A discussion guide on the failures of power industry privatization in the Philippines as well as the unfulfilled promises of the Energy Power Industry Reform Act of 2001 (EPIRA)
The document discusses the history of energy laws and crises in the Philippines from the 1990s onwards. It describes how the 1993 Power Crisis Act and 1994 BOT Law allowed private generation plants during a period of blackouts. The Ramos administration faced challenges of insufficient power and NPC's shattered finances. The EPIRA law later privatized generation assets and created agencies like PSALM and Transco to manage assets and the grid. The law does not ban cross-ownership among generators, distributors and the grid operator. The document also notes the current oversupply situation due to lower demand during the pandemic.
Reforming the Philippine Electric Power Industry Reform Act (EPIRA)Elvin Uy
Analysis of RA 9136, the Electric Power Industry Reform Act, for my Policy Analysis I course in Carnegie Mellon in 2010. Full paper can be viewed here: http://scr.bi/HNHTHU
The document provides an overview of the evolution of the Philippine power market under the Electric Power Industry Reform Act (EPIRA) of 2001. It discusses the key reforms introduced by EPIRA including the unbundling of the generation, transmission, and distribution sectors. It outlines the creation of the Wholesale Electricity Spot Market (WESM) and describes the buyers in the market including captive and contestable customers. The document also provides illustrations of the Luzon and Visayas grids as well as generation costs for different technologies.
The document outlines the roles and responsibilities of the Department of Energy (DOE) in the Philippines. It states that the DOE is responsible for:
1) Formulating energy policies and developing an annual Philippine Energy Plan to ensure efficient and economical energy supply through indigenous and renewable sources.
2) Preparing an annual Power Development Program and integrating it into the Energy Plan.
3) Ensuring reliability, quality and security of electric power supply.
4) Encouraging private sector investment in electricity and development of indigenous and renewable energy.
Industry and environmental analysis: business opportunity identificationdorotheemabasa
1. The document discusses industry and environmental analysis for business opportunity identification. It explains that industry analysis is essential before starting a business to understand its strengths, weaknesses, opportunities, and threats using a SWOT analysis.
2. It then describes different types of business organizations including sole proprietorships, partnerships, corporations, and cooperatives. Partnerships can be general or limited, and partners can be capitalist or industrial.
3. Key factors for evaluating industries and potential businesses are identified such as geographic area, industry size and trends, product description, target customers, regulations, competition, and growth factors.
The document summarizes the Special Program for Employment of Students (SPES) which helps poor students and out-of-school youth pursue their education through summer or Christmas employment. It outlines the program participants as students aged 15-25 from low-income families and out-of-school youth, and employers with 10+ employees. Students are employed for 20-52 days during summer or 10-15 days over Christmas at 60% wage paid by employers and 40% by DOLE education vouchers for tuition.
The document discusses the history of energy laws and crises in the Philippines from the 1990s onwards. It describes how the 1993 Power Crisis Act and 1994 BOT Law allowed private generation plants during a period of blackouts. The Ramos administration faced challenges of insufficient power and NPC's shattered finances. The EPIRA law later privatized generation assets and created agencies like PSALM and Transco to manage assets and the grid. The law does not ban cross-ownership among generators, distributors and the grid operator. The document also notes the current oversupply situation due to lower demand during the pandemic.
Reforming the Philippine Electric Power Industry Reform Act (EPIRA)Elvin Uy
Analysis of RA 9136, the Electric Power Industry Reform Act, for my Policy Analysis I course in Carnegie Mellon in 2010. Full paper can be viewed here: http://scr.bi/HNHTHU
The document provides an overview of the evolution of the Philippine power market under the Electric Power Industry Reform Act (EPIRA) of 2001. It discusses the key reforms introduced by EPIRA including the unbundling of the generation, transmission, and distribution sectors. It outlines the creation of the Wholesale Electricity Spot Market (WESM) and describes the buyers in the market including captive and contestable customers. The document also provides illustrations of the Luzon and Visayas grids as well as generation costs for different technologies.
The document outlines the roles and responsibilities of the Department of Energy (DOE) in the Philippines. It states that the DOE is responsible for:
1) Formulating energy policies and developing an annual Philippine Energy Plan to ensure efficient and economical energy supply through indigenous and renewable sources.
2) Preparing an annual Power Development Program and integrating it into the Energy Plan.
3) Ensuring reliability, quality and security of electric power supply.
4) Encouraging private sector investment in electricity and development of indigenous and renewable energy.
Industry and environmental analysis: business opportunity identificationdorotheemabasa
1. The document discusses industry and environmental analysis for business opportunity identification. It explains that industry analysis is essential before starting a business to understand its strengths, weaknesses, opportunities, and threats using a SWOT analysis.
2. It then describes different types of business organizations including sole proprietorships, partnerships, corporations, and cooperatives. Partnerships can be general or limited, and partners can be capitalist or industrial.
3. Key factors for evaluating industries and potential businesses are identified such as geographic area, industry size and trends, product description, target customers, regulations, competition, and growth factors.
The document summarizes the Special Program for Employment of Students (SPES) which helps poor students and out-of-school youth pursue their education through summer or Christmas employment. It outlines the program participants as students aged 15-25 from low-income families and out-of-school youth, and employers with 10+ employees. Students are employed for 20-52 days during summer or 10-15 days over Christmas at 60% wage paid by employers and 40% by DOLE education vouchers for tuition.
The document summarizes the history of electricity issues and reforms in the Philippines. It discusses the power crisis in the 1990s that stemmed from insufficient generating capacity. This prompted President Ramos to issue licenses to Independent Power Producers (IPPs) to build new plants. The IPPs solved the short-term crisis but their contracts proved costly. This led to the 2001 Electric Power Industry Reform Act that restructured the industry, privatized generation assets, and established an independent regulator. The document reviews key elements and impacts of the reforms, including the purchased power adjustment mechanism and issues raised around IPPs and distribution utility rates.
Ecological Solid Waste Management Act of 2000(RA 9003 )Jan Del Rosario
RA 9003, also known as the Ecological Solid Waste Management Act of 2000, provides the legal framework for solid waste management in the Philippines. It mandates local governments to implement comprehensive solid waste management programs, including waste segregation, recycling, and conversion of dumpsites to sanitary landfills. The law also establishes institutions like the National Solid Waste Management Commission to oversee its implementation. However, weaknesses include lack of funding support from the national government, lack of technical capability at the local level to develop waste management plans, and insufficient political will among some local officials to fully carry out the law.
This document discusses the inherent powers of the state under the Philippine constitution, including the police power, power of expropriation, and power of taxation. It provides characteristics and limitations for each power. The police power allows the government to regulate public order and welfare, and is the most pervasive and demanding power. The power of expropriation permits the taking of private property for public use, with requirements of necessity, private property, and just compensation. Finally, the power of taxation grants the ability to impose and collect revenues to fund government operations, which is an inherent function of sovereignty carried out through legislation.
Privatization of Public Services in the PhilippinesRegi Jan Vilches
The document discusses privatization of public services in the Philippines. It begins by defining public enterprises and noting that the 1973 constitution allows the state to establish industries and transfer utilities to public ownership. Privatization occurs when a government agency providing public services is converted to private ownership. Privatization can take the form of asset divesture, contracting out services, franchises, or public-private partnerships. The schemes of privatization include build-operate-transfer, rehabilitate-operate-transfer, and build-transfer-operate models. Reasons for privatization include reducing government involvement in commercial activities, increasing efficiency, providing competition, and addressing limited government capacity. Major privatized enterprises in the Philippines include PLDT, MW
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...alex regado
This document outlines the Philippine energy plan from 2012-2030. It discusses the Department of Energy's goals of ensuring energy security, achieving optimal energy prices, and developing a sustainable energy system. The plan aims to triple renewable energy capacity by 2030. It identifies strategies like expanding renewable energy use, accelerating oil and gas exploration, and promoting energy efficiency. The plan requires 3.174 trillion PHP in investments and involves various government agencies in implementation activities to achieve rural electrification, develop indigenous resources, and promote renewable energy.
This document provides an overview of key economic concepts including:
- Definitions of economics as the study of human behavior in making choices about goods and services.
- Theories of Malthus, Maslow, and scarcity of resources.
- Microeconomics focuses on individual decision making units while macroeconomics examines aggregate variables like GDP.
- Positive economics seeks to understand economic systems without judgment, while normative economics makes prescriptions.
- The circular flow diagram shows income and payments between households and firms.
This document provides an acknowledgement and thanks to those who helped with a hypothetical solar street light project in Pakistan. It recognizes the project professor, guide, family, and friends for their support. An executive summary then outlines the project, which aims to address Pakistan's energy crisis by installing solar street lights in Islamabad. Key project details are presented, including objectives to boost the economy and reduce costs through solar energy. Stakeholders include the Government of Pakistan, World Bank, UN, and UNICEF.
The document provides an overview of key aspects of the Philippine Electrical Code (PEC), including its objectives, scope, permits and inspections process, service requirements, and what must be included in standard electrical plans. Specifically, it outlines the government authorities that implement the PEC, what types of premises it covers, when permits are required, service entrance requirements including sizing and protection, and components that must be included in electrical plans like legends, location plans, and general notes.
Philippine Energy Plan: Towards a Sustainable and Clean Energy Future - Felix...OECD Environment
The document summarizes the Philippine Energy Plan towards achieving clean and sustainable energy. It outlines targets to transition to cleaner sources like renewables by 2040. Total energy investments of $153 billion are required, including $94.3 billion for new renewable power plants. It also summarizes the Clean Energy Finance and Investment Mobilization Programme and highlights from technical working group meetings on renewables and energy efficiency with stakeholders. The groups recommended strategies to overcome challenges like high capital needs, unfriendly tax rules for renewables, and the perception of technologies as high risk.
Local autonomy, decentralization and related conceptsDada Ilagan
This document discusses local autonomy and local government structures in the Philippines. It defines local autonomy as self-governance under one's own laws. The Local Government Code of 1991 significantly decentralized governance by devolving powers to local government units (LGUs). The LGUs are comprised of provinces, municipalities, cities, and barangays. Provinces have the largest jurisdiction and municipalities and cities provide services at the community level. Barangays are the smallest local units.
This article discusses the rules on conditional obligations where the condition is meant to extinguish an existing obligation to give something. Upon fulfillment of the condition, the parties must return what they have received from each other. The same rules for loss, deterioration or improvement of the thing from the previous article are applied - namely that the party bound to return the thing bears the risk of loss/deterioration unless it was the fault of the other party, and improvements benefit the other party. Obligations to do or not to do are subject to rules determined by courts case-by-case.
This project proposes to construct a 1,800 meter farm-to-market road in Barangay Abaca, Mabini, Bohol, Philippines to improve access for 385 farmer households. The existing road is muddy and dilapidated, hindering transportation of crops from farms. The new 10 meter wide cement road will aid economic development by increasing incomes, reducing transportation costs, and improving mobility and safety. It will benefit 1,165 people and support agriculture, potential solar and tourism industries. The PHP 23.96 million project is scheduled from 2015-2016 through cooperation between local governments and organizations.
The Barangay Disaster Risk Reduction Management PlanBarangay Hall
The document is the Barangay Disaster Risk Reduction Management Plan for Barangay 465 in Manila for 2013-2016. It was submitted by Punong Barangay Alexander T. Tasarra. The plan outlines the barangay's profile, history of past calamities, contingency and evacuation plans, priority projects, and inventory of disaster equipment. It aims to educate residents and prepare for potential natural disasters to minimize their impact on the community.
The document discusses the structure and powers of the Philippine government based on the Constitution. It notes that the government is divided into three branches - legislative, executive, and judicial - based on the separation of powers doctrine. The legislative branch, or Congress, has the power to create and repeal laws, appropriate funds, levy taxes, and approve treaties. These powers are delegated by the people through the Constitution but are subject to checks and balances from the other branches to prevent abuse of power.
This document discusses various research methods and designs. It describes historical research as systematically examining past events to understand their influence. Descriptive design involves observing and describing behavior without influencing it. Experimental design controls or manipulates variables to determine causal relationships. Different types of research designs are discussed, including historical, descriptive, experimental, case study, correlational, and content analysis.
The powers of the government, by virtue of this principle are divided into three (3) distinct classes: the legislative, the executive and the judicial. They are distributed, respectively among the legislative, executive, and judicial branches or departments of the government.
Under the principle of co-equal and coordinate powers among the three (3) branches, the officers entrusted with each of these powers are not permitted to encroach upon the powers confided to the others. If one department goes beyond the limits set by the Constitution, its acts are null and void. The adoption of this principle was motivated by the belief that arbitrary rule would result if the same person or body were to exercise all the powers of the government.
On November 11, Typhoon Ulysses (international name: Typhoon Vamco) made landfall in the Philippines and caused widespread damage to eight provinces in the island group of Luzon. The most notable flooding events were in Marikina City in Metro Manila, adjacent Rizal province, and in Region 2 or Cagayan Valley in northeastern Luzon. This study analyzes the flooding events in these localities to identify key factors and how to mitigate risk. Four main determinants stand out: (1) the degradation of natural watersheds (2) the marginalization of the poor that render them vulnerable and exposed to disasters, (3) stop-gap solutions that do not address the roots of our disaster vulnerability, and (4) that the national government remains unprepared for disaster. Policy priorities among other reforms are recommended based on this assessment.
Layunin ng Praymer hinggil sa Pambansang industriyalisasyon na ipaliwanag ang pambansang industriyalisasyon, mga kongkretong batayan sa pagtataguyod nito at ang papel ng mamamayan sa pagsusulong at pagkakamit nito.
Presentation version: https://goo.gl/2Cbt0a
The document summarizes the history of electricity issues and reforms in the Philippines. It discusses the power crisis in the 1990s that stemmed from insufficient generating capacity. This prompted President Ramos to issue licenses to Independent Power Producers (IPPs) to build new plants. The IPPs solved the short-term crisis but their contracts proved costly. This led to the 2001 Electric Power Industry Reform Act that restructured the industry, privatized generation assets, and established an independent regulator. The document reviews key elements and impacts of the reforms, including the purchased power adjustment mechanism and issues raised around IPPs and distribution utility rates.
Ecological Solid Waste Management Act of 2000(RA 9003 )Jan Del Rosario
RA 9003, also known as the Ecological Solid Waste Management Act of 2000, provides the legal framework for solid waste management in the Philippines. It mandates local governments to implement comprehensive solid waste management programs, including waste segregation, recycling, and conversion of dumpsites to sanitary landfills. The law also establishes institutions like the National Solid Waste Management Commission to oversee its implementation. However, weaknesses include lack of funding support from the national government, lack of technical capability at the local level to develop waste management plans, and insufficient political will among some local officials to fully carry out the law.
