Devender Singh is seeking a challenging position that allows him to utilize his 9+ years of AutoCAD experience drafting road and infrastructure plans, profiles, and sections. He currently works as a Technical Officer for SMEC India creating drawings for highway projects. Previously, he held drafting roles with Ramboll India and ICT drafting road, building, and structural plans. Singh is an experienced AutoCAD user proficient in creating various technical drawings for feasibility studies, detailed project reports, land acquisition plans, and other infrastructure documents. He is looking for opportunities to continue developing his technical skills.
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...Robert Bolton
A case study in how to connect people and processes to deliver product and customer value, plus material and information flow.
A holistic approach to improving flow in a complex mineral sand operation - Iluka South West Operations
Robert is pioneer of the ToC approach in mining, oil and gas, capital infrastructure and financial markets. He has developed and implemented the Theory of Constraints (TOC) concepts in mining and resources capital planning and business execution business systems.
This case study is the turnaround story at the Iluka South West operations in Capel WA. This operation is large and complex operation with 4 separate mining operations feeding a large process plant with many dependent process and common resources.
The Throughput Focused Mining (TFM) approach improved the planning and execution processes to improve the product flow and operation performance. This turnaround was rapid. This operation achieved record production rates. Operational revenue increased significantly.
The additional operating capacity released due to the “Mine to Market” initiative, led to the stopping of a significant capital project. This capital project was to increase operating capacity.
The Theory of Constraints (ToC) concepts, simulations models and education tools, were key element s of this business system solution. Short-term planning and new scheduling methods was an element of this “Mine to Market” approach. This combined with collaboration in the form of weekly meeting, scheduling tools, common terminology and various discussion groups across the business teams, enabled the business transformation to be rapid and sustaining.
Kids4Peace Camp Brings Together Children of Different FaithsFelix Rippy
The founding attorney of Rippy Law Firm in Mason, Texas, Felix Rippy possesses two decades of legal experience with a record of handling the most family law cases (roughly 2000) of any attorney ever to file a case in the large neighboring county of Williamson County, Texas. Felix Rippy also maintains affiliation in the Indiana State Capital in Indianapolis with Christ Church Cathedral, which awarded him the position of chalice bearer in January 2017.
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...Robert Bolton
A case study in how to connect people and processes to deliver product and customer value, plus material and information flow.
A holistic approach to improving flow in a complex mineral sand operation - Iluka South West Operations
Robert is pioneer of the ToC approach in mining, oil and gas, capital infrastructure and financial markets. He has developed and implemented the Theory of Constraints (TOC) concepts in mining and resources capital planning and business execution business systems.
This case study is the turnaround story at the Iluka South West operations in Capel WA. This operation is large and complex operation with 4 separate mining operations feeding a large process plant with many dependent process and common resources.
The Throughput Focused Mining (TFM) approach improved the planning and execution processes to improve the product flow and operation performance. This turnaround was rapid. This operation achieved record production rates. Operational revenue increased significantly.
The additional operating capacity released due to the “Mine to Market” initiative, led to the stopping of a significant capital project. This capital project was to increase operating capacity.
The Theory of Constraints (ToC) concepts, simulations models and education tools, were key element s of this business system solution. Short-term planning and new scheduling methods was an element of this “Mine to Market” approach. This combined with collaboration in the form of weekly meeting, scheduling tools, common terminology and various discussion groups across the business teams, enabled the business transformation to be rapid and sustaining.
Kids4Peace Camp Brings Together Children of Different FaithsFelix Rippy
The founding attorney of Rippy Law Firm in Mason, Texas, Felix Rippy possesses two decades of legal experience with a record of handling the most family law cases (roughly 2000) of any attorney ever to file a case in the large neighboring county of Williamson County, Texas. Felix Rippy also maintains affiliation in the Indiana State Capital in Indianapolis with Christ Church Cathedral, which awarded him the position of chalice bearer in January 2017.
Throughout my career in the Highway, Survey, Design and Quantity Survey of projects, I have been actively involved in direct consultation and liaison with client bodies, stakeholders, planning authorities, utility authorities, legal / contractual advisors and general public.
1. DEVENDER SINGH email : d.singh00129@yahoo.com
Village & P.o - Alawalpur prabhat00129@gmail.com
Teh. & Dist –Palwal(Faridabad) Haryana 121102 Mobile : - +91-9891374500
I am looking for an ever-challenging work environment, which provides ample scope for
efficient utilization of my skill-set as well as developing expertise in new skills.
Technical Skills Summary
Expert in software :
AutoCAD : Working exp. On 2004,2009 to 2016
Total Experience :
• 2007 To Till Date (More than NINE Year’s Experience).
I have experience of around 9+ Years’ experience on AutoCAD having
worked as CAD Draughtsman responsible for making Drawings of Typical
cross section of roads, plan & profiles drawings, Strip plan ,Draft
Feasibility Report ,Final Feasibility Report, Utility Shifting Plan, Draft
Detailed Project Report, Final Detailed Project Report, Detail cross section,
Junction drawings, super impose of revenue maps for Land Acquisition
Plan, Alignment of bypasses on topographical sheets & google images ,
other miscellaneous drawings and all Standard dwg.
Notice period : One month notice period in current Company.
Current ctc : 6.60 Lakh P.A
Professional Experience
Working in SMEC India Pvt. Ltd. (Dec. 2016 TO Till date)
Company Name : SMEC INDIA PVT.LTD
Designation : Technical Officer (Highway Draughtsman)
Address : 387,Udyog Vihar,Phase-2,Gurgaon
Projects:
• NH-47 (New NH-66) 4-Laning of Chertalai to Thiruvananthapuram Section of
from km 379.100 to km 551.900 (App.-172.8km)
Dec.2014 to Dec.2016 Exp. In Ramboll India Pvt. Ltd.
Company Name : RAMBOLL INDIA PVT. LTD.
Designation : Cad Technician (Highway Draughtsman)
Address : 17th floor Building no. 5 Gurgaon
Projects:
• Agra - Lucknow Expressway PKG–II km.-53.500 to 15.500 Plan & Profile,
Land Plan & Typical cross section (App.-62.0km)
• NH-37:-Numaligarh – Jorhat Strip plan ,Plan & Profile, Typical cross section &
Mics. dwg.(App.-51.040km)
• Kundli – Palwal Expressway PKG –III km.-46.500 to km.-71.000 Plan &
Profile, Typical cross section & Mics. dwg (App.24.5km)
Nov.2009 to Dec.2014 Exp. In ICT Pvt. Ltd.
Company Name : ICT PVT. LTD.
Designation : Assit. Manager (Highway Draughtsman)
Address : Green Park New Delhi
Projects:
• NH-47:-Kochi-Thiruvananthapuram Typical cross section (App. 86.0Km)
• NH-233:-Varanasi-Nepal Border Strip Plan ,Super impose of Revenue maps for
Land Acquisition plan & Utility Shifting Plan, Junction, Revised Detailed
Project Report, Typical cross section (App. 298.7km)
Personal Details
Passport No.
K0116757
Date of birth :
10th
May 1983
Nationality :
Indian
Marital status:
Married
Children’s
Two
Languages :
Hindi, English
Other Activities :
Listening Music
Playing football
Reading Books
Personal Strength:
Hard Working, Good Team
Member, Honest,
Self Motivated.
About Family
Father’s Name :
Sh. Mahender Singh
Mother’s Name :
Smt. Ramwati
Address :
V.P.O - Alawalpur
Teh. & Dist.- Palwal
Haryana-121102
2. • NH-12 :- Jabalpur-Bhopal Final Detailed Project Report ,Typical cross section, Detail cross
section all Standard dwg. (App.-93.2km)
• NH -31 :- Pundibari -Baxirhat Strip Plan ,Draft Feasibility Report ,Final Feasibility Report,
Utility Shifting Plan, Draft Detailed Project Report, Final Detailed Project Report, Typical cross
section, Detail cross section all Standard dwg, Junction dwg & super impose of revenue maps for
Land Acquisition Plan (App.-43.2km)
• NH -32 :- Chandil- Purulia Strip plan ,Draft Feasibility Report ,Final Feasibility Report, Utility
Shifting Plan, Draft Detailed Project Report, Final Detailed Project Report, Typical cross section,
Detail cross section all Standard dwg, Junction dwg & super impose of revenue maps for Land
Acquisition Plan (App.-83.0km)
• NH -203:- Final Detail Project Report ,Typical cross section (App.-92.0km)
• NH-44 :- Jowai-Assam Border Draft Feasibility Report, Final Feasibility Report, Utility Shifting
Plan, Draft Detailed Project Report, Final Detailed Project Report, Typical cross section all
Standard dwg (App.-44.0km)
• NH-6:-Baharagora-Sambalpur Detail cross section (App.-300.0km)
• NH-458:-Nimbijodha-Jasskhera Strip Plan ,super impose of revenue maps for Land Acquisition
Plan (App.-249.833km)
• SH-50 :- Anjar-Chirai Strip Plan, Draft Detailed Project Report ,Final Detailed Project Report
,Typical cross section, Detail cross section all Standard dwg. (App.-31.075km)
• NH-15:-Amritsar-Sri Ganga Nagar Strip plan ,Draft Feasibility Report ,Final Feasibility Report,
Utility Shifting Plan, Draft Detailed Project Report, Final Detailed Project Report ,Typical cross
section, Detail cross section all Standard dwg, Junction dwg
• SH-82:-Kadirganj-Sono Final Detailed Project Report, Typical cross section, Detail cross section
all Standard dwg. (App.-95.0km)
• Noida Junction :- Junction No.-01,03 to 19 Detailed Project Report, Typical cross section, Detail
cross section all Standard dwg.
Aug.2007 to Nov.20009 Exp. In Cem Engineers Consulting Pvt. Ltd.
Company name : CEM ENGINEERS CONSULTING PVT. LTD.
Designation : Cad Draughtsman (Architecture & Structure)
Address : Malviya Nagar New Delhi
Projects:
• As a Cad Operator responsible, Checking & Preparing of Section Buildings Architecture,
Structure Drg. Working on Various building projects and Layout Setting.
Professional Qualification :
ITI in CIVIL DRAUGHTSMAN, 2 years {2005-2007} (Institute Industrial Training Institute)
Firojpur Jhirka (Haryana)
Education Qualification :
SR.Secondary in {2001} from govt. sr. sec. school Alawalpur (Bhiwani board of Haryana).
The Particulars Provided above by me are true and correct to the best of my knowledge and
belief.
Date: