1. 1
FITMAN PROJECT PRESENTATION
FINES CLUSTER MEETING
BRUSSELS, MAY 6TH 2013
TXT PROJECT COORDINATION TEAM
claudia.guglielmina, sergio.gusmeroli
@txtgroup.com
FInES Cluster Meeting, FITMAN Project Presentation 1Brussels, May 6th 2013
2. FInES Cluster Meeting, FITMAN Project Presentation 2Brussels, May 6th 2013
FITMAN Factsheet
Project No: 604674
Project Full Name: Future Internet Technologies for MANufacturing
Duration: 24 months
Start date: April 1st 2013
Partnership: 29 partners, 9 countries
Strategic Objective: FP7-2012-ICT-FI
FI.ICT-2011.1.8: Use Case scenarios and early trials
Total Eligible Cost: 18.034.000 EURO
EC Contribution: 12.890.000 EURO
3. FInES Cluster Meeting, FITMAN Project Presentation 3Brussels, May 6th 2013
FITMAN Beneficiaries
SME Networks & Associated S/T (15)
Core Consortium (10)
Original Equipment Manufacturers (4)
4. FInES Cluster Meeting, FITMAN Project Presentation 4Brussels, May 6th 2013
The FI PPP Workprogramme
5. FInES Cluster Meeting, FITMAN Project Presentation 5Brussels, May 6th 2013
Target outcomes after phase 2:
i. Working experimentation sites building upon common components and Generic Enablers as
provided under the Core Platform Objective complemented by the identified use case specific
capabilities;
ii. Selected test applications implemented on these experimentation sites;
iii. Validation of the openness and versatility of the Core Platform and its software development kit,
through implementation of mixed use case scenarios originating from more than one use case
project;
iv. A detailed plan for how to move into phase 3, including detailed plans for the large scale
expansion of platform usage facilitated by local and regional stakeholders including SMEs.
Phase 2 Funding schemes
- Up to 5 IPs, with priority given to maximising the spectrum of use cases covered. Indicative
budget distribution and duration
- 13.5 M€ per use case project; at least 10% of the budget expected to be allocated via Open
Calls to allow for local solution providers & system integrators to get involved.
- Duration: max 24 months
Obj. 1.8 Phase II
6. FInES Cluster Meeting, FITMAN Project Presentation 6Brussels, May 6th 2013
Mission and Objectives
The mission of the FITMAN (Future Internet Technologies for MANufacturing industries) project is to
provide the FI PPP with a set of industry-led use case trials in the Smart, Digital and Virtual Factories
of the Future domains, in order to test and assess the suitability, openness and flexibility of FI-WARE
Generic Enablers, this way contributing to the social-technological-economical-environmental-political
sustainability of EU Manufacturing Industries.
In order to accomplish the mission statement, the FITMAN project will deliver:
• One FITMAN Generic Platform for Manufacturing Industries, as a collection of several Generic Enablers
Implementations of Fi-WARE Chapters (WP1);
• Three FITMAN Specific Platforms for Smart, Digital and Virtual Factories, as a collection of several
Specific Enablers Implementations belonging to Factories of the Future and Future Internet Enterprise
Systems research (WP3)
• Eleven FITMAN Trials Platforms as instantiation of the selected Generic and Specific Enablers for 11
industry-driven multi-sectorial Trials (WP4-5-6)
• One generic and flexible Trials Verification and Validation Framework, encompassing concepts,
methods and tools for Manufacturing Trials (WP2);
• One open-to-all FITMAN Phase III Package, to support FI-WARE PPP Phase III obj 1.8, Expansion of Use
Cases, access to FITMAN Reports / Prototypes (WP8)
7. FInES Cluster Meeting, FITMAN Project Presentation 7Brussels, May 6th 2013
Industrial Trials and Impact
• Eleven FITMAN Trial Experimentations and Lessons Learned by deploying and evaluating
the FITMAN Trials Platforms in realistic Smart-Digital-Virtual Factories IT and business cases:
• Smart Factories Trials: TRW (LE) automotive supplier – Safe & Healthy Workplace,
WHIRLPOOL (LE) white goods manufacturer – Mobile workforce, PIACENZA (SME)
textile/clothing – Cloud Manufacturing, COMPLUS (SME) LED smart lighting –
Collaborative Production.
• Digital Factories Trials: VOLKSWAGEN (LE) automotive manufacturer – PLM ramp-up for
reduced Time to Market , AGUSTAWESTLAND (LE) aeronautics manufacturer – Training
services for blue collar workers, AIDIMA (SME) furniture – Mass Customised Production,
CONSULGAL (SME) construction – As-designed vs. As-built Interoperability.
• Virtual Factories Trials: APR (SME) plastic industry – Collaboration valorisation, TANet
(SME) manufacturing resource management – Networked Business Innovation, SEGEM-
MacBo (SME) machinery for wood industry – Project-based Collaboration.
8. FInES Cluster Meeting, FITMAN Project Presentation 8Brussels, May 6th 2013
FITMAN & GEs Galaxy
9. FInES Cluster Meeting, FITMAN Project Presentation 9Brussels, May 6th 2013
Automotive Supplier (Spain; led by: TRW Automotive + Innovalia; LE)
White Goods OEM (Italy; led by: WHIRLPOOL + Politecnico Milano; LE)
Textile/Clothing (Italy; led by: Piacenza + Softeco; SME)
LED Lighting (Germany; led by: COMPlus Automation GmbH + Fraunhofer Institute; SME)
Automotive OEM (Germany; led by: Volkswagen + Fraunhofer IPK ; LE)
Aeronautics OEM (Italy; led by: AGUSTA WESTLAND and TXT e-Solutions ; LE)
Construction Industry (Portugal; led by: Consulgal + Uninova; SME)
Furniture (Spain; led by: AIDIMA + Universitat Politecnica de Valencia; SME)
Plastic Industry (France; led by: A.P.R. + University Lumiere Lyon 2; SME)
Manufacturing Resource Management (UK; led by: TANet and Coventry University ; SME)
Machinery for Wood (France; led by: SEGEM-MacBo + University Bordeaux I ; SME)
FITMAN 11 Trials
Digital Factory
Virtual Factory
Smart Factory
10. FInES Cluster Meeting, FITMAN Project Presentation 10Brussels, May 6th 2013
FITMAN: the FInES roots
• Many FITMAN beneficiaries participated in EI Cluster and are actively animating FInES Cluster
• The concept itself of Generic (and domain Specific) Enablers (which is at the basis of the FI PPP
Technology Foundation project) is derived from the “ICT commoditization” trend which was pre-announced
by the ISU (Interoperability Service Utility) and fully developed in the “Internet as Universal Business
System” FInES Task Force. In FI-WARE, Utility Services are now available under six different Chapters to
help developers build their own services and applications, as generic building blocks.
• FI PPP Phase III, the expansion of the use cases (service consumers) on a territorial basis (a new PPP
postulating a stronger relation between Local Public and Private bodies) as well as the creation of an
open-to-all, participatory ecosystem of service providers is indeed in line with COIN ISU 3.0 vision
included in the FInES ISU-UBS Task Force document
• One FITMAN Task (T3.4) is devoted to address (from a technical viewpoint) Enterprise Interoperability
issues, in particular to develop FITMAN specific enablers aimed at allow ERP systems compatibility (ESR
wording). Many outcomes from recent FInES projects will be exploited here (e.g. COIN, iSURF, COMMIUS,
SYNERGY, NISB)
• Some FITMAN Trials took inspiration by the 10 FInES running projects in the Factories of the Future
(mostly MSEE ComVantage IMAGINE Adventure) coordinated by Innovalia in the FoF Cluster
• FITMAN Trials reference architecture derived from the MSEE project and from the preparatory work
performed in the FInES Arch Task Force (see after)
11. FInES Cluster Meeting, FITMAN Project Presentation 11Brussels, May 6th 2013
Draft Reference Architecture for Trials
Cloud Manufacturing
Knowledge
Future InternetCore Platform
Generic Enablers
Applications/Services Ecosystems
Service Delivery Framework
Cloud Hosting and I/face to Network Devices
Internet of Things and Data/Context Mgmt
Security, Privacy and Trust
Business Ecosystem
Individual Factory/Enterprise
Future Internet Cloud
Interoperability of
Services/Platforms
Alignment of
Knowledge/Models
Human-centric
Manuf. Models
IoT-based Intelligent
Manufacturing
Ecosystem Skills
& Knowledge
Ecosystem Manuf.
Capacity
Domain Ontologies
and Models
EcosystemCollaboration&
Innovation Platform& Services
Product Life Cycle Management Platform
Service Life Cycle Management Platform
Innovation Life Cycle Management Platform
Collaborative Business Process / Project Mgmt
Production Planning and Scheduling
Smart Factory
(In)Tangible Assets
Digital Factory
(In)Tangible Assets
Virtual Factory
(In)Tangible Assets
Enterprise [Mobile]Applications
Platform & Services
Enterprise Resource Planning ERP System
Customer Relations Management CRM System
Supply Chain Management SCM System
Manufacturing Excution System MES
Automation, Control and SCADA System
Plus XIFI
Networks
Storage
Compute
FITMAN SEs:
COIN
MSEE
IOT@Work
COMMIUS
Open source
Trials specific
Legacy Systems
Integration as a
Service
12. FInES Cluster Meeting, FITMAN Project Presentation 12Brussels, May 6th 2013
FITMAN: the FInES H2020 PP
The FInES H2020 PP has been developed along 5 main thematic areas also relevant to FITMAN:
• FI-PPP. The role of FITMAN in the FI PPP is mainly to reinforce its business innovation capability in non-IT
industrial domains in collaboration with other Phase II projects (such as FISpace) and in close synergy with
the FoF PPP and its “ICT for Manufacturing” Grand Challenge.
• Web Entrepreneurship. FITMAN includes a Phase III preparation WP which is in charge to drive the
existing industrial Trials towards disruptive innovations such as business models or service innovations. This
often requires the creation of a start-up or spin-off, rather than trying to adapt the existing
organizational structures to the new needs
• Sensing Enterprise. Many FITMAN Trials could be considered Sensing Enterprise Trials with a massive use
of IoT technologies (Smart Digital Virtual) and the aim at reconciling real and virtual worlds through
adaptive and proactive digital enterprise systems and applications. The initial interpretation of the IoT
Chapter by FI-WARE (data capture towards a centralized cloud back-end) is currently under discussion
and now seems to evolve towards a more distributed and autonomous architecture, as required by the SE
• Digital Enterprise. This is the common aspect for all FITMAN Trials, where digital images of all enterprise
atomic assets need to be modelled, composed and orchestrated in complex, intelligent artifacts.
• Collective Awareness Platforms. Social sustainability is one of the pillars of the FoF STEEP concept, fully
adopted in all FITMAN Trials. Some of them are moreover directly addressing Consumer Goods, adding
relevant aspects such as reputation, sentiment analysis, image analysis and recommendation systems.
13. 13
FITMAN PROJECT PRESENTATION
FINES CLUSTER MEETING
BRUSSELS, MAY 6TH 2013
TXT PROJECT COORDINATION TEAM
claudia.guglielmina, sergio.gusmeroli
@txtgroup.com
FInES Cluster Meeting, FITMAN Project Presentation 13Brussels, May 6th 2013