80 Hactare) •Field to Field Survey of Block No. D8, D9, D10, D11 of SSNNL. (15000 Hactare) •Demarcation & J. M. works of Sub Minors for Block No.8. (P.II) •Work of Repairs and maintanance to R. & M to Distry & Minors for Block No. 9A-1. •Demarcation & J. M. works of Sub Minors for Block No. 9A-1. •Demarcation & J. M. works of Sub Minors for Block No. 9B-2. •Topography Survey of Gujarat Petronet Ltd., LNG Petronet terminal @ Dahej. •Demarcation & Join Measurement work of Sub Minor for Block No. – 12 •Consultancy Services for Cadastral Survey including field measurement, collecting FMB & Revenue record for Mumbai -Manmad pipe line project. 310Kms •MUNDRA - BHATINDA Crude Oil Pipe line for HPCL Project, Delhi. Preparing FMB & Field Verification (Rajsthan & Hariyana Section - 837 k.m.) •Other large data entry and manpower intensive projects •The company has handled database capturing, creation, verification and Election Card issue of over 2 crore citizens/ voters in Gujarat. They are one of the main pillars of the Election Commission’s data gathering exercise.
  • 34.
    Survey Projects carriedout by Data Point Associate 3 (approx 18000 kms HT/ LT GPS survey & 10 lakh consumers indexing) Sr No Customer Details of project Location Man- power Work Order Qty Unit Mths Status 1Kalpataru Power Transmission Ltd. Gauthan HT/ LT Feeder separation Yojana Pune, Aurangabad, Satara, Kolhapur, Ahmednagar 60 10000kms 6 6000 kms Completed 2ABB RGGY Yojana - Consumer indexing and GPS based survey of HT/ LT feeder lines (existing & proposed) superimposed over village maps for BPL families. Bhilwada District, Rajasthan 50 600 100000 kms Consumers 7 Completed 3SPIC SMO, Chennai RGGY Yojana - Consumer indexing and GPS based survey of HT/ LT feeder lines (existing & proposed) superimposed over village maps for BPL families. Jhalawad District, Rajasthan 50 700 50,000 kms Consumers 4 Completed 4Shyama Power Pvt. Ltd. RGGY Yojana - Consumer indexing and GPS based survey of HT/ LT feeder lines (existing & proposed) superimposed over village maps for BPL families. Bharatpur District, Rajasthan 40 500 40,000 kms Consumers 4 Completed 5Oswal Cable Pvt. Ltd. RGGY Yojana - Consumer indexing and GPS based survey of HT/ LT feeder lines (existing & proposed) superimposed over village maps for BPL families. Nagor District, Rajasthan 25 300 15,000 kms Consumers 3 Completed 6Jyoti Structures Ltd. HT/ LT Feeder separation Yojana Udaipur, Banswada, Dungarpur Districts, Rajasthan 35 1000kms 5 Completed 7Sintex Ltd. HT/ LT Feeder separation Yojana & material reconciliation Rajsamand, Nathdwara, Chittorgarh, Rajasthan 25 700kms 4 Completed 8GEC HT/ LT Feeders GPS survey, Consumer indexing, Bhopal, Murena, Gwalior Districts, Madhya Pradesh 20 150 45000 kms Consumers 4 Completed 9Diamond Cables RGGY Yojana - Consumer indexing and GPS based survey of HT/ LT feeder lines (existing & proposed) superimposed over village maps for BPL families. Bhavnagar, Mehsana, Patan, Palanpur, Anand Districts, Gujarat 50 2000 400000 kms Consumers 7 Completed 10W S Industries Ltd. RGGY Yojana - Consumer indexing and GPS based survey of HT/ LT feeder lines (existing & proposed) superimposed over village maps for BPL families. Kheda, Dahod Districts, Gujarat 40 1200 350000 kms Consumers 4 Ongoing 11ERDA Meter caliberation & testing Bangalore, Karnataka 10 700Consumers 12 Ongoing 12ABB (Thru MBH Power) Erection of HT/ LT cables & transformers for RGGY project Bhilwada District, Rajasthan 100 50kms 10 Completed 13Kalpataru Power Transmission Ltd. Erection of Gauthan HT/ LT Feeder separation Yojana Kolhapur District, Maharasthra 40 35kms 6 Completed 14Jyoti Structures Ltd. Erection of HT/ LT Feeder separation Yojana Udaipur District, Rajasthan 35 15kms 3 Ongoing 15Kalpataru Power Transmission Ltd. Labour supply Pune, Kolhapur, Maharashtra 50 Ongoing
  • 35.
