Foundation Data

Foundation Numbers and sizes

             Length      Width        Depth                          Page
 Number        (ft)       (ft)         (ft)       Area (ft^3)
   10         137          3           3.5          1438.5             2
   11         131          3           2.5          982.5              5
   12          88          3           1.5           396               8
   13          87          3           1.5          391.5             10
   14          85          3           1.5          382.5             13
   15          86          3           1.5           387              16
   16          83          3           1.5          373.5             19
   21         125          3           1.5          562.5             22
   26         119          3           1.5          535.5             25
   27         233          3            2            1398             28
   29         175          3            5            2625             31
   30          60          3            5            900              34
   31         176          3            5            2640             36
   32         177          3            5            2655             39


All reinforcements used in the foundations are in the following pages. They are broken into sections by
the foundation number, followed by the top, bottom, and shear reinforcement data.
Foundation 10

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #11

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        12            0       5    1.23    1.32
    2        #4        16            5      35    3.15     3.2
    3        #4        16           35      55    3.15     3.2
    4        #4        16           55      85    3.15     3.2
    5        #4        16           85     101    3.15     3.2
    6        #4        13          101     125    2.55     2.6
    7        #3         8          125     131    0.86    0.88




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #7         5            0      20    2.79      3
    2        #6        10           20      45    4.35     4.4
    3        #7         7           45      70    4.09     4.2
    4        #8         5           70      93    3.91    3.95
    5        #7         6           93     113    3.12     3.6
    6        #6         6          113     131    2.48    2.64
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #4        12          0      2.79    0.36     0.4
   #4        12        8.21      13     0.36     0.4
                        13       19       0       0
                        19       25       0       0
   #4        12         25     32.79    0.36     0.4
   #4        12       38.21    43.07    0.36     0.4
   #4        12       43.07      45     0.36     0.4
   #4        12         45     47.93    0.36     0.4
   #4        12       47.93    52.79    0.36     0.4
   #4        12       58.21      66     0.36     0.4
   #4        12         66       70     0.36     0.4
                        70       75       0       0
   #4        12         75     82.79    0.36     0.4
   #4        12       88.21      93     0.36     0.4
   #4        12         93     98.79    0.36     0.4
   #4        12       104.21    110     0.36     0.4
   #4        12        110      114     0.36     0.4
                       114      118       0       0
   #4        12        118     122.79   0.36     0.4
                      128.21    131       0       0
Foundation #12

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #13

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.32    0.55
    2        #4         7            3      33    1.33     1.4
    3        #4        10           33      53     1.9      2
    4        #4         7           53      83    1.34     1.4
    5        #3         5           83      87     0.3    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4        10            0      17    1.87      2
    2        #5        15           17      43    4.63    4.65
    3        #6        11           43      69    4.65    4.84
    4        #5         6           69      87    1.84    1.86
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     1.78    0.35    0.44
   #3         6       5.22      10    0.35    0.44
                       10       17      0       0
                       17       25      0       0
   #3        3         25     31.78    0.5    0.88
   #3        3        35.22     43    0.65    0.88
   #3        3         43     51.78   0.66    0.88
   #3        3        55.22     62    0.49    0.88
                       62       69      0       0
                       69       77      0       0
   #3        6         77     81.78   0.35    0.44
   #3        6        85.22     87    0.35    0.44
Foundation #14

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.07    0.55
    2        #4         6            2      32    1.13     1.2
    3        #4         7           32      52    1.38     1.4
    4        #4         6           52      82    1.11     1.2
    5        #3         7           82      85     0.7    0.77




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         6            0      16    1.18     1.2
    2        #5        11           16      42    3.31    3.41
    3        #5        11           42      68    3.32    3.41
    4        #4         6           68      85    1.16     1.2
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      4.23       6      0       0
                        6       15      0       0
                       15       25      0       0
   #3        6         25     30.77   0.35    0.44
   #3        6        34.23     37    0.35    0.44
   #3        6         37     39.74   0.35    0.44
                      39.74     42      0       0
                       42     45.26     0       0
   #3        6        45.26     48    0.35    0.44
   #3        6         48     50.77   0.35    0.44
   #3        6        54.23     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     80.77     0       0
Foundation #15

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.15    0.55
    2        #3        10            3      33    1.07     1.1
    3        #3        13           33      53    1.43    1.43
    4        #3        10           53      83    1.09     1.1
    5        #3         5           83      86    0.15    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         7            0      17    1.39     1.4
    2        #5        11           17      43    3.33    3.41
    3        #6         8           43      69    3.33    3.52
    4        #5         5           69      86    1.37    1.55
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                        0     1.27      0       0
                      4.73       8      0       0
                        8       17      0       0
                       17       26      0       0
   #3        6         26     31.27   0.35    0.44
   #3        6        34.73     38    0.35    0.44
                       38       41      0       0
                       41       45      0       0
   #3        6         45       48    0.35    0.44
   #3        6         48     51.27   0.35    0.44
   #3        6        54.73     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     81.27     0       0
                      84.73     86      0       0
Foundation #16

