Optimizing completions in deviated and extended reach wells is a key to safe drilling and optimum
production, particularly in complex terrain and formations. This work summarizes the systematic methodology
and engineering process employed to identify and refine the highly effective completions solution used in ERW
completion system and install highly productive and robust hard wares in horizontal and Extended Reach Wells
for Oil and Gas. A case study of an offshore project was presented and discussed. The unique completion design,
pre-project evaluation and the integrated effort undertaken to firstly, minimize completion and formation damage.
Secondly, maximize gravel placement and sand control method .Thirdly, to maximize filter cake removal
efficiencies. The importance of completions technologies was identified and a robust tool was developed .More
importantly, the ways of deploying these tools to achieve optimal performance in ERW’s completions was done.
The application of the whole system will allow existing constraints to be challenged and overcome successfully;
these achievements was possible, by applying sound practical engineering principle and continuous optimization,
with respect to the rig and environmental limitation space and rig capacity.
Keywords: Well Completions , Deviated and Extended Rearch Wells , Optimization
Sediment deposition in koyna reservoir by integrated bathymetric surveyeSAT Journals
Abstract In southern part of India, most of the precipitation occurs due to south-west monsoon during the months of June to September. Storage reservoirs are constructed to store the run-off volume and utilize it for long term requirements in the command such as irrigation, power generation, domestic water supply etc. The sediment deposition in the reservoir is a continuous and complex process. Sediment in a river which originates from the land erosion process in the catchment is propagated along with the river flow and finally gets deposited in the reservoir. This has adverse effect such as reduction in storage capacity and increase in backwater levels. For the long term and yearly planning of efficient utilization of reservoir capacity, estimation of sediment deposit is not only sufficient but also estimation of trapped sediment at different levels in the reservoir is required. Differential Global Positioning System (DGPS) based Integrated Bathymetric Survey System for hydrographic survey is used for estimation of sediment deposition pattern in the Koyna reservoir. In this method three or more satellite based GPS receivers are used in differential mode for positioning. Ecosounder is used for depth measurements. GPS reference receiver is located at a known latitude and longitude position and GPS mobile receiver is located on the survey boat. Both the GPS operate in differential mode through a communication link. From this study (2004) it is observed that sedimentation rate in Koyna reservoir is more than 6.5 Ham/100 sq.km/year anticipated in 1949. Key Words: reservoir, sedimentation, Bathymetric Survey, hydrographic, GPS
It describe how to build a modelling solution with the Simple Water Budget component of JGrass-NewAGE. Se the companion documentation regarding the component itself
Sensors being provided for Bardhaman Bridge health monitoringRajesh Prasad
For monitoring of the structural health of the bridge during its service life, 6 nos. sensors have been installed on the stay cables subjected to maximum loads.
Ultra-HPHT perforating system opens access to untapped reservoirs Baker Hughes
By Charlie McClean, Bill Myers, Didhiti
Talapatra, Mark Sloan and Stephen
Zuklic, Baker Hughes
Originally appeared in World Oil® SEPTEMBER 2014 issue, pgs 45-49. Posted with permission.
Chris Carpenter, JPT Technology Editor
JPT, October 2014 Issue
Copyright 2014, Society of Petroleum Engineers. Reprinted from the Journal of Petroleum Technology with permission.
Optimizing completions in deviated and extended reach wells is a key to safe drilling and optimum
production, particularly in complex terrain and formations. This work summarizes the systematic methodology
and engineering process employed to identify and refine the highly effective completions solution used in ERW
completion system and install highly productive and robust hard wares in horizontal and Extended Reach Wells
for Oil and Gas. A case study of an offshore project was presented and discussed. The unique completion design,
pre-project evaluation and the integrated effort undertaken to firstly, minimize completion and formation damage.
Secondly, maximize gravel placement and sand control method .Thirdly, to maximize filter cake removal
efficiencies. The importance of completions technologies was identified and a robust tool was developed .More
importantly, the ways of deploying these tools to achieve optimal performance in ERW’s completions was done.
The application of the whole system will allow existing constraints to be challenged and overcome successfully;
these achievements was possible, by applying sound practical engineering principle and continuous optimization,
with respect to the rig and environmental limitation space and rig capacity.
Keywords: Well Completions , Deviated and Extended Rearch Wells , Optimization
Sediment deposition in koyna reservoir by integrated bathymetric surveyeSAT Journals
Abstract In southern part of India, most of the precipitation occurs due to south-west monsoon during the months of June to September. Storage reservoirs are constructed to store the run-off volume and utilize it for long term requirements in the command such as irrigation, power generation, domestic water supply etc. The sediment deposition in the reservoir is a continuous and complex process. Sediment in a river which originates from the land erosion process in the catchment is propagated along with the river flow and finally gets deposited in the reservoir. This has adverse effect such as reduction in storage capacity and increase in backwater levels. For the long term and yearly planning of efficient utilization of reservoir capacity, estimation of sediment deposit is not only sufficient but also estimation of trapped sediment at different levels in the reservoir is required. Differential Global Positioning System (DGPS) based Integrated Bathymetric Survey System for hydrographic survey is used for estimation of sediment deposition pattern in the Koyna reservoir. In this method three or more satellite based GPS receivers are used in differential mode for positioning. Ecosounder is used for depth measurements. GPS reference receiver is located at a known latitude and longitude position and GPS mobile receiver is located on the survey boat. Both the GPS operate in differential mode through a communication link. From this study (2004) it is observed that sedimentation rate in Koyna reservoir is more than 6.5 Ham/100 sq.km/year anticipated in 1949. Key Words: reservoir, sedimentation, Bathymetric Survey, hydrographic, GPS
It describe how to build a modelling solution with the Simple Water Budget component of JGrass-NewAGE. Se the companion documentation regarding the component itself
Sensors being provided for Bardhaman Bridge health monitoringRajesh Prasad
For monitoring of the structural health of the bridge during its service life, 6 nos. sensors have been installed on the stay cables subjected to maximum loads.
Ultra-HPHT perforating system opens access to untapped reservoirs Baker Hughes
By Charlie McClean, Bill Myers, Didhiti
Talapatra, Mark Sloan and Stephen
Zuklic, Baker Hughes
Originally appeared in World Oil® SEPTEMBER 2014 issue, pgs 45-49. Posted with permission.
Chris Carpenter, JPT Technology Editor
JPT, October 2014 Issue
Copyright 2014, Society of Petroleum Engineers. Reprinted from the Journal of Petroleum Technology with permission.
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage WellsBaker Hughes
Shaelyn Gordon, Adriana Hightower, SPE
Nadine Macklin, Baker Hughes
Copyright 2014, Society of Petroleum Engineers. Reprinted from the Journal of Petroleum Technology with permission.
Baker Hughes introduces the Cut-and-Pull Spear technology as featured in the ...Baker Hughes
Baker Hughes introduces the Harpoon Cut-and-Pull Spear technology as featured in the Technology Applications section of JPT’s April issue. The Cut-and-Pull Spear eliminates multiple trips and has added safety features.
Baker Hughes introduces the Hughes Christensen IRev infinite-revolution bit a...Baker Hughes
The new Hughes Christensen IRev infinite-revolution bit improves run life while minimizing trips and the number of bits required when drilling in hard and abrasive intervals, including sandstones or complex sections interbedded with softer shales. Learn more: http://bit.ly/IRevBits
January 2014 Journal of Petroleum Technology Article: Electrical Submersible ...Baker Hughes
Read Chris Carpenter's, JPT Technology Editor, article on our new ProductionWave solution that provides flexible production alternatives for unconventional oil plays.
March 2014 World Oil: Greener completions advance in the MarcellusBaker Hughes
Cabot Oil & Gas Corporation, a Baker Hughes customer operating in the Marcellus shale play in Susquehanna County, Pennsylvania, wanted to improve the overall efficiency of its hydraulic fracturing operations while minimizing air emissions; reducing road traffic; and lowering health, safety, and environmental (HSE) risks. Baker Hughes proposed a Bifuel fracturing service, using the company's Rhino™ Bifuel frac pumps. Visit our website to learn more: http://www.bakerhughes.com/bifuel.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Fracture-Analysis Service
1. TECHNOLOGY APPLICATIONS
Chris Carpenter, JPT Technology Editor
Fracture-Analysis Service
Baker Hughes introduced its Stage-
Watch fracture-analysis service to col-lect
the sound reservoir data needed to
guide future drilling, perforating, frac-turing,
and completion programs. The
data enable proper planning for future
wells, effective refracturing strategies,
and data-driven completion designs
that increase production and ultimate
recovery. To obtain these data, pres-sure
and temperature gauges are insert-ed
into purpose-built sleeves, which are
deployed as part of the casing string
(Fig. 7). The StageWatch system was
designed to allow flexibility of sleeve
placement so that data could be captured
from multiple zones in the wellbore
without modifying the existing casing
program. To retrieve the gauges after the
job is completed, a bottomhole assem-bly
(BHA) comprising a circulation sub,
a recovery basket, and a shifting tool is
run downhole on coiled tubing. The dogs
on the shifting tool engage the sleeve
Fig. 7—Baker Hughes’ StageWatch fracture-analysis service allows flexible
sleeve placement.
and shift it open, releasing the gauges
into the annulus. The gauges are caught
in the basket, and the BHA is pulled
out of the hole to the next sleeve. The
BHA collects all of the memory gauges
in a single trip, providing an efficient
retrieval process. These data are then
interpreted by an engineer to provide
data administration and fracture, pro-duction,
and reservoir characterization,
enabling more-effective
future fractur-ing
programs. JPT
◗◗For additional information, visit
www.bakerhughes.com.
Copyright 2014, Society of Petroleum Engineers. Reprinted from the Journal of Petroleum Technology with permission.
26 JPT • SEPTEMBER 2014