This week, the filmmaker faced challenges with the location, time of day, and getting quality shots for their film project. They filmed exterior shots of an isolated house before production to have footage to edit, though progress was slow since the story was unplanned. Finding a suitably isolated house was difficult as the chosen building was next to others and a busy road. The filming went better when cars were absent, allowing clear shots of the spooky house and moon that added scariness. Footage was captured at night on an iPad to achieve the desired darkness, rather than using a dark filter during the day. This weekend, the filmmaker plans to get more footage filmed so they have material to edit in college and stay on schedule