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       1    0.01    0.55
    2        #4         8            1      31    1.44     1.6
    3        #3        10           31      51    1.03     1.1
    4        #4         7           51      81    1.37     1.4
    5        #3        10           81      83    1.02     1.1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        10            0      20    1.05     1.1
    2        #4        13           20      43    2.46     2.6
    3        #4        13           43      64    2.49     2.6
    4        #3        10           64      83    1.02     1.1
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      3.24       5      0       0
                        5       15      0       0
                       15       25      0       0
                       25     29.76     0       0
   #3        6        33.24     36    0.35    0.44
                       36       39      0       0
                       39       44      0       0
                       44       47      0       0
   #3        6         47     49.76   0.35    0.44
                      53.24     58      0       0
                       58       68      0       0
                       68       78      0       0
                       78     79.76     0       0
Foundation #21

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.13    0.55
    2        #4         7            2      32    1.39     1.4
    3        #5         5           32      52    1.43    1.55
    4        #4         7           52      82    1.38     1.4
    5        #4         5           82      98    0.98      1
    6        #5         5           98     122    1.48    1.55
    7        #4         5          122     125    0.97      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         6            0      21     1.8    1.86
    2        #6        10           21      42    4.14     4.4
    3        #5        12           42      68    3.68    3.72
    4        #4        16           68      90    3.17     3.2
    5        #5        11           90     108    3.24    3.41
    6        #5         5          108     125    1.53    1.55
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                       4.23       7       0       0
                         7       15       0       0
                        15       24       0       0
   #3        6          24     30.77    0.35    0.44
   #3        6        34.23      37     0.36    0.44
   #3        6          37     39.74    0.35    0.44
                      39.74      42       0       0
                        42     45.26      0       0
   #3        6        45.26      48     0.35    0.44
   #3        6          48     50.77    0.35    0.44
   #3        6        54.23      60     0.35    0.44
                        60       67       0       0
                        67       75       0       0
   #3        6          75     80.77    0.35    0.44
   #3        6        84.23      90     0.35    0.44
   #3        6          90     96.77    0.35    0.44
   #3        6        100.23    106     0.35    0.44
                       106      112       0       0
                       112      118       0       0
                       118     120.77     0       0
Foundation #26

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.09    0.55
    2        #4         8            2      20    1.55     1.6
    3        #4         8           20      47    1.49     1.6
    4        #4         8           47      82    1.54     1.6
    5        #3        10           82     117    1.05     1.1
    6        #3         5          117     119     0.1    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         7            0      12    0.67    0.77
    2        #3        15           12      34    1.61    1.65
    3        #4        17           34      63    3.28     3.4
    4        #3         8           63     100    0.79    0.88
    5        #3         6          100     119    0.65    0.66
Shear Reinforcement

  Size      Spc       Start    End     Req.    Prov.
            (in)       (ft)     (ft)   (in2)   (in2)
                      3.74       5       0       0
                        5        9       0       0
                        9       14       0       0
                       14     18.26      0       0
                      21.74     23       0       0
                       23       31       0       0
                       31       40       0       0
   #3        6         40     45.26    0.35    0.44
   #3        6        48.74     54     0.35    0.44
                       54       67       0       0
                       67     80.26      0       0
                      83.74     99       0       0
                       99      114       0       0
                       114    115.26     0       0
Foundation #27

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #29

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #30

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       7    0.03    0.55
    2        #3         5            7      25    0.32    0.55
    3        #4         8           25      52    1.59     1.6
    4        #3        13           52      60    1.42    1.43




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0      18    0.26    0.55
    2        #3         5           18      38    0.15    0.55
    3        #4        12           38      60    2.21     2.4
Shear Reinforcement

  Seg.      Size      Spc    Start    End    Req.    Prov.
                      (in)    (ft)    (ft)   (in2)   (in2)
    1                          0     2.23      0             0
    2                        12.77     16      0             0
    3                         16     20.23     0             0
    4                        30.77     39      0             0
    5                         39     47.23     0             0
    6                        57.77     60      0             0
Foundation #31

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.26    0.55
    2        #3         8            8      33    0.87    0.88
    3        #3         6           33      43    0.63    0.66
    4        #4         6           43      68    1.18     1.2
    5        #4         5           68      93    0.92      1
    6        #4         9           93     123    1.76     1.8
    7        #4         9          123     148    1.78     1.8
    8        #3        17          148     168    1.82    1.87
    9        #3        17          168     176    1.84    1.87




