SlideShare a Scribd company logo
Enabling Operational
Excellence in FPSO
Patrick Deruytter,General Manager
Emerson Process Management Korea
16-Sep-2008
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 2
FPSO Challenges/Global Market Trend
 New generation of highly complex vessels/plants
• New builds and conversions
 End-user Requirement
• Full Integration of all systems
– Navigation + IAS + CTS + Other
• Fast Track delivery
• Highly reliable and easy to maintain
 Customer Requirement (Shipyard)
• Integrated engineering and implementation (flexibility)
• Reduce Manufacturing cost
• Fast Track delivery
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 3
FPSO Project Trends
 One Stop Solution for Project Implementation
 Referenced on preferred vendor list to major shipyard as total
solution supplier
– Deliver tangible project life cycle savings to the shipyards
– Deliver a total automation integration
• From Propulsion to Sensors following the latest standards in Automation and
Marine
 User Choice System (flexibility)
– Cargo Part : Cargo handling, Ballast, VRCS, CTS with Transmitter.
– Mach. Part : Engine, PMS, Machinery control system with Transmitter
– New Tech. : Re-liquefaction system, Re-Gasification system etc.
 Improve the Operational Excellence of a Ship Operation
– Efficient, Predictable and Intuitive Operations, Maintenance & Support
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 4
Emerson Process Management
Total Solutions Strategy
Best-in-class Technologies
PlantWeb
Global Industry Services
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 5
Meeting the Challenges in Offshore Production
– Unique enabling technology to maximize production
– Remote monitoring and optimizing of process
equipment for health index and remote assistance
– Solution ready for existing challenges and regulatory
compliance requirements
– Highly flexible to enable fast track conversion projects
– Onboard manning and qualification requirements
– Intelligent solution to minimize necessary manning
Our architecture and application tailor made for FPSO
will bring the onboard crew and the spesialists closer together
Enabling
Technology
Maximum
up-time wherever
in the world
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 6
Emerson Wide Breadth/Depth of
Products, Solutions & Services
• Asset Management Systems
• Instrument and Valve Services
• Equipment and Plant Optimization
• Electrical Reliability Services
• Consulting
• Training
• Control Valves
• Regulators
• Valve Actuators
• Valve Instruments
Measurement
Valves & Regulators
Systems & Solutions
Asset Optimization
• Pressure
• Temperature
• Level
• Flow
• pH
• Conductivity
• Gas Composition
• Control Systems
• Turnkey Project Capability
• Engineering Design
• Industry Centers
• Chemical
• Oil & Gas
• Refining
• Power & Water
• Life Sciences
• Metals & Mining
• Pulp & Paper
• Marine
6
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 7
Emerson Marine Offshore Solution
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 8
Emerson Process Management offers One Window into all
process onboard, which makes the operation of a Offshore
Production Units more reliable and easier for onboard staff
than ever before. Add the AMSTM Suite, and you have
predictive diagnostic for detection of potential problems.
• Generators
• Separators & Treatment
• Reinjections
• Compressors
• Auxilliary Systems
• Oil/Gas Fiscal Metering
• Offloading
Oil/Gas Production
• Manifold & Subsea Valves
• Monitoring & Control
Subsea Control
• Vessel ESD/F & G System
• Oil/Gas ESD/F & G System
Safety
• Ballast/Bunker Control
• Oil Storage Monitoring
& Control
• Offloading
• Power Management
• Auxilliary Control
• Tank Washing
Vessel Automation
AMS
Predictive Maintenance
System for Machinary,
Equipment and
Instrumentation
One Window into the entire on board
processes
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 9
Cargo
• Cargo loading/offloading
• Control
• Boil of Gas (BOG) Control
• LD/HD Gas Compressor
Control
• Cargo Monitoring
• Load and Stability Calculator
FPSO Engine room Integrated Monitoring and
Control
Machinery
• Main Boilers monitoring and
Control
• Power Management
• Main/AUX Turbine Monitoring
• Auxiliary machinery Monitoring
and Control
• Bunkers Machinery and Control
• UMS/EO Monitoring functions
Onboard applications integrated
into Delta V Automation Systems
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 10
Project Execution Strategy
Real distribution of Power, Control and Safety
functions
Modularized Controls
 Installation cost saving
 Safer design
 Easier to test
One Window
 Oil and gas production
 Vessel automation
 Power management
 Subsea control
 Drilling
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 11
17-moduls+hull
FPSO Module Arrangement, a challenge for
Automation, Safety and Instrumentation
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 12
9327-23368
Marine Automation
Process Automation
Control Room
Distribute the Automation System close to the
Process
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 13
Centralized ESD and F&G
All Installation ,cable pulling and testing take place at the Yard
We are lifting the ESD and F&G a step further in
Offshore
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 14
We build equipment into the Skid/ Modules and do
commissioning Locally
•ON YARD;
Hook up ready tested
module to the overall
network
•Saving
Installation
time, testing
and cable coat
