SlideShare a Scribd company logo
BUILDING ENVELOPE
VISIONS BECOME REALITY.
ANYTHING IS POSSIBLE
Over the years Lindner Group has developed into a financially sound,
­technically strong, solution-oriented as well as reliable partner. In everything
we do, we always keep the environment in mind as “healthier construction“
is self-evident for us. New concepts challenge us to become even better at
­implementing projects. According to the motto “Anything is possible“ we
make the impossible possible for our customers.
STABILITY AND GROWTH
Since the founding by Hans Lindner in 1965, our headquarter is located in
Lower Bavarian Arnstorf, where we have grown enormously during the last
decades. With about 7,100 employees around the world, we are proud to be
the ­largest employer in the district of Rottal-Inn. Every day we work on 2,500
­projects which revolve mostly around our core business, the ­construction in-
dustry. We are complemented by our foundation, the mk | hotels, the house
breweries and more recently by a sustainable ­agriculture and forestry.
BUILDING ENVELOPE
VISIONS BECOME REALITY.
The Lindner Facade Group is your competent partner for the complete building envelope.
Whether for the building’s facade, the roof or free form and special structures – our
worldwide teams of specialists will deliver individual solutions for your requirements.
FACADES STEEL AND GLASS ROOFING
The ART Rotana, Manama, Bahrain
Photo: © Zmyasa Fotograf
www.Lindner-Group.com6 . Building Envelope
A GLOBAL PLAYER... WITH OUR ROOTS IN ARNSTORF
As a major specialist facade contractor, Lindner Facades designs, manufactures and installs high quality, bespoke unitised curtain
wall facades for worldwide construction projects.
We have set new standards in facade technology as we have been involved in some of the most iconic buildings worldwide,
­providing technologically advanced solutions to satisfy the complex project requirements in construction today.
Focused on product quality, occupational health & safety and environmental protection, Lindner Facades has a highly skilled and
well-trained workforce and offers a wide range of products. And although we act locally for the benefit of all of our employees,
clients and suppliers, we have the backing of a world-class organisation.
Lindner Facades Group
Georgstrasse 2 | 94424 Arnstorf | Germany
+49 8723 20-3500 | Lindner-Fassaden@Lindner-Group.com
New York
www.Lindner-Group.com Building Envelope . 7
Arnstorf
Dubai
Singapore
London Moscow
Ried
Selbitz
Dettelbach
Baku
Riyadh
Arlesheim
Lausanne
Photo: © Sergio Guerra
RANGE OF BUILDING
ENVELOPE SOLUTIONS
www.Lindner-Group.com Building Envelope Solutions . 9
MADE WITH LINDNER FACADES –
OUR RANGE OF BUILDING ENVELOPE SOLUTIONS
FACADES
	Unitised Curtain Walling (aluminium and glass)
	 Aluminium and Steel Windows, thermally insulated
	 Ventilate Single and Double Skin Facades
	 Automatic Doors
	 Aluminium and Steel Elements (secure by design  ballistic performing, blast enhanced, smoke/fire protection)
	 Customised Bespoke or Standard Solutions
	 Metal Facades
STEEL  GLASS
	 3D Free Forms
	 Space Frame Structures
	 Cable Stiffened Structures
	 Tensile Structures
	 Glass Structures
	 Smart Structures
ROOFING
	 Metal Roofing
	 Glass Roofing
	 Green Roofs
	 Membrane Roofs
	 Structural Waterproofing
	 Solar PV
The Sphere, Astana, Kazakhstan
Photo: © Nikolay Kazakov
Corniche, London, UK Rijeka
FACADES
SPECIALIST TAILORED
FACADE SOLUTIONS.
A facade is more than just the shell of a building. It has to fulfill the most
exacting aesthetic requirements, whilst providing intelligent functionality and
a completely effective solution.
With years of experience in the design, supply and installation of high quality
bespoke curtain walls, Lindner Facades has been involved in creating some
of the most iconic buildings in the world.
Developed and manufactured throughout our production facilities worldwide,
our products combine aesthetically appealing materials that offer superior
quality and performance. Ecologically tested and approved materials are
used, for both occupational health and safety and environmental protection
reasons.
Our systems are designed to complement each other or to be used
independently. The prerequisite for successful completion is individual
design, manufacture and installation. However, it’s Lindner’s commitment to
its Integrated Management System that ensures perfect coordination of all
the different areas, resulting in effective scheduling and a comprehensive
service right from the initial system design to technical installation and
beyond to product maintenance.
Share your ideas with us and let us make your visions reality.
Library of Birmingham, UK
www.Lindner-Group.com12 . Facades
	 SWISS-RE HEADQUARTER, LONDON
With its height of 180 metres the SwissRe Headquarter is the most significant addition to the City of London Skyline and one of
the most impressive office buildings in London. To realise the whole complex facade of this skyscraper Lindner used element-
and structural glazing facade systems.
ARCHITECT Foster + Partners
CLIENT Swiss Re´
SCOPE OF WORK curtain wall/unitised facade, structural glazing facade
Swiss-Re Headquarter, London, UK
THE CORNICHE, LONDON
The three spectacular towers of “The Corniche” lie on the southern bank of the Thames. They measure 85 m at their highest,
counting 15 to 27 storeys and 253 apartments. The towers also offer office spaces, a restaurant and café as well as a bar, a gym,
a pool and spa area. Situated on the Albert Embankment, the towers provide stunning views of the Westminster Palace, the Tate
Britain and the London Eye. Its exterior view shows distinctive forms that visually distinguish the complex from its surroundings.
ARCHITECT Foster + Partners
CLIENT Berkeley Homes
SCOPE OF WORK curtain wall/unitised facade, structural glazing facade
The Corniche, London, UK
www.Lindner-Group.com Facades . 13
www.Lindner-Group.com14 . Facades
	 BUCKINGHAM GATE, LONDON
No 62 Buckingham Gate is a 11 storey commercial building with retail and a public realm at the ground floor. Situated in central
London, only a short walk from Buckingham Palace, it offers 13,000 m2
of space in total.
Lindner Facades was responsible for the facade of this project, including production, project management and installation. The
complex 3D unitised curtain wall features eleven fold lines, creating various inclinations over the total area. Furthermore, the
facade visibly sails at the first and roof levels. Other unique facettes of the project are a curved entrance glazing, steel  glass
canopies to two elevations and a terrace glazing.
ARCHITECT Pelli Clarke Pelli/Swanke Hayden Connell
CLIENT Landsec
SCOPE OF WORK curtain wall/unitised facade
Buckingham Gate, London, UK
LIBRARY OF BIRMINGHAM
The Library of Birmingham is one of the most important urban renewal projects in Europe. The total investment volume for
its construction amounts to 188.8 Pounds. The Library was opened in September 2013, becoming the largest regional library
in Europe. Over 400,000 books are stored there. Amongst the most valuable items is a Shakespeare collection with originals
from 1623. The library is open seven days a week and has more than 3 million visitors per year. One of the reasons for the high
number of visitors is the remarkable interior and exterior design of the building. The Library has already become one of the most
popular attractions in Birmingham.
ARCHITECT Mecanoo International
CLIENT Birmingham City Council
SCOPE OF WORK curtain wall/special facade 13,000 m2
Library of Birmingham, UK
www.Lindner-Group.com Facades . 15
www.Lindner-Group.com16 . Facades
	 WOODBERRY DOWN KSS III, LONDON
Woodberry Park is one of the largest urban revitalisation projects in London. It is set to create over 4,500 residential units in
a natural environment and with excellent connection to the city centre. The quarter is easily distinguished from afar through
the 30-storey residential tower Woodberry KSIII, which houses 130 luxury apartments. Its modern design features large glazed
areas with integrated aluminum panels.
ARCHITECT Stock Woolstencroft
CLIENT Berkeley Homes
SCOPE OF WORK curtain wall/unitised facade, steel construction and locksmith works, balconies, metal plate covering and attics
Woodberry Down KSS III, London, UK
www.Lindner-Group.com Facades . 17
MADE BY LINDNER FACADES –
OUR RANGE OF SERVICES
Woodberry KSS3, London, UK
Facades . 19
MADE BY LINDNER FACADES
A RELIABLE PARTNER FROM START TO FINISH AND BEYOND
You can rely on Lindner’s professional service at every stage of your project. With an exclusive partner network, going back many
years, Lindner provides the ultimate in knowledge and expertise for guaranteed superior quality.
Our excellent manufacturing capacity ensures quick delivery and efficient installation of all products and, once the handover is
complete, rest assured you will continue to receive Lindner’s personal service and top-quality customer care.
Lindner Facades is one of the world’s leading specialists for the complete building envelope; a single source supplier capable of
providing complete solutions from design and planning to manufacture and installation, with branches and reliable partners all over
the world. Our strong global supply chain allows for highest service, quality and competitiveness.
Known for our iconic buildings, Lindner Facades has cooperated closely with some of the most renowned architects of our time. Our
vast experience in the development and implementation of individual, high-quality facade solutions has set new standards in facade
technology.
Being a solid partner with proven financial security and a proactive approach to health and safety, clients choose us for our vast
experience, technical expertise, quality of delivery, global supply chain excellence and close working relationship.
Whatever your project’s facade requirements may be – aesthetically elaborate or technically challenging: with the expertise
available in-house at Lindner Facades, we are confident that we will deliver the right facade solution and the very best client
experience from start to finish.
Villingen Schwennin
www.Lindner-Group.com20 . Facades . Range of Services
DESIGN AND ENGINEERING–
EXPERIENCED TECHNICAL EXPERTS
The design of quality, bespoke, unitised facades requires a high level of technical ability and experience. At Lindner we have some of the
most technically competent and experienced people in the business.
Our specialist Facade System Design Offices can take a facade from concept to reality, no matter how challenging, applying state of the
art methodologies as e.g. 3D design worldwide. Supported by our own in-house facade, structural, thermal and acoustic engineers, facade
designs are tailored to suit individual project performance specifications and aesthetic requirements.
We are able to provide early stage support for all Architects, Consultants and Contractors to help develop their aspirations into
realised solutions.
Our system designers and engineers are available to develop early stage architectural intent into engineered solutions to meet the
demands of all modern day facades.
We are able to offer commercial advice and support at the earliest possible phase of a project so that budget expectations are
understood by the client team from the very outset. Value-engineered solutions can be proposed in parallel offering the client
choices as designs evolve.
In conjunction with the technical and commercial challenges, our highly experienced operations teams are able to provide planning
and installation resolutions for the most complex of facades ensuring that safe and efficient methodologies are implemented with our
proposals in line with programme constraints.
Comprehensive bid proposals are prepared through our sales and estimating resources, incorporating Group expertise during the
tender phase and beyond. This ensures that continuity of all the necessary tender information is maintained and carried forward into
awarded projects.
MAINTENANCE AND AFTER SALES
Lindner Facades has its own dedicated service team which carries out a full range of maintenance and after sales works to the building
envelope, ranging from the replacement of a single pane of glass through to the re-cladding of an entire facade.
www.Lindner-Group.com Range of Services . Facades . 21
INSTALLATION –
DELIVERING HIGH QUALITY FACADES ON TIME, SAFELY
At Lindner Facades we understand just how important the planning and management of the installation phase is to the successful handover
