The document discusses five keys to achieving ultra-low PUEs (Power Usage Effectiveness) in data centers: 1) Be brave and embrace hardware failure by operating servers in higher temperature and humidity environments to reduce energy costs, 2) Ensure proper high-efficiency mechanical and electrical equipment and power distribution, 3) Maintain precise temperature control through environmental monitoring and adjustments, 4) Increase voltage distribution to reduce transmission losses, and 5) Choose equipment and designs that reduce pressure drops in air flow. The document argues these strategies can lower PUEs below 1.15 and significantly reduce total cost of ownership for data centers.
Do you think how big companies like google, facebook , adobe, ...etc, are store millians of data and also how they secure all those data. Please watch to know all these actual reality.
Bits, Bytes and BTUs: Warm Water Liquid Cooling at NRELinside-BigData.com
In this video from the 2014 HPC User Forum in Seattle, Steven Hammond from NREL presents: Bits, Bytes and BTUs: Warm Water Liquid Cooling at NREL.
Learn more: http://insidehpc.com/video-gallery-hpc-user-forum-2014-seattle/
The role uninterrupted power supplies play in data center operations cannot be understated. Given utility power failures can be expected at some point during operations, data centers must be equipped to withstand the disruptions without adverse effects on the business. A UPS will provide instantaneous, emergency power when the input power source fails. Find out more from this presentation given by CEO of DP Air Corp, Arnie W. Evdokimo.
Do you think how big companies like google, facebook , adobe, ...etc, are store millians of data and also how they secure all those data. Please watch to know all these actual reality.
Bits, Bytes and BTUs: Warm Water Liquid Cooling at NRELinside-BigData.com
In this video from the 2014 HPC User Forum in Seattle, Steven Hammond from NREL presents: Bits, Bytes and BTUs: Warm Water Liquid Cooling at NREL.
Learn more: http://insidehpc.com/video-gallery-hpc-user-forum-2014-seattle/
The role uninterrupted power supplies play in data center operations cannot be understated. Given utility power failures can be expected at some point during operations, data centers must be equipped to withstand the disruptions without adverse effects on the business. A UPS will provide instantaneous, emergency power when the input power source fails. Find out more from this presentation given by CEO of DP Air Corp, Arnie W. Evdokimo.
Progression, through Disaster Recovery as a Service (DRaaS) offering, makes sure that your IT infrastructure faces zero downtime in case of any kind of disaster. We deploy VMware Site Recovery Manager (SRM) to ensure business continuity for your enterprise.
The DR solution is provisioned using VMware Site Recovery Manager (SRM) and is replicated to a different geography. The SRM replicates the data from the primary site to the DR site. In the event of any disaster, the DR site is made operational immediately, or as per the recovery point objective (RPO) and recovery time objective (RTO) defined by the customers.
When planning for Disaster Recovery it is essential to have a clearly defined set of objectives that are based on your businesses needs .InTechnology's Product Director for Data & Cloud Services, Stefan Haase, provides tips for any business to consider when putting together their disaster recovery plan. http://www.intechnology.co.uk/resource-centre/webcast-disaster-recovery-planning.aspx
PAC 2.5 Efficiency is Attainable, What are you Waiting for?SchneiderITB
This presentation covers ways to increase data center efficiency. From what we consider the basics to more advanced techniques and then through services that are available. Many of these are covered through individual white papers and presentations but we wanted to bring these topics together under one presentation.
The green data center has moved from theoretical to the realistic, with IT leaders being challenged to construct new data centers (or retrofits the existing one) with energy saving features, sustainable materials and other environmental efficiencies in mind.
This project deals with the effects that are caused by the data center. How severe these effects are and how to overcome these. The measures that has been provided are not only in constructional point of view but also focusing on other dimensions.
Proactively Managing Your Data Center Infrastructurekimotte
Attached is the presentation from our Proactively Manage Data Center Infrastructure Webinar - to view the webinar with audio, go here:http://blog.eecnet.com/proactive-manage-data-center/
Eliminating Data Center Hot Spots: An Approach for Identifying and Correcting Lost Air
Data center cooling is a hot topic. But, when you consider the challenges associated with cooling the latest generation servers, the growing cost of infrastructure equipment, and the risks associated with data center hot spots brought on by high-density clusters and premature hardware failure, it's easy to understand the focus.
