Case Study
Fuel Terminal Decommission
Decommission
The Challenge
The main challenge was ensuring the site was safe to work in
which required the removal of any remaining fuel from site.
As the site was situated on a waterway, we also needed to ensure
no contamination occurred.
Due to the area being hazardous, CompEx electricians ensured
that the site was safe, and free of live cables or other hazards.
We also had a number of operators with confined space
certification to carry out the tank cleaning.
The client, a large forecourt operator, approached us
about the demolition of one of their assets.
Decommission
Our Response
Due to the area being hazardous, CompEx electricians first ensured
that the site was safe, and free of live cables or other hazards. The
first phase was to remove all the residual fuel from the site, and carry
out all the tank cleaning with confined space certified operators.
Each tank had different fuels, including petrol, diesel and kerosene,
and were capable of holding around five million litres of product. We
drained all the tanks, took the fuel off site and then did a man-entry
clean on each tank to ensure they were gas-free and ready for
demolition.
The second phase was to dismantle the pipework and structures.
There was still about 20,000 litres of fuel in the pipes that needed to
be removed before this could happen. In order to do this, all the
valves were dropped and each area was sucked out, once the fuel
was removed, we used gas monitoring wands to ensure there was no
gas left inside. This was done a few weeks before the demolition
started to allow any residual vapours to vent away.
In phase three we broke up the concrete and excavated the site. We
also undertook ground testing and sampling to make sure there was
no contamination.
The fourth phase was to remove all the pipe work from under the
jetty, grade the site, remove the remaining buildings, carry out final
soil testing before handing the site back to the client.
Decommission
The Outcome
Decommission
The project was completed on time and on budget, safely
and compliantly.
We removed and disposed of all the waste liquid fuel, and
managed the demolition of the physical assets.
Our teams of highly qualified consultants and ecologists
supported in the remediation of any contamination in the
land, allowing it to be handed over primed and ready for
redevelopment.
What The Client Said
Decommission
The decommissioning of the fuel terminal is one of the most
significant projects we have undertaken. Adler and Allan
were selected based on their excellent safety record and
historic quality of service delivery. Their ability to provide in-
house expertise across multiple disciplines was reflected in
their highly competitive costs.
Infrastructure Manager (Health & Safety)
The Adler and Allan Difference
Adler and Allan has been a one stop shop from arranging the risk
assessments and method statements at the start, right through to
handing the land back to the client at the end of the project.
Our in-house expertise has seen us deliver services from gas
freeing and removal of fuel from the site, to CompEx electricians
removing the electricals in hazardous areas, teams of highly
qualified consultants and ecologists supporting in the remediation
of contaminated land, and ultimately demolition.
We have a wide range of assets at our disposal from vacuum and
fuel tankers for fuel removal, and demolition equipment for the
breakdown of the tanks.
We also have the infrastructure to get our people wherever they
are needed, with depots and equipment nationwide.
Decommission

More Related Content

Similar to Fuel terminal decommission

CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
Mujahid Ali Akhtar
 
Baker Corp Product Information
Baker Corp Product InformationBaker Corp Product Information
Baker Corp Product Information
Brian Doughty
 
Forecourt PPM case study
Forecourt PPM case studyForecourt PPM case study
Forecourt PPM case study
Jen Patterson
 
Abfad Ltd General Services Presentation
Abfad Ltd General Services PresentationAbfad Ltd General Services Presentation
Abfad Ltd General Services Presentation
Abfad Limited
 
Reed Smith EME Environmental Law Services
Reed Smith EME Environmental Law ServicesReed Smith EME Environmental Law Services
Reed Smith EME Environmental Law ServicesAdam Hedley
 
Vacuum Tanker Vancouver
Vacuum Tanker VancouverVacuum Tanker Vancouver
Vacuum Tanker Vancouver
mcraesenviro01
 
G & M Tex Brochure
G & M Tex Brochure G & M Tex Brochure
G & M Tex Brochure
gmtex
 
Power sweeping services
Power sweeping servicesPower sweeping services
Power sweeping services
mcraesenviro
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen PresentationGeorge Duncan
 
Hotel in Knightsbridge
Hotel in Knightsbridge Hotel in Knightsbridge
Hotel in Knightsbridge
Jan Alvino
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy CleaningAaron Chapman
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy CleaningBen Urry
 
InterMarine Brochure SHIPPING
InterMarine Brochure SHIPPINGInterMarine Brochure SHIPPING
InterMarine Brochure SHIPPINGKevin Mcgarry
 
TRL_A4brochure_CP
TRL_A4brochure_CPTRL_A4brochure_CP
TRL_A4brochure_CPPeter Hale
 
SHC Latest Statement Of Qualifications
SHC Latest Statement Of QualificationsSHC Latest Statement Of Qualifications
SHC Latest Statement Of Qualifications
Graham Fraser SHC Marketing Manager
 
Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014
Chris Haritou
 
Abfad ltd company profile november 2014
Abfad ltd company profile november 2014Abfad ltd company profile november 2014
Abfad ltd company profile november 2014
Chris Haritou
 
Organisational Capacity
Organisational CapacityOrganisational Capacity
Organisational CapacityDean Singleton
 
Spill Chek pp
Spill Chek ppSpill Chek pp
Spill Chek pp
Barbara Ackles
 

Similar to Fuel terminal decommission (20)

CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Baker Corp Product Information
Baker Corp Product InformationBaker Corp Product Information
Baker Corp Product Information
 
Forecourt PPM case study
Forecourt PPM case studyForecourt PPM case study
Forecourt PPM case study
 
Abfad Ltd General Services Presentation
Abfad Ltd General Services PresentationAbfad Ltd General Services Presentation
Abfad Ltd General Services Presentation
 
Reed Smith EME Environmental Law Services
Reed Smith EME Environmental Law ServicesReed Smith EME Environmental Law Services
Reed Smith EME Environmental Law Services
 
Vacuum Tanker Vancouver
Vacuum Tanker VancouverVacuum Tanker Vancouver
Vacuum Tanker Vancouver
 
G & M Tex Brochure
G & M Tex Brochure G & M Tex Brochure
G & M Tex Brochure
 
Power sweeping services
Power sweeping servicesPower sweeping services
Power sweeping services
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen Presentation
 
Hotel in Knightsbridge
Hotel in Knightsbridge Hotel in Knightsbridge
Hotel in Knightsbridge
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy Cleaning
 
Colt Construction Canopy Cleaning
Colt Construction Canopy CleaningColt Construction Canopy Cleaning
Colt Construction Canopy Cleaning
 
InterMarine Brochure SHIPPING
InterMarine Brochure SHIPPINGInterMarine Brochure SHIPPING
InterMarine Brochure SHIPPING
 
TRL_A4brochure_CP
TRL_A4brochure_CPTRL_A4brochure_CP
TRL_A4brochure_CP
 
SHC Latest Statement Of Qualifications
SHC Latest Statement Of QualificationsSHC Latest Statement Of Qualifications
SHC Latest Statement Of Qualifications
 
Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014
 
Abfad ltd company profile november 2014
Abfad ltd company profile november 2014Abfad ltd company profile november 2014
Abfad ltd company profile november 2014
 
Organisational Capacity
Organisational CapacityOrganisational Capacity
Organisational Capacity
 
Spill Chek pp
Spill Chek ppSpill Chek pp
Spill Chek pp
 

Recently uploaded

一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

Fuel terminal decommission

  • 1. Case Study Fuel Terminal Decommission Decommission
  • 2. The Challenge The main challenge was ensuring the site was safe to work in which required the removal of any remaining fuel from site. As the site was situated on a waterway, we also needed to ensure no contamination occurred. Due to the area being hazardous, CompEx electricians ensured that the site was safe, and free of live cables or other hazards. We also had a number of operators with confined space certification to carry out the tank cleaning. The client, a large forecourt operator, approached us about the demolition of one of their assets. Decommission
  • 3. Our Response Due to the area being hazardous, CompEx electricians first ensured that the site was safe, and free of live cables or other hazards. The first phase was to remove all the residual fuel from the site, and carry out all the tank cleaning with confined space certified operators. Each tank had different fuels, including petrol, diesel and kerosene, and were capable of holding around five million litres of product. We drained all the tanks, took the fuel off site and then did a man-entry clean on each tank to ensure they were gas-free and ready for demolition. The second phase was to dismantle the pipework and structures. There was still about 20,000 litres of fuel in the pipes that needed to be removed before this could happen. In order to do this, all the valves were dropped and each area was sucked out, once the fuel was removed, we used gas monitoring wands to ensure there was no gas left inside. This was done a few weeks before the demolition started to allow any residual vapours to vent away. In phase three we broke up the concrete and excavated the site. We also undertook ground testing and sampling to make sure there was no contamination. The fourth phase was to remove all the pipe work from under the jetty, grade the site, remove the remaining buildings, carry out final soil testing before handing the site back to the client. Decommission
  • 4. The Outcome Decommission The project was completed on time and on budget, safely and compliantly. We removed and disposed of all the waste liquid fuel, and managed the demolition of the physical assets. Our teams of highly qualified consultants and ecologists supported in the remediation of any contamination in the land, allowing it to be handed over primed and ready for redevelopment.
  • 5. What The Client Said Decommission The decommissioning of the fuel terminal is one of the most significant projects we have undertaken. Adler and Allan were selected based on their excellent safety record and historic quality of service delivery. Their ability to provide in- house expertise across multiple disciplines was reflected in their highly competitive costs. Infrastructure Manager (Health & Safety)
  • 6. The Adler and Allan Difference Adler and Allan has been a one stop shop from arranging the risk assessments and method statements at the start, right through to handing the land back to the client at the end of the project. Our in-house expertise has seen us deliver services from gas freeing and removal of fuel from the site, to CompEx electricians removing the electricals in hazardous areas, teams of highly qualified consultants and ecologists supporting in the remediation of contaminated land, and ultimately demolition. We have a wide range of assets at our disposal from vacuum and fuel tankers for fuel removal, and demolition equipment for the breakdown of the tanks. We also have the infrastructure to get our people wherever they are needed, with depots and equipment nationwide. Decommission