This document discusses the inherent powers of the state under the Philippine constitution, including the police power, power of expropriation, and power of taxation. It provides characteristics and limitations for each power. The police power allows the government to regulate public order and welfare, and is the most pervasive and demanding power. The power of expropriation permits the taking of private property for public use, with requirements of necessity, private property, and just compensation. Finally, the power of taxation grants the ability to impose and collect revenues to fund government operations, which is an inherent function of sovereignty carried out through legislation.
Privatization of Public Services in the PhilippinesRegi Jan Vilches
The document discusses privatization of public services in the Philippines. It begins by defining public enterprises and noting that the 1973 constitution allows the state to establish industries and transfer utilities to public ownership. Privatization occurs when a government agency providing public services is converted to private ownership. Privatization can take the form of asset divesture, contracting out services, franchises, or public-private partnerships. The schemes of privatization include build-operate-transfer, rehabilitate-operate-transfer, and build-transfer-operate models. Reasons for privatization include reducing government involvement in commercial activities, increasing efficiency, providing competition, and addressing limited government capacity. Major privatized enterprises in the Philippines include PLDT, MW
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...alex regado
This document outlines the Philippine energy plan from 2012-2030. It discusses the Department of Energy's goals of ensuring energy security, achieving optimal energy prices, and developing a sustainable energy system. The plan aims to triple renewable energy capacity by 2030. It identifies strategies like expanding renewable energy use, accelerating oil and gas exploration, and promoting energy efficiency. The plan requires 3.174 trillion PHP in investments and involves various government agencies in implementation activities to achieve rural electrification, develop indigenous resources, and promote renewable energy.
This document provides an overview of key economic concepts including:
- Definitions of economics as the study of human behavior in making choices about goods and services.
- Theories of Malthus, Maslow, and scarcity of resources.
- Microeconomics focuses on individual decision making units while macroeconomics examines aggregate variables like GDP.
- Positive economics seeks to understand economic systems without judgment, while normative economics makes prescriptions.
- The circular flow diagram shows income and payments between households and firms.
This document provides an acknowledgement and thanks to those who helped with a hypothetical solar street light project in Pakistan. It recognizes the project professor, guide, family, and friends for their support. An executive summary then outlines the project, which aims to address Pakistan's energy crisis by installing solar street lights in Islamabad. Key project details are presented, including objectives to boost the economy and reduce costs through solar energy. Stakeholders include the Government of Pakistan, World Bank, UN, and UNICEF.
The document provides an overview of key aspects of the Philippine Electrical Code (PEC), including its objectives, scope, permits and inspections process, service requirements, and what must be included in standard electrical plans. Specifically, it outlines the government authorities that implement the PEC, what types of premises it covers, when permits are required, service entrance requirements including sizing and protection, and components that must be included in electrical plans like legends, location plans, and general notes.
Philippine Energy Plan: Towards a Sustainable and Clean Energy Future - Felix...OECD Environment
The document summarizes the Philippine Energy Plan towards achieving clean and sustainable energy. It outlines targets to transition to cleaner sources like renewables by 2040. Total energy investments of $153 billion are required, including $94.3 billion for new renewable power plants. It also summarizes the Clean Energy Finance and Investment Mobilization Programme and highlights from technical working group meetings on renewables and energy efficiency with stakeholders. The groups recommended strategies to overcome challenges like high capital needs, unfriendly tax rules for renewables, and the perception of technologies as high risk.
Local autonomy, decentralization and related conceptsDada Ilagan
This document discusses local autonomy and local government structures in the Philippines. It defines local autonomy as self-governance under one's own laws. The Local Government Code of 1991 significantly decentralized governance by devolving powers to local government units (LGUs). The LGUs are comprised of provinces, municipalities, cities, and barangays. Provinces have the largest jurisdiction and municipalities and cities provide services at the community level. Barangays are the smallest local units.
This article discusses the rules on conditional obligations where the condition is meant to extinguish an existing obligation to give something. Upon fulfillment of the condition, the parties must return what they have received from each other. The same rules for loss, deterioration or improvement of the thing from the previous article are applied - namely that the party bound to return the thing bears the risk of loss/deterioration unless it was the fault of the other party, and improvements benefit the other party. Obligations to do or not to do are subject to rules determined by courts case-by-case.
This project proposes to construct a 1,800 meter farm-to-market road in Barangay Abaca, Mabini, Bohol, Philippines to improve access for 385 farmer households. The existing road is muddy and dilapidated, hindering transportation of crops from farms. The new 10 meter wide cement road will aid economic development by increasing incomes, reducing transportation costs, and improving mobility and safety. It will benefit 1,165 people and support agriculture, potential solar and tourism industries. The PHP 23.96 million project is scheduled from 2015-2016 through cooperation between local governments and organizations.
The Barangay Disaster Risk Reduction Management PlanBarangay Hall
The document is the Barangay Disaster Risk Reduction Management Plan for Barangay 465 in Manila for 2013-2016. It was submitted by Punong Barangay Alexander T. Tasarra. The plan outlines the barangay's profile, history of past calamities, contingency and evacuation plans, priority projects, and inventory of disaster equipment. It aims to educate residents and prepare for potential natural disasters to minimize their impact on the community.
The document discusses the structure and powers of the Philippine government based on the Constitution. It notes that the government is divided into three branches - legislative, executive, and judicial - based on the separation of powers doctrine. The legislative branch, or Congress, has the power to create and repeal laws, appropriate funds, levy taxes, and approve treaties. These powers are delegated by the people through the Constitution but are subject to checks and balances from the other branches to prevent abuse of power.
This document discusses various research methods and designs. It describes historical research as systematically examining past events to understand their influence. Descriptive design involves observing and describing behavior without influencing it. Experimental design controls or manipulates variables to determine causal relationships. Different types of research designs are discussed, including historical, descriptive, experimental, case study, correlational, and content analysis.
The powers of the government, by virtue of this principle are divided into three (3) distinct classes: the legislative, the executive and the judicial. They are distributed, respectively among the legislative, executive, and judicial branches or departments of the government.
Under the principle of co-equal and coordinate powers among the three (3) branches, the officers entrusted with each of these powers are not permitted to encroach upon the powers confided to the others. If one department goes beyond the limits set by the Constitution, its acts are null and void. The adoption of this principle was motivated by the belief that arbitrary rule would result if the same person or body were to exercise all the powers of the government.
On November 11, Typhoon Ulysses (international name: Typhoon Vamco) made landfall in the Philippines and caused widespread damage to eight provinces in the island group of Luzon. The most notable flooding events were in Marikina City in Metro Manila, adjacent Rizal province, and in Region 2 or Cagayan Valley in northeastern Luzon. This study analyzes the flooding events in these localities to identify key factors and how to mitigate risk. Four main determinants stand out: (1) the degradation of natural watersheds (2) the marginalization of the poor that render them vulnerable and exposed to disasters, (3) stop-gap solutions that do not address the roots of our disaster vulnerability, and (4) that the national government remains unprepared for disaster. Policy priorities among other reforms are recommended based on this assessment.
Layunin ng Praymer hinggil sa Pambansang industriyalisasyon na ipaliwanag ang pambansang industriyalisasyon, mga kongkretong batayan sa pagtataguyod nito at ang papel ng mamamayan sa pagsusulong at pagkakamit nito.
Presentation version: https://goo.gl/2Cbt0a
Ang pambansang industriyalisasyon (national industrialization) ay proseso ng pagtatatag at pagpapaunlad ng iba't-ibang antas at uri ng mga industriya na siyang magpapasigla ng ekonomiya at tutustos sa mga pangangailangan ng isang bansa.
Layunin ng praymer na ito na ipaliwanag ang pambansang industriyalisasyon, mga kongkretong batayan sa pagtataguyod nito at ang papel ng mamamayan sa pagsusulong at pagkakamit nito.
Vew full text here: https://goo.gl/Cw0qgZ
This document discusses the Feed-In Tariff (FIT) system in the Philippines, which aims to promote renewable energy development through fiscal incentives for developers and investors. It provides context on the country's renewable energy sources and potential. It then explains how the FIT system works, including the collection of fees from electricity consumers. While the FIT aims to support renewable energy, there are concerns about the costs imposed on consumers and businesses. Alternatives to the cost pass-through are proposed, such as using existing energy funds instead of new consumer fees.
This document provides an analysis of the K-12 education program in the Philippines, specifically focusing on its impacts on science and mathematics education. It notes that Philippine education, and science/math education in particular, have historically been weak. The K-12 program aimed to address this by adding two years to basic education. However, the document argues that K-12 fails to address the root causes of weaknesses in science/math education, which include an inadequate curriculum that does not promote scientific thinking, shortcomings in teacher training, and shortages of educational facilities like science laboratories. It provides evidence that performance in science and math remains poor. Therefore, the document concludes that K-12 will not solve the systemic issues facing science and math education
This paper discusses the rationale for the nationalization of the MRT and LRT system as a catalyst for the development of a quality national mass transit system in the Philippines.
This document has been prepared by the Agham Advocates of Science& Technology for the People (AGHAM) to aid local communities threatened by dam projects. This reference document contain information and tools that can be used by the community to have a better understanding of dams and make informed decisions how to collectively approach the dam project in their area. This guide is not exhaustive and complete, but centers on basic questions to learn more about the dam project in the area and to guide further research.
The Philippines is a mineral-rich country. With this, it is but logical for mining to become one of the economic sources of the country and for many Filipinos to be engaged in it. Our ancestors have been mining before the Spanish colonization. Historically, mining has been a major and a significant contributor to the country’s economy, despite of the decline of the industry’s mineral production in the late 1990’s.
Mining in the Philippines can be classified into large-scale and small-scale. Large-scale mining is highly mechanized and uses heavy equipment. It produces sufficient commercial quantities to satisfy the requirements of the export market and large industries on a regular basis and therefore requires mobilization of substantial capital (Padilla, 1997). At present, it dominates the mining industry in terms of production, revenues and legal privileges.
Yet, small-scale mining undeniably remains a significant sector in the mining industry, especially with the closure of many large-scale mining operations starting in the 1990s. Such significance owes mainly to its economic contribution that comes with the large number of people involved in the industry. Unfortunately, only few studies have been devoted to it, compared to the wealth of literature on large-scale mining. Because of this, its overall aspects have yet to be fully understood by many.
Thus, this paper generally attempts to study the current state of small-scale mining in the Philippines in the context of our overall national development.
Note: This paper was written and researched for AGHAM by Erika M. Rey and Ricarido M. Saturay Jr. on 2005. It is being republished due to requests of communities hosting small scale mining activities. For questions, comments and suggestions, please contact the Agham secretariat at agham.national@gmail.com.
In this paper, Agham explores the issue of the use of renewable energy in the country and its place in achieving a pro-people, pro-environment national power industry. The paper would go through the basics of renewable energy (RE), the country's renewable energy resources and potentials vis-à-vis the current energy pattern. The overarching policy and program of the government will then be discussed, its impacts on the current energy landscape and Agham's critique on the current framework.
In this article, Agham - Advocates of Science and Technology for the People’s presents its observations on the issue of energy shortage and the President’s bid for emergency powers based on a review of the data and computation of the DOE. The paper then cautions against a possible power shortage, artificial and real, based on the review of the character of the ownership of the country's power system.
This document summarizes the proceedings of the 2nd National Peasant-Scientist Conference on Food Security and Self-sufficiency and Agricultural Modernization. It discusses the current state of Philippine agriculture, defines agricultural modernization, and how attaining food security and self-sufficiency can lead to agricultural modernization. Tables show the contribution of agriculture to GDP in various Asian countries. It argues that agricultural modernization is attainable in the Philippines and outlines how agriculture forms the base for developing industries in a country. It proposes that agricultural and rural development should include supporting light industries to supply domestic needs, heavy industries to support agricultural modernization, and rural industrialization to increase manufacturing and employment in rural areas.
The document summarizes the findings of an environmental investigation mission in Mt. Negron. It assessed the area's biodiversity through surveys of flora, fauna, soil, water, and agriculture. Key findings included high tree diversity providing economic and medicinal uses for indigenous peoples. Soil analyses found deficiencies in nitrogen and potassium in some areas. Water quality passed standards. Geologic findings indicated Mt. Negron is part of an active volcanic chain and features pyroclastic deposits, demonstrating the area's geologic significance. The investigation aimed to inform conservation and management of Mt. Negron's ecosystem.
After 10 years of implementing the Electric Power Industry Reform Act (EPIRA) of 2001:
1) Power rates have more than doubled, with residential electricity prices rising 112.5% and NAPOCOR generation charges jumping 95%. EPIRA led to privatization that benefited private corporations over consumers.
2) Energy security remains precarious as the country relies on private investors and IPPs to build power capacity only when profitable, threatening an adequate supply. The 2010 power shortage in Mindanao illustrates this risk.
3) NAPOCOR remains deeply in debt despite paying billions to service obligations, as EPIRA legitimized passing on costs of inefficient contracts to consumers through rate adjustments like the
EPIRA led to electricity rates more than doubling in the Philippines over 10 years. The law failed to cancel unfair contracts and introduced new fees. It also led to industry consolidation with just three groups now dominating distribution. NAPOCOR remained heavily indebted, paying $18 billion to cover previous financial obligations. Energy security also remained precarious with brownouts occurring due to plant shutdowns and lack of new capacity expansion.
The document discusses the linear "story of stuff" system of extraction, production, distribution, consumption and disposal that is causing environmental degradation. It leads to social inequities as powerful entities exploit resources and communities for profit. Different views on environmentalism are examined, but the root cause is identified as the wasteful and polluting nature of capitalist production solely for profit, which destroys the environment and leads to crisis.
This document summarizes discussions from the Center for Environmental Concerns Philippines' (CEC) monthly educational program "Talakayan sa Kubo". In October, the discussion focused on food security and the situation of Philippine peasants, with a representative from Kilusang Magbubukid ng Pilipinas stating that the country's agrarian policies are worsening poverty and hunger. In December, the discussion centered on human rights issues in the Philippines, with a representative from Karapatan saying President Aquino's reform agenda resembles the repressive previous administration. The document also provides statistics on extrajudicial killings under the former president.
This document provides an overview of radiation and its effects on the human body. It defines radiation as the emission of energy through waves or particles. Ionizing radiation like alpha particles, beta particles, gamma rays, x-rays and neutrons have sufficient energy to damage atoms and DNA. Sources include naturally occurring radioactive materials in the environment and man-made sources like nuclear reactors, medical equipment, and consumer products. Exposure to high doses of radiation can damage cells and lead to health issues like cancer, but risks are low from everyday sources like medical x-rays. The document recommends limiting radiation exposure through reducing time spent near sources, increasing distance, and using shielding when possible.
