KAIZEN
 The Key to Japan’s
 Competitive Success
By
VIVEK SHAH        11030241180
KINJAL GUPTA      11030241191
PALAK DABAS       11030241190
VINIT HANKARE     11030241179
VICTORY ABRAHAM   11030241186
TABLE OF CONTENTS

1. KAIZEN, The Concept


        2. Improvement East and West



            3. KAIZEN Management



             4. The KAIZEN Approach to Problem Solving


         5. KAIZEN, The Practice


 6. Changing the Corporate Culture
KAIZEN
The Concept
RECTIFICATION     CONTINUAL
                IMPROVEMENT




 INNOVATION      DAY-TO-DAY
 The story of the Kaizen miracle started in the
  1930s. Sakichi Toyoda, founder of Toyota, which
  manufactured automatic looms at the time

 In 1950 Toyota implemented quality circles leading
  to the development of Toyota’s unique “Toyota
  Production System”.

 These continual small improvements (Kaizen) add
  up to major benefits. They result, for example, in:
  faster delivery, lower costs, and greater customer
  satisfaction.

 In 1986 Masaaki Imai introduced to the Western
  world the Japanese term Kaizen and made it famous
  through his book, Kaizen: The Key to
  Japan's Competitive Success.
Three Award in Sumo Tournament ;

                   - An outstanding performance award
                   - A skill award
                   - A fighting spirit award




Focus more on process
 Rather than result !!!
Improvement
 East & West
TRADITIONAL METHOD VS KAIZEN
Continuous Improvement
KAIZEN




                                                      INNOVA
                                                        TION
                   Breakthrough



Science   Technology        Design       Production      Market




          Innovation                        KAIZEN
KAIZEN                   1             INNOVATION

       Long term                                 Short term
                              Effect
      Un-dramatic                                 Dramatic



      Small steps             Pace                Big steps



                              Time             Intermittent &
Continuous & incremental
                             frame            non incremental



  Gradual & consistent       Change          Abrupt & volatile




       Everybody           Involvement          “Champion”


     Collectivism,
                                           Rugged individualism,
 group efforts, systems     Approach     individual ideas & efforts
       approach                                         // YIS//062709//
KAIZEN                   2               INNOVATION

     Maintenance &                                    Scrap
                               Mode
     Improvement                                    & Rebuild


Conventional know-how &                    Technological breakthroughs,
     state of the art
                               Spark       new inventions, new theories


    Little investment         Practical         Large investment
 Great effort to maintain   Requirements     Little effort to maintain


                                Effort
         People                                    Technology
                             orientation


  Process & efforts for      Evaluation
                                                Results for profits
     better results           criteria


                             Economic
 Slow growth economy                          Fast growth economy
                             condition
                                                           // YIS//062709//
Standard

                                                       Maintenance        Innovation
                                          Actual
                  Standard

                      Maintenance
Innovation   Actual


                               Time




                                                                       Actual
                                                                                      KAIZEN
                                                                           Standard

Innovation + Kaizen                                Actual
                                                            KAIZEN

                             Innovation              Standard


                                                                Time
                                                                                  // YIS//062709//
 Widely applicable – Can be used in both
  manufacturing   and   non-manufacturing
  environments

 Highly effective & results oriented. Kaizen
  events will generate         quick results,
  Measurable results, Establish the baseline,
  and measure the change!!!

 A Learning Experience – Every member of
  a Kaizen Team will walk away from the
  event learning something new! !

 Team based & cross functional – Team
  members can be from various functions of
  the business. Top management participation
  is encouraged.
KAIZEN
MANAGEMENT
Management & Labor ;
Enemies or Allies?




                                                Cooperation
                                      Working together to bake bigger pie




          Confrontation
fighting over how to divide the pie
JOBS FUNCTION PERCEPTIONS
Japanese perceptions                       Western perceptions


                        Top management

                       Middle management

                          Supervisors

                            Workers
Middle
   Top
                        Management                Supervisors                 Workers
Management
                         and Staff

    Determine to                                      Use Kaizen in
                              Deploy and                                    Engage in Kaizen
introduce Kaizen as                                  functional rules
                         implement Kaizen                                      through the
a corporate strategy    goals as directed by                                suggestion system
                          top management           Formulate plans for       and small group
                            through policy         Kaizen and provide            activities
Provide support and        deployment and         guidance for workers
direction for Kaizen       cross functional
    by allocating            management
     resources                                                              Practice discipline in
                                                       Improve                 the workshop
                            Use Kaizen in         communication with
 Establish policy for   functional capabilities   workers and sustain
  Kaizen and cross                                   high morale
   functional goals                                                              Engage in
                         Establish, maintain,
                        and upgrade standard      Support small group         continuous self-
                                                   activities (such as        development to
Realize Kaizen goals
                                                  quality circles) and         become better
   through policy         Make employees
                                                     the individual           problem solvers
  deployment and           Kaizen-concious
       audits             through intensive       suggestion system
                          training programs
                                                  Introduce discipline in
    Build system,          Help employees              the workshop         Enhance skills and
   procedures, and        develop skills and                                 job performance
structures conducive      tools for problem                                 expertise with cross
                                                     Provide Kaizen
      to Kaizen                solving                                          education
                                                      suggestions
                                                                               // YIS//062709//
Manager's first job is to learn to communicate with his
employees so both workers and the company can achieve their
common goal




                                  Union leader who cannot understand
                                  financial statement and analyze the
                                  company's performance will not be able to
                                  negotiate with management on such labor-
                                  related subjects as technological innovation,
                                  personnel transfers, and scrapping facilities
The KAIZEN APPROACH
 to PROBLEM SOLVING
When there is no
         problem , there is no
             potential for
            improvements




KAIZEN starts with a problem,
more precisely the
recognition that a
problem exists
Seven Statistical
          tools               New Seven tools

• Pareto diagrams          • Relations diagram

• Cause & Effect diagram   • Affinity diagram

• Histograms               • Tree diagram

• Control charts           • Matrix diagram

• Scatter diagram          • Matrix data-analysis diagram

• Graphs                   • PDPC (Process Decision
                             Program Chart)
• Check-sheets
                           • Arrow Diagram
                                                 // YIS//062709//
VELOCITY FOR COMPETITIVE
                 ADVANTAGE




Standardization
Process optimization
Elimination of waste
Evolution in people and technique
Durable training                      // YIS//062709//
KAIZEN
the PRACTICE
1. Quality assurance


TQC         2. Cost reduction

            3. Meeting production quota


            4. Meeting delivery schedule


            5. Safety

            6. New-product development


            7. Productivity improvement


            8. Supplier management


      TQC
ACT

                                                   PLAN
                 Standardi-   Definitions
                   zation     of problem



CHECK   Confirmation                   Analysis of
         of results                     problem



                                    Identificati
            Implemen-
                                       on of
              tation
                                      causes

                        Planning

 DO
                        counter-
                        measures
Seiton (Set in order)


                                 2



          Seiri   1                               3    Seiso (Shine)
(Straighten up)

                               5s

         Shitsuke     5                       4   Seiketsu
         (Sustain)                                (Standardize)
Who               What                Where               When                 Why                How
                                                                              Why does he do
 Who does it?       What to do?        Where to do it?    When to do it?                           How to do it?
                                                                                   it?

                                         Where is it
Who is doing it? What is being done?                     When is it done?       Why do it?         How to do it?
                                          done?

Who should be     What should be       Where should        When should                           How should it be
                                                                              Why do it there?
  doing it?          done?              It be done?        it be done?                               done?


                                                                                                 Can this method
Who else can do What else can be Where else can What other time
                                                                              Why do it then?    be used in other
      it?           done?         it be done?   can it be done?
                                                                                                     areas?


                                        Where else
Who else should What else should be                       What other time      Why do it that    Is there any other
                                        should it be
    do it?            done?                              should it be done?       way?              way to do it?
                                          done?


                                        Where are 3-                    Are there any 3-           Are there any
Who is doing 3-   What 3-Mus are                     Are there any time
                                         Mus being                      Mus in the way of          3-MUs in the
    Mus?           being done?                            3-Mus ?
                                          done?                            thinking?                 method?
SEVEN
WASTES !!
Shortened lead time

                Reduced time spent on non-process
                                             work

                                Reduced inventory



J
I
T   Better balance between different
    processes

    Problem clarification
CHANGING
the CORPORATE CULTURE
 Canon of Japan implemented in 1975 to
  excel over international competition and
  expand its operations on a global scale in 6
  years.

 Canon put in place a special matrix
  management system with numerous small
  group activities.

 The purpose was to eliminate wastes,
  revitalize the workforce, and improve
  continuously in all business processes.

 Techniques like Canon Production System,
  Quality Assurance, Production Assurance,
  and Personnel Training were introduced.
  Canon achieved an astonishing 3% per
  month productivity increase.
 Fidelity Investments offers various financial
  services.

 Chairman and CEO, Johnson, introduced
  Kaizen in Fidelity by setting up a separate
  group to promote Kaizen.

 Each division was defined as a separate
  company or business unit.

 Employees were motivated to the maximum,
  leadership qualities were encouraged, and
  progress on goals was evaluated on monthly
  and quarterly basis for adjustments and
  refinements.

 Customer satisfaction      and   profitability
  improved in long-term.
 Gold Seal Engineering Products is an
  India-based automotive spares
  manufacturer, with exports to several
  countries.

 The 5S principles of Kaizen were
  implemented to cut down the production
  set-up time by 33%.

 In 6 months, production space increased
  45%, lead time was down by 25%, scrap
  was reduced by 75%, machine down time
  dropped by 60%, and response time got
  reduced by 42%.
 Resistance to change

 Lack of proper procedure to
  implement

 Too much suggestion may lead
  to confusion and time wastage
 Kaizen Reduces Waste- like
  inventory waste, time waste,
  workers motion

 Kaizen Improves space
  utilization, product quality

 Results in higher employee
  moral and job satisfaction, and
  lower turn-over.
KAIZEN PHILOSOPHY




 “Be it our working life, our social
life, or our home life, deserves to
      be constantly improved”




                                       // YIS//062709//
Foram 8

Foram 8

  • 1.
    KAIZEN The Keyto Japan’s Competitive Success By VIVEK SHAH 11030241180 KINJAL GUPTA 11030241191 PALAK DABAS 11030241190 VINIT HANKARE 11030241179 VICTORY ABRAHAM 11030241186
  • 2.
    TABLE OF CONTENTS 1.KAIZEN, The Concept 2. Improvement East and West 3. KAIZEN Management 4. The KAIZEN Approach to Problem Solving 5. KAIZEN, The Practice 6. Changing the Corporate Culture
  • 3.
  • 5.
    RECTIFICATION CONTINUAL IMPROVEMENT INNOVATION DAY-TO-DAY
  • 6.
     The storyof the Kaizen miracle started in the 1930s. Sakichi Toyoda, founder of Toyota, which manufactured automatic looms at the time  In 1950 Toyota implemented quality circles leading to the development of Toyota’s unique “Toyota Production System”.  These continual small improvements (Kaizen) add up to major benefits. They result, for example, in: faster delivery, lower costs, and greater customer satisfaction.  In 1986 Masaaki Imai introduced to the Western world the Japanese term Kaizen and made it famous through his book, Kaizen: The Key to Japan's Competitive Success.
  • 8.
    Three Award inSumo Tournament ; - An outstanding performance award - A skill award - A fighting spirit award Focus more on process Rather than result !!!
  • 9.
  • 10.
  • 11.
    Continuous Improvement KAIZEN INNOVA TION Breakthrough Science Technology Design Production Market Innovation KAIZEN
  • 12.
    KAIZEN 1 INNOVATION Long term Short term Effect Un-dramatic Dramatic Small steps Pace Big steps Time Intermittent & Continuous & incremental frame non incremental Gradual & consistent Change Abrupt & volatile Everybody Involvement “Champion” Collectivism, Rugged individualism, group efforts, systems Approach individual ideas & efforts approach // YIS//062709//
  • 13.
    KAIZEN 2 INNOVATION Maintenance & Scrap Mode Improvement & Rebuild Conventional know-how & Technological breakthroughs, state of the art Spark new inventions, new theories Little investment Practical Large investment Great effort to maintain Requirements Little effort to maintain Effort People Technology orientation Process & efforts for Evaluation Results for profits better results criteria Economic Slow growth economy Fast growth economy condition // YIS//062709//
  • 14.
    Standard Maintenance Innovation Actual Standard Maintenance Innovation Actual Time Actual KAIZEN Standard Innovation + Kaizen Actual KAIZEN Innovation Standard Time // YIS//062709//
  • 16.
     Widely applicable– Can be used in both manufacturing and non-manufacturing environments  Highly effective & results oriented. Kaizen events will generate quick results, Measurable results, Establish the baseline, and measure the change!!!  A Learning Experience – Every member of a Kaizen Team will walk away from the event learning something new! !  Team based & cross functional – Team members can be from various functions of the business. Top management participation is encouraged.
  • 17.
  • 18.
    Management & Labor; Enemies or Allies? Cooperation Working together to bake bigger pie Confrontation fighting over how to divide the pie
  • 19.
    JOBS FUNCTION PERCEPTIONS Japaneseperceptions Western perceptions Top management Middle management Supervisors Workers
  • 20.
    Middle Top Management Supervisors Workers Management and Staff Determine to Use Kaizen in Deploy and Engage in Kaizen introduce Kaizen as functional rules implement Kaizen through the a corporate strategy goals as directed by suggestion system top management Formulate plans for and small group through policy Kaizen and provide activities Provide support and deployment and guidance for workers direction for Kaizen cross functional by allocating management resources Practice discipline in Improve the workshop Use Kaizen in communication with Establish policy for functional capabilities workers and sustain Kaizen and cross high morale functional goals Engage in Establish, maintain, and upgrade standard Support small group continuous self- activities (such as development to Realize Kaizen goals quality circles) and become better through policy Make employees the individual problem solvers deployment and Kaizen-concious audits through intensive suggestion system training programs Introduce discipline in Build system, Help employees the workshop Enhance skills and procedures, and develop skills and job performance structures conducive tools for problem expertise with cross Provide Kaizen to Kaizen solving education suggestions // YIS//062709//
  • 21.
    Manager's first jobis to learn to communicate with his employees so both workers and the company can achieve their common goal Union leader who cannot understand financial statement and analyze the company's performance will not be able to negotiate with management on such labor- related subjects as technological innovation, personnel transfers, and scrapping facilities
  • 22.
    The KAIZEN APPROACH to PROBLEM SOLVING
  • 23.
    When there isno problem , there is no potential for improvements KAIZEN starts with a problem, more precisely the recognition that a problem exists
  • 24.
    Seven Statistical tools New Seven tools • Pareto diagrams • Relations diagram • Cause & Effect diagram • Affinity diagram • Histograms • Tree diagram • Control charts • Matrix diagram • Scatter diagram • Matrix data-analysis diagram • Graphs • PDPC (Process Decision Program Chart) • Check-sheets • Arrow Diagram // YIS//062709//
  • 25.
    VELOCITY FOR COMPETITIVE ADVANTAGE Standardization Process optimization Elimination of waste Evolution in people and technique Durable training // YIS//062709//
  • 26.
  • 27.
    1. Quality assurance TQC 2. Cost reduction 3. Meeting production quota 4. Meeting delivery schedule 5. Safety 6. New-product development 7. Productivity improvement 8. Supplier management TQC
  • 28.
    ACT PLAN Standardi- Definitions zation of problem CHECK Confirmation Analysis of of results problem Identificati Implemen- on of tation causes Planning DO counter- measures
  • 29.
    Seiton (Set inorder) 2 Seiri 1 3 Seiso (Shine) (Straighten up) 5s Shitsuke 5 4 Seiketsu (Sustain) (Standardize)
  • 30.
    Who What Where When Why How Why does he do Who does it? What to do? Where to do it? When to do it? How to do it? it? Where is it Who is doing it? What is being done? When is it done? Why do it? How to do it? done? Who should be What should be Where should When should How should it be Why do it there? doing it? done? It be done? it be done? done? Can this method Who else can do What else can be Where else can What other time Why do it then? be used in other it? done? it be done? can it be done? areas? Where else Who else should What else should be What other time Why do it that Is there any other should it be do it? done? should it be done? way? way to do it? done? Where are 3- Are there any 3- Are there any Who is doing 3- What 3-Mus are Are there any time Mus being Mus in the way of 3-MUs in the Mus? being done? 3-Mus ? done? thinking? method?
  • 31.
  • 32.
    Shortened lead time Reduced time spent on non-process work Reduced inventory J I T Better balance between different processes Problem clarification
  • 33.
  • 34.
     Canon ofJapan implemented in 1975 to excel over international competition and expand its operations on a global scale in 6 years.  Canon put in place a special matrix management system with numerous small group activities.  The purpose was to eliminate wastes, revitalize the workforce, and improve continuously in all business processes.  Techniques like Canon Production System, Quality Assurance, Production Assurance, and Personnel Training were introduced. Canon achieved an astonishing 3% per month productivity increase.
  • 35.
     Fidelity Investmentsoffers various financial services.  Chairman and CEO, Johnson, introduced Kaizen in Fidelity by setting up a separate group to promote Kaizen.  Each division was defined as a separate company or business unit.  Employees were motivated to the maximum, leadership qualities were encouraged, and progress on goals was evaluated on monthly and quarterly basis for adjustments and refinements.  Customer satisfaction and profitability improved in long-term.
  • 36.
     Gold SealEngineering Products is an India-based automotive spares manufacturer, with exports to several countries.  The 5S principles of Kaizen were implemented to cut down the production set-up time by 33%.  In 6 months, production space increased 45%, lead time was down by 25%, scrap was reduced by 75%, machine down time dropped by 60%, and response time got reduced by 42%.
  • 37.
     Resistance tochange  Lack of proper procedure to implement  Too much suggestion may lead to confusion and time wastage
  • 38.
     Kaizen ReducesWaste- like inventory waste, time waste, workers motion  Kaizen Improves space utilization, product quality  Results in higher employee moral and job satisfaction, and lower turn-over.
  • 39.
    KAIZEN PHILOSOPHY “Beit our working life, our social life, or our home life, deserves to be constantly improved” // YIS//062709//