Baltic SCOPE
An introduction to admin,
finance and reporting
Carsten Beyer
Gothenburg, 19 March 2015
Content
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting 2
Content
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting 3
Grant Agreement
Baltic SCOPE
• Between EASME and SWAM (Lead Partner Principle): Not
signed, yet, but finalization of contracting phase is due soon
• Start date (to be confirmed): 1 March 2015
• Consists of 2 sections and several annexes:
• Special Conditions (for Baltic Scope)
• General Conditions
 Annex 1: Call for Proposals MARE/2014/22
 Annex 2: Full Baltic Scope Application
 Annex 3: Detailed Budget
 Annex 4: Mandates
• 24 months, total budget approx. €2.63m, 80% co-financing (i.e.
€ 2.11m)
Introduction to Admin, Finance and Reporting 4
Cooperation Agreement
Baltic SCOPE
• Between SWAM and all other project partners: Draft
elaborated by SWAM will be circulated very soon
• Consists of main text body and several annexes:
 ANNEX A: Grant Agreement
 ANNEX B: Detailed work plan
 ANNEX C: Detailed Project budget
 ANNEX D: Cost Sharing Agreement
• The Cooperation Agreement incl. Annexes is the main guidance
document for partners on project implementation
Introduction to Admin, Finance and Reporting 5
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE
Questions
please
Content
Introduction to Admin, Finance and Reporting 6
Content
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting 7
Lead Partner
Baltic SCOPE
• Lead Partner Principle: Sole contractual partner of the
Commission, responsible for the overall coordination,
management and implementation of the project; implements
Cost Sharing Sharing Scheme
• Sole Point of Contact for Commission (incl. reporting)
• Receives all payments from the Commission and issues all
payments to the partners
• All LP duties specified in the Cooperation Agreement:
Introduction to Admin, Finance and Reporting 8
External PM - EPCO
Baltic SCOPE
• Support to the LP in its LP function
• Technical Reporting (incl. Deliverables) to DG MARE
• Collection of info from PPs (templates)
• Collation and analysis, overall report elaboration
• Financial Management & Reporting
• Partner Meeting
• Support to PPs in their Admin & Finance
• Permanent point of contact
• Pre-checks
Introduction to Admin, Finance and Reporting 9
Project Partner
Baltic SCOPE
• All PP (incl. the LP) shall ensure the quantitative and qualitative
delivery of the planned activities, outputs and results of the
project (as per grant agreement / application)
• Ensure information flow to LP and sound financial management
• Obey reporting timeline and content
• All PP duties specified in the Cooperation Agreement:
Introduction to Admin, Finance and Reporting 10
First Level Control (FLC)
Baltic SCOPE
• Each PP /LP needs to designate (i.e. nominate) a FLC
• FLC can be
 An independent qualified (i.e. certified) external auditor
 For public bodies: An independent qualified internal auditor
(i.e. an independent financial department)
• No specific designation certificate is needed but proof
that FLC is qualified and independent (see above) should
be available
• FLC of the LP needs to validate overall report (based on
control confirmations from PPs’ FLCs)
Introduction to Admin, Finance and Reporting 11
Timeline for FLC
Baltic SCOPE
IntroductiontoAdmin,FinanceandReporting
• No designated FLC
• No submission of interim report
• No reimbursement of cost
Thus you need to find a qualified FLC ASAP but at the latest
before the 1st interim report is due (approx. Sep 2015)
12
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting
Questions
please
Content
13
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting
Content
14
General Eligibility Criteria
Baltic SCOPE
• All costs must be directly linked to Baltic Scope (proposal) and
within the eligibility period
 From the date of signature of the grant agreement for 24 months
 Exception: this kick-off and some project closure costs (related to final
report)
• Reported costs must have actually paid by partner
 In-kind contribution is not eligible (e.g. from other Ministry)
 Voluntary work is not eligible
• VAT is not eligible (unless proof that it is irrecoverable)
• Accounting must allow assignment to project (own record)
• No double funding!
 for direct/indirect costs
 but also between Baltic Scope and other projects
Introduction to Admin, Finance and Reporting 15
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 16
BL1 – Staff
• Personnel costs of project staff
 Directly employed by project partners listed in the
application form
 Basis: employment/labour contract
 Carrying out project activities
 Gross salary + employer’s obligatory contributions on a
monthly basis!
• NON-ELIGIBLE
 Any voluntary remuneration and employer contribution
 Administration costs
Baltic SCOPE Introduction to Admin, Finance and Reporting 17
BL1 – Staff
• Costs for staff employed by public authorities are
only eligible if one of the three conditions is met
– Newly employed and ONLY working for project (it must say
so in the labour contract)
– Overtime remuneration: separate contract for the time
worked in overtime on the project making reference to
Baltic SCOPE
– Secondment: Duly documented decision that the
employee works for Baltic SCOPE in addition to fulfilling
tasks of his / her normal routine
Baltic SCOPE Introduction to Admin, Finance and Reporting 18
BL1 – Staff
Time Sheets – Proposal:
• EPCO develops template based on Interreg model of the
BSR programme
 Time sheet for full time employee (only working for Baltic Scope)
 Time sheet for part-time employee (Baltic Scope and other tasks)
• Requirements for Time Sheets
 Separate Time Sheet for each employee (signed)
 Recording of hours on a monthly basis (for part-time employees
also hours worked on other tasks)
 Briefly state the activities performed (remark “Component 1 –
step 2” or “C 2 - Reporting” would be sufficient)
Baltic SCOPE Introduction to Admin, Finance and Reporting 19
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 20
BL2 – Equipment
Baltic SCOPE Introduction to Admin, Finance and Reporting 21
• ONLY IT equipment such as a computer or a printer
necessary for project coordination as stipulated in the
application (annex 3)
• Exclusively used for Baltic Scope (otherwise only part of
cost eligible)
• Depreciation costs only (national rules)
• Respect PUBLIC PROCUREMENT (national rules)
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 22
BL3 – External experts
• Distinction between external experts and other
implementation costs:
• External expertise
– Content related expertise that is not provided in-house
– Budget for purposes stated in the application form only!
– Examples: Studies but also travel costs for external experts
• Other implementation contracts
– Non-content related external services
– Examples: FLC, Venue rental, Catering
Baltic SCOPE Introduction to Admin, Finance and Reporting 23
BL3 – External experts
• Expenses paid by project partners to external
providers
•  External = not employed by project partner
institutions
• Basis:
– Contracts of work, supply contracts, service contracts
– Invoices/requests for reimbursement
• PUBLIC PROCUREMENT!
• Non-eligible:
– Contracting between project partners
– Recoverable VAT is not eligible
(status was declared in the Application Form)
Baltic SCOPE Introduction to Admin, Finance and Reporting 24
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 25
BL4 –Implementation Contracts
Baltic SCOPE
• Not eligible (as covered by indirect costs):
• Stationery, Photocopying and Mailing
• Telephone, fax and internet
• Heating, electricity
• Office furniture, maintenance
• Office rent and other administration expenditure
• Publicity rules
• Name and emblem of the EU Commission on all project material, e.g.
publications, posters, lists of participants
• If publicity rules are not abided by, costs may be cut!
• PUBLIC PROCUREMENT!
Introduction to Admin, Finance and Reporting 26
Public procurement
Baltic SCOPE Introduction to Admin, Finance and Reporting
• Launch your tenders at an early stage, procurement takes time
• Procurement requirements:
 Transparency, equality, objectivity
 You have to obey your institutional procurement rules (which
acknowledge, regional, national and EU regulations)
• In any case: Always good to collect at least 3 offers
• For any service that is not included already in the list of Annex 3
to the grant agreement an approval from the Commission is
required! (PP via the LP)
27
Public procurement
Baltic SCOPE Introduction to Admin, Finance and Reporting
• Procurement is needed for BL2, BL3 and BL4
• PPs are responsible for creating and keeping the full audit
trail (document tender procedure):
• Tender / ToR
• Offers
• Evaluation and award
• Contract
• Deliverables and Invoices
• Only if public procurement procedures are observed
costs for goods, services and works are eligible!
28
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 29
BL5 – other eligible costs means
Travel and accommodation
• Travel and accommodation + subsistence
allowances
• Essential for project activities
• Most economic way of transport
• Observe national and institutional internal
rules!
• Prior approval of travels outside the
programme area and the EU!
Baltic SCOPE Introduction to Admin, Finance and Reporting 30
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 31
Indirect Costs
Baltic SCOPE
• All costs belonging to one of the BLs 1-5 are DIRECT COSTS
• When reporting direct costs a flat rate amount of 7% of the
total eligible direct cost can be added as eligible indirect cost
 No separate documentation needed
 No proof of payment needed
• The reporting template will calculate this amount automatically
Introduction to Admin, Finance and Reporting 32
Budget lines
BL1 – Staff
BL2 – Equipment
BL3 – External Experts
BL4 –Implementation Contracts
BL5 – Other eligible costs
Indirect Costs
10% Budget flexibility
Baltic SCOPE Introduction to Admin, Finance and Reporting 33
Budget flexibility rule
 Possibility to exceed totals by a maximum of 10% without approval from
the Commission
 Also a PP can exceed its partner budget by 10%
 Overspending must go hand in hand with underspending
 PPs always need to inform the LP / EPCO beforehand
NOT POSSIBLE
– Exceeding overall project budget
Baltic SCOPE Introduction to Admin, Finance and Reporting
BL1 BL2 BL3 BL4 BL5 Total
Comp. 1 Flexibility
Comp 2 Flexibility
Comp n Flexibility
Total Flexibility Flexibility Flexibility Flexibility Flexibility Total budget
34
Budget Changes
Baltic SCOPE
• LP can ask for a re-allocation of up to 20% but
 Only after prior request and approval from Commission
 Requires written amendment to the grant agreement
• Other external services than specified in the application must
be approved by the Commission
Introduction to Admin, Finance and Reporting 35
Pre-Financing
Baltic SCOPE
• 30% of total grant within 30 days after signature of the grant
agreement
• LP forwards shares to PPs upon receipt
• Proposed scheme for recovery of pre-financing with interim
reports:
 1/3 recovery with interim report 1 (amount is deducted by
LP from the respective interim payment amount)
 1/3 recovery with interim report 2
 1/3 recovery with interim report 3
• Grant agreement limits the total amount of interim payments
to 30%
Introduction to Admin, Finance and Reporting 36
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting
Questions
please
Content
37
Content
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting 38
Reporting – every 6 months
Baltic SCOPE Introduction to Admin, Finance and Reporting
EASME
Progress
Report
Control on
partner level
6 weeks
Control on
project level
6 weeks
LP
FLC
FLC
PP2
FLC
PP1
FLC
PP3
Validation of
expenditure
39
Baltic SCOPE Introduction to Admin, Finance and Reporting
• Based on official starting date 1 march 2015 (tbc):
• Reporting Period 1:
 1 March 2015 – 31 August 2015
 Individual PP Report due: 15 October 2015
 overall Progress Report due: 1 December 2015
• Reporting Period 2:
 1 September 2015 – 29 February 2016
 Individual PP Report due: 15 April 2016
 overall Progress Report due: 1 June 2016
• Reporting Period 3, and 4 accordingly
Reporting timeline
40
Baltic SCOPE Introduction to Admin, Finance and Reporting
• EPCO offers pre-check of your cost-itemisation list and financial
report before you submit it to your FLC (ideally 2 weeks after
end of reporting period)
Pre-check
41
Baltic SCOPE Introduction to Admin, Finance and Reporting
Costs cannot be reported without:
• Cooperation agreement
• First Level Control designation
• Control confirmation by the First Level Controller
Reporting pre-requisites
42
Baltic SCOPE Introduction to Admin, Finance and Reporting
Every Partner needs to submit by 15 October 2015 to
the LP / EPCO the following Docs:
• Cost Itemisation List
• Confirmation of Control
• On the technical reporting we propose to use very,
very brief monthly reports (ticking boxes and 1
sentence on ticked boxes)
• Technical Outputs (obey publicity rules)
Project Partner Report
Reporting – Obligatory documents from
every PP
43
44
Baltic SCOPE Introduction to Admin, Finance and Reporting
By 15 October 2015 to LP the following docs:
• The original signed and stamped Project Partner Report (esp.
the confirmation of control) in hardcopy
Reporting – What do you need to submit to
the LP?
44
45
Baltic SCOPE Introduction to Admin, Finance and Reporting
By 15 October 2015 to EPCO the following docs:
• The full Project Partner Report in electronic version (the final
Excel File and scans of the signed cost itemization list and the
confirmation of control)
• Electronic version of technical outputs
Reporting – What do you need to send to
EPCO?
45
46
Baltic SCOPE Introduction to Admin, Finance and Reporting
All accounting documents. Please do not send supporting
documents such as:
• Time Sheets
• Invoices or documentation of procurement
• Travel expense reports etc.
• They are checked by your FLC and need to be kept by you at
least until the end of 2024 for a audit!
• Please always keep copies of the FLC docs that you have
submitted to the LP
46
Reporting – What do you need to keep?
Baltic SCOPE Introduction to Admin, Finance and Reporting
• The template for the Project Partner Report, which comprises
the templates for the Cost Itemisation List, the confirmation of
control and the activity report, will be developed by EPCO
individually for each partner and send to you by August 2015
• Other useful templates:
 Time Sheet Template
 Bid@3 sheet for documenting procurement of external services
 Your normal travel expense reports (according to institutional /
national requirements)
47
Reporting – Templates
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting
Questions
please
Content
48
Content
1) Contracts
2) Roles & responsibilities
3) Financial Management
4) Reporting
5) Other issues
Baltic SCOPE Introduction to Admin, Finance and Reporting 49
Cost sharing
Baltic SCOPE Introduction to Admin, Finance and Reporting
From the cost sharing agreement to the financial note
Extern.
Service
50
Cost sharing
Baltic SCOPE Introduction to Admin, Finance and Reporting 51
• By last day of reporting period PP should receive
the financial note from the LP
• PP include their cost share in their financial report
• PP’s FLC confirms control
• Integrated overall report by LP
• EASME checks and pays grant (80%) to LP
• LP deducts cost shares from grant and pays PPs
• The Cooperation Agreement
• The call for Proposals MARE/2014/22
• Soon the Baltic Scope website
• Soon EPCO
Baltic SCOPE Introduction to Admin, Finance and Reporting 52
Sources of information / contacts
Thank you for your attention!
Carsten Beyer, s.Pro GmbH
cb@sustainable-projects.eu

More Related Content

What's hot

FruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issuesFruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issues
fruitbreedomics
 
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTMANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
Taiwo Okuselu
 
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Francis Ho
 
Independent Enitity_decision_IRP
Independent Enitity_decision_IRPIndependent Enitity_decision_IRP
Independent Enitity_decision_IRP
Honolulu Civil Beat
 

What's hot (19)

5_Procurement, conflict of interest and sub-granting
5_Procurement, conflict of interest and sub-granting5_Procurement, conflict of interest and sub-granting
5_Procurement, conflict of interest and sub-granting
 
8_Visibility
8_Visibility8_Visibility
8_Visibility
 
Budgeting in Italy - Jon Blöndal, OECD
Budgeting in Italy - Jon Blöndal, OECDBudgeting in Italy - Jon Blöndal, OECD
Budgeting in Italy - Jon Blöndal, OECD
 
FP7 project negotiation, management and financial rules
FP7 project  negotiation, management and financial rulesFP7 project  negotiation, management and financial rules
FP7 project negotiation, management and financial rules
 
FruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issuesFruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issues
 
Iktimed final presentation Marche Reg.
Iktimed final presentation Marche Reg. Iktimed final presentation Marche Reg.
Iktimed final presentation Marche Reg.
 
revenue and Expense: Recognition - David Bean, GASB, John Stanford, IPSASB
revenue and Expense: Recognition - David Bean, GASB, John Stanford, IPSASBrevenue and Expense: Recognition - David Bean, GASB, John Stanford, IPSASB
revenue and Expense: Recognition - David Bean, GASB, John Stanford, IPSASB
 
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTMANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
 
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
 
CIOB Complex Projects Contract 2013 and FIDIC: A Comparison
CIOB Complex Projects Contract 2013 and FIDIC: A ComparisonCIOB Complex Projects Contract 2013 and FIDIC: A Comparison
CIOB Complex Projects Contract 2013 and FIDIC: A Comparison
 
Are You Ready for the New Tangible Property Rules?
Are You Ready for the New Tangible Property Rules?Are You Ready for the New Tangible Property Rules?
Are You Ready for the New Tangible Property Rules?
 
Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation
 
Law management budget_finance nice layout for presentation
Law management budget_finance nice layout for presentationLaw management budget_finance nice layout for presentation
Law management budget_finance nice layout for presentation
 
Infrastructure & PPPs - Colin Forthun, Norway
Infrastructure & PPPs - Colin Forthun, NorwayInfrastructure & PPPs - Colin Forthun, Norway
Infrastructure & PPPs - Colin Forthun, Norway
 
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
Europeana Generic Services Projects Meeting, 29-30 October 2018, The Hague, E...
 
Independent Enitity_decision_IRP
Independent Enitity_decision_IRPIndependent Enitity_decision_IRP
Independent Enitity_decision_IRP
 
Refit rules guidelines license & Power Purchase Agreement
Refit rules guidelines license & Power Purchase AgreementRefit rules guidelines license & Power Purchase Agreement
Refit rules guidelines license & Power Purchase Agreement
 
10 internal audit manual for construction companies
10 internal audit manual for construction companies10 internal audit manual for construction companies
10 internal audit manual for construction companies
 
Kick off dalane vgs SIU
Kick off dalane vgs SIUKick off dalane vgs SIU
Kick off dalane vgs SIU
 

Viewers also liked

Finance and admin manager, j,d
Finance and admin manager, j,dFinance and admin manager, j,d
Finance and admin manager, j,d
Confidential
 
Evolution of Marketing Department
Evolution of Marketing DepartmentEvolution of Marketing Department
Evolution of Marketing Department
Jenıstön Delımä
 
Marketing organisation
Marketing organisationMarketing organisation
Marketing organisation
Amey Wagh
 
Functions of banks
Functions of banksFunctions of banks
Functions of banks
Neeta Sharma
 

Viewers also liked (7)

Finance and admin manager, j,d
Finance and admin manager, j,dFinance and admin manager, j,d
Finance and admin manager, j,d
 
Structuring for success - Developing a dynamic structure for your marketing t...
Structuring for success - Developing a dynamic structure for your marketing t...Structuring for success - Developing a dynamic structure for your marketing t...
Structuring for success - Developing a dynamic structure for your marketing t...
 
Evolution of Marketing Department
Evolution of Marketing DepartmentEvolution of Marketing Department
Evolution of Marketing Department
 
Marketing organisation
Marketing organisationMarketing organisation
Marketing organisation
 
Modern marketing organizational structure @kaykas - jascha kaykas-wolff
Modern marketing organizational structure   @kaykas - jascha kaykas-wolffModern marketing organizational structure   @kaykas - jascha kaykas-wolff
Modern marketing organizational structure @kaykas - jascha kaykas-wolff
 
Functions of banks
Functions of banksFunctions of banks
Functions of banks
 
The CMO's Guide to Marketing Org Structure
The CMO's Guide to Marketing Org StructureThe CMO's Guide to Marketing Org Structure
The CMO's Guide to Marketing Org Structure
 

Similar to Financial management baltic scope final

3. Kick-off TOJ - Final report
3. Kick-off TOJ - Final report3. Kick-off TOJ - Final report
3. Kick-off TOJ - Final report
Raffaella Battella
 
Budget planning training 14022014
Budget planning training 14022014Budget planning training 14022014
Budget planning training 14022014
PPF5Serbia
 
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9  - task 9.2, overview on the finacial guidelines by GraphitechSlope wp9  - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
SLOPE Project
 
Finance, control & subsidy contract
Finance, control & subsidy contractFinance, control & subsidy contract
Finance, control & subsidy contract
EUAlpineSpace
 

Similar to Financial management baltic scope final (20)

EC financial audits of Horizon 2020 projects
EC financial audits of Horizon 2020 projectsEC financial audits of Horizon 2020 projects
EC financial audits of Horizon 2020 projects
 
3. Kick-off TOJ - Final report
3. Kick-off TOJ - Final report3. Kick-off TOJ - Final report
3. Kick-off TOJ - Final report
 
OECD review of the PPP governance framework in the United-Kingdom: preliminar...
OECD review of the PPP governance framework in the United-Kingdom: preliminar...OECD review of the PPP governance framework in the United-Kingdom: preliminar...
OECD review of the PPP governance framework in the United-Kingdom: preliminar...
 
16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal16. Guidelines-to-prepare-the-proposal
16. Guidelines-to-prepare-the-proposal
 
New Transfer Pricing regulations in Poland
New Transfer Pricing regulations in PolandNew Transfer Pricing regulations in Poland
New Transfer Pricing regulations in Poland
 
Budget planning training 14022014
Budget planning training 14022014Budget planning training 14022014
Budget planning training 14022014
 
Short introduction to Horizon 2020 finances
Short introduction to Horizon 2020 financesShort introduction to Horizon 2020 finances
Short introduction to Horizon 2020 finances
 
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9  - task 9.2, overview on the finacial guidelines by GraphitechSlope wp9  - task 9.2, overview on the finacial guidelines by Graphitech
Slope wp9 - task 9.2, overview on the finacial guidelines by Graphitech
 
Finance, control & subsidy contract
Finance, control & subsidy contractFinance, control & subsidy contract
Finance, control & subsidy contract
 
Polish CIT in 2019 - CIT and TP revolution marches on
Polish CIT in 2019 - CIT and TP revolution marches onPolish CIT in 2019 - CIT and TP revolution marches on
Polish CIT in 2019 - CIT and TP revolution marches on
 
BEPS Webcast #5 - Update on project
BEPS Webcast #5 - Update on projectBEPS Webcast #5 - Update on project
BEPS Webcast #5 - Update on project
 
CIP Ecoinnovation – how to write a successful proposal
CIP Ecoinnovation – how to write a successful proposalCIP Ecoinnovation – how to write a successful proposal
CIP Ecoinnovation – how to write a successful proposal
 
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
 
KA3 start up seminar 2015
KA3 start up seminar 2015KA3 start up seminar 2015
KA3 start up seminar 2015
 
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...
Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...
Serbia Presentation, PPO, Svetlana Razic, Serbian Practical Experience in PP ...
 
Horizon Europe financial rules
Horizon Europe financial rulesHorizon Europe financial rules
Horizon Europe financial rules
 
Budget Profile of Portugal - Andre Marcalo, Portugal
Budget Profile of Portugal - Andre Marcalo, PortugalBudget Profile of Portugal - Andre Marcalo, Portugal
Budget Profile of Portugal - Andre Marcalo, Portugal
 
LS_Webinar_09-02-2023.pptx
LS_Webinar_09-02-2023.pptxLS_Webinar_09-02-2023.pptx
LS_Webinar_09-02-2023.pptx
 

Recently uploaded

一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
enbam
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
enbam
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
enbam
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
enbam
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单
enbam
 

Recently uploaded (20)

一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
 
Presentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantagePresentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantage
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnool
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Creating an Effective Veteran Policy in Ukraine
Creating an Effective Veteran Policy in UkraineCreating an Effective Veteran Policy in Ukraine
Creating an Effective Veteran Policy in Ukraine
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单
 

Financial management baltic scope final

  • 1. Baltic SCOPE An introduction to admin, finance and reporting Carsten Beyer Gothenburg, 19 March 2015
  • 2. Content 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting 2
  • 3. Content 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting 3
  • 4. Grant Agreement Baltic SCOPE • Between EASME and SWAM (Lead Partner Principle): Not signed, yet, but finalization of contracting phase is due soon • Start date (to be confirmed): 1 March 2015 • Consists of 2 sections and several annexes: • Special Conditions (for Baltic Scope) • General Conditions  Annex 1: Call for Proposals MARE/2014/22  Annex 2: Full Baltic Scope Application  Annex 3: Detailed Budget  Annex 4: Mandates • 24 months, total budget approx. €2.63m, 80% co-financing (i.e. € 2.11m) Introduction to Admin, Finance and Reporting 4
  • 5. Cooperation Agreement Baltic SCOPE • Between SWAM and all other project partners: Draft elaborated by SWAM will be circulated very soon • Consists of main text body and several annexes:  ANNEX A: Grant Agreement  ANNEX B: Detailed work plan  ANNEX C: Detailed Project budget  ANNEX D: Cost Sharing Agreement • The Cooperation Agreement incl. Annexes is the main guidance document for partners on project implementation Introduction to Admin, Finance and Reporting 5
  • 6. 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Questions please Content Introduction to Admin, Finance and Reporting 6
  • 7. Content 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting 7
  • 8. Lead Partner Baltic SCOPE • Lead Partner Principle: Sole contractual partner of the Commission, responsible for the overall coordination, management and implementation of the project; implements Cost Sharing Sharing Scheme • Sole Point of Contact for Commission (incl. reporting) • Receives all payments from the Commission and issues all payments to the partners • All LP duties specified in the Cooperation Agreement: Introduction to Admin, Finance and Reporting 8
  • 9. External PM - EPCO Baltic SCOPE • Support to the LP in its LP function • Technical Reporting (incl. Deliverables) to DG MARE • Collection of info from PPs (templates) • Collation and analysis, overall report elaboration • Financial Management & Reporting • Partner Meeting • Support to PPs in their Admin & Finance • Permanent point of contact • Pre-checks Introduction to Admin, Finance and Reporting 9
  • 10. Project Partner Baltic SCOPE • All PP (incl. the LP) shall ensure the quantitative and qualitative delivery of the planned activities, outputs and results of the project (as per grant agreement / application) • Ensure information flow to LP and sound financial management • Obey reporting timeline and content • All PP duties specified in the Cooperation Agreement: Introduction to Admin, Finance and Reporting 10
  • 11. First Level Control (FLC) Baltic SCOPE • Each PP /LP needs to designate (i.e. nominate) a FLC • FLC can be  An independent qualified (i.e. certified) external auditor  For public bodies: An independent qualified internal auditor (i.e. an independent financial department) • No specific designation certificate is needed but proof that FLC is qualified and independent (see above) should be available • FLC of the LP needs to validate overall report (based on control confirmations from PPs’ FLCs) Introduction to Admin, Finance and Reporting 11
  • 12. Timeline for FLC Baltic SCOPE IntroductiontoAdmin,FinanceandReporting • No designated FLC • No submission of interim report • No reimbursement of cost Thus you need to find a qualified FLC ASAP but at the latest before the 1st interim report is due (approx. Sep 2015) 12
  • 13. 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting Questions please Content 13
  • 14. 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting Content 14
  • 15. General Eligibility Criteria Baltic SCOPE • All costs must be directly linked to Baltic Scope (proposal) and within the eligibility period  From the date of signature of the grant agreement for 24 months  Exception: this kick-off and some project closure costs (related to final report) • Reported costs must have actually paid by partner  In-kind contribution is not eligible (e.g. from other Ministry)  Voluntary work is not eligible • VAT is not eligible (unless proof that it is irrecoverable) • Accounting must allow assignment to project (own record) • No double funding!  for direct/indirect costs  but also between Baltic Scope and other projects Introduction to Admin, Finance and Reporting 15
  • 16. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 16
  • 17. BL1 – Staff • Personnel costs of project staff  Directly employed by project partners listed in the application form  Basis: employment/labour contract  Carrying out project activities  Gross salary + employer’s obligatory contributions on a monthly basis! • NON-ELIGIBLE  Any voluntary remuneration and employer contribution  Administration costs Baltic SCOPE Introduction to Admin, Finance and Reporting 17
  • 18. BL1 – Staff • Costs for staff employed by public authorities are only eligible if one of the three conditions is met – Newly employed and ONLY working for project (it must say so in the labour contract) – Overtime remuneration: separate contract for the time worked in overtime on the project making reference to Baltic SCOPE – Secondment: Duly documented decision that the employee works for Baltic SCOPE in addition to fulfilling tasks of his / her normal routine Baltic SCOPE Introduction to Admin, Finance and Reporting 18
  • 19. BL1 – Staff Time Sheets – Proposal: • EPCO develops template based on Interreg model of the BSR programme  Time sheet for full time employee (only working for Baltic Scope)  Time sheet for part-time employee (Baltic Scope and other tasks) • Requirements for Time Sheets  Separate Time Sheet for each employee (signed)  Recording of hours on a monthly basis (for part-time employees also hours worked on other tasks)  Briefly state the activities performed (remark “Component 1 – step 2” or “C 2 - Reporting” would be sufficient) Baltic SCOPE Introduction to Admin, Finance and Reporting 19
  • 20. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 20
  • 21. BL2 – Equipment Baltic SCOPE Introduction to Admin, Finance and Reporting 21 • ONLY IT equipment such as a computer or a printer necessary for project coordination as stipulated in the application (annex 3) • Exclusively used for Baltic Scope (otherwise only part of cost eligible) • Depreciation costs only (national rules) • Respect PUBLIC PROCUREMENT (national rules)
  • 22. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 22
  • 23. BL3 – External experts • Distinction between external experts and other implementation costs: • External expertise – Content related expertise that is not provided in-house – Budget for purposes stated in the application form only! – Examples: Studies but also travel costs for external experts • Other implementation contracts – Non-content related external services – Examples: FLC, Venue rental, Catering Baltic SCOPE Introduction to Admin, Finance and Reporting 23
  • 24. BL3 – External experts • Expenses paid by project partners to external providers •  External = not employed by project partner institutions • Basis: – Contracts of work, supply contracts, service contracts – Invoices/requests for reimbursement • PUBLIC PROCUREMENT! • Non-eligible: – Contracting between project partners – Recoverable VAT is not eligible (status was declared in the Application Form) Baltic SCOPE Introduction to Admin, Finance and Reporting 24
  • 25. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 25
  • 26. BL4 –Implementation Contracts Baltic SCOPE • Not eligible (as covered by indirect costs): • Stationery, Photocopying and Mailing • Telephone, fax and internet • Heating, electricity • Office furniture, maintenance • Office rent and other administration expenditure • Publicity rules • Name and emblem of the EU Commission on all project material, e.g. publications, posters, lists of participants • If publicity rules are not abided by, costs may be cut! • PUBLIC PROCUREMENT! Introduction to Admin, Finance and Reporting 26
  • 27. Public procurement Baltic SCOPE Introduction to Admin, Finance and Reporting • Launch your tenders at an early stage, procurement takes time • Procurement requirements:  Transparency, equality, objectivity  You have to obey your institutional procurement rules (which acknowledge, regional, national and EU regulations) • In any case: Always good to collect at least 3 offers • For any service that is not included already in the list of Annex 3 to the grant agreement an approval from the Commission is required! (PP via the LP) 27
  • 28. Public procurement Baltic SCOPE Introduction to Admin, Finance and Reporting • Procurement is needed for BL2, BL3 and BL4 • PPs are responsible for creating and keeping the full audit trail (document tender procedure): • Tender / ToR • Offers • Evaluation and award • Contract • Deliverables and Invoices • Only if public procurement procedures are observed costs for goods, services and works are eligible! 28
  • 29. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 29
  • 30. BL5 – other eligible costs means Travel and accommodation • Travel and accommodation + subsistence allowances • Essential for project activities • Most economic way of transport • Observe national and institutional internal rules! • Prior approval of travels outside the programme area and the EU! Baltic SCOPE Introduction to Admin, Finance and Reporting 30
  • 31. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 31
  • 32. Indirect Costs Baltic SCOPE • All costs belonging to one of the BLs 1-5 are DIRECT COSTS • When reporting direct costs a flat rate amount of 7% of the total eligible direct cost can be added as eligible indirect cost  No separate documentation needed  No proof of payment needed • The reporting template will calculate this amount automatically Introduction to Admin, Finance and Reporting 32
  • 33. Budget lines BL1 – Staff BL2 – Equipment BL3 – External Experts BL4 –Implementation Contracts BL5 – Other eligible costs Indirect Costs 10% Budget flexibility Baltic SCOPE Introduction to Admin, Finance and Reporting 33
  • 34. Budget flexibility rule  Possibility to exceed totals by a maximum of 10% without approval from the Commission  Also a PP can exceed its partner budget by 10%  Overspending must go hand in hand with underspending  PPs always need to inform the LP / EPCO beforehand NOT POSSIBLE – Exceeding overall project budget Baltic SCOPE Introduction to Admin, Finance and Reporting BL1 BL2 BL3 BL4 BL5 Total Comp. 1 Flexibility Comp 2 Flexibility Comp n Flexibility Total Flexibility Flexibility Flexibility Flexibility Flexibility Total budget 34
  • 35. Budget Changes Baltic SCOPE • LP can ask for a re-allocation of up to 20% but  Only after prior request and approval from Commission  Requires written amendment to the grant agreement • Other external services than specified in the application must be approved by the Commission Introduction to Admin, Finance and Reporting 35
  • 36. Pre-Financing Baltic SCOPE • 30% of total grant within 30 days after signature of the grant agreement • LP forwards shares to PPs upon receipt • Proposed scheme for recovery of pre-financing with interim reports:  1/3 recovery with interim report 1 (amount is deducted by LP from the respective interim payment amount)  1/3 recovery with interim report 2  1/3 recovery with interim report 3 • Grant agreement limits the total amount of interim payments to 30% Introduction to Admin, Finance and Reporting 36
  • 37. 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting Questions please Content 37
  • 38. Content 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting 38
  • 39. Reporting – every 6 months Baltic SCOPE Introduction to Admin, Finance and Reporting EASME Progress Report Control on partner level 6 weeks Control on project level 6 weeks LP FLC FLC PP2 FLC PP1 FLC PP3 Validation of expenditure 39
  • 40. Baltic SCOPE Introduction to Admin, Finance and Reporting • Based on official starting date 1 march 2015 (tbc): • Reporting Period 1:  1 March 2015 – 31 August 2015  Individual PP Report due: 15 October 2015  overall Progress Report due: 1 December 2015 • Reporting Period 2:  1 September 2015 – 29 February 2016  Individual PP Report due: 15 April 2016  overall Progress Report due: 1 June 2016 • Reporting Period 3, and 4 accordingly Reporting timeline 40
  • 41. Baltic SCOPE Introduction to Admin, Finance and Reporting • EPCO offers pre-check of your cost-itemisation list and financial report before you submit it to your FLC (ideally 2 weeks after end of reporting period) Pre-check 41
  • 42. Baltic SCOPE Introduction to Admin, Finance and Reporting Costs cannot be reported without: • Cooperation agreement • First Level Control designation • Control confirmation by the First Level Controller Reporting pre-requisites 42
  • 43. Baltic SCOPE Introduction to Admin, Finance and Reporting Every Partner needs to submit by 15 October 2015 to the LP / EPCO the following Docs: • Cost Itemisation List • Confirmation of Control • On the technical reporting we propose to use very, very brief monthly reports (ticking boxes and 1 sentence on ticked boxes) • Technical Outputs (obey publicity rules) Project Partner Report Reporting – Obligatory documents from every PP 43
  • 44. 44 Baltic SCOPE Introduction to Admin, Finance and Reporting By 15 October 2015 to LP the following docs: • The original signed and stamped Project Partner Report (esp. the confirmation of control) in hardcopy Reporting – What do you need to submit to the LP? 44
  • 45. 45 Baltic SCOPE Introduction to Admin, Finance and Reporting By 15 October 2015 to EPCO the following docs: • The full Project Partner Report in electronic version (the final Excel File and scans of the signed cost itemization list and the confirmation of control) • Electronic version of technical outputs Reporting – What do you need to send to EPCO? 45
  • 46. 46 Baltic SCOPE Introduction to Admin, Finance and Reporting All accounting documents. Please do not send supporting documents such as: • Time Sheets • Invoices or documentation of procurement • Travel expense reports etc. • They are checked by your FLC and need to be kept by you at least until the end of 2024 for a audit! • Please always keep copies of the FLC docs that you have submitted to the LP 46 Reporting – What do you need to keep?
  • 47. Baltic SCOPE Introduction to Admin, Finance and Reporting • The template for the Project Partner Report, which comprises the templates for the Cost Itemisation List, the confirmation of control and the activity report, will be developed by EPCO individually for each partner and send to you by August 2015 • Other useful templates:  Time Sheet Template  Bid@3 sheet for documenting procurement of external services  Your normal travel expense reports (according to institutional / national requirements) 47 Reporting – Templates
  • 48. 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting Questions please Content 48
  • 49. Content 1) Contracts 2) Roles & responsibilities 3) Financial Management 4) Reporting 5) Other issues Baltic SCOPE Introduction to Admin, Finance and Reporting 49
  • 50. Cost sharing Baltic SCOPE Introduction to Admin, Finance and Reporting From the cost sharing agreement to the financial note Extern. Service 50
  • 51. Cost sharing Baltic SCOPE Introduction to Admin, Finance and Reporting 51 • By last day of reporting period PP should receive the financial note from the LP • PP include their cost share in their financial report • PP’s FLC confirms control • Integrated overall report by LP • EASME checks and pays grant (80%) to LP • LP deducts cost shares from grant and pays PPs
  • 52. • The Cooperation Agreement • The call for Proposals MARE/2014/22 • Soon the Baltic Scope website • Soon EPCO Baltic SCOPE Introduction to Admin, Finance and Reporting 52 Sources of information / contacts
  • 53. Thank you for your attention! Carsten Beyer, s.Pro GmbH cb@sustainable-projects.eu