    ADVISORY PANEL Sunil Parekh B Tech & a rank holder from IIT, Delhi in Mechanical Engineering & Computer Programming, graduated in 1976  Worked abroad for 15 years with working relationships in Africa, Europe and US.  Worked with CII for 5 years in Western Region office, as Senior Director. Conceived and implemented CII's Kutch rebuilding Initiative in 2002.  Associated briefly with Asian Development Bank, Manila in 2004-05 as a consultant for Industrial Development Projects.  Currently: Advisor - Zydus Group, Crisil Infrastructure Advisory, Suzlon Energy Ltd.  Member: First Honorary member of Indo American Chamber of Commerce IACC, Founder Member: "Gujarat First“, Chief Mentor: Gujarat Electronics & Software Industry Association GESIA, CII & FICCI Gujarat Council  Governing Council Member & Trustee: Pharma Export Council of India: Pharmexcil, Consumer Education and Research Centre, Gujarat Institute of Development Research, Ahmedabad, GRIMS Institute of Management, Indus Valley Civilization Initiative, Baroda, Museum of Medicine, Ahmedabad Management Association: AMA
  • 36.
    ADVISORY PANEL A BSingh  Former Executive Director, GAIL (India) Ltd.  Held positions as Sr Vice President, Mahanagar Gas Ltd., Addl Chief Engr, FCI, RCF, HFCL.  A veteran technocrat with solid experience of 38 years in leadership positions with world- class companies in Fertilizer, Oil & Gas sectors including Natural gas Transmission and City Gas Distribution, in managing large pipelining and CNG, Industrial and commercial gas supply distribution projects.  Adjudged as one of the strongest and committed leaders across GAIL in rising to the challenge of distribution /transmission of Complex commingled gas involving APM gas, gas from private entities to the Re gasified LNG (RLNG) , a pioneer work of this sort in India that started during 2004  Technical Advisor, GERMANISCHER LLYOLD, GERMANY, Jan 2006 – current
  • 37.
    ADVISORY PANEL Dr. P.P.Patel Expert on geology, hydrogeology, environment, ecology and Climate Change  Former Head Geology Department, M.S.University, Baroda  Member, Dam Safety Review Panel appointed by World Bank for Medium Irrigation Projects in Gujarat. (1985 till date)  Member, Sub-Committee on Salinity Ingress Prevention in Banni area of Kuchchh (1986-1989)  Vice President, Gujarat Regional Centre, Indian Society of Engineering Geology, Calcutta (1990 till date)  Organising Secretary, 13th Annual Convention of the Association of Exploration Geophysicists. (1987)  Convener, Workshop on Geo-Environmental Management in Gujarat, Gujarat Science Academy (1984)  Organising Secretary, National Seminar on Quaternary Environments (MSU- SAC) at Baroda (1982)  Member, Board of Governors, Gujarat Ecology Society, Baroda  About 44 papers in national and international journals
  • 38.
    ADVISORY PANEL J CMarathe  Former Joint Managing Director, Madhya Gujarat Vij Company Ltd. (MGVCL)  Implemented GIS system and SCADA in Vadodara city  Successfully implemented APDRP-I in Gujarat  Experience of more than 35 years in distribution, generation & transmission of power  Executive committee member, Society of Power Engineers, Vadodara Chapter  Pioneer of special design transformers for single phase supply for residential purpose on agriculture feeders  Pivotal role in successfully spinning off seven power generation, distribution and transmission companies from Gujarat Electricity Board (GEB)  Streamlined consumer billing and metering system to achieve 100% billing efficiency in Gujarat.
  • 39.
    ADVISORY PANEL Mr. V.M.Patel Worked as Joint Director Bureau of Economics & Statistics, Directo (Perspective Panning) , Officer on Special Duty & subsequent Advisor to Narmada Planning Group, Government of Gujarat  Conducted Evaluation Surveys of irrigation projects  Contributed extensively in preparation of Economic Appraisal of Sardar Sarovar Project  Conducted and guided several Socio-Economic Surveys mounted by Narmada Planning Group  Contributed extensively in preparation of Socio-Economic maps required for planning for Gujarat State  Contributed several research papers on State Income Estimates  Contributed articles related to Socio-Economic aspects of irrigation projects
  • 45.
    Thank you Mandar Mehta 16/A,Ajay Colony, Opp. Jain Temple, Nizampura, Vadodara - 390 002  +919898873233 e-mail: mandarmehta@Dtpt.com