Ultra-low
PUEs
Getting From Here To There
2
You’re using the latest high-efficiency servers. You keep your server room at a higher
temperature. You’ve virtualized to cut down on the number of servers. It seems like you’re
doing everything right. But you’re still stuck at a less than enviable PUE.
 33MW of data center, 18 acres
 Commissioned PUEs as low as 1.12
 15% reduction in TCO due to highly
efficient facility designs
 Largest LEED Platinum data center in
North America
I feel your PUE pain
Today I’d like to share five things we’ve learned
about getting to ultra-low PUEs. Check it out:
we’ve been able to hit 1.15 PUEs for our
customers.
We get it. We know this problem. We live and
breathe it every day.
PREVIOUS JOB
Chief Information
Officer (CIO)
As a former CIO, a current Chief of
Operations, and, most importantly,
someone who is passionate about building
awesome data centers, I’d like to call on all
CIOs.
Too often we are needlessly cautious when
it comes to hardware. Too often we make
IT decisions based on fear.
Why are we afraid to allow equipment to
fail? Why are we working so hard to avoid
breaking a server?
These decisions cost us more than we
suspect.
1. Be Brave
1. Be Brave
Operating
Envelope
ASHRAE
Allowed
Temp: 59°-90°
Humidity: 20-80%
Dew Point:
Up to 63°
Temp: 65-80
Humidity: 42-60%
Dew Point:
Up to 59°
The truth is, studies have shown IT equipment
can handle higher temperatures than what the
industry currently operates under.
The industry needs to diversify equipment-level
risk. Why should the loss of any single piece of
equipment compromise your business?
For Vantage, being located in Santa Clara, we
utilize the free-cooling hours throughout the fall,
winter, spring, and temperate summer days.
We help each customer build the data center
they want to build. If one feels comfortable and
wants to move out of the recommended
ASHRAE zone into allowable conditions, they
create greater cost efficiency by utilizing natural
air temperature and flow up to 80% of the year.
Even if you’re timid about rising to 90-degrees,
being more flexible on humidity can have a
positive effect.
ASHRAE
Recommended
1. Embrace Failure
Hello, my
name is
failure.
But you can
call me
recovery.
Stop trying to prevent hardware failure. It’s
not worth the cost. If you build with the
knowledge that hardware will fail, you can
instead focus on recovery.
This will save you money.
Operating at a higher operating envelope
may mean more hardware failure, but you
will save so much in energy efficiency and
costs.
Those savings will cover the money needed
to replace hardware, ten-fold.
Don’t let hardware failure be the worst-case-
scenario. Hardware failure is nothing to fear.
1.3  1.2
PUE
Operating
Envelope
$500K
7
Check out the cost savings!
A large data center running five-plus
megawatts can spend $500,000 more in
energy per month.
But let’s say you run the temperature up to
80-degrees in the cold aisle, taking your
PUE down from 1.3 to 1.2.
In this scenario, you will save over
$500,000 per year in energy, and break a
whole lot less than that in hardware.
Imagine the temperature at 85, 90-
degrees.
Focus on extending the envelope.
1. Bravery and Recovery = Cost Savings
8
Take the example of Netflix. Here’s a company that’s
challenged its system to plan for recovery and resilience.
They created Chaos Monkey, a software tool that forces
their engineers to deal with small failures, ones that, once
eliminated, will keep from turning into major outages.
Netflix says the name “Chaos Monkey” comes from the
idea of “unleashing a wild monkey with a weapon in data
center or cloud region to randomly shoot down instances
and chew through cable—all while we continue serving
our customers without interruption.”
When Netflix loses a server—no big deal. The software
reassigns the data elsewhere.
The challenge to developers everywhere is to write
applications to be resilient.