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 15
A full distribuated safety system on separate net
Emerson ESD and Fire & Gas System is
approved for Decentralized installation
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 16
We provide a real distribuated Smart Integrated
Control and Safety System onboard
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 17
One view into all processes onboard
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 18
Comparing the centristic with a
distributed modular approach
Central Control Room
 large control room
 miles of cables
 weight of cables
Remote I/O & Control
Stations
 small control room
 short cable runs
 modular design (pre-
assemble, pre-test)
Central
control
room
Central
control
room
field instrument remote I/O & control station
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 19
Remote I/O & Control Station
One cabinet per process module
with
 PCS (DeltaV)
 PSD (DeltaV SIS)
 AC/DC power supplies
– separate for PCS and PSD
– circuit breakers
 fiber optic connectivity
– fiber optic switches
– patch panel
 illumination for the cabinet
Central
control
room
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 20
Type Approved Systems and fit for Offshore
environments
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 21
9375-23586
Wireless Process Automation,
Hardwired Safety
Wireless Process Automation,
Hardwired Safety
Wireless Automation,
Hardwired Safety
Wireless Process Automation,
Hardwired Safety
Redundant Wireless Process
Automation,
Hardwired Safety
Redundant Wireless Process
Automation,
Hardwired Safety
Hardwired Process Automation
and Safety
Bridge
Additional Options for Smart Plants
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 22
9375-23642
Wireless Signal Distribution inside Power
Module
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 23
Customers Are Solving Real Plant
Problems: StatoilHydro Grane Platform
 Application: Monitor wellhead annular pressure and
heat exchanger pressures
 Smart Wireless delivered 100% reliability & stability
in the crowded metal wellhead environment
 Easy integration of wireless data into third party
system
 Customer identified operational improvements as a
result of increased process visibility
– Wireless solution eliminates the need for daily visits
to the wellhead to manually record gauge readings
– Continuous monitoring enables unusual readings to
be identified earlier
“ We are delighted with the performance of the Emerson Smart Wireless network in these
challenging conditions. Following a short training programme, our instrument engineers are very
confident about adding more wireless devices to our installation as required. These typically take
around two hours to install compared with up to two days for a conventional wired unit.”
— Geir Leon Vadheim, Instrument Lead, Grane Platform
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 24
...onboard anywhere at any time without physically being there
Shore Office Remote Office
Operating Centre Tecnical Staff System Expert
Process Expert
Remote Assistance & Operations Support
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 25
DeltaV Remote Client
Remote
Client
Server
DeltaV Remote Client makes a
thin client connection to a host
server on the DeltaV LAN
• Provides fully functional
operate and engineering
capability
• Supports LAN, Wireless,
satellite and dial-up modem
communications
DeltaV
Remote Client
DeltaV
LAN
Emerson Confidential
Emerson Process Management Overview
Revised 7-Nov 2006, Slide 26
Recently Realized FPSO Projects
International Offshore Oil & Gas reference with ICSS (SAS) delivery
Company Installation Category Engineering AMS
Control
System
Safety
system
Inst &
Valves
BP B 18 Greater Plutonio FPSO YES YES YES YES YES
Total Akpo FPSO YES YES YES YES YES
ExxonMobil Kizomba A FPSO YES YES YES YES YES
ExxonMobil Kizomba B FPSO YES YES YES YES YES
ExxonMobil Yoho FSO YES YES YES YES
Vaalco Gabon Vaalco FPSO YES YES YES YES
Dominion Devil's Tower Spar YES YES YES Unknown
Murphy Medusa Spar YES YES YES Unknown
Murphy Front Runner Spar YES YES YES Unknown
BWO / Pemex(Norway) Yuum k'ak naab FPSO YES YES YES Unknown
Petrojarl / Petrobras (Norway) Siri FPSO YES YES YES Unknown
Petrobra DPI (Norway) Pipa2 Vessel(FPSO) YES YES YES YES YES
Murphy Thunderhorse TLP YES YES YES YES YES
Bluewater Uisge GOM FPSO YES YES YES YES
Bluewater Glas Dowr FPSO YES YES YES YES
Amerada Hess Triton FPSO YES
ConocoPhillips Bohai Bay Ph2 FPSO YES YES YES
CNOOC West Nanhai 13-1 FPSO YES YES YES
CNOOC West Nanhai 13-2 FPSO YES YES YES
CNOOC West Nanhai 13-2 FPSO YES YES YES
Sea Production (Norway) Front Puffin FPSO YES YES YES YES
Global Process System / Tanker Pacific Coogee Montara FPSO YES YES YES YES YES
Teekay Petrojarl Che Guevara FPSO FPSO YES YES YES YES YES
Petrojarl Petrojarl 1 FPSO FPSO YES YES
Bergesen World-Wide Offshore Berge Entreprise, FPSO FPSO YES YES YES YES YES
Grenland Group ( Topside, BWO) Berge Entreprise, FPSO FPSO YES YES YES YES YES
Sea Production (Frontline) Front Puffin, FPSO FPSO YES YES YES YES YES
Multi Purpose Floater Corp. MPF-1 Drill & FPSO Vessel (drill) YES YES YES YES YES
Europe
Europe
Europe
Europe
Europe
Australia
Asia
Americas
Europe
Australia
Asia
Asia
Asia
World Area
West Africa
West Africa
West Africa
West Africa
West Africa
Americas
West Africa
Americas
North Sea
North Sea
Americas
Americas
Americas
North Sea
Americas
A Digital Production
Unit is a Smart
Production Unit
Thank You

