Get faster design success eliminating mistakes and proyect bugs by preventive use of DFMEA preventive and corrective actions. Practical experiences and tips
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
Is your FMEA performing for you?
This is advance level of PFMEA, Have basic understanding fo Core IATF Tools before refering to this presentation.
CADmantra Technologies Pvt. Ltd. is one of the best Cad training company in northern zone in India . which are provided many types of courses in cad field i.e AUTOCAD,SOLIDWORK,CATIA,CRE-O,Uniraphics-NX, CNC, REVIT, STAAD.Pro. And many courses
Contact: www.cadmantra.com
www.cadmantra.blogspot.com
www.cadmantra.wix.com
Get faster design success eliminating mistakes and proyect bugs by preventive use of DFMEA preventive and corrective actions. Practical experiences and tips
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
Is your FMEA performing for you?
This is advance level of PFMEA, Have basic understanding fo Core IATF Tools before refering to this presentation.
CADmantra Technologies Pvt. Ltd. is one of the best Cad training company in northern zone in India . which are provided many types of courses in cad field i.e AUTOCAD,SOLIDWORK,CATIA,CRE-O,Uniraphics-NX, CNC, REVIT, STAAD.Pro. And many courses
Contact: www.cadmantra.com
www.cadmantra.blogspot.com
www.cadmantra.wix.com
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...Tonatiuh Lozada Duarte
Besides the traditional 8D's to solve problems this a great method to solve any problem, companies as Ford Motor Company requires this method to their suppliers to get quick and correct solutions, I hope this material can be helpful for you.
Risk Analysis for Strategic Decisions – Some Useful ToolsJerry Boger
Tools of decision and risk analysis applied to product commercialization projects. This presentation was originally published on the Project Management Institute Rochester Chapter website.
When to “Flip the Switch”- Balancing Late Feasibility and Early Design ControlsGreenlight Guru
The decision of when to enter Design Controls is often unclear and arbitrary. When is the additional overhead “worth it?” Will FDA or other regulatory bodies push back on a late entry into Design Controls? What are some of the critical tasks we should accomplish in feasibility to optimize our work under Design Controls? This presentation explores the many facets of late feasibility and early Design Controls, including systems engineering best practices, regulatory involvement, and business risk. Priority Designs, in collaboration with CMD MedTech, will illustrate these key decision points through several case studies and provide the audience with a practical approach to “flipping the switch” between unregulated and regulated phases of a medical device development program.
This session took place live at the Greenlight Guru True Quality Virtual Summit, a three-day event for medical device professionals to learn to get their devices to market faster, stay ahead of regulatory changes, and use quality as their multiplier to grow their device business.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
More Related Content
Similar to Fault data spectrum an important quality tool
CADmantra Technologies Pvt. Ltd. is one of the best Cad training company in northern zone in India . which are provided many types of courses in cad field i.e AUTOCAD,SOLIDWORK,CATIA,CRE-O,Uniraphics-NX, CNC, REVIT, STAAD.Pro. And many courses
Contact: www.cadmantra.com
www.cadmantra.blogspot.com
www.cadmantra.wix.com
6 panel manual training guide by Tonatiuh Lozada Duarte an excellent method o...Tonatiuh Lozada Duarte
Besides the traditional 8D's to solve problems this a great method to solve any problem, companies as Ford Motor Company requires this method to their suppliers to get quick and correct solutions, I hope this material can be helpful for you.
Risk Analysis for Strategic Decisions – Some Useful ToolsJerry Boger
Tools of decision and risk analysis applied to product commercialization projects. This presentation was originally published on the Project Management Institute Rochester Chapter website.
When to “Flip the Switch”- Balancing Late Feasibility and Early Design ControlsGreenlight Guru
The decision of when to enter Design Controls is often unclear and arbitrary. When is the additional overhead “worth it?” Will FDA or other regulatory bodies push back on a late entry into Design Controls? What are some of the critical tasks we should accomplish in feasibility to optimize our work under Design Controls? This presentation explores the many facets of late feasibility and early Design Controls, including systems engineering best practices, regulatory involvement, and business risk. Priority Designs, in collaboration with CMD MedTech, will illustrate these key decision points through several case studies and provide the audience with a practical approach to “flipping the switch” between unregulated and regulated phases of a medical device development program.
This session took place live at the Greenlight Guru True Quality Virtual Summit, a three-day event for medical device professionals to learn to get their devices to market faster, stay ahead of regulatory changes, and use quality as their multiplier to grow their device business.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
1. 1
Title
Fault Data Spectrum:FDS
an important tool to monitor effectiveness of corrective
actions in Field before it is too late
By K Umesh
2. 2
Manuscript
The Objective is to introduce a tool to monitor the effectiveness of Corrective Actions on a
continuous basis so that the “Faults” cease to appear . If the “Faults” still appear after the
Corrective Actions, it is visible early so that the Organization regroup the teams together to start
another Cycle of “PDCA” with a proper root cause analysis and help with a fully Effective
Corrective Action.
The Corrective Actions may be taken on a Production or a Field Problem where the impact is
External and deep and can cause substantial loss of repute to the Organization at the cost of a
disenchanted Customer.
Brief Definition Of Fault :-
A “Fault” can occur in a Process, Component or a Product if one or more of the parameters
deviate beyond permissible limits of Design Intent. A Process Fault can occur due to high
dispersion and is controllable with control on the Process and Machine Parameters. The outcome
of a Process Fault will be a Faulty Product ultimately.
A “Fault” can also occur if the desired output is not achieved with the intended Design Input. A
Fault due to Design inadequacy will be highly repetitive in nature.
3. 3
All “Faults” are not similar in Impact with few in small nos. having a catastrophic effect on the
Product e.g. Safety Faults. While there may be others in large nos. but not noticed by a Normal
Customer but only by a “Highly Discernible Critical Inspector”. Such Faults do not have any
impact on the Functional or Reliability aspect & If they are overcome through simple Process or
Material change, it is pragmatic.
Thus, Faults need “Classification”. “Acceptance Quality Levels-AQL” can be decided for different
categories of Faults based on the Criticality of the Product. A Critical Healthcare equipment will
have a very rigid AQL.
See example below where the Faults are classified, coded and can be traced in the Field later.
The “Fault Codes F1 ..F13” shown are derived during development stages but will be used in Field
later.
Part Name
Part No
Date
Supplier
Classification
K A B C
1. Safety F1 a) Poor Weld Joints X
F2 b) Missing :Part Missing X
F3 c) Sharp Edges X
F4 d) Tube Crack X
F5 e) Weld Cracks X
2. Functional F6 a) Weld Discontinuity X
F7 b) Uncoverage of Paint /Coating X
F8 c) Paint peel off X
F9 d) Rust formation X
F10 e) Bubbles X
F11 f) Fastening Points - No Thread / Oversize /Undersize X
3. Minor / Appearance F12 a) Poor Surface Finish X
spot, pit marks, streak mark, scratches, flashes, burr
F13 b) Dirty
- Difficult to clean X
- Easily cleanable X
d) Surface Scratches
- Severe X
- Minor X
FAULT CLASSIFICATION
Chassis Frame Assy Document No xx/xxxxxx/001
xxx-xx-xx Revision R0
Fault type Fault Description
DD-MM-YYYY Prepared By----> xxxx/yyyyy
xyz, ABC Approved By----> zzzzzz
Fault
Codes
4. 4
Concept of “Fault Data Spectrum-FDS” :-
In the event of a Field Complaint, PDCA Cycle is used for Corrective Actions. “PDCA Cycle should
be Short & Effective” otherwise it will require another Cycle Causing delays & bad Customer
Perception.
Start Project
Collect Data
Identify Process
&
Set Target
Analyse Problem
&
Determine Cause
Decide On
Corrective
Actions
Implement
Solution
Review &
Assess
Results
Standardise
Solution
Conclude
Project
Plan
Do
Check
Act
5. 5
Customer perception gets affected if the Corrective Actions are not effective and that is
monitored through “Fault Data Spectrum”.
Fault Data Spectrum Tool
“FDS-Fault Data Spectrum” is a tool consisting of “Fault Classifications” with a “Positrol –
Positive Control Plan” in a Grid Structure.
The Tool has an FDS sheet and a Positrol sheet. The FDS sheet contains Faults Codes & Product
Sr.Nos. In each column it has color shades showing the implementation of Actions with reference
to the Manufacturing Month or Product Sr.No. After the implementation of the Corrective
actions the Faults should taper drastically or become zero.
6. 6
FDS of a New Product – an Outdoor Application Vacuum Cleaner with Fault codes & upto 3000
nos. sold.
For Faults F1 and F2, a corrective action was taken after Product No.226 but the action was only
partially effective as it did not eliminate complaints altogether. Only after another PDCA cycle at
Product No.326, the Faults did not recur in 2700 Products sold.
But additional PDCA Cycle has taken time equivalent of 100 Products manufactured and this is a
costly lapse for the company. Faults 3,4,5,7 & 8 have shown first time right corrective actions.
Final Effective
Solution
80 41 13 5 6 3 5 4 3
475 ~ 3000
400 ~ 475
375 - 400
351 - 375
326 - 350 1
301 - 325 1 1
276 - 300 1
251 - 275 1 1
226 - 250 1 3
201 - 225 1 1 1 1
176 - 200 6 1
151 - 175 4 1 2 1 1
126 - 150 7 2 2 2
101 - 125 2 1 1 1
76 - 100 13 2 1 1
51 -75 1 1 1 1
26 - 50 1 2 1 1
0 - 25 5 1
F1-Fault 1 F2-Fault 2 F3-Fault 3 F4-Fault 4 F5-Fault 5 F6-Fault 6 F7-Fault 7 F8-Fault 8
xxxx not
opening
with yyyy
xxxx not
opening
with zzzz
xx/yy not
opening
from inside
xx/yy not
opening
from
outside
xxxx noise
(abcd
loose)
nnnn
failures
xxxx switch
failure
White dot
markTotal
Production
Batch / Fault
Types
Containment Action
Interim Action-not fully
effective
Fault Data Spectrum for XXXX Assy
7. 7
Corrective Actions are described in Positrol sheet :-
Variation in xx Capacity:
Higher
All xxx above 180grams used 259 onwards
Intermittent operation in
rainy condition due to
water entry
-Hot glue application for connectors
-Wrapping of xxxx motor and
connector to avoid water ingress.
315 onwards
Variation in xx Capacity:
Higher
All xxx above 180grams used 259 onwards
Intermittent operation in
rainy condition due to
water entry
-Hot glue application for connectors
-Wrapping of xxxx motor and
connector to avoid water ingress.
315 onwards
F3
xx/yy not
opening from
inside
Bend length of xxx bigger
link is found insufficient to
hold the link even if the
clip is unlocked.
2. The xxx link bend length increased
by 2 mm
259 onwards
F4 to
F9
F2
xxxx not
opening with
zzzz
Similar method
Implemented
On
Status
F1
xxxx not
opening with
yyyy
Fault
Code
Fault
Description
Analysis Corrective Actions
8. 8
Example of a domestic Hair dryer which has 5 Major Faults.
For Fault1 , the corrective action was effective only in 3rd
Cycle.
Final effective solution
Intrim action-Not
fully effective
Intrim action-
Not fully
containment
action
30 24 3 1 1 1
375 - 10000
351 - 375
326 - 350 1
301 - 325
276 - 300 1
251 - 275
226 - 250 2 1
201 - 225 1
176 - 200 1
151 - 175 2
126 - 150 3
101 - 125 3
76 - 100 2 2 1 1
51 -75 5
26 - 50
0 - 25 3 1
Prod. Batch Fault 1 Fault 2 Fault 3.1 Fault 3.2 Fault 3.3
Switch operating
but lever not
moving
Solenoid
driver
failure
Driver fault
in pcb
Reverse lamp
driver failure
Fault Data Spectrum for Hair Dryer
Total
Fault types
Switch not /
intermittently
working
Positrol-Hair Dryer
Fault Code Fault Description Analysis Corrective Actions Implemented OnStatus
Flashes in switch cap assembly
Flashes in switch cap removed 001
Suction cup sticking to the switch bkt
Retainer design modified 314
Switch intermittent due to black
deposition after around 1000 cycles Switch make changed to xyz 384
Detent plate got bend
1.100% hardness checking of detenet
pin and bush.
2.Torque mark on detent plate screw to
be ensured @ incoming stage
347
Solenoid pin touching to PCB
housing
Pokayoke implemented @ supplier end
for complete pressing of solenoid pin
347
F3.1 Solenoid driver failure
Driver Optocoupler failure in xxxxx
PCB
Defective part sent to supplier for analysis
100% diagnostics checking @ supplier
end
347
F3.2 Driver fault in pcb
lead bridging positive signal track
and Dig 1 output pin short
100% diagnostics checking @ supplier
end / FI
347
F3.3 Reverse lamp driver failure Reverse Reed switch damage
100% diagnostics checking @ supplier
end /FI
347
F1
Switch not /
intermittently working
F2
Switch operating but
lever not moving
9. 9
Conclusions :-
“Fault Data Spectrum” is a very effective tool to monitor the effectiveness of corrective actions. It
can detect early and initiate another action without loosing much time and make a solution
permanent.
“Fault Data Spectrum” and “Fault Classification” are linkable and can take the actions upstream
at Tier 1, Tier 2 and Tier 3 supplier level. They can be used during Development Phases and each
Failure encountered in Alpha, Beta or Pilot Production can be seen for Closure effectively.