1. Bravery and Recovery = Cost Savings
2. Get the Foundation Right
High-efficiency
mechanical /
electrical
equipment
High-voltage
power
distribution
Measurement
&
Control
Proper
containment of
hot and cold
aisles
9
Achieving low PUEs begins with right, high-efficiency equipment. For Vantage that means these four pillars
listed above.
A solid foundation also includes minute attention to mechanical infrastructure like high-efficiency fan motors,
direct drive units, and variable frequency drives on all motors. Did you know we don’t use fans with belts? That
way we don’t have to worry about slippage and losing efficiency to those incremental, inevitable belt slips. All
the little things add up.
Monitor Adjust Recirculate
Precise temperature control
3.Maintain Infinite Control
It’s critical to choose an
environmental-electrical-monitoring
system that allows for precise high-
speed industrial process control.
The system tracks air conditions
both inside and outside the data
center—temperature, humidity,
dew point, flow volume.
This allows the system to make
adjustments with precision.
As the outside air temperature drops, the system is able to recirculate more heated air from
the data module into the supply air stream, allowing for precise temperature control.
This allows the system to modulate anywhere from 100% outside air economization down to
0% full recirculation.
The system can provide the minimal amount cooling to meet the envelope!
Losses
Current
Conductors
480V to
the rack
4. Increase the Voltage
11
Higher
Voltage
High voltage distribution to the IT racks reduces
transmission loss, decreases the amount of copper running
into the building, and minimizes transformation losses.
If you combined this with an open compute platform
approach, where you transform down from 480V at the rack
and share power supplies—think of all the energy you’d
retain!
Here’s the straight electric talk:
• The losses due to typical transformation from 480V to
208/120V of a typical Power Distribution Unit
(PDU) account for anywhere from 1.5%-3.5%
• Providing 400V to the Busway Distribution Units
(BDU’s, equivalent to PDU) line to neutral voltage of 230V
can be supplied to the IT equipment
• The result is reduced losses, lower current supplied to the
IT equipment, and smaller conductors required to power
the servers
• Extending the higher voltages out to the rack saves on
transformation losses and conductor costs
5.Reduce Pressure Drop
12
Choose mechanical cooling equipment that enables the
lowest available pressure drop.
Start with the outside air damper array and filter bank.
Choose components to minimize air velocity. These
range from oversized dampers and filters to higher cross-
section cooling coils.
Look at your fans. Belt drives inevitably lead to slippage
and energy loss. Direct drive supply fans eliminate such
loss, and large diameter fan rotors increase flow volume
while maintaining reasonable equipment footprint.
Use natural cycles. Data modules utilize vertical hot-
aisle, allowing for convective air flow to return the hot air
from the IT equipment to the cooling plenums.
Avoid leakage by creating a strong barrier between hot
and cold aisles.
1. This is not an all-or-nothing environment.
Going from open/shut cases to varying
degrees of open-to-shut provides optimization.
2. Moving a lot of air is turbulent. Rigid filtering is
better. Don’t let your filters disintegrate.
3. Air will mix before it hits the equipment. Add
lots of measurement points along the air flow
path. The air the racks ingest matters the most.
Lessons Learned
• Runs at 1.15 PUEs
• Fully redundant 2N
electrical configuration
• 9 megawatt, expandable
to 18 megawatts
This is already a reality today.
1. Be brave. Embrace failure.
2. Maintain infinite control.
3. Pick the right equipment.
4. Increase the voltage.
5. Reduce pressure drop.
Getting to Ultra-Low PUEs
Let’s connect:
THANK
YOU