More Related Content

Similar to FPSOOverviewPatrickDeruytter.pdf

Pro sphere customer technical
Pro sphere customer technicalPro sphere customer technical
Pro sphere customer technical
solarisyougood
 
201105 ureason introduction
201105 ureason introduction201105 ureason introduction
201105 ureason introduction
UReasonChannel
 
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
Schneider Electric
 
Altivar process, service oriented drive
Altivar process, service oriented drive Altivar process, service oriented drive
Altivar process, service oriented drive
Angela Micocci
 
Industrial Sales Presentation
Industrial Sales PresentationIndustrial Sales Presentation
Industrial Sales Presentation
ExpertsLogicTechnolo
 
Nidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applications
Nidec Corporation
 
PLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIES
PLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIESPLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIES
PLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIES
Messung Industrial Automation & Controls
 
Emerson converged infrastructure (thermal-power-mgt.-security (gs)
Emerson   converged infrastructure (thermal-power-mgt.-security (gs)Emerson   converged infrastructure (thermal-power-mgt.-security (gs)
Emerson converged infrastructure (thermal-power-mgt.-security (gs)
Greg Stover
 
Fieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying FieldbusFieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying Fieldbus
Emerson Exchange
 
Custom Modular Extrusion
Custom Modular ExtrusionCustom Modular Extrusion
Custom Modular Extrusion
Jeff West
 
Power path viewer_technical_presentation
Power path viewer_technical_presentationPower path viewer_technical_presentation
Power path viewer_technical_presentation
xKinAnx
 
Siemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocodeSiemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocode
Dien Ha The
 
Moore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineMoore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineGabriel van der Merwe
 
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas OffshoreVEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
Thorne & Derrick UK
 
Fieldbus Tutorial Part 3 - Example Applications
Fieldbus Tutorial Part 3  - Example ApplicationsFieldbus Tutorial Part 3  - Example Applications
Fieldbus Tutorial Part 3 - Example Applications
Emerson Exchange
 
Fieldbus tutorial part 3 example applications
Fieldbus tutorial part 3   example applicationsFieldbus tutorial part 3   example applications
Fieldbus tutorial part 3 example applicationsEmerson Exchange
 
Richmond Engineering Brochure
Richmond Engineering BrochureRichmond Engineering Brochure
Richmond Engineering Brochure
RichmondEngineering1601
 

Similar to FPSOOverviewPatrickDeruytter.pdf (20)

Pro sphere customer technical
Pro sphere customer technicalPro sphere customer technical
Pro sphere customer technical
 
201105 ureason introduction
201105 ureason introduction201105 ureason introduction
201105 ureason introduction
 
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
The Challenges and Solutions to Integrate Multi-Facility/Buildings Disparate ...
 