This document provides an overview of radiation and its effects on the human body. It defines radiation as the process of emitting energy through waves or particles, and identifies ionizing radiation as radiation that can knock electrons out of atoms. The types of ionizing radiation are identified as alpha particles, beta particles, gamma rays, x-rays, and neutrons. Sources of radiation include naturally occurring materials, medical equipment, consumer products, and industrial uses. Exposure to radiation can damage cells and DNA, potentially leading to cell death or cancer development over time. Methods to control radiation exposure include minimizing time spent near sources, maximizing distance, and using shielding to block radiation.
1) An earthquake is intense ground shaking caused by a sudden release of energy, often due to movement along faults within the Earth.
2) Earthquake magnitude is measured by the Richter Scale, where each whole number increase means the amplitude of shaking is 10 times greater. Magnitude 2.5 or less quakes are usually not felt, while anything above 8 can totally destroy communities near the epicenter.
3) Intensity refers to the amount of damage at a location and is measured by scales like Modified Mercalli, depending on factors like distance from the quake and duration of shaking.
More from AGHAM - Advocates of Science and Technology for the People (20)
1. Gabay sa pribatisasyon ng
power industry at Electric
Power Industry Act of 2001
(EPIRA) !
AGHAM
Advocates of Science and Technology for the People
Marso 2014!
2. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Paunang Salita
Inihanda ng Agham Advocates of Science and Technology for the People (Agham), sa pakikipagtulungan sa Bagong
Alyansang Makabayan (BAYAN), ang Gabay sa pribatisasyon ng power industry at Electric Power Industry Act of
2001 o EPIRA upang makatulong sa iba’t ibang kampanya sa pagbabasura ng batas gaya ng kasalukuyang kampanya
hinggil sa dagdag-singil ng Meralco at mga lokal na kampanya hinggil sa power industry.
Ang gabay ay Isinulat para sa mga kampanyador at edukador sa mga komunidad at batayang sektor. Nilalaman ng gabay
ang mga konseptong kailangan maunaawan upang epektibong mailunsad ang mga gawain sa propaganda at edukasyon
sa mga erya na ating kinikilusan.
Nahahati ang praymer sa apat na bahagi. Mayroong itong 13 na mahahalagang punto.
Inilahad sa Part I ang kahalagahan ng power industry sa pag-unlad at ang pangangailangan na maisabansa nito. Sa Part
II, binaybay naman ang maikling kasaysayan ng pribatisasyon ng power industry at mga kaganapang nagtulak upang
ipasa ang EPIRA. Ipinaliwanag dito ang mga mayor na nilalaman sa batas at ang implikasyon nito sa pagbabago sa
power industry, mga responsibilidad ng bawat ahensya ng pamahalaan at iba pang mga entidad na kalahok dito.
Ipinakita sa Part III ang epekto ng EPIRA. Sa loob ng 13 na taon, sumirit pataas ang singil sa kuryente, nananatiling baon
sa utang ang National Power Corporation (NPC), walang pa ring seguridad sa suplay ng kuryente at lalong tumindi ang
monopolyo sa power industry. Ang huling bahagi ay inilaan sa mga solusyon sa pagtaas ng singil sa kuryente at mga
panawagan sa patuloy na pagbabasura ng EPIRA.
Sinikap ng gabay na ilahad sa simpleng presentasyon ang buong isyu. Hinihikayat tayo na palaganapin ang mga
diskusyon sa mga komunidad at batayang sektor. Magpadala ng mga tanong o mungkahi sa Agham National Secretariat
upang higgit na paunlarin ang gabay na ito.
AGHAM ADVOCATES OF SCIENCE AND TECHNOLOGY FOR THE PEOPLE
agham.national@gmail.com
Agham Advocates of Science and Technology for the People 1
3. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
PART I:
Isabansa ang Power Industry
1. Estrahetiko at
mahalaga ang power
industry sa pag-unlad
ng bansa.
1.1 Ano ang kahalagahan ng industriya ng kuryente
(power industry) sa pag-unlad?
Pinagagaan ng kuryente ang pang-araw-araw na gawain ng mamamayan.
Ginagamit ito sa pagpapa-andar ng mga kagamitan sa loob at labas ng bahay.
Samakatuwid, isang serbisyong pampubliko ang ibinibigay ng power industry.
Nangangailangan din ng kuryente ang mga establisyimentong komersyal upang
umandar ang mga opisina, tindahan at iba pa.
Susi rin ang kuryente sa pagpapatakbo ng iba pang industriya. Hindi
magkakaroon ng mabilis na produksyon ang mga impresa at pagawaan kung
wala ito.
Kapag inalis o limitado ang akses sa kuryente, limitado at magiging mahirap
ang mga pangkaraniwang gawain at aktibidad ng mamamayan. Hihirap o hindi
tatakbo ang mga makina sa mga impresa at pagawaan, at babagal ang pag-unlad
ng bansa.
Responsibilidad ng pamahalaan na siguruhin ang akses ng mamamayan sa
serbisyo ng power industry. Tungkulin rin ng gubyerno na tiyakin na naihahatid
ito sa mamamayan sa pinakamabilis, epektibo at abot-kayang paraan.
Agham Advocates of Science and Technology for the People 2
4. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
2. Isabansa ang power
industry.
2.1 Bakit kailangan isabansa ang power industry?
Isang batayan at estratehikong serbisyo ang ibinibigay ng power industry sa
pambansang ekonomya at pamumuhay ng mamamayan. Nangangailangan ng
mahigpit na integrasyon sa imprastruktura at masinsin na koordinasyon at
pagpaplano ang pagpapatakbo ng power industry. Ito ay magagawa lamang
kung kontrolado at monopolisado ang buong industriya. Tanging sa paglalagay
nito sa kamay at monopolyo ng Estado na naglilingkod sa mamamayan lubos
na makikinabang dito ang bansa.
Ang pagsasabansa din ng industriyang ito ay unang mga hakbang upang
magsilbi ito sa pambansang industriyalisasyon, sa pagpapaunlad ng ekonomya
ng bansa at sa pagtataguyod ng kapakanan ng mamamayan.
Sa kasalukuyan, hawak ng iilang kapitalista ang power industry. Iilan lamang
ang may kontrol sa paggawa ng kuryente, iisang kumpanya ang namamahala
sa transmisyon, at iilan lang din ang may hawak ng distribusyon kagaya ng
Meralco at iba pang electric cooperatives (EC). Ang mga pribadong monopolyo
na ito ay pangunahing nagnanais na kumita sa halip magbigay ng serbisyo.
Sa ilalim ng Electric Power Industry Reform Act o EPIRA, ipinapaubaya ng
gobyerno sa pribadong sektor ang paglikha (generation), pagdadala
(transmission) at pamamahagi (distribution) ng kuryente.
FIg. 1. Daloy ng kuryente mula sa
planta papunta sa konsyumer1
Box 1. Paano nakararating sa mga konsyumer ang kuryente?
Ang kuryente ay ang pagdaloy ng charged electrons. Dumadaan sa iba’t ibang
proseso ang pagbabagong-anyo ng enerhiya mula sa source upang maging
kuryente na ginagamit ng mga konsyumer:
Ang buong proseso ay maaaring hatiin sa mga sumusunod:
Agham Advocates of Science and Technology for the People 3
5. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
1. Generasyon (generation): Nalilikha ang kuryente mula sa coal, diesel,
natural gas, sikat ng araw, nuclear, biomas, atbp. Sa mga planta ng
kuryente, nagpapanibagong-anyo ang enerhiya mula sa source
upang maging kuryente na nagagamit ng mga konsyumer.
2. Transmisyon (transmission): Dinadala ng mga transmission towers at
high tension cables ang kuryente mula sa mga planta papunta sa
mga substasyon. Mataas ang voltage ng kuryente sa pagdaloy nito.
Sa pagkakataon ng dumaloy na ang kuryente sa mga wires o cables
nagkakaroon rin ng system loss.
3. Substasyon (substation): Dito pinabababa ang voltage ng kuryente
para makadaloy sa sistema ng distribusyon.
4. Transformers: Dito inaangkop ang lakas ng voltage upang gamitin ng
iba’t ibang konsyumer (industrial, commercial o residential)
5. Linya ng serbisyo (service lines): Ang mga kawad na ito ang
nagdadala ng kuryente sa mga konsyumer.2
Tinatawag na Grid ang dugtungan ng generation at transmisyon. May tatlong
grid sa bansa: ang Luzon, Visayas at Mindanao Grid.
Box 2. Cuba bilang modelo ng kontrol ng Estado sa industriya ng
kuryente
Kontrolado ng pamahalaan ng bansang Cuba ang kanilang industriya ng
kuryente. Isinabansa nila ang industrya ng kuryente upang makapagbigay ng
maayos na serbisyo at sapat na suplay sa mamamayang Cubano.3
Ang gobyerno nila ang nagpapatakbo, nangangalaga, at nangangasiwa ng
lahat ng pasilidad ng power industry. Nagpatupad sila ng tinatawag na
distributed generation kung saan planado at nasa mga estratehikong lugar sa
buong Cuba ang kanilang mga power plant upang maiwasan ang pagtatayo ng
Agham Advocates of Science and Technology for the People 4
6. Fig 1. Daloy ng kuryente mula sa planta papunta sa konsyumer!
Source: eex.gov.au!
7. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
mga mahahabang linya ng transmisyon at mabawasan ang system loss o
nawawalang kuryente sa proseso ng distribusyon nito.
Sa kasalukuyan, sila na lamang ang tanging bansa sa daigdig na hindi
nagpatupad ng pribatisasyon at neo-liberalisasyon sa industriya ng kuryente.
Sa Venezuela naman 90% ng power generation ay kontrolad ng Estado.
Agham Advocates of Science and Technology for the People 5
8. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
PART II:
Maikling kasaysayan ng power industry sa bansa at ang
EPIRA
3. Ang pribatisasyon at
liberalisasyon ng
power industry.
3.1 Kasaysayan at kalagayan ng industriya ng kuryente
sa bansa
a. 1890-1970s
Nong 1890, itinayo ng La Electricista ang unang planta ng kuryente sa Quiapo,
Manila. Nagtayo rin ito ng tatlong poste ng kuryente sa Escolta, Manila.
Noong 1901, kinuha ng Manila Electric Railroad And Light Company (Meralco)
ang prankisa ng La Electricista sa pamamahagi ng kuryente sa Manila at mga
munisipalidad sa paligid ng siyudad. Noong 1906, ang taunang nalilikhang
kuryente ng Meralco ay 8 milyon kW mula sa planta na tinayo ng La Electricista
Calle San Sebastian at ang sarili nitong planta na Isla Provisora.4
Noong 1936, isinabatas ang Commonwealth Act 120 na nililikha ang National
Power Corporation (NPC) para sa pagpapa-unlad ng hydroelectric potential ng
bansa. Ang 8 MW Caliraya Storage Hydro Power Station sa Lumban, Laguna
ang unang proyekto nito.
Noong 1956, 1/3 ng kabuuang nalilikhang kuryente ay nagmula na sa NPC.
Ang natitirang 2/3 ay nasa kamay ng mahigit 300 pribadong electric utilities.
Meralco ang pinakamalaki rito na may kakayahang 990 MW. Umaabot sa
1,745.5 MW ang kabuuang pangangailangan sa bansa noon.
Agham Advocates of Science and Technology for the People 6
9. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Sa panahong ito, 20% lamang ng populasyon ang may kuryente at naka-konsentra
sa Manila at malalapit na lugar. Upang tugunan ang
pangangailangan na lumawak ito sa iba pang lugar sa bansa, nilikha ang
Electrification Administration (EA) noong 1960.
b. 1970s-1990s
Pagkatapos ng isang dekada nang rural electrification, mahigit 23% lamang ang
nagkaroon ng kuryente, kaya pinalitan ang EA ng National Electrification
Administration (NEA) noong 1969.
Noong 1972, isinabatas ang PD 40 upang isabansa ang power industry. Naging
mandato ng NPC na magtayo ng pasilidad sa generation at transmission sa
buong bansa. Binili ng NPC ang mga planta ng Meralco. Tumaas ang
generation capacity ng NPC at umabot ng 90% ng kabuuang kakayahan ng
bansa sa generation. NPC ang pinakamalaking prodyuser at supplier ng
elektrisidad sa panahong ito.
Sa pagbuhos ng pondo mula sa mga dayuhang bangko, lumawak ang serbisyo
ng kuryente sa kanayunan noong 1970-1980. Ang pamumuhunan sa NPC at
NEA ay nagresulta sa 50% electrification rate sa rural areas.
Noong 1977, sa pamamagitan ng PD 1206, nilikha ang DOE upang gumawa ng
mga programa sa pagpapa-unlad ng mga energy resource ng bansa. Ipinailalim
ang NPC sa DOE upang mas mahusay na ikoordina ang mga polisiya at
programa sa pagpapaunlad ng enerhiya sa bansa.
Ngunit nang mapalitan ang diktadurang Marcos, pinirmahan ni Presidente Cory
Aquino ang EO 215 at EO 172 noong 1987. Inalis ng EO 215 sa NPC ang
eksklusibong karapatan sa power generation at pinapasok ang pribadong
Agham Advocates of Science and Technology for the People 7
10. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
sektor sa power industry. Noong 1989, pinirmahan ang unang kontratang build-operate-
transfer (BOT).5 Nilikha naman ng EO 172 ang Energy Regulatory
Board na pangunahing tagapag-takda ng singil sa kuryente.
Mula sa huling bahagi ng 1980s hanggang sa maagang bahagi ng 1990s,
tumaas ang demand sa kuryente ngunit walang mga bagong planta na naitayo.
Noong 1991, halos isang bilyong dolyar kada taon ang nawala sa ekonomiya
dahil sa 6-8 oras na blackouts.
Noong 1992, bilang tugon sa krisis, isinabatas ang Department of Energy Act of
1992. Tungkulin ng DOE na isaayos ang Philippine Energy Program (PEP) at
maglalatag ng gabay para sa komprehensibong eksplorasyon, pagpapa-unlad,
paggamit at distribusyon ng mga rekurso ng enerhiya ng bansa. Pinalawak ang
pribatisasyon at ibinukas sa pribadong korporasyon ang buong industriya sa
enerhiya.
Noong 1993 lumaganap ang modelo ng BOT; tinatayo ang mga proyekto na
nangangailangan ng malaking kapital na hindi diumano gagastos ang
gobyerno.6
Imbes na ang tugon ng pamahalaan sa krisis sa kuryente ay magtayo ng
kinakailangang imprastruktura para matugunan ang pangangailangan ng
bansa, ipinasa ito sa pribadong sektor sa pamamagitan ng mga Independent
Power Producers (IPPs).
Upang mahikayat ang mga pamumuhunan, nagbigay ng mga insentibo ang
pamahalaan tulad ng probisyong take-or-pay sa mga kontrata. Babayaran ng
bansa ang kapasidad ng mga planta kahit hindi ito pinaandar o mas maliit dito
ang kuryenteng nakonsumo. Pinangako rin ng pamahalaan na akuin ang pa-bagu-
bagong halaga ng produksyon dahil sa pabagu-bagong halaga ng dolyar
sa pamilihan. Siniguro rin ng pamahalaan na bayaran ang halaga ng
Agham Advocates of Science and Technology for the People 8
11. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
panggatong na ginamit sa pagpapatakbo ng mga planta sa pamamagitan ng
fuel cost guarantee.
Noong 1997, habang nakaranas ng krisis ang mamamayan, maraming negosyo
ang nalugi at bumaba and demand sa kuryente dahil sa krisis pangekonomy sa
Asya, protektado ang kita ng mga IPPs. Sa 35 IPPs na may kontrata ang NPC,
27 ang may take or pay arrangement. Ibig sabihin, kahit hindi naman nagamit at
kinailangan ng mamamayan ang kuryente na kayang likhain ng mga plantang
ito ay kailangan pa rin niya itong bayaran. Kailangan din akuin ng mamamayan
ang pagkalugi ng dolyar at pagbago ng halaga ng panggatong. Ang mga
garantiya at insentibong ito ang dahilan kung bakit lumobo ang gastos ng NPC.
Noong 1998, umabot na sa Php 3.6 billion ang utang ng NPC at noon pa man
ay ipinapasa na sa mamamayang ang pagbayad ng mga utang na ito at
idinadagdag na sa singil sa kuryente.
4. Ang EPIRA ay
itinulak ng mga
dayuhang interes at
imposisyon ng mga
dayuhang bangko na
may pautang sa
bansa.
4.1 Ano ang mga kalagayang nagtulak sa pagsasabatas
ng EPIRA?
Ang pagsasabatas ng EPIRA ay isa sa mga kundisyon nang US$600 milyong
pautang ng Asian Development Bank (ADB) at Japan Bank for International
Cooperation (JBIC) noong 1998. Pakay ng pautang ang pag-“restructure”
(deregulasyon, pribatisasyon at liberalisasyon) ng industriya ng kuryente upang
mas mapabilis pa ang pagpasok ng mga dayuhang kumpanya. Naglatag sila ng
mga kundisyon at hakbangin na kailangan gawin ng pamahalaan para
marelease ang buong utang na ito.7
Matindi ang lobbying na ginawa ng mga imperyalistang bangko at creditor ng
NPC sa pangunguna ng ADB at International Monetary Fund (IMF) para
mapasa ang batas at matuloy ang kanilang mga kundisyon. Kapalit ng batas ay
Agham Advocates of Science and Technology for the People 9
12. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
ang paglabas ng $100 milyon noong 2001 at $100 milyon noong 20028 na parte
ng kabuuang pautang ng IMF, Asian Development Bank at Japan Export-Import
Bank sa Pilipinas.9
5. Ang EPIRA ay
kontra-mamamayan
na batas na lalong
nagsitematisa at
nagpalawak sa
pribatisasyon at
deregulasyon ng
industriya ng kuryente
sa bansa.
5.1 Ano ang EPIRA?
Isinulong ng Electric Power Industry Reform Act of 2001 o Republic Act 9136
ang deregulasyon sa serbisyo ng kuryente at pribatisasyon ng National Power
Corporation (NPC). Pinagtibay ito ni Macapagal-Arroyo bilang batas noong
Hunyo 8, 2001.
Pinangako ng rehimeng Arroyo na sa pamamagitan ng batas bababa ang singil
ng kuryente, maaayos ang paghahatid ng serbisyo ng kuryente sa
pamamagitan ng mas masiglang kompetisyon at efficiency sa industriya. Ang
esensya umano ng batas ay para mabigyang ng karapatang pumili ang mga
konsyumer kung kanino kukuha ng serbisyo ng kuryente.
Nakasaad sa batas na polisiya ng estado ang pagtitiyak at pagpapabilis ng
elektripikasyon sa bansa, pagtitiyak sa kalidad, maasahan, tiyak at murang
suplay ng elektrisidad, pagtitiyak ng transparent at reasonable na pagtatakda
ng presyo ng kuryente, at paghihikayat sa malayang kompetisyon.10
Ginagamit sa batas na ito ang mga salitang “reporma” at restructuring" upang
itago ang tunay nitong layunin na deregulasyon at pribatisasyon sa serbisyo ng
kuryente. Walang pinagkaiba ang batas na ito sa Oil Deregulation Law, Retail
Trade Act, Mining Act, Omnibus Foreign Investment Code at iba na nagdulot ng
dagdag pasanin ng mamamayan.
Tuluyan nitong ipinaubaya sa mga pribadong negosyo ang kontrol at
pamamahala sa mga plantang lumilikha ng kuryente. Isinapribado na rin
Agham Advocates of Science and Technology for the People 10
13. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
maging ang transmisyon o ang paghahatid ng kuryente mula sa mga planta
tungong mga distribution utilities (DU).
Ang EPIRA ang unang kumpletong pribatisasyon ng industriya ng kuryente sa
buong rehiyon ng Asya.
Fig. 2. Ang restructuring ng industriya
ayon sa DOE11
5.2 Ano ang nilalaman ng RA 9136 o EPIRA?
Ang EPIRA at ang Implementing Rules and Regulations nito na inaprubahan ng
Joint Congressional Power Commission noong ika-27 ng Peberero 200212 ay
naglalaman ng mga sumusunod na mayor na seksyon:
a. Pagbabago sa istruktura, operasyon at mga kalahok sa power
industry.15
Hinati sa apat na sektor ang power Industry: generation, transmission,
distribution at supply sector. Ang mga organisasyon o entidad dito ay tinatawag
na Electric Power Industry Participant.
1. Generation Sector: Ayon sa EPIRA, ang paglikha ng kuryente ay isang
business affected with public interest. Ang mga nasa generation sector
ay generation companies o (GenCos) na pinayagan ng ERC na lumikha
ng kuryente mula sa iba’t ibang sources tulad ng coal, diesel, natural
gas, hydro at geothermal. Kasama dito ang mga Independent Power
Producer (IPP) na pribadong nagma-may-ari ng planta ng kuryente.
2. Transmission Sector: ang transmission ay ang pagdaloy ng kuryente sa
pagitan ng mga power generators at distribution utilities. Ang
mamamahala nito ay pribadong korporasyon na bibigyan ng prankisa ng
pamahalaan.
Agham Advocates of Science and Technology for the People 11
14. Fig 2. Ang restructuring ng industriya ayon sa DOE!
Source: DOE!
Competitive generation
Regulated transmission
and distribution
Competitive retail
electricity providers
End-user
choice
• Restructuring of power
industry!
• Unbundling of electricity rates
for transparency!
• Privatization of NPC!
• Establishment of WESM!
• Open Access of distribution
network and retail competition!
• Definition of responsibilities of
DOE, NPC, ERC, PSALM!
15. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Fig. 3. Ang mg IPP ay nagsusuplay
ng kuryente sa NPC, DU at WESM.13
Fig. 4. Ang WESM14
3. Distribution: Ang gawain ng mga electricity distributors ay
maihahalintulad sa mga retail traders. Sila ang bumibili ng produkto
(kuryente) mula sa iba’t ibang sources at nagbebenta nito sa
consumers. Halimbawa nito ang distribution utilities (DU) gaya Meralco,
VECO at iba pang mga electric cooperative (EC) sa mga lalawigan.
4. Supply Sector: Kabilang dito sa ang mga GenCos, mga kapatid na
kumpanya at iba pang pinahintulutan na magbenta ng kuryente sa mga
konsyumer. Ginawa ang Wholesale Energy Spot Market (WESM) bilang
pamilihan na may mekanismo kung saan makakalahok ang iba't ibang
supplier o bumibili ng kuryente para makapagbenta ng kuryente. Ayon
sa batas, 10% ng kuryente na binibili ng DU ay dapat magmula sa
WESM.
Ayon sa batas, pinahintulutan ang cross-ownership sa GenCos at DUs. Ang
mga kapitalistang may-ari ng mga GenCos ay pinayagan rin na mag-ari ng mga
DUs. Dahil natural na paburan ng mga DUs ang mga kapatid ng GenCos sa
kani-kanilang mga bilateral contracts.
PInapayagan rin sa EPIRA na mag-ari ang isang kumpanya ng 30% ng lahat ng
mga planta sa isang grid at 25% ng buong kapasidad ng buong bansa kaya
naman
Fig. 5. Ang relasyon ng mga ahensya
ng gobyerno at industry paticipants16
b. Mga bagong responsibilidad ng iba’t ibang ahensya ng pamahalaan17
Dahil sa pagbabago ng istruktura, nagkaroon din ng pagbabago sa mga
responsibilidad ng pamahalaan. Ayon sa batas, ang sektor ng generation ay
magiging competitive at deregulated, habang ang transmission at distribution ay
nananatili sa ilalim ng “regulasyon” ng gubyerno. Nakasaad sa EPIRA ang mga
bagong responsibilidad ng iba't ibang ahensya ng pamahalaan:
Agham Advocates of Science and Technology for the People 12
16. Fig 3. Ang mg IPP ay nagsusuplay ng kuryente sa NPC, DU at
WESM!
Source: Salimbangon!
18. Fig 5. Ang mga ahensya ng gobyerno at industry paticipants!
Source: ERC Primer 2011!
19. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
• Department of Enegy (DOE): May mandato na bantayan o i-supervise
ang “pagsasa-ayos” ng industriya ng kuryente. Ito rin ang nagpa-plano at
nangunguna sa implementasyon ng mga komprehensibong programa
tulad ng Philippine Energy Plan (PEP) at Power Development Program
(PDP). Ang PDP ay gabay upang magsagawa ng mga eksplorasyon ng
mga rekursong pang-enerhiya sa bansa at pag-sanib nito sa industriya
ng kuryente sa bansa.
• National Power Corporation (NPC): Ang NPC na tuluyang isinapribado
ng EPIRA ang namamahala sa mga hydro powerplant at gumagawa ng
mga kasunduan para sa pribatisasyon ng operasyon at maintenance ng
mga power plants. Pinamamahalaan ng NPC ang NEA at Small Power
Utilities Group (SPUG).
• National Electrification Administration (NEA): Namamahala sa
elektripikasyon sa mga malalayong lugar. Sa kasalukuyan, NEA ang
naghahanda sa electric cooperatives na pumasok sa sistema ng
deregulated electric market.
• Power Sector Assets and Liabilities Management Corporation (PSALM):
Kompanyang pag-aari at kontrolado ng pamahalaan nangunguna sa
pagbebenta at pagsasapribado ng lahat ng ari-arian ng NPC tulad ng
NPC generation assets, liabilities, IPP contracts, real estate at lahat ng
disposable assets.
• National Transmission Corporation (TRANSCO) ay nasa pamamahala
ng PSALM na nangangasiwa naman sa paglipat ng pagmamay-ari ng
mga imprastruktura sa transmisyon at subsubtransmisyon ng NPC.
• Energy Regulatory Commission (ERC): Isang independyente at quasi-
Agham Advocates of Science and Technology for the People 13
20. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
judicial na komisyon na may regulatory function at kapalit ng Energy
Regulatory Board. ERC ang pangunahing taga-bantay ng gobyerno sa
generation companies at suppliers/aggregators at may responsibilidad
na mag-promote ng kumpetisyon at parusahan ang pag-abuso sa
industriya ng kuryente. Ang ahensya rin na ito ang nag-aapruba ng mga
aplikasyon at petisyon para sa rate adjustment o pag-kontrol sa presyo
na tinatakda sa transmission at distribution ng kuryente.
c. Unbundling of rates
Kasabay ng restructuring ng power Industry ay ang unbundling of rates o
pagtilad-tilad ng mga binabayaran ng konsyumer. Layunin nito na gawing
transparent diumano ang paniningil. Ngunit sa kabila ng unbundling, hindi
tinanggal ang Power Purchase Agreement o PPA na ikinampanya ng
mamamayan na hindi makatarungang bayarin at dagdag singil sa kuryente.
Fig. 6. Ang unbundling of rates at
pass through costs18
Fig. 7. Ang binabayaran sa Meralco
Bill.19
Box 3. Ang unbundling of rates at repleksyon nito sa binabayaran natin sa
kuryente
Ang Meralco, bilang DU, ay tagakolekta lang daw ng mga singil sa bawat yugto
ng paghatid ng kuryente. Ang mga items ay ang sumusunod at paliwanag
dito20:
a. Generation charge. Ito ang presyo ng kuryente na binili ng Meralco
mula sa kanyang mga suppliers, ang NPC, IPP at WESM. Humigit
kumulang sa 65% ng ibinabayad ng mga konsyumer ang napupunta sa
generation component ng electric bill.
b. Transmission charge. Ito ang bayad sa pagdadala ng kuryente mula sa
generators ng NPC at Meralco IPPs tungo sa mga distributors gaya ng
Agham Advocates of Science and Technology for the People 14
21. Fig 6. Ang unbundling of rates at pass through costs !
Source: DOE!
22. Fig 7. Ang binabayaran sa
Meralco Bill!
Source: GMA Network!
23. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Meralco o mga rural electric cooperatives. Ang transmission charge ang
bumubuo sa 8.7% ng power bill. Ang bayaring ito ay napupunta sa
korporasyong namamahala sa transmisyon.
c. Distribution charge. Ang distribution charge ang singil sa pagdadala ng
kuryente ng DU gaya ng Meralco o mga rural cooperatives sa mga
bahay ng konsyumer. Tinutustusan diumano ng distribution charge ang
pagtatayo at pagpapaandar ng mga pasilidad ng Meralco. Mayroon itong
dalawang components: (a) Ang metering charge ay ang binabayaran
natin sa operasyon, pagbasa at pagmantina ng mga metro ng kuryente
at (b) ang supply charge ang singil ng Meralco sa kanilang customer
service gaya ng billing, pangongolekta at iba pa. Ang taripang napupunta
sa mga distribution companies ay umaabot lamang sa 16% ng total
power bill.
d. Taxes. May nakapataw na buwis sa bawat yugto ng paghatid ng
kuryente. Sinisingil ng gobyerno ang franchise tax at value-added tax
(VAT) sa mga DU at ipinapasa naman ito sa mga konsyumer. Umaabot
ng 10% ang VAT na ipinapataw sa generation ng kuryente.
e. Iba pang charges. May iba pang mga sinisingil sa konsyumer gaya ng
universal charge, subsidies, at system loss.
Ang parte o percentage ng bawat item ay pabago-bago dahil maaring magiba
ang singil sa bawat isa, ngunit hindi naman mayor ang pagbabago nito. Ang
halaga na ginamit sa taas ay batay sa singil ng Meralco noong Enero 2012.
Fig. 8. Ang PPA sa bundled at
unbundled bill 21
Box 4. Ang mga hindi nakasaad sa bill na charges gaya ng PPA23
Ang PPA o Purchased Power Adjustment ay maugong na usapin bago pa man
isabatas ang EPIRA. Ito ay nagsimula sa mga ma-anomalyang kontrata na
pinasok ng gobyerno sa mga IPP. Gaya na ng nabanggit, nakasaad sa mga
Agham Advocates of Science and Technology for the People 15
24. Fig 8. Ang PPA sa
bundled at
unbundled bill !
Source: ERC Primer!
25. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Fig. 9. Ang iba’t ibang cost
adjustments22
kontrata ang mga probisyon na kakargahin ng NPC ang kapasidad ng mga
planta kahit hindi pa ito nagamit. Babayaran din niya ang pagkalugi ng piso pati
ang pagtaas ng halaga ng langis at panggatong na ginamit ng IPP. Dahil sa
mga probisyon na ito ay nalugi ang NPC at lumubo ang utang nito.
Upang mabawi ang gastos ng NPC at mabayaran niya ang mga utang na ito
pinapasa niya ito sa mamamayan. Maliban sa basic charges, ang mga power
utilities gaya ng NPC at DU ay pinahihintulutang sumingil ng mga karagdagang
halaga sa pamamagitan ng automatic cost adjustments.
Ang NPC ay naniningil ng karagdagang gastusing: (1) dulot ng pagtaas sa
halaga ng langis, (2) dulot ng paggalaw ng halaga ng kuryente na binili ng NPC
mula sa Independent power producer, at (3) dulot ng pagbabago ng halaga ng
palitan ng piso sa dolyar at iba pang pandaigdigang pananalapi. Ipinapasa ng
NPC ang singil na ito sa mga DU upang singilin sa mamamayan sa porma ng
PPA.
Sa kasalukuyan ay hindi na ginagamit ang mekanismo na PPA, ngunit pinalitan
lamang ito ng bagong mekanismo tulad ng Generation Rate Adjustment
Mechanism (GRAM) ng mga GenCos, Automatic Adjustment of Generation
Rates and System Loss Rates (AGRA) ng mga DU at Transmission Rates
Adjustment Mechanism (TRAM).
Bukod sa GRAM at AGRA, ipinapasa rin sa mga konsyumer ang pabagu-bagong
palitan ng piso at dolyar sa pamamagitan ng Incremental Currency
Exchange Rate Adjustment (ICERA).
Sinimula nang gamitin ang GRAM at ICERA noong 2003 na kinukwenta sa
tuwing ika-apat na buwan. Ang AGRA naman ay nagsimulang isama sa singilin
noong 2004 at kinukwenta kada buwan. Awtomatiko ang pagpapatupad ng
AGRA habang idinadaan naman sa public hearing ng ERC ang GRAM at
Agham Advocates of Science and Technology for the People 16
26. Fig 9. Ang iba’t ibang
cost adjustments !
10
Source: ERC!
27. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
ICERA.
Ang esensya ng automatic cost adjustment gaya ng PPA ay may kalayaan at
karapatan ang mga pribadong kumpanya na iadjust ang kanilang singil, dagdag
pa sa aktwal na gastos nila sa paghatid ng kuryente, at ipasa ito sa
mamamayan.
Fig. 10. Ang universal charge24 Box 5. Ang Universal charge
Ang pagsingil ng universal charge ay nakasaad sa EPRIA. Sa singil na ito,
ipinasa sa mamamayan ang pagbayad sa sa utang ng NPC. Ang maaring
singilin sa ilalim ng universal charge ay ang:
• Ang stranded debt o ang utang na naiwan sa NPC na hindi nakayang
bayaran ng kinita nito sa pribatisasyon.
• Ang stranded contract cost naman ay ang naiwang obligasyong
pinansyal sa NPC mula sa mga isinapribadong kontrata nito sa mga IPP.
• Kasama din sa universal charge ang paghahatid ng kuryente sa
malalayong lugar at ang pangangalaga sa mga watershed.
Agham Advocates of Science and Technology for the People 17
29. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
PART III:
Ang Epekto ng EPIRA
6. Sumirit pataas ang
presyo ng kuryente.
Isa ang Pilipinas sa
pinakamataas ang
singil sa buong
mundo.
Fig. 11. Sumirit pataas ang singil sa
kuryente
Fig. 12. Pagkukumpara ng singil ng
Meralco sa iba pang merkado.25
6.1 Bumaba ba ang singil sa kuryente noong isabatas
ang EPIRA?
Noong 2000, ang singil ng Meralco sa mga residential customers ay nasa P4.87
kada kilowatt-hour (kWh) lamang. Nang ipinasa ang EPIRA, nagkaroon ng 30
centavos na pagbaba na nilaman ng batas ngunit naging pansamantala lang
ito. Sa panahon ng implementasyon ng EPIRA, umabot na sa P10.35/kWh ang
average rate noong 2010. Mahigit doble ang itinaas na singil ng kuryente sa
nagdaan 10 taon. Kung isasama pa ang singil ngayon, base sa Enero 2014 bill
ng Meralco na P 11.45/kWh ay 330% na taas ito o triple kumpara sa 2001.26
Gayundin, lumaki ang generation charge ng NPC. Sa Luzon grid, halimbawa,
tumaas ang NPC effective rate mula P2.39 kada kWh noong 2000 patungong
P4.67 noong 2011. Halos dumoble ang sinisingil na generation charge ng NPC
nitong nagdaang sampung taon.
Sa isang pag-aaral, lumalabas na ang Pilipinas ang may pinakamahal na singil
sa kuryente sa buong Asya. Ayon sa International Energy Consultants, ang
average retail rate ng kuryente sa bansa na 18.1 US cents kada kWh noong
Oktubre 2010 ay mas mahal na sa 17.9 US cents sa Japan.
Katunayan, maliban sa Japan at Singapore, ang generation charge pa lamang
sa Pilipinas ay katumbas na sa buong singil sa kuryente sa mga bansang
sakop ng nasabing pag-aaral. Kabilang dito ang Thailand, Malaysia, South
Agham Advocates of Science and Technology for the People 18
30. Fig 11. Sumirit pataas ang singil sa kuryente ng Meralco!
16
14
12
10
8
6
4
2
0
Php
MERALCO residential rates
Generation rates
Year
Source: Meralco!
32. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Korea, Taiwan, at Indonesia.
Pinakamahal ang singil sa Pilipinas dahil ipinapasa lahat sa konsyumer ang
gastos sa produksyon at distribusyon. Tinukoy din nito na tanging Pilipinas
lamang ang privatized ang industriya ng kuryente at walang subsidy ang
gobyerno.27
Inulit ang pagaaral noong 2012 at lumalabas na ang singil ng Meralco ay ika-9
sa pinakamataas sa 44 na pamilihang habang ika-2 naman sa Asya, sumunod
sa Japan.28
6.2 Bakit mataas ang singil sa kuryente?
Sa kabuuan, mataas ang singil ng kuryente dahil pribado ang kumukontrol sa
industriya na ito at inalis ng pamahalaan ang kontrol nito sa pagtatakda ng
singil sa kuryente. Mataas ang singil sa kuryente dahil sa mga patakaran ng
pribatisasyon at deregulasyon, kung saan super-tubo na ang panguhahing
tunguhin sa halip na serbisyo.
a. Ang lahat ng gastos ng mga pribadong kumpanya ay pinapasa sa
konsyumer
Deregulated ang generation sector kaya walang kontrol ang pamahalaan sa
singil ng mga Gencos. Dahil deregulated, hindi na dumadaan sa anumang
pandinig (hearing) ang pagtaas ng generation charge. Hindi na rin ito
nangangailangan ng pagsang-ayon ng gubyerno sa pamamagitan ng
Department of Energy (DOE) at Energy Regulatory Commission (ERC).
Walang insentibo ang mga GenCos na babaan ang kanilang singil o babaan
ang gastos sa produksyon dahil ang kanilang mga bayarin at gastos, mula sa
pagbabago ng halaga sa palitan ng dolyar at piso pati ang pagbabago ng
Agham Advocates of Science and Technology for the People 19
33. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
presyo ng panggatong ay ipinapasa lang naman sa mga konsyumer. Ang mga
GenCos ay pinapayagan iadjust ang kanilang singil sa pamamagitan ng mga
automatic cost adjustments at ito ay napupunta sa konsyumer bilang mga pass
through cost ng distributor utilility.
Pinapasa din sa konsyumer ang mataas na buwis, utang ng NPC at iba pang
mga bayarin ng DU sa pamamagitan ng tax, system loss charge at universal
charge
Sa bawat yugto na dinadaan ng kuryente ay may buwis dito na binabayad sa
pamahalaan. Sa ilalim rin ng EPIRA ipinapasa sa konsyumer ang franchise tax,
energy tax at, simula noong 2006, angVAT. Sa katunayan, ang binayaran
nating franchise tax at energy tax ay pinapatawan pa ng VAT kaya doble-doble
ang buwis.
Pati ang kuryenteng hindi hindi nagagamit dahil sa tagasay sinisingil din sa
pamamagitan ng system loss charge. Ang system loss ay kuryenteng hindi
nagamit dahil sa tagas bunga ng inefficiency sa network o pagnanakaw
(pilferage at mga iligal na koneksyon).
Sinisingil rin ng NPC at Meralco sa konsyumer ang pagpapapatayo ng bagong
mga linya sa mga liblib na lugar o ang missionary electrification charge sa ilalim
ng universal charge. May sinisingil rin na environmental charge ang mga DUs.
b. Dagdag pa, hindi rin makatwiran ang pamamaraan ng pagkwenta ng
singil ng mga DU at TRANSCO
Kahalintulad ng transmission rate, ang distribution rate ay nasa ilalim din ng
regulasyon ng ERC. Bagama’t regulated ang mga sektor na ito, ang
pamamaraan ng pagkwenta ng singil ng mga DU at TRANSCO ay nagsisilbi
pagmaksimisa ng kita.
Agham Advocates of Science and Technology for the People 20
34. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Mula sa dating return on rate base (RORB), ginagamit na ngayon ng ERC ang
performance-based regulation (PBR) na ipinakilala nito noong 2005 sa
pagtatakda ng singil ng mga DU pati sa singil sa transmisyon ng National Grid
Corporation of the Philippines (NGCP).
Sa ilalim ng PBR, tumaas ang distribution charge ng mga DU kabilang ang
Meralco at transmission charge ng NGCP. Mas paborable para sa mga
pribadong korporasyon ang PBR. Sa RORB, kinukwenta ang singil batay sa
makatwirang kita (return) mula sa mga asset na aktwal na ginamit sa
distribusyon ng kuryente.
Sa PBR, kinukwenta ang singil batay sa tinatayang pamumuhunan at gastos sa
operasyon sa mga darating na panahon. Kaya ang singil ng NGCP at Meralco
ay nakabatay sa gastos at inaprubahang maksimum na kitang inaasahan nila
sa hinaharap. Sa madaling sabi, sinisingil na tayo sa mga gastusing hindi pa
nangyayari at ito ay sumasalamin bilang kita ng Meralco.
Sa pangkalahatan, lahat ng mga sinisingil ay hindi dumaan sa makatotohanang
konsultasyan sa mga konsyumer upang ipakita kung paano kinukwenta ang
mga bayarin na ito.
c. Nakikinabang ang pamahalaan sa mataas ang buwis na ipinapataw sa
bawat yugto ng kuryente
Gaya ng nabanggit, may nakapataw na buwis sa bawat yugto ng paghatid ng
kuryente. Sinisingil ng gobyerno ang franchise tax at value-added tax (VAT) sa
mga DU at ipinapasa naman ito sa mga konsyumer. Umaabot ng 10% ang VAT
na ipinapataw sa paglikha ng kuryente.
Agham Advocates of Science and Technology for the People 21
35. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
6.3 Paano kagyat na mababawasan ang singil sa
kuryente?
Ayon sa pamahalaan, wala na raw tayong magagawa sa mataas na singil na
ito. Hindi ito totoo, kung nanaisin talaga, maaring alisin agad ang mga
sumusunod:
• Hindi dapat ipasa sa konsyumer ang mga gastos ng mga kumpanya lalo
na sa generation sector. Ang pagkakautang ng NPC mula sa
makaisang-panig na mga kontrata sa IPPs contracts pati ang ibang
bayarin na ipinapasa sa pamamagitan ng universal charges ay dapat rin
alisin. Tungkulin dapat ng mga kumpanya na bigyan ng subsidyo ang
mga mahihirap na konsyumers bilang bahagi ng serbisyo nila kaya’t
hindi na dapat ito ipinapasa pa sa ibang konsyumer (tanstang 15%).
• Hindi rin dapat sinisingil sa konsyumer ang kuryente na hindi niya
nagamit sa pamamagitan ng systems losses (9%),
• Tanggalin ang VAT at iba pang government taxes (tanstang 10%).
Kung aalisin ang mga ito ay mahigit 30% ng ating bill ay mababawas. Dapat rin
ay limitahan ang kita ng mga pribadong kumpanya sa power industry.
Sa pangmatagalan, mapapababa ang singil sa kuryente kung aalisin ito sa
kamay ng pribadong kontrol at ituring itong isang mahalagang serbisyong
pinapatakbo ng gobyerno para sa kapakinabangan ng lipunan.
7. Hindi nabawasan,
bagkus ay lumubo pa
ang utang ng NPC.
7.1. Magkano ang utang ng NPC bago isabatas ang
EPIRA?
Bago pa man ipasa ang EPIRA, umabot ang utang ng NPC sa USD16. 39
Agham Advocates of Science and Technology for the People 22
36. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Bilyon sa taong 2001. Kalakhan ng mga utang na ito ay dahil sa mga kontrata
ng gubyerno sa mga IPPs. Ito ay mahahati sa:
• Utang ng NPC: USD 5.97 Bilyon
• Obligasyon sa IPP: USD 10.42 Bilyon
Isa sa mga sinabing layunin ng EPIRA ay ang bawasan o mabayaran ang utang
ng NPC mula sa mga nainbentang mga assets nito. Nilikha ang Power Sector
Assets and Liabilities Management (PSALM) Corporation at TRANSCO para
pangasiwaan ang pagbebenta at pagsasapribado ng mga assets na ito.
Fig. 13. Kabuuang utang ng NPC
mula 2001 hanggang 2011.33
7.2 Ano ang nangyari sa utang na ito?
a. Halaga ng kasalukuyang utang
Noong 2001 ang utang ng NPC ay USD16. 39 Bilyon. Lumipas ang sampung
taon ng EPIRA, tanging USD 570 milyon ang nabawas rito. Kasalukuyang USD
15.82 Bilyon utang nito sa PSALM.34
Habang ang obligasyon sa IPP ay nabawasan ng USD 1.63 Bilyon mula 2001
hanggang 2010, tumaas naman ang utang ng NPC ng USD 1.63 Bilyon sa
panahon ito.
b. Saan napunta ang pondong pambayad-utang ng NPC?