of a completed high quality facade to our clients, safely and on time. For this reason, our planning starts from the very first project meetings,
and our installation managers are engaged early on in the process to ensure their valuable experience is fed into our design, planning and
logistics strategies.
Our site set-up is substantial in comparison to most of our competitors, with the whole project team being based full-time on site. And to
ensure that everyone can communicate and work efficiently, our site office networks have fast broadband connections to all our various
offices worldwide.
Our innovative installation methodologies are tried, tested and tailored to suit individual project constraints. Installing unitised curtain wall at
height is our core business and, as such, we have robust systems to manage and control all aspects of our installation activities.
Safety is at the heart of everything we do of course and in contrast to many of our competitors, we allocate a full-time safety manager to
each of our major projects, not only to ensure our own works are installed safely but also to engage actively with the client teams and those
of our fellow trade contractors, making sure the whole site environment is one where everyone can go home safe at the end of their shift.
Lindner Facades has recently completed over one million man hours RIDDOR-free, an achievement of which we are very proud.
All of our projects are audited monthly on-site for health and safety, environmental and quality performance, with the results reviewed at
board level. This ensures that the service and performance we promise our clients are being achieved on-site.
PRODUCTION –
IMPRESSIVE PRODUCTION CAPABILITY AND STATE
OF THE ART MACHINERY
Lindner Facades’ extensive manufacturing capability enables quality to be maintained strictly whilst allowing maximum flexibility to meet
individual project requirements. Developed and manufactured throughout our high-capacity and state of the art production facilities
worldwide, our products combine aesthetically appealing as well as ecologically tested and approved materials that offer superior quality
and performance.
PROJECT MANAGEMENT –
EFFECTIVE PLANNING FROM START TO FINISH
At Lindner Facades we know the key to a successful project is meticulous planning, communication and, above all else, experienced
specialist facade project management. All of our project managers are experienced in bespoke unitised facades, and our management
structure ensures that each project team has hands-on support and guidance operationally at director level.
For us, a successful project starts even before it is awarded. Right from the beginning, our operations staff is involved actively in all tenders
to ensure our client proposals are based on well-thought-out programmes, and that our logistics and installation methodologies are tailored
to the particular project challenges and constraints. By doing this, if we are successful then both, our clients and our team, have the
confidence that our schemes are based on sound planning and workable methodologies.
Dedicated project teams
Unlike many of our competitors, all of our projects have dedicated full-time project teams. These teams are based in our various offices
during the off-site, lead-in activities but when the project approaches the site phase, the whole project team bases itself full-time onsite,
thereby ensuring direct control over operations on a day-to-day basis and face-to-face client communication.
Our project managers have direct contact with all of our design offices and, of course, our production facilities where each project has its
own full-time dedicated internal project manager to ensure the day-to-day project priorities are achieved.
Communication-driven project management
Regular internal face-to-face focus meetings ensure our project managers have full control over all aspects of the project at all times and,
again unlike our competitors, can give up-to-the-minute information to our clients across all aspects of their projects.
Our project management structure, systems and procedures ensure our teams follow a collaborative approach with open and honest
communication both internally and externally with regular reports on each project strand.
www.Lindner-Group.com22 . Facades
	 NEXUS PLACE, LONDON EC4
The main goal of this project was the redevelopment of an existing building by modernizing the facade from the ground floor up
to the eighth floor. Furthermore the building was extended by four additional floors. The highly complex 3D construction of the
facade is a bespoke solution. To achieve the comb-shaped character, a chrystalline structure has been applied to the facade´s
surface.
ARCHITECT Sturgis Associates
CLIENT ISG InteriorExterior plc
SCOPE OF WORK rainscreen cladding, metal surface, curtain wall/unitised facade, stick system, structural glazing facade
Nexus Place, London EC4, UK
30 CROWN PLACE, LONDON
Being a striking addition to the London skyline this headquarter was built at an important location close to the Liverpool Street
Station. For this project Lindner produced and manufactured several thousand square metres of curtain wall, scenic lift shaft
glazing, glass balustrades plus a glass roof to the atrium.
ARCHITECT Horden Cherry Lee Architects Ltd
CLIENT City Offices Real Estate (CORE)
SCOPE OF WORK curtain wall/unitised facade
30 Crown Place, London, UK
www.Lindner-Group.com Facades . 23
www.Lindner-Group.com24 . Facades
	 NO 4 ST PAUL‘S SQUARE, LIVERPOOL
No 4 St Pauls Square is a stunning 8 storey BREEAM “Excellent” awarded office building extending to an area of 109,000 m2
.
It constitutes the third and final phase of the development. Lindner assembled unitised facades, feature fins with Kapilux
insulation, a bolt fixed glazed entrance, motorised doors, copings and metal panels.
ARCHITECT RHWL
CLIENT Sheperd Construction Ltd
SCOPE OF WORK curtain wall/unitised facade
No 4 St Paul‘s Square, Liverpool, UK
Photo: © HUFTON CROW
www.Lindner-Group.com Facades . 25
www.Lindner-Group.com26 . Facades
	 KÖ-BOGEN, DUSSELDORF
The Kö-Bogen, designed by New York architect Daniel Liebeskind, is the highlight of Dusseldorf’s Königsallee, one of Europe’s
most famous shopping boulevards.
The distinctive design of the Kö-Bogen, with its unique curved shape, sharp corners and interplay of glass and natural stone,
as well as landscaped areas and baffles, has made it a much-loved landmark in the city. In addition, the project received the
MIPIM Award for the best urban renewal project, the ‘real estate Oscar’, and was awarded the Platinum LEED label, the highest
award available for sustainability.
ARCHITECT Daniel Libeskind
CLIENT die developer Projektentwicklung GmbH
SCOPE OF WORK curtain wall/special facade 15,000 m2
Kö-Bogen, Dusseldorf, Germany
www.Lindner-Group.com Facades . 27
Providence Tower, London, UK
	 PROVIDENCE TOWER, LONDON
This 136 m tall elliptical tower, a 45-storey luxury residential building, is located in Canary Wharf in London’s Docklands area, formerly
part of the Port of London and now one of the world’s most important financial centres. A special highlight is the viewing gallery on
the top floors, which offers a panoramic view over the whole of London.
As well as being awarded the contract for this highly distinctive landmark project, we also supplied the facade for the adjacent Bar
Building, a crescent-shaped 12-storey annex with affordable residential units.
ARCHITECT Skidmore, Owings  Merrill LLP
CLIENT Ballymore Properties Ltd
SCOPE OF WORK unitised facade 13,000 m2
, rainscreen cladding, stone surface 5,400 m2
www.Lindner-Group.com28 . Facades
	 THE FONTENAY, HAMBURG
The luxury hotel “The Fontenay” is a 5-star-superior establishment with a view on the Außenalster in the heart of Hamburg. The
seven-storey building integrates itself easily into the surrounding park-like scenery. The Fontenay offers 130 high-class rooms
and suites, the restaurants Parkview and Lakeside, the 1,000 m2
Fontenay Spa, a 320° Panorama Bar on the 6th floor as well as
numerous conference rooms.
The visual appearance of The Fontenay is characterised by organically flowing lines that manifest themselves in convex and
concave waves. The resulting layout displays three intertwined circles, which leads to a construction with hardly any right
angles. The shining white effect is created by the building´s facade, featuring horizontal bands with glass areas and white
glazed ceramic tiles.
ARCHITECT Störmer Murphy and Partners
CLIENT Kühne Immobilia GmbH
SCOPE OF WORK rainscreen cladding, metal surface 2,300 m2
, stone surface 1,750 m2
, steel construction and locksmith works, banis-
ters, curtain wall, stick system 3,000 m2
, special facade 5,500 m2
The Fontenay, Hamburg, Germany
www.Lindner-Group.com Facades . 29
	 Merck MIC Darmstadt, Germany
	 MERCK INNOVATION CENTER  EMPLOYEE RESTAURANT
The Merck Innovation Center (MIC) in Darmstadt symbolises Merck`s Headquarter´s development from a production site to
an international hub of knowledge and innovation. The building`s architecture represents a clear statement of the innovative
processes and methods applied by the people who are promoting cutting edge research inside.
Lindner Facades engineered, manufactured and installed the facades of the Innovation Center and Employee Restaurant. The
project was characterised by highest requirements regarding explosion protection, statics demanding the massive use of steel
and last, but not least Henn Architekten´s filigrane design.
ARCHITECT Henn Architekten
CLIENT Merck KGaA
SCOPE OF WORK curtain wall stick system 8,000 m2
, skylight roofing 220 m2
, rainscreen cladding, glass surface 400 m2
,
metal surface 200 m2
, steel construction and locksmith works, maintenance walkways 5,000 m2
www.Lindner-Group.com30 . Facades
	 THE LEXICON, BRACKNELL
The Lexicon is a 580,000 m² shopping and leisure area in north Bracknell, part of Greater London, England, and is the centerpiece of
a £240 million regeneration project. The development consists of eight buildings of which Prater was awarded the contract to supply
the outer shell for all of them – each being an individual project.
The Lexicon is a model project in the Prater portfolio, highlighting the importance and value of a cooperative work ethic. Its success
resulted not only from the skills and expertise of our specialist teams, but also from the partnership-based approach that enabled
eight new buildings to be handed over in just under 18 months.
ARCHITECT BDP Architects
CLIENT Bracknell Regeneration Partnership
SCOPE OF WORK rainscreen cladding, metal surface, curtain wall/unitised facade, stick system, sandwich facade, roof,
hot melt waterproofing, singly ply waterproofing
Lakhta Center Multifunctional Complex, St Petersburg
www.Lindner-Group.com Facades . 31
The Lexicon, Bracknell, UK
STEEL AND GLASS
GLASS IS OUR SPECIALITY.
Our Lindner Steel  Glass (LSG) division specialises in complex steel,
membrane and glass structures, and provides a complete design, delivery
and management service.
As a member of the Lindner Facades Group we recognise the importance of
good customer relationships in terms of ensuring the successful outcome of
a project. We work closely with our clients in order to establish their precise
requirements before tailoring the appropriate solution.
The Sphere, Astana, Kazakhstan
Photo: © Nikolay Kazakov
3-DIMENSIONAL FREE FORMS
SPACE FRAME STRUCTURES
CABLE STIFFENED STRUCTURES
TENSILE STRUCTURES
GLASS STRUCTURES
CUSTOM-MADE STEEL AND
GLASS SOLUTIONS
The ART Rotana, Manama, Bahrain
Photo: © Zmyasa Fotograf
CUSTOM-MADE STEEL AND GLASS SOLUTIONS
Custom-made steel and glass solutions are specialist developed systems which meet the clients’ demands in almost any aspects.
The combination of variable supporting structures together with almost all kind of envelopes (e.g. photovoltaic panels, curved glass,
stone, composite panels or louvres) is nearly unlimited. Our experienced engineers will be able to determine the technical feasibility
of any kind of structure even at a very early stage of the project.
GLASS STRUCTURES
Using modern lamination techniques, as well as new developments within Glass production, LSG is able to design large-span
complex glass only structures. Incorporating the latest glass technology almost any design is now achievable.
www.Lindner-Group.com
TENSILE STRUCTURES
Tensile or Membrane Structures rely on the integral strength of the covering membrane, covering the supporting steel structure. This
can be a woven fabric i.e. PTFE Coated Glass Fibre Fabric, or PVC coated Polyester Fabric. Also available is ETFE which is similar to a
PTFE material which is not woven. ETFE can be used in a single layer covering or more commonly in cushions filled with air.
CABLE STIFFENED STRUCTURES
High strength cables in stainless steel or galfan coated steel are used to create super transparent structures. The cables are usually
prestressed on site in order to increase the rigidity in the overall structure.
SPACE FRAME STRUCTURES
Space frame structures are an efficient form of lightweight steel structure. Members and machined nodes are bolted together on site
to form a complete load bearing frame structure with a wide range of geometrical options.
Steel and Glass . 35
Hazza Bin Zayed Stadium, Abu Dhabi, UAE
Photo: © DENNIS GILBERT
3-DIMENSIONAL FREE FORMS
Commonly known as Grid Shell Structures, the Geometry is a ‘Free Form’ shape and needs to be curved in order to provide inherent
stiffness. The steel structure can be made using single elements, with bolted nodes, or can be welded in ladder segments.
www.Lindner-Group.com36 . Steel and Glass
	 HAZZA BIN ZAYED STADIUM, ABU DHABI
The Hazza Bin Zayed Stadium represents Phase 1 of a mixed use development comprising the sports stadium, a commercial
office building, a sports centre and further site infrastructure facilities in the heart of Al Ain. With the opening of the stadium,
the local football club received one of the most modern, state-of-the-art stadia in the Middle East. The aesthetic treatment of the
stadium represents a modern facility combined with the traditional cultural elements. The design integrates the palm tree in the
palm bowl facade design concept.
ARCHITECT Pattern Design Ltd
CLIENT BAM International
SCOPE OF WORK steel and glass, tensile structures
www.Lindner-Group.com Steel and Glass . 37
Hazza Bin Zayed Stadium, Abu Dhabi, UAE
Photo: © DENNIS GILBERT
www.Lindner-Group.com38 . Steel and Glass
	 HOTEL ART ROTANA*****, BAHRAIN
The five-star hotel ART Rotana is located on the Amwaj Islands, a group of man-made islands in Bahrain, north of Manama. The hotel
has 311 luxury rooms and suites, all with sea views. Our scope of services included the canopy and facade.
The 1,650 m² canopy consists of a free-form, single-layer steel supporting structure made of triangular hollow sections connected by
solid steel nodes and supported by three funnels. It is covered with insulating aluminium and glass panels above the entrance area.
The facade includes a 10 m high curved foyer, with insulated glass panels supported by a customised steel structure.
ARCHITECT Middle East Architects SPC
CLIENT Argon Properties Co. W.L.L.
SCOPE OF WORK steel and glass/3-Dimensional free forms, curtain wall/stick system
www.Lindner-Group.com Steel and Glass . 39
The ART Rotana, Manama, Bahrain
Photo: © Zmyasa Fotograf
The Sphere, Astana, Kazakhstan
Photo: © Nikolay Kazakov
	 THE SPHERE, ASTANA
The Sphere is a stunning 80 m diameter structure created as the architectural centerpiece of the Astana Expo 2017 Exhibition in
Kazakhstan. Standing 100 m high, this steel and glass structure is believed to be the world’s largest spherical building.
The structure houses Kazakhstan’s national exhibition, the Museum of Energy, as well as large viewing platforms and open atriums.
We were responsible for the production of the steel facade construction as well as the assembly of the entire building envelope,
including the pre-stressed atrium cable net.
ARCHITECT Adrian Smith + Gordon Gill Architecture
CLIENT EXPO 2017 – Future Energy
SCOPE OF WORK custom solutions 18,000 m2
www.Lindner-Group.com40 . Steel and Glass
www.Lindner-Group.com Steel and Glass . 41
	 IZMIR AIRPORT
Four highly distinctive ‘funnel’ structures were designed using tubular elements. The choice of pipe cross-sections was
an architectural decision, but also ensured the structural rigidity that limits horizontal displacements under seismic loads. Full
penetration welds were made on nodes located halfway along the height of the ‘funnel’ from ground level. Site welding was kept
to a minimum due to pre-production in the factory.
Following completion of the welding work, fire-resistant coating was applied on site. The four structures were glazed inside the
funnel.
The tops of the funnels were covered with a membrane roof. The connection between the membrane and the roof of the terminal, on
the other hand, remained open to ensure natural ventilation within the structure.
ARCHITECT Hazan Architecture TAV TEPE AKFEN YATIRIM INSAAT VE ISLETME A.S.
SCOPE OF WORK steel and glass, 3-Dimensional free forms
Izmir Airport, Turkey
ROOFING
INDIVIDUAL SOLUTIONS
FOR YOUR BUILDING.
Whether a new-build, conversion or refurbishment project, we work hand-in-
hand with clients and partners to develop and deliver the most cost effective
and technically compatible roofing solutions available. Our commitment to
the highest standards of quality and to on-site safety management protects
both the environment and the health of our specialists, and ensures optimised
project delivery.
Our expertise in this area is enhanced by our ability to offer innovative green
roof solutions and off-site construction, enabling us to combine excellent
environmental compatibility with outstanding technical performance.
	 Metal Standing Seam Roof Systems
	 Composite Roof Systems
	 Bituminous Systems
	 Cold Applied Solutions
	 Green Roofing
	 Single Ply Membranes
	 Photovoltaic Systems
Taiwan
Photo: © provided by CK group
www.Lindner-Group.com44 . Roofing
	 OLYMPIC STADIUM, LONDON
Central to the vision for the 2012 London Games was to create facilities that would provide world class venues and form a legacy of
sustainable facilities for future use by the City.
Prater/Lindner detailed, procured and installed aluminium cladding combined with rigid phenolic boards to create an insulated
rainscreen system, a capped curtain walling package as well as blast resilient glazing, brise soleil and steel rainscreen cladding to
the two storey viewing platform of the ArcelorMittal Orbit Tower right next to the stadium.
ARCHITECT Populous
CLIENT Olympic Delivery Authority
SCOPE OF WORK aluminium cladding, roofing, rainscreen system, waterproofing, curtain walling
Olympic Stadium, London, UK
www.Lindner-Group.com Roofing . 45
	 OLYMPIC VELODROME, LONDON
The Velodrome is the most sustainable venue on the Olympic Park in terms of design and construction. Lindner/Prater specified
recycled materials where possible, such as the aluminium coil used for the roof sheets, to ensure the roof met the sustainability
targets. The roof lighting reduced the need for artificial lighting, natural ventilation minimised the need for air conditioning and water
saving fittings were installed to collect rainwater for reuse.
ARCHITECT Michael Hopkins
CLIENT Olympic Delivery Authority
SCOPE OF WORK standing seam roof, rooflights, bullnose
	 Olympic Velodrome, London, UK
WEMBLEY STADIUM, LONDON
Wembley Stadium was built in 2007 on the site of the former legendary Wembley Stadium. It is one of the largest arenas in Europe
and undoubtedly one of the world’s most scenic. During the construction, Lindner delivered an extensive interior design package
(and occasional exterior work) valued at around EUR 21 million. Overall, approximately 100,000 m2
of various interior fit-out solutions
were provided.
ARCHITECT Foster + Partners
CLIENT Wembley Stadium Ltd
SCOPE OF WORK partial roofing
www.Lindner-Group.com46 . Roofing
Wembley Stadium, London, UK
Photo: © Nigel Young/Foster + Partners
Use by courtesy of Wembley Stadium Ltd
www.Lindner-Group.com Roofing . 47
LINDNER FACADES’
STRENGTHS
www.Lindner-Group.com Strengths . 49
LINDNER FACADES’ STRENGTHS
We are part of the Lindner Group, Europe’s leading specialist interior fit-out and facades contractor. This means that, as well as
offering technical expertise and customer focus, we can also provide the reassurance of dealing with a financially secure, globally
active group. Furthermore, the skills that exist across our group enable us to offer the convenience of a single source procurement
route for the external envelope and internal fit-out of a project.
	 engineering
	 technical team worldwide: Germany/Switzerland/UK/Dubai/USA/Austria
	 3D design expertise
	inhouse building physics department
	 global supply chain
	 multiply disciplines: facades + interior fit-out
	 innovative glass facades with Lindner Steel and Glass
	 no limitation of project size and scope
	 innovation potentials
	 reference to quality and price features
	 development of new facade systems together with architects – develop and build in own production facilities
	 maximum creativity  inspiration
	 development from sketch with implementation of latest art of materials
	 automatic facade components
	 realization of most challenging architecture
	 strong partner
Clamart
Photo: © Sergio Grazia
FACADES PRODUCTION
TESTING FACILITIES
www.Lindner-Group.com Testing Facilities . 53
PERFORMANCE TESTING AND MUCH MORE
As well as VMUs we also produce “Performance Mock-Ups or PMUs”. These mock-ups are produced from the final approved and
project-specific materials for the sole purpose of performing CWCT testing to prove the air permeability, water resistance, and struc-
tural integrity of the system prior to going to full production. The facade units for these tests are produced in Germany and shipped to
the UK for testing at an accredited test centre.
Our in-house RD Department also carries out certified project-specific testing of system parts, such as impact testing of glass,
­cyclic testing of vents and many other types of tests which are often required when designing bespoke systems that must comply
with the various standards and regulations. We can also provide acoustic testing in our own independently accredited laboratory
within our Arnstorf factory.
TESTING FACILITIES
Our in-house testing facilities at the German headquarter are controlled and certified by independent 3rd party test institutes.
Our research and development department has the ability to test both in house or in conjunction with independent consultants:
	water tightness
	 structural calculations
	 dynamic tests as well as air
Random testing of our products is carried out as company standard:
	structural
	acoustics
	fire rating
	climate
	 weathering effects
Testing is carried out to European and international standards to validate performance versus design criteria. Testing also presents
value engineering opportunities to tackle buildability issues on the ground.
Discretionary tests performed at the laboratory include:
	 acoustic
	 building movement
	 seismic testing to AAMA standards
	 thermal cycling to CWCT standards
Curtain Walling – Standard Weathertightness and Impact Tests include
CWCT Section American Standard European Standard
Air Permeability 5 ASTM E283 EN12153
Static Water 6 ASTM E331 EN12155
Dynamic Water 7 AAMA 5011 EN13050
Wind Load 11  12 ASTM E330 EN12179
Impact TN76 N/A EN14019
MOCK-UPS
Bespoke unitised curtain walling is, by its very nature, unique and project-specific. To achieve each solution, it is necessary to
design project-specific aluminium profiles and gaskets that meet both the aesthetics and specific performance criteria required by
clients.
BRINGING DESIGNS TO LIFE IN MOCK-UP FORMAT
Taking project-specific profiles and gaskets from the drawing board to final production requires a significant lead-in. For this reason
we also offer our clients the facility to see their designs come to life earlier in the process by building full size mock-ups made from
timber and/or alternative materials prior to the production of the project-specific materials, which can have long lead times. These
“Visual Mock-Ups” (or VMUs) can then act as a benchmark for the final design and materials, and are generally built and assembled
for viewing at our factory in Arnstorf, offering clients the opportunity to visit our headquarters at the same time.
Main Picture: Woodberry Down KSS III, London, UK
This document and all contents are protected by copyright. All rights reserved. Copying or reproduction of partial content or the complete document in
any form (print, photocopy or other methods) as well as the storage, processing, copying and distribution through any electronic media or systems, is
prohibited for all parts of this document without the prior written approval of the publisher.
Lindner AG | Facade
Bahnhofstrasse 29 | 94424 Arnstorf | Germany
Lindner-Fassaden@Lindner-Group.com | www.Lindner-Group.com					 TMB_F/EN/1.0

More Related Content

What's hot

S. Palo interior Architect
S. Palo interior ArchitectS. Palo interior Architect
S. Palo interior ArchitectSimona Palo
 
Embassy site analysis in North Abdoun
Embassy site analysis in North AbdounEmbassy site analysis in North Abdoun
Embassy site analysis in North Abdoun
University of Jordan
 
Complete Vivianne Vianna Resume 1-2014
Complete Vivianne Vianna Resume 1-2014Complete Vivianne Vianna Resume 1-2014
Complete Vivianne Vianna Resume 1-2014Vivianne Vianna
 
Lewis & Hickey - Residential
Lewis & Hickey - ResidentialLewis & Hickey - Residential
Lewis & Hickey - ResidentialTim Hall
 
M+P Leisure
M+P LeisureM+P Leisure
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHYFocus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
VMZINC
 
Designed for nordic innovators
Designed for nordic innovatorsDesigned for nordic innovators
Designed for nordic innovatorsbigbluereports
 
JP Purchasing Consultancy 2014
JP Purchasing Consultancy 2014JP Purchasing Consultancy 2014
JP Purchasing Consultancy 2014Jan Piet Jacobi
 
INTERIOR-iD Slideshow
INTERIOR-iD SlideshowINTERIOR-iD Slideshow
INTERIOR-iD Slideshow
Radaschitz
 
Fiona Barratt Campbell Company Profile 2017
Fiona Barratt Campbell Company Profile 2017Fiona Barratt Campbell Company Profile 2017
Fiona Barratt Campbell Company Profile 2017
Charlotte Condon
 
Fiona Barratt-Campbell | A Company Overview 2017
Fiona Barratt-Campbell | A Company Overview 2017Fiona Barratt-Campbell | A Company Overview 2017
Fiona Barratt-Campbell | A Company Overview 2017
Sophie Callender
 
CyView Development 23
CyView Development 23CyView Development 23
CyView Development 23
CyviewDevelopers
 
Archizinc Trophy magazine n° 4 - 2010
Archizinc Trophy magazine n° 4 - 2010Archizinc Trophy magazine n° 4 - 2010
Archizinc Trophy magazine n° 4 - 2010
VMZINC
 
PS Presentation April 16
PS Presentation April 16PS Presentation April 16
PS Presentation April 16Damian McColgan
 
AADinteriorsagency-generalpresentation2015
AADinteriorsagency-generalpresentation2015AADinteriorsagency-generalpresentation2015
AADinteriorsagency-generalpresentation2015Igor Perusko
 
AG5 Tower Business Bay Dubai +971 4553 8725
AG5 Tower Business Bay Dubai +971 4553 8725AG5 Tower Business Bay Dubai +971 4553 8725
AG5 Tower Business Bay Dubai +971 4553 8725
Sandeepnextgen
 
FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012
FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012
FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012crispal1
 

What's hot (19)

S. Palo interior Architect
S. Palo interior ArchitectS. Palo interior Architect
S. Palo interior Architect
 
Embassy site analysis in North Abdoun
Embassy site analysis in North AbdounEmbassy site analysis in North Abdoun
Embassy site analysis in North Abdoun
 
Complete Vivianne Vianna Resume 1-2014
Complete Vivianne Vianna Resume 1-2014Complete Vivianne Vianna Resume 1-2014
Complete Vivianne Vianna Resume 1-2014
 
Lewis & Hickey - Residential
Lewis & Hickey - ResidentialLewis & Hickey - Residential
Lewis & Hickey - Residential
 
M+P
M+PM+P
M+P
 
M+P Leisure
M+P LeisureM+P Leisure
M+P Leisure
 
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHYFocus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
 
Portfolio_Luis Gomez-Lanza
Portfolio_Luis Gomez-LanzaPortfolio_Luis Gomez-Lanza
Portfolio_Luis Gomez-Lanza
 
Designed for nordic innovators
Designed for nordic innovatorsDesigned for nordic innovators
Designed for nordic innovators
 
JP Purchasing Consultancy 2014
JP Purchasing Consultancy 2014JP Purchasing Consultancy 2014
JP Purchasing Consultancy 2014
 
INTERIOR-iD Slideshow
INTERIOR-iD SlideshowINTERIOR-iD Slideshow
INTERIOR-iD Slideshow
 
Fiona Barratt Campbell Company Profile 2017
Fiona Barratt Campbell Company Profile 2017Fiona Barratt Campbell Company Profile 2017
Fiona Barratt Campbell Company Profile 2017
 
Fiona Barratt-Campbell | A Company Overview 2017
Fiona Barratt-Campbell | A Company Overview 2017Fiona Barratt-Campbell | A Company Overview 2017
Fiona Barratt-Campbell | A Company Overview 2017
 
CyView Development 23
CyView Development 23CyView Development 23
CyView Development 23
 
Archizinc Trophy magazine n° 4 - 2010
Archizinc Trophy magazine n° 4 - 2010Archizinc Trophy magazine n° 4 - 2010
Archizinc Trophy magazine n° 4 - 2010
 
PS Presentation April 16
PS Presentation April 16PS Presentation April 16
PS Presentation April 16
 
AADinteriorsagency-generalpresentation2015
AADinteriorsagency-generalpresentation2015AADinteriorsagency-generalpresentation2015
AADinteriorsagency-generalpresentation2015
 
AG5 Tower Business Bay Dubai +971 4553 8725
AG5 Tower Business Bay Dubai +971 4553 8725AG5 Tower Business Bay Dubai +971 4553 8725
AG5 Tower Business Bay Dubai +971 4553 8725
 
FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012
FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012
FEDAI FERIAS INTERNACIONAL DE ILUMINACIÓN 2012
 

Similar to Fassade br lindner_werblich--en

Woodbar Corporate Brochure
Woodbar Corporate BrochureWoodbar Corporate Brochure
Woodbar Corporate BrochureBarry Robinson
 
Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013
mountfordpigott
 
Lindner Products Eng
Lindner Products EngLindner Products Eng
Lindner Products Eng
lindnervietnam
 
Insite
InsiteInsite
Insite
Anthony Ash
 
Octink interiors & shopfitting
Octink interiors & shopfittingOctink interiors & shopfitting
Octink interiors & shopfittingRoss Hodgson
 
Mountford Pigott LLP Commercial Portfolio 2013
Mountford Pigott LLP Commercial Portfolio 2013Mountford Pigott LLP Commercial Portfolio 2013
Mountford Pigott LLP Commercial Portfolio 2013mountfordpigott
 
Residential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architectsResidential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architects
Simon Woods
 
Redbrick Construction - August 2011
Redbrick Construction - August 2011Redbrick Construction - August 2011
Redbrick Construction - August 2011askdave.ie
 
NJSR Architects : Practice Profile
NJSR Architects  : Practice ProfileNJSR Architects  : Practice Profile
NJSR Architects : Practice Profile
davidbslideshare
 
Sehbac 2014-product-brochure
Sehbac 2014-product-brochureSehbac 2014-product-brochure
Sehbac 2014-product-brochure
sehbac
 
R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...
R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...
R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...
Thomas McKenna
 
Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1Davide Bertacca
 
Mountford Pigott LLP Design & Build Portfolio 2013
Mountford Pigott LLP Design & Build Portfolio 2013Mountford Pigott LLP Design & Build Portfolio 2013
Mountford Pigott LLP Design & Build Portfolio 2013
mountfordpigott
 
Lindy Consulting Limited | Best Architect Toronto
Lindy Consulting Limited | Best Architect TorontoLindy Consulting Limited | Best Architect Toronto
Lindy Consulting Limited | Best Architect Toronto
Residential Architects Toronto
 
McNamara Profile Summary
McNamara Profile SummaryMcNamara Profile Summary
McNamara Profile SummaryUzoma Nwakuche
 

Similar to Fassade br lindner_werblich--en (20)

Woodbar Corporate Brochure
Woodbar Corporate BrochureWoodbar Corporate Brochure
Woodbar Corporate Brochure
 
Job Fair Brochure (Final low-res)
Job Fair Brochure (Final low-res)Job Fair Brochure (Final low-res)
Job Fair Brochure (Final low-res)
 
Kings cross PR page 2
Kings cross PR page 2Kings cross PR page 2
Kings cross PR page 2
 
Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013Mountford Pigott LLP Residential Portfolio 2013
Mountford Pigott LLP Residential Portfolio 2013
 
SKL Brochure
SKL BrochureSKL Brochure
SKL Brochure
 
Lindner Products Eng
Lindner Products EngLindner Products Eng
Lindner Products Eng
 
Insite
InsiteInsite
Insite
 
Octink interiors & shopfitting
Octink interiors & shopfittingOctink interiors & shopfitting
Octink interiors & shopfitting
 
Shalak international
Shalak internationalShalak international
Shalak international
 
Mountford Pigott LLP Commercial Portfolio 2013
Mountford Pigott LLP Commercial Portfolio 2013Mountford Pigott LLP Commercial Portfolio 2013
Mountford Pigott LLP Commercial Portfolio 2013
 
Residential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architectsResidential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architects
 
Redbrick Construction - August 2011
Redbrick Construction - August 2011Redbrick Construction - August 2011
Redbrick Construction - August 2011
 
NJSR Architects : Practice Profile
NJSR Architects  : Practice ProfileNJSR Architects  : Practice Profile
NJSR Architects : Practice Profile
 
Sehbac 2014-product-brochure
Sehbac 2014-product-brochureSehbac 2014-product-brochure
Sehbac 2014-product-brochure
 
R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...
R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...
R&M Developments Ltd - Turnkey Building & Civils Developments and Contracting...
 
Superior Brochure
Superior BrochureSuperior Brochure
Superior Brochure
 
Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1Woods Bagot_Lifestyle_Hotel and Resort_1
Woods Bagot_Lifestyle_Hotel and Resort_1
 
Mountford Pigott LLP Design & Build Portfolio 2013
Mountford Pigott LLP Design & Build Portfolio 2013Mountford Pigott LLP Design & Build Portfolio 2013
Mountford Pigott LLP Design & Build Portfolio 2013
 
Lindy Consulting Limited | Best Architect Toronto
Lindy Consulting Limited | Best Architect TorontoLindy Consulting Limited | Best Architect Toronto
Lindy Consulting Limited | Best Architect Toronto
 
McNamara Profile Summary
McNamara Profile SummaryMcNamara Profile Summary
McNamara Profile Summary
 

More from Mardi Rahardjo

A new facade concept for an existing office building
A new facade concept for an existing office buildingA new facade concept for an existing office building
A new facade concept for an existing office building
Mardi Rahardjo
 
Pbi 1971
Pbi 1971Pbi 1971
Pbi 1971
Mardi Rahardjo
 
Fassade nr -en
Fassade nr -enFassade nr -en
Fassade nr -en
Mardi Rahardjo
 
Ijsrp p3928
Ijsrp p3928Ijsrp p3928
Ijsrp p3928
Mardi Rahardjo
 
Power plants layout_mwm_06-14_en
Power plants layout_mwm_06-14_enPower plants layout_mwm_06-14_en
Power plants layout_mwm_06-14_en
Mardi Rahardjo
 
Mining fundamentals(1)
Mining fundamentals(1)Mining fundamentals(1)
Mining fundamentals(1)
Mardi Rahardjo
 

More from Mardi Rahardjo (6)

A new facade concept for an existing office building
A new facade concept for an existing office buildingA new facade concept for an existing office building
A new facade concept for an existing office building
 
Pbi 1971
Pbi 1971Pbi 1971
Pbi 1971
 
Fassade nr -en
Fassade nr -enFassade nr -en
Fassade nr -en
 
Ijsrp p3928
Ijsrp p3928Ijsrp p3928
Ijsrp p3928
 
Power plants layout_mwm_06-14_en
Power plants layout_mwm_06-14_enPower plants layout_mwm_06-14_en
Power plants layout_mwm_06-14_en
 
Mining fundamentals(1)
Mining fundamentals(1)Mining fundamentals(1)
Mining fundamentals(1)
 

Recently uploaded

Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
PrabhjeetSingh219035
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
h7j5io0
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 

Recently uploaded (20)

Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 

Fassade br lindner_werblich--en

  • 2.
  • 3. ANYTHING IS POSSIBLE Over the years Lindner Group has developed into a financially sound, ­technically strong, solution-oriented as well as reliable partner. In everything we do, we always keep the environment in mind as “healthier construction“ is self-evident for us. New concepts challenge us to become even better at ­implementing projects. According to the motto “Anything is possible“ we make the impossible possible for our customers. STABILITY AND GROWTH Since the founding by Hans Lindner in 1965, our headquarter is located in Lower Bavarian Arnstorf, where we have grown enormously during the last decades. With about 7,100 employees around the world, we are proud to be the ­largest employer in the district of Rottal-Inn. Every day we work on 2,500 ­projects which revolve mostly around our core business, the ­construction in- dustry. We are complemented by our foundation, the mk | hotels, the house breweries and more recently by a sustainable ­agriculture and forestry.
  • 4. BUILDING ENVELOPE VISIONS BECOME REALITY. The Lindner Facade Group is your competent partner for the complete building envelope. Whether for the building’s facade, the roof or free form and special structures – our worldwide teams of specialists will deliver individual solutions for your requirements. FACADES STEEL AND GLASS ROOFING
  • 5. The ART Rotana, Manama, Bahrain Photo: © Zmyasa Fotograf
  • 6. www.Lindner-Group.com6 . Building Envelope A GLOBAL PLAYER... WITH OUR ROOTS IN ARNSTORF As a major specialist facade contractor, Lindner Facades designs, manufactures and installs high quality, bespoke unitised curtain wall facades for worldwide construction projects. We have set new standards in facade technology as we have been involved in some of the most iconic buildings worldwide, ­providing technologically advanced solutions to satisfy the complex project requirements in construction today. Focused on product quality, occupational health & safety and environmental protection, Lindner Facades has a highly skilled and well-trained workforce and offers a wide range of products. And although we act locally for the benefit of all of our employees, clients and suppliers, we have the backing of a world-class organisation. Lindner Facades Group Georgstrasse 2 | 94424 Arnstorf | Germany +49 8723 20-3500 | Lindner-Fassaden@Lindner-Group.com New York
  • 7. www.Lindner-Group.com Building Envelope . 7 Arnstorf Dubai Singapore London Moscow Ried Selbitz Dettelbach Baku Riyadh Arlesheim
  • 8. Lausanne Photo: © Sergio Guerra RANGE OF BUILDING ENVELOPE SOLUTIONS
  • 9. www.Lindner-Group.com Building Envelope Solutions . 9 MADE WITH LINDNER FACADES – OUR RANGE OF BUILDING ENVELOPE SOLUTIONS FACADES Unitised Curtain Walling (aluminium and glass) Aluminium and Steel Windows, thermally insulated Ventilate Single and Double Skin Facades Automatic Doors Aluminium and Steel Elements (secure by design ballistic performing, blast enhanced, smoke/fire protection) Customised Bespoke or Standard Solutions Metal Facades STEEL GLASS 3D Free Forms Space Frame Structures Cable Stiffened Structures Tensile Structures Glass Structures Smart Structures ROOFING Metal Roofing Glass Roofing Green Roofs Membrane Roofs Structural Waterproofing Solar PV The Sphere, Astana, Kazakhstan Photo: © Nikolay Kazakov Corniche, London, UK Rijeka
  • 10.
  • 11. FACADES SPECIALIST TAILORED FACADE SOLUTIONS. A facade is more than just the shell of a building. It has to fulfill the most exacting aesthetic requirements, whilst providing intelligent functionality and a completely effective solution. With years of experience in the design, supply and installation of high quality bespoke curtain walls, Lindner Facades has been involved in creating some of the most iconic buildings in the world. Developed and manufactured throughout our production facilities worldwide, our products combine aesthetically appealing materials that offer superior quality and performance. Ecologically tested and approved materials are used, for both occupational health and safety and environmental protection reasons. Our systems are designed to complement each other or to be used independently. The prerequisite for successful completion is individual design, manufacture and installation. However, it’s Lindner’s commitment to its Integrated Management System that ensures perfect coordination of all the different areas, resulting in effective scheduling and a comprehensive service right from the initial system design to technical installation and beyond to product maintenance. Share your ideas with us and let us make your visions reality. Library of Birmingham, UK
  • 12. www.Lindner-Group.com12 . Facades SWISS-RE HEADQUARTER, LONDON With its height of 180 metres the SwissRe Headquarter is the most significant addition to the City of London Skyline and one of the most impressive office buildings in London. To realise the whole complex facade of this skyscraper Lindner used element- and structural glazing facade systems. ARCHITECT Foster + Partners CLIENT Swiss Re´ SCOPE OF WORK curtain wall/unitised facade, structural glazing facade Swiss-Re Headquarter, London, UK
  • 13. THE CORNICHE, LONDON The three spectacular towers of “The Corniche” lie on the southern bank of the Thames. They measure 85 m at their highest, counting 15 to 27 storeys and 253 apartments. The towers also offer office spaces, a restaurant and café as well as a bar, a gym, a pool and spa area. Situated on the Albert Embankment, the towers provide stunning views of the Westminster Palace, the Tate Britain and the London Eye. Its exterior view shows distinctive forms that visually distinguish the complex from its surroundings. ARCHITECT Foster + Partners CLIENT Berkeley Homes SCOPE OF WORK curtain wall/unitised facade, structural glazing facade The Corniche, London, UK www.Lindner-Group.com Facades . 13
  • 14. www.Lindner-Group.com14 . Facades BUCKINGHAM GATE, LONDON No 62 Buckingham Gate is a 11 storey commercial building with retail and a public realm at the ground floor. Situated in central London, only a short walk from Buckingham Palace, it offers 13,000 m2 of space in total. Lindner Facades was responsible for the facade of this project, including production, project management and installation. The complex 3D unitised curtain wall features eleven fold lines, creating various inclinations over the total area. Furthermore, the facade visibly sails at the first and roof levels. Other unique facettes of the project are a curved entrance glazing, steel glass canopies to two elevations and a terrace glazing. ARCHITECT Pelli Clarke Pelli/Swanke Hayden Connell CLIENT Landsec SCOPE OF WORK curtain wall/unitised facade Buckingham Gate, London, UK
  • 15. LIBRARY OF BIRMINGHAM The Library of Birmingham is one of the most important urban renewal projects in Europe. The total investment volume for its construction amounts to 188.8 Pounds. The Library was opened in September 2013, becoming the largest regional library in Europe. Over 400,000 books are stored there. Amongst the most valuable items is a Shakespeare collection with originals from 1623. The library is open seven days a week and has more than 3 million visitors per year. One of the reasons for the high number of visitors is the remarkable interior and exterior design of the building. The Library has already become one of the most popular attractions in Birmingham. ARCHITECT Mecanoo International CLIENT Birmingham City Council SCOPE OF WORK curtain wall/special facade 13,000 m2 Library of Birmingham, UK www.Lindner-Group.com Facades . 15
  • 16. www.Lindner-Group.com16 . Facades WOODBERRY DOWN KSS III, LONDON Woodberry Park is one of the largest urban revitalisation projects in London. It is set to create over 4,500 residential units in a natural environment and with excellent connection to the city centre. The quarter is easily distinguished from afar through the 30-storey residential tower Woodberry KSIII, which houses 130 luxury apartments. Its modern design features large glazed areas with integrated aluminum panels. ARCHITECT Stock Woolstencroft CLIENT Berkeley Homes SCOPE OF WORK curtain wall/unitised facade, steel construction and locksmith works, balconies, metal plate covering and attics
  • 17. Woodberry Down KSS III, London, UK www.Lindner-Group.com Facades . 17
  • 18. MADE BY LINDNER FACADES – OUR RANGE OF SERVICES Woodberry KSS3, London, UK
  • 19. Facades . 19 MADE BY LINDNER FACADES A RELIABLE PARTNER FROM START TO FINISH AND BEYOND You can rely on Lindner’s professional service at every stage of your project. With an exclusive partner network, going back many years, Lindner provides the ultimate in knowledge and expertise for guaranteed superior quality. Our excellent manufacturing capacity ensures quick delivery and efficient installation of all products and, once the handover is complete, rest assured you will continue to receive Lindner’s personal service and top-quality customer care. Lindner Facades is one of the world’s leading specialists for the complete building envelope; a single source supplier capable of providing complete solutions from design and planning to manufacture and installation, with branches and reliable partners all over the world. Our strong global supply chain allows for highest service, quality and competitiveness. Known for our iconic buildings, Lindner Facades has cooperated closely with some of the most renowned architects of our time. Our vast experience in the development and implementation of individual, high-quality facade solutions has set new standards in facade technology. Being a solid partner with proven financial security and a proactive approach to health and safety, clients choose us for our vast experience, technical expertise, quality of delivery, global supply chain excellence and close working relationship. Whatever your project’s facade requirements may be – aesthetically elaborate or technically challenging: with the expertise available in-house at Lindner Facades, we are confident that we will deliver the right facade solution and the very best client experience from start to finish. Villingen Schwennin
  • 20. www.Lindner-Group.com20 . Facades . Range of Services DESIGN AND ENGINEERING– EXPERIENCED TECHNICAL EXPERTS The design of quality, bespoke, unitised facades requires a high level of technical ability and experience. At Lindner we have some of the most technically competent and experienced people in the business. Our specialist Facade System Design Offices can take a facade from concept to reality, no matter how challenging, applying state of the art methodologies as e.g. 3D design worldwide. Supported by our own in-house facade, structural, thermal and acoustic engineers, facade designs are tailored to suit individual project performance specifications and aesthetic requirements. We are able to provide early stage support for all Architects, Consultants and Contractors to help develop their aspirations into realised solutions. Our system designers and engineers are available to develop early stage architectural intent into engineered solutions to meet the demands of all modern day facades. We are able to offer commercial advice and support at the earliest possible phase of a project so that budget expectations are understood by the client team from the very outset. Value-engineered solutions can be proposed in parallel offering the client choices as designs evolve. In conjunction with the technical and commercial challenges, our highly experienced operations teams are able to provide planning and installation resolutions for the most complex of facades ensuring that safe and efficient methodologies are implemented with our proposals in line with programme constraints. Comprehensive bid proposals are prepared through our sales and estimating resources, incorporating Group expertise during the tender phase and beyond. This ensures that continuity of all the necessary tender information is maintained and carried forward into awarded projects.
  • 21. MAINTENANCE AND AFTER SALES Lindner Facades has its own dedicated service team which carries out a full range of maintenance and after sales works to the building envelope, ranging from the replacement of a single pane of glass through to the re-cladding of an entire facade. www.Lindner-Group.com Range of Services . Facades . 21 INSTALLATION – DELIVERING HIGH QUALITY FACADES ON TIME, SAFELY At Lindner Facades we understand just how important the planning and management of the installation phase is to the successful handover of a completed high quality facade to our clients, safely and on time. For this reason, our planning starts from the very first project meetings, and our installation managers are engaged early on in the process to ensure their valuable experience is fed into our design, planning and logistics strategies. Our site set-up is substantial in comparison to most of our competitors, with the whole project team being based full-time on site. And to ensure that everyone can communicate and work efficiently, our site office networks have fast broadband connections to all our various offices worldwide. Our innovative installation methodologies are tried, tested and tailored to suit individual project constraints. Installing unitised curtain wall at height is our core business and, as such, we have robust systems to manage and control all aspects of our installation activities. Safety is at the heart of everything we do of course and in contrast to many of our competitors, we allocate a full-time safety manager to each of our major projects, not only to ensure our own works are installed safely but also to engage actively with the client teams and those of our fellow trade contractors, making sure the whole site environment is one where everyone can go home safe at the end of their shift. Lindner Facades has recently completed over one million man hours RIDDOR-free, an achievement of which we are very proud. All of our projects are audited monthly on-site for health and safety, environmental and quality performance, with the results reviewed at board level. This ensures that the service and performance we promise our clients are being achieved on-site. PRODUCTION – IMPRESSIVE PRODUCTION CAPABILITY AND STATE OF THE ART MACHINERY Lindner Facades’ extensive manufacturing capability enables quality to be maintained strictly whilst allowing maximum flexibility to meet individual project requirements. Developed and manufactured throughout our high-capacity and state of the art production facilities worldwide, our products combine aesthetically appealing as well as ecologically tested and approved materials that offer superior quality and performance. PROJECT MANAGEMENT – EFFECTIVE PLANNING FROM START TO FINISH At Lindner Facades we know the key to a successful project is meticulous planning, communication and, above all else, experienced specialist facade project management. All of our project managers are experienced in bespoke unitised facades, and our management structure ensures that each project team has hands-on support and guidance operationally at director level. For us, a successful project starts even before it is awarded. Right from the beginning, our operations staff is involved actively in all tenders to ensure our client proposals are based on well-thought-out programmes, and that our logistics and installation methodologies are tailored to the particular project challenges and constraints. By doing this, if we are successful then both, our clients and our team, have the confidence that our schemes are based on sound planning and workable methodologies. Dedicated project teams Unlike many of our competitors, all of our projects have dedicated full-time project teams. These teams are based in our various offices during the off-site, lead-in activities but when the project approaches the site phase, the whole project team bases itself full-time onsite, thereby ensuring direct control over operations on a day-to-day basis and face-to-face client communication. Our project managers have direct contact with all of our design offices and, of course, our production facilities where each project has its own full-time dedicated internal project manager to ensure the day-to-day project priorities are achieved. Communication-driven project management Regular internal face-to-face focus meetings ensure our project managers have full control over all aspects of the project at all times and, again unlike our competitors, can give up-to-the-minute information to our clients across all aspects of their projects. Our project management structure, systems and procedures ensure our teams follow a collaborative approach with open and honest communication both internally and externally with regular reports on each project strand.
  • 22. www.Lindner-Group.com22 . Facades NEXUS PLACE, LONDON EC4 The main goal of this project was the redevelopment of an existing building by modernizing the facade from the ground floor up to the eighth floor. Furthermore the building was extended by four additional floors. The highly complex 3D construction of the facade is a bespoke solution. To achieve the comb-shaped character, a chrystalline structure has been applied to the facade´s surface. ARCHITECT Sturgis Associates CLIENT ISG InteriorExterior plc SCOPE OF WORK rainscreen cladding, metal surface, curtain wall/unitised facade, stick system, structural glazing facade Nexus Place, London EC4, UK
  • 23. 30 CROWN PLACE, LONDON Being a striking addition to the London skyline this headquarter was built at an important location close to the Liverpool Street Station. For this project Lindner produced and manufactured several thousand square metres of curtain wall, scenic lift shaft glazing, glass balustrades plus a glass roof to the atrium. ARCHITECT Horden Cherry Lee Architects Ltd CLIENT City Offices Real Estate (CORE) SCOPE OF WORK curtain wall/unitised facade 30 Crown Place, London, UK www.Lindner-Group.com Facades . 23
  • 24. www.Lindner-Group.com24 . Facades NO 4 ST PAUL‘S SQUARE, LIVERPOOL No 4 St Pauls Square is a stunning 8 storey BREEAM “Excellent” awarded office building extending to an area of 109,000 m2 . It constitutes the third and final phase of the development. Lindner assembled unitised facades, feature fins with Kapilux insulation, a bolt fixed glazed entrance, motorised doors, copings and metal panels. ARCHITECT RHWL CLIENT Sheperd Construction Ltd SCOPE OF WORK curtain wall/unitised facade
  • 25. No 4 St Paul‘s Square, Liverpool, UK Photo: © HUFTON CROW www.Lindner-Group.com Facades . 25
  • 26. www.Lindner-Group.com26 . Facades KÖ-BOGEN, DUSSELDORF The Kö-Bogen, designed by New York architect Daniel Liebeskind, is the highlight of Dusseldorf’s Königsallee, one of Europe’s most famous shopping boulevards. The distinctive design of the Kö-Bogen, with its unique curved shape, sharp corners and interplay of glass and natural stone, as well as landscaped areas and baffles, has made it a much-loved landmark in the city. In addition, the project received the MIPIM Award for the best urban renewal project, the ‘real estate Oscar’, and was awarded the Platinum LEED label, the highest award available for sustainability. ARCHITECT Daniel Libeskind CLIENT die developer Projektentwicklung GmbH SCOPE OF WORK curtain wall/special facade 15,000 m2 Kö-Bogen, Dusseldorf, Germany
  • 27. www.Lindner-Group.com Facades . 27 Providence Tower, London, UK PROVIDENCE TOWER, LONDON This 136 m tall elliptical tower, a 45-storey luxury residential building, is located in Canary Wharf in London’s Docklands area, formerly part of the Port of London and now one of the world’s most important financial centres. A special highlight is the viewing gallery on the top floors, which offers a panoramic view over the whole of London. As well as being awarded the contract for this highly distinctive landmark project, we also supplied the facade for the adjacent Bar Building, a crescent-shaped 12-storey annex with affordable residential units. ARCHITECT Skidmore, Owings Merrill LLP CLIENT Ballymore Properties Ltd SCOPE OF WORK unitised facade 13,000 m2 , rainscreen cladding, stone surface 5,400 m2
  • 28. www.Lindner-Group.com28 . Facades THE FONTENAY, HAMBURG The luxury hotel “The Fontenay” is a 5-star-superior establishment with a view on the Außenalster in the heart of Hamburg. The seven-storey building integrates itself easily into the surrounding park-like scenery. The Fontenay offers 130 high-class rooms and suites, the restaurants Parkview and Lakeside, the 1,000 m2 Fontenay Spa, a 320° Panorama Bar on the 6th floor as well as numerous conference rooms. The visual appearance of The Fontenay is characterised by organically flowing lines that manifest themselves in convex and concave waves. The resulting layout displays three intertwined circles, which leads to a construction with hardly any right angles. The shining white effect is created by the building´s facade, featuring horizontal bands with glass areas and white glazed ceramic tiles. ARCHITECT Störmer Murphy and Partners CLIENT Kühne Immobilia GmbH SCOPE OF WORK rainscreen cladding, metal surface 2,300 m2 , stone surface 1,750 m2 , steel construction and locksmith works, banis- ters, curtain wall, stick system 3,000 m2 , special facade 5,500 m2 The Fontenay, Hamburg, Germany
  • 29. www.Lindner-Group.com Facades . 29 Merck MIC Darmstadt, Germany MERCK INNOVATION CENTER EMPLOYEE RESTAURANT The Merck Innovation Center (MIC) in Darmstadt symbolises Merck`s Headquarter´s development from a production site to an international hub of knowledge and innovation. The building`s architecture represents a clear statement of the innovative processes and methods applied by the people who are promoting cutting edge research inside. Lindner Facades engineered, manufactured and installed the facades of the Innovation Center and Employee Restaurant. The project was characterised by highest requirements regarding explosion protection, statics demanding the massive use of steel and last, but not least Henn Architekten´s filigrane design. ARCHITECT Henn Architekten CLIENT Merck KGaA SCOPE OF WORK curtain wall stick system 8,000 m2 , skylight roofing 220 m2 , rainscreen cladding, glass surface 400 m2 , metal surface 200 m2 , steel construction and locksmith works, maintenance walkways 5,000 m2
  • 30. www.Lindner-Group.com30 . Facades THE LEXICON, BRACKNELL The Lexicon is a 580,000 m² shopping and leisure area in north Bracknell, part of Greater London, England, and is the centerpiece of a £240 million regeneration project. The development consists of eight buildings of which Prater was awarded the contract to supply the outer shell for all of them – each being an individual project. The Lexicon is a model project in the Prater portfolio, highlighting the importance and value of a cooperative work ethic. Its success resulted not only from the skills and expertise of our specialist teams, but also from the partnership-based approach that enabled eight new buildings to be handed over in just under 18 months. ARCHITECT BDP Architects CLIENT Bracknell Regeneration Partnership SCOPE OF WORK rainscreen cladding, metal surface, curtain wall/unitised facade, stick system, sandwich facade, roof, hot melt waterproofing, singly ply waterproofing
  • 31. Lakhta Center Multifunctional Complex, St Petersburg www.Lindner-Group.com Facades . 31 The Lexicon, Bracknell, UK
  • 32.
  • 33. STEEL AND GLASS GLASS IS OUR SPECIALITY. Our Lindner Steel Glass (LSG) division specialises in complex steel, membrane and glass structures, and provides a complete design, delivery and management service. As a member of the Lindner Facades Group we recognise the importance of good customer relationships in terms of ensuring the successful outcome of a project. We work closely with our clients in order to establish their precise requirements before tailoring the appropriate solution. The Sphere, Astana, Kazakhstan Photo: © Nikolay Kazakov
  • 34. 3-DIMENSIONAL FREE FORMS SPACE FRAME STRUCTURES CABLE STIFFENED STRUCTURES TENSILE STRUCTURES GLASS STRUCTURES CUSTOM-MADE STEEL AND GLASS SOLUTIONS The ART Rotana, Manama, Bahrain Photo: © Zmyasa Fotograf
  • 35. CUSTOM-MADE STEEL AND GLASS SOLUTIONS Custom-made steel and glass solutions are specialist developed systems which meet the clients’ demands in almost any aspects. The combination of variable supporting structures together with almost all kind of envelopes (e.g. photovoltaic panels, curved glass, stone, composite panels or louvres) is nearly unlimited. Our experienced engineers will be able to determine the technical feasibility of any kind of structure even at a very early stage of the project. GLASS STRUCTURES Using modern lamination techniques, as well as new developments within Glass production, LSG is able to design large-span complex glass only structures. Incorporating the latest glass technology almost any design is now achievable. www.Lindner-Group.com TENSILE STRUCTURES Tensile or Membrane Structures rely on the integral strength of the covering membrane, covering the supporting steel structure. This can be a woven fabric i.e. PTFE Coated Glass Fibre Fabric, or PVC coated Polyester Fabric. Also available is ETFE which is similar to a PTFE material which is not woven. ETFE can be used in a single layer covering or more commonly in cushions filled with air. CABLE STIFFENED STRUCTURES High strength cables in stainless steel or galfan coated steel are used to create super transparent structures. The cables are usually prestressed on site in order to increase the rigidity in the overall structure. SPACE FRAME STRUCTURES Space frame structures are an efficient form of lightweight steel structure. Members and machined nodes are bolted together on site to form a complete load bearing frame structure with a wide range of geometrical options. Steel and Glass . 35 Hazza Bin Zayed Stadium, Abu Dhabi, UAE Photo: © DENNIS GILBERT 3-DIMENSIONAL FREE FORMS Commonly known as Grid Shell Structures, the Geometry is a ‘Free Form’ shape and needs to be curved in order to provide inherent stiffness. The steel structure can be made using single elements, with bolted nodes, or can be welded in ladder segments.
  • 36. www.Lindner-Group.com36 . Steel and Glass HAZZA BIN ZAYED STADIUM, ABU DHABI The Hazza Bin Zayed Stadium represents Phase 1 of a mixed use development comprising the sports stadium, a commercial office building, a sports centre and further site infrastructure facilities in the heart of Al Ain. With the opening of the stadium, the local football club received one of the most modern, state-of-the-art stadia in the Middle East. The aesthetic treatment of the stadium represents a modern facility combined with the traditional cultural elements. The design integrates the palm tree in the palm bowl facade design concept. ARCHITECT Pattern Design Ltd CLIENT BAM International SCOPE OF WORK steel and glass, tensile structures
  • 37. www.Lindner-Group.com Steel and Glass . 37 Hazza Bin Zayed Stadium, Abu Dhabi, UAE Photo: © DENNIS GILBERT
  • 38. www.Lindner-Group.com38 . Steel and Glass HOTEL ART ROTANA*****, BAHRAIN The five-star hotel ART Rotana is located on the Amwaj Islands, a group of man-made islands in Bahrain, north of Manama. The hotel has 311 luxury rooms and suites, all with sea views. Our scope of services included the canopy and facade. The 1,650 m² canopy consists of a free-form, single-layer steel supporting structure made of triangular hollow sections connected by solid steel nodes and supported by three funnels. It is covered with insulating aluminium and glass panels above the entrance area. The facade includes a 10 m high curved foyer, with insulated glass panels supported by a customised steel structure. ARCHITECT Middle East Architects SPC CLIENT Argon Properties Co. W.L.L. SCOPE OF WORK steel and glass/3-Dimensional free forms, curtain wall/stick system
  • 39. www.Lindner-Group.com Steel and Glass . 39 The ART Rotana, Manama, Bahrain Photo: © Zmyasa Fotograf
  • 40. The Sphere, Astana, Kazakhstan Photo: © Nikolay Kazakov THE SPHERE, ASTANA The Sphere is a stunning 80 m diameter structure created as the architectural centerpiece of the Astana Expo 2017 Exhibition in Kazakhstan. Standing 100 m high, this steel and glass structure is believed to be the world’s largest spherical building. The structure houses Kazakhstan’s national exhibition, the Museum of Energy, as well as large viewing platforms and open atriums. We were responsible for the production of the steel facade construction as well as the assembly of the entire building envelope, including the pre-stressed atrium cable net. ARCHITECT Adrian Smith + Gordon Gill Architecture CLIENT EXPO 2017 – Future Energy SCOPE OF WORK custom solutions 18,000 m2 www.Lindner-Group.com40 . Steel and Glass
  • 41. www.Lindner-Group.com Steel and Glass . 41 IZMIR AIRPORT Four highly distinctive ‘funnel’ structures were designed using tubular elements. The choice of pipe cross-sections was an architectural decision, but also ensured the structural rigidity that limits horizontal displacements under seismic loads. Full penetration welds were made on nodes located halfway along the height of the ‘funnel’ from ground level. Site welding was kept to a minimum due to pre-production in the factory. Following completion of the welding work, fire-resistant coating was applied on site. The four structures were glazed inside the funnel. The tops of the funnels were covered with a membrane roof. The connection between the membrane and the roof of the terminal, on the other hand, remained open to ensure natural ventilation within the structure. ARCHITECT Hazan Architecture TAV TEPE AKFEN YATIRIM INSAAT VE ISLETME A.S. SCOPE OF WORK steel and glass, 3-Dimensional free forms Izmir Airport, Turkey
  • 42.
  • 43. ROOFING INDIVIDUAL SOLUTIONS FOR YOUR BUILDING. Whether a new-build, conversion or refurbishment project, we work hand-in- hand with clients and partners to develop and deliver the most cost effective and technically compatible roofing solutions available. Our commitment to the highest standards of quality and to on-site safety management protects both the environment and the health of our specialists, and ensures optimised project delivery. Our expertise in this area is enhanced by our ability to offer innovative green roof solutions and off-site construction, enabling us to combine excellent environmental compatibility with outstanding technical performance. Metal Standing Seam Roof Systems Composite Roof Systems Bituminous Systems Cold Applied Solutions Green Roofing Single Ply Membranes Photovoltaic Systems Taiwan Photo: © provided by CK group
  • 44. www.Lindner-Group.com44 . Roofing OLYMPIC STADIUM, LONDON Central to the vision for the 2012 London Games was to create facilities that would provide world class venues and form a legacy of sustainable facilities for future use by the City. Prater/Lindner detailed, procured and installed aluminium cladding combined with rigid phenolic boards to create an insulated rainscreen system, a capped curtain walling package as well as blast resilient glazing, brise soleil and steel rainscreen cladding to the two storey viewing platform of the ArcelorMittal Orbit Tower right next to the stadium. ARCHITECT Populous CLIENT Olympic Delivery Authority SCOPE OF WORK aluminium cladding, roofing, rainscreen system, waterproofing, curtain walling Olympic Stadium, London, UK
  • 45. www.Lindner-Group.com Roofing . 45 OLYMPIC VELODROME, LONDON The Velodrome is the most sustainable venue on the Olympic Park in terms of design and construction. Lindner/Prater specified recycled materials where possible, such as the aluminium coil used for the roof sheets, to ensure the roof met the sustainability targets. The roof lighting reduced the need for artificial lighting, natural ventilation minimised the need for air conditioning and water saving fittings were installed to collect rainwater for reuse. ARCHITECT Michael Hopkins CLIENT Olympic Delivery Authority SCOPE OF WORK standing seam roof, rooflights, bullnose Olympic Velodrome, London, UK
  • 46. WEMBLEY STADIUM, LONDON Wembley Stadium was built in 2007 on the site of the former legendary Wembley Stadium. It is one of the largest arenas in Europe and undoubtedly one of the world’s most scenic. During the construction, Lindner delivered an extensive interior design package (and occasional exterior work) valued at around EUR 21 million. Overall, approximately 100,000 m2 of various interior fit-out solutions were provided. ARCHITECT Foster + Partners CLIENT Wembley Stadium Ltd SCOPE OF WORK partial roofing www.Lindner-Group.com46 . Roofing
  • 47. Wembley Stadium, London, UK Photo: © Nigel Young/Foster + Partners Use by courtesy of Wembley Stadium Ltd www.Lindner-Group.com Roofing . 47
  • 49. www.Lindner-Group.com Strengths . 49 LINDNER FACADES’ STRENGTHS We are part of the Lindner Group, Europe’s leading specialist interior fit-out and facades contractor. This means that, as well as offering technical expertise and customer focus, we can also provide the reassurance of dealing with a financially secure, globally active group. Furthermore, the skills that exist across our group enable us to offer the convenience of a single source procurement route for the external envelope and internal fit-out of a project. engineering technical team worldwide: Germany/Switzerland/UK/Dubai/USA/Austria 3D design expertise inhouse building physics department global supply chain multiply disciplines: facades + interior fit-out innovative glass facades with Lindner Steel and Glass no limitation of project size and scope innovation potentials reference to quality and price features development of new facade systems together with architects – develop and build in own production facilities maximum creativity inspiration development from sketch with implementation of latest art of materials automatic facade components realization of most challenging architecture strong partner Clamart Photo: © Sergio Grazia
  • 51.
  • 53. www.Lindner-Group.com Testing Facilities . 53 PERFORMANCE TESTING AND MUCH MORE As well as VMUs we also produce “Performance Mock-Ups or PMUs”. These mock-ups are produced from the final approved and project-specific materials for the sole purpose of performing CWCT testing to prove the air permeability, water resistance, and struc- tural integrity of the system prior to going to full production. The facade units for these tests are produced in Germany and shipped to the UK for testing at an accredited test centre. Our in-house RD Department also carries out certified project-specific testing of system parts, such as impact testing of glass, ­cyclic testing of vents and many other types of tests which are often required when designing bespoke systems that must comply with the various standards and regulations. We can also provide acoustic testing in our own independently accredited laboratory within our Arnstorf factory. TESTING FACILITIES Our in-house testing facilities at the German headquarter are controlled and certified by independent 3rd party test institutes. Our research and development department has the ability to test both in house or in conjunction with independent consultants: water tightness structural calculations dynamic tests as well as air Random testing of our products is carried out as company standard: structural acoustics fire rating climate weathering effects Testing is carried out to European and international standards to validate performance versus design criteria. Testing also presents value engineering opportunities to tackle buildability issues on the ground. Discretionary tests performed at the laboratory include: acoustic building movement seismic testing to AAMA standards thermal cycling to CWCT standards Curtain Walling – Standard Weathertightness and Impact Tests include CWCT Section American Standard European Standard Air Permeability 5 ASTM E283 EN12153 Static Water 6 ASTM E331 EN12155 Dynamic Water 7 AAMA 5011 EN13050 Wind Load 11 12 ASTM E330 EN12179 Impact TN76 N/A EN14019 MOCK-UPS Bespoke unitised curtain walling is, by its very nature, unique and project-specific. To achieve each solution, it is necessary to design project-specific aluminium profiles and gaskets that meet both the aesthetics and specific performance criteria required by clients. BRINGING DESIGNS TO LIFE IN MOCK-UP FORMAT Taking project-specific profiles and gaskets from the drawing board to final production requires a significant lead-in. For this reason we also offer our clients the facility to see their designs come to life earlier in the process by building full size mock-ups made from timber and/or alternative materials prior to the production of the project-specific materials, which can have long lead times. These “Visual Mock-Ups” (or VMUs) can then act as a benchmark for the final design and materials, and are generally built and assembled for viewing at our factory in Arnstorf, offering clients the opportunity to visit our headquarters at the same time.
  • 54. Main Picture: Woodberry Down KSS III, London, UK This document and all contents are protected by copyright. All rights reserved. Copying or reproduction of partial content or the complete document in any form (print, photocopy or other methods) as well as the storage, processing, copying and distribution through any electronic media or systems, is prohibited for all parts of this document without the prior written approval of the publisher.
  • 55.
  • 56. Lindner AG | Facade Bahnhofstrasse 29 | 94424 Arnstorf | Germany Lindner-Fassaden@Lindner-Group.com | www.Lindner-Group.com TMB_F/EN/1.0