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      21    0.98      1
    2        #5         7           21      38    2.16    2.17
    3        #4        10           38      56      2       2
    4        #5         6           56      81    1.72    1.86
    5        #4        11           81     105     2.2     2.2
    6        #5        11          105     136    3.41    3.41
    7        #4         5          136     158      0       1
    8        #5        10          158     176    2.87     3.1
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      2.79      0       0
                      13.21      20       0       0
                        20     27.79      0       0
                      48.21      55       0       0
                        55     62.79      0       0
                      73.21      80       0       0
                        80     87.79      0       0
                      98.21     107       0       0
                       107     116.79     0       0
   #5        18       116.79   117.79   0.35    0.41
   #5        18       128.21   129.21   0.35    0.41
   #5        18       129.21    136     0.35    0.41
                       136     142.79     0       0
                      153.21    157       0       0
                       157     161.79     0       0
   #5        18       161.79   162.79   0.35    0.41
                      173.21    176       0       0
Foundation #32

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.22    0.55
    2        #4         5            8      33    0.97      1
    3        #3         6           33      43    0.61    0.66
    4        #4         6           43      68    1.16     1.2
    5        #4         5           68      93    0.89      1
    6        #5         6           93     123    1.78    1.86
    7        #5         6          123     148    1.76    1.86
    8        #4        10          148     168    1.99      2
    9        #5         7          168     177    2.01    2.17




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      22    0.91      1
    2        #5         7           22      38    2.12    2.17
    3        #4        10           38      57    1.98      2
    4        #5         6           57      82    1.72    1.86
    5        #4        11           82     107    2.19     2.2
    6        #5        12          107     137    3.42    3.72
    7        #4         5          137     158      0       1
    8        #4        16          158     177    3.15     3.2
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      3.29      0       0
                      13.71      21       0       0
                        21     28.29      0       0
                      48.71      56       0       0
                        56     63.29      0       0
                      73.71      81       0       0
                        81     88.29      0       0
                      98.71     108       0       0
                       108     117.29     0       0
   #5        18       117.29   118.29   0.35    0.41
   #5        18       128.71    130     0.35    0.41
                       130      137       0       0
                       137     143.29     0       0
                      153.71    158       0       0
                       158     162.29     0       0
   #5        18       162.29   163.29   0.35    0.41
                      173.71    177       0       0
Foundation data collection

More Related Content

What's hot

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
fjsjjekdkme
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
Electromate
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
fhsjejfsekkkm
 
FM 753
FM 753FM 753
FM 753
seoripple
 
Massey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualMassey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manual
jfdjskmdmme
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
fjsjjekdkme
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
Petrobras
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
fjsjjekdkme
 
Hyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualHyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manual
fjskemdme
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
Mx Sanook
 
1 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 731 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 73
Mo Thegrindgixer
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
fjskemdme
 
Assignment model problems
Assignment model problemsAssignment model problems
Assignment model problems
Anurag Srivastava
 
Nuts bolts-screws-washers
Nuts bolts-screws-washersNuts bolts-screws-washers
Nuts bolts-screws-washers
Obuekwec
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
fjsjjekdkme
 
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor (  387021 (gb)) parts catalogue manualMassey ferguson mf290 tractor (  387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
fujsjefjkskem
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
fjskemdme
 

What's hot (17)

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
 
FM 753
FM 753FM 753
FM 753
 
Massey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualMassey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manual
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
 
Hyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualHyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manual
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
 
1 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 731 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 73
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
 
Assignment model problems
Assignment model problemsAssignment model problems
Assignment model problems
 
Nuts bolts-screws-washers
Nuts bolts-screws-washersNuts bolts-screws-washers
Nuts bolts-screws-washers
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
 
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor (  387021 (gb)) parts catalogue manualMassey ferguson mf290 tractor (  387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
 

Similar to Foundation data collection

Foundation data
Foundation dataFoundation data
Foundation data
J C
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
cathexis123
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Purple Vision
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Purple Vision
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
Chattichai
 
Stocks price
Stocks priceStocks price
Stocks price
iipmff2
 
10
1010
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
Aj Yawwalak
 
Dynaboltinstall
DynaboltinstallDynaboltinstall
Dynaboltinstall
Zaki Mubarok
 
The Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic InteractionThe Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic Interaction
reroth
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Nesma
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
Nestor Neto
 
Writing Readable Code with Pipes
Writing Readable Code with PipesWriting Readable Code with Pipes
Writing Readable Code with Pipes
Rsquared Academy
 
Bolt details
Bolt detailsBolt details
Bolt details
Ramesh Naik
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
Aj Yawwalak
 
mansoane
mansoanemansoane
mansoane
Ondrill.ro
 
Production forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfProduction forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdf
ssuserb71d4d
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
Josue Campos
 