To view the recorded webinar event, please visit http://www.42u.com/data-center-hot-spots-webinar.htm
Energy costs continue to be a major area of concern when cooling a data center. With cooling comprising a significant portion of energy, special attention must be placed on capacities and efficiencies of cooling equipment to offset these costs. Find out more from this presentation given by CEO of DP Air Corp, Arnie W. Evdokimo.
Green Business are the future business and Green IT can be one of the best business for future which help companies in Energy Efficiency and also help in CSR and also save the environment.
Progression, through Disaster Recovery as a Service (DRaaS) offering, makes sure that your IT infrastructure faces zero downtime in case of any kind of disaster. We deploy VMware Site Recovery Manager (SRM) to ensure business continuity for your enterprise.
The DR solution is provisioned using VMware Site Recovery Manager (SRM) and is replicated to a different geography. The SRM replicates the data from the primary site to the DR site. In the event of any disaster, the DR site is made operational immediately, or as per the recovery point objective (RPO) and recovery time objective (RTO) defined by the customers.
When planning for Disaster Recovery it is essential to have a clearly defined set of objectives that are based on your businesses needs .InTechnology's Product Director for Data & Cloud Services, Stefan Haase, provides tips for any business to consider when putting together their disaster recovery plan. http://www.intechnology.co.uk/resource-centre/webcast-disaster-recovery-planning.aspx
PAC 2.5 Efficiency is Attainable, What are you Waiting for?SchneiderITB
This presentation covers ways to increase data center efficiency. From what we consider the basics to more advanced techniques and then through services that are available. Many of these are covered through individual white papers and presentations but we wanted to bring these topics together under one presentation.
The green data center has moved from theoretical to the realistic, with IT leaders being challenged to construct new data centers (or retrofits the existing one) with energy saving features, sustainable materials and other environmental efficiencies in mind.
This project deals with the effects that are caused by the data center. How severe these effects are and how to overcome these. The measures that has been provided are not only in constructional point of view but also focusing on other dimensions.
Proactively Managing Your Data Center Infrastructurekimotte
Attached is the presentation from our Proactively Manage Data Center Infrastructure Webinar - to view the webinar with audio, go here:http://blog.eecnet.com/proactive-manage-data-center/
Eliminating Data Center Hot Spots: An Approach for Identifying and Correcting Lost Air
Data center cooling is a hot topic. But, when you consider the challenges associated with cooling the latest generation servers, the growing cost of infrastructure equipment, and the risks associated with data center hot spots brought on by high-density clusters and premature hardware failure, it's easy to understand the focus.
To view the recorded webinar event, please visit http://www.42u.com/data-center-hot-spots-webinar.htm
Energy costs continue to be a major area of concern when cooling a data center. With cooling comprising a significant portion of energy, special attention must be placed on capacities and efficiencies of cooling equipment to offset these costs. Find out more from this presentation given by CEO of DP Air Corp, Arnie W. Evdokimo.
Green Business are the future business and Green IT can be one of the best business for future which help companies in Energy Efficiency and also help in CSR and also save the environment.
Overheating Solutions - Keeping Your Computer Cool.pptxAccess Computer
The Content "Overheating Solutions - Keeping Your Computer Cool" offers practical tips and strategies for preventing computer overheating. It covers various methods to maintain optimal temperature levels within your computer system, including hardware upgrades, proper ventilation, and software solutions
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...Schneider Electric
Small server rooms and branch offices are typically unorganized, unsecure, hot, unmonitored, and space constrained. These conditions can lead to system downtime or, at the very least, lead to “close calls” that get management’s attention. Practical experience with these problems reveals a short list of effective methods to improve the availability of IT operations within small server rooms and branch offices. This paper discusses making realistic improvements to power, cooling, racks, physical security, monitoring, and lighting. The focus of this paper is on small server rooms and branch offices with up to 10kW of IT load.
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Upsite Technologies
The topic of raising temperatures in data centers used to be met with much criticism in the industry, but in recent years has become more accepted. A big driver for this acceptance has been ASHRAE’s expanded envelope for recommended and allowable server inlet temperatures. However, while this has eased the discussion, there are still some questions that have been left unanswered. What’s the difference between recommended and allowable? Which one is best to use? What steps must be taken to safely raise set points? How do you ensure servers are still adequately cooled? What if you have different server types (A1, A2, A3, A4)? This presentation will examine these questions to give a clearer understanding of ASHRAE’s recommended and allowable guidelines. Also covered will be an explanation on how, in some cases, it is possible to raise cooling control set points without raising server inlet temperatures.