Altivar process, service oriented drive
Altivar process, service oriented drive Altivar process, service oriented drive
Altivar process, service oriented drive
 
Industrial Sales Presentation
Industrial Sales PresentationIndustrial Sales Presentation
Industrial Sales Presentation
 
iab-suc-prosafe-en
iab-suc-prosafe-eniab-suc-prosafe-en
iab-suc-prosafe-en
 
aci.online
aci.onlineaci.online
aci.online
 
Nidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applications
 
PLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIES
PLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIESPLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIES
PLYWOOD MANUFACTURING PLANT AUTOMATION WITH MESSUNG'S NX-ERA SERIES
 
Emerson converged infrastructure (thermal-power-mgt.-security (gs)
Emerson   converged infrastructure (thermal-power-mgt.-security (gs)Emerson   converged infrastructure (thermal-power-mgt.-security (gs)
Emerson converged infrastructure (thermal-power-mgt.-security (gs)
 
Fieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying FieldbusFieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying Fieldbus
 
Custom Modular Extrusion
Custom Modular ExtrusionCustom Modular Extrusion
Custom Modular Extrusion
 
Power path viewer_technical_presentation
Power path viewer_technical_presentationPower path viewer_technical_presentation
Power path viewer_technical_presentation
 
scada
scadascada
scada
 
Siemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocodeSiemens catalog tong hop 3 uf simocode
Siemens catalog tong hop 3 uf simocode
 
Moore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineMoore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - online
 
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas OffshoreVEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
 
Fieldbus Tutorial Part 3 - Example Applications
Fieldbus Tutorial Part 3  - Example ApplicationsFieldbus Tutorial Part 3  - Example Applications
Fieldbus Tutorial Part 3 - Example Applications
 
Fieldbus tutorial part 3 example applications
Fieldbus tutorial part 3   example applicationsFieldbus tutorial part 3   example applications
Fieldbus tutorial part 3 example applications
 
Richmond Engineering Brochure
Richmond Engineering BrochureRichmond Engineering Brochure
Richmond Engineering Brochure
 