Noong 2004, ang gobyerno ay nagbayad na nang 200 bilyong pisong utang ng
NPC.
Mula 2001-2010, nakapaglabas na ng USD 18 Bilyon ang PSALM. Ang
halagang ito ay napunta sa mga sumusunod:
• Principal amortization: USD6.7 bilyon
Agham Advocates of Science and Technology for the People 23
37. Fig 13. Kabuuang utang ng NPC mula 2001 hanggang 2011!
Source: PSALM!
38. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
• Pambayad ng interes USD4.3 bilyon
• Independent power producers (IPPs): USD7 bilyon
c. Halaga ng kinita ng PSALM sa pribatisasyo ng mga assets at ang mga
bagong utang ng NPC
Noong 2011, 79.56% ng mga generating plants at 79.56% ng mga kontrata nito
sa IPPs ay naisapribado na.
Mula sa pagbebenta ng mga generation plant, transmission assets at IPP’s
contracts, ay nakalikom ang PSALM ng USD10.21 bilyon. Ito ay mahahati sa:
• Pagsasasapribado ng National Transmission Corporation (TRANSCO):
USD3.95 bilyon
• Pagbebenta ng mga generating plants: USD3.01 bilyon
• Paglipat ng ng kontrata ng NPC sa IPP sa IPP Administrators (IPPAs):
USD3.23 bilyon
Ngunit sa halagang ito, USD5.48 bilyon pa lang ang aktwal na nakolekta ng
PSALM, hulugan ang iskema ng pagbabayad sa pribatisasyon. Hindi sapat ang
nalikom ng PSALM bilang kabayaran sa utang ng NPC. Kaya naman sa
panahon na kailangan nang bayaran ang mga utang, umuutang ulit ito na
nagresulta sa USD12 Bilyon na bagong utang ng NPC sa loob ng 10 taon.
Box 6. Mga petisyon ng PSALM sa ERC para singilin sa mamamayan ang
utang ng NPC
Gaya na ng nabanggit, ayon sa EPIRA, ang mga pambayad utang na hindi
makukuha mula sa pagbebenta ng mga assets ng NPC ay kukunin sa
consumer sa porma ng universal charge.
Agham Advocates of Science and Technology for the People 24
39. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Noong 2009, naghain ng petition ang PSALM sa ERC na kunin ang P470.87
bilyon stranded debts para sa mga utang na hindi mababayaran dahil sa
pribatisasyon ng NPC at P22.26 bilyon na stranded contract costs o ang ang
bayad sa kuryente na hindi naman nagamit ng mamamayan pero kailangan
bayaran dahil ito ang nakasaad sa kontrata ng NPC at IPP sa Luzon Grid.
Ang pagbawi sa stranded debts ay nangangahulugan ng dagdag 30.49
centavos per kilowatt-hour (kWh) batay sa recovery period na 17 na taon. Ang
pagbawi naman sa stranded contract costs sa loob ng 5 taon ay 9.20 centavos
per kWh na dagdag.
Kung titignan ang laman ng P470.865 utang ng PSALM na nais nitong ipasa sa
konsumer, ito ay mahahati sa:
• “performance incentive” bonus na binigay nito sa kanyang mga
empleyado: P80.9 milyon
• sahod ng 165 na tauhan: P80.5 milyon
• night shift differentials ng trading team sa WESM: P18.4 milyon
• bayad sa serbisyo ng kanyang mga consultants sa pribatisasyon: P118
milyon.
Naghain ulit ang PSALM noong 2010 na petition para mabawi ang stranded
debts sa taong iyon na tinatayang P54.90 bilyon, katumbas ng 86.77 centavos
per kWh. Minungkahi rin nito na bawiin ang stranded contract costs ng 2009 na
may halagang P26.69 bilyon sa18.79 centavos per kWh na dagdag sa loob ng
3 taon.
Hindi pinayagan ng ERC ang mga petisyong ito dahil hindi nakapagsumite ang
PSALM ng mga kinakailangang dokumento. Ayon sa desisyon ng ERC maaring
magsumite ng bagong petisyon ang PSALM kung makumpleto nito ang mga
rekisitos.
Agham Advocates of Science and Technology for the People 25
40. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Kaya naman ay maasahan na magsusumite ng petisyon ang PSALM at
ikakarga sa consumer ang mga utang nito hanggang lagpas pa sa buhay ng
PSALM bilang korporasyon sa 2025.
8. Hindi nagkaroon ng
istableng suplay ng
kuryente.
8.1 Ano ang kalagayan ng suplay ng kuryente sa
bansa?
Bago isabatas ang EPIRA noong 2000, may installed generating capacity na
13,185 MW sa bansa. Noong 2012, nadagdagan ito at umabot na sa 17,025
MW.
Ngunit ang dagdag na kapasidad na ito dulot pa rin ng mga planta na itinayo 20
na taon na nakalipas. Ibig sabihin, hindi talaga nagtatayo ng bagong mga
planta ang mga kapitalista, sa halip pinagkakakitaan lang nila ang dati ng mga
plantang naitayo ng NPC. Sa Luzon, 1 lang ang bagong planta na natayo sa
loob ng 13 na taon.
Batay sa 17,025 MW installed generating capacity sa bansa na may 10,761
MW total peak demand sa taong 2012, inamin ni Energy Secretary Petilla, na
masikip ang suplay ng kuryente hanggang 2016 pero hindi magkakaroon ng
power failure.37
Sa ilang pag-aaral, mangangailangan ng dagdag na 2500 MW sa susunod na 4
na taon hanggang 2017 ang bansa. Ang pangangailangang ito ay tutugunan
daw ng dagdag na 1400 MW na committed plants na sinasabing matatapos ang
konstruksyon sa 2016.
Ngunit kahit pa matuloy ang pagtatayo ng mga dagdag na plantang ito ay hindi
pa rin masasabing may tiyak at estableng suplay ng kuryente sa bansa. Dahil
hindi kontralado ng pamahalaan ang mga generators, tila hostage ng mga
Agham Advocates of Science and Technology for the People 26
41. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
pribadong kumpanya ang mga konsyumer kapag naisipan nilang mag-shutdown
ng mga planta. Wala rin sa plano ng gobyerno ang pagsasaayos ng
power industry upang maghanda sa isang pambansang industriyalisasyon.
8.2 Nagkaroon ba ng tiyak na suplay ng kuryente dahil
sa EPIRA?
Hindi nagkaroon ng istableng suplay ng kuryente dahil ipinaubaya sa pribado
ang pagtatayo ng mga bagong planta at operasyon ng halos kabuuan ng power
industry. Inuna ng mga kumpanyang ito na siguruhin ang kita sa halip na
tugunan at ayusin ang suplay ng kuryente.
Tungkulin ng estado na planuhing mabuti ang suplay ng kuryente para sa
pangangailangan ng mga industriya at kabahayan. Trabaho nitong tiyakin ang
istabilidad ng suplay sa gitna ng mga umiiral na kondisyong gaya ng climate
change. Dahil sa pribatisasyon, arbitraryong nakakapagsagawa ng plant
shutdowns ang mga may hawak ng mga planta gaya ng nangyari sa Luzon.
Ang pagpapaunlad sa lokal na pinagkukunan ng enerhiya ay pinaubaya rin sa
mga dayuhan at pribadong kumpanya. Inalis ng EPIRA ang buwis sa paggamit
ng mga lokal na rekurso kaya’t libre itong pinagkakakitaan ng mga korporasyon.
Dagdag pa, alinsunod sa Seksyon 6 at 12 ng EPIRA binibigay sa mga
transmission at distribution companies ang karapatan na magpaalis sa mga
naninirahan o nagmamayari ng mga lupain na sakop ng kanilang operasyon. Ito
ay nagdulot ng malawakang dislokasyon ng mga katutubo mula sa kanilang
lupang ninuno at mga magsasak sa kanilang lupang sakahan sa pagpasok ng
mga proyekto sa kanilang lugar.
Agham Advocates of Science and Technology for the People 27
42. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Box 7. Kulang pa rin ang suplay ng kuryente sa Mindanao at walang
paghahanda para tugunan ang pangangailangan na ito
Noong 2010, halimbawa, dumanas ng krisis sa suplay ng kuryente ang iba’t
ibang bahagi ng bansa.
Sa Mindanao, umabot sa 700 MW ang kakulangan sa suplay noong Marso
2010. Nakaranas ang mga probinsya rito ng rotating brownouts ng hanggang 8
oras kada araw. Sinisi ng pamahalaan ang tagtuyot o El Niño dahil kalahati ng
suplay sa Mindanao ay mula sa mga hydropower plant. Walang dagdag na
kapasidad sa paglikha ng kuryente sa nasabing rehiyon sa loob ng mahigit
isang dekada. Tungkulin ito ng NPC ngunit inaatupag nito ang pagbebenta ng
mga ari-arian sa ilalim ng EPIRA kaya hindi natugunan ang lumalaking demand
sa kuryente sa Mindanao.38
Maging ang Metro Manila at Luzon ay dumanas din ng rotating brownouts
noong 2010. Umabot sa 641 MW ang kulang sa suplay ng kuryente sa Luzon
kasabay ng krisis noon sa Mindanao.
9. Lalong umigting ang
monopolyo sa
industriya ng kuryente
at hindi nagkaroon ng
"malayang
kumpetisyon".
Sa ilalim ng Electric Power Industry Reform Act o EPIRA, ibinigay sa pribadong
mga kumpanya ang pag-gawa (generation), pagdala (transmission) at
pagmamahagi (distribution) ng kuryente.
Dahil dito, hawak ng pribadong pag-aari ang isa sa susing bahagi ng industriya.
Iilan na lamang ang may kontrol ng pag-gawa ng kuryente, iisang kumpanya
ang may pagaari ng transmission, at iilan lang din ang may hawak ng
distribution.
Agham Advocates of Science and Technology for the People 28
43. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Fig. 14. Mga planta ng kuryente sa
bansa at mga nagmamay-ari nito39 9.1 Sino ang kumukontrol sa sektor ng generation?
Pag-aari na ng iilang pamilya/korporasyon ang pinakamalalaking
naisapribadong planta ng kuryente bukod pa sa naisapribado na ring contracted
capacity ng NPC:
1. Aboitiz
a. Tiwi-Makban (747.53 MW)
b. Magat (360 MW)
c. Ambuklao-Binga (175 MW)
d. PB 117 (100 MW),
e. PB 118 (100 MW),
f. Pagbilao (700 MW),
g. Talomo (3.5 MW);
2. Lopez
a. Palinpinon-Tongonan geothermal plants (305 MW),
b. Bac-Man (150 MW),
c. Pantabangan-Masiway (112 MW);
3. Consunji
a. Calaca coal (600 MW);
b. SMC – Limay (620 MW),
c. Sual (1,000 MW),
d. Ilijan (1,200 MW),
e. San Roque (345 MW).
Sa mga dayuhan, nangunguna ang
1. AES Corp. ng US (Masinloc, 600 MW) at
2. SPC Power Corp. ng Korea/KEPCO (Panay & Bohol, 168.5 MW; Naga,
55 MW).
3. Taga-Korea rin (K-Water) ang nakakuha ng Angat (218 MW) pero
Agham Advocates of Science and Technology for the People 29
44. 15
Fig 14. Mga planta ng kuryente
sa bansa at mga nagmamay-ari
nito!
Source: KPMG Global Energy Institute!
45. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
nakabinbin pa ang kaso nito sa Supreme Court.
Sa kabuuan, naisapribado na ang katumabas na 7,448.08 MW kapasidad ng
mga generating plants at contracted capacities ng NPC. Pinaghatian ito ng mga
sumusunod: SMC (42.5%), Aboitiz (29.3%), Consunji (8.1%), Lopez (7.6%),
AES Corp. (8.1%), iba pa (4.4%).
Kontrolado ng tatlong korporasyon ang 52% ng kapasidad sa generation: SMC
(20%); First Gen ng Lopez (17%) at Aboitiz (17%). Nasa 18% na lang ang
hawak ng PSALM at 6% sa NPC.
9.2 Sino ang kumukontrol sa transmisyon?
Ang National Grid Corporation of the Philippines (NGCP), ang may hawak sa
operasyon ng transmission nang isinapribado ang TRANSCO. Ito ay
pinagmamayarian ng mga sumusunod:
• Henry Sy, Jr. sa pamamagitan ng One Taipan Holdings na binili mula sa
Monte Oro Sources ni Enrique Razon: 30%
State Grid ng China (40%)
Calaca High Power Corp. (30%).41
9.3 Sino ang kumukontrol sa distribusyon?
Hindi lamang sa pag-generate ng kuryente namamayagpag ang monopolyo ng
mga kumprador. Hawak din nila ang distribution ng kuryente sa bansa.
Meralco, ang pinakamalaking DU sa bansa ay pagmamayari ng mga
sumusunod:
• Beacon Electric Asset Holdings, Inc. (consortium of PLDT and Metro
Pacific) ni Manny Pangilinan 49.96%
Agham Advocates of Science and Technology for the People 30
46. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
• SMC ang 27.12%
• First Philippines Utitilites Corporation ng mga Lopez ang 3.95%
Samantala, hawak naman ng Aboitiz ang pitong DU:
1. Davao Light and Power Co. Inc.,
2. Cotabato Light and Power Company,
3. Visayan Electric Co. (VECO),
4. San Fernando Electric Light & Power Co. Inc.,
5. Subic Enerzone Corp.,
6. Mactan Enerzone Corp., at
7. Balamban Enerzone Corp.
Ang Davao Light at ang Veco ang pangalawa at pangatlong pinakamalaking DU
sa bansa. 42
Fig. 15. Ang nagmamayari at
kumukontrol sa Meralco (2013)44
Box 8. Epekto ng pribatisasyon at monopolyo sa power industry: kaso ng
Disyembre 2013 dagdag-singil ng Meralco
1. Ang Meralco bilang distribution utility
Ang Meralco ang kasalukuyang pinakamalaking distribution utility (DU) sa
bansa na nagsu-supply ng 75% ng kuryente sa Luzon at 55% sa buong bansa.
Ang mga lugar na sakop nito ay 9337 square meters o buong Metro Manila, ang
buong probinsya ng Bulacan, Rizal at Cavite; parte ng mga probinsya ng
Laguna, Quezon at Batangas at 17 barangay sa Pampanga. Ang populasyon
sa mga lugar na ito ay aabot sa 23 miilyong tao o halos isang kapat ng buong
populasyon ng Pilipinas.
Ang gawain ng distributor ay bumili ng kuryente mula sa iba’t ibang generating
companies (GenCos) at ibenta ito sa konsumer. Ang mga distribution utilities ay
Agham Advocates of Science and Technology for the People 31
47. Fig 15. Ang nagmamayari at kumukontrol sa Meralco (2013)!
Source: Meralco!
48. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Fig. 16. Advisory ng Meralco na
nagpapahayag at nagpapaliwanag ng
kanilang dagdag singil.45
may kalayaang pumili ng kanilang mga suppliers. Sa teorya, maari nilang
paghaluin ang ibat ibang pinagkukunan ng kuryente upang mabawasan ang
halaga ng kuryente na sinisingil sa mga konsyumer.
Karamihan ng kuryente ng Meralco ay nagmumula sa National Power Corp.
(NPC), at mga independent power producers (IPPs), tulad ng Quezon Power
(coal) at Santa Rita and San Lorenzo (na kapwa natural gas-fired powers
plants) sa pamamagitan ng bilateral contracts habang ang 10% ay sa
pamamagitan ng WESM gaya ng nakasaad sa batas.46
2. Magkano ang balak na dagdagsingil sa kuryente?
Noong Nobyembre at Disyembre 2013, binalak ng Meralco na maningil ng
dagdag na P3.44 kada kilowatt-hour (kWh) sa singil nito sa kuryente. Kapag
isinama ang VAT, aabot ng P4.14/kWh ang itataas ng singil sa generation
charge. Para sa regular na bahay na nagkokonsumo ng 200 kWh, tataas ng
P9.1070 per kWh ang Disyembre 2013 bill o nangangahulugan ng P828 pesos
na dagdag-singil sa buwanang bill ng konsyumer.
Sa orihinal na plano, isang beses na P4.15/kWh pagtaas ang balak ng Meralco.
Subalit dahil sa presyur mula sa publiko, nagpasya ang Meralco na unti-untiin
ang rate hike. Sumulat ito sa Energy Regulatory Commision noong Disyembre
5 upang ipaalam na uunti-untiin ng kumpanya ang pagtaas ng singil sa loob ng
tatlong buwan: Disyembre (P2.41), Pebrero (P1.21) at Marso (P0.53).47
Ang ERC ay sumulat naman sa Meralco noong ika- 9 ng Disyembre na
pinapayagan ang staggered rate hike.48
3. Ano raw ang dahilan ng pagtaas ng singil sa kuryente?
a. Pagtataas ng singil ng GENCOs
Agham Advocates of Science and Technology for the People 32
49. Fig 16. Advisory ng
Meralco na nagpapahayag
at nagpapaliwanag ng
kanilang dagdag singil. !
50. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Ang mga GenCos na pinagkukunan ng kuryente ng Meralco ay kumukuha ng
enerhiya mula sa Malampaya gas station sa Palawan. Nagsasara at
nagsasagawa ang Malampaya ng maintenance kada 3 taon. Nagsagawa ng
shut down ang Malampaya mula Nobyembre 11 hanggang Disyembre 10.
Dahil sa pansamantalang pagsasara ng Malampaya gumamit ng mas mahal na
panggatong ang mga planta na dating gumagamit ng gas galing sa Malampaya
sa Palawan. Ang mga plantang ito ay ang mga sumusunod; 1,200-megawatt
(MW) Ilijan combined cycle natural gas plant ng Kepco Philippines Corp., ang
1,000-MW Sta. Rita at and 500-MW San Lorenzo natural gas facilities na
pagmamay-ari ng First Gen Corp. ng mga Lopezes.
Nagpasya din ang Meralco na i-dispatch o patakbuhin ang mga planta ng First
Gas, gamit ang liquid fuel sa halip na natural gas. Mas mahal ito nang doble sa
natural gas. Nagresulta ito ng P1.04/kWh na dagdag singil.
b. Pagtaas ng presyo na galing sa WESM
Ang 11.5% na kinuha ng Meralco sa WESM ay nagdulot ng 70% na pagtaas ng
generation rates ng Meralco. Napakaliit na bahagi ng WESM sa kabuuang
supply na kuryente ng Meralco. Gayunpaman, ito ang pinagmulan ng
P2.38/kWh sa dagdag singil na P4.14/kWh
Sa bentahan ng power sa WESM, itinatakda nang pinakamataas na presyo ang
kabuuang presyo ng power na binebenta rito. Binabayaran ng iisang rate
(presyo) ang lahat ng organisasyon/kumpanya na nagbebenta sa WESM.
Dahil sa mahal na bentahan ng power sa WESM, iniakyat nito ang kabuuang
presyo ng kuryente na babayaran ng mga konsyumer.
Agham Advocates of Science and Technology for the People 33
51. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
4. Bakit hindi katanggap-tanggap ang dahilan ng Meralco sa pagtaas ng
singil?
a. Ang dahilang gumamit ng mahal na panggatong ang mga GenCos dahil
sa pagsasara ng Malampaya
Ang Malampaya ay nagsasagawa ng scheduled maintenance at shut down
kada tatlong taon. Maaari itong paghandaan upang mapunuan ang magiging
kakulangan sa kuryente na dulot ng pansamantalang pagsasara ng
Malampaya.
Bukod sa pagsasara ng Malampaya, nagkaroon din ng hindi maipaliwanag na
sabay-sabay na power outages at shutdown ang mga iba’t-ibang plantang
gumagawa ng kuryente na nagpalala sa kakulangan ng supply ng kuryente.
b. Idinikta ng Meralco sa Therma Mobile ang mataas na presyo ng
pagbenta ng power sa WESM.
May kontrata ang Therma Mobile (diesel plant) na magsupply sa Meralco ng
0.6% ng power requirements nito. Ang presyo nito para sa Nobyembre, ayon sa
kontrata, ay P8.65. Ngunit ayon sa rekord ng WESM, ilang ulit na nag-bid ang
Therma Mobile sa presyong P62/kWh noong Nobyembre at Disyembre. Ito ang
humatak pataas ng presyo sa WESM.
Bilang may hawak ng supply contract, nasa interes ng Meralco na kontrolin ang
buong supply ng Therma Mobile. Ngunit lumabas sa balita na Inuutos ng
Meralco sa Therma Mobile na magbid ng mataas (P62/kWh). Sinadyang
hinatak pataas ng pinakamalaking DU sa bansa ang presyo ng kuryente sa
WESM.49
Agham Advocates of Science and Technology for the People 34
52. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
c. Maaring nagsabwatan ang mga organisasyon/kumpanyang may
kinalaman sa power industry:
1. Sumabay sa pag-shutdown ng Malampaya ang Pagbilao 2 at Sual 1
2. Halos itinaon din ang scheduled maintenance ng Pagbilao 2, Ilijan B, at
ng Calaca 2 sa panahong nagsasagawa ng maintenance ang
Malampaya
3. Nagkaroon ng hindi maipaliwanag na shutdown ang iba pang plantang
tulad ng Malaya 1 and 2, Pagbilao 2, Sta. Rita, Calaca 1, Masinloc 1 and
2 at Ilijan noong mga panahong hindi pinapatakbo ang Malampaya.
Gaya ng nabanggit na, ang mga kapitalistang nagmamay-ari ng Meralco ay
parehong mga indibidwal na nagmamay-ari rin ng mga generators. Iilang
indibidwal at organisasyon lamang ang mayroong shares sa GenCo na nagpo-prodyus
ng kuryente at sa mga distribution units tulad ng Meralco na
makikinabang sa mataas na presyo. Halos 70% ng enerhiya ng Luzon ay binibili
ng Meralco kaya sila ang isa sa susing nagtatakda ng presyo ng kuryente.
d. Bilang DU, may responsibilidad pa rin Meralco na magbigay ng tapat na
serbisyo sa konsyumer
Kahit pa sabihin na wala silang pakinabang o kikitain sa dagdag-singil, hindi pa
rin maaaring iabswelto ng Meralco ang sarili nito sa pagdadagdag sa pasaning
bayarin ng mamamayan.
Malinaw na walang pakialam ang mga generators at maging ang Meralco sa
itataas ng singil sa kuryente, dahil nga automatic pass-on naman ito sa
consumer. Kahit pa umabot sa P62/kWh ang generation charge, ipapasa lang
nila ito sa consumer. Dagdag pa, ang mataas na singil ng kuryente ay
nangangahulugan ng mataas na kita para sa Meralco.
Agham Advocates of Science and Technology for the People 35
53. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
5. Magkano ang kinikita ng Meralco bilang DU?
Kung titigan, para sa isang kumpanya na sinasabing walang pakinabang sa
pagtaas ng presyo ng kuryente, lumobo ang kita ng Meralco noong mga
nakaraang taon.
Ayon sa pagaaral ng Ibon, na mula 2008 ay tumaas ang return on equity (ROE)
at kita ng Meralco. Ang ROE ay isang sukatan ng kita ng isang kumpanya, ito
ang halaga ng netong kita na bumalik kumpara sa pinuhanan ng kanyang mga
shareholders.
Ani ng grupo, mula sa 5% noong 2008 ay umakyat ang ROE ng Meralco ng
10% noong 2009, 16% noong 2010, 20% noong 2011 at 25% noong 2012.
Dagdag pa, 56.3% ang tinaas ng kita ng Meralco noong nakaraang 6 na buwan.
Kung titignan din ang netong kita ng Meralco na P2.6 bilyon in 2008, tumaas ito
ng 6 na beses sa kita nito na P16.3 bilyon sa 2012. Para sa 2013, tinataya ng
Meralco na ang netong kita nito ay aabot sa P17.5 bilyon o 7 beses ng kita nito
noong 2008.50
6. Ano ang ginawa ng gubyerno upang pigilan ang dagdag-singil sa
kuryente?
Sabi ni Pangulong BS Aquino, walang magagawa ang gubyerno laban sa
pagtaas ng singil sa kuryente.55 Sa isang panayam, binigyan ni Aquino ng
dalawang pagpipilian ang mamamayang Pilipino: mataas na presyo ng kuryente
o walang kuryente. Ito rin ang sinabi ni Aquino hinggil sa krisis sa supply ng
kuryente sa Mindanao.56 Mula nang maupo sa pwesto, walang ginawa ang
administrasyong Aquino laban sa patuloy na pagtaas ng singil sa kuryente at sa
patuloy na pribatisasyon ng power Industry.
Agham Advocates of Science and Technology for the People 36
54. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Mula nang isabatas ang EPIRA, dumoble ang singil sa kuryente ng Meralco.
Sumirit ang singil sa kuryente mula P4.87/kWh noong 2000 tungong
P10.93/kWh ngayon. Hindi pa rito kasama ang nakaambang dagdag-singil na
napigilan ng mga kasong isinampa ng Makabayan bloc sa Korte Suprema (KS).
Noong unang lumabas ang isyu ng dagdag-singil, iminungkahi ni DOE
Secretary Petilla na gawing “staggered” o unti-untiin ang pagsingil sa mga
konsyumer sa halip na iutos na inimbestigahan ng ERC ang posibleng pang-aabuso
sa presyuhan. Inaprubahan ng ERC ang staggered rate hike nang
walang hearing. Hindi rin inimbestigahan ang kakaibang mga kaganapan na
nagdulot ng mataas na presyo ng kuryente sa WESM.
Dagdag pa sa walang ginawa ang pamhalaan, makikinabang ang gobyerno sa
P3.44/kWh increase dahil may dagdag pa itong 70 sentimos na VAT kada kWh.
Kung nakakabenta ng 2.8 billion kWh sa isang buwan ang Meralco, aabot sa
P1.96 bilyon ang kikitain ng gobyerno na VAT sa rate hike.
7. Paano napigilan ang pagtaas ng singil na ito?
Nang maglabas ang Meralco ng sulat sa ERC, inihain kaagad ng mga
kinatawan ng Bayan Muna Partylist na sina Neri Colmenares at Carlos Zarate
ang House Resolution No. 588. Inaatasan nito ang Kongreso na imbestigahan
ang napakataas na pagbabago sa singil ng kuryente. Bilang tugon,
inumpisahan ng House Committee on Energy ang imbestigasyon noong
Disyembre 10, 2013.
Naghain ng petisyon laban sa Meralco at ERC ang Makabayan Bloc na binubuo
ng Bayan Muna, Gabriela, Kabataan at ACT Teachers partylist sa KS para
hilingin ang Temporary Restraining Order (TRO) sa dagdag-singil. Naghain din
ng petisyon ang organisasyong Nasecore.
Noong Disyembre 23, nagisyu ng 60-araw na TRO ang KS kontra sa rate
Agham Advocates of Science and Technology for the People 37
55. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
hike.57 Ipinatigil ang koleksyon ng dagdag-singil ngunit marami na ang
nakapag-bayad. Hindi isinapubliko ng Meralco kung gaano na kalaki ang
nasingil nito bago ipataw ang TRO.
Kasabay ng laban sa korte ay ang kaliwa’t kanang kilos protesta na isinagawa
ng iba’t ibang progresibong grupo at mga sektor laban sa rate hike. 58
Noong Pebrero 18, pinalawig ng KS ang TRO ng karagdagang 60 araw.
Kasunod nito inutusan din ng KS na itigil pansamantala ng mga GenCos ang
pagsingil sa Meralco ng dagdag na generation costs.59
Marso 3, naglabas ng utos ang ERC na hindi ‘reasonable, rational, and
competitive' ang presyo ng WESM noong panahon ng Nobyermbre at
Disyembre 2013. Initusan naman nito ang Philippine Electricity Market Corp.
(PEMC), operator ng WESM na irecompute ang presyo sa panahaong ito.60
Ang ganitong mga pangyayari ay dulot ng tuloy tuloy na protesta ng
mamamayan at mga progresibong grupo.
8. Ano ang ugat ng dagdag singil sa kuryente?
Itinulak ng EPIRA ang pribatisasyon at deregulasyon ng power industry. Kung
saan pinaubaya nito sa mga pribadong kumpanya ang pagbibigay ng serbisyo.
Dahil sa ang tunay na interes ng mga kapitalista ay ang magkamal ng tubo,
naisasantabi ang pagbibigay ng maayos na serbisyo sa presyong makakaya ng
konsyumer.
Agham Advocates of Science and Technology for the People 38
56. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
PART 4:
Tuloy ang laban sa pagbabasura ng EPIRA at
pagsasabansa ng power industry
10. Sa loob ng 13
taon, walang mabuting
idinulot ang EPIRA sa
mamamayan.
Sa kabuuan, maituturing ang EPIRA na isa sa pinakapahirap at kontra-mamamayan
na programang neoliberal na iniwan ng kinasuklamang rehimeng
US-Arroyo. Pinaniwala noon ng rehimeng US-Arroyo ang publiko na bababa
ang singil sa kuryente, magkakaroon ng seguridad sa suplay, at mababayaran
ang lumulobong utang ng NPC.
Sa loob ng 13 taon, mabilis na sumirit pataas ang singil sa kuryente, nanatili
ang kawalan ng seguridad sa suplay, at nanatiling baon sa utang ang NPC.
Sumulpot ang bagong mga monopolyo sa enerhiya na binubuo ng mga
pinakamalaking burgesya kumprador at katuwang nilang mga dayuhang
negosyo.
11. Hindi babaguhin
ng rehimeng US-Aquino
ang
kasalukuyang
kaayusan sa power
Sa ilalim ng rehimeng US- Aquino, tila wala rin tayong maaasahang
makabuluhang pagbabago sa program sa enerhiya. Katunayan, ang
pangunahing programang pang-ekonomya ng administrasyon ni Aquino ay
public-private partnership (PPP). Wala itong ipinagkaiba sa pribatisasyon ng
kuryente na sinimulan ng mga proyektong BOT noong 1980s at 1990s at
pinatindi ng EPIRA nitong nakalipas na dekada.
Agham Advocates of Science and Technology for the People 39
57. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
industry. Ang
pangunahing
programa niyo ay
pagpapatindi pa ng
pribatisasyon.
12. Tanging ang sama
samang pagkilos ang
napatunayan na
epektibong
pamamaraan upang
pigilan ang dagdag
singil sa kuryente.
Ang pagpigil ng Korte Suprema sa nakaambang pagtataas ng singil sa kuryente
sa huling buwang ng 2013 at ang desisyon na ito na hindi makatwiran ang
inihapag na dagdag singil ng Meralco ay pagpapakita na sama-samang
pagkilos ang pangunahing sandata ng mamamayan upang sawatain ang ganid
na pagkakamal ng tubo ng mga kapitalistang nasa power industry.
Kahit pa ang naunang mga refund ng Meralco sa PPA ay ibinunga ng malawak
na pagkilos ng mamamayan noong 2004.
13. Kailangan
ipaglaban, isulong at
igiit ang pagbabasura
Sa pagtindi ng krisis pang-ekonomya at lumalalang kawalan ng trabaho at
kahirapan, lalong kailangan ang mahigpit na kontrol ng gobyerno sa power
industry. Para sa ordinaryong konsyumer, malaking bagay sa bitin na bitin nang
badyet ang abot-kayang bayarin sa kuryente. Sa kagyat ay kailangang tutulan
ang nakaambang dagdag-singil ng Meralco.
Agham Advocates of Science and Technology for the People 40
58. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
ng EPIRA at
pagsasabansa ng
industriya ng kuryente.
Kaugnay nito ay kailangang ilantad ang polisiya na nasa likod ng dagdag-singil
na ito at ang kontra-mamamayang balangkas ng kasalukuyang pamahalaan
hinggil sa power Industry.
Kailangang palitan ang kasalukuyang oryentasyon ng industriya na naniniwala
sa pribatisasyon at deregulasyon bilang pinakamahusay na paraan upang
maging maayos ang serbisyo. Dahil gaya na lang ng pinakita na epekto ng
EPIRA, walang mabuting ibinunga sa mamamayan ang ganitong polisiya at
oryentasyon.
Kontrolin at ibaba ang singil sa kuryente!
Huwag ipasa sa mamamayan ang utang ng Napocor!
Seguridad sa suplay ng kuryente, tiyakin!
Buwagin ang pribado at dayuhang monopolyo sa industriya ng kuryente!
Epira, ibasura!
Isabansa ang industriya ng kuryente!
Agham Advocates of Science and Technology for the People 41
59. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
Talaan ng sanggunian at dagdag na babasahin
Mayor na sanggunian at dagdag na babasahin
• Ever increasing rates from the EPIRA: A closer look at the electric power industry in the Philippines. AGHAM
Advocates of Science and Technology for the People. http://www.bulatlat.com/news/4-52/4-52-epira.html
• Power Failure: 10 years of EPIRA, A people’s review on the impact of the Electric Power Industry Reform Act of
2001. People Opposed to Warrantless Electricity Rates (POWER), Bagong Alyansang Makabayan (BAYAN), IBON
Foundation Inc., AGHAM Advocates of Science and Technology for the People. June 2011.
http://natoreyes.files.wordpress.com/2011/06/epira-report-final.pdf
• Power Failure: Sampung taon ng Electric Power Industry Reform Act (EPIRA). Bagong Alyansang Makabayan
(Bayan), Hunyo 2011. http://www.anakbayan.org/wp-content/uploads/2014/01/bayan-discussion-paper-sampung-taon-
ng-epira-may-2011-final-1.pdf
Hinggil sa EPIRA at kalagayan ng sektor ng kuryente sa bansa
• Republic Act No. 9136. An act ordaining reforms in the electric power industry, amending for the purpose certain
laws and for other purposes. http://www.neda.gov.ph/wp-content/uploads/2013/12/R.A.-9136.pdf
• Rules and regulations to implement republic act no. 9136, entitled "electric power industry reform act of 2001"
http://lia.erc.gov.ph/documents/65
• 22nd Electric Power Industry Reform Act Implementation Status Report (Period Covering November 2012 to April
2013). Department of Energy.
https://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/22nd_EPIRA_Status_Report_Final.pdf
Hinggil sa kalagayan ng power industry
• 2012 Power statistics. Department of Energy. https://www.doe.gov.ph/doe_files/pdf/02_Energy_Statistics/Power-
Statistics-2012.pdf
• The Energy Report Philippines: Growth and Opportunities int he Philippine Electric Power Sector. KPMG Global
Energy Institute. http://www.kpmg.com/Global/en/IssuesAndInsights/ArticlesPublications/Documents/energy-report-philippines.
pdf.
• Challenges In Pricing Electric Power Services In Selected Asean Countries Philippines. US AID. April 2013.
http://www.catif.org/wp-content/uploads/2013/10/Challenges-in-Pricing-Electric-Power-Services.pdf
Agham Advocates of Science and Technology for the People 42
60. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
1 Image source: http://eex.gov.au/files/2012/01/AEMO-Transport-of-Electricity_High-Res.jpg
2 Brain, Marshall. "How Power Grids Work" 01 April 2000. HowStuffWorks.com.
http://science.howstuffworks.com/environmental/energy/power.htm. 15 March 2014.
3 Distributed generation in Cuba. Mario Alberto Arrastía Avila. Cogeneration and On-Site Power Production november–december 2008
http://www.cubanismo.net/teksten_nl/sociaal/distri_generation.pdf
4 http://en.wikipedia.org/wiki/Meralco
5 http://www.doe.gov.ph/about-doe/who-we-are/energy-sector-milestones
6 Cham, Ma. Rowena. The Philippine power sector: Issues and solutions. June 2007.
7 Power Failure: Sampung taon ng Electric Power Industry Reform Act (EPIRA). Bagong Alyansang Makabayan (Bayan), Hunyo 2011
8 Philippine power industry restructuring and privatization. July 7, 2007. http://pcij.org/blog/wp-docs/Philippine_Power_Fact_Sheet.pdf
9 Padilla, Arnold. The role of foreign lenders, investment banks, and credit rating agencies in Philippine power sector reform. 13 June 2011.
http://arnoldpadilla.wordpress.com/2011/06/13/the-role-of-foreign-lenders-investment-banks-and-credit-rating-agencies-in-philippine-power-sector-reform.
15 March 2014.
10 Padilla, Arnold. 10 years of EPIRA: what went wrong? 6 June 2011. http://arnoldpadilla.wordpress.com/2011/06/06/10-years-of-epira-what-went-wrong/.
15 March 2014.
11 Image source: http://www.doe.gov.ph/doe_files/pdf/Researchers_Downloable_Files/EnergyPresentation/Philippine_Power_Sector.pdf
12 Rules And Regulations To Implement Republic Act No. 9136, Entitled "Electric Power Industry Reform Act Of 2001"
http://lia.erc.gov.ph/documents/65
13 Image source: http://salimbangon.systemixp.com/images/pw2.jpg
14 Image source: http://www.erc.gov.ph/admin/UploadFiles/Documents/Infographics_WESM.jpg
15 Republic Act No. 9136. An Act Ordaining Reforms In The Electric Power Industry, Amending For The Purpose Certain Laws And For Other
Purposes. http://www.neda.gov.ph/wp-content/uploads/2013/12/R.A.-9136.pdf
16 Image source: http://www.erc.gov.ph/admin/UploadFiles/Documents/ERC Primer 2011.pdf
17 Rules And Regulations To Implement Republic Act No. 9136, Entitled "Electric Power Industry Reform Act Of 2001"
http://lia.erc.gov.ph/documents/65
18 Image source: http://www.doe.gov.ph/doe_files/pdf/Researchers_Downloable_Files/Brochures/Unbundling_of_Rates.pdf
19 Image source: http://www.gmanetwork.com/news/photo/50283/what-goes-into-your-electricity-bill
20 Albert, Jose Ramon G. "What Drives Electricity Rates to Go Up, Up and Away?" NSCB. 27 September 2013.
http://www.nscb.gov.ph/sexystats/2013/SS20130927_electricity.asp. 15 March 2014.
21 Image source: http://www.erc.gov.ph/admin/UploadFiles/Documents/812_pub-unbundled.pdf
22 Image source: http://www.erc.gov.ph/admin/UploadFiles/Documents/EvolutionGRAdjmech.jpg
23 Energy Regulatory Commission. Ating Alamin ang PPA. http://www.erc.gov.ph/admin/UploadFiles/Documents/Alamin ang PPA.PDF. 15 March
2014.
24 Image source: http://www.napocor.gov.ph/index.php/universal-charge
25 Image source: http://static.rappler.com/images/energy-regional-comparison%202012-08-18.png
26 http://www.MERALCO.com.ph/pdf/rates/2014/January/01_2014_Rate_Schedule.pdf
27 International Energy Consultants. Regional Comparison of Retail Electricity Tariffs. June 2012.
Agham Advocates of Science and Technology for the People 43
61. Gabay sa Pribatisasyon ng power industry at Electric Power Industry Act of 2001 Marso 2013
http://www.MERALCO.com.ph/pdf/newsandupdates/2012/NW04812a_link.pdf.15 March 2014.
28 Anonuevo, Euan Paulo C. "PH electricity rates among 10 highest in survey of 44 countries." InterAksyon.com. 16 August 2012.
http://www.interaksyon.com/business/40664/ph-electricity-rates-among-10-highest-in-survey-of-44-countries. 15 March 2014.
33 http://www.psalm.gov.ph/liability.asp - pdp
34 PSALM’s Debt Profile. http://www.psalm.gov.ph/liability.asp - pdp.15 March 2014.
37 Gonzales, Iris. "YEARENDER: No shortage of energy woes in 2013." The Philippine Star. 28 December 2013..
http://www.philstar.com/business/2013/12/28/1272590/yearender-no-shortage-energy-woes-2013. 15 March 2014.
38 Rosauro, Ryan. "Mindanao power crisis: 2010 all over again, but with differences." Inquirer.net. 14 April 2012.
http://newsinfo.inquirer.net/176799/mindanao-power-crisis-2010-all-over-again-but-with-differences. 15 March 2014.
39 The Energy Report Philippines: Growth and Opportunities int he Philippine Electric Power Sector.
http://www.kpmg.com/Global/en/IssuesAndInsights/ArticlesPublications/Documents/energy-report-philippines.pdf.15 March 2014.
41 https://www.ngcp.ph. 15 March 2014.
42 Power Failure: 10 years of EPIRA, A people’s review on the impact of the Electric Power Industry Reform Act of 2001. People Opposed to
Warrantless Electricity Rates (POWER), Bagong Alyansang Makabayan (BAYAN), IBON Foundation Inc., AGHAM Advocates of Science and
Technology for the People. June 2011. http://natoreyes.files.wordpress.com/2011/06/epira-report-final.pdf
44 Image source: http://www.meralco.com.ph/resources/images/120413_Rel_Companies_Group_large_01.png
45 Image source: http://www.mommypracticality.com/2013/12/meralco-advisory-plus-energy-efficiency.html
46 http://www.Meralco.com.p
47 Image source: Meralco Advisory Plus Energy Efficiency Tips. December 23, 2013. http://www.mommypracticality.com/2013/12/Meralco-advisory-
plus-energy-efficiency.html
48 Meralco’s staggered rate hike OK’d By Bong Lozada, Riza Olchondra. INQUIRER.net, Philippine Daily Inquirer. 3:20 pm December 9th, 2013.
http://newsinfo.inquirer.net/543319/erc-approves-Meralcos-p2-41-power-hike-option-for-december
49 Meralco inflated charges, SC told by Buena Bernal POSTED ON 01/21/2014 6:38 PM. UPDATED 01/23/2014 8:09 AM.
http://www.rappler.com/business/industries/173-power-and-energy/48556-Meralco-hike-supreme-court-oral-arguments
50 Ibon. "Meralco profitability soaring amid rising power rates--IBON." 22 January 2014. http://ibon.org/ibon_articles.P?id=362. 15 March 2014.
55 Ubac, Michael Lim. "Aquino says he has no power to stop power rate hike." Philippine Daily Inquirer. 14 December 2013.
http://newsinfo.inquirer.net/546365/aquino-says-he-has-no-power-to-stop-power-rate-hike. 15 March 2014.
56 Burgonio, TJ. "Aquino: Higher Mindanao power rates inevitable." Philippine Daily Inquirer. 27 March 2013.
http://newsinfo.inquirer.net/380609/aquino-higher-mindanao-power-rates-inevitable. 15 March 2014.
57 Diola , Camille. "SC halts Meralco rate hike." Philstar.com. 23 December 2013. http://www.philstar.com/headlines/2013/12/23/1271382/sc-halts-
Meralco-rate-hike. 15 March 2014.
58 Arkibong Bayan. "The people vs the conspiracy of the power cartel and government bureaucrat-capitalists Protesting the P4.15/kwh increase in
electricity rates. January 21, 2014." http://www.arkibongbayan.org/2014/2014-01Jan21-vsMeralcoRatesHike/VsPowerHike2.htm. 15 March 2014.
59 Avendaño, Christine O. "60-day extension of TRO on power rate." Philippine Daily Inquirer. 19 February 2014.
http://newsinfo.inquirer.net/578979/sc-extends-tro-on-Meralco-power-rate-hike-by-60-days-until-apr-22
60 Salaverria, Leila B. "Meralco ready to refund excess charges." Philippine Daily Inquirer. 13 March 2014.
http://business.inquirer.net/166005/Meralco-to-refund-excess-after-erc-orders-re-computation-of-spot-market-power-rates.15 March 2014.
Agham Advocates of Science and Technology for the People 44
62. AGHAM Advocates of Science and Technology for the People!
Address: 279-B Scout Fuentebella St. Brgy. Sacred Heart, Kamuning, Quezon City!
Telephone: +632 998 4226 !
E-mail: agham.national@gmail.com !
www.agham.org!