How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingUpsite Technologies
Decisions and actions typically under the jurisdiction of the IT side of data center management can have a profound impact on the mechanical systems and resultant operating costs and capacity of the data center. By understanding these impacts, IT and facilities management are able to develop a cooperative approach to managing the data center, resulting in a more effective and efficient operation, thereby reducing operating costs.
Presented by:
Lars Strong, P.E., Senior Engineer, Upsite Technologies
Ian Seaton, Industry Guru & Technical Advisor, Upsite Technologies
High Efficiency Indirect Air Economizer Based Cooling for Data CentersSchneider Electric
Of the various economizer (free cooling) modes for data centers, using fresh air is often viewed as the most energy efficient approach. However, this paper shows how indirect air economizer-based cooling produces similar or better energy savings while eliminating risks posed when outside fresh air is allowed directly into the IT space.
Similar to In the Data Center: Five Keys to Achieving Ultra-Low PUEs (20)
Show drafts
volume_up
Empowering the Data Analytics Ecosystem: A Laser Focus on Value
The data analytics ecosystem thrives when every component functions at its peak, unlocking the true potential of data. Here's a laser focus on key areas for an empowered ecosystem:
1. Democratize Access, Not Data:
Granular Access Controls: Provide users with self-service tools tailored to their specific needs, preventing data overload and misuse.
Data Catalogs: Implement robust data catalogs for easy discovery and understanding of available data sources.
2. Foster Collaboration with Clear Roles:
Data Mesh Architecture: Break down data silos by creating a distributed data ownership model with clear ownership and responsibilities.
Collaborative Workspaces: Utilize interactive platforms where data scientists, analysts, and domain experts can work seamlessly together.
3. Leverage Advanced Analytics Strategically:
AI-powered Automation: Automate repetitive tasks like data cleaning and feature engineering, freeing up data talent for higher-level analysis.
Right-Tool Selection: Strategically choose the most effective advanced analytics techniques (e.g., AI, ML) based on specific business problems.
4. Prioritize Data Quality with Automation:
Automated Data Validation: Implement automated data quality checks to identify and rectify errors at the source, minimizing downstream issues.
Data Lineage Tracking: Track the flow of data throughout the ecosystem, ensuring transparency and facilitating root cause analysis for errors.
5. Cultivate a Data-Driven Mindset:
Metrics-Driven Performance Management: Align KPIs and performance metrics with data-driven insights to ensure actionable decision making.
Data Storytelling Workshops: Equip stakeholders with the skills to translate complex data findings into compelling narratives that drive action.
Benefits of a Precise Ecosystem:
Sharpened Focus: Precise access and clear roles ensure everyone works with the most relevant data, maximizing efficiency.
Actionable Insights: Strategic analytics and automated quality checks lead to more reliable and actionable data insights.
Continuous Improvement: Data-driven performance management fosters a culture of learning and continuous improvement.
Sustainable Growth: Empowered by data, organizations can make informed decisions to drive sustainable growth and innovation.
By focusing on these precise actions, organizations can create an empowered data analytics ecosystem that delivers real value by driving data-driven decisions and maximizing the return on their data investment.
Techniques to optimize the pagerank algorithm usually fall in two categories. One is to try reducing the work per iteration, and the other is to try reducing the number of iterations. These goals are often at odds with one another. Skipping computation on vertices which have already converged has the potential to save iteration time. Skipping in-identical vertices, with the same in-links, helps reduce duplicate computations and thus could help reduce iteration time. Road networks often have chains which can be short-circuited before pagerank computation to improve performance. Final ranks of chain nodes can be easily calculated. This could reduce both the iteration time, and the number of iterations. If a graph has no dangling nodes, pagerank of each strongly connected component can be computed in topological order. This could help reduce the iteration time, no. of iterations, and also enable multi-iteration concurrency in pagerank computation. The combination of all of the above methods is the STICD algorithm. [sticd] For dynamic graphs, unchanged components whose ranks are unaffected can be skipped altogether.
Opendatabay - Open Data Marketplace.pptxOpendatabay
Opendatabay.com unlocks the power of data for everyone. Open Data Marketplace fosters a collaborative hub for data enthusiasts to explore, share, and contribute to a vast collection of datasets.
First ever open hub for data enthusiasts to collaborate and innovate. A platform to explore, share, and contribute to a vast collection of datasets. Through robust quality control and innovative technologies like blockchain verification, opendatabay ensures the authenticity and reliability of datasets, empowering users to make data-driven decisions with confidence. Leverage cutting-edge AI technologies to enhance the data exploration, analysis, and discovery experience.
From intelligent search and recommendations to automated data productisation and quotation, Opendatabay AI-driven features streamline the data workflow. Finding the data you need shouldn't be a complex. Opendatabay simplifies the data acquisition process with an intuitive interface and robust search tools. Effortlessly explore, discover, and access the data you need, allowing you to focus on extracting valuable insights. Opendatabay breaks new ground with a dedicated, AI-generated, synthetic datasets.
Leverage these privacy-preserving datasets for training and testing AI models without compromising sensitive information. Opendatabay prioritizes transparency by providing detailed metadata, provenance information, and usage guidelines for each dataset, ensuring users have a comprehensive understanding of the data they're working with. By leveraging a powerful combination of distributed ledger technology and rigorous third-party audits Opendatabay ensures the authenticity and reliability of every dataset. Security is at the core of Opendatabay. Marketplace implements stringent security measures, including encryption, access controls, and regular vulnerability assessments, to safeguard your data and protect your privacy.
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
1. Enterprise Data Center Solutions
Five keys to achieving
ultra-low PUEs
Chris Yetman
Senior Vice President, Operations
2. Ultra-low
PUEs
Getting From Here To There
2
You’re using the latest high-efficiency servers. You keep your server room at a higher
temperature. You’ve virtualized to cut down on the number of servers. It seems like you’re
doing everything right. But you’re still stuck at a less than enviable PUE.
3. 33MW of data center, 18 acres
Commissioned PUEs as low as 1.12
15% reduction in TCO due to highly
efficient facility designs
Largest LEED Platinum data center in
North America
I feel your PUE pain
Today I’d like to share five things we’ve learned
about getting to ultra-low PUEs. Check it out:
we’ve been able to hit 1.15 PUEs for our
customers.
We get it. We know this problem. We live and
breathe it every day.
4. PREVIOUS JOB
Chief Information
Officer (CIO)
As a former CIO, a current Chief of
Operations, and, most importantly,
someone who is passionate about building
awesome data centers, I’d like to call on all
CIOs.
Too often we are needlessly cautious when
it comes to hardware. Too often we make
IT decisions based on fear.
Why are we afraid to allow equipment to
fail? Why are we working so hard to avoid
breaking a server?
These decisions cost us more than we
suspect.
1. Be Brave
5. 1. Be Brave
Operating
Envelope
ASHRAE
Allowed
Temp: 59°-90°
Humidity: 20-80%
Dew Point:
Up to 63°
Temp: 65-80
Humidity: 42-60%
Dew Point:
Up to 59°
The truth is, studies have shown IT equipment
can handle higher temperatures than what the
industry currently operates under.
The industry needs to diversify equipment-level
risk. Why should the loss of any single piece of
equipment compromise your business?
For Vantage, being located in Santa Clara, we
utilize the free-cooling hours throughout the fall,
winter, spring, and temperate summer days.
We help each customer build the data center
they want to build. If one feels comfortable and
wants to move out of the recommended
ASHRAE zone into allowable conditions, they
create greater cost efficiency by utilizing natural
air temperature and flow up to 80% of the year.
Even if you’re timid about rising to 90-degrees,
being more flexible on humidity can have a
positive effect.
ASHRAE
Recommended
6. 1. Embrace Failure
Hello, my
name is
failure.
But you can
call me
recovery.
Stop trying to prevent hardware failure. It’s
not worth the cost. If you build with the
knowledge that hardware will fail, you can
instead focus on recovery.
This will save you money.
Operating at a higher operating envelope
may mean more hardware failure, but you
will save so much in energy efficiency and
costs.
Those savings will cover the money needed
to replace hardware, ten-fold.
Don’t let hardware failure be the worst-case-
scenario. Hardware failure is nothing to fear.
7. 1.3 1.2
PUE
Operating
Envelope
$500K
7
Check out the cost savings!
A large data center running five-plus
megawatts can spend $500,000 more in
energy per month.
But let’s say you run the temperature up to
80-degrees in the cold aisle, taking your
PUE down from 1.3 to 1.2.