Recently uploaded

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

FPSOOverviewPatrickDeruytter.pdf

  • 1. Enabling Operational Excellence in FPSO Patrick Deruytter,General Manager Emerson Process Management Korea 16-Sep-2008
  • 2. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 2 FPSO Challenges/Global Market Trend  New generation of highly complex vessels/plants • New builds and conversions  End-user Requirement • Full Integration of all systems – Navigation + IAS + CTS + Other • Fast Track delivery • Highly reliable and easy to maintain  Customer Requirement (Shipyard) • Integrated engineering and implementation (flexibility) • Reduce Manufacturing cost • Fast Track delivery
  • 3. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 3 FPSO Project Trends  One Stop Solution for Project Implementation  Referenced on preferred vendor list to major shipyard as total solution supplier – Deliver tangible project life cycle savings to the shipyards – Deliver a total automation integration • From Propulsion to Sensors following the latest standards in Automation and Marine  User Choice System (flexibility) – Cargo Part : Cargo handling, Ballast, VRCS, CTS with Transmitter. – Mach. Part : Engine, PMS, Machinery control system with Transmitter – New Tech. : Re-liquefaction system, Re-Gasification system etc.  Improve the Operational Excellence of a Ship Operation – Efficient, Predictable and Intuitive Operations, Maintenance & Support
  • 4. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 4 Emerson Process Management Total Solutions Strategy Best-in-class Technologies PlantWeb Global Industry Services
  • 5. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 5 Meeting the Challenges in Offshore Production – Unique enabling technology to maximize production – Remote monitoring and optimizing of process equipment for health index and remote assistance – Solution ready for existing challenges and regulatory compliance requirements – Highly flexible to enable fast track conversion projects – Onboard manning and qualification requirements – Intelligent solution to minimize necessary manning Our architecture and application tailor made for FPSO will bring the onboard crew and the spesialists closer together Enabling Technology Maximum up-time wherever in the world
  • 6. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 6 Emerson Wide Breadth/Depth of Products, Solutions & Services • Asset Management Systems • Instrument and Valve Services • Equipment and Plant Optimization • Electrical Reliability Services • Consulting • Training • Control Valves • Regulators • Valve Actuators • Valve Instruments Measurement Valves & Regulators Systems & Solutions Asset Optimization • Pressure • Temperature • Level • Flow • pH • Conductivity • Gas Composition • Control Systems • Turnkey Project Capability • Engineering Design • Industry Centers • Chemical • Oil & Gas • Refining • Power & Water • Life Sciences • Metals & Mining • Pulp & Paper • Marine 6
  • 7. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 7 Emerson Marine Offshore Solution
  • 8. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 8 Emerson Process Management offers One Window into all process onboard, which makes the operation of a Offshore Production Units more reliable and easier for onboard staff than ever before. Add the AMSTM Suite, and you have predictive diagnostic for detection of potential problems. • Generators • Separators & Treatment • Reinjections • Compressors • Auxilliary Systems • Oil/Gas Fiscal Metering • Offloading Oil/Gas Production • Manifold & Subsea Valves • Monitoring & Control Subsea Control • Vessel ESD/F & G System • Oil/Gas ESD/F & G System Safety • Ballast/Bunker Control • Oil Storage Monitoring & Control • Offloading • Power Management • Auxilliary Control • Tank Washing Vessel Automation AMS Predictive Maintenance System for Machinary, Equipment and Instrumentation One Window into the entire on board processes
  • 9. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 9 Cargo • Cargo loading/offloading • Control • Boil of Gas (BOG) Control • LD/HD Gas Compressor Control • Cargo Monitoring • Load and Stability Calculator FPSO Engine room Integrated Monitoring and Control Machinery • Main Boilers monitoring and Control • Power Management • Main/AUX Turbine Monitoring • Auxiliary machinery Monitoring and Control • Bunkers Machinery and Control • UMS/EO Monitoring functions Onboard applications integrated into Delta V Automation Systems
  • 10. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 10 Project Execution Strategy Real distribution of Power, Control and Safety functions Modularized Controls  Installation cost saving  Safer design  Easier to test One Window  Oil and gas production  Vessel automation  Power management  Subsea control  Drilling
  • 11. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 11 17-moduls+hull FPSO Module Arrangement, a challenge for Automation, Safety and Instrumentation
  • 12. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 12 9327-23368 Marine Automation Process Automation Control Room Distribute the Automation System close to the Process
  • 13. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 13 Centralized ESD and F&G All Installation ,cable pulling and testing take place at the Yard We are lifting the ESD and F&G a step further in Offshore
  • 14. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 14 We build equipment into the Skid/ Modules and do commissioning Locally •ON YARD; Hook up ready tested module to the overall network •Saving Installation time, testing and cable coat
  • 15. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 15 A full distribuated safety system on separate net Emerson ESD and Fire & Gas System is approved for Decentralized installation
  • 16. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 16 We provide a real distribuated Smart Integrated Control and Safety System onboard
  • 17. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 17 One view into all processes onboard
  • 18. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 18 Comparing the centristic with a distributed modular approach Central Control Room  large control room  miles of cables  weight of cables Remote I/O & Control Stations  small control room  short cable runs  modular design (pre- assemble, pre-test) Central control room Central control room field instrument remote I/O & control station
  • 19. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 19 Remote I/O & Control Station One cabinet per process module with  PCS (DeltaV)  PSD (DeltaV SIS)  AC/DC power supplies – separate for PCS and PSD – circuit breakers  fiber optic connectivity – fiber optic switches – patch panel  illumination for the cabinet Central control room
  • 20. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 20 Type Approved Systems and fit for Offshore environments
  • 21. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 21 9375-23586 Wireless Process Automation, Hardwired Safety Wireless Process Automation, Hardwired Safety Wireless Automation, Hardwired Safety Wireless Process Automation, Hardwired Safety Redundant Wireless Process Automation, Hardwired Safety Redundant Wireless Process Automation, Hardwired Safety Hardwired Process Automation and Safety Bridge Additional Options for Smart Plants
  • 22. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 22 9375-23642 Wireless Signal Distribution inside Power Module
  • 23. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 23 Customers Are Solving Real Plant Problems: StatoilHydro Grane Platform  Application: Monitor wellhead annular pressure and heat exchanger pressures  Smart Wireless delivered 100% reliability & stability in the crowded metal wellhead environment  Easy integration of wireless data into third party system  Customer identified operational improvements as a result of increased process visibility – Wireless solution eliminates the need for daily visits to the wellhead to manually record gauge readings – Continuous monitoring enables unusual readings to be identified earlier “ We are delighted with the performance of the Emerson Smart Wireless network in these challenging conditions. Following a short training programme, our instrument engineers are very confident about adding more wireless devices to our installation as required. These typically take around two hours to install compared with up to two days for a conventional wired unit.” — Geir Leon Vadheim, Instrument Lead, Grane Platform
  • 24. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 24 ...onboard anywhere at any time without physically being there Shore Office Remote Office Operating Centre Tecnical Staff System Expert Process Expert Remote Assistance & Operations Support
  • 25. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 25 DeltaV Remote Client Remote Client Server DeltaV Remote Client makes a thin client connection to a host server on the DeltaV LAN • Provides fully functional operate and engineering capability • Supports LAN, Wireless, satellite and dial-up modem communications DeltaV Remote Client DeltaV LAN
  • 26. Emerson Confidential Emerson Process Management Overview Revised 7-Nov 2006, Slide 26 Recently Realized FPSO Projects International Offshore Oil & Gas reference with ICSS (SAS) delivery Company Installation Category Engineering AMS Control System Safety system Inst & Valves BP B 18 Greater Plutonio FPSO YES YES YES YES YES Total Akpo FPSO YES YES YES YES YES ExxonMobil Kizomba A FPSO YES YES YES YES YES ExxonMobil Kizomba B FPSO YES YES YES YES YES ExxonMobil Yoho FSO YES YES YES YES Vaalco Gabon Vaalco FPSO YES YES YES YES Dominion Devil's Tower Spar YES YES YES Unknown Murphy Medusa Spar YES YES YES Unknown Murphy Front Runner Spar YES YES YES Unknown BWO / Pemex(Norway) Yuum k'ak naab FPSO YES YES YES Unknown Petrojarl / Petrobras (Norway) Siri FPSO YES YES YES Unknown Petrobra DPI (Norway) Pipa2 Vessel(FPSO) YES YES YES YES YES Murphy Thunderhorse TLP YES YES YES YES YES Bluewater Uisge GOM FPSO YES YES YES YES Bluewater Glas Dowr FPSO YES YES YES YES Amerada Hess Triton FPSO YES ConocoPhillips Bohai Bay Ph2 FPSO YES YES YES CNOOC West Nanhai 13-1 FPSO YES YES YES CNOOC West Nanhai 13-2 FPSO YES YES YES CNOOC West Nanhai 13-2 FPSO YES YES YES Sea Production (Norway) Front Puffin FPSO YES YES YES YES Global Process System / Tanker Pacific Coogee Montara FPSO YES YES YES YES YES Teekay Petrojarl Che Guevara FPSO FPSO YES YES YES YES YES Petrojarl Petrojarl 1 FPSO FPSO YES YES Bergesen World-Wide Offshore Berge Entreprise, FPSO FPSO YES YES YES YES YES Grenland Group ( Topside, BWO) Berge Entreprise, FPSO FPSO YES YES YES YES YES Sea Production (Frontline) Front Puffin, FPSO FPSO YES YES YES YES YES Multi Purpose Floater Corp. MPF-1 Drill & FPSO Vessel (drill) YES YES YES YES YES Europe Europe Europe Europe Europe Australia Asia Americas Europe Australia Asia Asia Asia World Area West Africa West Africa West Africa West Africa West Africa Americas West Africa Americas North Sea North Sea Americas Americas Americas North Sea Americas
  • 27. A Digital Production Unit is a Smart Production Unit Thank You