508202
508202508202
508202
Vikram Kedar
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipn
Chhay Teng
 

Similar to Foundation data collection (20)

Foundation data
Foundation dataFoundation data
Foundation data
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
 
Stocks price
Stocks priceStocks price
Stocks price
 
10
1010
10
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
 
Dynaboltinstall
DynaboltinstallDynaboltinstall
Dynaboltinstall
 
The Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic InteractionThe Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic Interaction
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
 
Writing Readable Code with Pipes
Writing Readable Code with PipesWriting Readable Code with Pipes
Writing Readable Code with Pipes
 
Bolt details
Bolt detailsBolt details
Bolt details
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
 
mansoane
mansoanemansoane
mansoane
 
Production forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfProduction forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdf
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
508202
508202508202
508202
 
7 dimension and properties table ipn
7 dimension and properties table ipn7 dimension and properties table ipn
7 dimension and properties table ipn
 

More from cathexis123

Schott poly 220 240 datasheet
Schott poly 220 240 datasheetSchott poly 220 240 datasheet
Schott poly 220 240 datasheet
cathexis123
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
cathexis123
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
cathexis123
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collection
cathexis123
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
cathexis123
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysis
cathexis123
 
Final PV System cost analysis
Final PV System cost analysisFinal PV System cost analysis
Final PV System cost analysis
cathexis123
 
PV System Sizing
PV System SizingPV System Sizing
PV System Sizing
cathexis123
 
Tx dot use of pfc
Tx dot use of pfcTx dot use of pfc
Tx dot use of pfc
cathexis123
 
Optimum tilt of solar panels
Optimum tilt of solar panelsOptimum tilt of solar panels
Optimum tilt of solar panelscathexis123
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
cathexis123
 
Vpectrl3 ram steel - gravity column design summary
Vpectrl3   ram steel - gravity column design summaryVpectrl3   ram steel - gravity column design summary
Vpectrl3 ram steel - gravity column design summary
cathexis123
 
Vpectrl3 ram steel - gravity beam design
Vpectrl3   ram steel - gravity beam designVpectrl3   ram steel - gravity beam design
Vpectrl3 ram steel - gravity beam design
cathexis123
 
Vpectrl3 ram steel - column load summary
Vpectrl3   ram steel - column load summaryVpectrl3   ram steel - column load summary
Vpectrl3 ram steel - column load summary
cathexis123
 
Vpectrl3 ram steel - beam summary
Vpectrl3   ram steel - beam summaryVpectrl3   ram steel - beam summary
Vpectrl3 ram steel - beam summary
cathexis123
 
Beam and column list
Beam and column listBeam and column list
Beam and column listcathexis123
 
Vpectrl3 ram steel - gravity column design
Vpectrl3   ram steel - gravity column designVpectrl3   ram steel - gravity column design
Vpectrl3 ram steel - gravity column design
cathexis123
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
cathexis123
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
cathexis123
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
cathexis123
 

More from cathexis123 (20)

Schott poly 220 240 datasheet
Schott poly 220 240 datasheetSchott poly 220 240 datasheet
Schott poly 220 240 datasheet
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collection
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysis
 
Final PV System cost analysis
Final PV System cost analysisFinal PV System cost analysis
Final PV System cost analysis
 
PV System Sizing
PV System SizingPV System Sizing
PV System Sizing
 
Tx dot use of pfc
Tx dot use of pfcTx dot use of pfc
Tx dot use of pfc
 
Optimum tilt of solar panels
Optimum tilt of solar panelsOptimum tilt of solar panels
Optimum tilt of solar panels
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
Vpectrl3 ram steel - gravity column design summary
Vpectrl3   ram steel - gravity column design summaryVpectrl3   ram steel - gravity column design summary
Vpectrl3 ram steel - gravity column design summary
 
Vpectrl3 ram steel - gravity beam design
Vpectrl3   ram steel - gravity beam designVpectrl3   ram steel - gravity beam design
Vpectrl3 ram steel - gravity beam design
 
Vpectrl3 ram steel - column load summary
Vpectrl3   ram steel - column load summaryVpectrl3   ram steel - column load summary
Vpectrl3 ram steel - column load summary
 
Vpectrl3 ram steel - beam summary
Vpectrl3   ram steel - beam summaryVpectrl3   ram steel - beam summary
Vpectrl3 ram steel - beam summary
 
Beam and column list
Beam and column listBeam and column list
Beam and column list
 
Vpectrl3 ram steel - gravity column design
Vpectrl3   ram steel - gravity column designVpectrl3   ram steel - gravity column design
Vpectrl3 ram steel - gravity column design
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
 

Recently uploaded

HD Video Player All Format - 4k & live stream
HD Video Player All Format - 4k & live streamHD Video Player All Format - 4k & live stream
HD Video Player All Format - 4k & live stream
HD Video Player
 
The Evolution and Impact of Tom Cruise Long Hair
The Evolution and Impact of Tom Cruise Long HairThe Evolution and Impact of Tom Cruise Long Hair
The Evolution and Impact of Tom Cruise Long Hair
greendigital
 
SERV - Fun Things To Do In Overland Park
SERV - Fun Things To Do In Overland ParkSERV - Fun Things To Do In Overland Park
SERV - Fun Things To Do In Overland Park
SERV
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理
etycev
 
Leonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite Game
Leonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite GameLeonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite Game
Leonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite Game
greendigital
 
ℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girls
ℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girlsℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girls
ℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girls
meherkumarescorts
 
一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理
一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理
一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理
sbewyav
 
Morgan Freeman is Jimi Hendrix: Unveiling the Intriguing Hypothesis
Morgan Freeman is Jimi Hendrix: Unveiling the Intriguing HypothesisMorgan Freeman is Jimi Hendrix: Unveiling the Intriguing Hypothesis
Morgan Freeman is Jimi Hendrix: Unveiling the Intriguing Hypothesis
greendigital
 
Tom Cruise Daughter: An Insight into the Life of Suri Cruise
Tom Cruise Daughter: An Insight into the Life of Suri CruiseTom Cruise Daughter: An Insight into the Life of Suri Cruise
Tom Cruise Daughter: An Insight into the Life of Suri Cruise
greendigital
 
ℂall Girls Goa (india) +91-7426014248 Goa ℂall Girls
ℂall Girls Goa (india) +91-7426014248 Goa ℂall Girlsℂall Girls Goa (india) +91-7426014248 Goa ℂall Girls
ℂall Girls Goa (india) +91-7426014248 Goa ℂall Girls
moharsinghtrt1950
 
The Midnight Sculptor.pdf writer by Ali alsiad
The Midnight Sculptor.pdf writer by Ali alsiadThe Midnight Sculptor.pdf writer by Ali alsiad
The Midnight Sculptor.pdf writer by Ali alsiad
ali345alghlay
 
From Teacher to OnlyFans: Brianna Coppage's Story at 28
From Teacher to OnlyFans: Brianna Coppage's Story at 28From Teacher to OnlyFans: Brianna Coppage's Story at 28
From Teacher to OnlyFans: Brianna Coppage's Story at 28
get joys
 
原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样
原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样
原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样
sh8tjqt6
 
Clyde the cat and Space Poems by Basak Serin
Clyde the cat and Space Poems by Basak SerinClyde the cat and Space Poems by Basak Serin
Clyde the cat and Space Poems by Basak Serin
Basak24
 
Sara Saffari: Turning Underweight into Fitness Success at 23
Sara Saffari: Turning Underweight into Fitness Success at 23Sara Saffari: Turning Underweight into Fitness Success at 23
Sara Saffari: Turning Underweight into Fitness Success at 23
get joys
 
Chennai Call Girls 8824825030 High Calass Call Girl Chennai
Chennai Call Girls 8824825030 High Calass Call Girl ChennaiChennai Call Girls 8824825030 High Calass Call Girl Chennai
Chennai Call Girls 8824825030 High Calass Call Girl Chennai
Mobile Problem
 
Taylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women Magazine
Taylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women MagazineTaylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women Magazine
Taylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women Magazine
CIOWomenMagazine
 
What Going to the Doctor is Like as an Adult Comics
What Going to the Doctor is Like as an Adult ComicsWhat Going to the Doctor is Like as an Adult Comics
What Going to the Doctor is Like as an Adult Comics
Salty Vixen Stories & More
 
How OTT Players Are Transforming Our TV Viewing Experience.pdf
How OTT Players Are Transforming Our TV Viewing Experience.pdfHow OTT Players Are Transforming Our TV Viewing Experience.pdf
How OTT Players Are Transforming Our TV Viewing Experience.pdf
Genny Knight
 
VR Economy
VR EconomyVR Economy

Recently uploaded (20)

HD Video Player All Format - 4k & live stream
HD Video Player All Format - 4k & live streamHD Video Player All Format - 4k & live stream
HD Video Player All Format - 4k & live stream
 
The Evolution and Impact of Tom Cruise Long Hair
The Evolution and Impact of Tom Cruise Long HairThe Evolution and Impact of Tom Cruise Long Hair
The Evolution and Impact of Tom Cruise Long Hair
 
SERV - Fun Things To Do In Overland Park
SERV - Fun Things To Do In Overland ParkSERV - Fun Things To Do In Overland Park
SERV - Fun Things To Do In Overland Park
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证如何办理
 
Leonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite Game
Leonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite GameLeonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite Game
Leonardo DiCaprio Super Bowl: Hollywood Meets America’s Favorite Game
 
ℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girls
ℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girlsℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girls
ℂall Girls Lucknow (india) +91-7426014248 Lucknow ℂall Girls
 
一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理
一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理
一比一原版(uw毕业证书)美国威斯康星大学麦迪逊分校毕业证如何办理
 
Morgan Freeman is Jimi Hendrix: Unveiling the Intriguing Hypothesis
Morgan Freeman is Jimi Hendrix: Unveiling the Intriguing HypothesisMorgan Freeman is Jimi Hendrix: Unveiling the Intriguing Hypothesis
Morgan Freeman is Jimi Hendrix: Unveiling the Intriguing Hypothesis
 
Tom Cruise Daughter: An Insight into the Life of Suri Cruise
Tom Cruise Daughter: An Insight into the Life of Suri CruiseTom Cruise Daughter: An Insight into the Life of Suri Cruise
Tom Cruise Daughter: An Insight into the Life of Suri Cruise
 
ℂall Girls Goa (india) +91-7426014248 Goa ℂall Girls
ℂall Girls Goa (india) +91-7426014248 Goa ℂall Girlsℂall Girls Goa (india) +91-7426014248 Goa ℂall Girls
ℂall Girls Goa (india) +91-7426014248 Goa ℂall Girls
 
The Midnight Sculptor.pdf writer by Ali alsiad
The Midnight Sculptor.pdf writer by Ali alsiadThe Midnight Sculptor.pdf writer by Ali alsiad
The Midnight Sculptor.pdf writer by Ali alsiad
 
From Teacher to OnlyFans: Brianna Coppage's Story at 28
From Teacher to OnlyFans: Brianna Coppage's Story at 28From Teacher to OnlyFans: Brianna Coppage's Story at 28
From Teacher to OnlyFans: Brianna Coppage's Story at 28
 
原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样
原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样
原版制作(MUN毕业证书)纽芬兰纪念大学毕业证PDF成绩单一模一样
 
Clyde the cat and Space Poems by Basak Serin
Clyde the cat and Space Poems by Basak SerinClyde the cat and Space Poems by Basak Serin
Clyde the cat and Space Poems by Basak Serin
 
Sara Saffari: Turning Underweight into Fitness Success at 23
Sara Saffari: Turning Underweight into Fitness Success at 23Sara Saffari: Turning Underweight into Fitness Success at 23
Sara Saffari: Turning Underweight into Fitness Success at 23
 
Chennai Call Girls 8824825030 High Calass Call Girl Chennai
Chennai Call Girls 8824825030 High Calass Call Girl ChennaiChennai Call Girls 8824825030 High Calass Call Girl Chennai
Chennai Call Girls 8824825030 High Calass Call Girl Chennai
 
Taylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women Magazine
Taylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women MagazineTaylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women Magazine
Taylor Swift: Conquering Fame, Feuds, and Unmatched Success | CIO Women Magazine
 
What Going to the Doctor is Like as an Adult Comics
What Going to the Doctor is Like as an Adult ComicsWhat Going to the Doctor is Like as an Adult Comics
What Going to the Doctor is Like as an Adult Comics
 
How OTT Players Are Transforming Our TV Viewing Experience.pdf
How OTT Players Are Transforming Our TV Viewing Experience.pdfHow OTT Players Are Transforming Our TV Viewing Experience.pdf
How OTT Players Are Transforming Our TV Viewing Experience.pdf
 
VR Economy
VR EconomyVR Economy
VR Economy
 

Foundation data collection

  • 1. Foundation Data Foundation Numbers and sizes Length Width Depth Page Number (ft) (ft) (ft) Area (ft^3) 10 137 3 3.5 1438.5 2 11 131 3 2.5 982.5 5 12 88 3 1.5 396 8 13 87 3 1.5 391.5 10 14 85 3 1.5 382.5 13 15 86 3 1.5 387 16 16 83 3 1.5 373.5 19 21 125 3 1.5 562.5 22 26 119 3 1.5 535.5 25 27 233 3 2 1398 28 29 175 3 5 2625 31 30 60 3 5 900 34 31 176 3 5 2640 36 32 177 3 5 2655 39 All reinforcements used in the foundations are in the following pages. They are broken into sections by the foundation number, followed by the top, bottom, and shear reinforcement data.
  • 2. Foundation 10 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 3. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 4.
  • 5. Foundation #11 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 12 0 5 1.23 1.32 2 #4 16 5 35 3.15 3.2 3 #4 16 35 55 3.15 3.2 4 #4 16 55 85 3.15 3.2 5 #4 16 85 101 3.15 3.2 6 #4 13 101 125 2.55 2.6 7 #3 8 125 131 0.86 0.88 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #7 5 0 20 2.79 3 2 #6 10 20 45 4.35 4.4 3 #7 7 45 70 4.09 4.2 4 #8 5 70 93 3.91 3.95 5 #7 6 93 113 3.12 3.6 6 #6 6 113 131 2.48 2.64
  • 6. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #4 12 0 2.79 0.36 0.4 #4 12 8.21 13 0.36 0.4 13 19 0 0 19 25 0 0 #4 12 25 32.79 0.36 0.4 #4 12 38.21 43.07 0.36 0.4 #4 12 43.07 45 0.36 0.4 #4 12 45 47.93 0.36 0.4 #4 12 47.93 52.79 0.36 0.4 #4 12 58.21 66 0.36 0.4 #4 12 66 70 0.36 0.4 70 75 0 0 #4 12 75 82.79 0.36 0.4 #4 12 88.21 93 0.36 0.4 #4 12 93 98.79 0.36 0.4 #4 12 104.21 110 0.36 0.4 #4 12 110 114 0.36 0.4 114 118 0 0 #4 12 118 122.79 0.36 0.4 128.21 131 0 0
  • 7.
  • 8. Foundation #12 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 9. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 10. Foundation #13 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.32 0.55 2 #4 7 3 33 1.33 1.4 3 #4 10 33 53 1.9 2 4 #4 7 53 83 1.34 1.4 5 #3 5 83 87 0.3 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 10 0 17 1.87 2 2 #5 15 17 43 4.63 4.65 3 #6 11 43 69 4.65 4.84 4 #5 6 69 87 1.84 1.86
  • 11. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 1.78 0.35 0.44 #3 6 5.22 10 0.35 0.44 10 17 0 0 17 25 0 0 #3 3 25 31.78 0.5 0.88 #3 3 35.22 43 0.65 0.88 #3 3 43 51.78 0.66 0.88 #3 3 55.22 62 0.49 0.88 62 69 0 0 69 77 0 0 #3 6 77 81.78 0.35 0.44 #3 6 85.22 87 0.35 0.44
  • 12.
  • 13. Foundation #14 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.07 0.55 2 #4 6 2 32 1.13 1.2 3 #4 7 32 52 1.38 1.4 4 #4 6 52 82 1.11 1.2 5 #3 7 82 85 0.7 0.77 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 6 0 16 1.18 1.2 2 #5 11 16 42 3.31 3.41 3 #5 11 42 68 3.32 3.41 4 #4 6 68 85 1.16 1.2
  • 14. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 6 0 0 6 15 0 0 15 25 0 0 #3 6 25 30.77 0.35 0.44 #3 6 34.23 37 0.35 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 69 0 0 69 78 0 0 78 80.77 0 0
  • 15.
  • 16. Foundation #15 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.15 0.55 2 #3 10 3 33 1.07 1.1 3 #3 13 33 53 1.43 1.43 4 #3 10 53 83 1.09 1.1 5 #3 5 83 86 0.15 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 7 0 17 1.39 1.4 2 #5 11 17 43 3.33 3.41 3 #6 8 43 69 3.33 3.52 4 #5 5 69 86 1.37 1.55
  • 17. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 1.27 0 0 4.73 8 0 0 8 17 0 0 17 26 0 0 #3 6 26 31.27 0.35 0.44 #3 6 34.73 38 0.35 0.44 38 41 0 0 41 45 0 0 #3 6 45 48 0.35 0.44 #3 6 48 51.27 0.35 0.44 #3 6 54.73 60 0.35 0.44 60 69 0 0 69 78 0 0 78 81.27 0 0 84.73 86 0 0
  • 18.
  • 19. Foundation #16 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 1 0.01 0.55 2 #4 8 1 31 1.44 1.6 3 #3 10 31 51 1.03 1.1 4 #4 7 51 81 1.37 1.4 5 #3 10 81 83 1.02 1.1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 10 0 20 1.05 1.1 2 #4 13 20 43 2.46 2.6 3 #4 13 43 64 2.49 2.6 4 #3 10 64 83 1.02 1.1
  • 20. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.24 5 0 0 5 15 0 0 15 25 0 0 25 29.76 0 0 #3 6 33.24 36 0.35 0.44 36 39 0 0 39 44 0 0 44 47 0 0 #3 6 47 49.76 0.35 0.44 53.24 58 0 0 58 68 0 0 68 78 0 0 78 79.76 0 0
  • 21.
  • 22. Foundation #21 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.13 0.55 2 #4 7 2 32 1.39 1.4 3 #5 5 32 52 1.43 1.55 4 #4 7 52 82 1.38 1.4 5 #4 5 82 98 0.98 1 6 #5 5 98 122 1.48 1.55 7 #4 5 122 125 0.97 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 6 0 21 1.8 1.86 2 #6 10 21 42 4.14 4.4 3 #5 12 42 68 3.68 3.72 4 #4 16 68 90 3.17 3.2 5 #5 11 90 108 3.24 3.41 6 #5 5 108 125 1.53 1.55
  • 23. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 7 0 0 7 15 0 0 15 24 0 0 #3 6 24 30.77 0.35 0.44 #3 6 34.23 37 0.36 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 67 0 0 67 75 0 0 #3 6 75 80.77 0.35 0.44 #3 6 84.23 90 0.35 0.44 #3 6 90 96.77 0.35 0.44 #3 6 100.23 106 0.35 0.44 106 112 0 0 112 118 0 0 118 120.77 0 0
  • 24.
  • 25. Foundation #26 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.09 0.55 2 #4 8 2 20 1.55 1.6 3 #4 8 20 47 1.49 1.6 4 #4 8 47 82 1.54 1.6 5 #3 10 82 117 1.05 1.1 6 #3 5 117 119 0.1 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 7 0 12 0.67 0.77 2 #3 15 12 34 1.61 1.65 3 #4 17 34 63 3.28 3.4 4 #3 8 63 100 0.79 0.88 5 #3 6 100 119 0.65 0.66
  • 26. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.74 5 0 0 5 9 0 0 9 14 0 0 14 18.26 0 0 21.74 23 0 0 23 31 0 0 31 40 0 0 #3 6 40 45.26 0.35 0.44 #3 6 48.74 54 0.35 0.44 54 67 0 0 67 80.26 0 0 83.74 99 0 0 99 114 0 0 114 115.26 0 0
  • 27.
  • 28. Foundation #27 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 29. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 30.
  • 31. Foundation #29 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 32. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 33.
  • 34. Foundation #30 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 7 0.03 0.55 2 #3 5 7 25 0.32 0.55 3 #4 8 25 52 1.59 1.6 4 #3 13 52 60 1.42 1.43 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 18 0.26 0.55 2 #3 5 18 38 0.15 0.55 3 #4 12 38 60 2.21 2.4
  • 35. Shear Reinforcement Seg. Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 1 0 2.23 0 0 2 12.77 16 0 0 3 16 20.23 0 0 4 30.77 39 0 0 5 39 47.23 0 0 6 57.77 60 0 0
  • 36. Foundation #31 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.26 0.55 2 #3 8 8 33 0.87 0.88 3 #3 6 33 43 0.63 0.66 4 #4 6 43 68 1.18 1.2 5 #4 5 68 93 0.92 1 6 #4 9 93 123 1.76 1.8 7 #4 9 123 148 1.78 1.8 8 #3 17 148 168 1.82 1.87 9 #3 17 168 176 1.84 1.87 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 21 0.98 1 2 #5 7 21 38 2.16 2.17 3 #4 10 38 56 2 2 4 #5 6 56 81 1.72 1.86 5 #4 11 81 105 2.2 2.2 6 #5 11 105 136 3.41 3.41 7 #4 5 136 158 0 1 8 #5 10 158 176 2.87 3.1
  • 37. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 2.79 0 0 13.21 20 0 0 20 27.79 0 0 48.21 55 0 0 55 62.79 0 0 73.21 80 0 0 80 87.79 0 0 98.21 107 0 0 107 116.79 0 0 #5 18 116.79 117.79 0.35 0.41 #5 18 128.21 129.21 0.35 0.41 #5 18 129.21 136 0.35 0.41 136 142.79 0 0 153.21 157 0 0 157 161.79 0 0 #5 18 161.79 162.79 0.35 0.41 173.21 176 0 0
  • 38.
  • 39. Foundation #32 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.22 0.55 2 #4 5 8 33 0.97 1 3 #3 6 33 43 0.61 0.66 4 #4 6 43 68 1.16 1.2 5 #4 5 68 93 0.89 1 6 #5 6 93 123 1.78 1.86 7 #5 6 123 148 1.76 1.86 8 #4 10 148 168 1.99 2 9 #5 7 168 177 2.01 2.17 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 22 0.91 1 2 #5 7 22 38 2.12 2.17 3 #4 10 38 57 1.98 2 4 #5 6 57 82 1.72 1.86 5 #4 11 82 107 2.19 2.2 6 #5 12 107 137 3.42 3.72 7 #4 5 137 158 0 1 8 #4 16 158 177 3.15 3.2
  • 40. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 3.29 0 0 13.71 21 0 0 21 28.29 0 0 48.71 56 0 0 56 63.29 0 0 73.71 81 0 0 81 88.29 0 0 98.71 108 0 0 108 117.29 0 0 #5 18 117.29 118.29 0.35 0.41 #5 18 128.71 130 0.35 0.41 130 137 0 0 137 143.29 0 0 153.71 158 0 0 158 162.29 0 0 #5 18 162.29 163.29 0.35 0.41 173.71 177 0 0