Fearnside, P.M. 2017. Dams with
big reservoirs: Brazil’s
hydroelectric plans threaten its
Paris climate commitments. The
Globalist, 29 January 2017.
http://www.theglobalist.com/dams-climate-change-global-warming-brazil-
paris-agreement/
Copyright: The Globalist, Washington, DC, U.S.A..
The original publication is available at:
O trabalho original está disponível em:
http://www.theglobalist.com/dams-climate-change-global-warming-brazil-paris-agreement/.
Previous
Tweet
Brazil’s dreams of
large reservoirs
behind dams run
counter to hopes of
cutting carbon
emissions. 
Tweet
The short­term
damage from vast
reservoir methane
emissions could
outweigh Brazil’s plan
to cut CO2. 
Tweet
International
institutions financed
illogical Brazilian dam
projects based on
corrupt planning. 
Tweet
Amazonian dam
reservoirs contribute
more carbon
emissions than
elsewhere due to
more biomass. 
Takeaways
Brazil’s government wants to build dams in Amazonia with “big reservoirs.” That
is quite a point of departure compared to the run­of­river dams that have
dominated the country’s planning and construction activity over the last two
decades.
Undermining Paris commitments
Moreover, the September 2016 announcement by the National Agency for
Electrical Energy (ANEEL) runs directly counter to the December 2015 Paris
commitments.
They call for holding average global temperatures to a level “well below” a point
2°C above the average prior to the industrial revolution, and to “work towards”
holding the temperature at no more than 1.5°C above the pre­industrial average.
Methane and dams
The reason why tropical hydroelectric dams, especially those with large
reservoirs, undermine those goals is because they emit methane (CH4).
As the water stratifies into separate layers by temperature, this leaves water at
the bottom without oxygen. As a result, the decomposition of organic matter
cannot form CO2, and must end by producing CH4 instead.
This methane can be emitted to the atmosphere in several ways: either as
bubbles or by diffusion through the surface of the reservoir itself, or it can be
emitted as the water is drawn from deep in the reservoir to pass through the
turbines or spillways.
Another source of emission from reservoirs is carbon dioxide released by decay
of the trees killed when the reservoir is filled, whether they have been left
projecting out of the water or have been removed to another location.
Emissions from large reservoirs are greater than run­of­river dams – although,
contrary to hydro­industry statements, run­of­river dams do not have zero or
negligible emissions.
An example is the Santo Antônio Dam, which blocked Brazil’s Madeira River in
2011. Other environmental impacts are also greater with big reservoirs, including
Dams With Big Reservoirs
Brazil’s hydroelectric plans threaten its Paris climate commitments.
By Philip Fearnside, January 23, 2017
Global HotSpots
           
human displacement and the loss of forest and biodiversity.
Acting prudently now, not later
The Paris accords change many aspects of the efforts to combat global warming.
Actions will have to be taken in the next 20 years if average global temperature is
to be prevented from passing the agreed limit.
Carbon emissions, uptakes and avoided emissions 80, 90 or 100 years in the
future are not relevant. Reservoirs emit large amounts of greenhouse gases in
the time window when temperature must be brought under control.
Tropical dams have most of their environmental impact in the first few years after
filling a reservoir, when forest trees die and decay and carbon in leaves and soil
carbon is transformed into methane at the bottom of the reservoir. The emission
continues indefinitely at a lower level after the initial peak.
Bad timing
Carbon emission in the form of methane rather than CO2 further worsens the
impact of dams under the Paris accord because the impact of this gas is
concentrated in the time window for achieving the target.
Each ton of methane has an impact on global warming about 200 times that of a
ton of CO2 while it remains in the atmosphere, but methane remains for a
relatively short time (12.4 years on average), whereas CO2 remains about ten
times longer.
An appropriate choice of the conversion to express the impact of methane in
terms of CO2­equivalents (the “global warming potential,” or GWP) is essential to
achieving the Paris accords.
If one uses a 100­year time horizon for the GWP, each ton of methane has the
impact of 34 tons of CO2 on global warming. There is much talk of using 28 as
the GWP for methane, which is the 100­year value without feedbacks.
However, these feedbacks are part of the real climate system, as recognized in
the IPCC’s most recent Assessment Report (the AR­5).
If diplomats are serious about the Paris accords (an important caveat), then the
GWP to be used for methane is 86 (the IPCC’s 20­year value with feedbacks),
and the impact of Amazonian hydroelectric dams is triple what is implied by the
lower GWP values that many diplomats would like to adopt.
Rain forest dams
What dams are we talking about here? Much of what one often hears about
greenhouse gas emissions from dams being minimal is based on the world’s
existing dams with measurements of emissions.
The existing dams are preponderantly outside of the humid tropics, and among
existing dams most data are from those in non­tropical regions.
In Brazil, plans for future large dams are preponderantly in Amazon rainforest,
where emissions are higher than in locations outside of the humid tropics due to
Amazonia’s high biomass and warm climate. Studies in several Amazonian
reservoirs show high emissions.
The elephant in the room
The Babaquara Dam (officially renamed the “Altamira Dam”) is the elephant in
the room. This dam would have a huge reservoir: 6140 km2 if built as originally
planned, or twice the area of Brazil’s notorious Balbina Dam.
Most of the Babaquara reservoir would be on Indigenous land, and all in tropical
rainforest. The dam would be upstream of the Belo Monte Dam, which blocked
Brazil’s Xingu River in 2015 and is expected to have installation of its 11,233 MW
of turbines completed by 2019.
A matter of false advertising?
The problem is that there isn’t enough water in the Xingu River to run many of
these turbines for much of the year, and for three months there isn’t even enough
flow to run a single turbine in the main powerhouse with 11,000 MW.
This is based on the historical waterflows in the Xingu River, but studies have
shown that this flow will be substantially less if deforestation and climate change
continue as projected.
Storing water in upstream dams (originally planned to total five) would be
necessary to run these turbines for a longer period in the year, with a large
impact on the Belo Monte Dam’s financial viability.
Corruption doesn’t make it more viable
Belo Monte has been shown to be financially unviable without upstream dams,
but it was built anyway with 80% of the funding from subsidized financing from
BNDES, Brazil’s National Bank for Economic and Social Development.
Recent confessions released by federal courts indicate that corruption from the
construction companies involved financed the last two presidential election
campaigns, thus providing a rationale for detachment of decisions from normal
economic logic.
The economics matter
Plans for Babaquara were publically acknowledged until July 2008, when the
National Council on Energy Policy (CNPE) issued a resolution stating that Belo
Monte would be the only dam on the Xingu River.
However, this council is mainly composed of ministers who change with each
presidential administration, and the members are already not those who were
present in 2008. The council is free to change its mind whenever it wants.
Since turbines are the most expensive part of a hydroelectric dam, placing over
11,000 MW of capacity in a run­of­river dam without sufficient river flow to use
most of the turbines for much of the year makes the dam economically unviable.
Temptation and reality
This represents a constant temptation to build environmentally and socially
disastrous storage dams with large reservoirs upstream, beginning with
Babaquara.
The theory that Belo Monte would be the only dam on the Xingu River, known as
the “institutionalized lie” to Belo Monte opponents, was the justification for
excluding any consideration of upstream dams in the environmental impact
studies for Belo Monte.
Calculations show that Babaquara would result in massive emissions of
greenhouse gasses.
Impact assessment
Recognition of the full impacts of Amazonian hydroelectric dams, including their
greenhouse gas emissions and their other environmental and social impacts, is
essential to rational decision making on energy development and on strategies to
mitigate climate change.
Proper accounting for the global­warming impact of dams and the methane they
produce is necessary for meeting the objectives agreed in Paris. Brazil’s recently
announced priority switch to dams with “big reservoirs” is a blow to these efforts.
More on this topic
Hydro Power Over Homes in Peru (9)
India: Emerging Emissions (9)
Bon Voyage, World Bank! (6)
Tags: Amazonia, Brazil, climate change, dams, global warming, hydro power, latest, Paris Agreement
About Philip Fearnside
Philip Fearnside is a research professor at Brazil’s National Institute for Research in
Amazonia (INPA).
Full bio → | View all posts by Philip Fearnside →

More Related Content

Viewers also liked

Políticas ambientais e as representações sociais cornélio procópio
Políticas ambientais e as representações sociais  cornélio procópioPolíticas ambientais e as representações sociais  cornélio procópio
Políticas ambientais e as representações sociais cornélio procópio
Victor Ha-Kã Azevedo
 
Dams introduction
Dams  introductionDams  introduction
Dams introduction
Resnov
 
User Story Mapping: Discover the whole story, build the right product
User Story Mapping: Discover the whole story, build the right productUser Story Mapping: Discover the whole story, build the right product
User Story Mapping: Discover the whole story, build the right product
Joan Choi
 
Tell me more?: the effects of mental model soundness on personalizing an inte...
Tell me more?: the effects of mental model soundness on personalizing an inte...Tell me more?: the effects of mental model soundness on personalizing an inte...
Tell me more?: the effects of mental model soundness on personalizing an inte...
Joan Choi
 
It's not simply a matter of time
It's not simply a matter of timeIt's not simply a matter of time
It's not simply a matter of time
Joan Choi
 
Interacting with bots online
Interacting with bots onlineInteracting with bots online
Interacting with bots online
Joan Choi
 
Stability analysis of mula dam
Stability analysis of mula damStability analysis of mula dam
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
Kalpataru Das
 
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Hossam Shafiq I
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
srinivas2036
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
shubham paliwal
 
DAMS AND IT'S TYPES . . .
DAMS AND IT'S TYPES . . .DAMS AND IT'S TYPES . . .
DAMS AND IT'S TYPES . . .
Mohammad Sheraz Javed Awan
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
kumawat123
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
GAURAV. H .TANDON
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric designkhaledalshami93
 

Viewers also liked (15)

Políticas ambientais e as representações sociais cornélio procópio
Políticas ambientais e as representações sociais  cornélio procópioPolíticas ambientais e as representações sociais  cornélio procópio
Políticas ambientais e as representações sociais cornélio procópio
 
Dams introduction
Dams  introductionDams  introduction
Dams introduction
 
User Story Mapping: Discover the whole story, build the right product
User Story Mapping: Discover the whole story, build the right productUser Story Mapping: Discover the whole story, build the right product
User Story Mapping: Discover the whole story, build the right product
 
Tell me more?: the effects of mental model soundness on personalizing an inte...
Tell me more?: the effects of mental model soundness on personalizing an inte...Tell me more?: the effects of mental model soundness on personalizing an inte...
Tell me more?: the effects of mental model soundness on personalizing an inte...
 
It's not simply a matter of time
It's not simply a matter of timeIt's not simply a matter of time
It's not simply a matter of time
 
Interacting with bots online
Interacting with bots onlineInteracting with bots online
Interacting with bots online
 
Stability analysis of mula dam
Stability analysis of mula damStability analysis of mula dam
Stability analysis of mula dam
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
Lec 05 Horizontal Alignment (Transportation Engineering Dr.Lina Shbeeb)
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
DAMS AND IT'S TYPES . . .
DAMS AND IT'S TYPES . . .DAMS AND IT'S TYPES . . .
DAMS AND IT'S TYPES . . .
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 

More from Victor Ha-Kã Azevedo

PL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdf
PL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdfPL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdf
PL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdf
Victor Ha-Kã Azevedo
 
Dias zawadzki2021-hypostomus hermanni-h-robertsoni
Dias zawadzki2021-hypostomus hermanni-h-robertsoniDias zawadzki2021-hypostomus hermanni-h-robertsoni
Dias zawadzki2021-hypostomus hermanni-h-robertsoni
Victor Ha-Kã Azevedo
 
2020 comunicado da patrulha ambiental do rio ivai piracema 2020 2021
2020 comunicado da patrulha ambiental do rio ivai piracema 2020 20212020 comunicado da patrulha ambiental do rio ivai piracema 2020 2021
2020 comunicado da patrulha ambiental do rio ivai piracema 2020 2021
Victor Ha-Kã Azevedo
 
2020 patrulha ambiental do rio ivai semana do meio ambiente junho 2020
2020 patrulha ambiental do rio ivai semana do meio ambiente junho 20202020 patrulha ambiental do rio ivai semana do meio ambiente junho 2020
2020 patrulha ambiental do rio ivai semana do meio ambiente junho 2020
Victor Ha-Kã Azevedo
 
9 athayde et al_2019_current-opinion-in-
9 athayde et al_2019_current-opinion-in-9 athayde et al_2019_current-opinion-in-
9 athayde et al_2019_current-opinion-in-
Victor Ha-Kã Azevedo
 

More from Victor Ha-Kã Azevedo (20)

PL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdf
PL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdfPL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdf
PL rios piquiri e ribeira livres de barragens PROTOCOLADO dez 2023.pdf
 
Dias zawadzki2021-hypostomus hermanni-h-robertsoni
Dias zawadzki2021-hypostomus hermanni-h-robertsoniDias zawadzki2021-hypostomus hermanni-h-robertsoni
Dias zawadzki2021-hypostomus hermanni-h-robertsoni
 
Parecer
ParecerParecer
Parecer
 
Saltinho
SaltinhoSaltinho
Saltinho
 
Koning etal 2020
Koning etal 2020Koning etal 2020
Koning etal 2020
 
2020 comunicado da patrulha ambiental do rio ivai piracema 2020 2021
2020 comunicado da patrulha ambiental do rio ivai piracema 2020 20212020 comunicado da patrulha ambiental do rio ivai piracema 2020 2021
2020 comunicado da patrulha ambiental do rio ivai piracema 2020 2021
 
.1
.1.1
.1
 
2020 patrulha ambiental do rio ivai semana do meio ambiente junho 2020
2020 patrulha ambiental do rio ivai semana do meio ambiente junho 20202020 patrulha ambiental do rio ivai semana do meio ambiente junho 2020
2020 patrulha ambiental do rio ivai semana do meio ambiente junho 2020
 
Bsbi 131 mar
Bsbi 131 marBsbi 131 mar
Bsbi 131 mar
 
9 athayde et al_2019_current-opinion-in-
9 athayde et al_2019_current-opinion-in-9 athayde et al_2019_current-opinion-in-
9 athayde et al_2019_current-opinion-in-
 
Evento 50 sent1
Evento 50   sent1Evento 50   sent1
Evento 50 sent1
 
Cinzas
CinzasCinzas
Cinzas
 
2017 dams amazonia nature22333
2017  dams amazonia nature223332017  dams amazonia nature22333
2017 dams amazonia nature22333
 
2017 dams amazonia nature22333
2017  dams amazonia nature223332017  dams amazonia nature22333
2017 dams amazonia nature22333
 
Ata pesca
Ata   pescaAta   pesca
Ata pesca
 
Convite meio ambiente (1)
Convite meio ambiente (1)Convite meio ambiente (1)
Convite meio ambiente (1)
 
Convite
ConviteConvite
Convite
 
Final
FinalFinal
Final
 
Cultivando mananciais
Cultivando mananciaisCultivando mananciais
Cultivando mananciais
 
Request
RequestRequest
Request
 

Recently uploaded

MS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics Research
MS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics ResearchMS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics Research
MS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics Research
Panagiotis Arapitsas
 
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...
IMARC Group
 
Kitchen Audit at restaurant as per FSSAI act
Kitchen Audit at restaurant as per FSSAI actKitchen Audit at restaurant as per FSSAI act
Kitchen Audit at restaurant as per FSSAI act
MuthuMK13
 
Best hotel in keerthy hotel manage ment
Best hotel in keerthy hotel manage   mentBest hotel in keerthy hotel manage   ment
Best hotel in keerthy hotel manage ment
keerthyhotelmangemen
 
Food Processing and Preservation Presentation.pptx
Food Processing and Preservation Presentation.pptxFood Processing and Preservation Presentation.pptx
Food Processing and Preservation Presentation.pptx
dengejnr13
 
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
7sl9gbvd
 

Recently uploaded (6)

MS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics Research
MS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics ResearchMS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics Research
MS Wine Day 2024 Arapitsas Advancements in Wine Metabolomics Research
 
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...
Vietnam Mushroom Market Growth, Demand and Challenges of the Key Industry Pla...
 
Kitchen Audit at restaurant as per FSSAI act
Kitchen Audit at restaurant as per FSSAI actKitchen Audit at restaurant as per FSSAI act
Kitchen Audit at restaurant as per FSSAI act
 
Best hotel in keerthy hotel manage ment
Best hotel in keerthy hotel manage   mentBest hotel in keerthy hotel manage   ment
Best hotel in keerthy hotel manage ment
 
Food Processing and Preservation Presentation.pptx
Food Processing and Preservation Presentation.pptxFood Processing and Preservation Presentation.pptx
Food Processing and Preservation Presentation.pptx
 
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
在线办理(UCM毕业证书)加州大学美熹德分校毕业证文凭证书一模一样
 

Fearnside dams threaten-paris_agreement-the_globalist