In this scenario, you will save over
$500,000 per year in energy, and break a
whole lot less than that in hardware.
Imagine the temperature at 85, 90-
degrees.
Focus on extending the envelope.
1. Bravery and Recovery = Cost Savings
8. 8
Take the example of Netflix. Here’s a company that’s
challenged its system to plan for recovery and resilience.
They created Chaos Monkey, a software tool that forces
their engineers to deal with small failures, ones that, once
eliminated, will keep from turning into major outages.
Netflix says the name “Chaos Monkey” comes from the
idea of “unleashing a wild monkey with a weapon in data
center or cloud region to randomly shoot down instances
and chew through cable—all while we continue serving
our customers without interruption.”
When Netflix loses a server—no big deal. The software
reassigns the data elsewhere.
The challenge to developers everywhere is to write
applications to be resilient.
1. Bravery and Recovery = Cost Savings
9. 2. Get the Foundation Right
High-efficiency
mechanical /
electrical
equipment
High-voltage
power
distribution
Measurement
&
Control
Proper
containment of
hot and cold
aisles
9
Achieving low PUEs begins with right, high-efficiency equipment. For Vantage that means these four pillars
listed above.
A solid foundation also includes minute attention to mechanical infrastructure like high-efficiency fan motors,
direct drive units, and variable frequency drives on all motors. Did you know we don’t use fans with belts? That
way we don’t have to worry about slippage and losing efficiency to those incremental, inevitable belt slips. All
the little things add up.
10. Monitor Adjust Recirculate
Precise temperature control
3.Maintain Infinite Control
It’s critical to choose an
environmental-electrical-monitoring
system that allows for precise high-
speed industrial process control.
The system tracks air conditions
both inside and outside the data
center—temperature, humidity,
dew point, flow volume.
This allows the system to make
adjustments with precision.
As the outside air temperature drops, the system is able to recirculate more heated air from
the data module into the supply air stream, allowing for precise temperature control.
This allows the system to modulate anywhere from 100% outside air economization down to
0% full recirculation.
The system can provide the minimal amount cooling to meet the envelope!
11. Losses
Current
Conductors
480V to
the rack
4. Increase the Voltage
11
Higher
Voltage
High voltage distribution to the IT racks reduces
transmission loss, decreases the amount of copper running
into the building, and minimizes transformation losses.
If you combined this with an open compute platform
approach, where you transform down from 480V at the rack
and share power supplies—think of all the energy you’d
retain!
Here’s the straight electric talk:
• The losses due to typical transformation from 480V to
208/120V of a typical Power Distribution Unit
(PDU) account for anywhere from 1.5%-3.5%
• Providing 400V to the Busway Distribution Units
(BDU’s, equivalent to PDU) line to neutral voltage of 230V
can be supplied to the IT equipment
• The result is reduced losses, lower current supplied to the
IT equipment, and smaller conductors required to power
the servers
• Extending the higher voltages out to the rack saves on
transformation losses and conductor costs
12. 5.Reduce Pressure Drop
12
Choose mechanical cooling equipment that enables the
lowest available pressure drop.
Start with the outside air damper array and filter bank.
Choose components to minimize air velocity. These
range from oversized dampers and filters to higher cross-
section cooling coils.
Look at your fans. Belt drives inevitably lead to slippage
and energy loss. Direct drive supply fans eliminate such
loss, and large diameter fan rotors increase flow volume
while maintaining reasonable equipment footprint.
Use natural cycles. Data modules utilize vertical hot-
aisle, allowing for convective air flow to return the hot air
from the IT equipment to the cooling plenums.
Avoid leakage by creating a strong barrier between hot
and cold aisles.
13. 1. This is not an all-or-nothing environment.
Going from open/shut cases to varying
degrees of open-to-shut provides optimization.
2. Moving a lot of air is turbulent. Rigid filtering is
better. Don’t let your filters disintegrate.
3. Air will mix before it hits the equipment. Add
lots of measurement points along the air flow
path. The air the racks ingest matters the most.
Lessons Learned
14. • Runs at 1.15 PUEs
• Fully redundant 2N
electrical configuration
• 9 megawatt, expandable
to 18 megawatts
This is already a reality today.
15. 1. Be brave. Embrace failure.
2. Maintain infinite control.
3. Pick the right equipment.
4. Increase the voltage.
5. Reduce pressure drop.
Getting to Ultra-Low PUEs
Let’s connect: