GAP3 is the inspective approach to
assess the residual life of machines
Methodology
The      methodology      employed     is
conducting      standard   and    special
electrical tests and inspection on stator
and rotor windings and accessories
Unit Condition
The machine is in assembled condition with
access covers and top half of end brackets
removed
Inspection & tests Performed
Stator winding
Electrical tests as done in MAP2
Visual and borescope inspection of stator
winding,    stator   core    laminations and
fingerplates (as accessible)
Core tightness test    (visual     indications of
looseness)
Inspection & tests Performed
Corona tests, as accessible, to determine
areas and severity of any corona activity
DC step voltage test to determine insulation
integrity
End winding basket frequency check
Rotor winding
Electrical tests as done in MAP2
Visual and borescope inspection of     rotor
winding and blocking (as accessible)
Exciter and Accessories
Electrical tests as done in MAP2
Benefits
Reveals pending faults in winding
Reveals deterioration of coil insulation by
corona or end winding vibration
Establish a base line for evaluating future
inspection
Accurately assess life and future maintenance
requirements
Record of core tightness
Preventive maintenance plan
Schedule for GAP2, GAP3 and GAP4
Final Report
Standard format provided electronically
Photographs of critical areas
Location and levels of corona activity
Plots showing frequency distribution of
end winding basket
Core tightness record
Schedule for MAP4
Expected Downtime
5-7 days
Condition Assessment
                 Risk Assessment Approach
Condition Assessment
                       Stator
Operation & Maintenance History


Physical Inspection


Insulation Test


Generator Age
DC Ramped Voltage Test


Partial Discharge Measurement


Dissipation Factor Measurement


Ozone Monitoring


Black Out Test


High Potential Withstand Test


Stator Core Inspection


Wedge Tightness Evaluation


Core Loop Test
ELCID Test


Corona Probe Test


Coupling Resistance Test


Bump test


Capacitance Measurement


Core Bolt Insulation Resistance


Winding Conductor Resistance Measurement


Impedance Measurement


Winding Dissection
Stator Condition Index




  1   2 3 4 5 6 7 8 9 10
Stator Data Quality Index




    0      4      7     10
Condition Assessment
                       Rotor
Operation & Maintenance History


Physical Inspection


Insulation Test


Generator Age
High Potential Withstand Test


Rotor Core Inspection


AC Pole Drop Test


AC Impedance Test


Winding Resistance Measurement


RSO Test
Rotor Condition Index




  1   2 3 4 5 6 7 8 9 10
Rotor Data Quality Index




    0      4      7        10
Condition Assessment
                       Generators
Generator Condition Index




  1   2 3 4 5 6 7 8 9 10
Generator Data Quality Index




   0       4      7     10
THANK YOU



ध यवाद




               ‫ا‬
‫ﮨﮯ‬    ‫ﯾہ ادا‬



ந    றி

ಧನ ಾದಗಳ

More Related Content

Viewers also liked

Sowo570
Sowo570 Sowo570
презентация детские праздники
презентация детские праздникипрезентация детские праздники
презентация детские праздники
Nichald
 
Slimming ii презинтация
Slimming ii презинтацияSlimming ii презинтация
Slimming ii презинтацияNichald
 
презентация свадьбы Sunday
презентация свадьбы Sundayпрезентация свадьбы Sunday
презентация свадьбы Sunday
Nichald
 
презентация Sunday
презентация Sundayпрезентация Sunday
презентация Sunday
Nichald
 
Mobile templating με Joomla και K2
Mobile templating με Joomla και K2Mobile templating με Joomla και K2
Mobile templating με Joomla και K2Yiota Ziaggou
 
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκραFightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκραYiota Ziaggou
 
Generator Assessment Process - Level 2
Generator Assessment Process - Level 2Generator Assessment Process - Level 2
Generator Assessment Process - Level 2Anil Panjani
 
Selecting sales and marketing personnel
Selecting sales and marketing personnelSelecting sales and marketing personnel
Selecting sales and marketing personnelHussam Aldurayhim
 

Viewers also liked (9)

Sowo570
Sowo570 Sowo570
Sowo570
 
презентация детские праздники
презентация детские праздникипрезентация детские праздники
презентация детские праздники
 
Slimming ii презинтация
Slimming ii презинтацияSlimming ii презинтация
Slimming ii презинтация
 
презентация свадьбы Sunday
презентация свадьбы Sundayпрезентация свадьбы Sunday
презентация свадьбы Sunday
 
презентация Sunday
презентация Sundayпрезентация Sunday
презентация Sunday
 
Mobile templating με Joomla και K2
Mobile templating με Joomla και K2Mobile templating με Joomla και K2
Mobile templating με Joomla και K2
 
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκραFightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
 
Generator Assessment Process - Level 2
Generator Assessment Process - Level 2Generator Assessment Process - Level 2
Generator Assessment Process - Level 2
 
Selecting sales and marketing personnel
Selecting sales and marketing personnelSelecting sales and marketing personnel
Selecting sales and marketing personnel
 

Similar to Generator Assessment Process - Level 3

Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
srichakra kripa
 
Condition monitoring part 2
Condition monitoring part 2Condition monitoring part 2
Condition monitoring part 2
Hendry Hasbiallah
 
Well test procedures manual
Well test procedures manualWell test procedures manual
Well test procedures manual
Narendra Kumar Dewangan
 
Pad Cratering: Prevention, Mitigation and Detection Strategies
Pad Cratering: Prevention, Mitigation and Detection StrategiesPad Cratering: Prevention, Mitigation and Detection Strategies
Pad Cratering: Prevention, Mitigation and Detection Strategies
Cheryl Tulkoff
 
TURNER TG and BOP SERVICES
TURNER TG and BOP SERVICESTURNER TG and BOP SERVICES
TURNER TG and BOP SERVICESJoseph T. Turner
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
Global Physical Asset Management
 
Relay service providers and dealers
Relay service providers and dealers Relay service providers and dealers
Relay service providers and dealers
ashwini reliserv
 
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
AniketSingh198707
 
OCSTraining - API 577 Welding Inspection and Metallurgy
OCSTraining - API 577 Welding Inspection and MetallurgyOCSTraining - API 577 Welding Inspection and Metallurgy
OCSTraining - API 577 Welding Inspection and Metallurgy
Muanisa Waras
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
Easwaran Kanason
 
GENERATING UNIT TESTING AND MODEL VALIDATION
GENERATING UNIT TESTING AND MODEL VALIDATIONGENERATING UNIT TESTING AND MODEL VALIDATION
GENERATING UNIT TESTING AND MODEL VALIDATION
Power System Operation
 
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)KHUSHI9999
 
Flywheel Safety - Richard thompson - Jan 2011
Flywheel Safety - Richard thompson - Jan 2011Flywheel Safety - Richard thompson - Jan 2011
Flywheel Safety - Richard thompson - Jan 2011cahouser
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
kalyanasundaram veerasekaran
 

Similar to Generator Assessment Process - Level 3 (20)

Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
Condition monitoring part 2
Condition monitoring part 2Condition monitoring part 2
Condition monitoring part 2
 
Well test-procedures-manual
Well test-procedures-manualWell test-procedures-manual
Well test-procedures-manual
 
Well test procedures manual
Well test procedures manualWell test procedures manual
Well test procedures manual
 
Pad Cratering: Prevention, Mitigation and Detection Strategies
Pad Cratering: Prevention, Mitigation and Detection StrategiesPad Cratering: Prevention, Mitigation and Detection Strategies
Pad Cratering: Prevention, Mitigation and Detection Strategies
 
TURNER TG and BOP SERVICES
TURNER TG and BOP SERVICESTURNER TG and BOP SERVICES
TURNER TG and BOP SERVICES
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
 
Relay service providers and dealers
Relay service providers and dealers Relay service providers and dealers
Relay service providers and dealers
 
FMEA - Electrical Motor
FMEA - Electrical MotorFMEA - Electrical Motor
FMEA - Electrical Motor
 
FAZIL PASHA CV 3.6.2015
FAZIL PASHA CV 3.6.2015FAZIL PASHA CV 3.6.2015
FAZIL PASHA CV 3.6.2015
 
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
 
OCSTraining - API 577 Welding Inspection and Metallurgy
OCSTraining - API 577 Welding Inspection and MetallurgyOCSTraining - API 577 Welding Inspection and Metallurgy
OCSTraining - API 577 Welding Inspection and Metallurgy
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
 
GENERATING UNIT TESTING AND MODEL VALIDATION
GENERATING UNIT TESTING AND MODEL VALIDATIONGENERATING UNIT TESTING AND MODEL VALIDATION
GENERATING UNIT TESTING AND MODEL VALIDATION
 
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
 
Flywheel Safety - Richard thompson - Jan 2011
Flywheel Safety - Richard thompson - Jan 2011Flywheel Safety - Richard thompson - Jan 2011
Flywheel Safety - Richard thompson - Jan 2011
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 

Recently uploaded

Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 

Recently uploaded (20)

Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 

Generator Assessment Process - Level 3

  • 1. GAP 3 generator assessment process a solution to life assessment of large generators anilscoob@gmail.com omsaiempl@gmail.com
  • 2. 1 GAP 2 GAP GAP* GAP 4 GAP 3
  • 3. GAP3 is the inspective approach to assess the residual life of machines
  • 4. Methodology The methodology employed is conducting standard and special electrical tests and inspection on stator and rotor windings and accessories
  • 5. Unit Condition The machine is in assembled condition with access covers and top half of end brackets removed Inspection & tests Performed Stator winding Electrical tests as done in MAP2 Visual and borescope inspection of stator winding, stator core laminations and fingerplates (as accessible) Core tightness test (visual indications of looseness)
  • 6. Inspection & tests Performed Corona tests, as accessible, to determine areas and severity of any corona activity DC step voltage test to determine insulation integrity End winding basket frequency check Rotor winding Electrical tests as done in MAP2 Visual and borescope inspection of rotor winding and blocking (as accessible) Exciter and Accessories Electrical tests as done in MAP2
  • 7. Benefits Reveals pending faults in winding Reveals deterioration of coil insulation by corona or end winding vibration Establish a base line for evaluating future inspection Accurately assess life and future maintenance requirements Record of core tightness Preventive maintenance plan Schedule for GAP2, GAP3 and GAP4
  • 8. Final Report Standard format provided electronically Photographs of critical areas Location and levels of corona activity Plots showing frequency distribution of end winding basket Core tightness record Schedule for MAP4
  • 10. Condition Assessment Risk Assessment Approach
  • 12. Operation & Maintenance History Physical Inspection Insulation Test Generator Age
  • 13. DC Ramped Voltage Test Partial Discharge Measurement Dissipation Factor Measurement Ozone Monitoring Black Out Test High Potential Withstand Test Stator Core Inspection Wedge Tightness Evaluation Core Loop Test
  • 14. ELCID Test Corona Probe Test Coupling Resistance Test Bump test Capacitance Measurement Core Bolt Insulation Resistance Winding Conductor Resistance Measurement Impedance Measurement Winding Dissection
  • 15. Stator Condition Index 1 2 3 4 5 6 7 8 9 10
  • 16. Stator Data Quality Index 0 4 7 10
  • 18. Operation & Maintenance History Physical Inspection Insulation Test Generator Age
  • 19. High Potential Withstand Test Rotor Core Inspection AC Pole Drop Test AC Impedance Test Winding Resistance Measurement RSO Test
  • 20. Rotor Condition Index 1 2 3 4 5 6 7 8 9 10
  • 21. Rotor Data Quality Index 0 4 7 10
  • 22. Condition Assessment Generators
  • 23. Generator Condition Index 1 2 3 4 5 6 7 8 9 10
  • 24. Generator Data Quality Index 0 4 7 10
  • 25.