More Related Content

What's hot

FACT SHEET - DRaaS
FACT SHEET - DRaaS FACT SHEET - DRaaS
FACT SHEET - DRaaS Scott Wagner
 
Progression: Disaster Recovery as a Service
Progression: Disaster Recovery as a ServiceProgression: Disaster Recovery as a Service
Progression: Disaster Recovery as a Service
Progression Infonet Pvt. Ltd.
 
Disaster Recovery and Reliability
Disaster Recovery and ReliabilityDisaster Recovery and Reliability
Disaster Recovery and Reliability
Manish Pandit
 
Predictive Maintenance In HVAC Industry
Predictive Maintenance In HVAC IndustryPredictive Maintenance In HVAC Industry
Predictive Maintenance In HVAC Industry
Arnab Biswas
 
Disaster Recover : 10 tips for disaster recovery planning
Disaster Recover : 10 tips for disaster recovery planningDisaster Recover : 10 tips for disaster recovery planning
Disaster Recover : 10 tips for disaster recovery planning
InTechnology Managed Services (part of Redcentric)
 
Orloff-extra credit
Orloff-extra creditOrloff-extra credit
Orloff-extra creditamyorloff
 
E4 Less – Dc Energy Efficient Solutions V.2.2
E4 Less – Dc Energy Efficient Solutions   V.2.2E4 Less – Dc Energy Efficient Solutions   V.2.2
E4 Less – Dc Energy Efficient Solutions V.2.2
Vagelis Chalkiadakis
 
PAC 2.5 Efficiency is Attainable, What are you Waiting for?
PAC 2.5 Efficiency is Attainable, What are you Waiting for?PAC 2.5 Efficiency is Attainable, What are you Waiting for?
PAC 2.5 Efficiency is Attainable, What are you Waiting for?
SchneiderITB
 

What's hot (10)

FACT SHEET - DRaaS
FACT SHEET - DRaaS FACT SHEET - DRaaS
FACT SHEET - DRaaS
 
Progression: Disaster Recovery as a Service
Progression: Disaster Recovery as a ServiceProgression: Disaster Recovery as a Service
Progression: Disaster Recovery as a Service
 
Disaster Recovery and Reliability
Disaster Recovery and ReliabilityDisaster Recovery and Reliability
Disaster Recovery and Reliability
 
Predictive Maintenance In HVAC Industry
Predictive Maintenance In HVAC IndustryPredictive Maintenance In HVAC Industry
Predictive Maintenance In HVAC Industry
 
Design computerroom
Design computerroomDesign computerroom
Design computerroom
 
Disaster Recover : 10 tips for disaster recovery planning
Disaster Recover : 10 tips for disaster recovery planningDisaster Recover : 10 tips for disaster recovery planning
Disaster Recover : 10 tips for disaster recovery planning
 
Orloff-extra credit
Orloff-extra creditOrloff-extra credit
Orloff-extra credit
 
Green dc (1)
Green dc (1)Green dc (1)
Green dc (1)
 
E4 Less – Dc Energy Efficient Solutions V.2.2
E4 Less – Dc Energy Efficient Solutions   V.2.2E4 Less – Dc Energy Efficient Solutions   V.2.2
E4 Less – Dc Energy Efficient Solutions V.2.2
 
PAC 2.5 Efficiency is Attainable, What are you Waiting for?
PAC 2.5 Efficiency is Attainable, What are you Waiting for?PAC 2.5 Efficiency is Attainable, What are you Waiting for?
PAC 2.5 Efficiency is Attainable, What are you Waiting for?
 

Similar to In the Data Center: Five Keys to Achieving Ultra-Low PUEs

Green computing
Green computingGreen computing
Green computing
kunalsahu9883
 
Optimizing The Data Centre Environment
Optimizing The Data Centre EnvironmentOptimizing The Data Centre Environment
Optimizing The Data Centre Environmentmixalisg
 
Proactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center InfrastructureProactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center Infrastructure
kimotte
 
Data center m&e
Data center  m&eData center  m&e
Data center m&e
Jebaraj D.A.L
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
42U Data Center Solutions
 
Cooling a Data Center - DP Air
Cooling a Data Center - DP Air Cooling a Data Center - DP Air
Cooling a Data Center - DP Air
dpsir
 
Green Data Center
Green Data CenterGreen Data Center
Green Data Center
Christopher Duffy
 
NER Aurora Thermal_Monitoring_Whitepaper
NER Aurora Thermal_Monitoring_WhitepaperNER Aurora Thermal_Monitoring_Whitepaper
NER Aurora Thermal_Monitoring_Whitepaper
Greg Stover
 
Green IT
Green ITGreen IT
Green IT
Leo Zalki
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for Cooling
Graybar
 
DC inverter technology in HVAC-R business
DC inverter technology in HVAC-R businessDC inverter technology in HVAC-R business
DC inverter technology in HVAC-R business
CAREL Industries S.p.A
 
Optimize power and cooling final 1
Optimize power and cooling final 1Optimize power and cooling final 1
Optimize power and cooling final 1Viridity Software
 
Overheating Solutions - Keeping Your Computer Cool.pptx
Overheating Solutions - Keeping Your Computer Cool.pptxOverheating Solutions - Keeping Your Computer Cool.pptx
Overheating Solutions - Keeping Your Computer Cool.pptx
Access Computer
 
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Schneider Electric
 
It Presentation 2011 Santa Clara1
It Presentation   2011 Santa Clara1It Presentation   2011 Santa Clara1
It Presentation 2011 Santa Clara1Peter Kendall
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Upsite Technologies
 
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingHow IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
Upsite Technologies
 
Optimize power and cooling final
Optimize power and cooling finalOptimize power and cooling final
Optimize power and cooling finalViridity Software
 
High Efficiency Indirect Air Economizer Based Cooling for Data Centers
High Efficiency Indirect Air Economizer Based Cooling for Data CentersHigh Efficiency Indirect Air Economizer Based Cooling for Data Centers
High Efficiency Indirect Air Economizer Based Cooling for Data Centers
Schneider Electric
 

Similar to In the Data Center: Five Keys to Achieving Ultra-Low PUEs (20)

Green computing
Green computingGreen computing
Green computing
 
Optimizing The Data Centre Environment
Optimizing The Data Centre EnvironmentOptimizing The Data Centre Environment
Optimizing The Data Centre Environment
 
Proactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center InfrastructureProactively Managing Your Data Center Infrastructure
Proactively Managing Your Data Center Infrastructure
 
Data center m&e
Data center  m&eData center  m&e
Data center m&e
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
Cooling a Data Center - DP Air
Cooling a Data Center - DP Air Cooling a Data Center - DP Air
Cooling a Data Center - DP Air
 
Green Data Center
Green Data CenterGreen Data Center
Green Data Center
 
NER Aurora Thermal_Monitoring_Whitepaper
NER Aurora Thermal_Monitoring_WhitepaperNER Aurora Thermal_Monitoring_Whitepaper
NER Aurora Thermal_Monitoring_Whitepaper
 
Green IT
Green ITGreen IT
Green IT
 
Slides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for CoolingSlides: The Top 3 North America Data Center Trends for Cooling
Slides: The Top 3 North America Data Center Trends for Cooling
 
DC inverter technology in HVAC-R business
DC inverter technology in HVAC-R businessDC inverter technology in HVAC-R business
DC inverter technology in HVAC-R business
 
Green IT
Green ITGreen IT
Green IT
 
Optimize power and cooling final 1
Optimize power and cooling final 1Optimize power and cooling final 1
Optimize power and cooling final 1
 
Overheating Solutions - Keeping Your Computer Cool.pptx
Overheating Solutions - Keeping Your Computer Cool.pptxOverheating Solutions - Keeping Your Computer Cool.pptx
Overheating Solutions - Keeping Your Computer Cool.pptx
 
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
 
It Presentation 2011 Santa Clara1
It Presentation   2011 Santa Clara1It Presentation   2011 Santa Clara1
It Presentation 2011 Santa Clara1
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
 
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingHow IT Decisions Impact Facilities: The Importance of Mutual Understanding
How IT Decisions Impact Facilities: The Importance of Mutual Understanding
 
Optimize power and cooling final
Optimize power and cooling finalOptimize power and cooling final
Optimize power and cooling final
 
High Efficiency Indirect Air Economizer Based Cooling for Data Centers
High Efficiency Indirect Air Economizer Based Cooling for Data CentersHigh Efficiency Indirect Air Economizer Based Cooling for Data Centers
High Efficiency Indirect Air Economizer Based Cooling for Data Centers
 

Recently uploaded

Empowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptxEmpowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptx
benishzehra469
 
一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单
ewymefz
 
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
slg6lamcq
 
一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单
ewymefz
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
ukgaet
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
ewymefz
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
ewymefz
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Subhajit Sahu
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
yhkoc
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
mbawufebxi
 
Machine learning and optimization techniques for electrical drives.pptx
Machine learning and optimization techniques for electrical drives.pptxMachine learning and optimization techniques for electrical drives.pptx
Machine learning and optimization techniques for electrical drives.pptx
balafet
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
u86oixdj
 
一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单
ocavb
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
ewymefz
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
ArpitMalhotra16
 
Opendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptxOpendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptx
Opendatabay
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
AbhimanyuSinha9
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
haila53
 
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
nscud
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
ewymefz
 

Recently uploaded (20)

Empowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptxEmpowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptx
 
一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单
 
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
一比一原版(UniSA毕业证书)南澳大学毕业证如何办理
 
一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单一比一原版(NYU毕业证)纽约大学毕业证成绩单
一比一原版(NYU毕业证)纽约大学毕业证成绩单
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
 
Machine learning and optimization techniques for electrical drives.pptx
Machine learning and optimization techniques for electrical drives.pptxMachine learning and optimization techniques for electrical drives.pptx
Machine learning and optimization techniques for electrical drives.pptx
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
 
一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
 
Opendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptxOpendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptx
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
 
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
一比一原版(CBU毕业证)不列颠海角大学毕业证成绩单
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
 

In the Data Center: Five Keys to Achieving Ultra-Low PUEs

  • 1. Enterprise Data Center Solutions Five keys to achieving ultra-low PUEs Chris Yetman Senior Vice President, Operations
  • 2. Ultra-low PUEs Getting From Here To There 2 You’re using the latest high-efficiency servers. You keep your server room at a higher temperature. You’ve virtualized to cut down on the number of servers. It seems like you’re doing everything right. But you’re still stuck at a less than enviable PUE.
  • 3.  33MW of data center, 18 acres  Commissioned PUEs as low as 1.12  15% reduction in TCO due to highly efficient facility designs  Largest LEED Platinum data center in North America I feel your PUE pain Today I’d like to share five things we’ve learned about getting to ultra-low PUEs. Check it out: we’ve been able to hit 1.15 PUEs for our customers. We get it. We know this problem. We live and breathe it every day.
  • 4. PREVIOUS JOB Chief Information Officer (CIO) As a former CIO, a current Chief of Operations, and, most importantly, someone who is passionate about building awesome data centers, I’d like to call on all CIOs. Too often we are needlessly cautious when it comes to hardware. Too often we make IT decisions based on fear. Why are we afraid to allow equipment to fail? Why are we working so hard to avoid breaking a server? These decisions cost us more than we suspect. 1. Be Brave
  • 5. 1. Be Brave Operating Envelope ASHRAE Allowed Temp: 59°-90° Humidity: 20-80% Dew Point: Up to 63° Temp: 65-80 Humidity: 42-60% Dew Point: Up to 59° The truth is, studies have shown IT equipment can handle higher temperatures than what the industry currently operates under. The industry needs to diversify equipment-level risk. Why should the loss of any single piece of equipment compromise your business? For Vantage, being located in Santa Clara, we utilize the free-cooling hours throughout the fall, winter, spring, and temperate summer days. We help each customer build the data center they want to build. If one feels comfortable and wants to move out of the recommended ASHRAE zone into allowable conditions, they create greater cost efficiency by utilizing natural air temperature and flow up to 80% of the year. Even if you’re timid about rising to 90-degrees, being more flexible on humidity can have a positive effect. ASHRAE Recommended
  • 6. 1. Embrace Failure Hello, my name is failure. But you can call me recovery. Stop trying to prevent hardware failure. It’s not worth the cost. If you build with the knowledge that hardware will fail, you can instead focus on recovery. This will save you money. Operating at a higher operating envelope may mean more hardware failure, but you will save so much in energy efficiency and costs. Those savings will cover the money needed to replace hardware, ten-fold. Don’t let hardware failure be the worst-case- scenario. Hardware failure is nothing to fear.
  • 7. 1.3  1.2 PUE Operating Envelope $500K 7 Check out the cost savings! A large data center running five-plus megawatts can spend $500,000 more in energy per month. But let’s say you run the temperature up to 80-degrees in the cold aisle, taking your PUE down from 1.3 to 1.2. In this scenario, you will save over $500,000 per year in energy, and break a whole lot less than that in hardware. Imagine the temperature at 85, 90- degrees. Focus on extending the envelope. 1. Bravery and Recovery = Cost Savings
  • 8. 8 Take the example of Netflix. Here’s a company that’s challenged its system to plan for recovery and resilience. They created Chaos Monkey, a software tool that forces their engineers to deal with small failures, ones that, once eliminated, will keep from turning into major outages. Netflix says the name “Chaos Monkey” comes from the idea of “unleashing a wild monkey with a weapon in data center or cloud region to randomly shoot down instances and chew through cable—all while we continue serving our customers without interruption.” When Netflix loses a server—no big deal. The software reassigns the data elsewhere. The challenge to developers everywhere is to write applications to be resilient. 1. Bravery and Recovery = Cost Savings
  • 9. 2. Get the Foundation Right High-efficiency mechanical / electrical equipment High-voltage power distribution Measurement & Control Proper containment of hot and cold aisles 9 Achieving low PUEs begins with right, high-efficiency equipment. For Vantage that means these four pillars listed above. A solid foundation also includes minute attention to mechanical infrastructure like high-efficiency fan motors, direct drive units, and variable frequency drives on all motors. Did you know we don’t use fans with belts? That way we don’t have to worry about slippage and losing efficiency to those incremental, inevitable belt slips. All the little things add up.
  • 10. Monitor Adjust Recirculate Precise temperature control 3.Maintain Infinite Control It’s critical to choose an environmental-electrical-monitoring system that allows for precise high- speed industrial process control. The system tracks air conditions both inside and outside the data center—temperature, humidity, dew point, flow volume. This allows the system to make adjustments with precision. As the outside air temperature drops, the system is able to recirculate more heated air from the data module into the supply air stream, allowing for precise temperature control. This allows the system to modulate anywhere from 100% outside air economization down to 0% full recirculation. The system can provide the minimal amount cooling to meet the envelope!
  • 11. Losses Current Conductors 480V to the rack 4. Increase the Voltage 11 Higher Voltage High voltage distribution to the IT racks reduces transmission loss, decreases the amount of copper running into the building, and minimizes transformation losses. If you combined this with an open compute platform approach, where you transform down from 480V at the rack and share power supplies—think of all the energy you’d retain! Here’s the straight electric talk: • The losses due to typical transformation from 480V to 208/120V of a typical Power Distribution Unit (PDU) account for anywhere from 1.5%-3.5% • Providing 400V to the Busway Distribution Units (BDU’s, equivalent to PDU) line to neutral voltage of 230V can be supplied to the IT equipment • The result is reduced losses, lower current supplied to the IT equipment, and smaller conductors required to power the servers • Extending the higher voltages out to the rack saves on transformation losses and conductor costs
  • 12. 5.Reduce Pressure Drop 12 Choose mechanical cooling equipment that enables the lowest available pressure drop. Start with the outside air damper array and filter bank. Choose components to minimize air velocity. These range from oversized dampers and filters to higher cross- section cooling coils. Look at your fans. Belt drives inevitably lead to slippage and energy loss. Direct drive supply fans eliminate such loss, and large diameter fan rotors increase flow volume while maintaining reasonable equipment footprint. Use natural cycles. Data modules utilize vertical hot- aisle, allowing for convective air flow to return the hot air from the IT equipment to the cooling plenums. Avoid leakage by creating a strong barrier between hot and cold aisles.
  • 13. 1. This is not an all-or-nothing environment. Going from open/shut cases to varying degrees of open-to-shut provides optimization. 2. Moving a lot of air is turbulent. Rigid filtering is better. Don’t let your filters disintegrate. 3. Air will mix before it hits the equipment. Add lots of measurement points along the air flow path. The air the racks ingest matters the most. Lessons Learned
  • 14. • Runs at 1.15 PUEs • Fully redundant 2N electrical configuration • 9 megawatt, expandable to 18 megawatts This is already a reality today.
  • 15. 1. Be brave. Embrace failure. 2. Maintain infinite control. 3. Pick the right equipment. 4. Increase the voltage. 5. Reduce pressure drop. Getting to Ultra-Low PUEs Let’s connect: