FAIRMONT HIGH
SCHOOL
1977 - 2007
Clive Wigg
with contributions from:
Shirley Visser and Ron Dingley
FAIRMONTHIGHSCHOOL1977-2007
CliveWigg-withcontributionsfromShirleyVisserandRonDingley
‘Stand
Fast’
1
This history document
is dedicated to all the pupils,
past and present
from 1977 to 2007.
The “Flag of Learning”
2
1977 - 1981
FOUNDING TO FOUNDERS’ DAY - GROWTHAND SUCCESS
1977
This is the story of a school which started at a time of political unrest in South Africa. It has
experienced three decades of change and transformation, both politically and in education.
After only twenty years, Fairmont was rated as one of the top 100 schools in the country.
The story actually begins in 1973, when the Provincial Administration of the Cape Province
decided on the establishment of the school.
The site on which the school is situated was expropriated by the Provincial Education Depart-
ment for school purposes on 26 January 1966. The site at that stage, measuring 10.3511 ha,
was expropriated from a Mr Schabort, and the purchase price was R34 140. It was part of the
Eversdal farm, which originally measured 800 morgen and had been in possession of the
Schabort family since 1830. Portions of the site were transferred to the Municipality for road
purposes, leaving an area of 9.5871 ha.
A notice “Proposed closing of public place and proposed exchange of land” appeared in the
Cape Times and Die Burger on 9 and 16 November 1973. The relevant owners were informed
that: “A new High School is to be erected on the school site between Durbanville Hills and
Durbell and an improved entrance from Durbanville Avenue to serve Durbell and the new
school is necessary. A portion of the school site is required for this improved entrance and in
order to provide the necessary school facilities the open space in Durbell is required for tennis
courts for the school”.
In the early 1970’s, development occurred in the northern sector of Bellville, including
Ridgeworth, Stellenberg and Eversdal. In Durbanville part of Wellway Park in the north and
parts of Durbanville Hills and Valmary Park in the south were developed. This sectoral pattern
remained during the next few years, but the northern part of Bellville was to meet the southern
zone of Durbanville by 1977.
Durbanville High School was the only high school in the area. It was a dual-medium school with
an enrolment of over 1000. On the recommendation of the Parow School Board and the Educa-
tion Department, the Provincial Administration agreed to erect a new school, as an English-me-
dium High School and to change Durbanville High into an Afrikaans-medium high school.
The school was to comprise a hall to accommodate 900, classrooms, typing, music and art
rooms, a library, laboratories, offices and storerooms.
During 1976 there was much speculation as the building, with its attractive design and distinc-
tive arches, was constructed.
During the second half of the 1970’s, South African troops began to withdraw from Angola,
and the bush war raged on in Rhodesia. In 1976 violence swept through many townships and
even into the centre of Cape Town. Protests and unrest were experienced in various parts of
the country. On 16 June 1976 a student march in Soweto was stopped by police bullets.
There was to be further death and rioting during June of 1977 when the riots of the previous
year were commemorated. Disturbances were to continue throughout the country until 1980,
and return in a different form in 1984/85.
3
Clive Wigg: Principal October 1976 - December 2002
4
It was during this period of upheaval that the school staff was appointed, requisitions were
placed, pupils were enrolled and the Eversdal English-medium High School was opened. It
was the third such school in the Northern Suburbs, The Settlers having started in 1965 and
Fairbairn also starting in January 1977.
The position of Principal was advertised in the Education Gazette dated 15 July 1976. Inter-
views were conducted at the Parow School Board offices and Mr Clive Wigg, the Deputy
Principal at The Settlers High School in Bellville, was appointed, to commence duties on 1
October 1976. Mr Wigg, aged thirty-six, had taught previously at Muir College, Paarl Gymna-
sium and Sea Point Boys’ High.
He was required to appoint the new staff and to ensure that everything was ready for the first
term in 1977. The new school building was still being constructed. He was thus faced with the
daunting prospect of starting a school from scratch without an office or any assistance. Fortu-
nately, Mr Gerrit van Wyk, Principal of Kenridge Primary, and Mr Mike Reeler, Principal of
The Settlers High School, provided the use of offices. Mr Wigg thus did most of the requisi-
tioning of furniture, books and equipment from his old office at The Settlers, and enrolments
and interviews from a medical inspection room at Kenridge.
Interviews for the position of vice-principal were conducted at the Parow School Board office.
Mr Don Gibbon of Grey High School, Port Elizabeth, was nominated. The applications for all
other posts were supplied to the Principal, and he had to submit his nominations through the
School Board.
The school had to provide for Standards Six to Eight in the first year. The majority of new
enrolments were thus for pupils then at Durbanville High School. The subjects to be offered
would be the same as those at Durbanville High School. The first name to be entered into the
admissions register was Petra Abel. Needless to say, a new school attracted applications from
pupils at many different schools. It would be the task of the staff to weld these into a new
identity. This would not be an easy task without a common uniform and with new rules to be
formulated and observed.
The first circular to parents, dated 10 November 1976, stipulated that if an official school
uniform was worn, it must be complete. The principal of the school concerned had to give
permission. For those who did not possess a uniform or whose uniform was too small, white
shirts and grey trousers were prescribed for boys and a “plain one colour school uniform length
and style” dress for girls. Most of the rules listed in this circular are still applicable.
Further paragraphs of the circular read:
“The committee will be elected as soon as the hall becomes available. A PTA will be estab-
lished only after the formation of the school committee. Until such time, I hope to work on a
system of small voluntary committees. Attention will have to be given to fund-raising, ground
development, the tuck-shop, the design of the school uniform, the name of the school and the
names of the Houses, library facilities and the provision of library assistants.
The Department does not provide funds when a new school is established. Naturally, we will
need funds before we can purchase, for example, any sports equipment.
To start with, the voluntary (school fund) contribution is:
R20 for one child for one year,
R30 for two or more children for one year”.
5
Founder Staff:
The founder staff were to be:
Principal: Mr C Wigg
Vice-Principal: Mr D Gibbon
Senior Assistants: Miss L Coetzer
Mr A Viviers
Secondary Assistants: Mrs D Carstens
Miss D Durand
Mrs C Esterhuizen
Mr T Gilman
Miss V Hill
Mr K Milford
Mr W Roux
Miss N Smuts
Miss E Strauss
Mrs E van Rijswijk
Secretary: Mrs Y van Wyk
Janitor: Mr S Engelbrecht
Six of these were beginner teachers. One teaching post and posts for cleaners were still to be
confirmed.
Additional teaching posts were granted on the strength of the enrolment, and Mrs F Gillman,
Mrs E Els and Mrs I Murray were appointed later to start in January.
The caretaker and two cleaners, Mr W Herwil and Mrs EArendse, started work on 1 December
1976, all other posts taking effect on 1 January 1977. Mr Engelbrecht, the caretaker, the
longest serving member of staff, was still at the school in 2007. Miss D Malan replaced Mrs
Els in April of 1977 and Mr W Ladewig replaced Mrs Murray in October.
Facilities
As the end of 1976 approached, a storeroom was finally made available for the receipt of
material requisitioned from the Provincial Stores Department. The main quadrangle was still
a pile of sand and soil, and the builders’ huts and stores extended across the site of the present
swimming pool. The only developed areas were the grass strip in front of the entrance and the
field next to the partly constructed Hall. The grass at the front had to be cut with a lawnmower
brought from home!
In January, everything was ready for the big day. The offices were furnished with standard
desks, four-door cupboards and chairs. There were no curtains. The secretary’s office was that
now occupied by the Finance Secretary, and visitors had to sit on a hard wooden bench while
waiting to go down the short passage and into the Principal’s office. The secretary was pro-
vided with only a typewriter. Standard-issue chairs awaited the staff as they arrived for the
staff meeting on 17 January 1977, the day before the pupils were to arrive.
As can be imagined, all were excited; thrilled to be a part of a new venture in a wonderful
building, but somewhat wary about what to expect the next day. The list of thirty-three items
for the meeting included items such as procedure for the first day, record books and schemes of
work, dress, control, duplicating, equipment, inspectors’ visits, the model library and the for-
mation of a uniform committee to investigate and to present proposals to the school committee
when it was formed.
6
Everyone was impressed by the design and appearance of the school building, which was
different from that of other schools. The brickwork and aluminium windows would be main-
tenance free. The ramp was a new innovation and led to much speculation and rumour that the
building would be used as a hospital in an emergency. What was most striking, however, was
the multi-coloured interior. Every classroom had a different colour combination of walls,
floors and doors. The magnificent view across to the mountains was a talking point and al-
ready people were picturing what the grounds would be like when fully developed. The prin-
cipal made it clear that beautification of the grounds would be a priority.
The next few months would see a flurry of activity as classrooms were organised, teaching
progressed and sports and societies started. This, of course, took place with the building still
unfinished, the hall not available for assemblies until the start of the third term, and very
limited facilities for sport. No sports fixtures could be played at the school itself.
There was great excitement on 3 February when the tennis teams played their first matches.
The girls beat Tygerberg Commercial by eight games to four and the boys lost badly to Bellville
Technical High.
Certain basic equipment was still required. A diary entry on 25 February shows the purchase
prices of a vacuum cleaner (R199.50), a floor polisher (R796.00) and an adding machine
(R198.00).
On 16 March the staff considered the appointment of the first monitors - prefects would come
later. Leon van der Merwe and Lesley Windell were named as Head Boy and Head Girl.
The gymnastics requisition for ropes and apparatus for the hall was placed on 31 March.
The First School Committee
On 20April School Board officials conducted the election of the first School Committee. This
committee met on 25 April. The office-bearers were elected unanimously as follows:
Chairman: Mr E J Fivaz
Vice-Chairman: Mr F J Egan
Secretary: Prof T J McCarthy
Other members present were: Mr F Choice, Mrs D Matchett, Mr B Starke and Mr E Windell.
The Principal was present in an advisory capacity. It would be many years before Education
Department regulations changed to allow for staff and pupil representation. The agenda for
this meeting included the following items:
• transport payments
• refreshments for home games
• Speech Night
• bus services
• flooding from sports field
• establishment of a PTA
• an intercom system, the school name and school uniform.
The financial statement was considered and “it emerged that the current balance on school
funds was R940.36”. It was resolved that an “additional levy of R20 per family would have to
be requested from parents”.
A list of possible school names had been circulated to parents and it was clear from the re-
sponses that the name “Fairmont” enjoyed most support.
7
Building in progress 1976 (Courtesy: the Tygerburger 1976)
Founder staff
8
The Chairman was delegated as a one-man sub-committee to have uniform samples made up
as well as to report on the various cloths to be used. The official school colours were declared
to be chocolate brown and white. At the next meeting on 10 May, the committee “unani-
mously accepted that the name ‘Fairmont High School’ be forwarded to the School Board for
approval as the future name of the school”.
Voluntary Committees
The system of voluntary committees had been working well from the start. Mrs Maureen
Windell convened the Tuck Shop Committee, Mrs Val Williams the Fund-raising Committee
and Mrs Beryl Fivaz was the convenor for the first fête. A grand total of R2042.16 was raised.
Keen support from parents led to the presence of twenty-five stalls, the most successful on the
day being handwork (R321.87), cakes, plants and sideshows. Two plants left over grew into
big trees in the small garden next to the Administration block passage. The original iron
support is still embedded in one.
As a certain amount of money would now be available, the School Committee discussed the
purchase of an intercom system, an electric typewriter, a stencil cabinet, an automatic signal
clock for the bell, letterheads, report cards and cups and saucers.
The next significant event in 1977 was a meeting of parents held on 31 August. The staff and
approximately 150 parents were present, with Mr Wigg in the chair. He gave an outline of the
nature of various PTA’s and a brief history of such associations. “The main aim was to pro-
mote co-operation in the education of children and not merely to establish a fund-raising body.”
Discussions followed and it was decided that the provisional constitution presented be used for
one year. A committee, comprising Mrs B Craddock, Mrs B Fivaz, Mr B Froneman, Mrs S
Jordan, Mr I Shepherd, Mr D Stewart, Mrs V Williams and Mrs M Windell was elected.
The first meeting of this new PTACommittee was held on 8 September and included Mr Fivaz,
as School Committee representative, and staff representatives Miss Coetzer, Mr Gibbon and
Mr Wigg. Mr Stewart was elected as Chairman, Mr Shepherd Vice-Chairman, Mr Froneman
Treasurer and Mrs Craddock Secretary. It was agreed that the tuck-shop and fund-raising
committees would continue functioning with Mrs Windell and Mrs Williams as convenors
respectively. A Careers Evening was planned and a fund-raising competition proposed. Mr
Wigg requested that consideration be given to the composition of a suitable school song. It
was suggested that songs in addition to the one with words written by the Principal and music
by Miss Malan be composed and presented to the School and PTA Committees.
At a subsequent meeting quotations for curtaining of the school hall and other requirements
were presented as follows:
Curtaining R3000 - R5000
Public Address System R900
Stage Lighting R3000 - R5000
The Careers Evening, held on 19 October, was a great success. More than 600 parents and
pupils attended. The most popular careers, with numbers attending, were:
Ground Hostess 131
Primary School Teaching 123
Marine Biology 107
Kindergarten Teaching 102
Prizes for the fund-raising competition were drawn at a special meeting on 6 December - 1st
Prize - R400 worth of paint; 2nd Prize - a portable TV set and 3rd Prize - a R50 shopping
voucher.
9
The first cricket team to represent the school
Fairmont Karate Club
10
Grounds Beautification
In July a group of volunteers - Mrs Greshoff, Mrs Greaves and Mrs Shaw - assisted with the
selection and planting of a number of trees and shrubs as a first step in beautifying the grounds.
A large number of golden privets were also planted alongside pathways, and ficus trees pro-
vided by the Municipality were planted down Medway. Pupil Heather Stewart was to write
prophetically:
“I catch my first glimpse in twenty years of my old school. Through the mist and rain it looks
like some majestic castle high on a hill in the moors, dominating the broken skyline. The road
up towards the school is now an avenue of equally majestic trees. I can remember when this
road was lined with tiny saplings...”
In August of 1977 a circular listing a number of suggested school mottoes was sent to parents.
“Stand Fast,” suggested by Mrs Wigg, was the clear favourite.
Three potential school songs were prepared and sung at a school assembly. The song origi-
nally proposed by Mr Wigg and Miss Malan was chosen and later ratified by the School Com-
mittee. A suitable badge was the next important item to be designed.
By August the first school uniform, apart from the badge and the tie, had already been
designed. Dr C Pama was asked to design a school badge. His proposed design was
completed by November. The school committee discussed this at their meeting on 24
November and asked for amendments to the original design, including a battle-axe as the
crest! A new design was presented in January 1978. The committee reversed the original
decision, and the battle-axe was changed to a sphinx. This required a change to the design
of the mantling as well. The design was finalised in May 1978, the heraldic description
being:
ARMS: Or, three vine leaves conjoined in a fess-point and a chief dancette Vert
WREATH AND MANTLING: Or and Vert
CREST: a sphinx or
MOTTO: Stand Fast
For some reason the incorrect colour (light brown) was used on the shield instead of gold
(or) and for a number of years the blazer badges were thus actually incorrect. The original
drawing of the coat of arms had “disappeared”. Dr Pana did a new drawing in 1987. The
school badge was finally correct in both colour and design of mantling and the vine leaves.
Subsequently, an attempt was made to trace the coats of arms of Superintendents of Educa-
tion Dr James Rose-Innes (1939 - 1859 term of office), Sir Langham Dale (1859 - 1892)
and Sir Thomas Muir (1892 - 1915) after whom the school Houses were named. Registra-
tion of the school arms with the State Herald was considered
Limited facilities did not prevent a wide range of sports from being offered in the first year. In
addition to boys’ and girls’ tennis teams, mixed teams were also entered in leagues. Badmin-
ton started under the guidance of Miss Malan. Three boys’hockey teams entered leagues. Mr
Gibbon was in charge. The Durbanville Hockey Club granted the school the use of their fields.
This was to lead to a long association between school and club. Four girls’ hockey teams were
entered and also relied on the kind support of the Club. Miss Coetzer was in charge. There
were two rugby teams. All matches were played on an away basis. Softball started during the
summer term at the end of 1977, and netball teams were entered in all four sections of the Co-
Ed Schools Competition. An U14 soccer team initially played in the league. Karate-Do was
11
established as one of the first activities, with Mr Milford in charge. The Durbanville Cricket
Club kindly provided facilities. Two teams were entered in the first year. A start was also
made with swimming and athletics, and a cross-country competition was held. Initial develop-
ment was again hampered by lack of facilities. The first drum-majorette squad was to be
formed at the start of 1978. Provision was also made for golf, squash, table tennis and volley-
ball. By the end of the year it was proudly announced that individual pupils had represented
the province in tennis, sailing, gymnastics, cycling and ice-skating.
Societies
A Drama Club was founded. Mrs van Rijswijk, Miss Hill and Mr Gilman ran a course on
speech training, movement and creative drama, leading up to the first One-Act Play Competi-
tion in the second term. The stage had no curtains or backdrops, so flats were constructed.
Pupils themselves chose the plays, rehearsed and acted in the plays. The Houses were desig-
nated Blue, Yellow and Red as a temporary measure. Red House’s play, “The Crimson Coco-
nut”, produced by Angela Bremner, was the winner. Other groups to start were the Students’
Christian Association and the Chess Club. Three teams were entered in the Northern Suburbs
Chess League. The Choir performed twice. A number of pupils assisted Miss Hoogenhout
with the classification, shelving and covering of books in the library. Aroom, next to the boys’
changing room, was set aside as a photographic darkroom, and Mr Roux constructed the nec-
essary cupboards. The Grapevine, a quarterly newspaper, was started in the second term.
The Tuckshop
In April 1977 the grand opening of the tuckshop took place. As the kitchen was not yet ready,
thirty-seven enthusiastic mothers decided to start working for school funds, operated from two
classrooms, and made an excellent profit of R1000.
Speech Night
The first Fairmont Speech Night (Prize-giving) took place on 2 November. This was an im-
portant occasion as it would be the bench-mark for all subsequent functions. It would be a
formal occasion with the staff in academic dress. The programme was:
1. Introductory Remarks
2. Annual Report Mr C Wigg
3. Piano Solo Miss J Hall
4. Introducing the guest speaker Mr E J Fivaz
5. Address Mr E Louw
6. Piano Solo Miss G D Malan
7. Vote of Thanks Mr F Egan
8. Presentation of prizes and trophies Mrs E Louw
9. National Anthem
In addition to the academic and sports awards, there were also special awards including those
for best actor and actress, best orator and the winner of the general knowledge quiz.
It was announced that the full school uniform would soon be available, that provision had been
made for recognition of honours and merit awards and that a school badge was being designed.
The system of monitors would continue until the first prefects were appointed at the end of 1978.
12
An analysis of examination results revealed that one could be reasonably satisfied with the
progress. Unfortunately, a new school could not provide immediate answers to those with pre-
existing problems. The creation of a teacher-psychologist post was, therefore, particularly
satisfying.
Two high points of 1977 were the Fête and the Careers Evening. Two lows were the non-
payment of the voluntary school fees and the fact that only nine parents assisted with guarding
the school during the June holiday, considering that this was a time of unrest in the country,
much focused on schools. Staff members had thus to bear the brunt.
1978
The rapid growth in numbers meant that additional teachers were appointed. The average
enrolment was 500. The year proved to be a most exciting one in that three new fields were
levelled. This came about because of the generosity of Mr Basil Starke, a member of the
School Committee and a parent. As a result of a very low tender by Mr Starke, the Provincial
Administration had sanctioned the preparation of an additional three sports fields for the school.
This would mean that all sports would be played at the school from 1979. The provision for
these facilities so soon after the school’s inception was unique. It would be necessary, how-
ever, to raise the necessary funds for the purpose of grassing the fields and paying for the water
supply. To this end the teachers and pupils would embark on a sponsored twenty kilometre
walk on 1 May. It was hoped to raise R5000 in this way.
The appearance of the school altered rapidly as the slope down to the road was terraced. Grass
was planted in November after a pipe to supply water points for the additional fields was
supplied by the Works Department of the Cape Provincial Administration.
Mr Clarke, the teacher in charge of the grounds, reported: “In an effort to encourage pupil
participation in the development and funding of the grounds, a sponsored Big Walk was held.
This event formed part of the school’s contribution to Conservation Year. The Big Walk was
preceded by a talk on conservation and a tree-planting ceremony in which the monitors of
each class and Mr Wigg, Mr Gibbon and the Head Boy and Head Girl each planted a tree.
Additional shrubs and trees (nearly 200 in all) were also planted. By the end of 1978 trees had
been planted to form surrounds for all fields. In an effort to produce some shade in the quad-
rangles, shade trees were planted in pots.”
During 1978 new innovations included a “Meet the Teachers” evening after the May examina-
tion, a “Subject Choice” meeting for standard sevens and their parents and a “Fairmont Get
Together” in September. These were to become annual events.
The appointment of only one stockist to provide the school uniform led to some dissatisfaction
until the decision was clarified and explained by the School Committee at a special meeting.
“Film Evenings” were started, the first being on 10 February.
The PTA planned quarterly meetings with themes, The teenager and the school, the teenager
and his problems, The teenager and the community, and The teenager and his career. A mini-
fête was held on 27 May, at which approximately R2000 was raised. The final total for the Big
Walk was R4260.
By June the principal could report that the curtains for the hall had been ordered. The cost
would be R5219. A refund of R1400 would be received from the Education Department.
13
First tennis team - 1978
Standard Eight play - “Sorry wrong number “- 1978
14
Official Opening
The official opening of the school took place on 5 September. During the afternoon, class-
rooms and subject exhibitions were on view. The programme for the afternoon included: a
Physical Education class on the top field, the drum majorettes accompanied by the Paul Roos
Gymnasium Band, and boys’ hockey, girls’ hockey, netball and chess Inter-House matches.
The evening programme was:
1. School song - sung by the choir
2. Welcome - Chairman
3. Hymn
4. Lesson (Psalm 119, verses 1-8) and prayer - led by Mr P Holgate
5. Introduction of the Guest Speaker - Mr A D du P le Roux, Circuit Inspector
6. Address - Mr P S Meyer, Director of Education
7. Unveiling of Plaque - Mr P S Meyer
8. “Do You Know Where You’re Going To?” - sung by the choir
9. Thanks - Mr C Wigg, Principal
10. The National Anthem
Here follows an extract from Mr Meyer’s address:
“Tonight may be compared with the christening ceremony of a new baby and, on such an
occasion, it is wise to cast the thoughts ahead.
“What are the influences which are going to affect the future of Fairmont High School? What
is going to determine its ultimate character as an educational institution, and how is it going
to compare over the years with its fellow schools?
“I believe that a school must stand and fall by its end product. In other words, what is the quality
of the pupils who will leave its portals after having written their final school examination?
“What will be the quality of the lives they lead as adults, and what contribution will they make
as young South Africans to the corporate life of our country?”
Anew draft PTAconstitution was prepared and was adopted at theAGM of the PTAon 18 October.
Speech Night
In 1978 Speech Night was held on 1 November. Dr Sandra van der Merwe, who was to be the
guest speaker, was indisposed, and Prof McCarthy replaced her at short notice.
Staff
In his report, the Principal outlined the growth in enrolment and staffing. At the start of 1979
there would be thirty-one teachers. Two of the new posts would be promotion posts. Mr W
Ladewig and Mr P Holgate had been nominated to fill these posts. The projected enrolment
was 670. The school thus also qualified for a part-time Secretary and a fifth cleaner.
A printed supplement to the report detailed progress in all sports, societies and clubs. A
similar supplement was to be provided at all future speech nights. One significant event was
the Inter-Schools Athletics meeting against Fairbairn High. This competition was to be held
annually until 1992. The first tour was undertaken when both the boys’ and girls’ hockey
teams travelled to George.
A professional dancing teacher held weekly ballroom dancing classes. Drum majorettes started
and the squad performed on the day of the official opening of the school. The Photographic
Society was functioning well. The darkroom was a distinct asset. Unfortunately, the predic-
15
tion that “this society should prove to be of great value as it will assist with the recording of
school events, a photo library will be compiled and photographs may be used as teaching aids
and for projects” did not hold true for more than a few years. Sadly, this was also to be the case
for various history and archive groups formed through the years. An innovation was the pro-
vision of activities boards. These were situated outside the Needlework Room in the main
passage. The colourful plastic tags were intended to enable one to see at a glance in what way
every pupil in the school was participating in the school’s extra-mural programme. The year
was one of extra-mural consolidation and growth.
Prefects
The first Fairmont prefects were announced at the Speech Night function. From the next year,
they would be announced during the Valedictory Assembly.
The important role that prefects were to play in succeeding years is shown clearly in these
words from the principal’s address:
“Although students cannot make final decisions, they may certainly participate in and influ-
ence decision-making. Given the opportunity to raise issues, debate and discuss them, mem-
bers of the student council will find it necessary to keep in touch with the members of the
student body. The council must act then as the voice of the student body...The students’coun-
cil, as I envisage it, will, aside from being a forum for ideas, be given responsibilities quite
within their capacity to perform.
We have, therefore, drawn up a constitution embodying such articles as general goals, specific
aims, duties, committees and sub-committees. Embodied in the constitution are also the pre-
fects’pledge and the pupil leaders’creed.”
The prefects acted as leaders of the full Student Council, which included elected members
from each of Standards 9, 8 and 7.
The first Fairmont prefects were Torsten Moëhl (Head Boy), Lesley Windell (Head Girl), KevinWebb
(Deputy), Vanessa Koening (Deputy), Robin Craddock, Vanessa Edmunds, Diane Eva, Stacy Jonas,
Roderick Leerkamp, Hilary Middleton, Leon van der Merwe, Donna Vos and Gillian Williams.
The prefects attended a leadership and training camp at Steenbras Dam.
Cast of “What a Weekend”
16
1979
The school developed rapidly. The enrolment grew from 330 in 1977 to 636 in 1979 and the
staff from seventeen to thirty-eight. The Principal reported: “As the school was built to cater
for 750 pupils, we are fast approaching the position where the school will have the maximum
numbers of pupils possible.” The fact that few men were entering the profession was a cause
for concern.
The Works Department provided much improved outside lighting, and the first set of theatre
lights was installed. One of the cloakroom (peg) areas was converted into a store for the
Clothing Exchange. This conversion, opposite Room 57, was to be the first of many similar
conversions in later years as enrolment grew and the demand for accommodation increased. A
timber hut was purchased to provide a second outlet for the tuckshop in the main quadrangle.
This came to be known as the “Cabin”.
PTA
The PTA adopted the theme “Relationships and Responsibilities” as the theme for the year as
a further development of the theme “The Teenager”.
A major event during 1979 was the fête held on 5 May. This included a Pick a Box Show. The
Fairmont drum majorettes and the J J du Preez High cadet band paraded up the main street in
Durbanville to draw attention to the fête, which was a great success.
Apart from the financial benefit, a very happy atmosphere had been created in which parents,
pupils and staff worked together. Special thanks were expressed to the conveners, Mrs Cradock
and Mrs Williams, and to Mr Peter Hough, the organiser.
Other significant events were the staging on 27 July of the production “Anna and the King of
Siam”, produced Mr Peter Merrill for the Festival Players, and the Dinner Dance on 25 Au-
gust. The latter was the first of the many such PTA dances in later years.
The Dance, held at the Brackenfell Town Hall, with the band “The Pied Pipers”, included a
floor show arranged by Mrs Wigg, and was a tremendous social success.
The Springbok Radio show “Check Your Mate” was held on 12 November.
Matters receiving much attention during the year included traffic flow and the need for a cycle
lane in Durbanville Avenue, the introduction of a school uniform bank and alterations to the
tuckshop/hall kitchen servicing hatch. A first mention was made of “urgent attention...to the
provision of additional change room and toilet facilities”.
The first musical
Fairmont’s first musical was “What a Weekend”, with words and music by Professor T J
McCarthy. The report in the first school magazine read: “It was a pleasant surprise to see a
play written by a parent, produced by the headmaster, and most competently acted by the
pupils of the school”.
17
Inter-House Athletics 1979 - Dale win
One-Act Play Competition - Innes House: Christopher Payne, Michael McCarthy, Paul Bidder,
Michelle Faulhammer
18
CAST - “WHAT A WEEKEND” 1979
Colonel Lancelot (Pongo) Pilkington : Michael McCarthy
Mrs Mabel Pilkington - his wife : Susan Bremner
Deborah Pilkington - their daughter : Michelle Faulhammer
Joan - Deborah’s friend : Jennifer Hall
Captain Reginald (Whacko) Worthington : Kevin Seeley
Mrs Dulcie Worthington - his wife : Tracy McCarthy
Archiebald Worthington - their son : David Parkes
John - Archiebald’s friend : Christopher Payne
Jarvis - the butler : Lisa Brown
Professor Percy Weedsworth : Andrew Steyn
French Maid : Bonnie van der Walt
Hockey Girls and Cricketers
Another enjoyable function was the Music Evening in October. In addition to a number of
music items, the choir sang thirteen songs, the theme being Ben and Michelle.
The Grapevine newspaper was the mouthpiece for the pupils, and was produced entirely by a
pupil staff. The 1979 Editorial Staff was:
Editors: Christopher Payne and Denise Hammer
Sub-Editors: Kim Record, Sharlene Heath,
Karen Boshoff
Printers: Jannie Kolovos, Paul Bruins
Art & Advertising: Jennifer Hall
Assembly & Distribution: The Editorial Staff
This was still the time of wax stencils and manual printers. Covers were printed courtesy of
Mr and Mrs Wulfse. The Grapevine comprised letters, features, sport reports, comments,
articles, society reports, film reviews and literature. Two extracts from the second term edition
follow:
Congratulations
to the Sportsman of the term
KEVIN WEBB
Junior World Sailing
Championships
SA Representative
Levorno, Italy
Sailing a “420”
(2-man boat)
19
An appeal for understanding
Sitting while the world goes by.
Not saying a word.
Proud, putting on a bold front.
Feeding crumbs to pigeons
Thinking of yesterday,
and a house full of children
Caring, coping.
Encouraging, loving.
Always understanding.
Until now -
the one day of the year
when it would be nice
to be remembered.
You won’t forget - will you?
Craig Maasch
Literature would become a feature of future issues and of the school magazine. The annual
literature competition was to gain in importance. Parents and friends donated prizes and tro-
phies for academic, sporting, cultural and special achievements. A strong poetry tradition also
developed.
Traditions
Traditions commencing in 1979 were the ValedictoryAssembly, including the induction of the
new prefect body, the first Matric Farewell Dance, and the meeting for parents of the Standard
Tens.
The Matric Farewell Dance
The farewell took place in the school hall on Friday 5 October. Tracy McCarthy reported:
“All the matrics attended, with most of the staff and their respective partners. The Std Nine
Farewell Committee attended and many standard nines were working behind the scenes.
Thanks to our efficient cooks, waitresses and washer-uppers, we were served with delicious
food: fish cocktail, hot tropical chicken and vegetables, and cheesecake triangle. The theme
was ‘Asterix.’ Large murals, the length of the hall, were painted by some standard nines
during the holidays. The ceiling was lowered with a net and silver streamers were attrac-
tively looped around the hall.”
“That everybody thoroughly enjoyed the evening is indicated by the fact that the band was
requested to play on after midnight.”
The Valedictory Assembly
The Valedictory Assembly programme, which was to be similar (but with amendments) in
following years, was:
20
1. Choir - Guadeamus Igitur, prefects and other matrics to enter the hall from the foyer, in
procession.
2. Introductory remarks - Principal.
3. Announcement of the names of the new prefects.
4. The Prefects’ Pledge (said by one of the new prefects).
5. Presentation of badges and certificates - prefect to prefect.
6. The outgoing Head Boy/Head Girl address, and handing over of the School Flag to the
new Head Boy/Head Girl and to charge them with their responsibilities.
7. The outgoing prefects leave the stage.
8. Address to Std 10’s - Principal.
9. Scripture reading.
10. Prayer.
11. School song.
12. Pupils leave the hall, with standard nines leaving first.
13. Stage party leave Hall, the 10’s leaving last.
14. 10’s to pass through 6’s, 7’s, 8,’s, 9’s to leave at front gate.
15. Past Pupil representatives to greet Matrics at front gate.
The Valedictory Assembly, which took place on the day after Speech Night until the introduc-
tion of Matric Day on that day, followed breakfast for the staff and the matrics, the matric
concert for the school and tea for staff, committee members and matrics. Mrs Lyn Wigg
organised the tea for a number of years.
The camp for the new prefects (the second such camp) was again held over three days from 3
November at Steenbras Dam. Mr Gibbon reported: “An overflowing Steenbras Dam added
excitement to the initial proceedings...and provided a promising omen for the year ahead. The
spirit of the group, their willingness to learn and their determination to contribute positively to
the school provided a sound base from which to launch.”
The goal of the camp was to prepare prefects for their role as members of the Student Council
by including:
• styles of leadership
• creation of team spirit
• decision-making
• clarity regarding duties and responsibilities.
The 1979 school magazine was the first. The editors were pupils, Tracy McCarthy and Lynn
van der Hoven, under the supervision of Mr Parsons. The magazine covered the events of the
first three years. The list of contents read:
• Principal’s report
• Thoughts (literature)
• Fairmont in action (sport)
• Fairmont’s other activities (societies and cultural)
• Inter-House Competition
• Looking back
• Prizes and awards
• Class of ’79
21
The teaching staff had grown from an initial seventeen to thirty-three. Only eight of the origi-
nal teaching staff were still at the school, and also MrsYvan Wyk (secretary), Mr S Engelbrecht
(caretaker), Mr W Herwil - who was to become an institution at the school as “Willie” - and
Mrs E Arendse (cleaners). Nine staff members were married during the period 1977 - 1979
and seven babies were born.
Outstanding achievements in sports offered at the school were those of Janet Grieve (cross-
country), Tracey Jordan and Belinda Ireland (squash) and Ashley Ware-Lane (hockey), all of
whom were selected for WP school teams.
Carol-Ann Brown won the WP U14 javelin event, establishing a new record.
Robin Craddock hit the first four, six and fifty on the new cricket field, and Russell Davies
scored 105 against SACS.
School Committee:
P Hough, T McCarthy, P Ireland, D Smith, A Parker, E Fivaz, F Choice
22
1980
The examination results of the first matric class, published on 1 January 1980, elicited much
interest and comment.
Candidates: 73
Passed: 72
Matriculation Exemption: 43
Fifteen of the twenty-three subject averages were above those of the province.
Three founder members were among those who left at the end of 1979. The staff looked
forward to greeting the new faces in 1980, but possibly did not realise the extent to which the
complement would be altered.
Thirty-eight teachers comprised the academic staff in 1980.
As the year started with 700 pupils, the main concerns were accommodation and staffing.
Rapid development was taking place in the area which the school served. “The Education
Department is aware of the situation, and we trust that an answer will be found in the provi-
sion of another school or extensions to your building in the foreseeable future.” These words
from the Annual Report were a foretaste of what would occupy the minds of the School Com-
mittee for the next few years.
Widespread publicity was given to the “crisis in education” and it was increasingly difficult to
recruit Mathematics and Science teachers. An encouraging development was the reservation
of 15% of posts for the permanent appointment of married women.
Another matter which was given much attention was the system of examining and testing. The
cycle examination system, in which pupils were examined weekly throughout the year, was on
trial. A modified and more flexible system would be introduced in 1981.
The year saw a number of innovations such as the S.C.A Mission Week, the contact with The
Settlers High School staff and pupils over a number of days, a number of inter-disciplinary and
subject excursions, an inter-class sports day, the planning of a Std 6 camp and the establish-
ment of a course in first-aid. Kelly Austin from the USA became the second Rotary Exchange
Student to attend the school. Kim Cowley fromAustralia was the first in 1978. It was said that
“these new events and activities on our calendar will give a better indication of the spirit and
nature of this school than a thousand words can say”. The Settlers Contact and the Standard
6 Camp were to become important annual events.
Three events which brought great satisfaction were the pupils’ response to the call to partici-
pate in the Spring Walk, their appeals for sponsorship and their participation leading to an
amount of R6718 being raised, in the World Vision 40-Hour Fast, in which 150 pupils partici-
pated and raised R2100 for the World Vision Hungry Children’s Fund, and the establishment
of the Past Pupils’Association in June. Evangelos Kolovos, the first PPA chairman, described
the formation of the Association in his report in the 1980 School Magazine: “At the first
Valedictory Service breakfast, the first Std 10 class chose five of their number and gave them
the unique task of drawing up a constitution for the newly-christened Fairmont Past Pupils’
Association. The steering committee was: E G Kolovos (Chairman), M S Hansen (Secretary),
R A Craddock, R M Davies and K C Usmar-Blake.
23
First Softball Team - 1980
Drum Majorettes - 1980
24
“At the inaugural meeting at the Boston Hotel in June 1980, the nine-point constitution (pro-
posed by the steering committee) was unanimously approved. The following Executive Com-
mittee was elected for the year ending February 1981:”
Chairman: E Kolovos
Vice-Chairman: M S Hansen
Secretary-Treasurer: H M Middleton
Additional Members: C A Mostert, G S Williams
Staff member: L Coetzer
Principal (ex officio): C Wigg
Head Prefect (ex officio): J Cranke
The position of Honorary President was not filled initially.
“The main objectives of the Association are:
1. To promote the welfare of the school in all branches of its activities.
2. To promote the welfare of past pupils and to provide such social, cultural and sporting
functions as shall be to their interest.”
Among the items discussed at the first meeting of the PTA Committee in 1980 were a Dance,
a Big Walk, the sale of House T-shirts and the formation of a 100 Club.
It was resolved at the meeting held on 15 July that the PTA constitution be amended to move
the annual general meeting from October to February, and to elect parent representation per
standard. The draft amended constitution would be circulated to parents.
The PTA Dance was held on 26 July at the Brackenfell Civic Centre. Although the support of
the parents was disappointing, the dance proved to be an enjoyable occasion.
The General Secretary of the South African Teachers Association, Mr R Cope, addressed a gen-
eral meeting of the PTAon 27August. In his address he drew attention to the alarming increase in
resignations amongst teachers and the fact that certain schools in the country could not effectively
operate due to the staff shortage. He warned parents that if conditions did not become more
favourable and if future incentives did not draw student teachers and keep present teachers in their
profession, the future learning abilities of their children might be seriously jeopardised.
It was decided by those present that an effort should be made by every parent to address a letter to
the Minister of Education expressing dissatisfaction and concern about the future of teachers in
South Africa. This decision was later amended after discussion with the School Committee.
In September the Committee felt that a decision should be reached regarding the type of func-
tion for the Fifth Year Anniversary in order that planning might be commenced.
The only fund-raising event of any significance during 1980 was the Big Walk organised jointly
with the School in April. Other minor sources were the Dance and a recording session of the
Springbok Radio Show “Check Your Mate”.
The 1980 Annual Report had a supplement detailing progress in sport, societies and clubs. The
remarkable progress made in only a few years is evident from these extracts from the supplement.
Ballroom Dancing
Approximately 35 pupils have attended regular weekly classes conducted by professional teach-
ers. The pupils have received tuition in both ballroom and disco dancing.
Choir
The choir has performed in public on four occasions this year and has been very well received.
They were invited to the European Immigration Festival as a result of their good performance
in the Tygerberg Song Festival. On 8 December the first Carols function will take place.
25
Chess
15-20 players have participated regularly and two teams have competed in the schools’ league.
Cultural
This society has had a successful year and there have been numerous outings.
Drama
A successful Variety Show was held on 6 October, and a one-act play was presented on 23
October. A music revue, “Head Over Heels”, with words and music by Prof T McCarthy, was
presented in our hall on 7 May. This was a most enjoyable and successful production.
Inter-House One-Act Plays
The competition, held on 26 March, was a great success and a high standard was achieved.
Three-Act Play
“See How They Run”, the first three-act play to be presented at the school, ran for two nights
in October. This excellent production was very well received.
Drum majorettes
The drum majorettes have had a full programme and performed in public nine times.
German Society
An enjoyable evening was arranged for those senior pupils taking German at Brackenfell,
Durbanville and Fairmont, and will be an annual event.
Library
Much greater use has been made of the library, mainly due to the increased number of books.
Over R3000 has already been spent on an additional 800 books this year.
Matric Farewell Committee
The Dinner /Dance, held in an Arabian atmosphere, was a great success. Few parents and
pupils realise exactly how much effort goes into such a function. The Committee works to a
strict budget, has to seek donations, borrow materials, paint during the school holiday, and
consider numerous other aspects such as gifts, printing, ordering and preparation of the dinner.
Modern Dancing
Regular Wednesday afternoon classes are held under the auspices of the Charlotte Field Danc-
ing School. The girls performed successfully in public on 23 October.
Photographic Club
Fourteen pupils use the Darkroom regularly. The Club was placed second in the Cape Educa-
tion Department’s photographic competition. M. Faichnie and G. Liebenberg won individual
awards. A great deal has been done to expand the Society and to utilise the facilities fully. An
extensive training programme was conducted. Individual interest has been keen, and members
have assisted with other school projects, such as the School Magazine.
School Magazine
This year each class was asked to raise Rl,00 per pupil, either by direct payment or by means
of fund-raising activities. This has contributed greatly to class spirit. Mrs Wulfse again worked
tirelessly on our behalf and raised over R1700 from sponsors.
26
Students’ Christian Association
50 pupils attend meetings regularly, but up to 180 pupils attend on special occasions. Prayer
meetings are also held on Mondays, and area meetings with committees from other schools are
held quarterly. The full programme has included guest speakers, discussions, films, a very
successful “Focus Week”, and a welcome for the new Standard Sixes.
Students’ Council
The Council comprises fifteen prefects and thirty-six sub-committee members and monitors.
It has been very active this year under the leadership of John Cranke and Tracy McCarthy.
Evening meetings, ending with tea and cake, have been held two or three times a term. Particu-
larly pleasing areas of involvement have been a party at the orphanage, a garden party for the
members of Huis Aristea and Green Pastures, meetings with The Settlers and Durbanville
prefects, standard six orientation, initiation of the Fairmont Settlers contact, and certain im-
provements in the grounds.
Cricket
Five teachers and approximately 120 pupils have participated. Four teams competed in the
league and six teams compete internally. The internal Vineyard League has grown in popular-
ity, particularly during the fourth term. Standards have continued to improve and results have
been most encouraging. John Cranke and Gavin Taylor have represented the Tygerberg re-
gional XI, and Victor Hawken has played for the U15 Tygerberg XI.
Cross-Country
Janet Grieve represented W.P. at the S.A. Championships at Voortrekkerhoogte. The Schools’
Cross-country races, the “Spring Runs”, were successful and enjoyable, with much greater
participation this year.
Gymkhana
Ten riders have participated in two teams. The teams fared well at the opening of the Cape
Hunt and Polo Club clubhouse and course, when they came second.
Gymnastics
Juliet Kruger represented Western Province.
Boys’ Hockey
This has again been a very successful season. The School is fortunate in having a number of
experienced coaches. Mr Phillips, a qualified umpire, did much to develop umpiring skills,
and a number of pupils were able to handle games with confidence at the end of the season.
The enthusiasm of the coaches soon led to great keenness on the part of the players, and a
successful 24-hour fund-raising hockey marathon was held. The 1st XI was again invited to
participate in the prestige Outeniqua tournament in George, and during the third term the 1st
and U15A Boys’ and Girls’ teams played in Oudtshoorn and George. This was a successful,
enjoyable and educational visit. The internal “International League” also ‘“encouraged par-
ticipation “.
Girls’ Hockey
The girls also enjoyed a successful season. Four teams participated in senior leagues, the first
team participating in the Southern Suburbs league for the first time. The second and third
27
teams both won their respective leagues. The tour to Oudtshoorn and George was one of the
highlights of the season.
Karate
A small group entered the annual Karate-do competition as the Fairmont Club.
Rugby
The historic first game on our home field was played against The Settlers High. Matches will
be played on two home fields next year.
Softball
Forty girls have played regularly. The first team performed with credit in the Women’s League
during the second half of the 79/80 season.Anumber of players participated in the trials for the
W.P. team. C. Brown was chosen for the team, and A. Richter was the home reserve. Two
teams have now entered in the new Schools’ league. Our players have done so much for the
school and are to be congratulated on being among those responsible for the development of
softball as a sport in schools.
Squash
Twenty players participate. Two teams compete in the Schools’ league. Stephen Armstrong
won the National U13 championship and Belinda Ireland and Tracy Jordan represented W.P.
Swimming
There was a tremendous upsurge in interest and enthusiasm. The first Inter-House gala, held at
the Sanlam Bath, was a happy and successful occasion. The lack of training facilities remains
a serious obstacle, but the initiative and interest shown compensated greatly.
Head Prefects at play - 1980
28
Tennis
Teams: 1 Girls, 1 Boys 2 Mixed League. The girls won the first league for the second time.
About fifty pupils also participate internally, but additional facilities are urgently required.
André Wulfse, Heidi and Cindy Freudenberg, and Janine Lambert all represented Western
Province. Cindy is the current W.P. U14 champion.
Eisteddfod
Pupils were entered in both the Cape Town Eisteddfod and the Tygerberg Eisteddfod. The
following pupils all obtained Highest Honours for their respective items: Tracy McCarthy,
Louise du Preez, Michelle Faulhammer, Sanette van der Mescht and Grace Elliott.
First Aid
All twenty-two Standard Nines who participated passed the first diploma in First Aid after
attending classes for a term during the Youth Preparedness periods.
Leadership and Subject courses: Tracy McCarthy was selected for the course
organised by Die Burger in December 1973. The Head Prefects attended a course organised by
Stellenbosch University, and six pupils attended the Jaycee’s “Tomorrow’s Leaders” course at
Muizenberg. The Principal and Mr van Stormbroek attended a Youth Preparedness Course, Mr
Shaw a History course, and five English teachers a refresher course. Various teachers attended
Scripture courses.
Youth Preparedness: Some of the subjects covered were as follows: Std 6 orientation
andathletics;appreciationoftheproblemsofoldage;achievementsinsport;inter-classboeresport;
a Best Speakers’ competition; a show on Bob Dylan; Std X Careers Guidance, a demonstration of
weapons, talks on camping and school societies. A number of guest speakers visited the school.
The School - 1980
29
1981
In his report at the PTA AGM on 9 February 1981, the principal indicated that the enrolment
stood at 783. As the school had been planned for 750, accommodating more pupils would be
a problem in the near future.
Matric Results 1980:
Candidates 80
Passes 79
AAggregates 2
Accommodation
The School Committee considered accommodation requirements in a serious light. Action
taken is evident from these extracts from the minutes of the first term meeting in 1981:
• “Sports facilities: Notification that school is entitled to additional facilities is
noted. Mr Choice suggested a letter be sent to School Board confirming
approved additional facilities and requesting earliest provision/execution by
Works Department (done: 20 Feb 1981)
• Additional Sports fields: Further meetings/discussion with Municipal authori-
ties and Education authorities to finalise agreement to be held.
• Long Term Development Projects: Mr Wigg tabled sketches of school pavil-
ions with the suggestion/request that the PTA should work toward a similar
project on a staged, phased basis.
• Changing Room/Toilets/Clubhouse/Swimming Pool Complex: Mr Choice
reported that the Cape ProvincialAdministration would provide working draw-
ings of proposed complex free of charge.
Messrs Choice and Parker confirmed as sub-committee to investigate the
possible building of the proposed complex.
• Tennis and Netball Courts and Cricket Nets: Copy of urgent letter from School
Board to Department tabled.”
Other items handled by the committee included:
• the conveyance scheme for pupils
• use of the school building by the Methodist Church
• school signboard
• scoreboards
• honours boards
• raising/flying of school and national flags
• a burglar alarm system
• the possible introduction of a cadet corps.
Buildings and Grounds
In July the School Board informed the school that three prefabricated classrooms had been
allocated to the school for use in 1982. (These were to be the first of many such ‘prefabs’
extending eventually along the parking area to near the front gate and including a prefabricated
toilet block for some time.)
30
Erf 713, the ground below DurbanvilleAvenue, was acquired by the school on a twenty-five year
lease and grass seeding was completed during the year. These new fields would be used for
hockey and cricket in accordance with an agreement reached with the neighbouring residents.
A number of improvements and conversions were carried out. The original requisition store
was converted into an audio-visual theatre stocked with television camera and monitor, video
recorders and various projectors. Part of the Hall basement was partitioned off as a store.
Cloakroom areas were converted into a store for the clothing bank and a new Deputy Princi-
pal’s office. Staff room chairs and tables were provided.
LETTER FROM DURBANVILLE MUNICIPALITY 28 OCTOBER 1980
Dear Mr Wigg
TRAFFIC : FAIRMONT HIGH SCHOOL
Your letters dated 24 September and 23 October 1980 refer. I wish to inform you that my
Council considered the matter at its meeting held on 27 October 1980 and Council has
agreed to change Medway to a one-way street down from its intersection with Hillrise to
its intersection with Durbell Road. Steps will also be taken to create a no stopping zone
from the intersection of Medway and Hillrise to a suitable distance beyond the front gates
of the school. A pedestrian crossing will be provided in the vicinity of the gate leading to
the school sports-fields. In addition angled parking will be provided on the southern side of
Medway and parallel on-street parking is to be provided on the northern side of Medway.
A strip of road reserve on the northern side of Medway will be tarred for use by pedestri-
ans.
My Council unfortunately did not see its way clear to provide a pavement for pedestrians
and cyclists as contemplated in paragraph 6 of your letter of 23 October 1980. The neces-
sary road works will be commenced with as soon as possible and it is anticipated that all
works and traffic signs will be completed and erected by the beginning of January 1981.
Founders’ Day
Another important innovation in 1981 was a Founders’Day function. The first Founders’Day
Dinner was planned for 4 September. Mr and Mrs Isgar organised a most enjoyable Founders’
Day Banquet at which the guest speaker was the MEC for Education, Mr W Bouwer. Asimilar
anniversary function would be held every five years.
The Past Pupils’ Committee, under the leadership of Evangelos Kolovos, had an active year.
Their functions included a braai for the 1980 Matrics, a highly successful Max Collie (hypno-
tist) Show, the first PPA dinner-dance and the first Founders’ Day sports fixtures against the
school teams. The committee presented a new lectern for use in the hall.
The PTA Committee was elected according to the new system of representation per standard.
The Fifth Anniversary Féte, organised by Mr Gawler, was especially successful. A Fashion
Show was held in April, and the quarterly meetings were interesting and rewarding.
Two additional teaching posts were created. Ten new teachers joined the Staff. Five teachers
filled temporary positions.
31
USE OF SCHOOL PREMISES
For many years official permission had to be obtained for outsiders to use school facili-
ties and premises or to address gatherings of pupil and parents.
Similarly, permission had to be sought for wine to be served.
This letter, dated 24 July 1981, is an example:
The Secretary
Parow School Board
Dear Sir
FOUNDERS’DAY DINNER: 4 SEPTEMBER 1981
It is the intention to hold a Founders’ Day Dinner at this school the evening of 4 Septem-
ber to commemorate the 5th year of the school.
At the dinner the organisers would like to serve sherry and light wines. The serving of the
wine will be by senior pupils. We request your formal permission to organise the event
and the serving duties as outlined.
Yours faithfully
Secretary: School Committee
Notable successes included the victories in the Inter-School Athletics and Swimming compe-
titions in one week in March. A number of pupils were chosen as provincial representatives,
and Carol Brown (U19 Softball) and Katherine and Theresa Keet (Roller-Hockey) were cho-
sen for South African A teams. Softball, hockey and dance marathons were held as pupils
raised funds themselves for various activities. A prefects’exchange with Wynberg Girls’High
was initiated. Rugby teams toured to George, and the Girls’Hockey team attended a course at
the University of Port Elizabeth. Anumber of subject excursions were undertaken. The Stand-
ard Six four-day excursion/camp was especially noteworthy.
The first Panel Inspection was held from 3 to 7 August. Seven circuit inspectors and twelve
subject planners and advisors visited the school.
SOLAR ENERGY PROJECT: FIRST IN SOUTH AFRICA
“There was great excitement when the SABC TV crew arrived at the school to interview
and film the Solar Energy Group. The filming took place on the lawn outside the offices -
now part of the Pool lawn. More excitement followed as Fairmont was featured in the
evening news broadcast.
The Group was formed in 1980, following the announcement of a major competition by
the S A Institute of Mechanical Engineers, and comprised nine senior physics pupils. The
competition required that a working model which could harness the energy of the sun, be
designed and built by June of 1981.
The results of the regional judging were made known at the end of September. In Novem-
ber we learnt that Fairmont had been placed first in South Africa.”
32
An interesting consequence was a letter from a gentleman in Mexico, including the fol-
lowing extract:
“Dear Senor Stefan
I see where you have developed a producing machine to make alcohol from the sun. I am
much interested as we have plenty of sun here but alcoholic beverages are expensive,
especially imports from Scotland.
Would you be kind enough to send me details...”
(Mexico would feature again many years later when an invitation was received for the
Girls’ Basketball team to participate in a schools’ tournament in Mexico)
COMMENTS (MADE IN 2006) ON RULES AND REGULATIONS
• We weren’t allowed to ride bikes in the school grounds - we had to push!
• Not being allowed to use haversacks was a big gripe.
• The colour of the school uniform was a huge problem - not cool!
• Not being allowed to wear scarves in class!
• Girls weren’t allowed to wear clear nail polish...
• The lengths of our school dresses were checked!
• Not being allowed to sit in front of the school hall during breaks.
• Not being allowed to bring boyfriends/girlfriends to the Matric dance.
Matric Farewell Dance 1981
33
1982 - 1986
FACILITIES, FUND-RAISING AND TRADITIONS
1982
At the PTA AGM on 10 February 1982 the School Committee Chairman, Mr Fivaz, reported
on the distribution of funds for the year:
R5000 on sports equipment
R3100 on office equipment
R5600 on office equipment
R8400 on teaching aids
R2000 on library
R2000 on grounds
R2000 on transport costs
Buildings and Grounds
“According to a master plan, the Fund-raising Committee must set its sights on a building
complex to be erected on the middle terraced field. Improvements for the future would be
changing rooms, swimming bath, squash court, clubhouse and a second squash court.”
The cost of the facilities would be in the region of R250000-00. Mr Fivaz urged parents to
donate on a monthly basis and quoted from the 1981 Income TaxAct, with particular reference
to tax-deductible donations to secondary schools. The aim was for a three-year development
period.
Further development of facilities was in progress. The principal was able to report inApril that
four tennis courts and two netball courts were being built, and that additional cricket nets
would be supplied by the Education Department.
The Sports Complex and fund-raising for it was to be the focus for some time. By July the
wording for the special appeal pamphlet was finalised. Fund-raising was to continue into
1983, when a special fund-raising drive would be launched at a finger supper.
It is interesting to note that the PTA catered for teachers who remained at the school after
normal school hours so as to attend the evening meetings. Mrs Page handled this much appre-
ciated support role in 1982.
Problems with laboratory and hall floors were to be considered a number of times before
satisfactory solutions could be found.
The proposed lease for Erf 713 was read paragraph by paragraph and agreed to by the Commit-
tee on 28 July. It was recommended to the School Board for approval.
The constitutions of the Sports Complex Fund and the Educational Fund were ratified in Au-
gust. All funds deposited in the School Fund would henceforth be deposited in the name of the
Educational Fund. Receipts would be issued for purposes of section 18A of the Income Tax
Act of 1962.
34
A committee election took place in September and the new members were welcomed at the
meeting on 23 September. It was resolved at this meeting that “The Chairman, Headmaster
and Mr Choice to see the MEC as a matter of urgency to further motivate an application for
additions to our existing building and also to discuss the rapidly growing need for a new
English-medium school in the area”.
The opening of the new field would be a “low-key affair” - a cricket match between the school
and the municipality would take place.
The main fund-raising events during 1982 were a Big Walk and the Ken Higgens, Pip Freed-
man and Vincent van Rooyen show. The Walk was reported on in the 1982 magazine in these
words: “The Winter Wander was held on 11 August this year, in which 1600 feet raised nearly
R11 000 towards the Sports Complex Fund. That’s nearly R1.00 per foot...”.
The Past Pupils’Association had a successful year in spite of initial difficulties. A successful
variety show was held early in the first term and two film shows were held at the school. The
traditional braai for the Matrics took place after the final examination.
The opening of the Teachers’ Centre in Parow was an encouraging development.
The Media Centre was being used more extensively. Mrs Paula van Wyk was appointed as
secretary in the Media Centre, and the provision of better printing facilities helped greatly.
Some excellent television programmes were produced, one of which was shown as part of the
Speech Night displays. Thirteen subject displays were on view before and after the Speech
Night programme.
Honours boards were hung in the Hall foyer, and House Flags would soon be available. Fur-
ther conversions led to the provision of offices for the newly appointed laboratory assistant,
Mrs R van der Riet, and the fourth Head of Department.
The purchase of a computer to be used initially for administration purposes was being considered!
Achievements
• Two Std 10’s were selected as exchange students - Karen Davies on
Rotary Exchange to the USA and Kinga Sebesteny as an American Field
Service scholar to Thailand.
• Moira Paveley was placed nineteenth in the English Olympiad.
• Janet Grieve (cross-country) and Belinda Ireland and Trevor Davies (squash)
achieved national recognition.
Visitors to the school included the Jazzart Dance Company and CAPAB Opera and Drama Groups.
A special feature of Valedictory Assemblies at Fairmont has been the singing of a special song
for the matrics. For example, in 1982 Colleen Newham, music teacher, wrote these words to
the music of C Jacobs-Bond:
“When you come to the end of this perfect day
And you sit alone with your thought
You will know through the years there’ll be memories
Of the joy that these days have brought.
You’ll remember your friends and the golden days
And tears, happiness and love
And mem’ry will paint you this perfect day
With colours that never fade.”
35
The English Department submitted a request in March relating to inter-racial contact during
prefect and student exchanges. Unfortunately, at this time such contact was not officially
permitted. Other matters handled by the School Committee during the year included reim-
bursement of petrol expenses to teachers on official school business, advanced reading tech-
nique courses and the purchase of a sundial for the senior quadrangle.
Staff
The enrolment in 1982 stood at 850, with a staff of forty-four teachers, one laboratory assist-
ant, three secretaries, a caretaker and six cleaners.
The projected enrolment for 1983 was 940. Three additional teaching posts would be created.
Only two of the permanent staff left at the end of the year.
It was agreed at the Committee meeting of 23 September that all first teams would be permit-
ted to wear different socks so as “to distinguish them” (from the other teams).
In November it was agreed that fees be increased from R15 to R25 per term per family.
Mr Hardy and Matric Invigilators for Matric Examination 1983
36
1983
The Matric results were again very pleasing. Five pupils obtained A aggregates and seventy
(50.7% of the class) obtained matric exemption. Qualification for an A was to change in the
future, but at this stage it was still a genuine 80%.
Dear Mr Wigg
MATRIC RESULTS, 1982
It is a pleasure and a privilege to me to congratulate you and your staff on your school’s
excellent 1982 matric results, in particular in respect of those 5 pupils who obtained the
highest marks, namely an A symbol in their aggregate.
It is only through hard work that good results are obtained, which proves to me that you
and your staff carried out your vocation as teachers in a conscientious and dedicated
manner, thereby enabling both school and pupils to share in a great achievement.
Once again hearty congratulations and may 1982 be an incentive to aim at even greater
achievements during the new year.
Kind regards.
Yours faithfully
E LOUW
ADMINISTRATOR OF THE CAPE
Buildings and Grounds
Accommodation issues continued to predominate in 1983.
The Principal reported, at a Committee meeting on 16 March, on a meeting with the Chief,
Physical Amenities. Fairmont was not included on any building or sports facilities list up to
1985. A new high school was planned for the Stellenberg area. The school should open in
1986. The Education Department policy was to have schools with a maximum of 750 pupils.
If it was found that Fairmont stabilised at 850, for example, additions would be considered.
The policy was to provide mobile units as a temporary measure.
The Department would refund 100% of the cost of new changing rooms, provided they were
built according to the Department’s plans and specifications. Any extensions and additions to
the Department plans would have to be at the school’s own expense. Refunds would not be
provided for five to six years.
The Committee considered an extensive range of proposed expenditure items including a vacuum
cleaner, a cinema screen, a trailer, reception area improvements, additional intercom speakers,
hockey posts and physical education apparatus.
In June Mr Choice reported on his consultation with Mr R Nixon (the architect who had de-
signed the school building) concerning the proposed Sports Complex. The Committee de-
cided to proceed with sketch plans by Mr Nixon. These were presented at the meeting in
August. At this meeting it was decided to change the name of the Sports Complex Fund to
“Fairmont Development Fund”.
37
By the end of November the sketch plan for the Sports Complex had been approved and work-
ing drawings were being prepared by the architect.
Fouradditionalteachingpostsweregrantedfor1984. TheywereadvertisedintheEducationGazetteof
15 September. At the Committee meeting on 7 September twelve appointments were ratified.
A finger supper was arranged for 14 November for the School and PTA Committees, eight
senior teachers and certain parents who had rendered special service to the school. This was to
be the forerunner of many similar functions.
In a letter to new parents the School Committee chairman commented on the fact that Fairmont
was already the biggest English-medium high school in the Cape Province.
The following comments were among those made by the principal in his annual report:
Enrolment and Staff
The enrolment stands at 933. The subdivision of the school into three manageable units has
been an attempt to provide more individual attention.
Facilities
Six new tennis courts and four cricket nets were used for the first time this year, and the Oval Field
across the road has relieved the pressure on the original site. A large percentage of our pupils,
especially in the junior standards, participate in sport and all facilities are extensively used.
Drama
Aqualified Drama teacher, Miss Chait, has been appointed for next year and each standard six
class will have a drama period once a week. I hope that a strong drama society will develop and
that the school will present regular productions. Attention will thus have to be given to the
purchase of additional theatre lights, the stocking of a drama store and the improvement of
facilities in the drama room on the top floor of the changing room block.
Media Centre
The Media Centre will also be extended. Additional facilities will be provided and, with Mr
Holgate joining the Media Centre team of Mrs Du Toit and Mrs van Wyk next year, I trust that
this Centre will be used to an even greater extent by staff and pupils. Improvements have
already been effected in the A-V Theatre.
We are very short of office space and we hope to convert a cloakroom area to three offices for
Department Heads as soon as possible.
Attention is also being given to facilities for those in the Advanced Learning Programme,
started this year, and for the provision of computers when this becomes feasible. Three addi-
tional prefabricated classrooms have been provided.
You will have noticed the magnificent new trophy cabinet in the front foyer. This is a gift from
the Matric Class, aided by funds raised by last year’s class. We thank them most sincerely for
providing such a necessary and much appreciated facility.
Our school will be the venue for the Annual Conference of the South African Teachers Asso-
ciation in June 1984; the first time the Conference will be held in the Tygerberg.
Achievements
Some of the noteworthy achievements this year were:
• Greater community service, for example, the work of the Service Society, the partici-
pation in the SANCOB operation to save gannets affected by the oil tanker disaster,
and participation in the ‘Blisters for Bread’, ‘World Vision’ and ‘Beauty without
cruelty’ fund-raising activities.
38
• The boys U 15 A Hockey team won the WP Indoor tournament.
• A Junior Parent- Pupils’ Day in March was a great success.
• Table tennis and basketball were introduced as school sports, and have been very
popular.
• Birgit Hein was chosen for the WP basketball side.
• The standard 6 Camp and tours to Port Elizabeth and Grahamstown were again very
successful.
• Success of a std 8 science group in the Expo 83 competition.
• Success of Helen Letord in the English Olympiad.
• A number of our pupils in outside activities.
We are fortunate in having Mrs Smit, a Springbok, as our senior basketball coach. We much
appreciate the help of coaches Mrs Smit, Mrs Holdsworth (Basketball), and Mrs Steyn (Softball).
We now have an official Cadet Detachment.
Among the highlights of 1983 were the following events: Standard Six and Seven Parent -
Teachers Day, when the parents were invited to participate in cricket, tennis and softball matches
against their children. Over 500 people participated at this highly successful function organ-
ised by Peter Bishop.
No No Nanette: The musical was a dream come true for pupil Sanette van der Mescht, who
produced the show. The performances were outstanding successes. This was to be the stimu-
lus for continued dramatic achievements. The proposed policy was that musicals would alter-
nate with three-act plays annually. The appointment of Miss Cheryl Chait in 1984 was to lead
to an upsurge of interest in drama at the school.
The Standard Six Concert: Standard Nines accepted responsibility for producing class plays.
The theme for the evening was “Fairy Tales 1983”. The highly enjoyable function was to be
the forerunner of many similar Standard Six concerts in following years.
The senior boys’ soccer team was allocated a home field for the first time and celebrated with
several victories in the A section of the Western Province Schools Soccer League. Eleven
boys’ hockey teams participated in the school leagues.
True love never did run smoothly. “No No Nanette” - 1983
39
1984
The school was divided into three sections - Lower (Std’s 6 & 7), Middle (Std’s 8 & 9) and
Upper school (Std 10), each headed by a teacher in a promotion post.
While the School and PTA Committees had been devoting much time and attention to accom-
modation, fund-raising and provisioning, development in all fields was progressing apace.
Fifty-seven staff members appear in the staff photograph, as opposed to seventeen in 1977.
Achievements
Three 1983 matrics obtained A aggregates, and sixty-seven matric exemption.
TheAdvanced Learning Project: This project was initiated to accommodate the needs of those
pupils able to cope with the demands of the syllabus more easily and efficiently than others.
Pupils were allowed to withdraw from class for up to twelve periods a week in order to pursue
project work. The team, under the guidance of Mr Cliff, came second in the Provincial Prob-
lem-Solving Bowl competition.
The prefects organised a highly successful exchange with nine other schools.
Twenty-ninepupilsandthreeteachersattendedtheGrahamstownEnglishFestival. TheNationalSchools’
Festival had already become a major event in the calendar of SouthAfrican schools.
Miss Chait’s production of The Boyfriend was a huge success. Eighty pupils were involved,
with Mrs Newham again an excellent music director.
The annual Standard Six Camp was again very successful and enjoyable.
6Ca, with their production of Red Spying Hood were winners at the Standard Six Concert. One
pupil commented: “The spirit all through was fantastic. (It should have been, with all those Std
6’s - we had to beware of untimely dives from the stage).”
Societies
The first year of the Home Economics Society was action-packed with interesting demonstra-
tions and excursions.
The highlights of the Debating Society year were The Fairmont-Settlers debate and the Best
Orator competition.
The Matric Representative Committee consisted of twelve elected members, a boy and a girl
from each class. The group “felt it would be a good idea to...establish some traditions amongst
the matrics. We...organised the buying and delivering of red carnations to matrics on St Valen-
tine’s Day. We helped to make a reality the buying of matric badges. We started another
tradition: the planting of a tree by the matrics. Our tree is the Cape Fig Tree and was planted
on the matric lawn. (The original matric lawn was that behind the Hall next to the covered
walkway from the main building to the Woodwork room). We ran a competition for the best
design of the Matric tops. Next on our calendar was the tea-party for the aged.”
The History Society, under Mr Shaw’s leadership, arranged visits by two members of parlia-
ment and by Mr Chipole, a lecturer from UCT, who gave a broad outline of the problems faced
by black people. The group visited the Crossroads squatter camp.
The annual SCA Camp was attended by eighty members. The group organised the SCA wel-
come for Standard Sixes and held weekly prayer meetings.
The Animal Welfare Society had 118 members and was awarded a Gold Star by the Beauty
Without Cruelty Society for contributions made in 1983.
The 1984 Drum majorettes “astounded all at the annual inter-school Sports Day against
40
Fairbairn”. The squad participated in three major competitions and enjoyed many marches
and displays.
The Service Club enjoyed a wide and varied range of activities. The biggest ongoing concern
was for the De Novo old-age home in Kraaifontein. They were visited on a monthly basis and
the group organised a birthday party there for 170 people.
The P.R.O Society organised and displayed the various trophies in the display cabinet in the
foyer - a gift from the 1982/1983 matrics, and presented the first three volumes of the pictorial
history of Fairmont to the Principal.
The Boardsailing Club had grown significantly. Highlights were the Regatta at Zeekoevlei,
the camp, and three teams participating in the schools’ league.
Sport
Cricket: Seven teams participated in the leagues while another eight “battled for supremacy”
in the internal “International League”.
The Boys’ Tennis Team was promoted to the A league.
The U19 Table Tennis team won the Peninsula School Trophy in its first season and during this
season the team remained unbeaten.
The Athletes ran out comfortable winners against Fairbairn. Patrick Day was selected to rep-
resent Western Province at the South African Schools Championships. Heike Longwitz was
placed fifth at the S.A. U13 Biathlon Championship.
The lack of depth in rugby was a concern. A useful foundation, however, was laid during the
rugby camp held at Hout Bay. The first team appeared in its first match with its new brown and
white striped jersey.
THE RUGBY JERSEY
The first team wore the plain brown jersey until 1983. A brown and white striped jersey,
based on the design of the WP jersey, was introduced in 1984.
This was worn until the introduction of a standard first team top for all sports in 1990.
This white jersey with a broad brown band was based on the design of the then Transvaal
rugby jersey.
Boys’ Hockey had a very successful season. Highlights were the visit of the first team to the
York Easter Tournament, the home derby against Settlers and the highly successful annual
hockey awards evening. (Separate awards functions and dinners would later be stopped when
the combined awards functions - summer and winter - were introduced).
The Girls’ Hockey season was “characterised by some outstanding performances and some
rather mediocre results”. Rhondda Davies was chosen for the Western Province Peninsula
Hockey team.
The 1984 Cross-Country season was “one of active excitement and full of surprise”. The girls
won the N.S.P.A. league competition, while the U14 girls won the team competition at the
N.S.P.A. Championships.
There were fourteen netball teams, six in the leagues and eight playing internal matches.
The 1983/1984 Softball season “proved to be another ‘grand slam’year for Fairmont. The first
team won the Norman Brown Floating Trophy. Six girls were chosen for the two W.P. teams.”
Teams that performed with varying success were chess, girls’ tennis, swimming, soccer, golf,
badminton, squash and basketball.
41
Inter-Schools vs Fairbairn at the Bellville Track - 1984
Matric Dance - Standard Nine Group - 1984
42
PTA
At the PTA meeting on 29 February 1984 it was reported that the first stage of the Sports
Complex would cost approximately R125 000. The C.P.A. would eventually refund an esti-
mated amount of R106 000. In a letter in March, however, the School Board informed the
school that the refund would be limited to R87 500.
A‘Gold Rush’was planned for the afternoon of the Settlers/Fairmont Contact. The PTAwould
organise the annual supper for the teachers of both schools during the Contact Week.
Mr Peter Bishop, in an article in the Tyger Burger, reported on the Gold Rush: “Fairmont
High School of Durbanville flooded over on Saturday morning as a crowd of 3000 took part in
an unusual Gold Rush which would satisfy the craving of the wildest speculator. Notwith-
standing gold’s discouraging price of $333 an ounce, on offer was over R1000’s worth of gold
coins, plotted over the schools’main field. The school raised well over R10 000 through this
initiative and is now all set to start on a major building project providing changing facilities
and, in time, a swimming bath and squash courts.”
The Mayor of Durbanville, Mr B Andrag, presented the prize to the winner, Mrs Shirley Smith
of Bloemhof.
In October the chairman of the Building Committee reported on developments. No final deci-
sion had yet been reached, but the PTA Committee wished the project to proceed. The Com-
mittee accepted as fund-raising projects for 1985: a School Levy, a Big Walk and a Big Draw/
Fête. It was hoped to raise R86 000.
Teachers’ conference
TheAnnual Conference of the SouthAfricanTeachers’Association was held at the school in June.
This was the first time the conference was held in the Northern Suburbs of Cape Town. The staff
room became The Tiger’s Lair for five days. The participation of the PTA in the catering was
much appreciated. Many favourable comments were received from conference attendees. The
facilities were considered outstanding.
Facilities
Four additional mobile classrooms were to be provided for 1985.
Gas geyers were provided for the staff showers at the back of the hall.
In May further attention was given to toilet facilities, soundproofing of the music rooms, cables
for the intercoms in the mobile classrooms, a burglar alarm system, a proposed rifle range for
Cadets, and additional catwalks for the hall. InAugusttheprincipalwasinformedthatanothermobile
classroomwastobeprovidedspecificallyforwoodwork. Thiswastobesituatednexttothefieldonthe
parking area at the end of the road. By October all the prefabricated classrooms had been repaired.
Staffing
As a new staffing structure would take effect in 1985, the number of Department Heads would
double. As all applicants had to be evaluated by an inspector, the principal suggested that evalu-
ations be done so that appointments from within (the existing staff) might be made. The position
of second deputy was also to be advertised.
MrAlastair Frost was nominated to fill the post of Deputy fromApril 1985. Mrs E Müller and Mr
S van Wyk were nominated to fill Department Head posts.
A second laboratory assistant was appointed in July.
43
Matric Dance - Fairmont’s Eiffel Tower - 1984
Matric Breakfast - 1984
44
School Board
The Committee addressed a letter to theAdministrator of the Cape supporting MrAvan Niekerk’s
candidature for Ward 1 - the ward in which the school was situated - for re-election to the Parow
School Board. An urgent request was made that consideration be given to nominating at least two
of the four nominated members to be representative of English-medium schools in the area. There
had been a significant increase in the numbers of English pupils. Afavourable response was later
received from the MEC for Education.
In November the principal attended a computer seminar for principals. Recommendations in-
cluded one that the school should obtain a computer immediately, this to be available to clerical
staff initially. A needs assessment should be carried out in consultation with the C.E.D. Planner.
At least as much should be allocated to software as to hardware. In-service training would com-
mence in 1985. The C.E.D. would possibly provide computers.
School Committee matters
The medical inspection report indicated that 277 of the 1006 pupils at the school were examined.
117 parents were present at the examination.
The Committee again considered queries about why the school had only one uniform stockist.
An excellent report was received from the Guidance inspector. Mr Phillips and Miss Middleton
were congratulated and thanked. The Sports Complex Fund and the Educational Fund were
combined into one account.
1984 also saw the introduction of the Uninterrupted Sustained Silent Reading period and the
various questionnaires to be completed during panel inspections.
New Staff 1984
In 1984 Fairmont had 1018 pupils, making it one of the largest English-medium schools in the Cape.
A number of new teachers were appointed. Front from left: Mr P H Phoenix, Mr D A Marnewick,
Miss A Mukheibir, Mr P Vegter and Miss D Middleton. In the back row are Mr J Dempers,
Mrs S van Niekerk, Mrs E Boonstra, Miss D van Niekerk, Miss C Chait, Miss S Lockett, Miss M Kitshoff
and Mr T A Cleevely (Courtesy: the Tygerburger 1984)
45
1985
In his circular to parents on 24 January 1985, Mr Wigg gave details about enrolment, staffing
and communication with the school.
The enrolment stood at 1126.
The new staffing structure meant that the school now had two Deputy Principals and eleven
Department Heads. Mr Gibbon was in charge of the Senior School (Stds 8 - 10) and Mr
Holgate, acting Deputy, in charge of the Junior School (Stds 6 - 7). Each standard had a
teacher in a promotion post as head.
Accommodation
In a note to the Committee he listed factors affecting teacher satisfaction including overcrowded
corridors and quadrangles, overcrowded changing rooms for girls’ physical education classes,
strain on toilet facilities, lack of tarred parking areas and the fact that sixteen teachers had to
teach in prefabricated classrooms.
There was much joy, therefore, on receipt of a letter from the School Board stating:
“A building scheme for extensions to provide accommodation for 850 pupils at your school
has been approved by the Department and it was also confirmed that the highest priority pos-
sible will be given to this scheme.”
A further mobile classroom and a prefabricated toilet block were provided.
An on-site meeting was held to consider alternative siting for the Sports Complex - the rival
sites being the corner of the Vineyard Field (an area to be utilised in later years for garages and
a rifle range) and an area near the library, including the gravel parking area overlooking the
end of the rugby field.
It is interesting to note that in a memorandum to the School Committee on future requirements
the principal included as an item to be considered: “Indoor Sports/Examination/Gymnasium/
Hall: Could this be sited between the two sets of tennis courts or should it be included in the
plans for extension to the main building?”
Eventually, Mr Fivaz, Dr Ireland and Mr Wigg met the MEC at the Provincial Building on 8
May in connection with the various accommodation matters. This was discussed at the subse-
quent Committee meeting.
The Department would first study the effect of the new (Stellenberg) school for some time
before making any decision.
This approach was unacceptable to the Fairmont delegation and an immediate plea was made
for financial assistance towards the sports complex. The MEC agreed to direct a delegation to
visit the school.
Re-siting the sports complex to the parking area site was going to compromise parking se-
verely. This matter would thus receive further attention.
At the Committee meeting in June the Robert Nixon Sports Complex design was cancelled.
New Departmental drawings would be available shortly.
The minutes of the meeting ended: “The meeting closed in record time! Members rushed for
the exits to be in time to see Bobby Ewing’s exit from Dallas!!!”
46
The Joint Association of Parent Associations of the Cape Province was inaugurated on 15
November 1984 to represent the views of parents of children at English-medium schools in the
Cape Province. This was brought to the attention of the School Committee for membership
application.
Three pupils obtained A aggregates in the 1984 Matric examination. Sixty passed with Matric
exemption.
Pupil Barbara Simon was a finalist in the Rooi Rose Home Economics competition. An amount
was allocated to enable the teacher, Mrs Kriek, to accompany her to the final in Margate.
Mr Ladewig and Mr Bishop left on promotion at the end of the second term.
Representations finally resulted in the Department allocating a third full-time secretary to the
school. Mrs Paula van der Wyk was appointed.
School Committee matters
At a meeting in September following the School Committee election, the new office-bearers
were elected:
Chairman - Mr D Truter
Vice Chairman - Mr K Cloete
Secretary - Mr J Cammidge
In his report in the school magazine, Mr Wigg paid tribute to Mr Fivaz, Mr Choice and Mr
Parker, who had served on the committee from 1977 to 1985.
In October new instructions regarding the raising, utilisation of and control over school funds
were received.
Tenders for the new Sports Complex to be built according to the modified Departmental plans
were opened on Thursday 31 October. At the subsequent Committee meeting it was resolved
that the tenders from Louis Naude Construction for the building at R207 817 and Micro Elec-
tric for the electrical installation at R13 771 be accepted.
The Department required annual inventory checks and stocktaking. At the time the general
inventory of furniture and equipment had to be divided into three sections - items provided by
the Department, Rand-for-Rand purchases and School Fund purchases and donations. Subject
inventories were also required. The Department provided separate general and subject cata-
logues.
Following instances of suspension and expulsion of pupils and an administrative inspection,
detailed instructions relating to these were given to all staff members. These included the
words “suspension involves a complicated procedure. The school psychologist must be con-
sulted, the School Committee must meet within seven days, interviews may be required and
the Department must be involved.”
Of the numerous items handled by the Committee in November some of the more interesting
were: the site for the Sports Complex would be handed over on 18 November, the school need
no longer refer requests for use of the school building to the School Board, queries again about
one school uniform stockist and the donation of a ‘tennis ball popper’ by the Rotary Club.
Items to proceed included a rubbish enclosure, a tennis shelter, micro jets and fertilising the
fields. Mr Truter was elected at the regional congress concerning parent representation.
47
Class of ‘85 - (Die Burger) - Valedictory Day 1985
The Swimming Team - 1985
THE THREE HOUSES
The highlight of the year for the 1985
Matric Council was the presentation
on Matric Day of the coats of arms of
South Africa and Fairmont and the
badges of the three houses.
48
PTA
The PTA general meetings during 1985, on a Standard basis, were Std 10 in June, Std 8 in July,
Std 9 in August, and Std 7 in October.
The AGM had as theme “Focus on Fairmont - A face in the crowd”. This was a pupil and staff
presentation in two parts and included the participation of three Rotary Exchange students.
The Big Walk was the main fund-raising activity. R16 500 was raised. The Rotary Careers
Evening (the Std 9 meeting) was also most successful.
Founders’ Day, on 7 September, included a braai organised by Mr Hudson and was a great
success.
The PTA braai was held on 16 November. School Committee members and sub-committee
convenors were included.
Achievements
Twenty-two pupils were selected to represent the Province during the year.
Softball was flourishing as these comments from the teacher-in-charge, Mr Steve Wright, indi-
cate:
“Fairmont continues to dominate WP Softball. Seven of our girls obtained Provincial colours.
Softball is possibly Fairmont’s biggest and most successful sport”.
Highlights of the year included the production “Relative Values” and the Spring Run - this had
become a tradition to celebrate the beginning of Spring. An extract for the magazine report
gives an indication of the spirit of the occasion:
“Mr Wigg started, first the girls and then the boys, by sounding the now traditional siren. The
boys set off at a blistering pace (obviously trying to catch up with the girls) with Patrick Day
in the lead.
“As usual, the Spring Run had the runners, the joggers, the walkers, the slouchers and...the
teachers. The light drizzle caused some people to look rather soggy and caused others to look
considerably cleaner (no doubt, a serious side-effect). On the whole everyone thoroughly
enjoyed the occasion and we are looking forward to the event next year.”
During the Youth Week contact between Fairmont and Durbanville High Schools, the Public
Relations Society compiled, published and distributed 1500 copies of a sixteen-page booklet
informing the youth of Durbanville of the many sporting and cultural activities available.
Mr Raymond Ackerman was the guest speaker at Speech Night. He very kindly offered to
assist the school with its swimming pool project by way of the Pick ‘n Pay “Till Strip Scheme”.
Pick ‘n Pay would commit 1% of R1 million worth of till strips handed in, that is R10 000. The
period for the scheme would be 1 March to 30 September 1986.
The first rugby and netball teams toured to Lutzville.
The Computer Club was introduced by Mr Ladewig. As Fairmont still did not have a compu-
ter, the first few months were spent on computer basics. Finally, towards the end of the second
term, a BBC computer was purchased.
The art and literature included in the magazine was again of outstanding merit. Bronwyn
Kelly, Linda Padfield, Andrew Loudon and Neil Walker were among those whose contribu-
tions were included.
49
The magazine again featured individual photographs of the matrics with - in most cases -
humorous comments. A random selection:
“René Burbidge: This1984/85 drum majorette leader wishes to become a graphic
designer. She wants to invent a jet-propelled mace with a magnetic-field link with her
hands.
Grant Catto: ‘Commodore’ will proceed in life digging up old trees in search of trunks
(trees of treasure?). He played first team rugby and golf and hopes to retire at an early
age to enjoy his findings.
Gavin Perrow: Although Gavin wants to be famous, he also wants his name in lights,
preferably floodlights. He wants to continue life as an earthworm trainer extraordinaire.
Sally Williams: ‘Willy’was Chairlady of the Outdoor Club. Too much sun has led to
her believe she can become a fairy. She described her impact on Fairmont as amazing!”
MATRIC AND HOUSE BADGES
The Matric Representative Council introduced Matric Badges in 1984. The 1985 coun-
cil presented on Matric Day the coats of arms of South Africa and Fairmont and the
badges of the three houses. All the funds were raised by the matrics of 1985.
In December, Mr Don Gibbon, Deputy Principal and member of the founder staff, left the
school to take up the position of Principal of Muizenberg High School and Mr Holgate left to
become a Department Head at Plumstead High.
Opening of the Recreation Centre: Dr S W Walters and Mr C Wigg - 1986 (Courtesy: the Tygerburger)
50
1986
PTA
In February the PTA Committee determined that its main project for the year would be the
Tenth Anniversary of the founding of the school. A committee for this purpose comprising
Mrs Stumpf, Mr Long and Mr Kleynhans was established. Mrs du Toit later joined this com-
mittee. To celebrate the tenth anniversary it was decided to include the official opening of the
new building, Founders’ Day 1986, tree-planting and a formal dinner early in 1987.
Mrs Keohane, the tuck shop convenor, outlined a number of requirements and suggestions. A
separate fund-raising committee decided on:
• a 10th Anniversary Swimming Pool Appeal
• a Golf Day and
• a “Diamond Rush” to be linked to Founders’ Day.
The Pick ‘n Pay till slips scheme was progressing well and already half a million rands’ worth
of slips had been collected.
APTAMaintenance work party met periodically and assisted with a number of projects. Meet-
ings were still being conducted on a Standard basis.
The R1 million target for the till strip scheme was reached by May. Mr Long, in charge, was
congratulated on this remarkable achievement.
At the May PTA meeting the programme of tenth anniversary events was further clarified:
• The official opening of the Recreation Centre (the new name for the Sports Complex)
would take place on 5 September. A cocktail party would follow that evening.
• Saturday 6 September - the 10th Founders’ Day. The sports day would start during
the late morning and end at approximately five in the afternoon. The PPA would also
be involved.
• At 18:00 that evening the “Diamond Rush” would take place and be followed by a
Barn Dance.
• 27 October - 10th Speech Night. There would be an Open Day from lunch-time.
• A formal dinner would be held early in 1987.
The abuse of drugs in the wider community was becoming evident. Unfortunately, this was a
time when a number of false bomb threats were being made in the country. Three Fairmont
pupils were charged with making such a threat at the school.
The school participated in a fund-raising drive for the Diabetes Association. R6000 was col-
lected and one hundred pupils received calculators for their efforts.
The English-speaking Parents’Association was well established, but most of the work was still
being done behind the scenes.
Coffee mugs had been sold to commemorate the Fifth Anniversary. 500 mugs bearing the
school coat of arms were ordered for the Tenth.
As the year progressed, the PTA Committees and the sub-committees were very active in
preparation for these major events. Each group reported back in detail on the arrangements at
successive meetings.
51
Bugsy Malone - Anthony Shaw and Vanda Fernandes (Photo: The Argus)
52
School Committee
The School Committee devoted much attention to progress on the Recreation Centre, prepara-
tions for the construction of a swimming pool, a proposed cricket pavilion for the Oval Field
(Erf 713), extensions to the main building and various other minor works. The Municipality,
which had facilitated the use of Erf 713 on a twenty-five year lease after a consultation process
with the school and neighbouring residents, now made available the triangle of land south of
Medway for parking. However, no improvements would be made to the area.
An administration sub-committee was established. Proposed rugby and hockey tours to theTrans-
vaal and a cricket tour to Uitenhage were also discussed. It was decided that the publication date
for the school magazine would be January 1987. Mrs Clarke would be the teacher-in-charge.
In August the Department informed the school that no financial assistance could be expected
from the Department. It was resolved that a delegation be sent to object and endeavour to
change the decision. Other items considered at this time were a new prefects’ room, acoustics
in the AV theatre, painting and refurbishing, the tuckshop problems and the school magazine.
Mr Basil Starke was thanked for his very kind donation of a scoreboard for the main rugby field.
Mr Williamson reported on the results of the survey concerning the school uniform and the
stockist. The committee resolved to retain the current school uniform, but to investigate the
appointment of an additional stockist. The La Vita Restaurant at the Bellville Golf Club would
be the venue for the tenth anniversary dinner. Curtaining of the Recreation Centre would be
investigated.
Staffing
Department of Education Circular 66/1986 brought about significant changes in staffing. In a
policy statement, the Minister declared that ten per cent of teaching posts below the level of
head of department were to be reserved for the appointment of students completing their courses
of study and for teachers who were available for temporary appointment. In secondary schools
thirty per cent of the posts should be reserved for men and thirty per cent for women, while the
rest might be filled by either men or women. Married women teachers were eligible for per-
manent appointment from 1 January 1987.
The PTA was informed that two events to thank all parents and staff for the special help given
during the year would be organised - a tea for the tuckshop ladies and a braai for the PTA. All
arrangements for the opening of the Recreation Centre and the Founders’ Day activities the
next day were finalised at the meeting on 4 September.
Opening of Recreation Centre
The Recreation Centre was opened on Friday 5 September by Dr S W Walters, Deputy Direc-
tor of Education for the Cape. The programme read:
1. National Anthem
2. Welcome - Mr C Wigg, Principal
3. Reading - Miss N Oosthuizen, Head Girl
4. The Lord’s Prayer - Choir
5. Introduction of Deputy Director of Education by Mr A J Truter, Chairman, School
Committee
6. Address - Dr S W Walters
7. Official opening of Centre and unveiling of plaque - Dr S W Walters
53
First Awards Function in the Recreation Centre - Terry
Fowler receives her award - 1986
Prefects’Induction Ceremony - 1986
The Prefects - 1986
54
8. Hymn - Your God Reigns
9. Thanks - Mr C Mullet, Head Boy
10. School Song
Special guests included the Head of PhysicalAmenities, the Director: Works, the School Board
Representative, a representative from the Architects’office, the circuit inspector, the builder, a
Works Department representative, Mr Fivaz, previous School Committee chairman, and the
school and PTA committees.
They and the staff enjoyed a buffet lunch in the Centre afterwards.
A report in the Tyger Burger provided a description of the opening and of the centre:
“Fairmont High School’s new Recreation Centre of R222 000 was officially opened...last
Friday. More than half of the building costs - an amount of R132 000 - was contrib-
uted by the school.
...the ground floor comprises three changing rooms with showers and toilets for boys,
two changing rooms with showers and toilets for girls, a big kitchen that will also be
used as a tuckshop, toilets for adults, two storerooms of which one will be used for the
swimming pools’filtration plant and a first aid room, also to be used by referees. On
the top floor are a small kitchen, storeroom and hall for social functions. The hall will
also be used as a venue for girls’ physical education classes”
The events of Founders’ Day, 6 September, were very successful. A R7000.00 profit was
made. Photographs of the weekend would be on display on Open Day (20 October). Thanks
were expressed to all concerned, especially to Mr Brymer, who organised the Diamond Rush,
staff members Mr Long and Mr Clarke, and Mr Bosman for the braai. The Barn Dance was
well organised by Mr and Mrs Parker.
Final arrangements were also made for the Open Day. The Junior Prize-giving would be at
13:00, followed by the events of the day. Mrs J Grieve would be the speaker at the Junior
Prize-giving. Speech Night at 20:00 would be for pupils from Standards 8 to 10 and their
parents. The speaker would be Miss H Starke of Child Welfare.
Unfortunately, the number of parents who attended the two prize-givings was disappointing.
In November the Committee appointedTowers Store as the second stockist of the school uniform.
The school was informed that it would receive a fourteen-point rifle range and a type C ar-
moury during 1990/91.
Other matters of interest included the uninterrupted reading period, the intercom system, the
achievement award process for staff, the commencement of automatic salary payments, item
bank tests by the HSRC, the successful Needlework Fashion Show and the staff bowls compe-
tition. With the exception of one year, when the staff attempted golf, a bowls afternoon was an
annual event.
In 1986, the staff comprised the principal, two deputies, eight department heads, three senior
teachers and forty other teachers. Five acted as department heads for all or part of the year.
There were three secretaries, two laboratory assistants, the caretaker and his six assistants.
The magazine Staff Notes included this paragraph: “The Fairmont Staff Room was a warm,
friendly place in spite of the constantly changing population and the need to get to know new
people almost every month.”
Sixty-nine pupils obtained matriculation exemption in the 1985 examination. Heather McGregor
achieved an A aggregate.
55
Fêtes
Convener Sum Raised
1977 Mrs Beryl Fivaz R2 042
1978 Mrs Beryl Fivaz R2 000+
1979 Mrs Beryl Craddock R3 500+
Mrs Val Williams
1981 Derek & Alison Gawler R5 500
Speech Night - Guest Speakers
1977 Mr Gene Louw
1978 Prof Terry McCarthy
1979 Sir De Villiers Graaff
1980 Mr Clive van Ryneveld
1981 Prof M J Ashley
1982 Mrs Madeleine van Biljon
1983 Mr George Young
1984 Mr G L Hester
1985 Mr Raymond Ackerman
1986 Mrs Helen Starke
Junior Prize-givings
1984 Mr Clive Roos
1985 Mr Philip Parsons
1986 Mrs Julie Grieve
Openings
School - Mr PS Meyer
5 September 1978
Fields -Mr Basil Starke 1980
Recreation
Centre - Dr S W Walters
5 September 1986
The South African Teachers’ Association
Conference (1984) was held at Fairmont
Fund-raising
1978 Autumn Walk R4 260
1979 The King & I
(by the Festival Players)
1979 Pick a box (part of fête)
1979 PTS Dance (Brackenfell)
1979 Check your Mate
(Springbok Radio)
1980 Autumn Walk R6 700
1981 Max Collie Show (PPA)
1982 Pip Freedman (PTA)
Big Walk R11 000
1984 Gold Rush R10 600
1985 Big Walk R16 400
1986 Diamond Rush
Some memorable occasions
1985 - Youth Year: Presentation of fountain
to town by Durbanville High &
Fairmont
1986 - Founders Day
Diamond Rush and Barn Dance
1984 - 29 pupils & 3 teachers attended the
Grahamstown English Festival
(13 attended in 1982)
Annual Events
1. 1st Saturday in September annually -
Past Pupils vs School
2. Annually - first week of third term -
Settlers vs Fairmont contact (the first
contact was in April 1980)
Exchange Scholars at Fairmont
1978 Kim Cowley (Australia)
Kelly Austin (USA)
1981 Melanie Trethowan (USA)
Astrid Levelt (Canada)
Anke Weidemann (Germany)
1984 Drew O’Neal (USA)
Julie Bryant (USA)
1985 Maureen Keeley (USA)
1986 Karl Anderson (USA)
1977 - 1986
56
Exchange Scholars from Fairmont
1983 Kinga Sebesteny (Thailand)
Karen Davies (USA)
1985 Sonja Blok (USA)
1986 Audrey Hepburn (USA)
1986 Michael Paton (USA)
Enrolment
1977 - 330
1978 - 496
1979 - 635
1980 - 691
1981 - 784
1882 - 831
1983 - 935
1984 - 1001
1985 - 1119
1986 - 1078
1979 First School Magazine
1982 Girls’ Hockey & Netball -
UPE Winter Sports School
1982 Tours of Europe (Settlers/Fairmont)
1982 Fairmont/York High Contact
1983 Fairmont/York High Contact
1986 Rugby/Hockey team tour to
Johannesburg
Musicals, Plays and Events
1979 - What a Weekend
1980 - Christmas Carols & Readings (8 Dec)
1980 - See How They Run (Oct)
1981 - Head over Heels - Music revue
5th Anniversary Dinner
(Founders’Day Dinner): Mr Bouwer,
MEC Education, guest speaker.
1983 - No No Nannette
1984 - The Boyfriend
1985 - Relative Values
1986 - Bugsy Malone
Pupil Achievements
1979 Kevin Webb - SA Sailing team (Italy)
1986 Pantry Pride Competition:
Winners: Penny Neumann & Bridget
Laughton
Past Pupils’Association
Inaugural meeting - 25 June 1980
First AGM - 25 February 1981
Chairman
1980 - 1982 Evangelos Kolovos, Craig Paine,
Derek Klazinga, Clem van der Riet.
Tenth Anniversary Dinner: Mrs S Neumann, Mr Clive Wigg, Mrs L Wigg, Mr E Louw - 1987
57
1987 - 1991
POOL, REUNIONS, SPIRIT AND MODEL B
1987
The 1987 school year started with a 10th Anniversary cake, resplendent with ten candles, in
Assembly.
Financial Matters
Financial matters were predominant at the start of 1987. The Receiver of Revenue informed
the school that of the total initial contribution of R160 made by a parent in respect of his child
in the 1987 tax year (1986 school year) the R60 donation to the educational fund would qualify
as a deduction and a Section 18A receipt might be issued in respect of this amount. However,
the remainder, which clearly constituted school fees, was non-deductible.
One of the full-time secretaries’ posts was converted to a part-time post.
An Education Department circular headed, “Curtailment of Expenditure”, stated:
“The Department’s budget allowance for the 1987/88 financial year is inadequate for the
continuation of all services supplied in the past or their supply on the same scale as before.
For this reason it is absolutely essential that expenditure be curtailed drastically. The Depart-
ment is compelled to suspend the allocation for the upkeep of sports facilities immediately.”
The implication was that over R4000 in school income for 1987 had to be found from other
sources.
This was at the time the school was proceeding with the swimming pool. The Committee was
also to consider the establishment of a bursary fund. A parent, Mr MJ Strydom, had prepared
the relevant documents for the establishment of a trust for this purpose.
Education Department Circulars
Two circulars from the Department, which aroused some debate at the time, were, firstly, one
that stated that “Educational properties may not be made available for advertising purposes
or, with a view to making a profit, to outside bodies. These properties may not be used for
dances unless the dances are for pupils, in which case there must be proper supervision.”
Secondly, in a statement on National Sports Policy, “The Department prefers that a school
committee should do everything possible to attain consensus (unanimity) before a match against
a sports team of a school for Coloured, Asian and Black pupils takes place. If, however, unani-
mous agreement cannot be attained, a majority decision of the committee will be sufficient.”
A litho-printer was purchased and installed in May.
Pool payments made during 1987 were:
• Springbok Gunite R22500 and R20997
• Starke Ayres R462
• Watney’s Excavators R276
• Rolltop Fencing R6548
• Trio Building & Plumbing R4218 and R329
• Pool & Filtration Engineering R2620 and R380
• L&G Landscaping R300
58
To this, paving at R9839 and construction of a new pump area at R2400 had still to be added.
By April the principal was able to inform the PTA Committee that the first phase of the pool
had been completed. The filtration plant was to be installed in August.
Tenth Anniversary Dinner
The TenthAnniversary Formal Dinner, a Polynesian Buffet, was held at the La Vita Restaurant
at the Bellville Golf Club on 31 January. The guest speaker was theAdministrator of the Cape,
Mr Gene Louw. Mr Keith Cloete was the master of ceremonies. Mr Truter, Chairman of the
School Committee, welcomed all present and Mr Clem van der Riet, Chairman of the Past
Pupils’Association, also addressed the guests.
PTA
The PTAAGM programme in February included talks by Vanda Fernandes, the Head Girl, on
“Die Burger Leadership Course for Head Prefects”, for which she had been selected, slides
and a talk by Sarah Wass, Rotary Exchange Student, and a talk by Mrs Heyns, Teacher-Coun-
sellor, on Lifeskills Teaching.
Main fund-raising ideas on the PTA’s list in March were: Fun Run, Boot Sale, Art and Pottery
Exhibition, 100 Club, Variety Show, Film Premiere at a local cinema.
The Art Display commenced on 18 May. This proved to be a worthy cultural event. The PTA
planned, initially, a 100 Club. The plans were then to change this to a 250 Holiday Club, but
the response was poor and the venture was cancelled. An open Fun Run was held as a fund-
raising venture. 232 runners participated. The next function to be planned was the Alvon
Collison Show. Each standard would perform for fifteen to twenty minutes during the first
half of the programme. The show was well attended and well received.
An important decision was to have a cheese and wine function for the parents of all new pupils
at the start of 1988. The function would become an annual event.
Some of the spirit and fun of the year can be seen in extracts from The Grapevine.
DRUMMIES 1987
Thursday dawned and Fairmont’s badly painted bus made its way to Boksburg. After final
warm-ups and many pep-talks, we marched through to the semi-finals with our best per-
formance ever. Our bus drivers watched us and they were so thrilled by our performance
that they surprised us with a carnation on each of our seats.
On Friday we bettered our display with “happy, smiling faces and sparkling personalities”
and to our great joy, we achieved our goal by reaching the finals. That night we splashed
out in style and dined at Gold Reef City. Various speeches were made and we realised
with rising emotion that the following day would be our last competition march as the
1987 squad. Tears were eventually shed when Yvette de Reuck choked on the first sen-
tence of her speech and everyone vowed to do her best on Saturday.
Saturday arrived and we pulled out all the stops to come 8th in the whole of South Africa
(out of approximately 200 schools). Our leader, Carol-Anne Heibner, was awarded 7th
place and our classy gold and brown uniform, 4th.
59
PAUL BUCKBY AND “CHANCE” VISIT FAIRMONT
The band waddled excitedly onto the stage amid screams for “Paul”. The one lady
member of the band, who was obviously into shorts and mini-skirts, did cause quite a
stir amongst the “boys” not screaming for Paul Buckby.
After the first one or two numbers, a general migration took place towards the stage
and then almost all the girls went ape. It is appropriate to pause here and extend our
sincere condolences to the family of the boy on whose shoulders Sandra sat. We feel
for you. Apart from this, a good time was had by all those pressed against the stage
passionately.
To refocus our attention on the star of the show...well, what can I say about his dress,
other than it reeks of Miami Vice; his style is that of an aspirant sex symbol and his
attitude marks him as a potential Simon le Bon.
The music lacked a South African flavour, but otherwise was refreshingly original.
Our thanks to Mrs Newham for making the concept possible, Mr Wigg for allowing it
and US for supporting it. We hope the enthusiasm shown will encourage more shows.
(Maybe one day in the not too far off future Savuka and Johnny Clegg will pay us a
visit. Teehee!). The Grapevine
Pupil achievements during 1987 included:
• Fairmont being placed tenth out of 102 schools in the UCT/Shell Mathematics Olym-
piad.
• Annemarie Hettasch and Belinda Ollewagen won 1st prize in the Pantry Pride
Cooking Competition.
• Glynnis Horne was placed second in South Africa in the Bernina/”Rooi Rose” Sewing
Competition for her evening garment made as part of her class needlework.
• Judy Newham was the winner of a national art competition.
• The choir won the St George’s Singers Trophy for mixed choirs of eighteen years and
under at the Cape Town Eisteddfod.
• Five pupils were placed in the top 10% in the country in the 23rd National Youth
Science Olympiad.
• Glen Buckley was selected for the SAAll-Star baseball team.
• Andrew Sturdon won the general section of the WP Closed Chess Championship.
• Lance Butler scored 126 against Settlers - the highest individual cricket score to date.
• The Boys’ first hockey team was unbeaten. Barry Chedburn was chosen for the SA
Schools’ B team.
• The U16 soccer team won their league.
• Robert Northcote (captain), Stuart McNee (vice-captain) and Allan Beverley were
chosen for the WP Schools U19 soccer team.
• Samantha Rose, Laureen Fraser and Natalie Lloyd were chosen for the WP Schools’
U19 softball team.
• The first table tennis team won the WP Schools’ League Championship.
• Colleen de Villiers was selected for the WP Schools tennis team.
• Richard Olivier was chosen as a member of the SA Wrestling team.
60
PANEL INSPECTION PANIC
From 31August to 4 September Fairmont was in a state of emotional and physical upheaval.
This was the week when the no...no...notorious panel inspectors made their appearance.
Teachers lived in fear of these cunning creatures and some still have nightmares. Group-
work suddenly became an everyday occurrence and so did regular homework.
Pupils stared in amazement as plants sprung up in the strangest areas of the corridors,
desks were sanded and painted, floors, walls and ceilings were polished and adorned
with posters, and worst of all...hair and nail inspections were held almost hourly!
When the time came for the teachers to be evaluated, pupils witnessed severe cases of
memory loss and fumbling for words. Long, perfectly manicured teachers’ nails were
bitten to the quick and various other unmentionable side effects were seen taking their
toll on the teachers.
The inspection, however, showed the pupils one thing: teachers are people too and not
the “iron men/women” they appear (perhaps try) to be.
The Grapevine
Each class raised money for the Community Chest during the year. A trophy was presented to
Fairmont in recognition of the effort of the Std 6 to 8 pupils. This was to be awarded annually
for community service.
Speakers at theWinter SportsAwards Dinner were Mr and Mrs K Rose-Innes, and Mr Robin Jackman
was the guest speaker at the Summer Sports Awards Dinner, held in the Recreation Centre.
Winners of the annual literature competition were Dominique le Roux (senior section) and
Charmaine Gray (junior). This is a short extract:
EXAM FEVER
Here I sit in total confusion
With waves of chaos breaking over me.
My mind, like an overstuffed letterbox,
rejects all this information
that I try to cram in.
D le Roux
Past Pupils’Association
Newly elected to the Past Pupils’Association Committee in September were K Seeley (chairman), B
Proctor (vice-chairman), J Quine (secretary), S Cummings (treasurer), K Penrose and L Hills.
Staff:
Teachers who left at the end of the year included Mr Gilman of the founder staff, Mr Phillips,
Mr Phoenix, Mr Krige and Mr S. van Wyk (all on promotion), Mr Marnewick, Mrs Mills, Mrs
Povey and Miss Sharpe.
Mrs Neumann, secretary, left to join the Arts Faculty at UCT.
Nine staff members continued with further study.
1987 Matric Results: Six A aggregates, forty-five matriculation exemptions.
61
The Swimming Pool Area - 1987
Front of School - 1987
62
1988
At the first committee meeting of the year the PTA appointed new sub-committees. These were:
• Teas Committee (Evening) S Johnston
• Teas Committee (Day) S Dorrington
• Tuckshop J Gouws
• Clothing Bank T Bramham
• Speakers G Thurtell
• Fund-raising Executive
Proposed capital items for the next four years were listed by the Principal:
1988 Bus No 1 R31300
Garage R6500
Computer-Administration System R15000
1989 Computers - Teaching R11200
A/V Theatre R6500
Equipment Store R10000
Tractor Shelter R3000
Display cabinet (foyer) R3000
1990 Changing rooms (Oval) R60000
Stands and seating R30000
1991 Grand piano R20000
Band instruments R4000
Partition Recreation Centre R10000
The water account for sports fields was budgeted at R14000 for 1988, and boreholes were to
be investigated.
Three combined committees socials were planned.
Improvements were effected to the school coat-of-arms, which led to a neater, sharply de-
fined badge.
The Parow Teachers’Centre conducted a professional needs analysis at the school. The results
of the surveys presented new challenges. This was the first survey conducted at the school.
Others would follow.
Other important events were:
• the Panel Inspection in May
• the fête and the Leap Year Dance
• the arrival of the Fairmont bus
• Arbor Day
• the Big Swim
• the production “Alice in Wonderland”
• the Needlework Fashion Show
• the official opening of the pool by the mayor, Councillor R Ciolli.
This was a time of national service for both graduating pupils and for staff members, and was
a matter of concern each year, affecting staffing and the lives of those involved. Conscription
would continue until it finally ended in 1993.
63
SCHOOL INFORMATION 1988
Number of teaching staff 59
Promotability: number visited 1
Merit Awards: number visited 6
Number of beginner teachers 3
Number of Std 10 pupils 202
Approximate number of grade/subject changes 150
Number of applicants for teaching bursaries 7
The prefects revived the Boeresport Day, which proved to be one of the more successful events of
the year. “In an effort to develop the school archives, numerous photographs were mounted and
hung in the hall foyer, giving the area a sense of history and reminding us of those who have
contributed to Fairmont’s past”. The intention was to add to and extend the display annually.
Sporting achievements included:
• Kim White was champion of her age group at the WP Junior Athletics meeting, and
was placed eighteenth at the SA cross-country championship.
• The most successful year to date of the Drum majorettes. The proud squad returned
from the national championships in Durban, covered with glory and accolades, offi-
cially acknowledged as one of the top squads in the country; and the winners of the
shield for the Best Parade Team. The team was placed fourth in South Africa.
Some Matrics of 1988
(Back) Stephanie Bickel, Heidi Stumpf, Rene Cloete,
(Front)KristinaKratz,EwoldvanMechelen,AngelaCox
(Back) Lynda van der Westhuizen, Nicole Lenz, Yvette
Lombard (Front) Shirley Cannone, Jenean Whitmore,
Carol Whitchurch
Laureen Fraser, Gillian Wood, Chanelle van der Watt,
Kathy van der Riet, Caronne Hughes, Julie Kearsey,
Marielle Steeman, Janice Turner
(Back) Ian Skeet, Jane Slabber, Graham Skelding
(Front) Nicole Heidemann, Gero Aweh, Ena Venter,
Jean-Pierre Craye
64
• Quentin du Toit and Bronwyn Hudson were selected for WP Hockey A teams.
• Sean Bossenger reached a milestone when he played his fiftieth match for the
first rugby team and played in the Craven Week trials.
• “The First softball team must still be ranked as the number one school side in
South Africa.” Eight girls were chosen for provincial teams - Laureen Fraser,
Samantha Rose and Genevieve Steyn for the U19 team. Mr Long was selected as
the WP U13 team coach.
• “Fairmont was one of the strongest soccer-playing schools in the Peninsula.”
• Steven Crooke was seeded sixth in South Africa in table tennis.
ROLY POLY’S...
Whether you are a roly-poly, obese midget, spaghetti giant or Fairmont Fairy, in the eyes
of the PT teacher, handstands on beams are for all!!! Whether you’re dripping with rain
or dripping with perspiration - IT’S PT - whether you like it or not!
The PT lesson (of course) brings with it a sackful of letters from very worried mommies
whose daughters are perhaps sufferers from claustrophobia and can’t bear the thought of
crawling through tunnels under benches.
Even if they are petrified of heights, they’re expected to shin up 10m high rope ladders
and swing along ropes at 50km/h like Tarzan. Except that instead of brave war cries you
hear petrified shrieks.
Perhaps if the PT teachers did the backward rolls on slanting benches and ran around the
field with the girls, they too would experience the pleasures of physical torture.
Sometimes the beam wobbles so much under a poor shaking girl’s legs that it almost
develops its natural frequency. Then there is the horse that nearly cracks under the weight
of the girls that “plonk” heavily onto it!
Whatsheermadnesstomakegirls(whohaven’texercisedstrenuouslyformonths)suddenlytake
on a vicious aerobics class so that they suffer every time they creakily TRYto take a step.
But take heart - PT isn’t all that bad. Some classes have started to have dancing lessons.
Unfortunately not everyone is born with a sense of rhythm. I wonder how Mrs Nieuwoudt
manages to keep a straight face while some girls plod around doing the “waltz”?
But the sheer fun of it all certainly makes up for it.
The Grapevine 2nd term 1988
Matric Dance Invitation - 1988
65
In September the PTA conducted a survey of parents to obtain feedback on the popularity of a
number of fund-raising schemes. 402 questionnaires were returned. The ratings were:
1. Dance
2. Fête
3. Pop Concert
4. Max Collie Hypnotist Show (or similar)
5. Big Walk / nationwide competition
6. Concert plus dinner / cheese and wine
In November it was decided on:
1. A Valentine’s dance for pupils on 17 February 1989
2. A fête on 29 April.
3. A raffle.
The chairman and vice-chairman would represent the committee at the luncheon for new teachers
on 17 January 1989.
Here are some of the Matrics’ responses to a survey about themselves and what they would
remember about Fairmont (taken from the 1988 magazine):
THE ACADEMICS
• Glen Thomson, The School Dux and all-round A-aggregate pupil (who
was confused about why he lost two marks in his Maths HG exam).
• Paul Klaver and Reinhardt Rall (the Sharp Twins), who never went through a
Maths lesson without whipping out their calculators.
• The modest Gillian Human.
• Greg Wilkinson (always stiff competition).
• Colleen de Villiers and Lawrence Ireland (the academic pride and joy of IOC).
• Konrad Herre (the silent one)
THE “CHARACTERS” . . .
• Janet Beverley and Caroline van Heerden - brought delight and laughter
to many a boring occasion.
• J.P “Loverboy” Gouws, who broke just too many hearts.
• Nicola Prangley, who managed to maintain a tan throughout the year, while her friends
worked hard at school.
• Paul Prior, who split his pants just before the Matric Farewell.
• Robert Northcote, Paul Prior and Alan Rees - unforgettable as the ultimate ugly sisters
and fairy godmother in the Standard Nine production of “Hot Cinders”.
• Lance Butler, the tap dancer, who also was capable of surprising everyone with his
occasional earth-shattering intellectual comments.
THE LASTING MEMORIES . . . OF FAIRMONT
• Having breaks shortened because of someone else’s litter.
• The Standard 6 camp.
• Abortive Physics experiments.
• “Bugsy Malone”, “Alice” and the other dramatic productions.
• The teachers and pupils who tried to make us feel as if Fairmont had always been home.
• Mr Frost and his “when the going gets tough, the tough get going”
• Athletics Day.
• Standard 6 plays.
• The “brown-ness” of it all!
66
OF THE MATRIC YEAR
• Homework ’till the early hours of the morning.
• The thrill of our very first swim in the school pool (we thought it would never happen).
• Cheerleading.
• The prefects.
• The braai with the teachers.
• Valentine’s Day fun.
• The Senior Citizens’ tea-party.
• and - on ALL the lists - “Taking a Chance” at the MATRIC DANCE.
WHAT WE’LL MISS
• Bubbly Cathy Searle giving hugs to everyone.
• The enjoyable hockey tours.
• Mr Collier (“Have you started learning History yet?).
• Drummie competitions.
• Miss Coetzer’s motherly love for her Standard 10’s.
• Just being able to see our friends every day.
• The jokes.
• Usually getting home at 2:45.
• The drama functions.
• Unbelievably, the teachers.
• The annoying Standard 8’s.
• Mr Clarke’s Biology worksheets.
• Swimming during P.E.
• FRIENDS.
WHAT WE WILL NOT MISS
• The early mornings (for a while anyway)
• Homework.
• Short hair.
• Rules and uniform.
• Work squad.
• The commands being shouted at the drummies loudly enough for everyone to hear.
• Lining up and walking in straight lines.
• The pressure of matric.
Five 1988 Matric pupils obtained A aggregates in the final examination, and a further 116
obtained matriculation exemption.
Charleen Cannone, Nicolette Klose, Louise Hullock, Michelle Hauck
67
1989
The 150th anniversary of the Cape Education Department was celebrated. As part of this the
Drama, Art, Cultural and Photographic Societies combined to present a Festival of the Arts
from 17 to 21 April. The Fairmont revue “The Good, The Bad and The Ridiculous” high-
lighted periods during the school life of the pupils. It was highly acclaimed. In addition to the
other activities of the festival, a Standard 6 mural and plaque, donated by the 1989 prefect
body, was unveiled. The mural portrayed that which the 1988 standard 6’s found most enjoy-
able about the first year of high school.
UNVEILING OF STD 6 ART MURAL
• Music played while people arrive.
• Items by Lelania Cromwell and Anya Haarhoff (Std 6 1988 pupils).
• Unveiling of mural by Mr Wigg
• Handing out of sweets and more music.
Arbor Day
Mr K Meiring (Administrator of the Cape) and Mr Fox (Chief Superintendent of Education)
were honoured guests at a special Arbor Day assembly on 11 August, and afterwards partici-
pated in a tree-planting ceremony. Tree-planting on Arbor Day was to become an annual event.
Big Walk
11 August “will long be remembered as a day of great determination, perseverance and sur-
vival of the fittest. The occasion was, of course, the infamous 10km ‘Big Walk’.”
Cape Co-Educational Schools Sports Week
Mr B van Wijk, deputy principal, reported on the Cape Co-Educational Schools’Winter Sports
Week: “The first week of the June/July holidays saw Fairmont hosting the Cape Co-Educa-
tional Schools’ Winter Sports Week. This week was introduced by Cambridge High School
from East London in 1987 and is held every second year. The following schools participated:
Cambridge High and Hudson Park High from East London, Westering High and Lawson Brown
High from Port Elizabeth, Fish Hoek Senior High, Bergvliet High and Fairmont High from
Cape Town. The schools participated in the following sports: rugby, netball and girls’hockey.”
Despite the severe Cape winter, the week was an outstanding success.
The melodrama “BeforeYour Very Eyes” was produced by Miss Bartels. The cast was “drawn
from a wide spectrum of Fairmont personalities and included a number of teachers - reference
was made to ‘Marnewick’s Belly Dance, Touzel’s Tutus and Marshall’s Injun’s”.
First Matric Reunion
The 10th Anniversary Reunion of the first matric class was the first such reunion and the
forerunner of many similar functions. Carina (Norman) and Karen (Blake) initiated the reun-
ion and Ilse (Landman) “had telephone lines red-hot over our country to ensure a good attend-
ance. A number of previous staff members also attended a highly successful function.”
1989 also, sadly, saw the departure of two of the outstanding members of the founder staff -
Mrs Yvonne van Wyk (secretary) and Mr Abe Viviers (accounting).
68
The choir’s “Carols by Candlelight” in December was another success.
The cheerleaders for the Inter-Schools athletics meetings, chosen at the Inter-House meeting,
were Angie Niedermeyer, Jayne Cohen, Brent Willet and Gavin Jacobs.
Much of the work of the PTA concerned fund-raising, especially all aspects of the Big Walk,
the Fête, the tuckshop, the clothing bank and the boerewors braai. A total of R29483 was raised.
Other noteworthy events and achievements during the year were the traditional Boeresport
Day, a girls’ rugby match during the fête, the Sports Awards Dinner, the drum majorettes’
outstanding success in being placed fourth at the national championship, the fashion show of
matric dresses and, as always, the dance itself and the Standard Six Camp.
Sport
Carmen Truter captained the WP Schools’ Basketball team and Quentin du Toit captained the
WP Boys’ Hockey team.
The softball team was again exceptionally successful. Genevieve Steyn and Charmaine van
der Walt were selected for the WP U19 team. Past pupils Tracy Turner and Carol Brown were
selected to represent South Africa at senior level. Laureen Fraser and Genevieve Steyn were
chosen as All-Stars (Junior SA team) and Genevieve subsequently represented Western Prov-
ince at U21 level.
Ben Naude was selected for the WP U19 Squash team. Simon Morton and Trevor Rolfe
represented the Boland Schools’ team. Steve Crooke was graded seventh in the country in the
U21 table tennis group, and Theresa Pitcher was the reserve for the team.
Mr Dean Ashworth, Springbok basketball player, used the letters in the word FAIRMONT to
convey a sense of sportsmanship and commitment when he addressed the Summer Sports
Award Dinner:
F - Fairness
A - Positive Attitude
I - Initiative
R - Reasoning
M - Mental preparation
O - Objectives
N - Nerve
T - Temperament
Simon Reeves was placed second in the SA Guild of Speech and Drama Teachers’ Public
Speaking competition.
Conscription was reduced from two years to one year, and South African troops left Namibia.
Fairmont Poetry
Lana Wasson was one of the young poets who attended the 1989 University of Cape Town
Poetry Workshop. She was awarded Eisteddfod Honours for two of her poems.The following
is an example of the many excellent poems by Fairmont pupils appearing in The Grapevine,
the yearbooks and in publications in South Africa and overseas.
69
THE SEA by Lana Wasson
Obscene skull-shells of a prophecy
Rest on your beaches
Patient, eternal waiting for the reader:
Fingers reach to possess their secrets.
Waves have sent whispers rippling
Through time -
Anger and power, and chains
Murmur in the shells -
Promises hung in the limitless skies
of your wayward child allowed
to burst from your blue embrace
knowing nothing -little of why?
But wondrously alive
(the ant-people only a shrug
on her huge back)
and smiling -
And still you slumber in wait
For he who will be born from Africa’s womb
To see the future in the bones.
Tenth Anniversary Reunion of 1979 Class - 1989
70
Standard Ten Boeresport - 1989
Arrival of the Administrator of the Cape: Mr K Meiring, E Kleyn, R Ross - 1989
71
1990
The 1989 matric results were excellent. Thirteen pupils obtainedAaggregates, and the subject
averages were very good when compared with those of the province.
The theme for the year was “Respect and Responsibility”. Founders’ Day was changed from
the first Saturday in September annually, to the Friday closest to 1 March. Mr Fillmore re-
ported in the school magazine:
FOUNDERS’ DAY
The start of the new year heralded many changes and innovations at Fairmont, not the least
among these being the celebration of Founders’Day on 1 March and not on the first Saturday
in September.
The academic school-day ended at midday and was followed by an assembly. Guest speakers
included the deputy mayor of Durbanville, Mr E. Fivaz, and Fairmont’s first head prefects,
Torsten Moehl and Lesley Thompson.
During the afternoon the school first teams played matches against the past pupils in the
summer sport disciplines. The past pupils beat the school’s first cricket side convincingly,
while at basketball the school’s boys’and girls’teams won their matches with ease.
The day was combined with an open day at the school. All offices, classrooms and laborato-
ries were opened for parents to visit. Various subject groups and societies exhibited relevant
material to inform visitors about their activities.
The drum majorette leader group provided a display of mace-twirling precision to start the
evening’s activities. This was followed by the first-ever cadet flag parade at which the Stand-
ard 9 and 10 cadets, accompanied by the JJ du Preez cadet band, paraded the national, school
and house flags before the many visitors at the school.
Parents were then invited to observe and participate in society meetings so that they might
gain first-hand knowledge of the activities of the societies and how they were being run. At the
same time, a reunion of the 1980 matric class was held in the Recreation Centre.
These events were followed by a variety programme in the school hall in which various socie-
ties and subject groups presented slide shows, skits and poems reflecting their individual inter-
ests.
In overview, the day’s activities united the school to present to the community Fairmont as it
really is - a many-faceted and multi-talented institution. This day was the start of yet another
fine tradition at Fairmont.
An interesting article, “Population boom in ‘rustic town”, appeared in the Northern Argus of
30 May. Not only did this indicate future problems regarding school accommodation, but the
words of the Mayor, Mr Frikkie van Zyl, were prophetic, “Durbanville is one of SouthAfrica’s
fastest growing towns...” said the Mayor. “The council is continually requested to start new
residential areas. Agrowth in the northern borders of Durbanville will shift the business centre
from Bellville towards Durbanville, which I think will eventually become a major shopping
area.”
72
Prefects
The prefects enjoyed a very active year. Among their many projects were repainting of the old
tuckshop, the Std 6 Toilet Scheme (beautifying the toilets), the Supporters Club, matric boys’
netball, a matric café on the matric lawn, three dances, including a Sixties and a Halloween
Dance, the presentation of an Inter-House singing trophy, refurbishment of the Prefects’room,
the staff-matric braai, the teachers’ birthday tea each term, inter-class volleyball, teachers’
hockey and soccer matches, the senior citizens’ tea party and the Valentine’s Day postal serv-
ice. “The Arts and Societies Week was a creative medley of bizarre ideas and activities con-
jured up by the prefects’society portfolio and three other matrics. A matric picnic was held as
well as a pavement art competition.”
The Big Walk, originally planned for Arbor Day, was held on 17 August. It was again a well-
organised, safely patrolled and successful function. The Arbor Day tree-planting was de-
scribed by pupil C Dorrington, who ended with the words, “The entire school body is dedicated
to preserving the rhythm of nature and this annual ritual is symbolic of our new awareness”.
Sarah Oates
One pupil who really stood out during the year was Sarah Oates. Her brilliant violin perform-
ance at the assembly during the Settlers Contact Week led to her being asked to perform at
Settlers as well. Sarah became the youngest member of the SA National Youth Orchestra and
was the best overall string player at both the Tygerberg and Stellenbosch Eisteddfods. She
won the Huguenot Festival competition and the gold medal for overall winner at the National
High Schools’ competition.
“In 1990 Cadets at Fairmont came of age. In addition to the first Parade, the band was
formed, boys attended the first bivouac and cadets participated in the Inter-Schools Drill Com-
petition.”
In September the School Committee “agreed unanimously to erect a memorial in the quadran-
gle to pupils of Fairmont who died while still scholars. It would include the names of those
past pupils who gave their lives while doing military service.”
“Grease”, produced by Miss E Kitshoff, ran to packed houses in October.
The drum majorettes again performed with distinction. This was the first year the school
entered the Indoor League as well. At the National Championships the team was placed fifth,
while in the indoor competitions, Mandy Slabber (Individual Rifle) and Tanya van den Brandt
(Individual Flag) were placed first.
Not to be outdone by sport awards functions, the societies had their first ever awards function,
at which Society and Merit Awards were presented.
Three long-serving staff members, Alida Pool, Steve Wright and Rosemary van der Riet, were
among those who left the school.
The school was shaken by three tragic deaths. Charlotte Engel, an exceptionally talented Std
7 pupil, died tragically while on her way to school. Louise Bulman died on 27 October. Roland
Cassels, a 1989 matric pupil, died in the same accident. Everyone was also saddened by the
death of Leigh Duncan after a long illness.
73
Founders’ Day Cadet Parade - 1990
Founders’Day Flag Procession - 1990 Arbour Day - 1990
74
Past Pupils’Association
The Past Pupils held a Careers Braai for the matrics in August. Attendance was most encour-
aging. It was hoped that this event would become a tradition. The Past Pupils’ Award was
presented for the first time at Speech Night.
Adult Education
The introduction of an adult education programme was approved by the Department for com-
mencement in January 1991. A letter from the Education Department, dated 16 May 1990,
stipulated the procedures to be followed and the conditions to be met.
A successful Golf Day was held in March as part of the fund-raising for the year. Mrs Jenny
Holland convened the project, which was a team effort among parents, teachers and the
Durbanville Golf Club. R5850 was raised.
The meaning and the usage of the school diary was outlined by Mrs Müller at a PTA general
meeting. In September Mr Wigg informed the PTA that the prize- giving would include prizes
for diligence, perseverance and service. Honours blazers would be introduced. Successful
matric students that year were to be listed alphabetically in the press and not under school
headings.
School Models
On 23 May 1990 Mr PJ Clase, Minister of Education (Administration: House of Assembly)
released a press statement about the draft models for the provision of schooling. These models
were being considered in addition to the existing models, namely separate schools for whites
and existing private schools. (Cape Education Department Circular 44/1990)
Acircular explaining the proposed different models of schooling for the future was distributed.
245 parents indicated in their response to questions in a School Committee survey that they
were not prepared to pay considerably higher school fees for the freedom to decide on admis-
sion policy. However, 305 said that school fees should be made compulsory by legislation
before a change was made to admission policy.
First team top
A new first team top, white with a broad brown band, applicable to all sports, was introduced.
This was to ensure that first team players were easily recognisable wherever Fairmont par-
ticipated.
Other Pupil achievements included:
• Justine Fowler and Karin de Beer-Smit were selected for the WP basketball team.
• Charlaine Coetzee was the first girl to captain a school golf team in the province.
• Teresa Pitcher won Junior Springbok colours for table tennis.
• Paul Saman was selected for the WP Schools A tennis team.
• The boys’ first tennis team performed exceptionally well at the schools tournament in
Queenstown.
• Charmaine van der Walt was selected for the SAAll-Stars softball team. Genevieve
Steyn represented the WP U19 and senior sides.
75
Buildings and Grounds
Alterations to the secretaries’ office were completed by the Works Department. A new store-
room was constructed under the ramp. A small wooden hut was provided at the netball courts
for serving refreshments. The Traffic Department provided a plan for a change to the existing
traffic layout of the school. This would include an entrance to a parking area on the “Medway
triangle”.
The Cadet Band - 1990
The Ladies’Tea - 1990
76
1991
Alternative models for schooling under the Department of Education and Culture (House of
Assembly) were announced in September 1990. The focus of attention was on the admission
policies of schools. Options were
• Model A - private school - own admission policy.
• Model B - state school - own admission policy.
• Model C - state-aided school - own admission policy.
“When schools commenced in January, 205 schools all over the country implemented Model
B. The majority of schools are admitting only a limited number of pupils from other groups.”
(Department of Education Newsletter March 1991).
Legislation to make Model C possible had yet to be passed in parliament.
At Fairmont the significant dates were:
• 10 December 1990. The Department was requested to give approval for a poll.
• 26 February 1991. Polling Day - the culmination of a period of voting starting
on the 18 February.
In a poll of 89.3%, 85.4% of parents voted in favour of a change to Model B status.
21 March 1991. Approval was granted by the Minister of Education.
Management Council
All school committees in the Cape were dissolved on 28 February 1991. The decision implied
that management councils had to be elected.
“In consequence of the implementation of the Education Affairs Act 1988, the election of man-
agement councils (previously known as school committees) must in future be held in terms of
the regulations...”. (Cape Education Department Circular C8/1991)
The first meeting of the Fairmont Management Council was held on 5 March 1991.
The principal became a member of the council, the majority of the members of which had to be
parents of the school.
School rules were approved by the Education Department in terms of the Education Act and
gained legal standing.
School Spirit
The wonderful spirit prevailing during the year with its American theme is illustrated in these
extracts from the school magazine:
77
Prefects’Camp - the 1991 prefects at Steenbras Dam
“The Beeple” - 1991
78
Every school has spirit, but it may not always be as strong as it should be. This year has
been one of remarkable spirit-building at Fairmont, as this magazine clearly shows.
Traditions are a very special part of a school spirit. I am sure that Spirit Week, Home-
coming Week and Polar Bear Day, to mention but a few, will in time become part of the
tradition of the school.
I congratulate everyone on a very successful year. May the spirit of 1991 be sustained,
and the achievements lead to even greater efforts in 1992.
Clive Wigg
Dear Seniors
Your Senior year will not be forgotten! Initiated by a spirited prefect body, the American
theme took off and kept its momentum throughout the year.
Mingled with proven Monties traditions you often had us guessing as to what would
came up next...this Yearbook probably being the last piece of America Graffiti.
The Senior-Staff braai (barbecue), Valentine’s week, Inter-Schools’Special boaters, Red
Nose Day, Polar Bear Club, Homecoming Week, the Senior Prom...and the Senior (not
you this time) Citizens Tea, all added to the thrill and character of a “colorful” year.
Mastermind McKinley (Summer Cum Laude) had no match, but nor did Milne! For-
eigners Hill and Asnal added “flavor” to an exciting year, as did all who made a mean-
ingful contribution by giving of themselves.
May the memories of this year live on as we remember you and bid you well.
Hans van Stormbroek
Few present in 1991 will forget, for example, the whole school participating in “Simon Says”
in the quad, led by Simon Morton and Kaeli Albertyn from the roof, the assembly “in the
round” in the hall with the prefects in the centre, and the principal as the Easter Rabbit and
Father Christmas at spirit assemblies.
New Traditions
New traditions were established in keeping with the theme - inspired by the yearbook of Fairmont
Senior High in Fairmont , West Virginia and by exchange student Elize Kleyn’s experience in
Arizona.
• The Monty Bear based on the American school’s mascot, a polar bear.
• The Monty Bear banner held over teams as they ran onto the fields.
• The “yearbook” instead of the magazine.
• Pep rallies.
• Spirit Week.
• The Valentine’s Week, including the whole school forming a heart on the field.
• Homecoming Week, in conjunction with the Settlers Contact.
• The Polar Bear Club.
• The Homecoming kings and queens.
• The “Prom” instead of the Matric Farewell Dance.
• The “Valedictorian” for the school dux.
• The special matric awards - Most likely to succeed, Monty Bear, Friendliest, Spark
Plug and Bright Spark.
79
Cherie Werner - best actress, the school debutante
The Big Knit - staff members in action - 1991
80
The teachers became “mentors”, the matrics became seniors, the 9’s juniors, the 8’s senior
sophomores, the 7’s sophomores and the 6’s freshmen.
Achievements
Outstanding pupil achievements were those of:
• Karen de Beer-Smith (SA Schools Basketball).
• Sarah Oates (co-leader World Youth Symphony Orchestra, USA).
• Mandy Slabber and Tanya van den Brandt (SA Show Majorettes).
• Robyn Dreijer (co-leader of National Youth Concert Orchestra).
• Cherie Werner (highest sum for charity, R6550, in the Tygerberg Debutantes
Competition).
• The first senior homecoming king was Ben Naude and the first queen
was Robyn Bruce.
• Kaeli Albertyn and Rory McKinley were chosen by the seniors as “Most
likely to succeed”.
• Monty Bear awards were presented to Richard Friend and
Mandy Slabber.
• The “Friendliest” were Dion Pye, Lynn McGrath and Bradley Northcote.
• Sonja Stumpf and Simon Morton won “Spark Plug” awards, and Rory McKinley and
Lynn McGrath were the “Bright Sparks”.
Civvies Days included Hat Day and Nerd Day. “The Beeple”, produced by Miss Bartels,
enjoyed colourful and successful performances.
PTA
A Golf Day, organised by Mrs Jenny Holland, held on 17 March, was very successful, both
socially and financially. The profit was R7839.
Another successful fund-raising venture was The Big Knit, held on 31 July. R11624 was
raised. The one-hour sponsored knit was followed by a Barn Dance and Disco. Further changes
to the PTA constitution were circulated for ratification at the next AGM.
Mrs Skeet and her helpers ran a very successful Adult Education Programme and donated
R5500 to the school. Colleen Williams donated R3000 after her Ballet School performances.
New Awards
New Speech NightAwards were the FairmontAward, a service award, presented to adults who
had served the school community for three or more years, Honours with distinction and Hon-
ours summa cum laude. The first recipients of Fairmont Awards were Sheila Johnstone and
Margaret Oosthuizen. Rory McKinley won the Honours summa cum laude award. The pre-
fects’ executive were also presented with special awards.
The principal was selected to be a member of the group which was taken on a three-day orien-
tation tour of defence force bases in the Western Cape in July.
Remembrance Day
The inaugural Remembrance Day Assembly took place on 8 November. In future Remem-
brance Day would always be on the Friday closest to 11 November. The assembly would be an
occasion for the whole Fairmont community to remember loved ones who had passed away,
especially those who died while on military service, pupils and staff members who died while
still at the school, and those who experienced family bereavements during the year. The digni-
81
fied ceremony in the quadrangle included participation by the cadets and pupil leaders, and
wreath-laying.
Buildings and Grounds
The parking area adjacent to Medway was completed and changes were made to provide for a
better flow of traffic. The Chief Architect of the Works Department was consulted about the
possibility of adding another floor to the Recreation Centre. The inspecting engineer reported
that this was possible and that they would draw the plans if required.
A letter from the Executive Director: Education, dated 19 September 1991 and entitled Fairmont
High School: Extensions, included this paragraph, “Your request to provide lecture rooms and
group study rooms instead of conventional classrooms can be considered on condition that the
total area allowed...is not exceeded.”
The memorial stone, with sundial, was
unveiled by Mrs Lyn Wigg, the plaque
bearing the words from the poem by
Lawrence Binyon:
“They shall not grow old, as we who
are left behind grow old;
Age shall not weary, nor the years
condemn.
At the going down of the sun, and in
the morning
We will remember them.”
First Rugby Team 1991
82
1992-1996
EXTENSIONS AND VOLUNTARY SEVERANCE
1992
A discussion document on A Curriculum Model for Education in South Africa was made
available in January for the information of staff members and the management council.
The South African Teachers’Association’s newsletter No 1 of January 1992 included:
“The major interest in the alternative models (of schooling) was the extent to which they could
or could not achieve even an initial opening of the white state school system...
It is becoming clear from the broader acceptance of Model B schools, pronouncements by the
State President and various recommendations contained in the interim report on group and
human rights that race will not be a basis for the development of a future system of education.
Seen against this background, the models as determinants of admission policies can be noth-
ing more than an interim measure...
The models as models of school management will have to be re-assessed by many committees
and by the teaching profession during 1992.”
Model C
However, the Minister, Mr Piet Marais, announced an abrupt switch to Model C in February,
and the transformation began on 1 May. The next phase was on 1 August, when new staffing
scales were introduced and teacher numbers cut. In an address to the Cape Province Parents’
Association, he acknowledged that the switch to Model C or state-aided schools had been done
with “extreme haste”.
Various newspaper articles described the implications of the decision, and other matters affect-
ing education, for example, “Schools tax shocker”, “ Fees to rocket for Model C parents” ,
“Teacher terror” (Sunday Times 27 April 1992), “Model C- skole skarrel om geld in te samel “
(Die Burger 29 April 1992). The “Teacher Terror” headline referred to intimidation by pupils
and militant unionists.
Model C provided for greater autonomy for schools but required parents to pay for the cost of
the premises and facilities. The government was responsible for the salaries of only a certain
number of staff.
The school changed from a state school to a state-aided school. This brought about consider-
able confusion, misunderstanding and anxiety. The immediate reaction was to the increase
in school fees.
The reduction in the number of posts, retrenchments, information about voluntary early retire-
ment, and the reduction in the number of promotion posts caused additional stress on teachers.
In order to maintain standards, additional teachers were and would be appointed to positions
financed by the school.
School spirit, which reached a peak in 1991, was again evident when the athletes “took them
by surprise” at the first ever quadrangular meeting, held at Green Point, against Table View,
Milnerton and Settlers. “Dedication of our pupils and enthusiasm of our coaches paid off and
at the end of the day the trophy was ours.”
A long tradition ended when the final inter-schools meeting with Fairbairn took place.
The staff editorial in the yearbook described “the best of times and the worst of times”.
83
Shooting Range preparation - 1992
Victory at Inter-Schools Athletics - 1992
84
STAFF EDITORIAL
It was the best of times and the worst of times. 1992 saw many changes to the Fairmont
family with ‘old’ favourites leaving the fold and many new additions arriving.
Mr Duckitt ‘came of age’ and with his family emigrated to the greener pastures of Eng-
land. We will miss his determination, his involvement and his friendly attitude in the
classroom.
At the same time Mrs Heyns decided that being a home executive was more attractive
and she left to have baby Matthew. We miss her friendly smile and concern for everyone.
The Physical Education Department, true to form, kept on the move. Mr Touzel left to
enjoy employment in the private sector and Mr Saayman decided to leave the field of
education to explore the other side of the fence.
Mr Roux also decided that the time was right to leave. So he downed tools, removed his
ear mufflers and retired. His quiet approach and often incisive comments will be con-
spicuous by their absence.
Mrs du Toit packed her books to move up in the world to the Education Department
Library. We wish her every success in her new position.
Teachers returning with renewed vigour and enthusiasm after brief periods of leave were:
Mrs Maclachlan, Miss Elion, Mr Patterson, Mrs Weerts, Mr Dempers and Mr van Wijk.
A tired Mrs Bassett left to give birth to her first child, a bouncing baby boy, Jarrard.
With all these changes may we not forget the ‘old faithfuls’ who, day after day, continue
to give of their best to improve standards at Fairmont High.
The school was fortunate to acquire a car for driver education. Mr Frost led a group of staff
instructors. The head prefects wore green blazers and ties - this, however, was not to become
a tradition.
Included in the results of a survey of matric favourites were:
• Actress - Julia Roberts
• Actor - Tom Cruise
• Music group - U2, Guns ‘n Roses
• Song - Please don’t go
• Radio station - Radio 5
• Sweet - Bar One
• Film - Pretty Woman
• Singer - Bryan Adams
• Teachers - Mr Duckitt, Mr Collier, Mr Vegter.
At the Matric Farewell matrics went off to Greece. Most of the spirit activities of the year built
on those of 1991.
The Bard’s Birthday Bash
An innovation of the English Department was “The Bard’s Birthday Bash” on Shakespeare’s
birthday. Pupils dressed up as their favourite characters.
On 14 and 15 October the school hall was “transformed into a magical setting” for Fairmont’s
first ever Candlelight Dinner and Cabaret. The show, with a cast of forty-four, was produced
by Mrs Colleen Newham. The programme consisted of songs and dances from famous shows.
85
The original bear - Charlaine Coetzee at Fairmont Senior High, West Virginia - 1992
Founders’Day 1992 - Victor Hawken and Alison Nardone, the 1982 head prefects, with guest speaker
Karen Davies
86
Past Pupils’Association
The 1992 Past Pupils’Association committee hosted the 1982 matric class to a very enjoyable
cheese and wine function. An extremely successful fund-raising fashion show was held on 20
August. Two guest models were British professional squash players Mark Allen and Matthew
Rudd. The evening boosted the Foundation Fund by R1600.
Pupil Matters
Matters of importance to the pupils are shown in the agenda for the prefects’ meeting on 18
August. Items discussed were:
• Team photographs - found and to be framed and displayed by the
Traditions portfolio.
• Letter to Fairmont, West Virginia.
• Senior Citizens’ Tea Party.
• Societies Week.
• Spirit.
• Boys’ netball and girls’ soccer.
• Matric Tops Day (40 days).
• Quotes for present - cabinet and sign.
• Dance
• Discipline in quadrangles.
Achievements
The girls’ basketball first team, unbeaten, won the league. Karen de Beer, who had been
selected for the SASchools team in 1991, Claire Lotter and Estelle Visagie were chosen for the
WP Schools team.
The drum majorettes again performed with distinction, and were placed fifth at the SA Cham-
pionships. The girls’ hockey team “played an incredibly high standard of hockey”. The team
was placed second in the premier league. Twelve softball players were selected for WP teams
during the 1991 - 1992 season. Tanya Price was chosen for the SA Schools team. The high-
light of the squash season was the selection of Shelley Hopkins to the U19 WP Girls Team.
Other provincial representatives were Michelle Dosson (WPswimming) and Leonhard Freidberg
(captain), Elton Neething and Nicky Klip (Boland swimming). Jenny Kirkwood became the
SA Junior Judo champion.
The SCA experienced a particularly successful year. The dramatic recreation of CS Lewis’s
The Screwtape Letters was highlighted. The cast of twenty-four performed during a Bible
Education period and also at Edgemead and Settlers High Schools. The Drama Society mem-
bers won Eisteddfod Highest Honours certificates.
Buildings and Grounds
Although a shooting range was provided by the Defence Force, the school had not yet been
provided with an armoury, strongroom and rifles. The citizenship programme, which had
replaced Youth Preparedness, led to the junior boys becoming involved in cadets, with the
seniors as leaders, and the establishment of a girls’ platoon.
The Medway triangle (Erf 300/8) was transferred to the State and would be transferred to the
school on condition that it could not be used for any purpose other than parking.
In an attempt to find a water source on the school grounds, a geological report was prepared. A
87
water diviner was asked to identify and possibly confirm the geologist’s report. Three boreholes
were eventually drilled but without success. The original farm borehole had been next to the
entrance to the school.
In September the Cape Education Department described its Computers in Schools and Col-
leges Project in a circular to schools. Improvements and alterations to the Media Centre (Li-
brary) were proposed and eventually carried out. These included the creation of a teachers’
workroom/computer room in Room 3.
The total number of teaching posts would be reduced from fifty-one to forty-eight in 1993 as a
result of the changed staffing quotas.
The Flag of Learning - the symbolism explained
Past Pupils’ Reunion 1992
The committee consisted of Monique Bosman, Samantha Quinn, Christopher Lockett (Treasurer), Jacky
Bartels (Teacher Rep.), and Gail Ross (Chairlady and Secretary)
88
1993
Buildings
At the beginning of the year, a start was made on the long awaited and much needed extensions
to the main building. Ten years of applications, meetings and interviews had finally borne
fruit. Occupation would be in 1994, when it would be possible to sell a number of the prefab-
ricated (mobile) classrooms. The extension above the art and woodwork rooms, and enclosing
the junior quadrangle, comprised a number of classrooms, a tuckshop, a computer room, vari-
ous special classrooms, cloakrooms and storerooms. Provision was made for a double room to
be used as a lecture theatre for large groups and team teaching. The original intention was to
have the library relocated to this position and to have the lecture theatre and offices adjacent to
it. Unfortunately, this was not accepted by the Department.
The double garages near the hockey field had to be relocated and a new store for sports equip-
ment and kit was constructed. The counselling department was relocated after new offices
were provided by sub-dividing classroom 57. Two new parking areas were provided. A new
burglar alarm system was installed. A link between the main building and the Recreation
Centre was considered so as to make greater use of this facility. It was resolved at the Govern-
ing Body meeting in November that plans be prepared.
Finances
The financial implications of becoming a state-aided school were being felt to a greater extent.
“Model C caused considerable distress and confusion.” An article in the Financial Mail,
dated 15 January 1993, elaborated on this. It described how Model C was always going to be
a transitional arrangement, that the ANC rejected it as a perpetuation of white privilege and
that much of the confusion and unhappiness had its source in the NP’s anxious policy reactions
after the decision to abolish apartheid. “The system of ‘models’ available for white schools
was instituted partly as a result of political pressure and partly to save money.” The article
went on to state, “There is a fundamental tension in the proposition that education can be both
compulsory and not free.”
Academics
Fortunately, there was very little staff movement. Academic excellence was identified as a
priority and to that end a mentor system to improve communication between the school and
parents, and an integrated day with a changed timetable and providing more time for subject
and other groups to meet professionally, were investigated.
The principal announced that a semester system would be introduced in 1994 with two major
examinations and a regular test system for Standards 6 to 9.
The school was selected as one of the thirty schools in the region to introduce the new Educa-
tion for Living programme, comprising citizenship, personal and career education, physical
education, arts education and Bible education. Attention would also be given to topics such as
human rights and education for democracy.
The results of an internal survey of fifty standard nines and fifty parents proved very interest-
ing. One third of the pupils considered unemployment the greatest threat to the country, while
another third were afraid of a possible civil war. 40% considered the greatest threat to pupils
to be deterioration of values and morals.
89
The Junior Quadrangle before main building extensions
Driver Education Societies Promotion Day
90
The parents rated the most important tasks of the school to be the acquisition of basic skills -
reading, writing, speaking, computing, and career planning and training in beginning occupa-
tional skills.
One highlight of the year was the first international pupil exchange undertaken by the school.
The following extract is from the report in the 1993 school magazine.
PUPIL EXCHANGE TO FAIRMONT SENIOR HIGH
SCHOOL U.S.A.
On 24 April 1993 three of our pupils - Catherine Broek (deputy head girl), Bradley
Croucher (prefect) and Allison Wiehahn - embarked on the trip of a lifetime, a three-
week international student exchange programme to Fairmont Senior High School in
West Virginia U.S.A.
They report. “After stopping over in London and Washington for two and three nights
respectively, we headed off to Fairmont Senior in the American city of Fairmont - a
school we’ve been twinning with for two years. We’ve been letter-writing and exchang-
ing yearbooks, items of clothing and newspaper articles with them during that time.
In 1992, a past pupil from our school, Charlaine Coetzee - currently studying on a golf
scholarship in Virginia - visited the American school, where she met Amy Leinhardt, the
Student Body President and Mrs Janet Satterfield, the Student Council Sponsor. They
spoke about a possible student exchange, and this year the idea became reality. Through
fundraising activities, such as the Big Walk, we managed to raise money to go towards
the project. We were allowed to raise a maximum of half the travel costs and our parents
made up the shortfall.
In Fairmont we stayed with separate families and were made to feel at home from the
first day in the city. At the school we were shown around by different pupils and were
able to experience various classroom situations.
The school was completely different to ours and we noticed that the pupils there had a lot
more freedom! The classes were very easy and, although a relaxed atmosphere pre-
vailed, the students honoured the name of their school. The students were very friendly,
outspoken and very interested to hear about South Africa. In fact, they were shocked to
see that we were actually just like them. They had actually imagined that South Africa
was very primitive and “backward”.
The Founders’ Day assembly was addressed by the 1983 Head Girl, Mrs J Thompson (Lam-
bert) and many members of the 1983 matric class were present. Included in the activities of
the day were displays of societies and practical subjects, and outdoor displays by the drum
majorettes and the cadets, synchronised swimming and a dog display by the navy. That evening
the class of 1983 had their 10-year reunion in the Recreation Centre. The writer of the maga-
zine report added, “This is an occasion which has become a tradition at Fairmont, and serves to
strengthen the ties between the school and all those who have passed through its doors”.
Catherine Broek submitted a proposal for changes to the Valedictory Assembly based on her
observations in West Virginia. Her proposal that “graduation certificates” be presented to all
matrics during the assembly was accepted. This was to become a feature of all future Valedic-
tory assemblies.
91
Staff
Assie van Aswegen, who had been at the school for thirteen years, left due to ill health. A
tribute in the magazine included these words, “with his interest in and knowledge of the mod-
ern media, he was often a sought-after friend. Assie’s positive attitude and sparkling enthusi-
astic personality made him a favourite colleague. Very seldom did he betray the hardships he
had to bear due to ill health”.
There were concerns during the second term about the possible invasion and occupation of
white schools, and contingency plans were prepared. The end of conscription was finally
announced.
Some of the pupils’ concerns are shown in the agenda for a typical prefects’ meeting (22 June):
outfit for Polar Bear Club, shelter for first-aiders, debutante competition, Homecoming Dance
(Cinderella Ball), election of king and queen (matric) and princesses (Standard’s 6 to 9), “Big
Brag”, monitors, team photographs to be hung in passage, detention, banner for co-ed meet-
ings, teachers’ tea, Saturday refreshments, Settlers Contact, La Rochelle visit and matric girls’
nails for the dance.
Alterations to facilitate the better running of the library were completed. A new system of
filing examination papers was introduced, and CNN was screened during second breaks in an
attempt to improve pupils’ knowledge of current affairs.
The extended learning programme, with Ms B Elion as co-ordinator, was very successful. The
Adult Education programme continued to operate successfully. Many Olympiads and compe-
titions were entered. Dr Grazioli addressed the parents and standard tens on various aspects of
sex awareness, and cabaret evenings took place inAugust. Ronita Wilbert won the gold medal
in the prose section of the Cape Town Eisteddfod for her contribution, entitled “Eclipse”.
Achievements
Claire Lotter was selected as a member of the SA Schools basketball team, the drum majorettes
were placed first in the Western Province and eighth in South Africa, and Catherine Gould and
Bronwen van Heerden were softball Junior Springboks. Others who achieved success in na-
tional competitions were Rory Yorke in the Computer Olympiad and Vanessa Mayley, Simon
Frouws and Kirsty Gilham in the Santam Art Competition.
The Settlers Contact: Mr C Wigg and Mr T Webster - 1993
92
1994
The country’s first democratic election took place, and Nelson Mandela was sworn in as
president.
The effects on Fairmont can perhaps best be illustrated by these excerpts from the magazine
messages of the principal and the chairman of the governing body:
Change is the way of life in schools. A changing society requires changing schools. The
public is likely to view those schools responsive to change as the most desirable ones. If
change is going to be our way of life, then nurturing the change process is going to be an
implicit part of every principal’s job.
How true this has been of Fairmont this year. Not only have there been the dramatic changes
in our country, but we have experienced change here too - the opening of new extensions,
plans for further improvements, the expectations of a new Education Department, proposed
changes to syllabuses, to staffing - the list is long and seemingly endless.
In the face of all this change, we must focus on our strengths and develop strategies for im-
provement. We must look at technological advances and see how they may assist us in working
with pupils. We must improve communication, monitor progress, and consider ways to raise
funds and consolidate assets.
Clive Wigg
Whilst the effect of the rapid metamorphosis of our country seemingly has everyone in a frenzy,
it is perhaps a good time to pause for a moment’s reflection.
There is no doubt that a certain amount of apprehension exists within most of us when we think
of the immediate future of this beautiful, but ravaged land and our role in it. We can either
adopt a pessimistic and gloomy “wait and see” attitude, or roll up our sleeves and take up the
challenge to make this country into a peaceful land of opportunity and abundance for all its
citizens.
To achieve this Utopia will require a great deal of teamwork and co-operation and at the
forefront will be the education of our children. Due to the uncertainty of the present education
policy it is extremely difficult for any accurate medium to long term planning. It seems certain,
however, that the face of education is going to experience some major changes, largely due to
past imbalances which will exhaust the Education budget completely and thereby place a
greater financial burden on an already overtaxed community. Larger classes with fewer teach-
ers are fast becoming a reality and in anticipating this, the Governing Body has to a great
degree been pro-active with the limited funds at its disposal.
The parent body is going to have to play a far greater role by participating in the all-round
education of their children.
Let us therefore bring our priorities into focus and give wholehearted support to the Fairmont
Family to help maintain it as a school which prepares young people of calibre ready to meet
the challenges of the future.
Leon Huisamen
Chairman - Governing Body
Buildings and Grounds
There were obvious physical changes at the school. The extensions to the main building were
opened on Founders’ Day, 25 February. Mr Wigg cut the ribbon across the passage near the
new tuckshop in the presence of the special guests - officials from the Education and Works
93
Cheerleaders at Inter-Schools Athletics - 1994
Main Building extension - completedin 1994
94
Departments, representatives of the architects and the builders, and committee members.
A number of prefabricated classrooms - the “prefabs” - were removed and the link between the
main building and the Recreation Centre was constructed.
Other matters handled by the Governing Body included protection for the windows in the new
building, a proposed canopy for the junior quadrangle, a new tie, new tracksuit, seating for the
lecture room, air-conditioning, changes to the old darkroom, vending machines, the textbook
levy, a new kiosk at the field corner of the hall block, a staff benefits scheme and a marketing
survey conducted by Mr Hilton Calder.
It was proposed to halve the existing principal’s office and to extend it into the courtyard to
compensate so as to provide another secretary’s office.
The changes meant that Fairmont pupils could enjoy the best possible facilities.
The constitution of the Governing Body had also to be finalised.
Successes
The 1993 examination results were excellent. Further study, and staff involvement as examin-
ers and sub-examiners, led to a continual improvement in the quality of teaching.
Pupils achieved great success in a number of fields and they and their coaches were congratu-
lated on their fine successes. Nikki Klip became a full Springbok (for aerobics) and Schonette
Coetzee (hockey), Steven Dosson (hockey) and J du Plooy (cycling) were selected for na-
tional school teams. Vanessa Mayley and Stuart Teare achieved great success in international
and other art competitions.
Fairmont provided the greatest number of students (163) at the Cape Technikon in 1994. The
59% success rate of 1991 enrolments obtaining a National Diploma in 1993 was one of the
highest.
A building and grounds administrator (Mr B Gifford) was appointed, and he became responsi-
ble for many tasks previously undertaken by teachers.
Parents were exhorted to support the next major project - the construction of an Indoor Centre
for various sports and other activities, including functions and examinations.
Everywhere in the world pupils were becoming more involved in decision-making. Steps in
this direction were taken at the school and two successful staff-student leader seminars were
held. A peer-tutoring scheme was initiated, and consideration would also be given to the
introduction of peer counselling.
Although the process of appointing prefects varied from year to year, the basic approach
was similar throughout.
In 1994 the procedure was:
1. Completion of nomination forms - proposer and ten signatures.
2. Submission of CV’s with photographs. Pledge to be signed.
3. Interviews.
4. Short-list prepared.
5. Voting
6. Announcement on last day of third term.
95
Valentine’s Day - 1994
Past Pupils’Association - 1994
Back: Left to right, Wayne Rossouw, Tony Marshall, Steven Goodrich, Greg Hudson, Clive Wigg
Front: Michelle Radford-Hayden, Martina Popkiss (Chair), Tracy Booysen
96
The Flag of Learning
The principal, in his Speech Night address, made reference to the Flag of Learning. The flag,
symbolising the link between education and a strong free nation, was first raised throughout
the USA on July 4 1985. It was subsequently flown at schools and other institutions through-
out the world. At Fairmont it was introduced in 1992 and was the symbol of the school’s
pursuit of excellence, communicating the key foundations of quality education symbolised in
the stylised flame on the flag:
• High expectations for students and teachers.
• Excellent teachers in the school
• A community involved with the school.
• Families willing to accept their responsibility for learning.
The flag would later be used in the Valedictory Assembly, when the school flag was passed
from outgoing head boy to new head boy, and the flag of learning from head girl to head girl.
PTA
The PTA had a busy and successful year. “The first and most profitable venture was the raffle
for a prize of two years’school fees. This was followed by the Treasure Hunt, in which over a
hundred prizes donated by local businesses were won. The Barn Dance....provided a wonder-
ful opportunity for relaxation and fun. The premiere of ‘Nunsense’at the Theatre on the Bay
provided scintillating entertainment and was the highlight of the functions for the year”.
The Saturday morning tuckshop was reinstated and the tuckshop, the clothing bank and the
Adult Education programme continued to provide excellent service.
An air conditioner was finally installed in the staff room. Many staff members showed their
versatility in the production of Snow White.
Honours Dinner
Dawn Durrbaum, convenor of the prefects’ academic portfolio, was responsible for the first
Honours Dinner. This was to honour the top twenty students in each of standards eight to ten,
and would become another Fairmont tradition.
Existing traditions successfully observed included civvies days, Arbor Day tree-planting, Val-
entine’s day - again the creation of a huge heart on the field - the Polar Bear Club, the matric-
staff braai, the senior citizens’ tea-party and the boeresport competitions.
A highlight of the year was the unique Matric Farewell Dance. Here is Andrew Wilkinson’s
description included in his review of the Std 9 year:
“The Matric Dance Committee had a mammoth task ahead of them when they were chosen
earlier this year. They organised, painted and laboured away; and the result was an extremely
successful Matric Dance. The theme was ‘A Day at the Races’ and saw the memorial quad
being magically transformed into a marquee. The food was excellent and a Std 9 pupil gave a
commentary on a horse race onto an audio cassette. After the matrics had placed their bets,
97
the race was ‘run’. Two lucky matrics won a gold watch and gold bracelet. The Matric Dance
of this year was, in a nutshell, a ‘runaway success’!”
Miss Basset’s outstanding organisation and Mrs Weerts’s professional catering ensured the
resounding success of the dance.
The United School Sports Association (USSASA) was introduced to WP school sport organi-
sations for the first time in June. In October among the principles listed in the Declaration of
Intent were:
• The participation of all school children in sport on an equal basis.
• School sport should not be politically aligned.
At the meeting on 21 November, the Governing Body resolved to disband the cadet corps,
approved the move of the library to the Recreation Centre and the extension to the principal’s
office. The roller shutters at the old tuckshop were replaced with windows so that the room
could be used as a centre for more advanced students.
Valedictory Day - the last goodbye - 1994
98
1995
The Acting Head of the Western Education Department wrote in a circular dated 1 January,
“The establishing of the new education department of the Western Cape marks the beginning
of a new chapter in education in South Africa”.
Departmental Circular 1 of 1995 included these paragraphs:
“New co-ordinated staff provision scales are still receiving attention. Attempts are being made
to bring the teacher-pupil ratios of the ex-departments closer to each other.
“As a result of budget cuts, new posts may no longer automatically be created according to the
old scales.
“Amendments to certain syllabuses have been approved for implementation in 1995.
“A new system of inspection and subject advisory services is being planned.”
From 1994 to 1997 the new government was faced with the problem of financing the imple-
mentation of its new education policies.
The first important step was the White Paper of February 1995. One of the proposals was the
establishment of a National Qualifications Framework (NQF). Shortly afterwards, the Hunter
Committee was established and recommended that there should be only two types of schools -
independent and public. Each public school was to have a governing body.
Mr Bob Williamson, chairman of the Fairmont governing body (known internally as the Board
of Governors, or BOG), wrote in his magazine message, “It is essential that we, like every
other South African institution, contribute in whatever way we can to the reconstruction and
development of our country and it is the view of your Board of Governors that the community
which Fairmont serves, takes full responsibility for the education of its young men and women,
thereby maintaining its own independence and allowing national resources to be devoted to
priority areas.”
Team-building
The governing body undertook a comprehensive survey during the year to determine the mar-
keting needs of the school and a three-day team-building seminar for the staff leadership team
(all in promotion posts) was held in January at Mont Fleur, near Stellenbosch, and was led by
Mr Hilton Calder. The two events led to the school finalising its aims and objectives. The staff
and the governing body visited the Education Department library and went on a boat trip at the
Waterfront.
The prospectus was re-designed and published in an attractive folder. The English Department
also experienced a team development weekend seminar at Gordon’s Bay in October.
School Mission
The school mission statement - We of Fairmont strive for excellence by seeking opportunities
for all to realise their unique potential through self-discipline in a trusting, enjoyable and
caring atmosphere of mutual respect - was finalised after a series of meetings for staff, parent
and pupil representatives and volunteers. The process was extremely beneficial and rewarding.
Continual reference was made to the statement and its implications at assemblies and meetings.
99
A Scene from Romeo and Juliet - 1995
Staff Orchestra - 1995
100
Media Centre
At the end of 1994 and the beginning of 1995, the Recreation Centre was renovated and re-
vamped upstairs as a spacious attractive Media Centre. The balcony was enclosed, and im-
provements were effected to the storerooms, kitchen and office. A new carpet was laid and
new curtains hung. Mr Gifford and Mr Engelbrecht organised the enormous task of disman-
tling, moving and reassembling the shelves. The books and media equipment were moved
during the December holiday. The enclosed balcony included a teachers’study and provided a
venue for chess players, for quiet breaks and for a new photocopier. Two large work-stations
were provided for computers and other audio-visual equipment. The new Media and Resource
Centre became a very popular place for pupils. In the first quarter of 1995, issue statistics for
books to pupils were twice as high as for the same period the previous year.
Tour to Zimbabwe
Another first for the school was the first sports tour out of the country - that of the girls’ hockey
squad to Zimbabwe. The tour, organised by Ms Sue Cromhout, covered the whole country and
included a series of matches and unforgettable experiences and visits. A highlight was the
victory over Chisipite School in Harare, the current winners of the National Hockey Cham-
pionship.
The school hosted rugby teams from England - Colston’s School from Bristol and King Edward
from Birmingham.
The Past Pupil’s Reunion in March was a great success. All but nine members of the 1985
class were contacted, and approximately 120 people attended the braai.
The Standard reports in the school magazine were of a high quality, amusing and informative.
Here follow a series of extracts illustrating the wide range of activities and interests during the
year:
“In addition, we finally bagged the Spirit trophy and were awarded with a free civvies day
(yay).
“But the main attraction was definitely the staff doing their rendition of the YMCA (during the
Founders’ Day Festival).
“It was here that the birth of the dreaded Froggy Pond Gestapo took place, who wasted no
time in securing their iron claw grip on the boys’ dorms, crushing all elements of revolution
(referring to the Std 9 leaders at the Std 6 camp).
Lee Herman and Stephen van der Merwe (Std 9)
“The highlight of our English year was undoubtedly the ‘Bard’s Birthday Bash’. This is held
every year, in commemoration of Shakespeare’s birthday. While watching... we held a typical
Shakespearian banquet (chips and coke)!
“The highlight of the third term was the ‘Big Knit’held to raise funds for a new Student Centre.
This was held in the hall after the King Edward/Fairmont rugby match. (They beat us!).
“In addition, the teachers staged an excellent production - ‘A Day in the Life of a Fairmont
Pupil’.”
Nicola Davenport (Std 8)
“The return of the contentious Academic Reinforcement period from the mists of time was
greeted with mixed feelings. For those not involved it meant an early afternoon off, but why on
a Wednesday when a Friday would have given us an early start to our glorious weekends?
101
Cheerleaders - 1995
The Fairmont Carnival - 1995
102
“The biggest ‘sports’event of the year turned out to be the Annual Durbanville Excursion. A
conspiracy of teachers managed to organise this even during the worst Cape Winter storms”.
Michelle Adams (Std 7)
The Fireworks Carnival
The first of a series of Fireworks/Carnivals organised under the leadership of Mr Michael
Ettish took place on 27 October and was “a resounding success with positive feedback from all
quarters”. The importance of the Carnival can be seen in this summary of 1995 fund-raising:
Parent Association
• Masked Dance R1 271.00
• Carnival R44 462.27
R45 733.27
Staff and Pupils
• Victory Race R7 055.25
• Small change forms R13 637.76
• Big Knit R8 126.88
• Big Walk R6 843.11
R35 663.11
TOTAL R81 396.88
The Parents’Association also launched a 100 Club, an excellent means of creating spirit and
raising funds for the school.
During 1995 there was much controversy about school “right-sizing”, re-deployment of teach-
ers and voluntary severance packages. This was to continue into 1996. Right-sizing came
about as a result of agreements between education departments and teacher union representa-
tives on a new set of student-teacher ratios, thus implementing equity. The national Minister
said that the process was to effect equity in staff provisioning, not to decrease the number of
teachers, but to redeploy them. The process was to lead to Fairmont losing the services of
eighteen of the teachers by the end of 1996.
A huge teachers’ protest meeting was held in the Parow Civic Centre on 18 May.
Buildings and Grounds
An area adjacent to the pool, together with a roadway to the double garages, was tarred. Steps
were constructed on the field banks and the wooden huts were removed. Consideration was
given to the acquisition of a railway carriage to serve as a cafeteria, similar to that at DF
Malan High.
The Governing Body, after much deliberation, withdrew an offer to purchase the house at the
entrance to the school. The intention had been to provide a teaching venue, possibly for the
Music Department, and accommodation for teachers and those accompanying touring teams.
The first design for a proposed Sports Centre was considered. Security lights were installed
and a grand piano was acquired. A tennis shelter and a tuckshop shelter were constructed.
The Board also considered the possible acquisition of the piece of ground adjacent to the
tennis courts. This could not be used for any purpose other than for sport. Provision was made
for alterations to provide a new reception office, a door and steps from the ramp, and a stair-
case to the Memorial Quadrangle. Pupils would no longer use the main entrance.
103
The Governing Body - 1995
Speech Night 1995: Dr and Mrs I McCullum, Mr and Mrs R Williamson, Mr and Mrs C Wigg
104
The Triple A (AAA) for success programme was initiated. This was to recognise pupils for
outstanding attendance, attitude and achievement.
The name FAIRMONT was added to all sports tops and additional signs for the building were
provided. The new tie would be phased in from 1996.
AWARDS
The awards presented until 1994 were Honours/Merit/Team. These were shown on blazers
as follows:
Honours: Full school arms in cloth.
Merit: School badge in wire, plus scroll.
Team: Scroll.
In 1995 Colours Awards were introduced to provide a new category between Merit and
Honours.
Sporting Achievements
Danielle de Wet, in Std 9, as the top member of the Namibian rhythmic gymnastics team,
performed with distinction at the African Games. Thirty-five pupils were selected for provin-
cial teams, and Lee Russell was chosen for a SA Baseball team. Jason Wright and Alex Mion
were placed second in SouthAfrica in the computer section of the National Expo Competition.
Staff members, Mrs Feltoe and Mrs Crofton, were in charge of theAdult Education Programme.
Saturday detention was introduced.
Rules
Representatives of teachers, prefects and matric council met on three occasions to propose
changes to school rules, and agreed that rules should incorporate a code of conduct for pupils
and that there should be a clear distinction between rules and procedures.
A matter handled by the Board of Governors over a number of months was the creation of a
system of staff awards, rewards and incentives.
An extract from the President’s Column in SATAnewsletter number 5 of 1995 gives an indica-
tion of the morale of teachers:
“Over the past few months we have had to endure the debacle of the paltry salary increase,
financed from pension contributions, the Labour Relations Bill and its implications for teach-
ers, the Hunter report, and the lack of clarity with regard to new teacher-pupil ratios.”
It was decided, after representation from those in charge of issuing textbooks, to stop the levy
system, to sell the remaining textbooks and to require pupils to purchase books in future.
The Board wrote to the Department about the possible introduction of a post-matric class at the
school, up to three UNISA subjects being offered to pupils in addition to other subjects. The
reply included these words: “the envisaged project is a bold and exciting venture”.
105
Academic Aces - 1995
Fairmont High School’s academics with their trophies for academic achievement: Nicholas Maunder,
Carly Steyn, Lisa Stockland and Samora Adams. ( Photograph by Pieter Van Der Vyver: Northland
News, November 1995)
The stairway to the Memorial Quad was provided in 1995
106
1996
In his first circular of the year to parents in January, the principal wrote, “1996 is going to be a
year of great challenges. The uncertainty about the new dispensation and reports about im-
pending regrading of posts and schools, retrenchments, early retirements and loss of promo-
tion posts have led to a degree of despondency and loss of morale and motivation in the profes-
sion. Already five of our teachers have accepted posts elsewhere.”
In October he reported, “Today we are faced with the knowledge that at least a further eight-
een of our staff will have left the school, and, in most cases, the profession, by 31 December.”
The situation was brought about by the right-sizing, redeployment and voluntary severance
process. Details of the Voluntary Severance Package were provided in the Department’s Cir-
cular 51/1996. Any educator could volunteer for a severance package.
The redeployment process did not function well in practice. There was at first an assumption
that voluntary service packages would be offered only to teachers who had been declared
redundant and for particular reasons could not be redeployed. The media and the ‘white’
teachers’ unions considered that the severance packages would be the main provision of right-
sizing. The High Court would effectively declare the redeployment process null and void in a
case brought by the Grove Primary governing body.
The National Education Policy Act of 1996 provided for the determination of national policy
for education; to amend the Act of 1984; to provide afresh for the determination of policy on
salaries and conditions of employment of educators; and to provide for related matters.
Education White Paper 2 on the ‘Organisation, governance and funding of schools’ was pub-
lished in February. The Board, at a meeting in March, established strategic planning and
redundancy committees. A meeting handling sections 13 - 17 of the Schools Bill was held at
Totius Primary. Initially, there was a great deal of anger and confrontation. Aletter of protest was
sent to the Ministry mainly about the Board’s powers to appoint educators and non-educators.
A number of Fairmont teachers and pupils protested at the foot of Medway, displaying signs
such as ‘No teachers, no future” and ‘Education abuse, we refuse’.
The South African School Bill of August 1996 led to the South African Schools Act. This Act
was to provide a uniform system for the organisation, governance and funding of schools.
Model C schools, as such, were done away with and became Section 21 schools. The School
Act covered the funding, organisation and governance of schools. It stipulated that governing
bodies should be composed of representatives from the parents, the teaching staff, the student
body and the non-teaching staff. The first election of the governing body in accordance with
the Act would take place in July 1997, when the first Students’ Representative Council would
also be elected.
Examinations
The 1995 examination results were excellent. Every matric passed, and there were some ex-
ceptional subject averages, for example, 73% for History HG and 71% for Art HG. Three
pupils obtained over 90% for History. Four obtained an A aggregate, and a further seventy-
nine obtained matriculation exemption. Continuous assessment of pupils’ work became an
important feature. This meant that there was less emphasis on formal examinations as the
main means of evaluating pupils’ work.
107
Sport
A number of pupils achieved with distinction in co-curricular activities. Those awarded colours
for National junior teams were: Aniela Mojzis, ranked in the top five in the world in her age group
fortennis,JamesPerryandShaunduPlooyforcycling,JonathanGreenfieldforsoccerandMichael
Dockerill for ice hockey. Michelle Dosson was selected for the WP Senior Swimming team.
Achievements
Kristy Munro and Susan Gustafson were prizewinners in the Typing Olympiad and Martin
Meyer received a bronze medal at the National Science Expo. Nicole Klassen, the Head Girl,
was selected as an exchange student to Austria. Exchange students from Denmark, Switzer-
land and Germany were welcomed. Another feature of the international connection was the
increased number of touring teams from overseas - matches were played against teams from
Taunton, Downside, Down and Arnold Schools from England.
The draft constitution of the United School SportsAssociation (USSASA) was distributed in May.
The production of “The Happiest Days of Your Life” in April showed how well pupils, parents
and teachers could work together.
A group of students and teachers worked together to plan the Twentieth Anniversary celebra-
tions to take place in 1997.
PTA
The PTA launched its own newspaper, the Paperclip. The PTA dance, held in the school hall,
was thoroughly enjoyed. The 100 Club, in its second year, continued to function very well. A
Fun Walk/Ride on the 13 September was a great success. The Carnival, on 2 November, was
again a huge success. “What a wonderful day this was for our school. The thousands who
came to participate and help all experienced something which will live in the memory long
after the event. There was excitement and a dazzling display, but there was also a shared
recognition of how many different components can work together to form a great school.”
Here follows a brief list of the other matters receiving attention during the year:
• the shooting range site
• vending machines
• ramp surface
• the school e-mail address
• field names
• stage catwalk
• school scholarships
• PTSA
• prospectus cover photographs
• cheerleaders
• visit of Steve Hamilton (for a drugs presentation)
• strategic planning commissioned by the Board of Governors
• concept plans for a future Sports Centre
• door canopies
• possible roofing of a quadrangle
• job-shadowing
• Big Walk
• matric exit survey
• the AAA programme
• the prefects’ executive breakfast
• book sales.
108
Protest - 1996
Hillary Hall - “The Happiest Days of Your Life” - 1996
109
Staff Matters
The strategic planning report was presented to the governing body in August and was pre-
sented to the parents on 16 October. The title of the report was “Let the Teachers Teach”. The
intention was to bring about a new structure in which teachers would be relieved of a number
of their administrative duties so that they could concentrate more on academic and cocurricular
activities. The position of estate manager was abolished and new positions, those of adminis-
trative manager and co-curricular co-ordinator were created to commence in January 1997,
with Mr M King and Mr U Horsthemke being appointed to these positions.
Unfortunately, five outstanding members of the permanent staff left during 1996. Miss Leonie
Coetzer was a founder member and had been a Deputy Principal since 1990. Mr Hans van
Stormbroek, at the school since 1979, left as an internal Deputy and Head of Biology and Bible
Education. Mr Dereck Marnewick, Head of Department, taught at the school from 1984 to
1987 and again from 1989. Mr Brian van Wijk was a Deputy Principal from 1989, and was
Head of History. Mrs Nikki Smal, teacher-counsellor from 1989, was part of a very successful
counselling team.
The chairman presented the staffing structure proposal for 1997 at the meeting in October.
This was accepted with the suggestion that seven additional teachers should be appointed.
At the meeting in November, the Board again discussed staff incentive schemes and resolved
to award a bonus to teachers remaining at the school for their loyalty and service.
Revised implementation dates for the new national curriculum were announced in October. It
would commence in Grades 8 and 10 in 1999. During 1995 continuous assessment was intro-
duced. In February of 1996 a discussion document was distributed to schools. In circular 83/
1996, dated 4 September, the Western Cape Education Department informed schools year
marks would be used in the 1996 Senior Certificate Examination.
The previous proposals regarding a post matric course were again considered at a meeting in
November when a project to introduce an Accelerated Education Programme and A Levels was
approved subject to Heads of Agreement being drafted, and the budget in detail to be approved.
Top Five in Standard Ten: M Swart, A Lang, G Dreijer, J Brink, C Steyn - 1996
110
SPEECH NIGHT & GUEST SPEAKERS
1987 - Mr J X (Puggy) Munnik
1988 -Justice EL King
1989 - Mr M Whetmore
1990 - MR CD Adams
1991 - Dr R Dickson
1992 - Mrs J Stern-Hardie
1993 - Mr R Taylor
1994 - Prof J Thomson
1995 - Dr I McCullum
1996 - Prof S Ridge
DRAMATIC PRODUCTIONS
1988 - Alice in Wonderland
1989 - The Good, The Bad & The Ridiculous
Before Your Very Eyes
1990 - Grease
1991 - The Beeple
1992 - Fairmont Cabaret
1993 -
1994 -
1995 - Romeo & Juliet
1996 - The Happiest Days of Your Life
MATRIC FAREWELL THEMES
1988 - Moneytree Casino
1989 - Take a Chance
1990 - A Royal Ball
1991 - Some Enchanted Evening
1992 - Greece
1993 - Egyptian Splendour
1994 - Durbanville Derby
1995 - A Hobo’s Night in Paradise
1996 - A Night in Shining Armour
FOUNDERS DAY GUEST SPEAKERS
1990 - Mr E Fivaz
Mr T Moehl (HB 1979)
Mrs L Thompson (Windell) (HG 1979)
1991 - Mr M Steyn (HB 1981)
1992 - Ms K Davies (GF 1982)
1993 - Mrs J Thompson (Lambert) (HG 1983)
1994 - Mr A Hudson (HB 1984)
1995 - Ms C MacLeod (HG 1985)
1996 - Mr C Mullet (HB 1986)
*HB: Head Boy *HG: Head Girl * GF: Good Fellowship
1987 - 1996
111
1997 - 2002
ANNIVERSARIES, A LEVELS AND OBE
1997
The Twentieth Anniversary Year was one of outstanding suc-
cess. Highlights included the Anniversary celebration week,
the school being listed as one of the Top 100 schools in South
Africa, the introduction of A Levels, another wonderful car-
nival, the election of the first governing body and the first
Students’ Representative Council under the new dispensa-
tion, and the first Matric Art Exhibition.
At the inter-schools athletics meeting the girls won the
trophy, three Fairmont athletes won individual trophies,
and the school won the coveted Spirit Trophy.
The description of the Twentieth Anniversary Celebrations
was published in the 1997 school magazine.
FAIRMONT’S 20TH ANNIVERSARY
The highlight of the year must certainly be the celebration of Fairmont High’s 20thAnniver-
sary. With the advent of 1997, Fairmont’s 20th year in existence, a committee of excited and
rather anxious teachers and pupils, under the Chairmanship of Mr Wigg, were able to put
their months of planning into action. The celebration week took place from 24 February to 1
March 1997 with the theme for the week being “Yesterday, Today and Tomorrow”.
MONDAY 24 FEBRUARY: OPENING DAY
Tracey Kairuz (Head Girl 1980) officially opened the week’s celebration at the Opening
Ceremony, held on Hillcrest Field and she presented the 1997 Head Prefects with a time
capsule containing 20th Anniversary memorabilia. All the Fairmont pupils formed an
impressive “twenty” on the field and each pupil, armed with a helium-filled balloon, re-
leased it into the sky, to establish whose balloon would travel the furthest. A“humungous”
cake was baked for the occasion and each pupil received a piece of cake to share in the
birthday celebration.
In the evening, a superb formal dinner was held at La Verona Restaurant in Durbanville.
The guest speaker was Mr Brian O’Connell (Head of WCED). The evening included an
auction of selected artworks painted by Fairmont pupils, which were auctioned by the
entertaining and professional auctioneer, Mr Julius Buchinsky.
TUESDAY 25 FEBRUARY:
The day was characterised by a “Civvies Day” with the pupils dressing up to the theme of
“Yesterday”. The staff added to the spirit of the theme by dressing up as school pupils in
uniform. The Inter-House Plays were staged during school hours and anxious moments
awaited directors, Susan Gustafson (Innes), Jeanette Steynberg (Dale) and Claire O’Neill
(Muir). Innes House dominated the awards, winning the award for “Best Play”. The other
major awards were as follows:
Best Director: Claire O’Neill
Best Actor: Gary Rhoda
Best Actress: Clare Vernalls
The pupils enjoyed a picnic on the field during the extended break.
112
A Proud Day - 1997
PTA Committee - 1997
113
WEDNESDAY 26 FEBRUARY:
The theme for the “Civvies Day” was “Tomorrow” with many pupils dressing up in some
spectacular futuristic outfits. The day was characterised by the “Fun Olympics” com-
mencing with the traditional inter-class “Boeresport” competition, which proved to be
great fun. The highlight of the “Boeresport” was the Tug-O-War, with the staff team
stamping its authority on the feverishly determined Standard 10 team. The “Fun Athletics
Meeting” in the afternoon included some fun-filled and hilarious events. Another of the
highlights of the day was the Inter-Schools “Fun Gala” which included a pool noodle relay
race, a tube relay race and a piggy-back relay race. Needless to say Fairmont won the
Inter-Schools “Fun Gala” showing our neighbouring schools that we know how to have
fun.
THURSDAY 27 FEBRUARY:
One of the highlights of the week was certainly the Fairmont Fashion Show and the Mr
and Miss Fairmont Competition held on the Thursday evening. The finalists, chosen from
the Standard 8 to 10 pupils, were announced well in advance to enable sufficient practising
and to ensure that the Fairmont models were able to “strut their stuff” on the catwalk.
Modelling agencies assisted with the choreography, Mr Dill was the creator and designer
of the splendid set, the stunning outfits worn by the finalists were provided by leading
stores and the fabulous prizes “up for grabs”, all made this a spectacular occasion. The
evening culminated with the crowning of James Espin and Tegan Swart as Mr and Miss
Fairmont respectively.
FRIDAY 28 FEBRUARY:
The traditional Founders’ Day Assembly was held on Friday morning with Dr Clifton
Woods (Head Boy in 1987) addressing the Assembly. A number of special guests, previ-
ous head prefects and past pupils attended the Assembly, which was followed by a lunch
for the invited guests.
The 20th Anniversary Carnival commenced in the evening with a Fun Fair and a Pupils’
Dance. The Past Pupils’ Reunion was also held with many past pupils, particularly the
1987 Matrics, celebrating their 10th Reunion renewing old acquaintances in the beer tent
and at the spit-braai. Each standard spent the afternoon and evening frantically building
their respective floats, to the theme of “Yesterday, Today, Tomorrow” for the Float Proces-
sion the next morning.
SATURDAY 1 MARCH:
The day started with the Float Procession through Durbanville led by the stunning
“Drummies” and “Bummies”! The five floats, built by each standard, were most impres-
sive, with the Standard 9 float judged as the “Best Float”.
The Carnival atmosphere continued throughout the day with a number of Arena Events,
including a karate demonstration, roller-blading, drum majorettes, a synchronised swim-
ming display as well as folk-dancing. A “Gold Rush” was also held with many fabulous
prizes being won. Awide variety of stalls, including food stalls, were in operation throughout
the afternoon and evening. The evening’s entertainment included the Fun Fair for the kids
and the beer tent, which included a number of oom-pah bands that kept the adults in a
“swinging” mood. The celebrations came to a close with the Bandslam in the school hall
in which a number of pupil bands provided some “head banging” entertainment.
Finally, thank you to the 20thAnniversary committee for their commitment and hard work
which made this event the success that it was.
114
A scene from “Grease” - 1997
20th Anniversary - the balloons are released - 1997
115
A Levels
The A Levels programme was introduced after the Board of Governors agreed to an initiative
of Ms Barbara Elion, a former English teacher at Fairmont and co-ordinator of the school’s
GCE (Gifted Child Education) programme. Classrooms and an office on the top floor were
made available for specialised tuition in six subjects by outside tutors leading to examinations
under the auspices of the University of Cambridge’s Local Examinations Syndicate. The inde-
pendent programme, with Ms Elion as co-ordinator, attracted enormous interest from the press
and various radio stations. “Twenty-four excited and motivated Fairmont academic ‘guinea
pigs’ enrolled for various combinations of A level subjects.”
Top 100 Schools
The Sunday Times presented its Top 100 Schools supplement on 14 September. The panelists
had set out to look for schools that were making a difference in their context - schools that
were exceptional, whatever their disadvantage or privilege and that were worthy of emulation.
Three criteria were developed for identifying such schools: performance or achievement in
academic and extra-curricular activities; the ways in which the schools prepared pupils and
staff for a rapidly changing world, and the ways in which they adapted to increased autonomy;
and the creation of opportunities and conditions for learning. It was with great pride that the
Fairmont community heard that Fairmont had been listed as one of the Top 100 schools.
PTA
The PTA adopted a different approach for the quarterly meetings when it was decided “not to
get speakers, but to do it ourselves!” Two successful meetings involving teachers and parents
were “Air your views - share your feelings” in May, and “Working together works” in August.
The PTADance was again a most enjoyable occasion with Fay Davids and Michelle Vorster in
charge. The 100 Club continued to be a source of enrichment and social enjoyment.
A report in the Paperclip included this paragraph: “An elated, although exhausted chairman of
the PTA, Michael Ettish, reported that the 1997 Carnival and Fireworks Display netted the
school a tidy sum of R175 000. A sincere thank you to all those parents who so tirelessly
contributed their time, sweat, brain power, muscles, elbow grease and even their children and
parents to make this year’s event the success that it was.”
Pupil achievers deserving special mention included:
• Shawn du Plooy (cycling), James Perry (cycling), Martin le Roux (baseball) and
Aniela, Peter and Michelle Mojzis (tennis), who were selected for national teams.
• Vanessa Mayley, who won a R10 000 scholarship as first prize in the national round
of the United Nations Population Fund Art Competition.
• Jonathan Greenfield represented South Africa as captain of the national U14 soccer
team.
• Melissa Leader, who was placed ninth out of 4500 candidates in the National English
Olympiad and represented South Africa in a student exchange programme in Russia.
• Martin Meyer, who was awarded a gold medal at the Expo-Science International ’97.
• Kirstyn Harris, drum majorettes leader, won the SA title for mace duets with her
partner at the SA Indoor Championship.
116
20th Anniversary Celebration (aerial view) - 1997
A Levels:
J Watson, L Kohler, Ms B Elion, M Johannes, V van Vuuren (photo: The Argus) - 1997
117
The 1996 Matric results were excellent:
A aggregate 8
Matriculation exemption 97
Senior Certificate 69
Failures 0
Matters receiving attention during the year included a secondary staff room on the first floor,
shade-ports and/or shelter for cars and in the Junior Quad, a store next to the drama room, a
sign at the front entrance, a tour to Gauteng, the “Group of 80” contesting the Grove case, the
introduction of girls’ trousers and planning for the proposed Indoor Centre.
The production of ‘Grease’, which ran to packed houses for three nights, and the very success-
ful Art Exhibition proved that there was tremendous talent and potential among the pupils.
The staff enjoyed a weekend of team-building at the Tygerberg Nature Reserve. This was
followed by a weekend at Mount Fleur for the senior staff and subject heads. This staff devel-
opment exercise was conducted by Mr Hilton Calder, who also addressed the matrics later in
the year.
Proposed Indoor Centre
Planning for the proposed Indoor Centre/Students’ Centre was initiated. There was a great
deal of discussion as to siting. Various positions on the netball and basketball courts, the
matric lawn in front of the hall, and the parking area adjacent to the pool were all considered.
Plans were prepared by a number of construction companies, all to include spectator seating
and other facilities. Budgetry constraints would eventually determine the size, position and
nature of the multi-purpose building.
Staff
Tony Marshall left after almost nine years as Head of the English Department to take up the
position of Deputy Principal at Strand High. Others who left were Kaeli Albertyn, a past pupil
and previous Head Girl of the school, and Liezel Kühlcke, who had been a popular teacher-
counsellor for five years and had been actively involved in many spheres of school life. Liz
Müller was promoted to Deputy Principal after a number of years as Head of the Mathematics
Department. Following an approach by an occupational therapist, Mrs E Bretteny, it was
proposed that facilities be provided on the school premises so as to have a team approach to
counselling, necessary after the demise of the school clinics.
A new governing body was elected. This included two pupil representatives, who had “full
voting rights except where contracts are concerned or in decisions which force a legal liability
on a third party”.
A “Conditions of Service Adjustment Package for Educators” was finally agreed to in August,
but only by the State and the majority employee party, SADTU. It would, however, be ex-
tended to all educators. The South African Teachers’Association announced this as “SALA-
RIES - finality, but no victory”.
The school, as a member of the “Group of 80 Schools”, joined those who “were committed to
raising the necessary funds to finance opposition to the Minister’s Appeal against the Grove
decision. (The Minister had been ordered to pay the costs of the High Court case).
In October, the final draft of the marketing plan for the school was approved.
118
Standards
The changes to the way in which marks were allocated and distinctions and symbols were
awarded, especially in matric, led to much public comment and speculation in the press about
lowering of standards. This led to the principal’s comment in his annual report that “I believe
that if we fulfil our mission of striving for excellence, it will not be the A in the matric exam that
becomes important but that the pupil who obtained the A did so at Fairmont. We can make of
any syllabus what we will, and we should aim for the highest standard which we ourselves can
set.”
The Students’Representative Council - 1998
The Student Centre - building progress - 1998
119
1998
The failure of the redeployment process had led to a huge budget crisis in 1997 as it became
clear that Departments would have to spend far more on teachers’ salaries than anticipated.
Thousands of new teachers had to be employed to fill new posts at understaffed schools. Teachers
declared in excess remained at schools and many who had taken the severance package were
still on the payroll.
At the start of 1998, there was great tension as the National Department initially declared that
approximately 20 000 temporary teachers would be re-hired. Following a three-day strike by
thousands of teachers in mid-1998, a new agreement was reached. The national minister would
set student-teacher ratios, and Provincial Departments could determine the number of teach-
ers, according to their budgets.
Curriculum
The phasing in of the new curriculum started in January 1998. A six-day cycle timetable was
introduced with school hours being 08:00 until 13:45.
The reduction in staff unfortunately meant that physical education classes had to be discontin-
ued. A number of teachers attended weekend training seminars, including one on Outcomes
Based Education. Many staff members began experimenting with OBE. Mr Wigg attended
the Convention of the National Association of Secondary School Principals of the USA in San
Diego. He reported back at an open meeting in April on Changes in Education. The most
important current topics were those which would also soon become the focus of attention in
South African education:
• The development of flexible timetabling.
• The technological revolution - equal in effect and importance to the Industrial
Revolution.
• Assessment methods.
• Student-centred learning, rather than teacher-based instruction.
• Reality based, market related, career orientated curriculum.
• Integrated curriculum.
He suggested that the school give attention to, among other factors, training of teachers in the
applied use of computers, additional computer facilities, rooms assigned for group work, a
students’ centre with, if possible, a cafeteria, and various assessment and instructional methods.
Buildings
The staffing and strategic planning sub-committee proposed to the Board in June that the
project having priority should be an “additional computer room, together with all extensions,
furniture and equipment, the necessary teacher training, and including upgrading of the Lec-
ture Theatre (sound system, acoustics, curtains, ventilation and seating)”.
Fortunately, the chairman of the Board of Governors was in a position to report in October that
“we have implemented two of our most ambitious projects to date by equipping two class-
rooms with comprehensive computer equipment, which may become a model for the future.
We also commenced with the construction of a Student Centre (due for completion in the first
quarter of 1999) to accommodate indoor basketball, netball, five-a-side soccer, drum majorettes
and a multitude of other sporting and cultural activities.
A wonderful donation was received from a parent for a digital internet connection.
120
Administrative Staff: Mr M King (Administration Manager),
Mr U Horsthemke (Co-curricular Co-odinator) - 1998
Administrative Staff: Mrs H Tatley, Mrs A Jacobs, Mrs J Moreland, Mrs P Retief - 1998
121
PTA
The PTA enjoyed a successful and productive year. The annual dance, with the theme “Afri-
can”, was a resounding success as was the excellent Carnival and the 100 Club. Sub-commit-
tees were - tuckshop under Mrs Gessner, the kiosk run by Mrs Page and Mrs Bosch, and the
clothing bank run by Mrs Dijkshoorn. The proposal to change the name to PTSA could only
be ratified at the 1999AGM, but pupils Lauren Young and Kim Brown joined the committee as
observers. A cultural committee comprising staff, parents and pupils was formed. Another
group bringing comfort and support to many was Mothers Who Care, a group of mothers who
met regularly at the school.
A new member of staff, Leigh-Ann Littleton, in a remarkably short time, produced Lust, De-
ceit and Folly, which proved to be “undoubtedly a brilliant display of untapped talent”. An-
other show which was very well received was the variety show Showbuzz.
A group of “young, dynamic 1997 matriculants” reinstated the Past Pupils’Association at the
initiative of Sean Loots. Building on the success of the 1997 Mr and Miss Fairmont pageant,
they set about organising their first major event. Twenty finalists appeared before three pro-
fessional judges modelling clothes from a number of stores. Included in the programme were
other items including “the sensational voice of Tracey Murray”. Winners of the Mr and Miss
Fairmont titles were Gary Swart and Samantha Jones.
New developments were the changes to a fixed, timetabled Societies period for all, and the
introduction of soccer for girls.
The school hosted three exchange students - Laura Perichon from Belgium, Mette Jensen from
Denmark and Camilo Benitez-Aldana from Paraguay.
Matric Results
The matric results of 1997 were again excellent:
Matriculation Endorsement 94
Senior Certificate 68
Failures 0
Total 162
Twelve pupils obtained A aggregates.
Grades
1998 marked a change from Standards to Grades. Pupils in all grades who obtained A aggre-
gates in both December of the previous year and June of the current year were invited to the
annual Honours Dinner, held at the Bloemhof restaurant. The guest speaker,Adv. Liesl Fichardt,
had a powerful, motivating message for the top pupils.
Another function enjoying wide support was the exhibition of work by the thirty-six matric art
students. Sarah Goddard received international recognition when one of her works was cho-
sen for the International Touring Exhibition.
The SRC, under the direction of Mrs Esmeraldo, had a busy and successful year. Members
attended a number of leadership seminars and represented the pupils on many committees and
sub-committees.
The success of the A levels programme was illustrated by the outstanding success of Neil
Yorke. He wrote thirteen papers in Mathematics, Physics and Chemistry, this in addition to the
normal school examinations! He passed all, obtaining an A for Mathematics (with 100% in
Pure Mathematics) and a B in Physics.
122
Achievements
Other outstanding pupil achievements included those of Michelle Mojzis, the current SA U14
tennis champion, who represented SA in tournaments in a number of countries, Sharon
Stanbridge, the first Fairmont drum majorette to be awarded SADMA (national) colours, Susan
Gustafson, who won the typing speed, senior section of the Cape College Typing Olympiad
and cyclist Shawn du Plooy, who was again selected for a national team. Renate van Dijk’s
poem Release was published in an anthology entitled Mirror Images.
Bereavements
The school was saddened by the death of pupil Giselle Pappada and staff member Kallie du
Plessis, who suffered a heart attack at the school. Kallie had been a loyal worker for twenty years.
Staff
Mr Chris Bester left the school and the country after nearly twelve years as Head of Geogra-
phy, Head of Department and Grade Coordinator. Ms Elmarie Kitshoff left in June after being
a member of the Afrikaans Department since 1981.
Overseas Tour
1998 ended on a high note when the first historic overseas tour was undertaken, that of the
rugby squad, which toured in the United Kingdom from 4 to 18 December. Mr Mike Rosewell,
chairman of the fund-raising committee and his supporters, including Messrs Barry Evans,
Russell Smedly and Louis van Schalkwyk, had worked wonders in order to make the tour a
reality. The excellent tour booklet included messages from President Mandela, the British
High Commissioner, Nick Mallet and Gary Teichmann.
Mr S Engelbrecht (Caretaker) and general assistants - 1998
123
Mr Steve Hamilton - drugs awareness
presentation - 1998
Mr and Mrs Michael Ettish - 1998
Valedictory Day - the matric farewell song
124
1999
Familiar terms at the start of 1999 were appraisal, quality assurance, multiple intelligences and
the guardian system.
In WCED circular 34/99 schools were informed that “The Minister of Education
has...determined the date from which the governing bodies of ordinary public schools must
function in terms of the above-mentioned Act (The South African Schools Act, 1996), as at 1
January 1999.”
The Governing Body had visited indoor centres at Stellenberg, Settlers and the Edgemead
Community Centre when finalising plans for the Students’ Centre. The floor of the Centre
now received attention and Pinelands High was visited. Other matters discussed were the
provision of chairs, access to the Centre, curtains, carpets, prospectus folders, school scholar-
ships, parking for the Centre and computers for the Typing Room. One scholarship for tertiary
study would be offered each year. A teaching position at Fairmont would be guaranteed. This
would be available to current and past pupils.
Examination Results
Matric 1998
190 candidates - all passed
20 A aggregates
56 B aggregates
71% Matriculation exemption.
(fourth consecutive year in which all passed)
There were sweeping changes to the way in which matric results were announced. These
included the announcement of the top three candidates in each subject, listing of schools with
100% pass rates and those which had improved, and indication of subject distinctions.
The Matric class of 1998 presented the school with a hand-crafted replica of the school coat of
arms, carved by Bellville artist Marie von Willich. This was hung in the school hall.
Thirty-five Grade 11’s wrote the subject Small Business Management as a seventh subject.
Twenty-seven obtained A’s.
A brief list of staff meetings for the school term illustrates important issues of the time.
14 May: School Management Team (all in promotion posts) to
meet. This group has previously been known as the
Leadership Team.
17 May: Subject Groups. Staff Development Team (SDT) for
appraisal to meet from 16:00 to 18:00.
24 May: SDT presentation to staff 14:30 TO 17:15.
25 May: PTSA Forum. All staff.
31 May: Reports on teachers’ union professional growth seminars.
Anew official staff appraisal system was implemented, and the official Development Planning
system started in July.
The Head Prefects of 1989, Dr Elize Kleyn and Dr Roderick Ross, flew from England to attend
the Founders’ Day celebrations in February.
125
Opening of the Students’ Centre
The Students’ Centre was opened on 21 May - undoubtedly a highlight of the year. Here
follow extracts from the report in the school magazine:
“Nearly fifteen years after first considering the building of an indoor centre, we celebrated
the official opening. The original initiative came from the school’s sports coaches. Over the
years various schemes were considered, including a building on the old shooting range site
and a hall (with seating in the length) and clubhouse in front of the existing school hall, but
these were abandoned for the present site.
“The first test holes were eventually dug on 9 October last year, and the building was com-
pleted by Raciti Builders.
“Funds were raised mainly through the annual Carnival. The main fund-raising...started
about four years ago, and the building of the Centre can be attributed to the success of the
Carnivals convened by Mike Ettish. Speaking at the opening ceremony, ex-mayor, school
committee chairman and current chairman of the Tygerberg Sports Control Board, Eddie Fivaz,
told pupils he was proud to see this ‘tremendous facility’.”
Other highlights of 1999 were:
• The Carnival on 29 and 30 October.
• The production of “Midsummer Nights” on 13 to 16 April.
• The Mr and Mrs Fairmont Fashion Show and Design Competition on 13 August.
THE FAIRMONT CARNIVALS
Mr Michael Ettish organised a series of remarkably successful carnivals from 1995 to
1999.
His enthusiasm and drive ensured that substantial amounts were raised for the construc-
tion of an indoor centre for sport, examinations and functions.
Thousands attended the carnivals and the fireworks displays, which were the talk of the
Tygerberg for this period.
Other schools and organisations soon attempted to emulate the success of the Fairmont
Carnivals.
PTSA
The AGM saw the adoption of the change from a Parent Teachers’ Association (PTA) to a
Parent Teacher Students’Association (PTSA), thereby formalising the active involvement of
students. Undoubtedly, the highlights of the year were the Bingo evening in May and the
PTSA dance in September, both of which focused on ‘fun-raising’ as well as fund-raising.
The Bingo evening was the first major function in the new Students’ Centre. 390 attended and
R10000 was raised after a donation of R3000 to Mothers Who Care. The success was an
indication that this would become an annual event.
In December 1998 the rugby team experienced a most rewarding and worthwhile tour of the
United Kingdom. One memorable occasion was the meeting with the Lord Mayor of Swan-
sea, including a visit to St Helens Club.
126
The cast of Midsummer Nights - 1999
Mothers Who Care - 1999
127
In addition to the traditional Valentine’s Week, Settlers Contact, Derby Days, Homecoming
Dance, the Polar Bears Club, Sports Awards Functions, civvies days, Honours Dinner, Inter-
School Athletics, Matric Day and Matric Awards, prefects’ final assembly, Matric Farewell
Dance and the Valedictory Assembly, there were memorable subject excursions, a group at-
tended the Grahamstown Festival, the school participated in the Co-Ed Schools Tournament at
Westering High in Port Elizabeth and two pupils,Andrew Wiley and Hayley Wren, travelled to
Scotland on an exchange programme, together with the mayor of Cape Town.
The girls’ basketball team received an invitation out of the blue to attend a schools’ tournament
in Mexico. There was a flurry of excitement and fund-raising plans were made but, unfortu-
nately, the trip did not prove feasible.
Fifty-four pupils appeared in the photograph of the achievers of the year. They included nine-
teen who had been selected for national teams or obtained national recognition, and thirty-five
others who had been selected for Western Province teams.
Girls’ trousers were introduced after long deliberation about style and fabric. For the first time
every pupil would receive a copy of the school magazine.
The Matric Farewell was held in the Students’ Centre for the first time. The Centre was trans-
formed into a “warm, inviting Night on the Town, with beautiful skyscraper backdrops and a
swinging band”. Mrs Kingwill and Mrs Aston, in charge, had worked wonders.
Mrs Julie Moreland, a loyal and popular member of the administrative personnel, moved to
Gauteng. Other popular members who left were Mrs Louise van Zyl, who had been at the
school for eleven years, and Mr Stuart Collier, Head of Department and Head of History, who
had been at the school for fourteen years.
Staff Matters
In 1999 the majority of Fairmont teachers were members of the National Union of Educators,
affiliated to NAPTOSA. Acopy of a letter from the National President of the NUE was sent to
all parents with school circular 14 of 1999. This explained the current situation relating to
salaries and conditions of service in the profession. Parents were informed that Fairmont
teachers would support the rejection of the State’s final offer in two ways - fourteen would
participate in the solidarity march under one banner by all Public Service Unions in the centre
of Cape Town, and a number of others would withdraw from cocurricular activities on the
same day.
National Qualifications Framework
Information was also given on the phasing in of Curriculum 2005 and the General Education
Band (for Grades 1 to 9). The following is an extract from Lindaba, a publication of the
WCED, in April 1999: “The present Senior Certificate has been criticised as being too nar-
row, abstract and ‘academic’ and not relevant enough to either further study or the world of
work. Remedying these defects is one of the aims of South Africa’s new National Qualifica-
tions Framework, in which the Further Education and Training Certificate (the FETC, replac-
ing the Senior Certificate) will offer learners a wider range of more relevant options aimed at
helping them find rewarding work and/or study further with success.”
(The term “learners” was introduced in the SASchoolsAct, which subsequently also led to the
official term for Students Representative Councils being changed to Representative Councils
of Learners).
128
The school was, unfortunately, compelled to cease responsibility for the A level programme
after 1999, mainly because of financial constraints.
Buildings
Room 7 was converted to a laboratory. Two classrooms were combined to form a laboratory/
lecture area for biology and physiology classes, a room was furnished for Computyping and all
the toilets were painted in colours chosen by the student body. A new clothing store was
created on the top floor.
PTSA - 1999
A Grade 8 Camp Scene - 1999
129
Worthy gift:
Fairmont High School’s matric class of 1998 presented their alma mater with an exquisite gift - a hand-carved
replica of the badge by Bellville artist Marie van Willich, second from left. At hand to receive the work of art were
principal Clive Wigg, deputy principal (academic) Liz Müller and financial head, Mike King.
(Courtesy: the Tygerburger 1998)
Marita Engel with, from left, Joanne de la Cornillére, Ben van Stormbroek and Colleen Saunders
130
2000
In the Education Department newsletter in January, Minister Helen Zille listed the six priori-
ties of the Department and the criteria by which all schools would be evaluated in 2000 stating
“this blue sheet (the criteria) will be one of the most important documents of the next few
years.”
The school development plan, developed by staff, parents and pupils, had four main sections
requiring appropriate action:
• Attitudes
• Leadership
• Teamwork
• Recognition
The events of 2000 can be summarised by listing the highlights of the different groups - pupils,
past pupils, staff and parents.
The SRC programme included Valentine’s Week, with its ‘Tunnel of Love’, auction and dance,
the Easter Egg tunnel, Duens collect-a-bag competition, teachers’ birthday teas, announcing
pupils’ birthdays, announcing team of the week, visits to Green Pastures Old Age Home and
the Stikland Kinderhuis, assistance at SANCCOB and collection of blankets, clothes and food
for the homeless.
The prefects organised civvies days, the honours dinner, assemblies, the Contact Week with
Settlers, dances and Valentine’s Week jointly with the SRC.
“During the first week in August, Fairmont was taken on a musical journey ‘Through the
Decades’ by a stunning cabaret production including music, song, mime and dance”. This
proved to be a resounding success.
Past Pupils’Association
The Past Pupils’Association had great fun “bringing back to life” the Past Pupils’ Sports Day
in the third term. The annual Mr and Miss Fairmont Fashion Show organised by Sean Loots
and fifteen students was again a great success. Over fifty designs were entered in The De-
signer Competition, won by Clare Lyddon. Lee van der Bergh and Donné Pienaar were crowned
Mr and Miss Fairmont..
The Matric Class of 1980 enjoyed a very successful twenty-year reunion, organised by Jacqui
de Villiers and Barbara de Villiers.
Nicola Meyer, Head Girl of 1990, “enchanted the audience with her inspiring and enlighten-
ing speech on Founders’ Day”. Long-service awards were presented to nineteen staff mem-
bers, four of whom - Mr Long, Mr Horsthemke, Mrs Arendse and Mr Engelbrecht - received
gold awards for twenty years’ service to the school.
Staff
Six teachers attended National Union of Educators training seminars during the course of the
year, and the principal attended a principals’convention in Texas. It was resolved by the Board
that a Fairmont delegate should be sent to the NASSP Convention every second year. The
teacher responsible for the academic portfolio should attend the convention inAtlanta in 2002.
Teachers who left the school included Mr Peter-Jon Prince, Miss Joanna Rayner and Mrs
Therese Roux, senior teacher-counsellor.
131
Mrs Oosthuizen and first-aiders
One Act plays - Best of the best - 2000
132
Buildings
The Board of Governors continued with the development of the campus, and the road at the
rear of the school, next to the Students’ Centre, was completed in September. Construction of
a storeroom for the Students’ Centre commenced. The formation of a user-friendly trust for
the school was investigated.
Marketing Strategy
Parents were informed of the results of the 1999 Marketing Plan survey at an information
meeting in April. Groups were formed to rectify shortcomings and to develop a marketing
strategy for the school.
PTSA
PTSA highlights were the Bingo Evening, the Theatre Evening, the Dance and the Engen
Fairmont Fun Ride in which almost a thousand cyclists participated. Three forums were held.
Parents, teachers and students discussed matters of mutual interest. School circulars were
added to the school website and subject reports were included in the school magazine for the
first time. The magazine was prepared by a student staff with Shelley Manford as editor.
Subjects
Significant subject successes and developments included:
• The twenty-seven A symbols in Afrikaans.
• The Grade 9 “Multi-Experiential Camp”.
• The first Grade 8 Market Day.
• First Computer Studies SG Grade 12 examination.
• First Computyping class.
• Eleven A’s for Senior Certificate English.
• The audio-visual presentation to matrics by the celebrated South African poet,
Chris Mann.
• The job-shadowing programme.
• The Education Department Library Service selected Fairmont as a pilot school to run
the PALS system.
• The conversion of a classroom to a modern laboratory designed for group work, and
the introduction of Somerset micro-chemistry kits and programmes.
• The introduction of Xhosa.
• Jennifer Poole and Fidelia van der Linde were chosen to attend a
Gebruiksafrikaansweek in Pretoria.
• Liza Stockland obtained the highest marks for History in the Western Cape in the
1999 Senior Certificate Examination.
Jennifer Poole, in particular, achieved success in Olympiads, obtaining a gold award in the
English Olympiad, and was placed joint sixth in the Gebruiksafrikaans Olimpiade.
Matric Results 1999:
A aggregates 12
B aggregates 41
VALEDICTORY DAY
A day of tears, laughter and, above all, heartfelt good-byes to those people who have influ-
enced our lives in countless way, our beloved Matrics.
133
It was a culmination of all the hardships they’ve endured, the loves they’ve lost and the
friendships they’ve shared and it was only fitting that they started it on a high note with
the people who have guided them through all of these times, their teachers, at an early
breakfast function. Suddenly, it was time for the Matric plays and, as usual, we shuffled
into the Hall like sheep awaiting the slaughter. Boy, were we mistaken! The gymnastic
dazzle of Steven Harmer, David-Jon’s gyrating hips, Mr Veldman’s hilarious antics and
Michael Cannone’s interesting impression of Tom Cruise will never be forgotten, and
Mia and Cherie’s rendition of “The Blair Witch Project” and Britney Spears will always
live on as fond memories of Fairmont 2000.
But all good things must come to an end, and we all left the Hall for break while the
Matrics went to tea, complete with cakes and other delicacies provided by a handful of
dedicated Grade 11’s. Then it was on to the Valedictory Assembly, highlighted by the
presentation of certificates to the Matrics, the announcement of the 2001 Prefect Execu-
tive and who can forget the Graduation Song, sung by Bridgette and Abigail, two of
Fairmont’s very own, upcoming singing talents and the choir.
It was finally time to say our last tearful good-byes, and the Matrics took their last jour-
ney down the corridor, flanked by hordes of uniformed pupils. Forgotten friendships were
rekindled, past acquaintances remembered and for just one, fleeting moment in time, we
were all unified in the hope that their success in the future will be just as profound as the
impact that they’ve had on us in the past.
Leighann Nelson : Grade 11
SCHOOL CONTACTS
2000 marked the 20th anniversary of the first Settlers Contact Week.
A highlight was the victory of the first rugby team - for the first time in fifteen years!
The Derby Days against Bergvliet and Milnerton High Schools had also become impor-
tant annual events.
The previous inter-schools athletics rivalry with Fairbairn High had lasted from 1978 to
1992
Achievements
Fourteen pupils were selected for SA teams. Tamaryn Schultz, especially, achieved great
success in gymnastics at international and local competitions.
Tarryn Bright represented Western Province at the SA Senior Athletics Championships, and
was placed fifth in the javelin event.
Michael Dunn was chosen for the WP U19A cricket team, a feat not equalled by a Fairmont
player for a number of years.
Indoor hockey was introduced. The first league match was played in the Students’ Centre in
February.
There was friendly rivalry between the “Bulldogs”, the first rugby team, and the “Wildcats”,
the first soccer team. Four Fairmont rugby players joined the Tetbury Rugby Club in the UK
at the end of the year, same of their players having being hosted at Fairmont.
Nineteen societies functioned successfully throughout the year, ranging from Aviation to
Wargaming.
Co-curricular commitments were taken into account in a revised staff incentive and reward
system. Honours badges and braid were introduced, but there was no response to an appeal for
sponsorship of staff jackets and ties.
134
Mr and Miss Fairmont Competition winners: A Mullins, L van der Berg, D Pienaar, B Theron,
T Carlson, E Copley
Congratulations and Happy Birthday - Happy Celebrations of Mr Wigg’s Sixtieth Birthday - 2000
135
Students also took a wonderful lead at various camps and excursions, and in preparation for
such major events as the Face of Fairmont and Designer Competition and the Matric Farewell
Dance, held away from the school for the first time. A cheerleading team of nineteen, led by
Justine Vorster, added colour to sports events.
Achievements
Taryn Boonzaier (drum majorettes), Tarryn Bright (hockey), Tamaryn Schultz (gymnastics)
and Blake Solomon (baseball) were selected for national teams.
Past pupil Olivia Villet’s book Chester’s Big Surprise, was “snapped up by scores of book-
stores in the United Kingdom alone”.
USA Visit
During the first term Steve Myers, principal, and a number of students from a school in Denver,
USA visited Fairmont. This was to lead to a successful and enjoyable exchange visit when Mr
Peter le Roux led a group of Fairmont pupils to Orlando and Amherst in the USA, Mr Steve
Myers having moved as principal to Amherst.
The Governing Body Foundation expressed disquiet about a number of clauses in the Educa-
tion Laws Amendment Bill of 2001, especially “this council (the Representative Council of
Learners) must be the only recognised student body at the school” and the exclusion, in Sec-
tion 3, of school fund money from trusts and the prevention of governing bodies from collect-
ing contributions from parents for trusts.
There was concern about the position of prefects and other school groups.
The question of trusts remained on the Board’s agenda.
Unfortunately, for a second successive year, there were protracted negotiations about teachers’
salaries and the threat of a strike.
In his report, Mr M Ettish, governing body chairman, wrote, “we...have had to weather an-
other very trying year on the education front, due to policies and continuing changes taking
place in education”.
OBE
Outcomes Based Education was finally introduced in Grade 8. In order to encourage more
pupils to offer the matric exemption course, subjects in Grade 10 were offered on the Higher
2001
The theme for the year was “Dream it, Believe, Achieve it” - a challenge offered to students to
accept more responsibility personally and to take a greater lead in the school.
The Matric class of 2000 achieved excellent results.
Candidates 179
A aggregates 18
Matriculation endorsement 100.
Cherie Salomon (for Mathematics SG) and Michael Thacker (for Technical Drawing HG)
were placed in the top three in the province. A special assembly was held in January to honour
those who had performed with distinction in the examination.
History was made when the annual dramatic production Wh@t was written and directed by
Geri Olwagen, a matric student.
136
Grade only, except for Mathematics and subjects available only on the Standard Grade.
A number of teachers attended professional growth seminars organised by the National Union
of Educators. The staff were allocated to a number of commitees which included pupil repre-
sentatives. The chairmen of these committees then formed the CC or committee of chairmen.
This was to enable all to participate in decision-making and team-building. The staff incentive
scheme was again revised to provide for academic performance, co-curricular involvement
and administrative duties.
Board of Governors
A proposal to level the Fairview and Vineyard fields to make one field to accommodate a full-
size cricket oval, two rugby fields and an athletics track was discussed by the Board of Gover-
nors in March. It was decided that this project would become part of a five-year plan.
In September the Board of Governors accepted a quotation for glass fibre coating of the Pool
and approved the replacement of the filtration plant. Acapital projects survey was undertaken.
The results were analysed and the following plan of action was proposed:
Year 1 (2002): Access steps, caretaker’s room, staff toilets.
Year 2 (2003): Security fencing.
Year 3 (2004): Seating on banks, cafeteria.
It was emphasised that this plan of action did not mean that the other projects would not be
considered. It was felt that innovative funding would be a requirement of other projects. It
was further agreed that a Clubhouse fund-raising committee be launched, but that this would
be a separate project. (BOG Minutes 25 September 2001).
In October the Board considered a proposal to enclose and heat the pool. The organisation
concerned would have to provide a financial plan. The Amenities Committee was asked to
investigate further.
PTSA
PTSA functions included a Barn Dance and the annual Bingo Evening - again very successful.
The Drug Educational Council “delivered some hard hitting facts on teenage drug abuse” at a
meeting in July. This was followed by a lively discussion in October amongst parents, teach-
ers and students on the Fairmont Code of Conduct.
The increase in the number of applications for admission to the school, especially from outside
the natural feeder area, led to the Board decision in May to restrict the number admitted to
Grade 8 to 200. This was to prevent future overcrowding in terms of the number which the
building could officially accommodate.
It was resolved that pupils purchase name tags and carry school identity cards.
OFFICES
By 2001 all original peg areas for blazers and bags had been converted into offices: for
a clothing store and Standard Heads on the top floor, for Mrs Bretteny, the occupational
therapist, prefects and Standard Heads on the middle floor, and for laboratory assist-
ants, printer and, first for a Deputy Principal and then for the reception secretary on the
ground floor.
The original reception office became that of the financial assistant. The book room,
137
Matric A students 2000 Examination
The Polar Bear Club - 2001
138
opposite it, became an office for a Deputy and one for interviews. The caretaker’s room
was changed into a sick bay.
The extension to the principal’s office, added in 1994 and known as the “fishbowl”, was
changed into an office for the principal’s secretary.
The original medical rooms were use as offices for the cocurricular co-ordinator and the
administration manager.
The caretaker occupied the original library office next to the Seminar Room (it being the
original library).
Classroom 57 had been changed into offices, reception area and store for the counsellors.
Founders’ Day again took place in the third term. The assembly was preceded by a breakfast
for invited guests and staff. Bonnie du Plessis (van der Walt), the winner of the Good Fellow-
ship Prize in 1981, was the guest speaker.
An excellent twentieth anniversary reunion of the 1981 class, organised by Noela Huysamen
(Horn), Jeanette van Kraayenburg (McEvoy) and Antonio Texeira, followed on Saturday 1
September, when the traditional matches between past pupil and school teams were played.
In November a police drugs search was undertaken. This was in line with the drugs policy of
the school.
Staff
Sadly, two long-serving members of the administrative staff left the school. Mrs Liefie Jacobs
was redeployed to Durbanville Primary School in March and Mrs Janet Hall, laboratory assist-
ant and administrative assistant, resigned. Mrs Therese Roux, who had helped in a part-time
capacity, left to further her studies, and Mrs Jenan Kingwill left after five years at Fairmont.
Mrs D du Plessis was appointed as the principal’s secretary.
The matrics ‘graduated’at the ValedictoryAssembly, meaningful words from the song “Gradu-
ation” also appearing on their programmes:
“As we go on, we remember
All the times we had together.
And as our lives change
Come whatever,
We will still be friends forever.”
PUPIL LEADERSHIP
1979 - 1981: Prefects, plus Student Council (prefects and elected Std 7, 8 ad 9
representatives) and Std 9 monitors (each for one term).
1982 - Matric Representative Council, known later as the Matric Council.
1997 - Students’ Representative Council (elected in terms of the Schools Act).
Prefects were appointed annually (with a voting component). The SRC was elected
annually.
The Matric Council had taken various forms. For example, in 2000, it was a prefect
portfolio.
The SRC matric members had also served as the executive of the Matric Council.
139
2002
Best of the Best
In January, the 25th Anniversary of the founding of the school was celebrated with the news
that Fairmont had again been listed under the heading “The Best of the Best” based on the
2001 Western Cape Matric results. Thirty-four matrics obtainedAaggregates and the pass rate
was again 100%. The top eight students obtained averages above 90%. Tamara Courchay was
placed first in the province for French, and Dominique Oebell was placed second in Computer
Studies SG. The Matric results over a number of years were a good indication of the excellent
teaching in the school. Other excellent academic results in 2002 were those of Wendy Stone,
Erin Smith and Clayton Heroldt, who were placed tenth, eleventh and thirteenth in the country
in the Gebruiksafrikaans Olimpiade.
Building and Grounds
The Board of Governors continued with the development of the campus. The year saw major
upgrading and redevelopment of the swimming pool, as well as extensive upgrading and de-
velopment of the computer facilities. The process of extending the network to Subject Heads’
rooms was started,
Planning for perimeter security fences and for security cameras was initiated. At the budget
presentation meeting in October R5520 was accepted as the school fee for 2003. This would
include funds to address the security plan of cameras and fencing.
The Council was thanked for the provision of parking bays and the erection of retaining struc-
tures in Reservoir Road, and bollards at the Oval.
Further improvements were the erection of a new room for the caretaker and the start of con-
versions to provide more cloakroom facilities for female staff.
The parking area adjacent to Medway would finally be included in the school grounds after
years of negotiation.
In November the Board agreed to improvements and alterations to the Seminar Room. Re-
moval of the ‘temporary’partition in the principal’s office would be delayed until the appoint-
ment of the new principal.
At a meeting on 2 December, a draft plan for a hall extension was tabled. It was reaffirmed that
the PTSA Committee was the fund-raising co-ordination sub-committee. “It was decided that
the Clubhouse Hall extension would be the project for which the Fund-raising Committee
would raise funds. This would be a separate project over and above annual minor capital
projects. The intention was to display the plan tabled at the start of 2003 so that everyone
could be made aware of the nature of the project.”
The appeal to past pupils for contributions to a Clubhouse Fund had been largely unsuccess-
ful. There was a realisation that accurate records of and better communication with past pupils
was essential. Mrs Caron Nightingale (Jackson - 1981) was appointed to trace past pupils and
record their details.
Staff Matters
Terms which became familiar to staff were progressive discipline, appraisal and staff develop-
ment. Thirty teachers experienced a Franklin Covey course on The Seven Habits of Highly
Effective People in April. The intention was for the remainder to attend the course in 2003.
140
Fairmont Idols - 2002
Mark Shuttleworth presentation - 2002
141
Mrs Müller attended the convention in Atlanta, as agreed in 2000. Mrs Hazel Tatley retired in
June after twelve years as financial administrator. Mrs Tatley had been a staunch supporter of
the school for many years - for the PTA and in the office. Mrs Marie-Louise Nel relocated to
Gauteng after nearly ten years at Fairmont. Among other activities, Mrs Nel promoted the
successful Grade 8 Market Days.
The prefects and the SRC attended a combined leadership camp in the first term, and worked
well together throughout the year. They claimed a world record for the biggest hug on Valen-
tine’s Day. Everyone at the school participated. The SRC organised an Aids Week and also
held a successful Band Evening. Spirit Week, including the Settlers Contact and the Home-
coming Dance, organised by the prefects, was also a great success.
The Mark Shuttleworth Road Show visited the school in September and the Hip2b2
banner
presented to the school was hung with the House and Best School banners in the Students’
Centre. A giant chess board and set was used in the Memorial Quadrangle and the WP Chess
trials were held in the Students’Centre in May. Funds were raised for the boys’hockey tour to
Holland in 2003. A tour group from Wolverhampton was the biggest yet to visit the school.
Fashion Week
The Fashion Week, incorporating the Face of Fairmont and Student Fashion Designer Compe-
titions was very successful and enjoyable. Professional judges and the presence of contestants
from various schools contributed to the excellence of the occasion. Coralee Long won the
Designer Competition. The Faces of Fairmont were Dan Kadima and Megan Lenz.
Pop Idol
Fairmont’s own Pop Idol competition added interest and enjoyment to a series of assemblies
until Brigette Greybe was finally declared the winner.
Grade 11 Camp
A new innovation was the Grade 11 Achievers Camp for all Grade 11’s. This, like the Grade 8
and Grade 9 Camps and excursions, proved to me of significant benefit and value to those
involved.
The principal was informed that the school had been selected to participate in a South African/
French teacher and pupil exchange with Reunion.
Two important productions were Get the Colour Right and Blithe Spirit. The former was a
significant contribution to improving relationships.
The Board declared in May that a copy of the drugs policy of the school should be sent to every
family and should be given to newcomers.
Founders’ Day
The 25thAnniversary Founders’Day was celebrated on 30August. Anumber of past and present
committee members and friends of the school joined the staff for breakfast in the Seminar Room,
followed by the assembly, addressed by Lisa Arries (Luddit), deputy head girl of 1990.
Drum Majorettes 25th Anniversary
The drum majorettes celebrated their 25th Anniversary at a breakfast function in the school
hall. Fairmont drum majorettes, perhaps more than any other group, had ensured that the name
Fairmont was well known throughout the country. Their history and their outstanding suc-
142
Civvies Day - Pyjama Day - 2002
Hockey players’vs Wolverhampton - 2002
143
cesses were described in a special pamphlet. The school qualified to compete in the SA Na-
tional Championships for the first time in 1985, when Debbie Heyns was the trainer, and, apart
from 1986, had qualified fifteen times until 2001, an achievement unequalled by any other
Western Province team. The team was placed fourth in the country in 1989 and 1998. Indi-
viduals were placed first in the competitions in 1991 and 1997. Three girls, Sharon Stanbridge
(1998), Taryn Boonzaier (2001) and Lauren Nortje (2002) were selected for national teams.
Achievements
Pupils achieving national recognition in other sports, and whose successes were described in
the yearbook were Leigh Bierman (hockey), Lauryn Fabian and Nici Gouws (aerobics), Lisa
Loynes (pentathlon), Alexander Nikiforou (wrestling), Alida Schoonenberg (goju ryu) and
Tamaryn Schultz (gymnastics).
Retirements
Mr Clive Wigg (principal) and Mr Alastair Frost (senior deputy) gave notice during the year
that they would retire in December. Unfortunately, the Education Department delayed adver-
tising the posts, which meant that the appointment of a new principal and deputy would be
delayed until midway through 2003.
The school bade farewell to Mr Wigg, the founder principal, and Mr Frost, who had been at the
school since April 1985, at the final assembly of the year. A farewell function for parents, past
pupils and friends of the school was held in the school hall on the preceding Friday.
1997 - 2002
SPEECH NIGHT GUEST SPEAKERS
1997 - Prof RL Christie
1998 - Mr P van Vuuren
1999 - Prof N Kok
2000 - Dr Pat Gorvalla
2001 - Dr L Vermaak
2002 - Mr N Andrews
DRAMATIC PRODUCTIONS
1997 - Grease
1998 - Lust, Deceit and Folly
1999 - Midsummer Nights
2000 - Cabaret Through the Decades
2001 - Wh@t
2002 - Blithe Spirit
FOUNDERS’ DAY GUEST SPEAKERS
1997 - Dr C Woods (HB 1987)
1998 - Ms C de Villiers (1988)
1999 - Dr R Ross (HB 1989)
2000 - Ms N Meyer (HG 1990)
2001 - Mrs B du Plessis (van der Walt)
( GF 1981)
2002 - Mrs L Arries (Luddit) (DHG 1990)
HB: Head Boy HG: Head Girl GF: Good
Fellowship Prize DHG: Deputy Head Girl
MR AND MISS FAIRMONT
1997 - James Espin/Teegan Swart
1998 - Gary Swart/Samantha Jones
1999 - Dennis de Wet/Eula Boltman
2000 - Lee van der Berg/Donné Pienaar
FACES OF FAIRMONT
2001 - Edward Copley/Laura D’Amore
2002 - Dan Kadima/Megan Lenz
MATRIC FAREWELL THEMES
1997 - The Academy Awards
1998 - Ice Palace
1999 - Night on the Town
2000 - Cosmos
2001 - Reflections
2002 - Xanadu
144
Matric results happiness: Tarryn Tiedemann, Jackie Preston, Sharryn Zinn - 2002
In his address at this function, Mr Wigg said, “I thank you, all my present and past colleagues
and members of various committees and groups for your friendship and support. I thank Lyn,
my wife, and my family, for their support and loyalty.
A number of people have made a difference in my life. Many are here today. I thank them for
contributing in one way or another to my happiness and my career, and for sharing my joys and
sorrows”
In his last newsletter to parents, he wrote: “It has been a wonderful privilege to be principal of
this fine school. I will always retain rich memories of the people and the events of the past
twenty-six tears.
I am particularly proud of the many excellent achievements of our past and present pupils. I
hope that as the years go by they will become more and more involved in the life and the
development of the School and their communities.
As the School enters a new phase, may the staff be blessed with the wisdom and resilience, and
may the students both present and future always maintain a spirit of honour and loyalty, mak-
ing true integrity a very real feature of the fabric of their lives.
My very best wishes go with you all.”
145
Fairmont Scientists were first in South Africa in the 1981 solar energy
competition of the SA Institute of Mechanical Engineers
Mr Wigg flanked by the 1992 Head Prefects, S Ward
and J Reeves, retired in 2002
Mr Alastair Frost, Senior Deputy Principal,
retired in 2002
Mrs L Müller at Mont Fleur -
1995
146
2003 - 2007
A NEW BEGINNING
2003
The motto for 2003 was A NEW BEGINNING, which was enthusiastically accepted by staff
and pupils alike. Mrs Liz Müller requested that the staff work as a team and tighten up on
aspects such as discipline.
The year began with Liz Müller as acting principal from 1 January to 31 March and Mr B.
Elgie and Mr R. Long acting deputies after bidding farewell to Mr Wigg and Mr Frost at the
end of 2002.
The school was informed by the Department that the number of staff had to be reduced from
thirty-four to thirty-one and one post level 2 post would be lost.
NEW BEGINNINGS
“Begin to be now what you will be hereafter...”
Saint Jerome (Latin Scholar)
On 1 July Mrs Müller was officially appointed as Fairmont’s Principal. She had been Head of
the Mathematics Department since 1985, was appointed Deputy Principal in 1999 and had
initially taken over the Principal’s seat in an acting capacity. She was known as a perfectionist
who, in spite of a hectic workload, found time to display a wicked sense of humour.
“I have had several calls from prospective parents asking whether I was the secretary and
telling me that they wanted to speak to the headmaster,” she said with a twinkle in her eye.
“The seat as principal of a co-ed school has not been taken by a female too often in the past which
makes the challenge so much bigger. It shows that Fairmont does not back off from change.”
Mrs Müller managed to take over the reins of Fairmont in a firm yet compassionate manner
and imparted a sense of unity, pride and enthusiasm and hard work to everyone within the
Fairmont community.
ANOTHER NEW BEGINNING
Mr Ron Dingley, an ex-Durbanite, joined the staff in the third term when he accepted the post
as Deputy Principal, bringing his own inimitable style of calm and respect. He graduated with
a B.Sc, HED and B.Ed from Natal University and taught at Durban High School and Northwood
in Durban for a total of twenty-five years.
He is married to Marian and has two daughters, Sarah and Vanessa.
Mr Dingley has travelled widely including Britain, various parts of Europe, Turkey, Hong
Kong, Australia and New Zealand and South America.
HATS OFF TO OUTGOING BOARD
Mr Michael Ettish retired as Chairman of the Board of Governors since it was his last year as
a parent of a learner at the school. He was responsible for organizing highly successful carni-
vals, firstly as chairman of the PTSA and then as chairman of the Board of Governors. During
his term of office the appearance of the entrance to the school was enhanced and the princi-
pal’s office was upgraded.
147
Mrs Liz Müller - Principal 2003 - 2006
148
Many other projects were undertaken.
• The caretaker’s room was completed.
• The existing staff toilets were upgraded.
• Additional toilets for the female staff were built
• The seminar room was re-carpeted
• The previous caretaker’s room was incorporated into the seminar room as a serving area.
Mr Niel Spheres was elected the new Chairman of the Governing Body.
School fees were increased to accommodate a security fence and surveillance cameras to en-
sure the safety of pupils and to curb vandalism. TheAmenities Committee addressed this issue
and a palisade fence and an effective camera system were approved and installed.
Mr Phillip Botha was elected chairman of the PTSA, the main objective of which was to improve
the percentage of parent and pupil involvement in the extra-mural activities of the school. The
increasing involvement in derby and contact days, the good turnout at the food festival and the
successful post-matric dance held for the first time in three years were mainly owing to their
efforts.
The running of the tuckshop was taken over by Amanda de Reuck at the beginning of 2003 with
great enthusiasm and the intent of offering pupils something different. There was a fund-raising
drive to continue raising funds towards a clubhouse/ cafeteria at the school. R25 000 was raised.
The prefect body had a training seminar and a three-day camp river-rafting on the Breede
River at the beginning of the year. They organized Valentine’s Week and Spirit Week, and
various other activities as well as Prefect Assemblies. Spirit Week included the highly antici-
pated Fairmont/Settlers Contact. There were a number of prefect exchanges with The Settlers,
Durbanville High, Belville High and Westerford.
The SRC organized a number of activities, including a Grade 8 Bring and Braai, a Civvies Day
Pyjama Day to donate funds to underprivileged schools and the Inter-Schools Cheerleaders
Fund, a Chowdown Competition, “Make-Yourself- Noticed” Civvies Day, quick-selling hot
cross buns scheme and encouraging the entire school to participate in the Easter Eggs Hunt.
They also designed a new school cap and began the Team of the WeekAward. Various Student
Exchanges took place with Stellenberg, The Settlers, Abbots and Guguhletu, and during Aids
Week pamphlets were handed out and donations given to various Aid Organizations.
A number of firsts in the academic field were:
• the introduction of a mini-exam in the first term
• the presentation of Art History in power-point format
• simulated Business Enterprise based on real transactions
• the first Grade 11 class taking Computer Studies HG as a 7th subject, previously
taught only at Durbanville High School
• GeographyexcursionsalongtheTableBaycoastline,andalongthecoastuptoKleinmond
• Music excursions to Stellenbosch Conservatoire
• Natasha Otero took part in the Johann Vos Piano Competition
• Jane Lindhorst achieved as top Physiology student in the Western Cape
• Technical Drawing had a project to draw a perspective view of the clubhouse.
The annual production , “New Rock City”, was written by two of Fairmont’s English teachers
and began a new cultural revival since Fairmont had its own stage crew, propmasters and
make-up artists. The Designer and Face of Fairmont competition was organized by Sean
Loots, a past pupil. A Chamber ensemble was established at the beginning of the third term
and thirteen artworks were entered in an Eistedfodd. Eleven awards were received for these.
149
A warm welcome for Mrs Müller on the annoucement of her principalship - 2003
Jean-Pierre Catto - Special
Award: Student Leader and
Principal’s prize - 2003
Prefect Exectutive - J Clark (Deputy Head Girl) J Catto (Head Boy),
Mrs E Müller (Principal), T Blackwood (Head Girl) and G Staffen
(Deputy Head Boy) - 2003
Some Personalities of 2003
Claudia Cole - Good Fellowship Warren Kent - Past Pupils’ Award Ryan Hultzer - School Dux Geoffrey Schlee - 2nd in Class
Stephanie Zietsman - 3rd in Class LisaLoynes-4thinClass AlexaHelm-5thinClass Walechia Vraagom - SA Swimming
150
The Egyptology and Classical Civilization Society focused on Tutankhamen, Cleopatra and
ancient mythology. A wargaming society was also an interesting club.
2003 was the year in which the saying “Innes House Rules” became a reality. Innes House won
the Inter-House athletics and Spirit Trophies. It also won the swimming gala and the Inter-House
competition.
As far as sport was concerned, 2003 was the most successful year in the history of Fairmont
rugby. Seven teams were fielded and all teams were undefeated for 75% of their matches.
They proved Gary Player’s words: “The more you practise, the luckier you get.” The Player
of the Year was Warren Kent. The girls’ badminton team beat The Settlers for the first time in
five years and the netball team won their league.
During the March holidays, Mr Elgie and Mr Horsthemke accompanied sixteen hockey play-
ers on a successful tour to Belgium and Holland.
In swimming, a new Grade 8 learner, Wilechia Vraagom, took part in the African Games held
in Luanda in August and won five gold and two silver medals. She also represented South
Africa in Brazil at the end of September.
There were a number of sportsmen who received Western Province colours for various sports,
namely Kyle Kokott, Joshua West, Jason Soloman and Bruce Mcmullen (hockey); Coralie
Steenkamp (rhythmic gymnastics); Grant Snyman (baseball); ShamizAllen (rugby); Wilechia
Vraagom (swimming); and Wietske Rubow (aerobics),
At the annual speech night a Special Award for a True Gentleman, in the form of a painting of
the school, was given to Mr Clive Wigg, former principal, for his contribution to the school
facilities, the school song, motto, uniform, The Settlers Contact and various other events.
The school obtained thirt-six A aggregates in the final examinations - the most ever at this
stage at Fairmont!
Ryan Hultzer, the school Dux, obtained 101,7%, having obtained 100% for Mathematics HG
and being placed first in Computer Studies HG in the province.
A photograph of the painting of the school presented to Mr Wigg.
151
TOGETHER WE MAKE A DIFFERENCE
2004
In 2004 the Board of Governors decided to see the year as a consolidation year, concentrating
on school matters, policies, staff selection, budget control, parent/pupil/teacher communica-
tion and planning for the school’s future growth.
The school had a staff of thirty state-employed teachers and a budget for twenty-seven addi-
tional teachers. Five educators resigned, namely Mrs Te Roller (birth of child), Ms Cromhout
and Mr Montague-Fryer (joined private sector), Mrs Greeff and Mrs Wilbraham (retired) and
Mrs Tracey (husband relocated to Australia.)
In the spirit of the theme “Together we make a difference”, parents, pupils and teachers partici-
pated in a number of activities throughout the year.
The Board of Governors authorized the purchase of fifty-five new computers, the upgrading of
the electrical supply, lighting and the new school reception area, shade parking for the teach-
ers’ as well as planning for the upgrade of the six prefabs, the creation of three additional
classrooms and a lecture room from existing facilities.
Approval of parents was obtained to plan for a multi-purpose facility with construction begin-
ning in 2005.
PTSA
The PTSAtried to involve the parent body in their efforts of fundraising to contribute to school
funds.
• The tuckshop raised R25 000 under the leadership of Amanda de Reuck.
• The Food Fair was predominantly a social event run by Ross Odendaal and team.
• The raffle co-ordinated by Wendy Grimm raised R72 000.
• A Valentine’s Dance was a social event which raised R5 800.
The prefects and SRC truly succeeded in achieving new levels of co-operation. The prefects
had a very successful Grade 8 orientation day and Grade 8 athletics meeting. They also had a
team-building camp on the Breede River.
The SRC organized a number of annual events such as the SRC Chowdown, assemblies, teachers’
teas and civvies days as well as a Fairmont Phat Jam, Valentine’s Week, Bands for Charity
Campaign (which raised R 3 000 for the Guide Dog Association for the Blind), a mass visit to
old age homes and shelters for abused women and children, Aids Week, and managed to pro-
vide music at breaks.
The Grade 8’s went to Simonsberg Christian Centre in Stellenbosch for their annual camp
because of the large numbers of pupils, and had their first Grade 8 gala, initiated by Mr Dingley.
On the cultural front the Interact Society organized an inter-class sandwich competition while
the Debating Society, a choir of Thirty-six members, and the Egyptology and Classical Civili-
zations Club were very active throughout the year.
The annual dramatic production “Clue” was based on the Parker Brothers’ board game, Cluedo,
and was greatly enjoyed by all whodunit fans. This very funny production takes place against
152
Valedictory Ceremony - 2004
Valedictory 2004 - Mrs Müller, Head Boy Jade Köhler, Head Girl Monique Huysamen,
Deputy Head Boy Sean Hulley and Deputy Head Girl Lauren Hambides
153
the backdrop of 1950’s Washington D>C. and the MacCarthy Witch trials. Six unsuspecting
people are invited by a mysterious Mr Boddy to Hill House, where the staff all seem to have
hidden agendas. Add the arrival of a stranded motorist, an off-duty policeman and a singing
telegram girl and you have a rollicking play.
The Inter-House plays were very entertaining with productions by Dale (A Bed full of Foreign-
ers), Muir (4 Shizzle Dizzle) and Innes (Word of Word). Innes was successful in winning the
Best Play Award. Other winners were Dean van Heerden (Director and Best Actor), Fiona
Tanner (Best Actress), Dean Louw (Best Supporting Actor), all from Innes, and Cara-Jean
Petersen (Muir) and Tyren McNamara (Dale) as Best Supporting Actresses.
The Face of Fairmont competition was organized by Past Pupils’Award Winner Claire Allen.
The 6th Annual Fashion Week included The Student Designer and Face of Fairmont competi-
tion. Leanne Williams performed “My Immortal”. The winners were Karryn Jones and Michael
Williams (1st), Shannon Jones and Kerry Deaconas (2nd) and Rori Fortuin and Damian Whatley
(3rd). Andrew Davenport and Lauren Ter Morshuizen were awarded the prize for most photo-
genic male and female, respectively.
The first prize-winner of the Student Designer Competition, which took place on the same
evening, was Micah Chrisholm, while second prize went to Janet Phillips and Jenna Fowlie,
and third to Samantha Murray.
On the sporting front, Innes, under the leadership of Mr Piet Cronje, won the Inter-Schools athlet-
ics and swimming gala again. The school decided on the theme “All that Jazz” from the current
“Chicago” and won the Cheerleading Cup at the Annual Inter-Schools Athletics meeting.
There were a number of sporting achievements throughout the year.
• Fairmont was recognized as the top swimming school in the Northern Suburbs.
• Kim Bonney (U 19) received W.P. USSASA Colours for swimming and captained
the USSASA team.
• Wilechia Vraagom, Lauren Vogel (U 16), and Caley van Hoeslin and Guinevere
Rogers (U 14) also received swimming colours.
• Caley and Guinevere were also selected for the W.P. Life-saving Team.
• Wilechia Vraagom also obtained S.A. Colours and represented SouthAfrica in Brazil
in September where she received three medals - two gold and one silver.
• Our Softball team were runners-up in the A League.
• Mr Long was selected as a Manager Coach of the W.P. U 16 Softball team which took
part during December 2003 and was placed second in South Africa by the end of the
tournament.
• Steve Smith was officially ranked twentieth best U 18 tennis player.
• The soccer first team won their final match against Milnerton, which made them the
top team of the Atlantic Zone.
• Bianca Smyth, Zikhana Jonas, Jody Hopley, Sue-Al Collins and Lizaan Brand formed
part of the Regional Soccer team which went to Port Elizabeth in September.
• Fairmont won a trophy at an Indoor Soccer Tournament arranged by the German
School.
• Leanne Beattie, Candice Johnson and Tarryn Mutch made the SA National Drum
Majorettes team while Melissa De Lange, Angelique Mills and Julia Taylor were
awarded WP colours.
• Vaughan Wise was selected for the SA National U 19 team and the U 19 SA
Volleyball team.
• Coralie Steenkamp received WP colours for Rhythmic Gymnastics.
154
The reception area was upgraded - 2004
Fairmont Rugby Squads visit Argentina - 2004 The Annual Production “Clue” - 2004
155
Fairmont Rugby went Latino as thirt-one players and 3 staff members, Mr Cronje, Mr Free-
man and Mr Dingley, together with Mr and Mrs Speres and Mrs Dingley, spent eleven days in
Argentina.
Warrick Wyngaard ended his report of the tour as follows: “All in all, it was a tour never to be
forgotten. As they say “friends made on the sports field are friends for life and the memories
you share with them will never be forgotten”... “Pro amore Ludi”: “for the love of the Game.”
At a special Academic Achievement Assembly in the first term, the 36 A candidates of 2003
were honoured.
The Dux of 2003, Ryan Hultzer, addressed the pupils. His speech was both relevant to the
current pupils and future pupils.
The following is an abridged version of that message:
“I have been asked to speak to you this morning about achievements and how I achieved
academically.
Well firstly, you need to have some sort of goals. For me, it was ensuring that I set the highest
possible standard of work. I set longer term goals, such as achieving a high final aggregate,
but the only way to achieve this was to set smaller goals for each test, exam and project. And
for certain tests and exams, my goal wasn’t just to get an “A”. I was aiming much higher. I
think that as soon as you limit your goals, you are limiting your result. So, for your next test,
don’t try to get only 10 or 20 percent more; try to get a superbly high result.”
I suppose you want to know how to achieve the goals you set. Well, there is no guaranteed
method of achieving extremely high results, but here’s what I think is needed to achieve your
best results.
1. A comfortable studying environment.
2. Put lots of effort in all of your work.
3. Don’t be scared to ask for corrections.
4. Do subjects that interest you.
5. Be healthy - especially when studying.
6. Avoid missing lessons or not concentrating during lessons.
7. Don’t overwork yourself.
But, what if you try all this and still can’t achieve? Well, don’t give up. You will later discover
how important a good Matric pass is when you are looking for a job or planning to study
further.
To finish off, I must just say work hard this year and be proud of any achievements you make.
Remember - it’s not the knowledge you gain at school that is important, but the way of thinking
to which you become accustomed.”
The final words of the Head prefect, Jade Kohler (who led the prefect body with Monique
Huysamen) echoed the sentiments of many matrics as their year at Fairmont ended.
“I’ll never forget Fairmont High School, my second home and family”.
The matriculants of 2004 did not disappoint us and 27 A aggregates, 44 B and 59 C aggregates
were obtained at the end of the year. Gannie Tzoneva achieved 106,1 %.
156
Ferry crossing from Buenos Aires to Montevideo - 2004
The Faces of Fairmont - 2004
157
2005
The year started with 1200 pupils, thirty-one state-employed teachers and twenty-nine addi-
tional teachers. There were eleven new teachers. Parents of Grade 9 pupils were informed of
the new subjects at a special Grade 9 subject choice meeting since the new FET curriculum
would begin in 2006. Teachers attended special courses in the July and September holidays.
The Board of Governors under the chairmanship of Mr Mike de Villiers focused on maintain-
ing the balance between academics, cultural and sporting activities. It attempted to spread the
budget equitably across these disciplines.
The following decisions were made:
• four additional Board-appointed posts were created
• substantial funds were to be allocated to upgrade the prefabs, corridors and lighting
• the budget for outside coaches to assist coaching of sport was to be increased
• the replacement of key equipment would take place
• the facilitating of Fairmont being part of the new astro turf hockey field planning at
the old stadium, alongside Voortrekker Road in Bellville would be a priority
• the first impression of the proposed Multi-purpose Centre would be shown
AMESSAGEFORTHEMATRICSWITHPERMISSIONFROMTHEAUTHOR,MR
NORMAN NEL, FROM HIS BOOK, ‘WOULDYOU PLEASE SAYAFEWWORDS’.
One of the members of the Board of Governors and a matric parent, Niel Speres, gave
the following contribution on behalf of the all the matric parents representing the class
of 2005.
“ The chaplain’s advice to a matric pupil on graduation
day: ‘I am giving you the ball, and naming you the scrum-
half for your team in the game of life. I am your coach,
so I’ll give it to you straight.
“There is only one game to play. It lasts all your life,
with no time out and no substitutions. You play the whole
game all your life. You’ll have a great backline and full
back. You are calling the signals, but the other six fel-
lows in the backline with you have great reputations. They
are named Faith, Hope, Charity, Love, Peace and Com-
mitment.
You’ll work behind a truly powerful pack of forwards.
End to end they consist of Honesty, Loyalty, Devotion to
Duty, Self Respect, Sturdy Cleanliness, Good Behaviour,
Courage and Enthusiasm.
The goal posts are the gates of Heaven. God is the referee and the sole official. He makes
all the rules, and there is no appeal from them. There are ten rules. You know them as the
Ten Commandments and you play them strictly in accordance with your own religion.
There is only one important ground rule It is: ‘As ye would that men should do to you,
do ye also to them likewise.’
Here is the ball. It is your immortal soul! Hold onto it.”
158
Fairmont won the Inter-Schools’ Cheerleading Trophy - 2005
The Fairmont Annual Production -
“At The Hop” - 2005
Gina Louw and Lloyd Rhodes
“At The Hop” - 2005
159
PTSA
The PTSA was successful in contributing approximately R110 000 towards the Governing
Body funds despite difficult times in respect of fund-raising.
The tuckshop was open for extra-mural events at school, the raffle raised approximately R80
000 and it was decided to continue with the raffle as an annual event. The carnival on 29
October was successfully co-ordinated by Amanda de Reuck.
As usual Fairmont made a number of contributions to the community, namely to the Reach for
a Dream Organization and the SPCA. The school assisted Rotary in purchasing wheelchairs
for the needy as well as donating school stationery for the needy in Lesotho. The matrics also
treated the elderly to a Senior Citizens Tea Party.
The prefects and the SRC had a very busy year.
The prefects organized the Grade 8 orientation day and spent the day teaching the Grade 8’s
what it meant to be a “Monty”, and held the traditional Grade 8 sports day. They organized a
Song Competition and a number of Civvies Days. They spent a weekend away at High Africa
Camping Resort with Mr Dill and Ms Piek rock-climbing, swimming, playing soccer and
going for walks.
In the second term a school dance was held, and there were prefect exchanges with Table View
High School, Durbanville High and Stellenberg High School, while in the third term Spirit
Week was celebrated with walls being decorated, motivational posters and baby photos being
plastered everywhere and a Hug-a-Prefect competition being held. A themed Civvies Day
“Monties on a Mission” was held for the upcoming Settlers Contact. The prefects and SRC’s
from both schools met for discussion and dinner at The Settlers High School and both plays by
the respective prefects dazzled the audience. The prefects also organized the annualAcademic
Dinner held at Anica Restaurant in Durbanville.
Theprefectsof2005provedtobeamulti-talentedgroup. TheyparticipatedintheInter-Houseplays,the
Annual Production, FashionWeek, the Senior DebatingTeam, Monty Bears, Inter-School athletics and
every imaginable sports team, and many achieved outstanding academic results.
The SRC camped at Kleinbaai to put their plans into place for the busy year of planning assem-
blies, choosing Team of the Month and Teacher of the Month Awards as well as for a student
Dance - the SRC Shakedown - for which a guest DJ was hired. A Valentine’s Day celebration
was organized - “A Tunnel of Lurv” - and the Animal Welfare Centre in Bellville was visited.
A donation of R2500 was given from Civvies Day’s Funds.
As far as the Houses were concerned, 2005 was a year which was good for every house. Innes
House beat Muir by one point in the Inter-House athletics. Dale House won the Academic
Shield and Muir won the co-curricular trophy, awarded at Speech Night.
Innes did, however, win the swimming and one-act play competitions. Muir and Innes shared the spirit
trophy. And,yet,anothertraditionwasstartedwiththeBarneysong“Iloveyou-youloveme”becom-
ingapartofInnesHousewithMrPietCronjeinmind,who encouraged Innes House with the words:
“To the world you might be one person, but to one person you might be the world!”
Inter-Schools were held at the University of the Western Cape campus. Fairmont was to present
the most complex cheer to date. The excitement had reached fever pitch at the Big Brag and
the theme ‘Boogie Wonderland” would capture the imagination of all those present. The cheer-
leaders spent the night before the big event at D’Aria guesthouse in Durbanville, waking up at
4.30 to eat a hurried breakfast before going to the stadium to prepare the finishing touches.
Fairmont brought the spirit trophy home after four years, and we were placed second overall.
160
The Annual Talent Show was introduced in 2004
Fairmont performed well at Inter-Schools 2004 and won the Spirit Trophy
One-Act Play Winners - Alex de Villiers, Candice Harding, Gavin Cook and Fiona Tanner - 2005
161
The Settlers Contact in July, the Bergvliet Derby in May and the Milnerton Derby in August were
enjoyed by all. The rugby team was especially successful, winning all three derbies and against three
touring sides.
The girls’ hockey team went to Argentina. Fourteen girls, Mrs Jacobs and Miss Milne left on
Easter Sunday from Cape Town. Nine hours later they landed at Ezeiza International. They
experienced the sights of BuenosAires and the tango at the magical town La Bocca. They also
met the world number one rated women’s hockey player. Then they travelled to Tandile,
where they played their first game on a gravel pitch. They did a lot of shopping and exploring
and met up with other SouthAfrican touring sides. They spent a night out in the trendy town of
Ricoeletta and then visited the Fiesta Gaucha Ranch, which was one of the highlights of the
tour. Here they experienced the cowboy way of life - horseriding and enjoying the local danc-
ing. The team returned on 7 April with many memories of a very enjoyable tour.
The school was also very honoured to have Shaun Pollock share breakfast with us as well as
Mr P. Levi, who was the guest speaker at our sport awards evening in October. The top achiev-
ers of our teams were congratulated on their achievements.
Top achievers who represented South Africa were:
•Samantha de Villiers and Colette Janssen (aerobics) at the Fisaf junior worldAerobics
and Fitness Championships in Moscow, Russia in November 2005. Lauren Cannone
was selected for the Rhapsody team to take part at the same venue.
•Shannon Ekermans (baseball) was selected as a member of the S.A. u.18 Baseball
Team.
•Ciaran Liedeman (chess) won the Africa Amateur u.21 title in June 2005.
•Kenneth Ketterer was awarded S.A. Team Colours for Track Cycling and Road Cycling.
•Brendon High and Garth High received S.A. Junior Colours for (Bass) Angling.
•Richard Murray was the u.17 All African Triathlon Champion for 2005 which
qualified him to be a member of the S.A. Triathlon Team.
On the cultural side events such as The Designer and Face of Fairmont (organized by Claire
Allen), One-Act Plays (won by Innes House), the Talent Show (organized by Mrs Kurt) and
the annual production (produced by Ms Bleeker) took place.
About 500 pupils and parents attended the One-Act play competition to see Innes garner six of
the awards. Fiona Tanner won the director, scriptwriter and lead actress prizes. Gavin Cook
was the best actor.
The annual production “At the Hop the heart and soul of rock ‘n’roll” had the oldies tapping
their feet. It is the Summer of 1958 in Spartenburg, South Carolina. Four close friends have
one last fling together before going to university and being married - a summer of adventure,
romance and unlimited freedom. The local diner, The Hop, is the backdrop of their adventure.
An heir to a hotel fortune, brings his friends to his family’s holiday home and so the two groups
meet for an unforgettable summer of bobbysocks, ducktails and kiss curls, drive-ins and Elvis.
A real trip down memory lane!
Interact continued their contact with Rosehaven OldAge Home, the Children’s ward atTygerberg
Hospital and provided sandwiches for the less fortunate.
The concert band played at the annual Speech Night and the choir of thirty performed at the
Ascension Day service and matric Valedictory Service.The Talent Show held with Idol con-
testant Ezra Langeveldt as MC was a great success, ane the debating teams continued to repre-
sent the school well in their league.
As usual the matric farewell was an evening of sheer magic as the young gentlemen and ladies
showed off their finery.
162
A number of academic highlights can be mentioned.
• four Grade 12’s, namely Zoe Blaauw, Yanni Yang, Jevan van Vuuren and Kyle
Martin, participated in the Accounting Olympiad and they averaged highest out of
the fourty-six schools taking part in the first round.
• Pupils could now choose Art HG, Art SG, Graphics SG, Drawing SG, Painting SG,
Sculpture SG or Design SG.
• Biology had a number of excursions. The Grade 9 biology camp was at Mizpah
while the Grade 10’s visited Dalebrook. The Grade 11’s visited the World of Birds at
Hout Bay and made a trip to Seal Island. The Grade 12’s visited museums and the
dissecting rooms of the University of Stellenbosch at Tygerberg Hospital.
• English pupils attended a production of HAMLET at UCT.
• The history pupils undertook excursions to Robben Island and the Holocaust Centre.
• Home Economics prepared food for the Matric Farewell and the matric breakfast.
• The Grade 9’s did a traffic study in Durbanville and the Grade 8’s went to
Froggy Pond.
• The annual excursion of Physiology pupils to the Tygerberg Hospital Anatomy
Department was undertaken without anybody fainting at the sight of cadavers and
“body bits” in jars.
• 120 Grade 10’s visited the MTN Science Centre at Canal Walk to attend the show
“Imaging Einstein” to commemorate the centenary of the birth of Albert Einstein.
• The Grade 11’s spent an afternoon at “Phenomenal Physics” at UCT.
• Pupils participated in the Equal Water Distribution System Competition.
• Grade 8 learners made accessories in Technology classes to be sold during the SoccerWorld
Cup.
It should also be mentioned that Mr Elgie received a Long ServiceAward from the WCED for
thirty years of service.
At Speech Night special awards were given to Mrs A de Reuck, Mrs L. du Toit, Mrs A.
Langeveldt, Mr N. Speres, Mrs A. Stone, Mr G. and Mrs J. Vlok. The Honours summa cum
laude award was presented to Yanni Yang for the highest percent in all exams from Grade 10 to
Grade 12. The Principal’s Award was presented to Michelle Kilfoil.
The Dux of 2004 shared her tips on success as follows:
• good self-discipline
• good study methods
• understanding your work
• summarizing and testing yourself
• regular breaks and being active
• interests whether sport of cultural
23 pupils obtainedA aggregates, 44 obtained B’s and 53 obtained C’s, which meant that 119 of
the 200 matrics that wrote had aggregates above 60% - a record to be very proud of indeed.
163
The school was honoured to have Shaun Pollock as guest at a special breakfast. Mr Du Toit of the
Governing Body and Shaun pose for a photograph..
Fairmont pupil Edward Ndopu and spectators at the Gala - 2005
164
A brief overview of Mrs Müller’s role was given in the two services held at school to accom-
modate both pupils and parents as well as the many people in the education field who wanted
to pay respects.
Elizabeth Irene Müller was born in Wellington, Cape and matriculated at Huguenot High School.
She graduated with a BSc,HDE and BEd from the University of Stellenbosch and Unisa. In
1976 she married Helgard Müller and had two beautiful daughters, Nina and Bianca.She started
her teaching career in 1977 at Ysterplaat High School. In 1985 Mrs Müller was appointed as
Head of the Mathematics Department at Fairmont High School and subsequently became Deputy
Principal in 1997.
On 1 July 2003 she was officially appointed as the new principal of Fairmont High School and
was warmly welcomed by the staff, pupils and community alike. She set out passionately to
take over the reins at Fairmont in a firm yet compassionate manner. In no time, as principal,
she made her mark.
As an educator, Mrs Müller showed a keen interest in educational affairs by attending numer-
ous conferences, seminars and workshops. Change was not something she backed off from
but instead enthusiastically explored. She made many positive contributions towards educa-
tion.
Mrs Müller was a perfectionist in everything that she did and as a result consistently delivered
work of a high quality. Her strength and the enthusiasm with which she tackled her day-to-day
tasks were greatly admired by all. She managed to establish and maintain an amicable and
respectful relationship with her staff, pupils and parents. All who knew her certainly appreci-
ated her quick wit and sense of humour. Despite her outstanding achievements, she remained
humble and grateful for the opportunities awarded her.
Mrs Müller had a very heavy workload, yet insisted on teaching. She felt that it was necessary
to be aware of the pupils’ needs first hand and so it was back to the classroom for her. Her
extraordinary people skills and understanding of children allowed her to make a difference in
the lives of many of the pupils. The pupils looked up to her as a role model because she always
led by example. They were filled with great respect and admiration for Mrs Müller because as
principal she had a vision for the school which was to strive for excellence by seeking oppor-
tunities for all to realize their unique potential through self-discipline in a trusting, enjoyable
and caring atmosphere of mutual respect.
Mrs Müller fulfilled so many roles. She was not merely a principal and educator but to many
she was a mentor and loyal friend, a mother-figure filled with compassion, a confidante and a
motivator. Her door was always open and one was met by a woman who would listen. So
A SORROWFUL YEAR - FAIRMONT SALUTES
LIZ MÜLLER
2006
2006 was certainly a very sorrowful year for Fairmont with the death of the principal, Liz Mü
ller as well as that of Mark Holroyd, a dedicated English teacher and much admired Head of
Department. We also experienced the death of a young Grade 10 pupil, Graham Page.
165
2006 was a sorrowful year with the passing away
of Principal Mrs L Müller
Mr Mark Holroyd, a dedicated English
teacher and much admired Head of
Department, passed away in 2006
Mrs Müller placing the first brick of the
Multipurpose Centre 2006
Mrs Müller in a light-hearted moment in 1994
166
many have had precious moments shared with her in which she comforted, advised and sup-
ported.
A week before the June holidays, Mrs Müller was taken ill and after a battery of tests, diag-
nosed with cancer. She remained positive. She underwent extensive surgeries and received
therapy treatment for her condition. Though eventually frail in body, Mrs Muller was excep-
tionally strong in spirit and it was the fighting spirit which inspired so many around her. On 10
August at 10:30, after a courageous battle, she sadly passed away.
The Fairmont High School staff, pupils and parents will always remember her for the truly
remarkable lady that she was. In her honour we shall continue to build on the very solid
foundation that she lay and memory will be kept alive.
Fairmont was also very saddened by the sudden death of Mark Holroyd, who was considered
by many to be one of the best English teachers. InAugust he was diagnosed with an aggressive
cancer of the liver, and after a short but noble battle, he sadly passed away on Thursday 21
August.
The year had started with 1290 pupils, which was an increase of 109 pupils from 2005. The
pupil/teacher ratio was still a priority so the staff consisted of thirty-one governing body posts
and twenty-nine state-employed teachers.Twelve new teachers joined the staff.
Construction of the multi-purpose centre began. There is a lovely photograph of Mrs Muller
laying the first brick on 14 January.
Two additional classrooms were made by sub-dividing the lecture room, and a fourth compu-
ter room was commissioned to cope with the growing demand for the subject. Cricket nets
were refurbished, a discus throwing circle was constructed and additional security fencing was
installed around the tennis court areas.
Power outages caused many problems for our server was damaged and the security gates did
not work. There were also problems associated with not having a bell to indicate the end of
breaks.
The chairman of the PTSAJohn Lucas, recorded that the raffle raised R62 000. Other contribu-
tions were from advertisements, the clothing bank and the tuckshop. The annual festival was
held on 28 October. It was decided that once the Multi-purpose Centre was completed, the
PTSAwould be tasked with raising funds to purchase all crockery, cutlery, multi-media equip-
ment, stoves and fridges, unless willing parents are prepared to donate the funds to the school
for the purchase of this equipment.
The Board of Governors had a seminar on Good Governance in terms of Documents, Policies
and Procedures, conducted by Mr Clive Roos, an educational policy advisor.
As a result, the Board of Governors embarked on an audit of good governance practices as a
Board of Governors in consultation with other schools and hope to have this on CD as well as
on our website for the entire Fairmont Community. This will include all policies and proce-
dures, which will allow parents and pupils to be aware of these, especially the code of conduct
as the Board of Governors strive to uphold and improve upon the standards of Fairmont.
In Mrs Müller’s first circular of the year, she stated: “ To make Fairmont a success and to
ensure that we deliver the best, it takes all of us to be committed, and so the theme for 2006 is
‘Striving for excellence’.”
In striving for excellence, therefore, Fairmont was once again very busy throughout the year.
The prefect body was led by Jamie Rossouw and Jayde Dunlop, and had a team-building camp
on the Breede River. The prefects and the SRC organized annual events such as the Grade 8
167
The Governing Body - 2006: Seated, Mr M de Villiers (Chairman), Mrs A Lourens, Mrs L Fuller
(Vice-Chairman), Ms L van Aswegen, Mrs M Kropman. Standing, Mrs B Norman, Mr R Dingley,
Mr A Kokott, Mr A du Toit, Mr L Liederman. Absent, Mr B Dill and Mr P Lester
The Governing Body Chairman, Mike de Villiers and Mrs Liz Müller - 2006
168
orientation day, the Grade 8 athletics meeting, civvies days, and the chowdown competition.
The first SRC Student Awards evening took place with entertainment provided in the form of
singing, dancing and stand-up comedy.
As usual, many donations were made to various charities such as the SPCA, Reach for a
Dream, R5 000 to the Red Cross Children’s Hospital, the Safe House for orphans in Joostenberg,
the Tygerberg hospital childrens’ward, as well as continuing to provide sandwiches for a local
primary school.
Fairmont participated in the Durbanville Bicentenary Celebrations by presenting a profile of
the school for the Tygerburger newspaper, taking part in a street procession through Durbanville,
attending a church service and witnessing the unveiling of a plaque at the Town Hall by the
mayor of Cape Town, Mrs Helen Zille.
On 1 May Sean Loots launched FRESH 2006, a designer competition. A donation was given
from the proceeds to the Reach for a Dream Foundation and awards were given for Interior
Design, 2D work and wearable art.
On 5 May the Face of Fairmont, affectionately known as FOF, was held. Tickets were sold out
a week before the event and it was a “talked-about-for-days-afterwards” event. Neil Sneyd
and Jo-Dee Swart were announced the “Faces of Fairmont”.
The Inter-House one act plays once more had a winning play by Innes. The best actress was
Nicole Bosch and the best actor, Thomas Mitchell, both of Dale House. Other winners were
Best supporting actor: Bruce McMullen of Innes House; Best Director: Robyn Rawlings and
Tracy-Lee de Villiers, also of Dale House.
Many of our children took part in the Tygerberg Eisteddfod and achieved very good results.
Top achievers who received Highest Honours were Ondela Matsha (poetry), Diedre Ellis (crea-
tive writing), You Na Park (piano), Ania Barma (creative writing), Juliana Nardone (dance),
Emily Kempton-Jones and Juliana Nardone (ballet duet), Chane Bunning and Juliana Nardone
(funk dance duet) and Emily Kempton-Jones (poetry).
Other achievements were obtained by You Na Park who submitted an essay entitled “Is Rapid
Urbanization the best Solution to Human Survival in Africa?” and was awarded a distinction
and R1 500 in prize money.
Nicole Janse van Rensburg played the Grade 5 Royal School’s oboe examination and received
87%. She was also rewarded with the first ever Liz Müller Music Trophy for the highest result
in an external examination.
The annual production “Fallen Angel” was exceptional. The school received many letters of
congratulation from people who attended the show. It was a story of intrigue and pulsating
rhythms which thrilled the audience with a soundtrack which contained songs from such greats
as Kenny Loggins, Phil Collins, Elton John, Joan Jett and the Blackhearts, Status Quo, Starship,
Huey Lewis and the News, Cher and the Eurythmics, with the title song “Fallen Angel” by
Poison.
2006 also welcomed back the ever-popular Talent Show, which proved to be a great success.
The evening was hosted by Big Brother South Africa’s very own Ferdinand Rabie, who kept
everyone in high spirits.
An exciting new event in the form of the Makeover Evening included learners as well as staff.
All participants were magnificently transformed but prizes were finally awarded to Miss Kirby
for the Best Teacher Makeover and Terri Evans for the Best Student Makeover.
FIND was started to benefit not only the pupils but also the teachers. It was previously the
169
Members of the Cast of “Fallen Angel” - 2006
Prefects - 2006
170
SCA of the school, but it decided on this name because of the members’ wish that all people
find God, find answers to their questions and find their purpose in life. They started with a
membership of twenty, but this quickly increased to more than a 100 and have become a very
active part of Fairmont.
Other cultural societies such as the Debating Society and Interact continued with the excellent
work and achievements of the past years.
The highlight of the first term on the sporting front was definitely our performance on 10
February at the Bellville Stadium, where we lost by only eighteen points after losing by 183
points in 2005. Fairmont won the Spirit Trophy and the girls won the Best Girls’Team trophy.
In the Inter-House competition, Dale House came first overall and Innes House second since
the winter Inter-House sports were also included.
The annual Bergvliet Derby, Milnerton Derby and Settlers Contact were enjoyed by all, and on
26 August a Past Pupils’ Sportsday was held.
The school had a full sporting programme with learners achieving Western Province colours
in Aerobatic Dance, angling, badminton, baseball, chess, cricket, cycling, drum-majorettes,
gymnastics, hockey, Irish dancing, karate, netball, rugby, soccer, squash, swimming, Scouts
Sport aerobics and fitness, and Tri- and Duathlon.
Danielle van Niekerk was selected for the South African Girls u16 squash team to tour Scot-
land and England in December.
The Boys’Hockey team consisting of fifteen players and three staff members arrived at Heathrow
Airport in London on 25 March on an overseas tour. They had many adventures and
misadventures shopping in Picadilly, taking a bus tour of London, taking the barge down the
Thames and walking to Greenwich as well as getting back to Barking.
They drew one game 0 - 0 and won 4 - 1 against the Buckinghamshire champions. They then
left for Holland, where they played against a men’s team and lost 1 - 3. All the games in
Holland were played at night. They lost one game very badly, but then went on to win the next
six games. The best game of the tour was played against the Dutch u18 team, which they lost
1 - 3. The tour of eleven days was filled with games and visits to many places.
One of the highlights for the first rugby team was their tour to East London for the Cambridge
Sport Festival held during the first weekend of the June school holidays. The first team also
had the chance to play against three touring sides, namely Hilton College, Gelofte School and
Whitgift School.
The end of the year functions including Speech Night, the Matric Farewell and the Valedictory
service were filled with a mixture of celebration and sadness since the loss of those dear to us
during the year was felt most poignantly at these times.
Special Awards were given to Rosalind Odendall, Jenny Martin and Marian Dingley; Honours
summa cum laude to Laura van Laeren for the highest percentage from Grade 10 to Grade12; the
Good Fellowship Prize to Sita Smit and the Principal’s Award to Janine Janssen. It only seems
fitting to end the year of 2006 with an extract from the words of Mr N.Veldman, said at the annual
Remembrance Day Service, which was held on 23 November at the Memorial Stone.
“The way you live today will determine how you will be rememberd by others and how you will
be judged by God. What you do now does matter. Every act of our lives strikes some chord that
will vibrate in eternity.”
Those we had lost in 2006 certainly will always be remembered as an integral part of the
history of Fairmont.
171
The Fairmont community - pupils, staff and parents - united in their sorrow would echo the
words of the chairman of the Board of Governors when he quoted from James1 verse 1:4.
“My brothers and sisters, consider yourselves fortunate when all kinds of trials come your
way, for you know that when your faith succeeds in facing such trials, the result is the ability to
endure. Make sure your endurance carries you all the way without failing, so that you may be
perfect and complete, lacking nothing.”
Fairmont endured a difficult year, but remained united and strengthened.
Cheerleaders - 2006
172
SOMETHING TO CELEBRATE: 30 YEARS!
2007
The year started with the report of the academic results of 2006, which were most pleasing.
The top candidate, Laura van Laeren, had obtained an aggregate of 102,67%. There were 24A
aggregates, 33 B aggregates, and 46 C aggregates.
Mr Ron Dingley was Acting-Principal and Mrs A. Lourens Acting Deputy . Mr Dingley was
later promoted to the post of Principal of Fairmont High School. Seven new teachers were
welcomed and certain changes were made concerning school times. A Tuesday test timetable
was introduced.
The first term had a number of events such as the Grade 8 Orientation day, the Grade 8 Fun
Day, a Parents’Welcome Evening, a blood donation day, InterHouse athletics, a matric theme
day, the Inter-House gala, the English Olympiad, the Mr and Miss Fairmont competition and
the Summer Sports Awards. The Grade 8 camps with the Prefects and SRC also took place.
Parents were informed of the new cell phone policy which restricted the use of cell phones and
explained clearly the consequences: first offence - the cell phone would be confiscated and
parents would be required to retrieve it from school; second offence - cell phone would be
confiscated and parents would be required to retrieve if from the school after paying a fine of
R200, and third offence - cell phone would be confiscated and pupil would be required to
attend a disciplinary hearing.
Parents were invited to form a Garden Club voluntarily to meet once a week to further enhance
and beautify the surroundings of the school.
The new parents were addressed by various role-players where a number of key issues were
discussed such as the focus on academics, the Tuesday test series, the discipline system, the
role of the PTSA and the Board of Governors. They were also addressed by the Mothers Who
Care, and the Head Boy and Head Girl.
The Fairmont Inter-House athletics competition was held for the first time at the Bellville
Velodrome and was a great success. Innes won the trophy for Cheerleaders, Muir won the
Spirit Trophy and Dale was the winning House.
ATHLETICS; INTER-SCHOOLS WIN FOR FAIRMONT!
We could not have asked for a better start to celebrate our thirtieth anniversary. It was
indeed a proud moment for the school when our athletics captains, Guinevere Rogers and
Lucienne Vogel, raised the trophy at the announcement of Fairmont’s win. The Inter-
Schools meeting was dedicated to the memory of Mrs Liz Müller, and her husband, Mr
Helgard Müller, was present to hand out the trophies. The theme of “Swinging Sophiatown”
was once again a hit with wonderful rhythms and music such as Meadowlands and Pata
Pata. As a reward, pupils were given a shortened day on 8 February.
The Inter-House one act plays took place in the school hall and a number of pupils and parents
attended. Muir was the winning House. Best actor was Lucienne Vogel and best actress was
Colette Janssen.
Guinivere Rogers and Andrzej Lipowski were selected for the W.P. Life-saving team to com-
pete at the SA National Championship in Pretoria in March. Lynette Morgan and Siobhan
Loots, two athletes, obtained their WP colours and competed at the Belville Velodrome, where
Lynette received a bronze medal in the 400m and Siobhan received a gold medal in the 100m
173
Mr Ron Dingley - Current Principal 2007
174
and bronze in the 200m. They later competed in the National Championships in Port Eliza-
beth. Bradley Barnes (cricket) was selected to represent WP in his age group at the Western
Cape Games at the Tygerberg Cricket Club.
Melanie von Gunten took part in the SAAction Netball Championships in Johannesburg. Her
team won a silver medal.
Bruce McMullen was selected as one of the eight members of the u18 WP golf team
The Mr and Miss Fairmont 2007 replaced the Face of Fairmont function this year in celebra-
tion of Fairmont’s 30th Anniversary. Twelve Matric finalists displayed their talents to an
enthusiastic audience. Mr Fairmont was Lucienne Vogel and Coralie Valentyn was chosen as
Miss Fairmont. Neil Vermeulen was chosen as Mr Personality and Danielle Waugh as Miss
Personality.
The summer sports awards ceremony took place with guest speaker, Bruce McClelland, giving
an inspirational talk on how to focus on achieving in sport.
Two publications by pupils were revived, namely the Grapevine and the Quarter Pounder.
The Multi-purpose Centre was officially opened in the second term by Mr Barry Volschenk,
director of the EMDC North, Western Cape Education Department. This coincided with the
Art Festival with many artworks on view and a coffee shop for visitors. The highlight of this
festival was the celebration music concert with guest guitarist and past pupil, James Grace, and
Myles Roberts. Some of Fairmont’s pupils also performed as well as other invited artists.
On 26 April a special 30thAnniversary Assembly was held as part of celebrating the history of
the school. Reverend Brent Russell, a past pupil, prayed for the school at the assembly and
each pupil received a piece of cake and a colddrink after the assembly. A brief history of the
school was given by the Head Boy, JJ Odendaal, followed by a musical item by Jonathan
Otero. Mr Horsthemke reminisced about the early years at Fairmont as well.
A Grade 8 forum evening was held for the first time in the hall. It was a fun evening and an
opportunity for pupils to voice their opinions and show their speaking talents. There were
twelve teams and a best speaker was chosen in each team. Abest chairman award was given to
Michelle van Sittert to be shared with Siviwe Dlikilili. AToastmasters’Course was also started
and was hosted by Mr Lionel Bourtious of the Bellville Toastmasters. The pupils who at-
tended enjoyed it immensely and will continue the course in the third term.
The Fabulous Fairmont Show was one of the highlights of this year. Pupils, staff and parents
participated to make this a truly memorable evening. Edward Ndopu, one of our Grade 10
pupils, opened the show with a poem written by him. This is the poem:
FABULOUS FAIRMONT
We’ve laughed with her
We’ve cried with her
We’ve triumphed with her
We’ve shared with her
Her spirited active life
Her path to glory is still a strife
Her change is constant
Her excellence is potent
175
Richard Murray Matric 2007, became World Champion in his Duathlon U19 event in Hungary
Birthday cake for all - Kelly Mealor handing out cake at our Anniversary assembly
176
Her vision for greatness
Her efforts inspire togetherness
At times we go by and not notice what
An intricate part she plays in our lives
She’s been around for quite some time...
Oh yes!
Indeed you know who she is; we all do
She has for long been succeeding.
She’s perfected the art of leading
She’s thirty, flirty and outright fun
She’s left her mark but she’s not quite done
We are therefore certain and can emphatically
Say that ‘she’ is, Fabulous Fairmont.
Edward Ndopu
2007 witnessed a dispute between the State and the Public Service Unions, which culminated
in strike action. The school was not affected by this action although a number of staff did
exercise their right to strike.
Mrs Esmeraldo was promoted to the post of HOD at Fairmont and Ms Barnardt joined the
school as HOD in the IT department.
Millicent Gulwa of grade twelve was selected as a presenter for the Kfm Youth Day Experi-
ence on 16 June and we ended the term with the good news that Shameegh Allen of Grade 12
had been selected for the Western Province Schools rugby team. He was congratulated on this
achievement by being the first Fairmont player in the history of Fairmont Rugby to be selected
for the Western Province Craven Team.
After saying a sad farewell to Miss Shirly Milne, a Fairmont past pupiI, teacher and special
member of our staff who left to travel overseas, we welcomed in the third term four teachers to
our staff: Mr Edwards, Mrs Friedenthal, Mrs Hansen and our HOD Mrs Barnardt.
The Drummies returned from the National competition in Durban with some very good results .
It was with heavy hearts that we said farewell to one of Fairmont’s leading citizens, Mr Brian
Dill, who left Fairmont at the end of July to enter the private sector. We thank him for the many
years he enriched our school.
The third term highlight on our calendar, the Settlers Derby, was held at The Settlers School.
We thank them for their hospitality and friendship.
The Milnerton Derby was interrupted by rain, but we managed to complete most of our fix-
tures by organizing mid-week games.
Lynette Morgan represented the Western Cape Youth team at the SouthAfrican Youth games in
Bloemfontein. Adrean Rebelo achieved world champion status by coming first in the continu-
ous fighting division at the international karate event in Orlando USA. Our 1st Badminton
team was selected to participate in the National School Competition in Durban.
Mrs Vermeulen and the cast of “A Celebration of Music and Dance” put on a wonderful an-
nual production show, and we were again amazed at the talent of the school.
177
Mr and Miss FHS Winners, Seated: Lucien Vogel (Mr
FHS) Coralie Valentyn (Miss FHS). Standing: Neil
Vermeulen (Mr Personality) and Danielle Waugh (Miss
Personality)
James Grace, pupil at Fairmont in 1992, stud-
ied guitar with Carlos Bonell at the Royal Col-
lege of Music in London and became the first
guitarist in the history of the College to receive
the Tagore Gold Medal. James has recorded
his first solo CD and is currently Head of Clas-
sical Guitar at the University of Cape Town.
James appeared at the Fairmont Music Con-
cert Celebration in April 2007
The Tuckshop was upgraded in 2007
Bruce McMullen represented the U18 WP
golf team
178
We acknowledged our academic honours achievers at a special dinner at the Piatto Restaurant,
where Eric Symons gave our pupils a special message on achieving in life.
Miss Pienaar, one of our Fairmont staff members was congratulated on her selection to the WP
Peninsula Hockey team.
Our PTSA was very active during the year and one of the many events on their calendar was
the Andy Marinos Breakfast, a successful and informative event enjoyed by 100 guests.
Other events hosted and organised by the PTSA were the successful 30th Anniversary Dance
Bash, a fun evening of dance to the live music of Back on Track, and the Annual Fairmont
Community Festival which raised R80 000.00.
The Past Pupils’ Sports Day took place on 1 September and the Matric Class of 1987 held a
well supported reunion. They donated R5 500 towards the furnishing of the boardroom, an
addition to the donation of a boardroom table and chairs from the Teare family.
Twelve of our girls qualified to represent SA in the 2007 senior and junior World Fitness
Aerobics Championships held in Serbia during October.
Toks van der Linde was the guest speaker at the Winter SportsAwards. His message was that one
should believe in one’s own abilities, have passion for what one does and do it with determination.
On Friday 22 September, the big event of the year, the Matric Farewell Dance, with the theme,
Atlantis, took place.
The new library is established and will be commissioned in the first part of 2008. Plans for a
technology centre were tabled.
Parents at the annual budget meeting voted in favour of a R50.00 per month levy towards a
sport project fund to improve the sport facilities at the school. The first project to be tackled is
the construction of an Astroturf hockey field, which should be constructed in the first part of
2008. Other projects on the list include a gym, improved cricket facilities, rugby terraces and
deepening the pool for water polo, to mention but a few.
How rewarding it was to receive the Matric results of 2007 and witness the best academic
performance in the history of the school. Well done to the Class of 2007 on their outstanding
results and for making us all proud to be part of the Fairmont academic institution.
A summary of the results is as follows:
Number of candidates: 219
AAggregates: 47
B Aggregates: 39
C Aggregates: 58
D Aggregates: 55
E Aggregates: 15
Total scoring above 60%: 143
Total number of subject distinctions: 212
Total number of subject ‘B’s’; 217
Total number of subject ‘C’s’: 311
We congratulated Mrs M Esmeraldo and Mrs M Schnehage, who were both nominated as
acting deputy principals at Fairmont in 2007.
179
SPEECH NIGHT GUEST SPEAKERS
2003 Mr C Roos
2004 Ds J van Rensburg
2005 Mrs M du Preez
2006 Rev. B Russell
2007 Mr C Wigg
DRAMATIC PRODUCTIONS
2003 New Rock City
2004 Clue
2005 At the Hop
2006 Fallen Angel
2007 30 Years of Fairmont: A Celebration of Music and Dance
MR AND MISS FAIRMONT
2006 Neil Sneyd and Jo-Lee Swart
2007 Lucien Vogel and Coralee Valentyn
FACE OF FAIRMONT
2003 Nici Gouws and Robert Starke
2004 Kerryn Jones and Michael Williams
2005 Bianca Rudman and Luke Bunding
MATRIC FAREWELL THEMES
2003 Eastern Mosaic
2004 Moonstruck
2005 A Night at the Opera
2006 Chicago
2007 Atlantis
2003 - 2007
Cast members of ‘At the Hop’
180
Mr Barry Volschenk, Director of the EMDC North, Western Cape Education Department, cuts the
ribbon at the opening ceremony of the Multi-purpose Centre, Wednesday 18 April 2007
The PTSA of 2007. Back: Mrs J Hoenck, Mrs H Kempton-Jones, Mrs F Higgins, Mrs J Hunt,
Mrs J Martin, Mrs M Janssen, Mrs A Dolpire, Mrs R Odendaal, Mrs S de Villiers.
Seated: Mr P Cronje, Mrs C Robinson, Mr B Pearce, mrs J Cooper, Mrs M Hlozek, Mr R Dingley
Absent Mrs A de Reuck
181
A celebration of
Music and Dance
Fairmont 30 years
Cast members
during a lighter
moment at the
school
production “A
celebration of
Music and
Dance”
Mr Schalk Engelbrecht, caretaker at Fairmont High School, retired in 2007
after 30 years service to the school.
182
Reflecting back on what has been written in this publication fills one with pride to be associ-
ated with such a unique school, - a school with a personality of its own, a place where young
people can develop in the security of an enriched academic environment. The school continues
to receive accolades from the top Cape Town universities, singing the praises of our pupils
who go on to study at these tertiary institutions, for their ability to cope and achieve in de-
manding academic circumstances.
It is our vision to continue to make Fairmont a place for all to flourish as individuals in a safe and
caring environment based on a sound code of good behaviour where we all respect one another’s
rights to be happy at school and grow in a responsible way as individuals and good citizens.
Fairmont owes a deep gratitude to all the teachers over the past thirty years who have given
unselfishly to the school to develop that special “Monty” spirit and to parents alike who have
made it possible through their financial contributions and moral support to make the school the
great institution it is today.
In a nutshell, the six key words in the mission statement are central to the continuation of the
reality of Fairmont: Excellence, Opportunity, Uniqueness, Self-discipline, Trust and Respect.
May Fairmont grow from strength to strength - at thirty years of age we salute all the pupils
who have gone through the Fairmont ranks in the knowledge that it is all about them and what
they have achieved these three decades.
Fairmont we are proud of you!
A number of our Fairmont Girls participated at the World Fitness and Aerobic event. Back row: Tarryn
Willemse, Jade Levy, Manya Schut, Niki Gartrell, Colette Janssen and Chané Bunning
front row; Samantha De Villiers, Liezel Killian, Jessica Keytel, Amber Carstens, Nicole Peper and
Natalie Teuchert
183
The new library will be commissioned in 2008
The new Multi-purpose centre
184
APPENDICES
1. Reflections
2. Documents
3. Governing Body Chairmen
4. PTA/PTSA Chairmen
5. Head Prefects
6. SRC Chairmen
7. Honours Summa Cum Laude
8. School Dux
9. ‘A’Aggregates
10. Good Fellowship Prize
11. Principal’s Prize
12. Past Pupils’Award
13. Fairmont Awards
14. First Team Captains
15. Personalia
16 Staff Present during Anniversary year
17. References
185
APPENDIX 1
REFLECTIONS
Memories of a “Montie”
In 1976 I was in Std 5 at Durbanville Primary School, and had always presumed that I would
be going to Durbanville High School, until we heard that they were building a new English-
medium high school. I lived down the road from the new school site, which was a vineyard at
the time, and I remember watching the building process of my “new school”. In 1977 Fairmont
High School (first called Eversdal High English Medium) opened its doors for the first time to
Std 6’s, 7’s and 8’s. I started in Std 6 and I recall feeling both overwhelmed and excited.
Coming from a primary school atmosphere that was old, dark and dismal, I recall walking into
this brand new beautiful building and thinking “wow”! The builders were still in the process
of construction and the smell of new paint greeted me. Everything was brand new. New
classrooms, desks, books, and new science/home economics equipment - everything was shiny
and modern. But best of all - we had no school uniform! For the first year of high school, we
could wear civvies!
Emotions were divided. I felt very grown up and excited going to high school for the first
time, but at the same time I was scared - as I think we all were. After being the top dogs in
Primary School, our bubble burst when we got to Std 6 and realised we were once again at the
bottom of the food chain. But there was an upside to being in high school - the older boys
looked very attractive to us girls - we were at school with men!
It was strange being in a different school with new teachers - most of whom were younger than
we are now; and after having predominantly women as school principals, we now had a male,
by the name of Mr Wigg. We were frightened out of our wits by this man who said he had a
cane in his office! We all vowed never to visit his side of the school building (of course most
of us ended up having a meeting with him at some time or another).
That first year went by in haze of new activities. We had no school hall or sports fields, but we
played at other venues, and slowly the school spirit grew. We acquired a school flag, a school
motto “Stand Fast”, and a school song. Then the dreaded school uniform arrived in 1978. It
was inspired by a classmate, who one day wore a brown and white checked dress. Most of us
hated brown - what an “uncool” colour! For the next four years this poor classmate (who was
very dear to us) was not very popular! But, eventually we accepted the uniform and became
proud to wear it. We now had an identity, we were a group, and we were a school that people
now recognised - we were “Monties”.
A school magazine, “The Grapevine” was started. It was first published by the pupils them-
selves. I remember spending hours typing my fingers to the bone and then hours stapling the
pages together. We charged 5c a copy. In 1979, the first official Fairmont High School Year-
book was published.
Various clubs and societies were started, e.g. choir, drum majorettes, photographic, drama,
debating, etc, which were all fun. Mr Wigg also introduced “The Gardening Club”. This was
our detention activity, usually held on a Friday afternoon. Many of us spent hours digging,
weeding, planting and cleaning the school’s garden. I now often drive past the school and look
at the fruits of our labours of so many years ago.
New sports fields were eventually built, which were sometimes used at break times for a quick
“puff”. Pupils who came to school early in the mornings always met on the front steps of the
hall and had sandwiches and chats, and quickly completed unfinished homework (sometimes
186
copying from our friends). During breaks the girls used the quad areas to tan our legs, much to
the consternation of Miss Coetzer whose repeated “put your socks and shoes on girls” always
went unheard. Noticeably, “The Gardening Club” had many more members in the summer
months. The tuckshop was also a novelty, as the moms served hot soup during winter. Queues
were always long, with pupils buying sweets and chips to munch on later in class, also leading
to another get-together with the “Gardening Club”.
Inter-House (Dale, Innes and Muir) and inter-school sports days were a favourite amongst the
pupils. It meant a day away from the school books and the confines of the classroom. Inter-
House gave us the chance to watch the teachers’ races, which were always hilarious. For the
inter-schools meet, we were bussed to Bellville Athletics Club and screamed and sang our
lungs out, only to come home hot, tired and hoarse, but oh so proud!
The first matric class graduated in 1979, which was a very proud first milestone in Fairmont’s
history. I graduated in 1981 and I remember the Valedictory Service that last day of school.
Where had the five years gone? I was now leaving the comfort of familiarity and facing a new
chapter of my life. We all cried many tears that day. Tears of sadness for leaving our friends
mixed with tears of happiness at the thought of being “free”.
In 2001 I was fortunate enough to help organise our 20th Reunion, and was invited to attend a
school assembly the day before. I remember walking through the school gates and entering
the school. I took a walk through the school. What a nostalgic moment. So much had changed
and yet it was still the same. All the memories came flooding back. Good memories, but at the
same time I felt infinitely sad. Sad, because on a day twenty years ago I wanted to be free of
the constraints of school, and now as an adult, I wanted to recapture that innocence of youth. I
realised then that I was actually “free” at school, but because life is what it is, we never appre-
ciate something until we don’t have it anymore. I then ventured into the school hall for the
assembly and sat at the back gazing across at the field of brown school uniforms. I hoped
fervently that these pupils would one day look back and be proud of the fact that they had
attended a remarkable school. I stood and sang the school song with the rest of the school. The
words came back instinctively and a lump formed in my throat. I was and always will be a
“Montie”
Jeanette van Kraayenburg (McEvoy, 1981)
1976 - My first impressions of the unfinished building before I applied for the post - beautiful
location and structure with magnificent view.
The first year the pupils had no uniform. Everybody had to wear something blue to create a
form of similarity. As the Senior Lady Teacher, I was involved with much of the planning,
together with Clive Wigg and Don Gibbon. One of our missions was to visit many of the
uniform outlets. We were very proud of the brown colour, which was different from the nor-
mal greens and blues of the time. The colour also matched the building.
The seventeen staff members in 1977 were lost in the huge staff room. During breaks we all
sat together in the corner closest to the staff kitchen, on pupils’ chairs.
Everybody knew where the Bookroom was. From here not only were textbooks issued, but it
served as an office too. The star of the bookroom was Anne-Marie Hettasch, who assisted
from her Std 6 to her Std 10 year.
(She did not only assist with the books, but organized my life too - nog steeds dankieAnne-Marie)
For many years the Prize-giving function was my responsibility. The main fear was that some-
body would juggle the books, diplomas, trophies etc. after they had been set out for the evening
- and what about the evening when the main speaker asked for water and none was available!
187
As a team building exercise for staff, we tried a golf outing. After only five holes played and
darkness having descended, we moved to the 19th hole. Bowls became the better option, and
once a year the teachers showed a variety of skills regarding this game. Some of you will
remember the socials at homes on a Friday afternoon. (That was before the staff meetings on
a Friday afternoon started).
What an experience it was to strike in 19??. Not only did teachers march, but parents also
joined in. The train trip into Cape Town was part of the excitement. With tired bodies and feet
we returned, not knowing if it was worth our while.
In 1996 I decided to call it a day, and applied for the Voluntary Severance package. At this
stage I was a Deputy Principal. I had given to Fairmont of my best, and for 19+ years it was
my heart and soul.
Leonie Coetzer (ex-teacher January 1977 - September 1996).
We arrived on that first day, wearing the school uniform of the school that we had attended
previously, although some of the boys had had to buy just grey trousers and white shirts to start
with. Our standard was told, very often, that we were the seniors and as such had to remember
to set an example always, a sentence we came to hate, as we could never just be ourselves. The
hall had not been built and there was only one sports field. The rest was still untouched
farmland.
By the middle of the year, if I remember correctly, a uniform had been decided on: a brown and
white checked dress for the summer term for girls and a pinafore (beige-brown in colour) and
white shirt for winter, oh and a tie. At all times, white ankle socks! After hefty protest, we
were allowed to wear ordinary stockings as well! A brown jersey and, compulsory in winter, a
brown blazer. We were pleased with the uniform as it was very different from the many shades
of blue that were prevalent at the time.
We did lots of fund-raising to build tennis courts, netball courts and playing fields throughout
the three years I was there.
The school aimed for high scholastic standards, so we sat exams in June, September and No-
vember/December. I was lucky that I did not find exams too hard.
A system of monitors was introduced when we were halfway through Std 8, and it ran until
the first prefects were announced at the end of Std 9. When the first prefects were an-
nounced, we threw them into the showers, just as we’d seen our peers do at the schools we
came from! Boy, did we get into trouble!!! We were all called into the hall and given such
a scolding by Mr Gibbon, calling us all kinds of names! We were told that that kind of
behaviour would not be tolerated - ever!!!
On our last day of school in Std. 10, we wore civvies! What a novelty! I believe it went on to
become a tradition that the leaving Matrics did. We started with a breakfast before going to
class and then followed assembly where we performed a song for the school, singing Goodbye
to the Beatles melody of Girl! I don’t know who cried more, the teachers and other pupils or
us!
Merete Hipp (Hansen - 1979)
I am one of the first groups of students who traipsed through the doors in 1977. We were in a
sparkling new school, with everything from desks to doorframes unmarked, unblemished and,
with the colour coding, even quite cheerful (for a school, that is!) It was a privilege and a
challenge to be able to lay foundations and traditions starting way back in 1977.
188
That’s the beauty of school years - a group of diverse personalities with different ambitions,
talents and desires, many of which are still in formative stages, but who don’t even realise it at
the time. We had a wonderful group of teachers with the principal, Mr Wigg, encouraging new
ideas. He even agreed that the proposed winter uniform for girls really did not look very good
without socks (try it girls - those pink tunics with plain stockings and brown shoes...!)
It is sad to know that some of our classmates from those early years are no longer with us in
this world. Their contributions to the memories of our school days are still clear in our minds.
To those who now live far away from the green sports fields and facebrick buildings of Fairmont
High, this opportunity of getting in touch with ‘old mates’is great! We are part of a school that
has sent many a young person out into the world equipped with enough knowledge and atti-
tude to more than ‘get by’. For me it was also having been part of something new.
To all those who were there with us in those early days - I hope life has been good to you. For
those who came after us, I hope you enjoyed your time at Fairmont as much as we early
‘pioneers’ did. For those currently at Fairmont, and for those who will come in the future,
“Stand Fast”. For it is only with roots that we learn to grow.
Tracy Kairuz (McCarthy - 1980)
In 1977 South Africa was in a different world. The townships were in turmoil, the Berlin Wall
still stood and the rand was worth more than the dollar. I had just entered my third year of
Primary School in Kenridge when Fairmont High School opened. On moving up to Fairmont
in 1982, I was excited for the new challenges ahead, but nervous about being just another kid
at the entry level of a larger school. Fairmont turned out to be a great life-changing experience,
and in my case this was due to the freedom to take responsibility. I was amazed at how
initiative was encouraged and rewarded at the school. We frequently pushed the boundaries of
what academic freedoms were possible (with each edition of the Grapevine being censored
while I was editor), and thrived in the doing of new things. We launched a radio station and
changed school rules in my Matric year, which had a fantastic class with a great group of
prefects. Since I matriculated from Fairmont in 1986, the world and especially South Africa
has changed again. I certainly hope that the education and values provided by Fairmont will
continue to inspire its students into the world of the future.
Craig Mullet (1986)
It’s an honour for me to be asked to write an article for the history of the school I went to for
one year (1993-1994) as a Rotary Exchange Student.
When my friends ask me to tell them something about my time in South Africa, particularly at
Fairmont, I always think of the school uniform (it still hangs in my cupboard). The school
uniform was a big issue for me, because I wasn’t used to wearing uniform in school, especially
not in those colours! (Excuse me for mentioning that, but at that time I was 16 and a girl!!!!) I
also remember several meetings with the Principal Mr Wigg, who patiently listened to me but
made me understand that girls had to wear skirts and not trousers.
Together with the uniform and other experiences, I learned that one has to fit in, may it be in a
class, school, town or country. What I also remember are friendly pupils who made one feel
welcome from the very first day, patient teachers who supported me and made me face chal-
lenges and my host families who tried very hard to make me feel at home.
What impressed me enormously was the fact that the pupils had the opportunity to participate
in school life: the prefects and the council, sports activities and matches - to mention only a
189
few. But even though school in
Durbanville was different from my
school in Wolfsburg, some things
were the same: teachers who “tor-
tured” us with “stuff’we didn’t want
to know, pupils and their behaviour
and the breaks - the most important
platform for a teenager!
That was long time ago....
... and still I don’t seem to get enough
of school. After I finished school I
first went toAthens for a year to learn
Greek (and to make up my mind
whether I wanted to become a den-
tist or a goldsmith). Finally I stud-
ied German and English philology
and became a...teacher. I started last
summer to teach 11-17 year old teen-
agers - who may feel somehow simi-
lar to the way I did then...
My best wishes go to Fairmont’s
pupils and all the people who make
it possible that the youngsters can
learn!
Christine Adamis
Upon receiving the request for sub-
missions for the Fairmont history, I
began thinking about my years at
Fairmont and realised just how many
fond memories I actually have. I re-
member many times getting up for school and not wanting to go and my mom telling me that
I should appreciate those years as they would be my best. At the time I did not believe her but
I now realise just how right she was. In retrospect those really were great years.
So, what things do I particularly remember? It is the people I remember more than anything else,
and I made some of my closest friends in the time that I was at Fairmont. In particular, I think of
my good friend Charlene Williams (now Lopes). I think we have had the biggest impact on each
other’s lives to this day. While in high school she introduced me to my husband. And from that
introduction we introduced her to my husband’s best friend - who is now her husband! And they
now have a beautiful little daughter together ... a very special person in my life!
I also remember the privilege I was given to be made a prefect at the school - something which
resulted in a keen sense of camaraderie and belonging to a great group of people. We worked
hard but also had great fun - our Prefects’ Camp in Saldanha springs to mind. In general, I will
never forget the Fairmont traditions ... inter-house sports day; inter-schools ... and who could
forget the Polar Bear Club! I will also never forget the play which I was a part of in 1996,
“The Happiest Days of our Lives”, I think it was called. Also hard work but great fun...and
good to get to know our teachers better!
Christine Adamis
190
Academically I believe that Fairmont prepared me for my future. Going to university was made
easier by a solid academic base. I am most grateful for this as it has led to a relatively successful
career to date, as well as venturing into the entrepreneurial world as a business owner.
What else? Mr Le Roux’s antelope horn springs to mind; the prefects sleeping over at school
one night and ending up very afraid of ghosts (!); squashed, hot assemblies; school dances ...
there are too many things to count.
In short, Fairmont was a great school to have attended and there are so many wonderful memo-
ries for me. Wow ... 30 years! And I am proud to have been part of five of those!
Caroline Simoes (Thickett - 1997)
I arrived at Fairmont in 1996. Everything about the school seemed so large. The prefects looked
as if they were about thirty years old and the building was so big and confusing, I was con-
vinced that it would take me all five years at the school to figure out where my Maths class
was.As a Std 6 (Grade 8) student, you learned to work from one central point, the Junior Quad.
This is where you spend your breaks and have the Matrics looking at you through the windows
as if you were fish in a fish bowl.
Very quickly I learned to love my school. It was still so young when I arrived, but had already so
many lovely traditions. The thing that makes a school is not the buildings or facilities, the tradi-
tions or even the classrooms. Even though Fairmont has all of those, what makes a great school in
my eyes are the teachers. For the first time in my life I learned that teachers were also people.
In 1997, the teachers went on a march through Cape Town to hand over a document in parlia-
ment. I asked my step-dad if he would take me as I felt that what was happening to my teachers
was unfair. A teacher has the most important job in the world. They spend more time with a
child than their parents and I wanted to know that one day when my children go to school, they
have the best possible people teaching them. It was supposed to be a very sombre day but I had
the greatest time. I walked in my school uniform with my teachers and Principal and had a real
sense of achievement when I went home.
Fairmont always had something exciting happening. My favourite time of the year was the
annual Carnival and Fireworks display. To have rides and fireworks and stalls on our school
fields was great; to have people come from all over the Western Cape to YOUR school made
you proud. There were many times I was so proud of my school. When Fairmont had its 25th
birthday, when it was named one of the top 100 schools in South Africa and when many of the
students from Fairmont excelled in sport.
My favourite time at my school must have been in my Matric year. The year went so fast, but
was action-packed with activities. These would include diving into the pool on the coldest day
of the year dressed up in a silly outfit, 40 days, matric dance, tea parties etc.
One of my favourite memories of Mr Wigg was on 40 days, his 60th birthday. We organized a
civvies day and told him that the theme was “Wigg day”. He arrived at assembly wearing a
purple wig and everyone else had dressed up to the real theme: “red, white and blue”. Mr
Wigg loved to dress up. I have personally seen him in a bunny suit at Easter and a Father
Christmas suit at Christmas.
I left school six years ago. I studied accounting at Stellenbosch University and run a newspa-
per and have a promotions company in Stellenbosch. Every time I meet someone and they ask
me what school I went to, I feel proud to tell them I was at Fairmont.
Lauren Young
191
I look back upon my years at Fairmont High School with many fond memories. The opportu-
nities we had to excel at sport and to be involved on every different level were countless. For
this alone I owe the school a great deal.
When I was at Fairmont I involved myself in everything that the school had to offer.
One of the first memories I have of high school, was winning the Inter-Schools Spirit Trophy
in Std 6. This paved the way for what was to be an adventurous five years, with many ups and
downs, and culminating in a fitting farewell for our class of 2001, when we once again re-
claimed the Spirit Trophy in our matric year. I was part of Muir House in school, which leads
me to one of the personal highlights of my school career. We were normally the whipping boys
of Dale and Innes, but in our matric year we walked away with not only the Inter-House Plays
for the third year in a row, but also the Inter-House Athletics (last won ±12 years before) and
the Inter-House Swimming (last won ± 17 years before).
I still look back upon ‘the good old days’ and find it hard to believe that almost five years have
gone by. Many of my good school friends have become life-long friends, and therein lies my wish
for current and future pupils of Fairmont High School. Take advantage of the many great oppor-
tunities that the school has to offer, and may the friends that you make here, be friends for life.
Gavin Meinking (2001)
My eighteen years at Fairmont, culminating in retirement, were among the most enjoyable of
my forty-one years in teaching.
Arriving at Fairmont was something of a shock - over 1100 pupils, more than twice as numer-
ous as any other school that I had experienced. Getting to know pupils by name and personal-
ity was a very big challenge, and here I failed as I could never say that I knew all the pupils. I
would be reluctant to put a percentage to the number I knew! But I found that if I tried to be
fair and firm there was generally a positive response from even those I hardly knew.
I am reluctant to name any pupils that I remember clearly as either first class contributors to the
school (inevitably some would be ‘missed’), or to name some of the pupils who took up much
time because of negative behaviour... some may be in significant positions today!
Happy memories of time on the cricket field, of batting feats and bowling achievements and brilliant
fielding exploits come to mind, and time spent with parents who came to support the game.
Teaching Geography was, for me, more than a subject. It was an opportunity to talk about real
issues and developing life values.
I always appreciated the notes/letters received from pupils. Yes, many happy memories and
appreciation for the positive interactions that took place with so many colleagues, pupils and
parents. May God Bless Fairmont High
Alastair Frost
Remember when - Medway was just gravel - and some students were not quite togged out in
full uniform. New school - new order - what a nightmare. Just a few unfinished buildings to
accommodate the students. But dreams of a school with a great future did not deter those who
had faith in Fairmont. Still they attended Fairmont - despite the lack of luxuries.
I have watched Fairmont grow. I have watched Fairmont students over the years walk past my
parents’ house - in Medway. Never once did I notice a student that was not proud to be a
Fairmont pupil. Over the years I have observed Fairmont grow from strength to strength,
never losing faith in Fairmont - and watching the school grow from strength to strength.
Fairmont’s values are also of the highest standard. Granted, some teachers are tested by pu-
192
pils. What would a school be without these challenging pupils? This is what makes a school.
Just think how boring school would be if all the pupils were all the same.
I remember standing in my parents’ kitchen in Medway - heavily pregnant with my first child
- “my children will attend this school - I have good faith in Fairmont”. So they did. Megan
matriculated in 1999 and Andrew in 2000. Today they both speak highly of Fairmont.
Just a few words from a Mom that is always proud to tell parents that her children attended
Fairmont.
Maryanne Whiley
Congratulations to Fairmont High School on your 30th Anniversary.
We were privileged to teach Karate-Do at your school shortly after the school was founded.
Mr Keith Milford was a class teacher there. He was also one of our Black Belts at Kushido
Karate-Do and organized that Hanshi Denis St John Thomson (the chief Instructor of Karate-
Do) taught classes on Monday and Wednesday afternoons.
We started training in the quadrangle of the school. This proved too difficult (working on tar
or concrete) and so we were allowed to use the school hall. The classes proved very popular
and the student numbers grew to approximately 100 students. The Karate-Do training devel-
ops attributes of confidence, respect and increased learning capacity and of course the ability
to protect themselves. The teachers were impressed with the general improvement in the
students’ school work and their discipline.
On behalf of Kushido Karate Do we wish the school continuing success in all your endeavours
in the future.
Merelle Thomson (Secretary)
On behalf of the Kenridge dojo of Kushido Karate-Do, we congratulate Fairmont High School
on its 30th Anniversary.
The essence of a good school lies within the solid foundations of positive traditions. It is
tradition that upholds positive core values and Fairmont’s traditions have maintained the school’s
pride over the years up until present times, and we see the school excelling in both academic
and extra-mural pursuits. Indeed, our local karate school is also built on traditions that span
decades in the same neighbourhood, and our results mirror those of Fairmont.
From a karate perspective, Fairmont has produced many champions. Two recent examples are
ex-Fairmont student, Brian Jooste, who earned the title of National Grand Champion in 2004,
and new Black Belt Michael Woodland, who at eighteen years, was the youngest Black Belt
in our school.
May your school continue to excel in all honourable endeavours, and may your students stand
tall when they proudly say, “I am/was a Fairmont student.”
Brian Woodland
193
APPENDIX 2
DOCUMENTS AND PHOTOGRAPHS
1. Page 1 of first circular to parents.
2. First page of 1977 admissions register
3. First page of first School Committee minutes.
4. Attendance register - first PTA Committee meeting.
5. Official Opening programme.
6. Sports Complex appeal.
7. Recreation Centre opening.
8. 10th Anniversary Dinner 1987.
9. Academic Honours Dinner 2000
10. Students’ Centre opening 1999.
11. Carnival flyer/pamphlet.
12. Grapevine cover
13. Drama programme
14. The site of the Multipurpose Centre and Architect’s impression
15. Letter of congratulations from the Circuit Manager Mr AAppel
16. The 30th Anniversary Staff - 2007
194
Page 1 of first circular to parents - 1976
195
First page of 1977 admissions register
196
First page of first School Committee minutes
197
Attendance reister - first PTA Committee meeting - 1977
198
Official Opening programme - 1978
199
Sports Complex appeal - 1982
200
Official Opening of Recreation Centre
201
10th Anniversary Dinner - 1987
202
Academic Honours Dinner 2000
Jennifer Poole - School Dux 2000 Susan Wood - Honours Summa Cum Laude
2000
203
Opening of the Students’Centre - 21 May 1999
204
Carnival Flyer
205
The Grapevine - 1987
206
“No No Nanette” - 1983
207
The site where the Multi-purpose Centre is constructed - originally known as the “Matric lawn”
Architect’s inpression of the Multi-purpose centre
208
Letter of congratulations from the Circuit Manager - Mr A Appel
209
The30thAnniversaryStaff-2007
Thirdrow:SJohnston;ESplinter;LKassier;SVisser;JSolomons;GDijkshoorn;LRousseau;PNaidoo;TJansevanRensburg;LdeClerq;DBradshaw;
BVermotor;RHansen
Secondrow:HFreeman;HHomewood;IHodge;JHancock;NKirby;NBleeker;PCronje;CMurphy;WDowd;GJordaan;MLeibbrandt;JOosthuizen;
SCheminais;RFinlay;WvanderMerwe;JEdwards;JvanderMerwe;KBredenkamp;MJacobs;LJacobs;OPiek;LJob
Firstrow:LNeethling;ABehrendt;NVeldman;JAggenbach;JBotes;GStemmett;JKingwill;NPool;EBretteny;BNel;EvanZyl;HBruce;BMcmillan;
AFriedenthal;CVermeulen;SSwanepoel;LPienaar;LSmitsdorf;MBadenhorst-Niewoudt;BVezasie
Seated:LvanAswegen;BVorster;CWeerts;SLamprecht;MBarnard;MEsmeraldo;JDempers;RDingley;ALourens;CKurt;MUys;BElgie;PVegter;
UHorsthemke;VvanNiekerk;CdeKock
210
APPENDIX 3
GOVERNING BODY CHAIRMEN
1977 - 1985 Mr E Fivaz
1985 - 1988 Mr A Truter
1989 - 1991 Mr S Robinson
1992 - 1993 Mr R. Nelson
1990 - 1993 Mr S Robinson
1994 Mr L Huisamen
1995 - 1999 Mr R Williamson
2000 - 2003 Mr M Ettish
2003 - 2004 Mr N Speres
2005 - 2007 Mr M de Villiers
APPENDIX 4
PTA/PTSA CHAIRMAN
1977 - 1979 Mr D Stewart
1979 - 1980 Mr D Klazinga
1980 - 1981 Mr D Stewart
1981 - 1983 Mr B Isgar
1983 - 1984 Mr J Cammidge
1985 Mr A Truter
1986 Mr A Neumann
1987 Mr E Brymer
1988 Mr D Insley
1989 Mr A Young
1989 - 1990 Mrs S Visagie
1991 - 1993 Mr G Warburton
1994 Mrs D Robinson
1995 - 1997 Mr M Ettish
1999 - 2001 Mr R Crow
2002 - 2003 Mr P Botha
2004 - 2006 Mr J Lucas
2007 Mrs J Cooper
APPENDIX 5
HEAD PREFECTS
1979 Torsten Moehl Lesley Windell
1980 John Cranke Tracy McCarthy
1981 Mark Steyn Dorin Neckel
1982 Victor Hawken Alison Nardone
1983 Kevin Hawkins Janine Lambert
211
1984 Anthony Hudson Karen van Niekerk
1985 Graham Morton Carole MacLeod
1986 Craig Mullet Norma Oosthuizen
1987 Clifton Woods Vanda Fernandes
1988 Lawrence Ireland Roslin McComb
1989 Roderick Ross Elize Kleyn
1990 Trevor Rolfe Nichola Meyer
1991 Simon Morton Kaeli Albertyn
1992 Simon Ward Jacqui Reeves
1993 Steven Schmutz Bonny Robb
1994 Mark Maritz Natasha Bauermeister
1995 Brian Coldrey Nina Dewey
1996 Morné Swart Nicole Klassen
1997 Nicholas Higham Carrie-Anne Kropman
1998 Robert Gessner Sandra Mansell
1999 Ben van Stormbroek Joanne de la Cornillere
2000 Michael Dunn Lauren Young
2001 Shawn Thompson Kirsty van Stormbroek
2002 Mark Phillips Candice Lyons
2003 Jean-Pierre Catto Tarryn Blackwood
2004 Jade Köhler Monique Huysamen
2005 Lloyd Rhodes Michelle Kilfoil
2006 Jamie Roussouw Jayde Dunlop
2007 Jacques-Johann Odendaal Jaclyn van Greunen
APPENDIX 6
SRC CHAIRMEN
1997 Nicholas Higham
1998 Ben van Stormbroek
1999 Diane-Maree D’Aguiar
2000 David-Jon Friederichs
2001 Tanzi Davies
2002 Tarryn Blackwood
2003 Claudia Cole
2004 Warrick Wyngaard
2005 Tarryn Petersen
2006 Julia Taylor
2007 Coralie Valentyn
APPENDIX 7
HONOURS - SUMMA CUM LAUDE
1991 Rory McKinley
1992 Nicole Kok
1993 Steven Schmutz
1994 Dawn Durrbaum
1995 Lorna Maneveld
212
1996 Annette Lang
1997 Carrie-Anne Kropman
1998 Neil Yorke
1999 Lisa Stockland
2000 Susan Wood
2001 Tamsin Adams
2002 Jane Lindhorst
2003 Ryan Hultzer
2004 Gannie Tzoneva
2005 Yanni Yang
2006 Laura van Laeren
2007 Wietske Rubow
APPENDIX 8
SCHOOL DUX
1979 Roderick Leerkamp
1980 Tracy McCarthy
1981 Clem van der Riet
1982 Noel de Villiers
1983 Noel Gillespie
1984 Jimmy Donaldson
1985 Heather McGregor
1986 Craig Mullet
1987 Chantal Jeannot
1988 Glen Thomson
1989 Roderick Ross
1990 Nichola Meyer
1991 Rory McKinley
1992 Nicole Kok
1993 Steven Schmutz
1994 Rory Yorke
1995 Lorna Maneveld
1996 Annette Lang
1997 Carrie-Anne Kropman
1998 Neil Yorke
1999 Lisa Stockland
2000 Jennifer Poole
2001 Tamsin Adams
2002 Jane Lindhorst
2003 Ryan Hultzer
2004 Gannie Tzoneva
2005 Yanni Yang
2006 Laura van Laeren
2007 Wietske Rubow
213
APPENDIX 9
‘A’AGGREGATES
1980 1988 1993 1998
J. de Villiers C. de Villiers A. Afonso M. Adam
T. McCarthy K. Hare C. Broek S. Allison
L. Ireland R. Human M. de Bruyn
G. Thomson A. Kropman K-M. Elgie
1981 G. Wilkinson D. Maritz J. Hirschi
- G. O’Conner M-A. Johannes
1989 A. Rabe C. Kirby
1982 S. Schmutz S. Mansell
M. Butler E. Visagie N. Maunder
J. Andreas L. Gray G. Rodrigues
N. de Villiers P. Jacoby 1994 C. Roux
J. Marais E. Kleyn T. Sickel
A. Nardine C. Lockett E. de Villiers J. Smit
D. Wilkinson H. Pitcher R. Dreijer J. Steynberg
N. Puttergill D. Durrbaum D. Thomas
1983 S. Quinn R. Durrbaum R. van Dijk
G. Rose J. Knowles V. van Vuuren
N. Gillespie R. Ross M. Maritz M. West
J. Quine L. Wasson R. Yorke T-L. Williams
C. Rabe K. Webb N. Yorke
J. Woods 1995
1984 1999
1990 K. Bell
J. Donaldson N. Dewey L-A. Bingham
S. Kluyts J. Calefato L. Maneveld C. Cawood
G. Tredoux H. Hettasch A. Taylor C. Fourie
N. Meyer S. Giles
1985 R. Oates 1996 C. Goodwin
T. Rolfe J. McMillan
H. McGregor J. Brink K. Muirhead
1991 M. Butterly G. Muller
1986 M. Kilian M. Oudejans
K. Albertyn A. Lang L. Stockland
S McCall B. Eastes S. Mullett B. Taylor
C. Menck R. Heideman S. Sickel L. van der Merwe
C. Mullet (10th
) N. Lockett M. Swart B. van Stormbroek
N. Oosthuizen R. McKinley S. van der Merwe
E. Starke J. Turner
A. Tomkyns 1997
1992
1987 S. Adams
N. Kok S. Birch
C. Jeannot S. Lourens A. Bokelman
J. Judelsohn C. Murphy N. Crowley
J. le Roux A. Robinson M. Danielsen
D. O’Conner N. Higham
G. Robertson C-A. Kropman
A. Sturdon M. Leader
M. Meyer
D. Mottershead
N. Taylor
C-L. Vermoter
214
2000 2002 2003 2005
B. Bester L. Bartsch C. Raad C. Lesch
L. Bokelman C. Batchelor S. Redivo G. Louw
C. Crosswell K. Bird J. Roberts L. Malander
D-M. D’Aguiar J. Danielsen G. Schlee Z. Malinga
S. du Toit A. de Beer T. Schultz C. Martin
C. Fischer R. de Villiers S. Sickel K. Martin
A. Foxcroft Tanya Dennis C. Thomson B. McMillan
N. Hayward Tracey Dennis L. Trollope A. Muller
L. Jack M. Enslin A. Verkhovsky K. Mwaba
M. Kossmann C. Frey L-M. West N. Sobotker
A. Lehner C. Gessner S. Zietsman J. van Vuuren
J. Main R. Guise Y. Yang
A. Maunder A. Hsu 2004
A. Miller J. Lindhorst 2006
A Nicol S. Links L. Basson
J. Poole C. Lyons K. Bonney S. Batchelor
S. Wood A. Main W. de Wit B. Beecroft
C. Zietsman R. Marthinussen T. Eberhard N. Conradie
D. Moodley S. Evans G. Deacon
2001 D. Mpye N. Gous M. de Lange
M. Niemand M. Grapendaal T-L. de Villiers
B. Adams L. Philips A. Grimm N. Eberhard
T. Adams J. Rodriques L. Hambides L. Foxcroft
W. Botha M. Stockland K. Kelly S. Francis
K. Calitz K. Sunkel T-M Kingwill L. Hanekom
C. Chowles R. Topp J. Kopec K. Helm
L. Coetzee K. van der Merwe C. Long G. Janse van Veuren
K. Collier C. Meissenheimer J. Janssen
K. Coupar 2003 B. Miller F. Löndt
M. de Groot J. Muirhead A. Mills
C. Ebden A. Aldridge T. Purnell Y-N. Park
M. Fredericks R. Barlow E. Smith P. Rokita
M. Grapendaal T. Blackwood V. Snyman S. Smit
A. Hambides J-P. Catto R. Stemmett J-P. Steyn
V. Hsu J. Clark W. Stone L. van Laeren
J. Kingwill C. Cole G. Tzoneva T-L. Vos
J. Klink A. Colyn L. Upsher A. Ward
T. Kretschmer C. Cookson L. van der Linde Z. Withers
M. le Grange D-L. D’Aguiar D. van Heerden H. Woodhead
L. Loots T. Foxcroft A. Verreynne
J. Macfarlane A. Gartrell L-A. Wood-Pottle
S. Manford A. Helm
L. Mattheyse R. Hultzer 2005
M. Mayley E. Khan
G. Meinking G. Kiewitz J. Berry
L. Nelson K. Lancaster Z. Blaauw
D. Oebell N. Louw N. Davies
D. Pienaar J. Louwrens G. Flynn
L. Robertson L. Loynes R. Gartrell
G. Rulfo S. Lubeck C. Harding
T. Smith L. Malan M. Hirst
E. van der Linde L. Mallon M. Kilfoil
K. van Stormbroek A. Mohamed A. Lampard
G. Willow E. Mugabo L. Langeveldt
M. Yiannakis L. Noach S-J. Laten
215
A fitting end to the 30th year celebrations were the Matric results of 2007, the best recorded at
Fairmont. Seen here are some of the 47 ‘A’candidates celebrating their academic achievement.
2007
A. Afonso
A. Barma
B. Botha
L. Butler
N. Christy
A. Couchay
D. Croucher
M. Davidson
K. Emma-Iwuoha
M. Golden
A. Greyling
S. Harding
L. Horstmann
K. Jarvis
R. Kerr
R. Kotze
J. Krige
F. L’Abbate
H. Lee
C. Lombard
S. Matsolo
L. McGeorge
K. McKinley
K. Mealor
K. Morrissey
K. Mwaba
J. November
JJ. Odendaal
C. Petersen
K. Poovan
J. Rom
W. Rubow
E. Rusconi
R. Scott
N. Sneyd
N. Swanepoel
E. Taylor
A. Teare
B. Teare
R. Teuchert
N. Van der Touw
N. Van Rensburg
B. Van Sittert
W. Vraagom
J. West
S. Yang
Y. Yiannakis
216
APPENDIX 10
GOOD FELLOWSHIP PRIZE *
1979 Lesley Windell
1980 Tracy McCarthy
1981 Bonnie van der Walt
1982 Karen Davies
1983 Sanette van der Mescht
1984 Darlene Mynhardt / Ian Cloete
1985 Jane Hulatt
1986 Craig Cloete
1987 Jean-Pierre Rossouw
1988 Robyn Ferguson
1989 Judy Newham
1990 Martin Meyer
1991 Richard Friend
1992 Elton Neethling
1993 Catherine Broek
1994 Kym Pope-Ellis
1995 Lawrence Higham
1996 Gavin Hauck
1997 Sean Loots
1998 Keri-Lyn Dick
1999 Leanne Saffrey
2000 -
2001 Gavin Jones
2002 Kirstin van der Merwe
2003 Claudia Cole
2004 Wouter de Wit
2005 Warrick Wyngaard
2006 Sita Smit
2007 Robert Kotze
* 1979, 1980 chosen by staff, 1981 - 2007 chosen by matrics
APPENDIX 11
PRINCIPAL’S PRIZE
1981 Vanessa Radford-Hayden
1982 Derek Klazinga
1983 Bruce Low
1984 Glen McNair
1985 Heather McGregor
1986 John Money
1987 Diane O’Connor
1988 Terry Fowler
217
1989 Bryan Kelly
1990 Charlaine Coetzee
1991 Carel Theron
1992 Tanya Price
1993 Catherine Broek
1994 Dawn Durrbaum
1995 Nina Dewey
1996 Vaughn Jensen
1997 Carolyn Holland
1998 Sandra Mansell
1999 Leanne Saffrey
2000 David-Jon Friedrichs
2001 Taryn Boonzaaier / Tarryn Bright
2002 Carla Ancillotti
2003 Jean-Pierre Catto
2004 Xavier Millar
2005 Michelle Kilfoil
2006 Janine Janssen
2007 Jacques-Johann Odendaal
APPENDIX 12
PAST PUPILS’AWARD
1990 Jeannine Herrington
1991 Sharon Roux
1992 Samantha Saunders
1993 Annemarie Kropman
1994 Schonette Coetzee
1995 Rene Fourie
1996 Antony Tolfts
1997 Nicola Taylor
1998 Samantha Jones
1999 Brynn Taylor
2000 Samantha Stampe
2001 Linda Mattheyse
2002 Andy Hsu
2003 Warren Kent
2004 Claire Allen
2005 Michelle Pheiffer
2006 Jaco Venter
2007 Nadine Swanepoel
218
APPENDIX 13
FAIRMONT AWARDS
The Fairmont Award was introduced in 1991.
In addition to the many who have served on committees and sub-committees, others who will
always be remembered for their special contribution to the school before 1991 include:
* Mrs Craddock, first PTA secretary and fête convener.
* Tuckshop convenors Mrs Windell, Mrs McCarthy, Mrs Keohane, Mrs Bosken,
Mrs Gouws.
* Mrs Woodhead, Mrs Howard and Mrs Crighton - clothing bank.
* Mrs Fivaz and Mrs Williams - fêtes and fund-raising.
* Mr Hardy and the matric examination invigilators.
* Mrs Duckitt, Mr Steynberg, Mr Collins, Mr De Vries, Mr Dewey, Mr Kingwill and
Mr Leader, who were responsible for school finances.
* Mrs M Wulfse and all who assisted with magazine advertisements.
* Mrs Ludditt and those who coached or assisted school teams.
* Mrs Lyn Wigg, who helped in so many ways throughout, but especially during the
founder years, in the clothing bank, with the provision of curtains in the hall, the
offices, staff room, library and Recreation Centre, and who organised the Valedictory
Day teas for a number of years.
* Mrs Yvonne van Wyk, first school secretary.
* Magazine editors.
* Dance convenors and organisers.
* Printers, laboratory assistants.
* Mr Engelbrecht, caretaker, and general assistants.
* Mr Frank Choice.
* MrClivePeckwho,apartfrombeingacommitteemember,randancingclassesfor manyyears
* Drum majorette mothers.
1991 Mrs S Johnston
1992 Mrs P Koning
Mrs V Helders
Mrs A Jones
Mr G Willet
1993 Mrs G Bull
Mrs J Davis
Mr B Machrell
Mr B Merryweather
1994 Mrs P Chapman
Mrs B Sheet
Mrs E Donachie
Mrs B Vermoter
Mr D Meyer
1995 Mrs J Brink
Mrs V Crighton
Mrs A Loynes
1996 Mrs A Bosch
Mrs L Coetzer
Mrs C Cowley
Mr F Ershine
1997 Mr M Ettish
1998 Mrs F Harvey
Mrs H Smit
1999 Mr R Aitken
Mrs H Isgar
Mrs M Oosthuizen
Mrs D Smedley
Mrs M Vorster
Mr B Williamson
2000 -
2001 -
2002 Mrs G Aldridge
Mr G Gatenby
Mrs C Schwartz
2003 -
2004 Mrs T Boonzaaier
Mrs R Killassy
2005 Mrs A de Reuck
Mrs L du Toit
Mrs A Langeveldt
Mr N Speres
Mrs A Stone
Mr G and Mrs J Vock
2006 Mrs R Odendaal
Mrs J Martin
Mrs M Dingley
2007 Mrs A Dolpire
Mr N Donachie
Mrs J Hunt
Mr A Kokott
Mrs M Kropman
219
1979
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
1980
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
1981
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Robin Craddock
Gavin Howard
Colleen Egan
Carol Partridge
Mark Radford-Hayden
Paul Bidder
Fern Hemy
Craig Paine,
Tammy Watermeyer
Fern Hemy
Gary le Seur
Grant Morton
Susan Bremner
Celeste Taylor
Mark Radford-Hayden
Derek Klazinga
Karen Axon
Tammy Watermeyer
Debby Coltman
Derek Klazinga
Justin Johnstone
Gillian Hand
Celeste Taylor
Norman Woods
Derek Klazinga
Cheryl Martin
Mark Hershaw
Melinda Wulfse
APPENDIX 14
FIRST TEAM CAPTAINS
(We apologise to those captains whose names are not listed. Every effort was made to trace them)
1982
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
1983
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
1984
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
Derek Klazinga
Victor Hawken
Gillian Hand
Michele Viljoen
Benjamin Cranke
Stefan Janser
Michelle Botes
Benjamin Cranke
Melinda Wulfse
Dan Truter,
Ruth Grieve
André Swart
Shaun Bougard
Susan Hynes
Karen Thompson
Bruce Low
Roel Veenstra
Tracy Turner
M Nortje,
Janine Horne
Tracy Fraenkel
Patrick Day,
Gail Grobbelaar
Anthony Batchelor
Shaun Bougard
Rhondda Davies
Karen Thompson
John Dixon
Derek Hershaw
Tracy Turner
René Burbidge
Samantha Kotze
220
1985
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1986
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1987
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1988
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1989
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1990
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
Patrick Day,
Janine Quine
Craig Cloete
Andrew Donnelly
Dominique Veldhuis
Janice Röbeck
Craig Cloete
Douglas Thomson
Dominique Veldhuis
G King,
Sandy Puttergill
René Burbidge
René Lotz
Craig Cloete
Barry Chadburn
Penny Neumann
Terry Fowler
Craig Cloete
Allan Beverley
Judy Hynes
Carol-Anne Heibner
Haig Greenwood
Pamela Woolliscroft
James Fraser,
Bridget Laughton
Barry Chedburn
Barry Chedburn
Natalie Lloyd
Terry Fowler
Paul Prior
Allan Beverly
Laureen Fraser
Angus Gray,
Heike Longwitz
Carol-Anne Heibner
Billy Bishop
Terry Fowler
Graham Skelding,
Terry Fowler
Paul Prior
Quentin du Toit
Bronwyn Hudson
Terry Fowler
Paul Prior
Robert Northcote
Laureen Fraser
Jayne Cohen
Paul Prior
Janet Beverly
Roderick Ross,
Kim White
Morné de Wet
Quentin du Toit
Christine Forbes
Lisa Ludditt
Bruce Fairhurst
Michael White
Genevieve Steyn
Nikki Puttergill
Tania Hobbs
Wayne Parker
Carmen Truter
Neil Slabbert,
Jeannine Herrington
Brendan de Wet
Richard Friend
Charlaine Coetzee
Leanne Crooke
Benjamin Naude
Michael White
Bronwyn van Heerden
Trevor Rolfe,
Irene Ackermann
Tracy Stebbing
Martin Meyer
Justine Fowler
221
1991
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1992
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1993
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1994
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Girls’ Basketball
1995
Athletics
Badminton
Cricket
Cycling
Chess
Boys’CrossCountry
Girls’CrossCountry
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Table Tennis
Tennis and Golf
Girls’ Tennis
Drum Majorettes
Girls’ Basketball
1996
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Girls’ Basketball
Dino Steele
Schonette Coetzer
Claire Davis
Mark Maritz
Mark Koppel
Schonette Coetzer
Jason Render
Kelly Steenkamp
Nicole Luis
Michelle Uys
Greg Marshall,
Cara Kilgour
Scott O’Conner
Bernard Nel
Shaun du Plooy
David Smith
Antony Tolfts
Diane Thomas
P-J Loynes
Debbie Friend
Charlene Bronkhorst
Angus Tanner
Grant Croeser
Julie Hauck
Derrick Heiberg,
Kim Chambers
Peter Prinsloo
Sven Petersen
Diti Blias
Melanie Selman
Liezel Hackart
Heinrich Wicht,
Kerry Compton
Julian Calefato
Craig Baxter
Michelle Roux
Janine Wordon
Gavin Hauck
Grant Croeser
Leonard Beyers,
Michelle Dosson
Kirstyn Harris
Liezel Hackart
Neil Slabbert,
Elise de Vries
Richard Friend
Richard Friend
Bronwyn van Heerden
Lynn McGrath
Benjamin Naude
Simon Ward
Bronwyn van Heerden
Simon Morton,
Michelle v.d Meulen
Mandy Slabber
Kevin Dentener
Karen de Beer Smit
André Theron,
Elise de Vries
Gary Wallace
Darryl Muldoon
Theresa Pitcher
Tanya Price
Stuart Tanner
Simon Ward
Bronwyn van Heerden
Elton Neethling
Michelle Ladewig
Kevin Dentener
Karen de Beer Smit
Andre Theron
Louise Robinson
Gary Wallace
Darryl Muldoon
Bronwyn van Heerden
Claire Davies
Sheldon Smorenburg
Cowan Johnstone
Bronwyn van Heerden
Ryan Bidgood
Annemarie Kropman
Nicole Luis
Robert Chin
Claire Lotter
Adrian Wiehahn
Glen Seiler
222
1997
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1998
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer Girls
Soccer Boys
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
1999
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer Girls
Soccer Boys
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
Angus Tanner,
Diane Thomas
Julian Calefato
Craig Turnbull
Pamela Johnston
Celeste Sameuls
James Espin
Dean Jardine
Natalie Ryke
Sean Loots,
Carrie-Anne Kropman
Kirstyn Harris
Sean Pye
Carolyn Holland
Diane Thomas
Justin v.d Merwe
Craig Turnbull
Heather Gauld
Celeste Sameuls
Luke Keyser
Tenille Jurd
Leigh Köhler
Natalie Ryke
André Montauban,
Diane Thomas
Lee-Ann Harvey
Garth Howell
Celeste Sameuls
Dennis de Wet,
Laurien Allison
Edward Knowles
Ben van Stormbroek
Michelle Moore
Nadia Smit
Luke Keyser
Amanda Denys
Ryan Lea
Linzi-Jane Kingwill
Mark Lambson,
Sarah O’Hanlon
Chantelle Ackerman
Marco Nucci
Jenny Mayley
2000
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer Girls
Soccer Boys
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
2001
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer Girls
Soccer Boys
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
2002
Athletics
Cricket
Boys’ Hockey
Girls’ Hockey
Netball
Rugby
Soccer Girls
Soccer Boys
Softball
Swimming
Drum Majorettes
Boys’ Basketball
Girls’ Basketball
Henry Thomas,
Tarryn West
Michael Dunn
Rhyno Swart
Lauren Mitchell
Samantha Stampe
Lee v d Berg
Joanne Merry
David-Jon Friedrichs
Lauren Mitchell
Jason Vorster,
Lauren Allison
Erin Killassy
David Chiang
Michelle Mayley
Stuart Klaassen,
Marika Yiannakis
Shawn Thompson
Lawrence Romburgh
Marika Yiannakis
Candice Henry
Wandile Nkula
Joanne Merry
Gavin Meinking
Benjamin vd Merwe,
Leigh-Anne Loots
Tarryn Boonzaaier
Bjorn Groenewald
Michelle Mayley
Troy Siebert,
Sarah Pope
L Brown
Mark Phillips
Leigh Bierman
Christina Gessner
Ryan Haste
Nicole Davies
Justin Davids
C Keyser
Benjamin vd Merwe,
Lisa Loynes
Daphne Storey
Bjorn Groenewald
L Booysen
223
2003
Athletics Jason Annandale
Lisa Loynes
Cricket Greg Staffen
Boys’ Hockey Jean-Pierre Catto
Girls’ Hockey Leigh Bierman
Netball Jannice Annandale
Rugby Arthur Hewitt
Soccer Girls Tracey Robertson
Soccer Boys Justin Davids
Softball Ashleigh Haste
Swimming Leigh Bierman
Drum Majorettes Chloë Lyth
Boys’ Basketball Xavier Millar
Girls’ Basketball Michelle Hopley
Badminton Boys Wouter de Wit
Badminton Girls Sylcke Lübeck
Chess Martin Skeens
Cross Country Wouter de Wit
Squash Boys Aran Gatenby
Squash Girls Debbie McAlistair
Table Tennis Darren-Lee Dorman
Boys’ Tennis
Girls’ Tennis Shelly Crowther
Indoor Hockey Leigh Bierman
2004
Athletics Xavier Millar
Rori Fortuin
Cricket Sean Hulley
Boys’ Hockey Richrd Sclanders
Girls’ Hockey Leanne Langeveldt
Netball Cherise Griffin
Rugby Gareth Jones
Soccer Girls Kay Norton
Soccer Boys Damian Whatley
Softball Kay Norton
Swimming Stacey-Lee la Bella
Tyron McNamara
Drum Majorettes Leanne Beattie
Boys’ Basketball Xavier Miller
Girls’ Basketball Alyssa Cookson
Badminton Boys Wouter de Wit
Badminton Girls Ania Barma
Chess Yun-Kuang Cheng
Golf Neil Whitehorn
Squash Boys Aran Gatenby
Squash Girls Jayde Dunlop
Table Tennis Darren-Lee Dorman
Boys’ Tennis Lloyd Rhodes
Girls’ Tennis Lisa Upsher
Indoor Hockey Leanne Langeveldt
2005
Athletics Matthew Speres
Rori Fortuin
Cricket Cheslin Tremble
Boys’ Hockey Lloyd Rhodes
Girls’ Hockey Leanne Langeveldt
Netball Rori Fortuin
Rugby Matthew Speres
Soccer Girls Taryn Vos
Soccer Boys Dean Gabriels
Softball
Swimming Jayde Dunlop
Sean Hunt
Drum Majorettes Candice Johnson
Boys’ Basketball Matthew Speres
Girls’ Basketball Alyssa Cookson
Badminton Boys Adrian de Vries
Badminton Girls Ania Barma
Chess Yun-Kuang Cheng
Golf Bruce McMullen
Squash Boys Tarquin Stapa
Squash Girls Jayde Dunlop
Table Tennis Cheslin Tremble
Boys’ Tennis Lloyd Rhodes
Girls’ Tennis Ingrid Crowther
Indoor Hockey Leanne Langeveldt
2006
Athletics Ashley Smit
Jaclyn van Greunen
Cricket Nathan Kolbe
Boys’ Hockey Jamie Rossouw
Girls’ Hockey Sita Smit
Netball Janine Janssen
Rugby Ashley Smit
Soccer Girls Taryn Vos
Soccer Boys Yorgo Yiannakis
Softball
Swimming Jayde Dunlop
Sean Hunt
Drum Majorettes Andrea Stewart
Boys’ Basketball Michael Holliday
Girls’ Basketball Janine Janssen
Badminton Boys Adrian de Vries
Badminton Girls Kalyn de Vries
Chess Ciaran Liederman
Golf Hansol Lee
Squash Boys Marc Rafael
Squash Girls Nicole Bosch
Table Tennis Wesley van Huyssteen
224
Boys’ Tennis Niel Vermeulen
Girls’ Tennis Linda Jooste
Indoor Hockey Aimee Hill
2007
Athletics Lucien Vogel
Guinivere Rogers
Cricket Steven Dembitzer
Boys’ Hockey Bruce McMullen
Girls’ Hockey Jaclyn van Greunen
Netball Chanel Neethling
Rugby Jarred le Roux
Soccer Girls Auberi Courchay
Soccer Boys Yorgo Yiannakis
Softball Chanel Neethling
Swimming Ettiene Rusconi
Marisia Lipowski
Drum Majorettes Ashton Warrington
Boys’ Basketball Michael Holliday
Girls’ Basketball Dominique Du Plooy
Badminton Boys Adrian de Vries
Badminton Girls Kalyn de Vries
Chess RyanJansevanRensburg
Golf Bruce McMullen
Squash Boys Thomas Ibbotsen
Squash Girls Nicole Bosch
Table Tennis Craig Bauer
Boys’ Tennis Luke Thorrold
Indoor Hockey Paula Lotter
APPENDIX 15
PERSONALIA
Mrs Maria Kropman - Longest serving
member of the Governing Body
Mrs Maria Kropman has been associated with
Fairmont as a mother for nineteen continuous
years. From January 1989 to the end of 2007
she has been parent to six children who have
passed through the corridors of our school.
She was a member of the old parent association
from 1993 to 1997 and a member of the School
Governing Body since 1997.
She held the office of Vice Chairperson from
2000 to 2006 serving on four main committees
namely: Discipline, Interviews, Uniform and
Academic.
She has served under the chairmanship of: Rob Williamson, Mike Ettish, Neil Speres, Mike de
Villiers and Andre du Toit as well as all three principals of Fairmont.
Maria Kropman’s input, interest and unselfish contributions throughout these years is nothing
short of outstanding.
As a longstanding member of the parent body, she provided a system of continuity in policy
and decision making.
Mrs Kropman continues to serve the school as a co-opted member of the Governing Body.
225
Mr Udo Horsthemke - Longest serving member of the Fairmont Staff
As Co-curricular Co-ordinator Udo
Horsthemke is almost synonymous with
Fairmont High School. Ask anyone about any
sport event involving Fairmont High School
and Udo will be mentioned. If the staff need to
organize transport, Udo is the person to call.
But, even more significant is Udo’s loyalty to
the school as one of the first staff members of
the school - a 30 years’ bond which makes him
a true blue Monty.
Udo, a UCT graduate, taught for 6 years in three
different Namibian schools before applying for
the post of German and Afrikaans teacher at
the then one year old Fairmont. (Udo
laughingly says that one can easily say that he
has grown “older” with Fairmont.)
Udo’s relationship with Fairmont began with the teaching of German (Standard 6 to Matric),
Afrikaans (Standard 6 and 7) and History (Std 6). He was asked to teach Bible Education,
Youth Preparedness, Music Appreciation and Geography also at various times before he left
teaching in 1996.
One can see clearly why Udo is so respected as Co-curricular Co-ordinator since he has
always been totally involved and interested in school activities. The fact that extra-mural
involvement was compulsory during his teaching years was certainly not a hardship for him.
He started a German Society in 1979 and kept it going until he retired. He was in charge and
coached Soccer for most of his teaching career and also enjoyed being in charge of Athletics
for three years, as well as managing tennis and cricket teams at various times.
During the first years of Fairmont High School, all teachers were asked to contribute to the
administrative duties and Udo was appointed Head of Stationery, Inventory, ordering and
control of school books (which was a huge ongoing task) and for sometime he was Head of
Acquisitions.
He was also Standard Head (now Grade Head) of all standards at various stages. He greatly
enjoyed the opportunity to work with some of the most enthusiastic pupils when he was in
charge of the matric farewell for four years. Other duties that he performed most efficiently
were: Matric Valedictory Services, School Drivers’Education Programme ( which he claims
to have given him grey hair prematurely), the control and hiring of school lockers and transport
arrangements for staff and pupils. Certainly an illustrious teaching career.
In 1997, Udo was appointed Co-Curricular Co-ordinator. He still taught German privately to
pupils who were still interested to write the subject until the end of 2007.
In his capacity of Co-Curricular Co-ordinator, he is an integral part in the running of the
school’s extra-mural programme and is respected as someone who is always amiable and
courteous, highly organized and a true ambassador for the school.
Udo declares that although many may feel that thirty years at the same school may sound
boring, it has been thirty years of experiencing every day as different and working with great
people which has made this position a pleasure.
226
APPENDIX 17
REFERENCES
1. The Making of Education Policies in South Africa - Ken Hartshorne Oxford 1999.
2. Managing Educational Change - Brahm D Fleisch Heinemann 2002
Academic Staff
Mrs Juanita Aggenbach
Mrs Carol Aston
Mrs Marcel Badenhorst-Nieuwoudt
Mrs M Barnardt
Mrs Alta Behrendt
Ms Nicolette Bleeker
Mrs Estelle Brettenny
Mrs Heather Bruce
Mr Pieter Cronje
Mr Johann Dempers
Mr Ron Dingley
Mr Willie Dowd
Ms Karien Bredenkamp
Mr Justin Edwards
Mr Brian Elgie
Mrs Morna Esmeraldo
Mr Hendry Freeman
Mrs Anne Friedenthal
Ms Jessica Hancock
Mrs Rinnie Hansen
Ms Ingrid Hodge
Mr Udo Horsthemke
Mrs Maria Jacobs
Mrs Tanya Janse van Rensburg
Mr Lance Job
Mr Gerhard Jordaan
Ms Liska Kassier
Mrs Jenan Kingwill
Ms Nicola Kirby
Mrs Carla Kurt
Mrs Sandra Lamprecht
Mr Michael Leibbrandt
Mrs Antoinette Lourens
Mr Stevan Marais
Mrs Barbara McMillan
Mrs Clare Murphy
Mrs Portia Naidoo
Mrs Lorraine Neethling
Mrs Beatrix Nel
Mrs Jeanne Oosthuizen
Ms Oreada Piek
Ms L’nanda Pienaar
Mrs Arlene Pietersen
Mrs Linette Rousseau
Mrs Mari Schnehage
Ms Lynelle Smitsdorff
Mrs Janice Solomons
Mrs Eleanor Splinter
Mrs Gillian Stemmett
Mrs Shilo Swanepoel
Mrs Mattie Uys
Ms Jeanette v.d. Merwe
Ms Wendy van der Merwe
Ms Verena van Niekerk
Ms Sunelle van Wyk
Mrs Elsabé van Zyl
Mr Paul Vegter
Mr Neville Veldman
Mrs Christa Vermeulen
Mrs Brenda Vermoter
Mrs Beulah Vezasie
Mrs Shirley Visser
Mrs Betsie Vorster
Mrs Christine Weerts
Administrative Staff
Mrs Bronwen Bradshaw
Mrs Lola De Clercq
Mrs Amanda de Reuck
Mrs Gonnie Dijkshoorn
Mrs René Finlay
Mrs Hildegard Homewood
Mrs Liefie Jacobs
Mrs Shelagh Johnston
Mrs Nelly Pool
Ms Lesley van Aswegen
Support Staff
Mr Abraham Muller (Chucky)
Mr Moses Allens (Pikkie)
Mr John Apies
Mrs Ann Bonthuys
Mr Elario Geldenhuys
Mr Klaas Jordaan
Mr Alfred Maxongo
Mr Andries Mekriega
APPENDIX 16
STAFF PRESENT DURING ANNIVERSARY YEAR - 2007
Fairmont High School
Private Bag X11 Durbanville 7551
Medway Durbell Durbanville
Tel: (021) 976-1147 Fax: (021) 976-8735
e-mail: postmaster@fairmont.co.za
www.fairmont.co.za
Fairmont High School, originally known as The Eversdal English Medium
School, opened its doors in January 1977. The first Principal, Mr Clive
Wigg, started the school with a staffing complement of seventeen teachers
and three hundred and thirty pupils in a three-storey building which was
far too big for the first intake. There were no sports fields, no memorial
quad, the hall was still under construction and the pupils had no prescribed
uniform.At the end of the first year, the school was renamed Fairmont High
School. At that stage, the school was equipped with two tennis courts, two
netball courts, two cricket nets, and a turf wicket in the centre of the only
field. The pupils proudly wore their brown uniform – very different from
all the surrounding schools.
In 1979 there were six hundred and sixty pupils. Three additional fields were
completed and the first official cricket match took place against Bergvliet.
In 1983 the state provided forty-eight staff members and in 1986 there
were fift-nine state-employed educators. By 2006, the state employed only
thirty-three educators, while the Board of Governors of Fairmont employed
thirty additional teachers.
It became apparent that the school built for 720 pupils, was far too small
for the 1200 pupils it had to accommodate. Extensions to the main building
were completed in 1994.
In December 2002 Mr Wigg retired from teaching, leaving behind a vibrant
active school. Mrs Liz Müller, who had been teaching at Fairmont since
1985, took over as acting Principal in January 2003 and in July 2003 was
appointed as Principal.
The theme “ANew Beginning” seemed to be most appropriate for 2003 and
gave everyone something new to strive for. Sadly, Mrs Müller, after a brief
illness, passed away in 2006.
Today the school continues to grow on the foundations built by Mr Wigg
and Mrs Müller. The Principal of Fairmont is Mr Ron Dingley. There is a
staff contingent of seventy teachers, twenty administrative and support staff
and one thousand two hundred and fifty pupils. Fairmont is the only English
medium school between Durbanville and Stellenbosch.
This document is an account of the years 1977 to 2007.

Fairmont High School: 1977 - 2007

  • 1.
    FAIRMONT HIGH SCHOOL 1977 -2007 Clive Wigg with contributions from: Shirley Visser and Ron Dingley FAIRMONTHIGHSCHOOL1977-2007 CliveWigg-withcontributionsfromShirleyVisserandRonDingley ‘Stand Fast’
  • 2.
    1 This history document isdedicated to all the pupils, past and present from 1977 to 2007. The “Flag of Learning”
  • 3.
    2 1977 - 1981 FOUNDINGTO FOUNDERS’ DAY - GROWTHAND SUCCESS 1977 This is the story of a school which started at a time of political unrest in South Africa. It has experienced three decades of change and transformation, both politically and in education. After only twenty years, Fairmont was rated as one of the top 100 schools in the country. The story actually begins in 1973, when the Provincial Administration of the Cape Province decided on the establishment of the school. The site on which the school is situated was expropriated by the Provincial Education Depart- ment for school purposes on 26 January 1966. The site at that stage, measuring 10.3511 ha, was expropriated from a Mr Schabort, and the purchase price was R34 140. It was part of the Eversdal farm, which originally measured 800 morgen and had been in possession of the Schabort family since 1830. Portions of the site were transferred to the Municipality for road purposes, leaving an area of 9.5871 ha. A notice “Proposed closing of public place and proposed exchange of land” appeared in the Cape Times and Die Burger on 9 and 16 November 1973. The relevant owners were informed that: “A new High School is to be erected on the school site between Durbanville Hills and Durbell and an improved entrance from Durbanville Avenue to serve Durbell and the new school is necessary. A portion of the school site is required for this improved entrance and in order to provide the necessary school facilities the open space in Durbell is required for tennis courts for the school”. In the early 1970’s, development occurred in the northern sector of Bellville, including Ridgeworth, Stellenberg and Eversdal. In Durbanville part of Wellway Park in the north and parts of Durbanville Hills and Valmary Park in the south were developed. This sectoral pattern remained during the next few years, but the northern part of Bellville was to meet the southern zone of Durbanville by 1977. Durbanville High School was the only high school in the area. It was a dual-medium school with an enrolment of over 1000. On the recommendation of the Parow School Board and the Educa- tion Department, the Provincial Administration agreed to erect a new school, as an English-me- dium High School and to change Durbanville High into an Afrikaans-medium high school. The school was to comprise a hall to accommodate 900, classrooms, typing, music and art rooms, a library, laboratories, offices and storerooms. During 1976 there was much speculation as the building, with its attractive design and distinc- tive arches, was constructed. During the second half of the 1970’s, South African troops began to withdraw from Angola, and the bush war raged on in Rhodesia. In 1976 violence swept through many townships and even into the centre of Cape Town. Protests and unrest were experienced in various parts of the country. On 16 June 1976 a student march in Soweto was stopped by police bullets. There was to be further death and rioting during June of 1977 when the riots of the previous year were commemorated. Disturbances were to continue throughout the country until 1980, and return in a different form in 1984/85.
  • 4.
    3 Clive Wigg: PrincipalOctober 1976 - December 2002
  • 5.
    4 It was duringthis period of upheaval that the school staff was appointed, requisitions were placed, pupils were enrolled and the Eversdal English-medium High School was opened. It was the third such school in the Northern Suburbs, The Settlers having started in 1965 and Fairbairn also starting in January 1977. The position of Principal was advertised in the Education Gazette dated 15 July 1976. Inter- views were conducted at the Parow School Board offices and Mr Clive Wigg, the Deputy Principal at The Settlers High School in Bellville, was appointed, to commence duties on 1 October 1976. Mr Wigg, aged thirty-six, had taught previously at Muir College, Paarl Gymna- sium and Sea Point Boys’ High. He was required to appoint the new staff and to ensure that everything was ready for the first term in 1977. The new school building was still being constructed. He was thus faced with the daunting prospect of starting a school from scratch without an office or any assistance. Fortu- nately, Mr Gerrit van Wyk, Principal of Kenridge Primary, and Mr Mike Reeler, Principal of The Settlers High School, provided the use of offices. Mr Wigg thus did most of the requisi- tioning of furniture, books and equipment from his old office at The Settlers, and enrolments and interviews from a medical inspection room at Kenridge. Interviews for the position of vice-principal were conducted at the Parow School Board office. Mr Don Gibbon of Grey High School, Port Elizabeth, was nominated. The applications for all other posts were supplied to the Principal, and he had to submit his nominations through the School Board. The school had to provide for Standards Six to Eight in the first year. The majority of new enrolments were thus for pupils then at Durbanville High School. The subjects to be offered would be the same as those at Durbanville High School. The first name to be entered into the admissions register was Petra Abel. Needless to say, a new school attracted applications from pupils at many different schools. It would be the task of the staff to weld these into a new identity. This would not be an easy task without a common uniform and with new rules to be formulated and observed. The first circular to parents, dated 10 November 1976, stipulated that if an official school uniform was worn, it must be complete. The principal of the school concerned had to give permission. For those who did not possess a uniform or whose uniform was too small, white shirts and grey trousers were prescribed for boys and a “plain one colour school uniform length and style” dress for girls. Most of the rules listed in this circular are still applicable. Further paragraphs of the circular read: “The committee will be elected as soon as the hall becomes available. A PTA will be estab- lished only after the formation of the school committee. Until such time, I hope to work on a system of small voluntary committees. Attention will have to be given to fund-raising, ground development, the tuck-shop, the design of the school uniform, the name of the school and the names of the Houses, library facilities and the provision of library assistants. The Department does not provide funds when a new school is established. Naturally, we will need funds before we can purchase, for example, any sports equipment. To start with, the voluntary (school fund) contribution is: R20 for one child for one year, R30 for two or more children for one year”.
  • 6.
    5 Founder Staff: The founderstaff were to be: Principal: Mr C Wigg Vice-Principal: Mr D Gibbon Senior Assistants: Miss L Coetzer Mr A Viviers Secondary Assistants: Mrs D Carstens Miss D Durand Mrs C Esterhuizen Mr T Gilman Miss V Hill Mr K Milford Mr W Roux Miss N Smuts Miss E Strauss Mrs E van Rijswijk Secretary: Mrs Y van Wyk Janitor: Mr S Engelbrecht Six of these were beginner teachers. One teaching post and posts for cleaners were still to be confirmed. Additional teaching posts were granted on the strength of the enrolment, and Mrs F Gillman, Mrs E Els and Mrs I Murray were appointed later to start in January. The caretaker and two cleaners, Mr W Herwil and Mrs EArendse, started work on 1 December 1976, all other posts taking effect on 1 January 1977. Mr Engelbrecht, the caretaker, the longest serving member of staff, was still at the school in 2007. Miss D Malan replaced Mrs Els in April of 1977 and Mr W Ladewig replaced Mrs Murray in October. Facilities As the end of 1976 approached, a storeroom was finally made available for the receipt of material requisitioned from the Provincial Stores Department. The main quadrangle was still a pile of sand and soil, and the builders’ huts and stores extended across the site of the present swimming pool. The only developed areas were the grass strip in front of the entrance and the field next to the partly constructed Hall. The grass at the front had to be cut with a lawnmower brought from home! In January, everything was ready for the big day. The offices were furnished with standard desks, four-door cupboards and chairs. There were no curtains. The secretary’s office was that now occupied by the Finance Secretary, and visitors had to sit on a hard wooden bench while waiting to go down the short passage and into the Principal’s office. The secretary was pro- vided with only a typewriter. Standard-issue chairs awaited the staff as they arrived for the staff meeting on 17 January 1977, the day before the pupils were to arrive. As can be imagined, all were excited; thrilled to be a part of a new venture in a wonderful building, but somewhat wary about what to expect the next day. The list of thirty-three items for the meeting included items such as procedure for the first day, record books and schemes of work, dress, control, duplicating, equipment, inspectors’ visits, the model library and the for- mation of a uniform committee to investigate and to present proposals to the school committee when it was formed.
  • 7.
    6 Everyone was impressedby the design and appearance of the school building, which was different from that of other schools. The brickwork and aluminium windows would be main- tenance free. The ramp was a new innovation and led to much speculation and rumour that the building would be used as a hospital in an emergency. What was most striking, however, was the multi-coloured interior. Every classroom had a different colour combination of walls, floors and doors. The magnificent view across to the mountains was a talking point and al- ready people were picturing what the grounds would be like when fully developed. The prin- cipal made it clear that beautification of the grounds would be a priority. The next few months would see a flurry of activity as classrooms were organised, teaching progressed and sports and societies started. This, of course, took place with the building still unfinished, the hall not available for assemblies until the start of the third term, and very limited facilities for sport. No sports fixtures could be played at the school itself. There was great excitement on 3 February when the tennis teams played their first matches. The girls beat Tygerberg Commercial by eight games to four and the boys lost badly to Bellville Technical High. Certain basic equipment was still required. A diary entry on 25 February shows the purchase prices of a vacuum cleaner (R199.50), a floor polisher (R796.00) and an adding machine (R198.00). On 16 March the staff considered the appointment of the first monitors - prefects would come later. Leon van der Merwe and Lesley Windell were named as Head Boy and Head Girl. The gymnastics requisition for ropes and apparatus for the hall was placed on 31 March. The First School Committee On 20April School Board officials conducted the election of the first School Committee. This committee met on 25 April. The office-bearers were elected unanimously as follows: Chairman: Mr E J Fivaz Vice-Chairman: Mr F J Egan Secretary: Prof T J McCarthy Other members present were: Mr F Choice, Mrs D Matchett, Mr B Starke and Mr E Windell. The Principal was present in an advisory capacity. It would be many years before Education Department regulations changed to allow for staff and pupil representation. The agenda for this meeting included the following items: • transport payments • refreshments for home games • Speech Night • bus services • flooding from sports field • establishment of a PTA • an intercom system, the school name and school uniform. The financial statement was considered and “it emerged that the current balance on school funds was R940.36”. It was resolved that an “additional levy of R20 per family would have to be requested from parents”. A list of possible school names had been circulated to parents and it was clear from the re- sponses that the name “Fairmont” enjoyed most support.
  • 8.
    7 Building in progress1976 (Courtesy: the Tygerburger 1976) Founder staff
  • 9.
    8 The Chairman wasdelegated as a one-man sub-committee to have uniform samples made up as well as to report on the various cloths to be used. The official school colours were declared to be chocolate brown and white. At the next meeting on 10 May, the committee “unani- mously accepted that the name ‘Fairmont High School’ be forwarded to the School Board for approval as the future name of the school”. Voluntary Committees The system of voluntary committees had been working well from the start. Mrs Maureen Windell convened the Tuck Shop Committee, Mrs Val Williams the Fund-raising Committee and Mrs Beryl Fivaz was the convenor for the first fête. A grand total of R2042.16 was raised. Keen support from parents led to the presence of twenty-five stalls, the most successful on the day being handwork (R321.87), cakes, plants and sideshows. Two plants left over grew into big trees in the small garden next to the Administration block passage. The original iron support is still embedded in one. As a certain amount of money would now be available, the School Committee discussed the purchase of an intercom system, an electric typewriter, a stencil cabinet, an automatic signal clock for the bell, letterheads, report cards and cups and saucers. The next significant event in 1977 was a meeting of parents held on 31 August. The staff and approximately 150 parents were present, with Mr Wigg in the chair. He gave an outline of the nature of various PTA’s and a brief history of such associations. “The main aim was to pro- mote co-operation in the education of children and not merely to establish a fund-raising body.” Discussions followed and it was decided that the provisional constitution presented be used for one year. A committee, comprising Mrs B Craddock, Mrs B Fivaz, Mr B Froneman, Mrs S Jordan, Mr I Shepherd, Mr D Stewart, Mrs V Williams and Mrs M Windell was elected. The first meeting of this new PTACommittee was held on 8 September and included Mr Fivaz, as School Committee representative, and staff representatives Miss Coetzer, Mr Gibbon and Mr Wigg. Mr Stewart was elected as Chairman, Mr Shepherd Vice-Chairman, Mr Froneman Treasurer and Mrs Craddock Secretary. It was agreed that the tuck-shop and fund-raising committees would continue functioning with Mrs Windell and Mrs Williams as convenors respectively. A Careers Evening was planned and a fund-raising competition proposed. Mr Wigg requested that consideration be given to the composition of a suitable school song. It was suggested that songs in addition to the one with words written by the Principal and music by Miss Malan be composed and presented to the School and PTA Committees. At a subsequent meeting quotations for curtaining of the school hall and other requirements were presented as follows: Curtaining R3000 - R5000 Public Address System R900 Stage Lighting R3000 - R5000 The Careers Evening, held on 19 October, was a great success. More than 600 parents and pupils attended. The most popular careers, with numbers attending, were: Ground Hostess 131 Primary School Teaching 123 Marine Biology 107 Kindergarten Teaching 102 Prizes for the fund-raising competition were drawn at a special meeting on 6 December - 1st Prize - R400 worth of paint; 2nd Prize - a portable TV set and 3rd Prize - a R50 shopping voucher.
  • 10.
    9 The first cricketteam to represent the school Fairmont Karate Club
  • 11.
    10 Grounds Beautification In Julya group of volunteers - Mrs Greshoff, Mrs Greaves and Mrs Shaw - assisted with the selection and planting of a number of trees and shrubs as a first step in beautifying the grounds. A large number of golden privets were also planted alongside pathways, and ficus trees pro- vided by the Municipality were planted down Medway. Pupil Heather Stewart was to write prophetically: “I catch my first glimpse in twenty years of my old school. Through the mist and rain it looks like some majestic castle high on a hill in the moors, dominating the broken skyline. The road up towards the school is now an avenue of equally majestic trees. I can remember when this road was lined with tiny saplings...” In August of 1977 a circular listing a number of suggested school mottoes was sent to parents. “Stand Fast,” suggested by Mrs Wigg, was the clear favourite. Three potential school songs were prepared and sung at a school assembly. The song origi- nally proposed by Mr Wigg and Miss Malan was chosen and later ratified by the School Com- mittee. A suitable badge was the next important item to be designed. By August the first school uniform, apart from the badge and the tie, had already been designed. Dr C Pama was asked to design a school badge. His proposed design was completed by November. The school committee discussed this at their meeting on 24 November and asked for amendments to the original design, including a battle-axe as the crest! A new design was presented in January 1978. The committee reversed the original decision, and the battle-axe was changed to a sphinx. This required a change to the design of the mantling as well. The design was finalised in May 1978, the heraldic description being: ARMS: Or, three vine leaves conjoined in a fess-point and a chief dancette Vert WREATH AND MANTLING: Or and Vert CREST: a sphinx or MOTTO: Stand Fast For some reason the incorrect colour (light brown) was used on the shield instead of gold (or) and for a number of years the blazer badges were thus actually incorrect. The original drawing of the coat of arms had “disappeared”. Dr Pana did a new drawing in 1987. The school badge was finally correct in both colour and design of mantling and the vine leaves. Subsequently, an attempt was made to trace the coats of arms of Superintendents of Educa- tion Dr James Rose-Innes (1939 - 1859 term of office), Sir Langham Dale (1859 - 1892) and Sir Thomas Muir (1892 - 1915) after whom the school Houses were named. Registra- tion of the school arms with the State Herald was considered Limited facilities did not prevent a wide range of sports from being offered in the first year. In addition to boys’ and girls’ tennis teams, mixed teams were also entered in leagues. Badmin- ton started under the guidance of Miss Malan. Three boys’hockey teams entered leagues. Mr Gibbon was in charge. The Durbanville Hockey Club granted the school the use of their fields. This was to lead to a long association between school and club. Four girls’ hockey teams were entered and also relied on the kind support of the Club. Miss Coetzer was in charge. There were two rugby teams. All matches were played on an away basis. Softball started during the summer term at the end of 1977, and netball teams were entered in all four sections of the Co- Ed Schools Competition. An U14 soccer team initially played in the league. Karate-Do was
  • 12.
    11 established as oneof the first activities, with Mr Milford in charge. The Durbanville Cricket Club kindly provided facilities. Two teams were entered in the first year. A start was also made with swimming and athletics, and a cross-country competition was held. Initial develop- ment was again hampered by lack of facilities. The first drum-majorette squad was to be formed at the start of 1978. Provision was also made for golf, squash, table tennis and volley- ball. By the end of the year it was proudly announced that individual pupils had represented the province in tennis, sailing, gymnastics, cycling and ice-skating. Societies A Drama Club was founded. Mrs van Rijswijk, Miss Hill and Mr Gilman ran a course on speech training, movement and creative drama, leading up to the first One-Act Play Competi- tion in the second term. The stage had no curtains or backdrops, so flats were constructed. Pupils themselves chose the plays, rehearsed and acted in the plays. The Houses were desig- nated Blue, Yellow and Red as a temporary measure. Red House’s play, “The Crimson Coco- nut”, produced by Angela Bremner, was the winner. Other groups to start were the Students’ Christian Association and the Chess Club. Three teams were entered in the Northern Suburbs Chess League. The Choir performed twice. A number of pupils assisted Miss Hoogenhout with the classification, shelving and covering of books in the library. Aroom, next to the boys’ changing room, was set aside as a photographic darkroom, and Mr Roux constructed the nec- essary cupboards. The Grapevine, a quarterly newspaper, was started in the second term. The Tuckshop In April 1977 the grand opening of the tuckshop took place. As the kitchen was not yet ready, thirty-seven enthusiastic mothers decided to start working for school funds, operated from two classrooms, and made an excellent profit of R1000. Speech Night The first Fairmont Speech Night (Prize-giving) took place on 2 November. This was an im- portant occasion as it would be the bench-mark for all subsequent functions. It would be a formal occasion with the staff in academic dress. The programme was: 1. Introductory Remarks 2. Annual Report Mr C Wigg 3. Piano Solo Miss J Hall 4. Introducing the guest speaker Mr E J Fivaz 5. Address Mr E Louw 6. Piano Solo Miss G D Malan 7. Vote of Thanks Mr F Egan 8. Presentation of prizes and trophies Mrs E Louw 9. National Anthem In addition to the academic and sports awards, there were also special awards including those for best actor and actress, best orator and the winner of the general knowledge quiz. It was announced that the full school uniform would soon be available, that provision had been made for recognition of honours and merit awards and that a school badge was being designed. The system of monitors would continue until the first prefects were appointed at the end of 1978.
  • 13.
    12 An analysis ofexamination results revealed that one could be reasonably satisfied with the progress. Unfortunately, a new school could not provide immediate answers to those with pre- existing problems. The creation of a teacher-psychologist post was, therefore, particularly satisfying. Two high points of 1977 were the Fête and the Careers Evening. Two lows were the non- payment of the voluntary school fees and the fact that only nine parents assisted with guarding the school during the June holiday, considering that this was a time of unrest in the country, much focused on schools. Staff members had thus to bear the brunt. 1978 The rapid growth in numbers meant that additional teachers were appointed. The average enrolment was 500. The year proved to be a most exciting one in that three new fields were levelled. This came about because of the generosity of Mr Basil Starke, a member of the School Committee and a parent. As a result of a very low tender by Mr Starke, the Provincial Administration had sanctioned the preparation of an additional three sports fields for the school. This would mean that all sports would be played at the school from 1979. The provision for these facilities so soon after the school’s inception was unique. It would be necessary, how- ever, to raise the necessary funds for the purpose of grassing the fields and paying for the water supply. To this end the teachers and pupils would embark on a sponsored twenty kilometre walk on 1 May. It was hoped to raise R5000 in this way. The appearance of the school altered rapidly as the slope down to the road was terraced. Grass was planted in November after a pipe to supply water points for the additional fields was supplied by the Works Department of the Cape Provincial Administration. Mr Clarke, the teacher in charge of the grounds, reported: “In an effort to encourage pupil participation in the development and funding of the grounds, a sponsored Big Walk was held. This event formed part of the school’s contribution to Conservation Year. The Big Walk was preceded by a talk on conservation and a tree-planting ceremony in which the monitors of each class and Mr Wigg, Mr Gibbon and the Head Boy and Head Girl each planted a tree. Additional shrubs and trees (nearly 200 in all) were also planted. By the end of 1978 trees had been planted to form surrounds for all fields. In an effort to produce some shade in the quad- rangles, shade trees were planted in pots.” During 1978 new innovations included a “Meet the Teachers” evening after the May examina- tion, a “Subject Choice” meeting for standard sevens and their parents and a “Fairmont Get Together” in September. These were to become annual events. The appointment of only one stockist to provide the school uniform led to some dissatisfaction until the decision was clarified and explained by the School Committee at a special meeting. “Film Evenings” were started, the first being on 10 February. The PTA planned quarterly meetings with themes, The teenager and the school, the teenager and his problems, The teenager and the community, and The teenager and his career. A mini- fête was held on 27 May, at which approximately R2000 was raised. The final total for the Big Walk was R4260. By June the principal could report that the curtains for the hall had been ordered. The cost would be R5219. A refund of R1400 would be received from the Education Department.
  • 14.
    13 First tennis team- 1978 Standard Eight play - “Sorry wrong number “- 1978
  • 15.
    14 Official Opening The officialopening of the school took place on 5 September. During the afternoon, class- rooms and subject exhibitions were on view. The programme for the afternoon included: a Physical Education class on the top field, the drum majorettes accompanied by the Paul Roos Gymnasium Band, and boys’ hockey, girls’ hockey, netball and chess Inter-House matches. The evening programme was: 1. School song - sung by the choir 2. Welcome - Chairman 3. Hymn 4. Lesson (Psalm 119, verses 1-8) and prayer - led by Mr P Holgate 5. Introduction of the Guest Speaker - Mr A D du P le Roux, Circuit Inspector 6. Address - Mr P S Meyer, Director of Education 7. Unveiling of Plaque - Mr P S Meyer 8. “Do You Know Where You’re Going To?” - sung by the choir 9. Thanks - Mr C Wigg, Principal 10. The National Anthem Here follows an extract from Mr Meyer’s address: “Tonight may be compared with the christening ceremony of a new baby and, on such an occasion, it is wise to cast the thoughts ahead. “What are the influences which are going to affect the future of Fairmont High School? What is going to determine its ultimate character as an educational institution, and how is it going to compare over the years with its fellow schools? “I believe that a school must stand and fall by its end product. In other words, what is the quality of the pupils who will leave its portals after having written their final school examination? “What will be the quality of the lives they lead as adults, and what contribution will they make as young South Africans to the corporate life of our country?” Anew draft PTAconstitution was prepared and was adopted at theAGM of the PTAon 18 October. Speech Night In 1978 Speech Night was held on 1 November. Dr Sandra van der Merwe, who was to be the guest speaker, was indisposed, and Prof McCarthy replaced her at short notice. Staff In his report, the Principal outlined the growth in enrolment and staffing. At the start of 1979 there would be thirty-one teachers. Two of the new posts would be promotion posts. Mr W Ladewig and Mr P Holgate had been nominated to fill these posts. The projected enrolment was 670. The school thus also qualified for a part-time Secretary and a fifth cleaner. A printed supplement to the report detailed progress in all sports, societies and clubs. A similar supplement was to be provided at all future speech nights. One significant event was the Inter-Schools Athletics meeting against Fairbairn High. This competition was to be held annually until 1992. The first tour was undertaken when both the boys’ and girls’ hockey teams travelled to George. A professional dancing teacher held weekly ballroom dancing classes. Drum majorettes started and the squad performed on the day of the official opening of the school. The Photographic Society was functioning well. The darkroom was a distinct asset. Unfortunately, the predic-
  • 16.
    15 tion that “thissociety should prove to be of great value as it will assist with the recording of school events, a photo library will be compiled and photographs may be used as teaching aids and for projects” did not hold true for more than a few years. Sadly, this was also to be the case for various history and archive groups formed through the years. An innovation was the pro- vision of activities boards. These were situated outside the Needlework Room in the main passage. The colourful plastic tags were intended to enable one to see at a glance in what way every pupil in the school was participating in the school’s extra-mural programme. The year was one of extra-mural consolidation and growth. Prefects The first Fairmont prefects were announced at the Speech Night function. From the next year, they would be announced during the Valedictory Assembly. The important role that prefects were to play in succeeding years is shown clearly in these words from the principal’s address: “Although students cannot make final decisions, they may certainly participate in and influ- ence decision-making. Given the opportunity to raise issues, debate and discuss them, mem- bers of the student council will find it necessary to keep in touch with the members of the student body. The council must act then as the voice of the student body...The students’coun- cil, as I envisage it, will, aside from being a forum for ideas, be given responsibilities quite within their capacity to perform. We have, therefore, drawn up a constitution embodying such articles as general goals, specific aims, duties, committees and sub-committees. Embodied in the constitution are also the pre- fects’pledge and the pupil leaders’creed.” The prefects acted as leaders of the full Student Council, which included elected members from each of Standards 9, 8 and 7. The first Fairmont prefects were Torsten Moëhl (Head Boy), Lesley Windell (Head Girl), KevinWebb (Deputy), Vanessa Koening (Deputy), Robin Craddock, Vanessa Edmunds, Diane Eva, Stacy Jonas, Roderick Leerkamp, Hilary Middleton, Leon van der Merwe, Donna Vos and Gillian Williams. The prefects attended a leadership and training camp at Steenbras Dam. Cast of “What a Weekend”
  • 17.
    16 1979 The school developedrapidly. The enrolment grew from 330 in 1977 to 636 in 1979 and the staff from seventeen to thirty-eight. The Principal reported: “As the school was built to cater for 750 pupils, we are fast approaching the position where the school will have the maximum numbers of pupils possible.” The fact that few men were entering the profession was a cause for concern. The Works Department provided much improved outside lighting, and the first set of theatre lights was installed. One of the cloakroom (peg) areas was converted into a store for the Clothing Exchange. This conversion, opposite Room 57, was to be the first of many similar conversions in later years as enrolment grew and the demand for accommodation increased. A timber hut was purchased to provide a second outlet for the tuckshop in the main quadrangle. This came to be known as the “Cabin”. PTA The PTA adopted the theme “Relationships and Responsibilities” as the theme for the year as a further development of the theme “The Teenager”. A major event during 1979 was the fête held on 5 May. This included a Pick a Box Show. The Fairmont drum majorettes and the J J du Preez High cadet band paraded up the main street in Durbanville to draw attention to the fête, which was a great success. Apart from the financial benefit, a very happy atmosphere had been created in which parents, pupils and staff worked together. Special thanks were expressed to the conveners, Mrs Cradock and Mrs Williams, and to Mr Peter Hough, the organiser. Other significant events were the staging on 27 July of the production “Anna and the King of Siam”, produced Mr Peter Merrill for the Festival Players, and the Dinner Dance on 25 Au- gust. The latter was the first of the many such PTA dances in later years. The Dance, held at the Brackenfell Town Hall, with the band “The Pied Pipers”, included a floor show arranged by Mrs Wigg, and was a tremendous social success. The Springbok Radio show “Check Your Mate” was held on 12 November. Matters receiving much attention during the year included traffic flow and the need for a cycle lane in Durbanville Avenue, the introduction of a school uniform bank and alterations to the tuckshop/hall kitchen servicing hatch. A first mention was made of “urgent attention...to the provision of additional change room and toilet facilities”. The first musical Fairmont’s first musical was “What a Weekend”, with words and music by Professor T J McCarthy. The report in the first school magazine read: “It was a pleasant surprise to see a play written by a parent, produced by the headmaster, and most competently acted by the pupils of the school”.
  • 18.
    17 Inter-House Athletics 1979- Dale win One-Act Play Competition - Innes House: Christopher Payne, Michael McCarthy, Paul Bidder, Michelle Faulhammer
  • 19.
    18 CAST - “WHATA WEEKEND” 1979 Colonel Lancelot (Pongo) Pilkington : Michael McCarthy Mrs Mabel Pilkington - his wife : Susan Bremner Deborah Pilkington - their daughter : Michelle Faulhammer Joan - Deborah’s friend : Jennifer Hall Captain Reginald (Whacko) Worthington : Kevin Seeley Mrs Dulcie Worthington - his wife : Tracy McCarthy Archiebald Worthington - their son : David Parkes John - Archiebald’s friend : Christopher Payne Jarvis - the butler : Lisa Brown Professor Percy Weedsworth : Andrew Steyn French Maid : Bonnie van der Walt Hockey Girls and Cricketers Another enjoyable function was the Music Evening in October. In addition to a number of music items, the choir sang thirteen songs, the theme being Ben and Michelle. The Grapevine newspaper was the mouthpiece for the pupils, and was produced entirely by a pupil staff. The 1979 Editorial Staff was: Editors: Christopher Payne and Denise Hammer Sub-Editors: Kim Record, Sharlene Heath, Karen Boshoff Printers: Jannie Kolovos, Paul Bruins Art & Advertising: Jennifer Hall Assembly & Distribution: The Editorial Staff This was still the time of wax stencils and manual printers. Covers were printed courtesy of Mr and Mrs Wulfse. The Grapevine comprised letters, features, sport reports, comments, articles, society reports, film reviews and literature. Two extracts from the second term edition follow: Congratulations to the Sportsman of the term KEVIN WEBB Junior World Sailing Championships SA Representative Levorno, Italy Sailing a “420” (2-man boat)
  • 20.
    19 An appeal forunderstanding Sitting while the world goes by. Not saying a word. Proud, putting on a bold front. Feeding crumbs to pigeons Thinking of yesterday, and a house full of children Caring, coping. Encouraging, loving. Always understanding. Until now - the one day of the year when it would be nice to be remembered. You won’t forget - will you? Craig Maasch Literature would become a feature of future issues and of the school magazine. The annual literature competition was to gain in importance. Parents and friends donated prizes and tro- phies for academic, sporting, cultural and special achievements. A strong poetry tradition also developed. Traditions Traditions commencing in 1979 were the ValedictoryAssembly, including the induction of the new prefect body, the first Matric Farewell Dance, and the meeting for parents of the Standard Tens. The Matric Farewell Dance The farewell took place in the school hall on Friday 5 October. Tracy McCarthy reported: “All the matrics attended, with most of the staff and their respective partners. The Std Nine Farewell Committee attended and many standard nines were working behind the scenes. Thanks to our efficient cooks, waitresses and washer-uppers, we were served with delicious food: fish cocktail, hot tropical chicken and vegetables, and cheesecake triangle. The theme was ‘Asterix.’ Large murals, the length of the hall, were painted by some standard nines during the holidays. The ceiling was lowered with a net and silver streamers were attrac- tively looped around the hall.” “That everybody thoroughly enjoyed the evening is indicated by the fact that the band was requested to play on after midnight.” The Valedictory Assembly The Valedictory Assembly programme, which was to be similar (but with amendments) in following years, was:
  • 21.
    20 1. Choir -Guadeamus Igitur, prefects and other matrics to enter the hall from the foyer, in procession. 2. Introductory remarks - Principal. 3. Announcement of the names of the new prefects. 4. The Prefects’ Pledge (said by one of the new prefects). 5. Presentation of badges and certificates - prefect to prefect. 6. The outgoing Head Boy/Head Girl address, and handing over of the School Flag to the new Head Boy/Head Girl and to charge them with their responsibilities. 7. The outgoing prefects leave the stage. 8. Address to Std 10’s - Principal. 9. Scripture reading. 10. Prayer. 11. School song. 12. Pupils leave the hall, with standard nines leaving first. 13. Stage party leave Hall, the 10’s leaving last. 14. 10’s to pass through 6’s, 7’s, 8,’s, 9’s to leave at front gate. 15. Past Pupil representatives to greet Matrics at front gate. The Valedictory Assembly, which took place on the day after Speech Night until the introduc- tion of Matric Day on that day, followed breakfast for the staff and the matrics, the matric concert for the school and tea for staff, committee members and matrics. Mrs Lyn Wigg organised the tea for a number of years. The camp for the new prefects (the second such camp) was again held over three days from 3 November at Steenbras Dam. Mr Gibbon reported: “An overflowing Steenbras Dam added excitement to the initial proceedings...and provided a promising omen for the year ahead. The spirit of the group, their willingness to learn and their determination to contribute positively to the school provided a sound base from which to launch.” The goal of the camp was to prepare prefects for their role as members of the Student Council by including: • styles of leadership • creation of team spirit • decision-making • clarity regarding duties and responsibilities. The 1979 school magazine was the first. The editors were pupils, Tracy McCarthy and Lynn van der Hoven, under the supervision of Mr Parsons. The magazine covered the events of the first three years. The list of contents read: • Principal’s report • Thoughts (literature) • Fairmont in action (sport) • Fairmont’s other activities (societies and cultural) • Inter-House Competition • Looking back • Prizes and awards • Class of ’79
  • 22.
    21 The teaching staffhad grown from an initial seventeen to thirty-three. Only eight of the origi- nal teaching staff were still at the school, and also MrsYvan Wyk (secretary), Mr S Engelbrecht (caretaker), Mr W Herwil - who was to become an institution at the school as “Willie” - and Mrs E Arendse (cleaners). Nine staff members were married during the period 1977 - 1979 and seven babies were born. Outstanding achievements in sports offered at the school were those of Janet Grieve (cross- country), Tracey Jordan and Belinda Ireland (squash) and Ashley Ware-Lane (hockey), all of whom were selected for WP school teams. Carol-Ann Brown won the WP U14 javelin event, establishing a new record. Robin Craddock hit the first four, six and fifty on the new cricket field, and Russell Davies scored 105 against SACS. School Committee: P Hough, T McCarthy, P Ireland, D Smith, A Parker, E Fivaz, F Choice
  • 23.
    22 1980 The examination resultsof the first matric class, published on 1 January 1980, elicited much interest and comment. Candidates: 73 Passed: 72 Matriculation Exemption: 43 Fifteen of the twenty-three subject averages were above those of the province. Three founder members were among those who left at the end of 1979. The staff looked forward to greeting the new faces in 1980, but possibly did not realise the extent to which the complement would be altered. Thirty-eight teachers comprised the academic staff in 1980. As the year started with 700 pupils, the main concerns were accommodation and staffing. Rapid development was taking place in the area which the school served. “The Education Department is aware of the situation, and we trust that an answer will be found in the provi- sion of another school or extensions to your building in the foreseeable future.” These words from the Annual Report were a foretaste of what would occupy the minds of the School Com- mittee for the next few years. Widespread publicity was given to the “crisis in education” and it was increasingly difficult to recruit Mathematics and Science teachers. An encouraging development was the reservation of 15% of posts for the permanent appointment of married women. Another matter which was given much attention was the system of examining and testing. The cycle examination system, in which pupils were examined weekly throughout the year, was on trial. A modified and more flexible system would be introduced in 1981. The year saw a number of innovations such as the S.C.A Mission Week, the contact with The Settlers High School staff and pupils over a number of days, a number of inter-disciplinary and subject excursions, an inter-class sports day, the planning of a Std 6 camp and the establish- ment of a course in first-aid. Kelly Austin from the USA became the second Rotary Exchange Student to attend the school. Kim Cowley fromAustralia was the first in 1978. It was said that “these new events and activities on our calendar will give a better indication of the spirit and nature of this school than a thousand words can say”. The Settlers Contact and the Standard 6 Camp were to become important annual events. Three events which brought great satisfaction were the pupils’ response to the call to partici- pate in the Spring Walk, their appeals for sponsorship and their participation leading to an amount of R6718 being raised, in the World Vision 40-Hour Fast, in which 150 pupils partici- pated and raised R2100 for the World Vision Hungry Children’s Fund, and the establishment of the Past Pupils’Association in June. Evangelos Kolovos, the first PPA chairman, described the formation of the Association in his report in the 1980 School Magazine: “At the first Valedictory Service breakfast, the first Std 10 class chose five of their number and gave them the unique task of drawing up a constitution for the newly-christened Fairmont Past Pupils’ Association. The steering committee was: E G Kolovos (Chairman), M S Hansen (Secretary), R A Craddock, R M Davies and K C Usmar-Blake.
  • 24.
    23 First Softball Team- 1980 Drum Majorettes - 1980
  • 25.
    24 “At the inauguralmeeting at the Boston Hotel in June 1980, the nine-point constitution (pro- posed by the steering committee) was unanimously approved. The following Executive Com- mittee was elected for the year ending February 1981:” Chairman: E Kolovos Vice-Chairman: M S Hansen Secretary-Treasurer: H M Middleton Additional Members: C A Mostert, G S Williams Staff member: L Coetzer Principal (ex officio): C Wigg Head Prefect (ex officio): J Cranke The position of Honorary President was not filled initially. “The main objectives of the Association are: 1. To promote the welfare of the school in all branches of its activities. 2. To promote the welfare of past pupils and to provide such social, cultural and sporting functions as shall be to their interest.” Among the items discussed at the first meeting of the PTA Committee in 1980 were a Dance, a Big Walk, the sale of House T-shirts and the formation of a 100 Club. It was resolved at the meeting held on 15 July that the PTA constitution be amended to move the annual general meeting from October to February, and to elect parent representation per standard. The draft amended constitution would be circulated to parents. The PTA Dance was held on 26 July at the Brackenfell Civic Centre. Although the support of the parents was disappointing, the dance proved to be an enjoyable occasion. The General Secretary of the South African Teachers Association, Mr R Cope, addressed a gen- eral meeting of the PTAon 27August. In his address he drew attention to the alarming increase in resignations amongst teachers and the fact that certain schools in the country could not effectively operate due to the staff shortage. He warned parents that if conditions did not become more favourable and if future incentives did not draw student teachers and keep present teachers in their profession, the future learning abilities of their children might be seriously jeopardised. It was decided by those present that an effort should be made by every parent to address a letter to the Minister of Education expressing dissatisfaction and concern about the future of teachers in South Africa. This decision was later amended after discussion with the School Committee. In September the Committee felt that a decision should be reached regarding the type of func- tion for the Fifth Year Anniversary in order that planning might be commenced. The only fund-raising event of any significance during 1980 was the Big Walk organised jointly with the School in April. Other minor sources were the Dance and a recording session of the Springbok Radio Show “Check Your Mate”. The 1980 Annual Report had a supplement detailing progress in sport, societies and clubs. The remarkable progress made in only a few years is evident from these extracts from the supplement. Ballroom Dancing Approximately 35 pupils have attended regular weekly classes conducted by professional teach- ers. The pupils have received tuition in both ballroom and disco dancing. Choir The choir has performed in public on four occasions this year and has been very well received. They were invited to the European Immigration Festival as a result of their good performance in the Tygerberg Song Festival. On 8 December the first Carols function will take place.
  • 26.
    25 Chess 15-20 players haveparticipated regularly and two teams have competed in the schools’ league. Cultural This society has had a successful year and there have been numerous outings. Drama A successful Variety Show was held on 6 October, and a one-act play was presented on 23 October. A music revue, “Head Over Heels”, with words and music by Prof T McCarthy, was presented in our hall on 7 May. This was a most enjoyable and successful production. Inter-House One-Act Plays The competition, held on 26 March, was a great success and a high standard was achieved. Three-Act Play “See How They Run”, the first three-act play to be presented at the school, ran for two nights in October. This excellent production was very well received. Drum majorettes The drum majorettes have had a full programme and performed in public nine times. German Society An enjoyable evening was arranged for those senior pupils taking German at Brackenfell, Durbanville and Fairmont, and will be an annual event. Library Much greater use has been made of the library, mainly due to the increased number of books. Over R3000 has already been spent on an additional 800 books this year. Matric Farewell Committee The Dinner /Dance, held in an Arabian atmosphere, was a great success. Few parents and pupils realise exactly how much effort goes into such a function. The Committee works to a strict budget, has to seek donations, borrow materials, paint during the school holiday, and consider numerous other aspects such as gifts, printing, ordering and preparation of the dinner. Modern Dancing Regular Wednesday afternoon classes are held under the auspices of the Charlotte Field Danc- ing School. The girls performed successfully in public on 23 October. Photographic Club Fourteen pupils use the Darkroom regularly. The Club was placed second in the Cape Educa- tion Department’s photographic competition. M. Faichnie and G. Liebenberg won individual awards. A great deal has been done to expand the Society and to utilise the facilities fully. An extensive training programme was conducted. Individual interest has been keen, and members have assisted with other school projects, such as the School Magazine. School Magazine This year each class was asked to raise Rl,00 per pupil, either by direct payment or by means of fund-raising activities. This has contributed greatly to class spirit. Mrs Wulfse again worked tirelessly on our behalf and raised over R1700 from sponsors.
  • 27.
    26 Students’ Christian Association 50pupils attend meetings regularly, but up to 180 pupils attend on special occasions. Prayer meetings are also held on Mondays, and area meetings with committees from other schools are held quarterly. The full programme has included guest speakers, discussions, films, a very successful “Focus Week”, and a welcome for the new Standard Sixes. Students’ Council The Council comprises fifteen prefects and thirty-six sub-committee members and monitors. It has been very active this year under the leadership of John Cranke and Tracy McCarthy. Evening meetings, ending with tea and cake, have been held two or three times a term. Particu- larly pleasing areas of involvement have been a party at the orphanage, a garden party for the members of Huis Aristea and Green Pastures, meetings with The Settlers and Durbanville prefects, standard six orientation, initiation of the Fairmont Settlers contact, and certain im- provements in the grounds. Cricket Five teachers and approximately 120 pupils have participated. Four teams competed in the league and six teams compete internally. The internal Vineyard League has grown in popular- ity, particularly during the fourth term. Standards have continued to improve and results have been most encouraging. John Cranke and Gavin Taylor have represented the Tygerberg re- gional XI, and Victor Hawken has played for the U15 Tygerberg XI. Cross-Country Janet Grieve represented W.P. at the S.A. Championships at Voortrekkerhoogte. The Schools’ Cross-country races, the “Spring Runs”, were successful and enjoyable, with much greater participation this year. Gymkhana Ten riders have participated in two teams. The teams fared well at the opening of the Cape Hunt and Polo Club clubhouse and course, when they came second. Gymnastics Juliet Kruger represented Western Province. Boys’ Hockey This has again been a very successful season. The School is fortunate in having a number of experienced coaches. Mr Phillips, a qualified umpire, did much to develop umpiring skills, and a number of pupils were able to handle games with confidence at the end of the season. The enthusiasm of the coaches soon led to great keenness on the part of the players, and a successful 24-hour fund-raising hockey marathon was held. The 1st XI was again invited to participate in the prestige Outeniqua tournament in George, and during the third term the 1st and U15A Boys’ and Girls’ teams played in Oudtshoorn and George. This was a successful, enjoyable and educational visit. The internal “International League” also ‘“encouraged par- ticipation “. Girls’ Hockey The girls also enjoyed a successful season. Four teams participated in senior leagues, the first team participating in the Southern Suburbs league for the first time. The second and third
  • 28.
    27 teams both wontheir respective leagues. The tour to Oudtshoorn and George was one of the highlights of the season. Karate A small group entered the annual Karate-do competition as the Fairmont Club. Rugby The historic first game on our home field was played against The Settlers High. Matches will be played on two home fields next year. Softball Forty girls have played regularly. The first team performed with credit in the Women’s League during the second half of the 79/80 season.Anumber of players participated in the trials for the W.P. team. C. Brown was chosen for the team, and A. Richter was the home reserve. Two teams have now entered in the new Schools’ league. Our players have done so much for the school and are to be congratulated on being among those responsible for the development of softball as a sport in schools. Squash Twenty players participate. Two teams compete in the Schools’ league. Stephen Armstrong won the National U13 championship and Belinda Ireland and Tracy Jordan represented W.P. Swimming There was a tremendous upsurge in interest and enthusiasm. The first Inter-House gala, held at the Sanlam Bath, was a happy and successful occasion. The lack of training facilities remains a serious obstacle, but the initiative and interest shown compensated greatly. Head Prefects at play - 1980
  • 29.
    28 Tennis Teams: 1 Girls,1 Boys 2 Mixed League. The girls won the first league for the second time. About fifty pupils also participate internally, but additional facilities are urgently required. André Wulfse, Heidi and Cindy Freudenberg, and Janine Lambert all represented Western Province. Cindy is the current W.P. U14 champion. Eisteddfod Pupils were entered in both the Cape Town Eisteddfod and the Tygerberg Eisteddfod. The following pupils all obtained Highest Honours for their respective items: Tracy McCarthy, Louise du Preez, Michelle Faulhammer, Sanette van der Mescht and Grace Elliott. First Aid All twenty-two Standard Nines who participated passed the first diploma in First Aid after attending classes for a term during the Youth Preparedness periods. Leadership and Subject courses: Tracy McCarthy was selected for the course organised by Die Burger in December 1973. The Head Prefects attended a course organised by Stellenbosch University, and six pupils attended the Jaycee’s “Tomorrow’s Leaders” course at Muizenberg. The Principal and Mr van Stormbroek attended a Youth Preparedness Course, Mr Shaw a History course, and five English teachers a refresher course. Various teachers attended Scripture courses. Youth Preparedness: Some of the subjects covered were as follows: Std 6 orientation andathletics;appreciationoftheproblemsofoldage;achievementsinsport;inter-classboeresport; a Best Speakers’ competition; a show on Bob Dylan; Std X Careers Guidance, a demonstration of weapons, talks on camping and school societies. A number of guest speakers visited the school. The School - 1980
  • 30.
    29 1981 In his reportat the PTA AGM on 9 February 1981, the principal indicated that the enrolment stood at 783. As the school had been planned for 750, accommodating more pupils would be a problem in the near future. Matric Results 1980: Candidates 80 Passes 79 AAggregates 2 Accommodation The School Committee considered accommodation requirements in a serious light. Action taken is evident from these extracts from the minutes of the first term meeting in 1981: • “Sports facilities: Notification that school is entitled to additional facilities is noted. Mr Choice suggested a letter be sent to School Board confirming approved additional facilities and requesting earliest provision/execution by Works Department (done: 20 Feb 1981) • Additional Sports fields: Further meetings/discussion with Municipal authori- ties and Education authorities to finalise agreement to be held. • Long Term Development Projects: Mr Wigg tabled sketches of school pavil- ions with the suggestion/request that the PTA should work toward a similar project on a staged, phased basis. • Changing Room/Toilets/Clubhouse/Swimming Pool Complex: Mr Choice reported that the Cape ProvincialAdministration would provide working draw- ings of proposed complex free of charge. Messrs Choice and Parker confirmed as sub-committee to investigate the possible building of the proposed complex. • Tennis and Netball Courts and Cricket Nets: Copy of urgent letter from School Board to Department tabled.” Other items handled by the committee included: • the conveyance scheme for pupils • use of the school building by the Methodist Church • school signboard • scoreboards • honours boards • raising/flying of school and national flags • a burglar alarm system • the possible introduction of a cadet corps. Buildings and Grounds In July the School Board informed the school that three prefabricated classrooms had been allocated to the school for use in 1982. (These were to be the first of many such ‘prefabs’ extending eventually along the parking area to near the front gate and including a prefabricated toilet block for some time.)
  • 31.
    30 Erf 713, theground below DurbanvilleAvenue, was acquired by the school on a twenty-five year lease and grass seeding was completed during the year. These new fields would be used for hockey and cricket in accordance with an agreement reached with the neighbouring residents. A number of improvements and conversions were carried out. The original requisition store was converted into an audio-visual theatre stocked with television camera and monitor, video recorders and various projectors. Part of the Hall basement was partitioned off as a store. Cloakroom areas were converted into a store for the clothing bank and a new Deputy Princi- pal’s office. Staff room chairs and tables were provided. LETTER FROM DURBANVILLE MUNICIPALITY 28 OCTOBER 1980 Dear Mr Wigg TRAFFIC : FAIRMONT HIGH SCHOOL Your letters dated 24 September and 23 October 1980 refer. I wish to inform you that my Council considered the matter at its meeting held on 27 October 1980 and Council has agreed to change Medway to a one-way street down from its intersection with Hillrise to its intersection with Durbell Road. Steps will also be taken to create a no stopping zone from the intersection of Medway and Hillrise to a suitable distance beyond the front gates of the school. A pedestrian crossing will be provided in the vicinity of the gate leading to the school sports-fields. In addition angled parking will be provided on the southern side of Medway and parallel on-street parking is to be provided on the northern side of Medway. A strip of road reserve on the northern side of Medway will be tarred for use by pedestri- ans. My Council unfortunately did not see its way clear to provide a pavement for pedestrians and cyclists as contemplated in paragraph 6 of your letter of 23 October 1980. The neces- sary road works will be commenced with as soon as possible and it is anticipated that all works and traffic signs will be completed and erected by the beginning of January 1981. Founders’ Day Another important innovation in 1981 was a Founders’Day function. The first Founders’Day Dinner was planned for 4 September. Mr and Mrs Isgar organised a most enjoyable Founders’ Day Banquet at which the guest speaker was the MEC for Education, Mr W Bouwer. Asimilar anniversary function would be held every five years. The Past Pupils’ Committee, under the leadership of Evangelos Kolovos, had an active year. Their functions included a braai for the 1980 Matrics, a highly successful Max Collie (hypno- tist) Show, the first PPA dinner-dance and the first Founders’ Day sports fixtures against the school teams. The committee presented a new lectern for use in the hall. The PTA Committee was elected according to the new system of representation per standard. The Fifth Anniversary Féte, organised by Mr Gawler, was especially successful. A Fashion Show was held in April, and the quarterly meetings were interesting and rewarding. Two additional teaching posts were created. Ten new teachers joined the Staff. Five teachers filled temporary positions.
  • 32.
    31 USE OF SCHOOLPREMISES For many years official permission had to be obtained for outsiders to use school facili- ties and premises or to address gatherings of pupil and parents. Similarly, permission had to be sought for wine to be served. This letter, dated 24 July 1981, is an example: The Secretary Parow School Board Dear Sir FOUNDERS’DAY DINNER: 4 SEPTEMBER 1981 It is the intention to hold a Founders’ Day Dinner at this school the evening of 4 Septem- ber to commemorate the 5th year of the school. At the dinner the organisers would like to serve sherry and light wines. The serving of the wine will be by senior pupils. We request your formal permission to organise the event and the serving duties as outlined. Yours faithfully Secretary: School Committee Notable successes included the victories in the Inter-School Athletics and Swimming compe- titions in one week in March. A number of pupils were chosen as provincial representatives, and Carol Brown (U19 Softball) and Katherine and Theresa Keet (Roller-Hockey) were cho- sen for South African A teams. Softball, hockey and dance marathons were held as pupils raised funds themselves for various activities. A prefects’exchange with Wynberg Girls’High was initiated. Rugby teams toured to George, and the Girls’Hockey team attended a course at the University of Port Elizabeth. Anumber of subject excursions were undertaken. The Stand- ard Six four-day excursion/camp was especially noteworthy. The first Panel Inspection was held from 3 to 7 August. Seven circuit inspectors and twelve subject planners and advisors visited the school. SOLAR ENERGY PROJECT: FIRST IN SOUTH AFRICA “There was great excitement when the SABC TV crew arrived at the school to interview and film the Solar Energy Group. The filming took place on the lawn outside the offices - now part of the Pool lawn. More excitement followed as Fairmont was featured in the evening news broadcast. The Group was formed in 1980, following the announcement of a major competition by the S A Institute of Mechanical Engineers, and comprised nine senior physics pupils. The competition required that a working model which could harness the energy of the sun, be designed and built by June of 1981. The results of the regional judging were made known at the end of September. In Novem- ber we learnt that Fairmont had been placed first in South Africa.”
  • 33.
    32 An interesting consequencewas a letter from a gentleman in Mexico, including the fol- lowing extract: “Dear Senor Stefan I see where you have developed a producing machine to make alcohol from the sun. I am much interested as we have plenty of sun here but alcoholic beverages are expensive, especially imports from Scotland. Would you be kind enough to send me details...” (Mexico would feature again many years later when an invitation was received for the Girls’ Basketball team to participate in a schools’ tournament in Mexico) COMMENTS (MADE IN 2006) ON RULES AND REGULATIONS • We weren’t allowed to ride bikes in the school grounds - we had to push! • Not being allowed to use haversacks was a big gripe. • The colour of the school uniform was a huge problem - not cool! • Not being allowed to wear scarves in class! • Girls weren’t allowed to wear clear nail polish... • The lengths of our school dresses were checked! • Not being allowed to sit in front of the school hall during breaks. • Not being allowed to bring boyfriends/girlfriends to the Matric dance. Matric Farewell Dance 1981
  • 34.
    33 1982 - 1986 FACILITIES,FUND-RAISING AND TRADITIONS 1982 At the PTA AGM on 10 February 1982 the School Committee Chairman, Mr Fivaz, reported on the distribution of funds for the year: R5000 on sports equipment R3100 on office equipment R5600 on office equipment R8400 on teaching aids R2000 on library R2000 on grounds R2000 on transport costs Buildings and Grounds “According to a master plan, the Fund-raising Committee must set its sights on a building complex to be erected on the middle terraced field. Improvements for the future would be changing rooms, swimming bath, squash court, clubhouse and a second squash court.” The cost of the facilities would be in the region of R250000-00. Mr Fivaz urged parents to donate on a monthly basis and quoted from the 1981 Income TaxAct, with particular reference to tax-deductible donations to secondary schools. The aim was for a three-year development period. Further development of facilities was in progress. The principal was able to report inApril that four tennis courts and two netball courts were being built, and that additional cricket nets would be supplied by the Education Department. The Sports Complex and fund-raising for it was to be the focus for some time. By July the wording for the special appeal pamphlet was finalised. Fund-raising was to continue into 1983, when a special fund-raising drive would be launched at a finger supper. It is interesting to note that the PTA catered for teachers who remained at the school after normal school hours so as to attend the evening meetings. Mrs Page handled this much appre- ciated support role in 1982. Problems with laboratory and hall floors were to be considered a number of times before satisfactory solutions could be found. The proposed lease for Erf 713 was read paragraph by paragraph and agreed to by the Commit- tee on 28 July. It was recommended to the School Board for approval. The constitutions of the Sports Complex Fund and the Educational Fund were ratified in Au- gust. All funds deposited in the School Fund would henceforth be deposited in the name of the Educational Fund. Receipts would be issued for purposes of section 18A of the Income Tax Act of 1962.
  • 35.
    34 A committee electiontook place in September and the new members were welcomed at the meeting on 23 September. It was resolved at this meeting that “The Chairman, Headmaster and Mr Choice to see the MEC as a matter of urgency to further motivate an application for additions to our existing building and also to discuss the rapidly growing need for a new English-medium school in the area”. The opening of the new field would be a “low-key affair” - a cricket match between the school and the municipality would take place. The main fund-raising events during 1982 were a Big Walk and the Ken Higgens, Pip Freed- man and Vincent van Rooyen show. The Walk was reported on in the 1982 magazine in these words: “The Winter Wander was held on 11 August this year, in which 1600 feet raised nearly R11 000 towards the Sports Complex Fund. That’s nearly R1.00 per foot...”. The Past Pupils’Association had a successful year in spite of initial difficulties. A successful variety show was held early in the first term and two film shows were held at the school. The traditional braai for the Matrics took place after the final examination. The opening of the Teachers’ Centre in Parow was an encouraging development. The Media Centre was being used more extensively. Mrs Paula van Wyk was appointed as secretary in the Media Centre, and the provision of better printing facilities helped greatly. Some excellent television programmes were produced, one of which was shown as part of the Speech Night displays. Thirteen subject displays were on view before and after the Speech Night programme. Honours boards were hung in the Hall foyer, and House Flags would soon be available. Fur- ther conversions led to the provision of offices for the newly appointed laboratory assistant, Mrs R van der Riet, and the fourth Head of Department. The purchase of a computer to be used initially for administration purposes was being considered! Achievements • Two Std 10’s were selected as exchange students - Karen Davies on Rotary Exchange to the USA and Kinga Sebesteny as an American Field Service scholar to Thailand. • Moira Paveley was placed nineteenth in the English Olympiad. • Janet Grieve (cross-country) and Belinda Ireland and Trevor Davies (squash) achieved national recognition. Visitors to the school included the Jazzart Dance Company and CAPAB Opera and Drama Groups. A special feature of Valedictory Assemblies at Fairmont has been the singing of a special song for the matrics. For example, in 1982 Colleen Newham, music teacher, wrote these words to the music of C Jacobs-Bond: “When you come to the end of this perfect day And you sit alone with your thought You will know through the years there’ll be memories Of the joy that these days have brought. You’ll remember your friends and the golden days And tears, happiness and love And mem’ry will paint you this perfect day With colours that never fade.”
  • 36.
    35 The English Departmentsubmitted a request in March relating to inter-racial contact during prefect and student exchanges. Unfortunately, at this time such contact was not officially permitted. Other matters handled by the School Committee during the year included reim- bursement of petrol expenses to teachers on official school business, advanced reading tech- nique courses and the purchase of a sundial for the senior quadrangle. Staff The enrolment in 1982 stood at 850, with a staff of forty-four teachers, one laboratory assist- ant, three secretaries, a caretaker and six cleaners. The projected enrolment for 1983 was 940. Three additional teaching posts would be created. Only two of the permanent staff left at the end of the year. It was agreed at the Committee meeting of 23 September that all first teams would be permit- ted to wear different socks so as “to distinguish them” (from the other teams). In November it was agreed that fees be increased from R15 to R25 per term per family. Mr Hardy and Matric Invigilators for Matric Examination 1983
  • 37.
    36 1983 The Matric resultswere again very pleasing. Five pupils obtained A aggregates and seventy (50.7% of the class) obtained matric exemption. Qualification for an A was to change in the future, but at this stage it was still a genuine 80%. Dear Mr Wigg MATRIC RESULTS, 1982 It is a pleasure and a privilege to me to congratulate you and your staff on your school’s excellent 1982 matric results, in particular in respect of those 5 pupils who obtained the highest marks, namely an A symbol in their aggregate. It is only through hard work that good results are obtained, which proves to me that you and your staff carried out your vocation as teachers in a conscientious and dedicated manner, thereby enabling both school and pupils to share in a great achievement. Once again hearty congratulations and may 1982 be an incentive to aim at even greater achievements during the new year. Kind regards. Yours faithfully E LOUW ADMINISTRATOR OF THE CAPE Buildings and Grounds Accommodation issues continued to predominate in 1983. The Principal reported, at a Committee meeting on 16 March, on a meeting with the Chief, Physical Amenities. Fairmont was not included on any building or sports facilities list up to 1985. A new high school was planned for the Stellenberg area. The school should open in 1986. The Education Department policy was to have schools with a maximum of 750 pupils. If it was found that Fairmont stabilised at 850, for example, additions would be considered. The policy was to provide mobile units as a temporary measure. The Department would refund 100% of the cost of new changing rooms, provided they were built according to the Department’s plans and specifications. Any extensions and additions to the Department plans would have to be at the school’s own expense. Refunds would not be provided for five to six years. The Committee considered an extensive range of proposed expenditure items including a vacuum cleaner, a cinema screen, a trailer, reception area improvements, additional intercom speakers, hockey posts and physical education apparatus. In June Mr Choice reported on his consultation with Mr R Nixon (the architect who had de- signed the school building) concerning the proposed Sports Complex. The Committee de- cided to proceed with sketch plans by Mr Nixon. These were presented at the meeting in August. At this meeting it was decided to change the name of the Sports Complex Fund to “Fairmont Development Fund”.
  • 38.
    37 By the endof November the sketch plan for the Sports Complex had been approved and work- ing drawings were being prepared by the architect. Fouradditionalteachingpostsweregrantedfor1984. TheywereadvertisedintheEducationGazetteof 15 September. At the Committee meeting on 7 September twelve appointments were ratified. A finger supper was arranged for 14 November for the School and PTA Committees, eight senior teachers and certain parents who had rendered special service to the school. This was to be the forerunner of many similar functions. In a letter to new parents the School Committee chairman commented on the fact that Fairmont was already the biggest English-medium high school in the Cape Province. The following comments were among those made by the principal in his annual report: Enrolment and Staff The enrolment stands at 933. The subdivision of the school into three manageable units has been an attempt to provide more individual attention. Facilities Six new tennis courts and four cricket nets were used for the first time this year, and the Oval Field across the road has relieved the pressure on the original site. A large percentage of our pupils, especially in the junior standards, participate in sport and all facilities are extensively used. Drama Aqualified Drama teacher, Miss Chait, has been appointed for next year and each standard six class will have a drama period once a week. I hope that a strong drama society will develop and that the school will present regular productions. Attention will thus have to be given to the purchase of additional theatre lights, the stocking of a drama store and the improvement of facilities in the drama room on the top floor of the changing room block. Media Centre The Media Centre will also be extended. Additional facilities will be provided and, with Mr Holgate joining the Media Centre team of Mrs Du Toit and Mrs van Wyk next year, I trust that this Centre will be used to an even greater extent by staff and pupils. Improvements have already been effected in the A-V Theatre. We are very short of office space and we hope to convert a cloakroom area to three offices for Department Heads as soon as possible. Attention is also being given to facilities for those in the Advanced Learning Programme, started this year, and for the provision of computers when this becomes feasible. Three addi- tional prefabricated classrooms have been provided. You will have noticed the magnificent new trophy cabinet in the front foyer. This is a gift from the Matric Class, aided by funds raised by last year’s class. We thank them most sincerely for providing such a necessary and much appreciated facility. Our school will be the venue for the Annual Conference of the South African Teachers Asso- ciation in June 1984; the first time the Conference will be held in the Tygerberg. Achievements Some of the noteworthy achievements this year were: • Greater community service, for example, the work of the Service Society, the partici- pation in the SANCOB operation to save gannets affected by the oil tanker disaster, and participation in the ‘Blisters for Bread’, ‘World Vision’ and ‘Beauty without cruelty’ fund-raising activities.
  • 39.
    38 • The boysU 15 A Hockey team won the WP Indoor tournament. • A Junior Parent- Pupils’ Day in March was a great success. • Table tennis and basketball were introduced as school sports, and have been very popular. • Birgit Hein was chosen for the WP basketball side. • The standard 6 Camp and tours to Port Elizabeth and Grahamstown were again very successful. • Success of a std 8 science group in the Expo 83 competition. • Success of Helen Letord in the English Olympiad. • A number of our pupils in outside activities. We are fortunate in having Mrs Smit, a Springbok, as our senior basketball coach. We much appreciate the help of coaches Mrs Smit, Mrs Holdsworth (Basketball), and Mrs Steyn (Softball). We now have an official Cadet Detachment. Among the highlights of 1983 were the following events: Standard Six and Seven Parent - Teachers Day, when the parents were invited to participate in cricket, tennis and softball matches against their children. Over 500 people participated at this highly successful function organ- ised by Peter Bishop. No No Nanette: The musical was a dream come true for pupil Sanette van der Mescht, who produced the show. The performances were outstanding successes. This was to be the stimu- lus for continued dramatic achievements. The proposed policy was that musicals would alter- nate with three-act plays annually. The appointment of Miss Cheryl Chait in 1984 was to lead to an upsurge of interest in drama at the school. The Standard Six Concert: Standard Nines accepted responsibility for producing class plays. The theme for the evening was “Fairy Tales 1983”. The highly enjoyable function was to be the forerunner of many similar Standard Six concerts in following years. The senior boys’ soccer team was allocated a home field for the first time and celebrated with several victories in the A section of the Western Province Schools Soccer League. Eleven boys’ hockey teams participated in the school leagues. True love never did run smoothly. “No No Nanette” - 1983
  • 40.
    39 1984 The school wasdivided into three sections - Lower (Std’s 6 & 7), Middle (Std’s 8 & 9) and Upper school (Std 10), each headed by a teacher in a promotion post. While the School and PTA Committees had been devoting much time and attention to accom- modation, fund-raising and provisioning, development in all fields was progressing apace. Fifty-seven staff members appear in the staff photograph, as opposed to seventeen in 1977. Achievements Three 1983 matrics obtained A aggregates, and sixty-seven matric exemption. TheAdvanced Learning Project: This project was initiated to accommodate the needs of those pupils able to cope with the demands of the syllabus more easily and efficiently than others. Pupils were allowed to withdraw from class for up to twelve periods a week in order to pursue project work. The team, under the guidance of Mr Cliff, came second in the Provincial Prob- lem-Solving Bowl competition. The prefects organised a highly successful exchange with nine other schools. Twenty-ninepupilsandthreeteachersattendedtheGrahamstownEnglishFestival. TheNationalSchools’ Festival had already become a major event in the calendar of SouthAfrican schools. Miss Chait’s production of The Boyfriend was a huge success. Eighty pupils were involved, with Mrs Newham again an excellent music director. The annual Standard Six Camp was again very successful and enjoyable. 6Ca, with their production of Red Spying Hood were winners at the Standard Six Concert. One pupil commented: “The spirit all through was fantastic. (It should have been, with all those Std 6’s - we had to beware of untimely dives from the stage).” Societies The first year of the Home Economics Society was action-packed with interesting demonstra- tions and excursions. The highlights of the Debating Society year were The Fairmont-Settlers debate and the Best Orator competition. The Matric Representative Committee consisted of twelve elected members, a boy and a girl from each class. The group “felt it would be a good idea to...establish some traditions amongst the matrics. We...organised the buying and delivering of red carnations to matrics on St Valen- tine’s Day. We helped to make a reality the buying of matric badges. We started another tradition: the planting of a tree by the matrics. Our tree is the Cape Fig Tree and was planted on the matric lawn. (The original matric lawn was that behind the Hall next to the covered walkway from the main building to the Woodwork room). We ran a competition for the best design of the Matric tops. Next on our calendar was the tea-party for the aged.” The History Society, under Mr Shaw’s leadership, arranged visits by two members of parlia- ment and by Mr Chipole, a lecturer from UCT, who gave a broad outline of the problems faced by black people. The group visited the Crossroads squatter camp. The annual SCA Camp was attended by eighty members. The group organised the SCA wel- come for Standard Sixes and held weekly prayer meetings. The Animal Welfare Society had 118 members and was awarded a Gold Star by the Beauty Without Cruelty Society for contributions made in 1983. The 1984 Drum majorettes “astounded all at the annual inter-school Sports Day against
  • 41.
    40 Fairbairn”. The squadparticipated in three major competitions and enjoyed many marches and displays. The Service Club enjoyed a wide and varied range of activities. The biggest ongoing concern was for the De Novo old-age home in Kraaifontein. They were visited on a monthly basis and the group organised a birthday party there for 170 people. The P.R.O Society organised and displayed the various trophies in the display cabinet in the foyer - a gift from the 1982/1983 matrics, and presented the first three volumes of the pictorial history of Fairmont to the Principal. The Boardsailing Club had grown significantly. Highlights were the Regatta at Zeekoevlei, the camp, and three teams participating in the schools’ league. Sport Cricket: Seven teams participated in the leagues while another eight “battled for supremacy” in the internal “International League”. The Boys’ Tennis Team was promoted to the A league. The U19 Table Tennis team won the Peninsula School Trophy in its first season and during this season the team remained unbeaten. The Athletes ran out comfortable winners against Fairbairn. Patrick Day was selected to rep- resent Western Province at the South African Schools Championships. Heike Longwitz was placed fifth at the S.A. U13 Biathlon Championship. The lack of depth in rugby was a concern. A useful foundation, however, was laid during the rugby camp held at Hout Bay. The first team appeared in its first match with its new brown and white striped jersey. THE RUGBY JERSEY The first team wore the plain brown jersey until 1983. A brown and white striped jersey, based on the design of the WP jersey, was introduced in 1984. This was worn until the introduction of a standard first team top for all sports in 1990. This white jersey with a broad brown band was based on the design of the then Transvaal rugby jersey. Boys’ Hockey had a very successful season. Highlights were the visit of the first team to the York Easter Tournament, the home derby against Settlers and the highly successful annual hockey awards evening. (Separate awards functions and dinners would later be stopped when the combined awards functions - summer and winter - were introduced). The Girls’ Hockey season was “characterised by some outstanding performances and some rather mediocre results”. Rhondda Davies was chosen for the Western Province Peninsula Hockey team. The 1984 Cross-Country season was “one of active excitement and full of surprise”. The girls won the N.S.P.A. league competition, while the U14 girls won the team competition at the N.S.P.A. Championships. There were fourteen netball teams, six in the leagues and eight playing internal matches. The 1983/1984 Softball season “proved to be another ‘grand slam’year for Fairmont. The first team won the Norman Brown Floating Trophy. Six girls were chosen for the two W.P. teams.” Teams that performed with varying success were chess, girls’ tennis, swimming, soccer, golf, badminton, squash and basketball.
  • 42.
    41 Inter-Schools vs Fairbairnat the Bellville Track - 1984 Matric Dance - Standard Nine Group - 1984
  • 43.
    42 PTA At the PTAmeeting on 29 February 1984 it was reported that the first stage of the Sports Complex would cost approximately R125 000. The C.P.A. would eventually refund an esti- mated amount of R106 000. In a letter in March, however, the School Board informed the school that the refund would be limited to R87 500. A‘Gold Rush’was planned for the afternoon of the Settlers/Fairmont Contact. The PTAwould organise the annual supper for the teachers of both schools during the Contact Week. Mr Peter Bishop, in an article in the Tyger Burger, reported on the Gold Rush: “Fairmont High School of Durbanville flooded over on Saturday morning as a crowd of 3000 took part in an unusual Gold Rush which would satisfy the craving of the wildest speculator. Notwith- standing gold’s discouraging price of $333 an ounce, on offer was over R1000’s worth of gold coins, plotted over the schools’main field. The school raised well over R10 000 through this initiative and is now all set to start on a major building project providing changing facilities and, in time, a swimming bath and squash courts.” The Mayor of Durbanville, Mr B Andrag, presented the prize to the winner, Mrs Shirley Smith of Bloemhof. In October the chairman of the Building Committee reported on developments. No final deci- sion had yet been reached, but the PTA Committee wished the project to proceed. The Com- mittee accepted as fund-raising projects for 1985: a School Levy, a Big Walk and a Big Draw/ Fête. It was hoped to raise R86 000. Teachers’ conference TheAnnual Conference of the SouthAfricanTeachers’Association was held at the school in June. This was the first time the conference was held in the Northern Suburbs of Cape Town. The staff room became The Tiger’s Lair for five days. The participation of the PTA in the catering was much appreciated. Many favourable comments were received from conference attendees. The facilities were considered outstanding. Facilities Four additional mobile classrooms were to be provided for 1985. Gas geyers were provided for the staff showers at the back of the hall. In May further attention was given to toilet facilities, soundproofing of the music rooms, cables for the intercoms in the mobile classrooms, a burglar alarm system, a proposed rifle range for Cadets, and additional catwalks for the hall. InAugusttheprincipalwasinformedthatanothermobile classroomwastobeprovidedspecificallyforwoodwork. Thiswastobesituatednexttothefieldonthe parking area at the end of the road. By October all the prefabricated classrooms had been repaired. Staffing As a new staffing structure would take effect in 1985, the number of Department Heads would double. As all applicants had to be evaluated by an inspector, the principal suggested that evalu- ations be done so that appointments from within (the existing staff) might be made. The position of second deputy was also to be advertised. MrAlastair Frost was nominated to fill the post of Deputy fromApril 1985. Mrs E Müller and Mr S van Wyk were nominated to fill Department Head posts. A second laboratory assistant was appointed in July.
  • 44.
    43 Matric Dance -Fairmont’s Eiffel Tower - 1984 Matric Breakfast - 1984
  • 45.
    44 School Board The Committeeaddressed a letter to theAdministrator of the Cape supporting MrAvan Niekerk’s candidature for Ward 1 - the ward in which the school was situated - for re-election to the Parow School Board. An urgent request was made that consideration be given to nominating at least two of the four nominated members to be representative of English-medium schools in the area. There had been a significant increase in the numbers of English pupils. Afavourable response was later received from the MEC for Education. In November the principal attended a computer seminar for principals. Recommendations in- cluded one that the school should obtain a computer immediately, this to be available to clerical staff initially. A needs assessment should be carried out in consultation with the C.E.D. Planner. At least as much should be allocated to software as to hardware. In-service training would com- mence in 1985. The C.E.D. would possibly provide computers. School Committee matters The medical inspection report indicated that 277 of the 1006 pupils at the school were examined. 117 parents were present at the examination. The Committee again considered queries about why the school had only one uniform stockist. An excellent report was received from the Guidance inspector. Mr Phillips and Miss Middleton were congratulated and thanked. The Sports Complex Fund and the Educational Fund were combined into one account. 1984 also saw the introduction of the Uninterrupted Sustained Silent Reading period and the various questionnaires to be completed during panel inspections. New Staff 1984 In 1984 Fairmont had 1018 pupils, making it one of the largest English-medium schools in the Cape. A number of new teachers were appointed. Front from left: Mr P H Phoenix, Mr D A Marnewick, Miss A Mukheibir, Mr P Vegter and Miss D Middleton. In the back row are Mr J Dempers, Mrs S van Niekerk, Mrs E Boonstra, Miss D van Niekerk, Miss C Chait, Miss S Lockett, Miss M Kitshoff and Mr T A Cleevely (Courtesy: the Tygerburger 1984)
  • 46.
    45 1985 In his circularto parents on 24 January 1985, Mr Wigg gave details about enrolment, staffing and communication with the school. The enrolment stood at 1126. The new staffing structure meant that the school now had two Deputy Principals and eleven Department Heads. Mr Gibbon was in charge of the Senior School (Stds 8 - 10) and Mr Holgate, acting Deputy, in charge of the Junior School (Stds 6 - 7). Each standard had a teacher in a promotion post as head. Accommodation In a note to the Committee he listed factors affecting teacher satisfaction including overcrowded corridors and quadrangles, overcrowded changing rooms for girls’ physical education classes, strain on toilet facilities, lack of tarred parking areas and the fact that sixteen teachers had to teach in prefabricated classrooms. There was much joy, therefore, on receipt of a letter from the School Board stating: “A building scheme for extensions to provide accommodation for 850 pupils at your school has been approved by the Department and it was also confirmed that the highest priority pos- sible will be given to this scheme.” A further mobile classroom and a prefabricated toilet block were provided. An on-site meeting was held to consider alternative siting for the Sports Complex - the rival sites being the corner of the Vineyard Field (an area to be utilised in later years for garages and a rifle range) and an area near the library, including the gravel parking area overlooking the end of the rugby field. It is interesting to note that in a memorandum to the School Committee on future requirements the principal included as an item to be considered: “Indoor Sports/Examination/Gymnasium/ Hall: Could this be sited between the two sets of tennis courts or should it be included in the plans for extension to the main building?” Eventually, Mr Fivaz, Dr Ireland and Mr Wigg met the MEC at the Provincial Building on 8 May in connection with the various accommodation matters. This was discussed at the subse- quent Committee meeting. The Department would first study the effect of the new (Stellenberg) school for some time before making any decision. This approach was unacceptable to the Fairmont delegation and an immediate plea was made for financial assistance towards the sports complex. The MEC agreed to direct a delegation to visit the school. Re-siting the sports complex to the parking area site was going to compromise parking se- verely. This matter would thus receive further attention. At the Committee meeting in June the Robert Nixon Sports Complex design was cancelled. New Departmental drawings would be available shortly. The minutes of the meeting ended: “The meeting closed in record time! Members rushed for the exits to be in time to see Bobby Ewing’s exit from Dallas!!!”
  • 47.
    46 The Joint Associationof Parent Associations of the Cape Province was inaugurated on 15 November 1984 to represent the views of parents of children at English-medium schools in the Cape Province. This was brought to the attention of the School Committee for membership application. Three pupils obtained A aggregates in the 1984 Matric examination. Sixty passed with Matric exemption. Pupil Barbara Simon was a finalist in the Rooi Rose Home Economics competition. An amount was allocated to enable the teacher, Mrs Kriek, to accompany her to the final in Margate. Mr Ladewig and Mr Bishop left on promotion at the end of the second term. Representations finally resulted in the Department allocating a third full-time secretary to the school. Mrs Paula van der Wyk was appointed. School Committee matters At a meeting in September following the School Committee election, the new office-bearers were elected: Chairman - Mr D Truter Vice Chairman - Mr K Cloete Secretary - Mr J Cammidge In his report in the school magazine, Mr Wigg paid tribute to Mr Fivaz, Mr Choice and Mr Parker, who had served on the committee from 1977 to 1985. In October new instructions regarding the raising, utilisation of and control over school funds were received. Tenders for the new Sports Complex to be built according to the modified Departmental plans were opened on Thursday 31 October. At the subsequent Committee meeting it was resolved that the tenders from Louis Naude Construction for the building at R207 817 and Micro Elec- tric for the electrical installation at R13 771 be accepted. The Department required annual inventory checks and stocktaking. At the time the general inventory of furniture and equipment had to be divided into three sections - items provided by the Department, Rand-for-Rand purchases and School Fund purchases and donations. Subject inventories were also required. The Department provided separate general and subject cata- logues. Following instances of suspension and expulsion of pupils and an administrative inspection, detailed instructions relating to these were given to all staff members. These included the words “suspension involves a complicated procedure. The school psychologist must be con- sulted, the School Committee must meet within seven days, interviews may be required and the Department must be involved.” Of the numerous items handled by the Committee in November some of the more interesting were: the site for the Sports Complex would be handed over on 18 November, the school need no longer refer requests for use of the school building to the School Board, queries again about one school uniform stockist and the donation of a ‘tennis ball popper’ by the Rotary Club. Items to proceed included a rubbish enclosure, a tennis shelter, micro jets and fertilising the fields. Mr Truter was elected at the regional congress concerning parent representation.
  • 48.
    47 Class of ‘85- (Die Burger) - Valedictory Day 1985 The Swimming Team - 1985 THE THREE HOUSES The highlight of the year for the 1985 Matric Council was the presentation on Matric Day of the coats of arms of South Africa and Fairmont and the badges of the three houses.
  • 49.
    48 PTA The PTA generalmeetings during 1985, on a Standard basis, were Std 10 in June, Std 8 in July, Std 9 in August, and Std 7 in October. The AGM had as theme “Focus on Fairmont - A face in the crowd”. This was a pupil and staff presentation in two parts and included the participation of three Rotary Exchange students. The Big Walk was the main fund-raising activity. R16 500 was raised. The Rotary Careers Evening (the Std 9 meeting) was also most successful. Founders’ Day, on 7 September, included a braai organised by Mr Hudson and was a great success. The PTA braai was held on 16 November. School Committee members and sub-committee convenors were included. Achievements Twenty-two pupils were selected to represent the Province during the year. Softball was flourishing as these comments from the teacher-in-charge, Mr Steve Wright, indi- cate: “Fairmont continues to dominate WP Softball. Seven of our girls obtained Provincial colours. Softball is possibly Fairmont’s biggest and most successful sport”. Highlights of the year included the production “Relative Values” and the Spring Run - this had become a tradition to celebrate the beginning of Spring. An extract for the magazine report gives an indication of the spirit of the occasion: “Mr Wigg started, first the girls and then the boys, by sounding the now traditional siren. The boys set off at a blistering pace (obviously trying to catch up with the girls) with Patrick Day in the lead. “As usual, the Spring Run had the runners, the joggers, the walkers, the slouchers and...the teachers. The light drizzle caused some people to look rather soggy and caused others to look considerably cleaner (no doubt, a serious side-effect). On the whole everyone thoroughly enjoyed the occasion and we are looking forward to the event next year.” During the Youth Week contact between Fairmont and Durbanville High Schools, the Public Relations Society compiled, published and distributed 1500 copies of a sixteen-page booklet informing the youth of Durbanville of the many sporting and cultural activities available. Mr Raymond Ackerman was the guest speaker at Speech Night. He very kindly offered to assist the school with its swimming pool project by way of the Pick ‘n Pay “Till Strip Scheme”. Pick ‘n Pay would commit 1% of R1 million worth of till strips handed in, that is R10 000. The period for the scheme would be 1 March to 30 September 1986. The first rugby and netball teams toured to Lutzville. The Computer Club was introduced by Mr Ladewig. As Fairmont still did not have a compu- ter, the first few months were spent on computer basics. Finally, towards the end of the second term, a BBC computer was purchased. The art and literature included in the magazine was again of outstanding merit. Bronwyn Kelly, Linda Padfield, Andrew Loudon and Neil Walker were among those whose contribu- tions were included.
  • 50.
    49 The magazine againfeatured individual photographs of the matrics with - in most cases - humorous comments. A random selection: “René Burbidge: This1984/85 drum majorette leader wishes to become a graphic designer. She wants to invent a jet-propelled mace with a magnetic-field link with her hands. Grant Catto: ‘Commodore’ will proceed in life digging up old trees in search of trunks (trees of treasure?). He played first team rugby and golf and hopes to retire at an early age to enjoy his findings. Gavin Perrow: Although Gavin wants to be famous, he also wants his name in lights, preferably floodlights. He wants to continue life as an earthworm trainer extraordinaire. Sally Williams: ‘Willy’was Chairlady of the Outdoor Club. Too much sun has led to her believe she can become a fairy. She described her impact on Fairmont as amazing!” MATRIC AND HOUSE BADGES The Matric Representative Council introduced Matric Badges in 1984. The 1985 coun- cil presented on Matric Day the coats of arms of South Africa and Fairmont and the badges of the three houses. All the funds were raised by the matrics of 1985. In December, Mr Don Gibbon, Deputy Principal and member of the founder staff, left the school to take up the position of Principal of Muizenberg High School and Mr Holgate left to become a Department Head at Plumstead High. Opening of the Recreation Centre: Dr S W Walters and Mr C Wigg - 1986 (Courtesy: the Tygerburger)
  • 51.
    50 1986 PTA In February thePTA Committee determined that its main project for the year would be the Tenth Anniversary of the founding of the school. A committee for this purpose comprising Mrs Stumpf, Mr Long and Mr Kleynhans was established. Mrs du Toit later joined this com- mittee. To celebrate the tenth anniversary it was decided to include the official opening of the new building, Founders’ Day 1986, tree-planting and a formal dinner early in 1987. Mrs Keohane, the tuck shop convenor, outlined a number of requirements and suggestions. A separate fund-raising committee decided on: • a 10th Anniversary Swimming Pool Appeal • a Golf Day and • a “Diamond Rush” to be linked to Founders’ Day. The Pick ‘n Pay till slips scheme was progressing well and already half a million rands’ worth of slips had been collected. APTAMaintenance work party met periodically and assisted with a number of projects. Meet- ings were still being conducted on a Standard basis. The R1 million target for the till strip scheme was reached by May. Mr Long, in charge, was congratulated on this remarkable achievement. At the May PTA meeting the programme of tenth anniversary events was further clarified: • The official opening of the Recreation Centre (the new name for the Sports Complex) would take place on 5 September. A cocktail party would follow that evening. • Saturday 6 September - the 10th Founders’ Day. The sports day would start during the late morning and end at approximately five in the afternoon. The PPA would also be involved. • At 18:00 that evening the “Diamond Rush” would take place and be followed by a Barn Dance. • 27 October - 10th Speech Night. There would be an Open Day from lunch-time. • A formal dinner would be held early in 1987. The abuse of drugs in the wider community was becoming evident. Unfortunately, this was a time when a number of false bomb threats were being made in the country. Three Fairmont pupils were charged with making such a threat at the school. The school participated in a fund-raising drive for the Diabetes Association. R6000 was col- lected and one hundred pupils received calculators for their efforts. The English-speaking Parents’Association was well established, but most of the work was still being done behind the scenes. Coffee mugs had been sold to commemorate the Fifth Anniversary. 500 mugs bearing the school coat of arms were ordered for the Tenth. As the year progressed, the PTA Committees and the sub-committees were very active in preparation for these major events. Each group reported back in detail on the arrangements at successive meetings.
  • 52.
    51 Bugsy Malone -Anthony Shaw and Vanda Fernandes (Photo: The Argus)
  • 53.
    52 School Committee The SchoolCommittee devoted much attention to progress on the Recreation Centre, prepara- tions for the construction of a swimming pool, a proposed cricket pavilion for the Oval Field (Erf 713), extensions to the main building and various other minor works. The Municipality, which had facilitated the use of Erf 713 on a twenty-five year lease after a consultation process with the school and neighbouring residents, now made available the triangle of land south of Medway for parking. However, no improvements would be made to the area. An administration sub-committee was established. Proposed rugby and hockey tours to theTrans- vaal and a cricket tour to Uitenhage were also discussed. It was decided that the publication date for the school magazine would be January 1987. Mrs Clarke would be the teacher-in-charge. In August the Department informed the school that no financial assistance could be expected from the Department. It was resolved that a delegation be sent to object and endeavour to change the decision. Other items considered at this time were a new prefects’ room, acoustics in the AV theatre, painting and refurbishing, the tuckshop problems and the school magazine. Mr Basil Starke was thanked for his very kind donation of a scoreboard for the main rugby field. Mr Williamson reported on the results of the survey concerning the school uniform and the stockist. The committee resolved to retain the current school uniform, but to investigate the appointment of an additional stockist. The La Vita Restaurant at the Bellville Golf Club would be the venue for the tenth anniversary dinner. Curtaining of the Recreation Centre would be investigated. Staffing Department of Education Circular 66/1986 brought about significant changes in staffing. In a policy statement, the Minister declared that ten per cent of teaching posts below the level of head of department were to be reserved for the appointment of students completing their courses of study and for teachers who were available for temporary appointment. In secondary schools thirty per cent of the posts should be reserved for men and thirty per cent for women, while the rest might be filled by either men or women. Married women teachers were eligible for per- manent appointment from 1 January 1987. The PTA was informed that two events to thank all parents and staff for the special help given during the year would be organised - a tea for the tuckshop ladies and a braai for the PTA. All arrangements for the opening of the Recreation Centre and the Founders’ Day activities the next day were finalised at the meeting on 4 September. Opening of Recreation Centre The Recreation Centre was opened on Friday 5 September by Dr S W Walters, Deputy Direc- tor of Education for the Cape. The programme read: 1. National Anthem 2. Welcome - Mr C Wigg, Principal 3. Reading - Miss N Oosthuizen, Head Girl 4. The Lord’s Prayer - Choir 5. Introduction of Deputy Director of Education by Mr A J Truter, Chairman, School Committee 6. Address - Dr S W Walters 7. Official opening of Centre and unveiling of plaque - Dr S W Walters
  • 54.
    53 First Awards Functionin the Recreation Centre - Terry Fowler receives her award - 1986 Prefects’Induction Ceremony - 1986 The Prefects - 1986
  • 55.
    54 8. Hymn -Your God Reigns 9. Thanks - Mr C Mullet, Head Boy 10. School Song Special guests included the Head of PhysicalAmenities, the Director: Works, the School Board Representative, a representative from the Architects’office, the circuit inspector, the builder, a Works Department representative, Mr Fivaz, previous School Committee chairman, and the school and PTA committees. They and the staff enjoyed a buffet lunch in the Centre afterwards. A report in the Tyger Burger provided a description of the opening and of the centre: “Fairmont High School’s new Recreation Centre of R222 000 was officially opened...last Friday. More than half of the building costs - an amount of R132 000 - was contrib- uted by the school. ...the ground floor comprises three changing rooms with showers and toilets for boys, two changing rooms with showers and toilets for girls, a big kitchen that will also be used as a tuckshop, toilets for adults, two storerooms of which one will be used for the swimming pools’filtration plant and a first aid room, also to be used by referees. On the top floor are a small kitchen, storeroom and hall for social functions. The hall will also be used as a venue for girls’ physical education classes” The events of Founders’ Day, 6 September, were very successful. A R7000.00 profit was made. Photographs of the weekend would be on display on Open Day (20 October). Thanks were expressed to all concerned, especially to Mr Brymer, who organised the Diamond Rush, staff members Mr Long and Mr Clarke, and Mr Bosman for the braai. The Barn Dance was well organised by Mr and Mrs Parker. Final arrangements were also made for the Open Day. The Junior Prize-giving would be at 13:00, followed by the events of the day. Mrs J Grieve would be the speaker at the Junior Prize-giving. Speech Night at 20:00 would be for pupils from Standards 8 to 10 and their parents. The speaker would be Miss H Starke of Child Welfare. Unfortunately, the number of parents who attended the two prize-givings was disappointing. In November the Committee appointedTowers Store as the second stockist of the school uniform. The school was informed that it would receive a fourteen-point rifle range and a type C ar- moury during 1990/91. Other matters of interest included the uninterrupted reading period, the intercom system, the achievement award process for staff, the commencement of automatic salary payments, item bank tests by the HSRC, the successful Needlework Fashion Show and the staff bowls compe- tition. With the exception of one year, when the staff attempted golf, a bowls afternoon was an annual event. In 1986, the staff comprised the principal, two deputies, eight department heads, three senior teachers and forty other teachers. Five acted as department heads for all or part of the year. There were three secretaries, two laboratory assistants, the caretaker and his six assistants. The magazine Staff Notes included this paragraph: “The Fairmont Staff Room was a warm, friendly place in spite of the constantly changing population and the need to get to know new people almost every month.” Sixty-nine pupils obtained matriculation exemption in the 1985 examination. Heather McGregor achieved an A aggregate.
  • 56.
    55 Fêtes Convener Sum Raised 1977Mrs Beryl Fivaz R2 042 1978 Mrs Beryl Fivaz R2 000+ 1979 Mrs Beryl Craddock R3 500+ Mrs Val Williams 1981 Derek & Alison Gawler R5 500 Speech Night - Guest Speakers 1977 Mr Gene Louw 1978 Prof Terry McCarthy 1979 Sir De Villiers Graaff 1980 Mr Clive van Ryneveld 1981 Prof M J Ashley 1982 Mrs Madeleine van Biljon 1983 Mr George Young 1984 Mr G L Hester 1985 Mr Raymond Ackerman 1986 Mrs Helen Starke Junior Prize-givings 1984 Mr Clive Roos 1985 Mr Philip Parsons 1986 Mrs Julie Grieve Openings School - Mr PS Meyer 5 September 1978 Fields -Mr Basil Starke 1980 Recreation Centre - Dr S W Walters 5 September 1986 The South African Teachers’ Association Conference (1984) was held at Fairmont Fund-raising 1978 Autumn Walk R4 260 1979 The King & I (by the Festival Players) 1979 Pick a box (part of fête) 1979 PTS Dance (Brackenfell) 1979 Check your Mate (Springbok Radio) 1980 Autumn Walk R6 700 1981 Max Collie Show (PPA) 1982 Pip Freedman (PTA) Big Walk R11 000 1984 Gold Rush R10 600 1985 Big Walk R16 400 1986 Diamond Rush Some memorable occasions 1985 - Youth Year: Presentation of fountain to town by Durbanville High & Fairmont 1986 - Founders Day Diamond Rush and Barn Dance 1984 - 29 pupils & 3 teachers attended the Grahamstown English Festival (13 attended in 1982) Annual Events 1. 1st Saturday in September annually - Past Pupils vs School 2. Annually - first week of third term - Settlers vs Fairmont contact (the first contact was in April 1980) Exchange Scholars at Fairmont 1978 Kim Cowley (Australia) Kelly Austin (USA) 1981 Melanie Trethowan (USA) Astrid Levelt (Canada) Anke Weidemann (Germany) 1984 Drew O’Neal (USA) Julie Bryant (USA) 1985 Maureen Keeley (USA) 1986 Karl Anderson (USA) 1977 - 1986
  • 57.
    56 Exchange Scholars fromFairmont 1983 Kinga Sebesteny (Thailand) Karen Davies (USA) 1985 Sonja Blok (USA) 1986 Audrey Hepburn (USA) 1986 Michael Paton (USA) Enrolment 1977 - 330 1978 - 496 1979 - 635 1980 - 691 1981 - 784 1882 - 831 1983 - 935 1984 - 1001 1985 - 1119 1986 - 1078 1979 First School Magazine 1982 Girls’ Hockey & Netball - UPE Winter Sports School 1982 Tours of Europe (Settlers/Fairmont) 1982 Fairmont/York High Contact 1983 Fairmont/York High Contact 1986 Rugby/Hockey team tour to Johannesburg Musicals, Plays and Events 1979 - What a Weekend 1980 - Christmas Carols & Readings (8 Dec) 1980 - See How They Run (Oct) 1981 - Head over Heels - Music revue 5th Anniversary Dinner (Founders’Day Dinner): Mr Bouwer, MEC Education, guest speaker. 1983 - No No Nannette 1984 - The Boyfriend 1985 - Relative Values 1986 - Bugsy Malone Pupil Achievements 1979 Kevin Webb - SA Sailing team (Italy) 1986 Pantry Pride Competition: Winners: Penny Neumann & Bridget Laughton Past Pupils’Association Inaugural meeting - 25 June 1980 First AGM - 25 February 1981 Chairman 1980 - 1982 Evangelos Kolovos, Craig Paine, Derek Klazinga, Clem van der Riet. Tenth Anniversary Dinner: Mrs S Neumann, Mr Clive Wigg, Mrs L Wigg, Mr E Louw - 1987
  • 58.
    57 1987 - 1991 POOL,REUNIONS, SPIRIT AND MODEL B 1987 The 1987 school year started with a 10th Anniversary cake, resplendent with ten candles, in Assembly. Financial Matters Financial matters were predominant at the start of 1987. The Receiver of Revenue informed the school that of the total initial contribution of R160 made by a parent in respect of his child in the 1987 tax year (1986 school year) the R60 donation to the educational fund would qualify as a deduction and a Section 18A receipt might be issued in respect of this amount. However, the remainder, which clearly constituted school fees, was non-deductible. One of the full-time secretaries’ posts was converted to a part-time post. An Education Department circular headed, “Curtailment of Expenditure”, stated: “The Department’s budget allowance for the 1987/88 financial year is inadequate for the continuation of all services supplied in the past or their supply on the same scale as before. For this reason it is absolutely essential that expenditure be curtailed drastically. The Depart- ment is compelled to suspend the allocation for the upkeep of sports facilities immediately.” The implication was that over R4000 in school income for 1987 had to be found from other sources. This was at the time the school was proceeding with the swimming pool. The Committee was also to consider the establishment of a bursary fund. A parent, Mr MJ Strydom, had prepared the relevant documents for the establishment of a trust for this purpose. Education Department Circulars Two circulars from the Department, which aroused some debate at the time, were, firstly, one that stated that “Educational properties may not be made available for advertising purposes or, with a view to making a profit, to outside bodies. These properties may not be used for dances unless the dances are for pupils, in which case there must be proper supervision.” Secondly, in a statement on National Sports Policy, “The Department prefers that a school committee should do everything possible to attain consensus (unanimity) before a match against a sports team of a school for Coloured, Asian and Black pupils takes place. If, however, unani- mous agreement cannot be attained, a majority decision of the committee will be sufficient.” A litho-printer was purchased and installed in May. Pool payments made during 1987 were: • Springbok Gunite R22500 and R20997 • Starke Ayres R462 • Watney’s Excavators R276 • Rolltop Fencing R6548 • Trio Building & Plumbing R4218 and R329 • Pool & Filtration Engineering R2620 and R380 • L&G Landscaping R300
  • 59.
    58 To this, pavingat R9839 and construction of a new pump area at R2400 had still to be added. By April the principal was able to inform the PTA Committee that the first phase of the pool had been completed. The filtration plant was to be installed in August. Tenth Anniversary Dinner The TenthAnniversary Formal Dinner, a Polynesian Buffet, was held at the La Vita Restaurant at the Bellville Golf Club on 31 January. The guest speaker was theAdministrator of the Cape, Mr Gene Louw. Mr Keith Cloete was the master of ceremonies. Mr Truter, Chairman of the School Committee, welcomed all present and Mr Clem van der Riet, Chairman of the Past Pupils’Association, also addressed the guests. PTA The PTAAGM programme in February included talks by Vanda Fernandes, the Head Girl, on “Die Burger Leadership Course for Head Prefects”, for which she had been selected, slides and a talk by Sarah Wass, Rotary Exchange Student, and a talk by Mrs Heyns, Teacher-Coun- sellor, on Lifeskills Teaching. Main fund-raising ideas on the PTA’s list in March were: Fun Run, Boot Sale, Art and Pottery Exhibition, 100 Club, Variety Show, Film Premiere at a local cinema. The Art Display commenced on 18 May. This proved to be a worthy cultural event. The PTA planned, initially, a 100 Club. The plans were then to change this to a 250 Holiday Club, but the response was poor and the venture was cancelled. An open Fun Run was held as a fund- raising venture. 232 runners participated. The next function to be planned was the Alvon Collison Show. Each standard would perform for fifteen to twenty minutes during the first half of the programme. The show was well attended and well received. An important decision was to have a cheese and wine function for the parents of all new pupils at the start of 1988. The function would become an annual event. Some of the spirit and fun of the year can be seen in extracts from The Grapevine. DRUMMIES 1987 Thursday dawned and Fairmont’s badly painted bus made its way to Boksburg. After final warm-ups and many pep-talks, we marched through to the semi-finals with our best per- formance ever. Our bus drivers watched us and they were so thrilled by our performance that they surprised us with a carnation on each of our seats. On Friday we bettered our display with “happy, smiling faces and sparkling personalities” and to our great joy, we achieved our goal by reaching the finals. That night we splashed out in style and dined at Gold Reef City. Various speeches were made and we realised with rising emotion that the following day would be our last competition march as the 1987 squad. Tears were eventually shed when Yvette de Reuck choked on the first sen- tence of her speech and everyone vowed to do her best on Saturday. Saturday arrived and we pulled out all the stops to come 8th in the whole of South Africa (out of approximately 200 schools). Our leader, Carol-Anne Heibner, was awarded 7th place and our classy gold and brown uniform, 4th.
  • 60.
    59 PAUL BUCKBY AND“CHANCE” VISIT FAIRMONT The band waddled excitedly onto the stage amid screams for “Paul”. The one lady member of the band, who was obviously into shorts and mini-skirts, did cause quite a stir amongst the “boys” not screaming for Paul Buckby. After the first one or two numbers, a general migration took place towards the stage and then almost all the girls went ape. It is appropriate to pause here and extend our sincere condolences to the family of the boy on whose shoulders Sandra sat. We feel for you. Apart from this, a good time was had by all those pressed against the stage passionately. To refocus our attention on the star of the show...well, what can I say about his dress, other than it reeks of Miami Vice; his style is that of an aspirant sex symbol and his attitude marks him as a potential Simon le Bon. The music lacked a South African flavour, but otherwise was refreshingly original. Our thanks to Mrs Newham for making the concept possible, Mr Wigg for allowing it and US for supporting it. We hope the enthusiasm shown will encourage more shows. (Maybe one day in the not too far off future Savuka and Johnny Clegg will pay us a visit. Teehee!). The Grapevine Pupil achievements during 1987 included: • Fairmont being placed tenth out of 102 schools in the UCT/Shell Mathematics Olym- piad. • Annemarie Hettasch and Belinda Ollewagen won 1st prize in the Pantry Pride Cooking Competition. • Glynnis Horne was placed second in South Africa in the Bernina/”Rooi Rose” Sewing Competition for her evening garment made as part of her class needlework. • Judy Newham was the winner of a national art competition. • The choir won the St George’s Singers Trophy for mixed choirs of eighteen years and under at the Cape Town Eisteddfod. • Five pupils were placed in the top 10% in the country in the 23rd National Youth Science Olympiad. • Glen Buckley was selected for the SAAll-Star baseball team. • Andrew Sturdon won the general section of the WP Closed Chess Championship. • Lance Butler scored 126 against Settlers - the highest individual cricket score to date. • The Boys’ first hockey team was unbeaten. Barry Chedburn was chosen for the SA Schools’ B team. • The U16 soccer team won their league. • Robert Northcote (captain), Stuart McNee (vice-captain) and Allan Beverley were chosen for the WP Schools U19 soccer team. • Samantha Rose, Laureen Fraser and Natalie Lloyd were chosen for the WP Schools’ U19 softball team. • The first table tennis team won the WP Schools’ League Championship. • Colleen de Villiers was selected for the WP Schools tennis team. • Richard Olivier was chosen as a member of the SA Wrestling team.
  • 61.
    60 PANEL INSPECTION PANIC From31August to 4 September Fairmont was in a state of emotional and physical upheaval. This was the week when the no...no...notorious panel inspectors made their appearance. Teachers lived in fear of these cunning creatures and some still have nightmares. Group- work suddenly became an everyday occurrence and so did regular homework. Pupils stared in amazement as plants sprung up in the strangest areas of the corridors, desks were sanded and painted, floors, walls and ceilings were polished and adorned with posters, and worst of all...hair and nail inspections were held almost hourly! When the time came for the teachers to be evaluated, pupils witnessed severe cases of memory loss and fumbling for words. Long, perfectly manicured teachers’ nails were bitten to the quick and various other unmentionable side effects were seen taking their toll on the teachers. The inspection, however, showed the pupils one thing: teachers are people too and not the “iron men/women” they appear (perhaps try) to be. The Grapevine Each class raised money for the Community Chest during the year. A trophy was presented to Fairmont in recognition of the effort of the Std 6 to 8 pupils. This was to be awarded annually for community service. Speakers at theWinter SportsAwards Dinner were Mr and Mrs K Rose-Innes, and Mr Robin Jackman was the guest speaker at the Summer Sports Awards Dinner, held in the Recreation Centre. Winners of the annual literature competition were Dominique le Roux (senior section) and Charmaine Gray (junior). This is a short extract: EXAM FEVER Here I sit in total confusion With waves of chaos breaking over me. My mind, like an overstuffed letterbox, rejects all this information that I try to cram in. D le Roux Past Pupils’Association Newly elected to the Past Pupils’Association Committee in September were K Seeley (chairman), B Proctor (vice-chairman), J Quine (secretary), S Cummings (treasurer), K Penrose and L Hills. Staff: Teachers who left at the end of the year included Mr Gilman of the founder staff, Mr Phillips, Mr Phoenix, Mr Krige and Mr S. van Wyk (all on promotion), Mr Marnewick, Mrs Mills, Mrs Povey and Miss Sharpe. Mrs Neumann, secretary, left to join the Arts Faculty at UCT. Nine staff members continued with further study. 1987 Matric Results: Six A aggregates, forty-five matriculation exemptions.
  • 62.
    61 The Swimming PoolArea - 1987 Front of School - 1987
  • 63.
    62 1988 At the firstcommittee meeting of the year the PTA appointed new sub-committees. These were: • Teas Committee (Evening) S Johnston • Teas Committee (Day) S Dorrington • Tuckshop J Gouws • Clothing Bank T Bramham • Speakers G Thurtell • Fund-raising Executive Proposed capital items for the next four years were listed by the Principal: 1988 Bus No 1 R31300 Garage R6500 Computer-Administration System R15000 1989 Computers - Teaching R11200 A/V Theatre R6500 Equipment Store R10000 Tractor Shelter R3000 Display cabinet (foyer) R3000 1990 Changing rooms (Oval) R60000 Stands and seating R30000 1991 Grand piano R20000 Band instruments R4000 Partition Recreation Centre R10000 The water account for sports fields was budgeted at R14000 for 1988, and boreholes were to be investigated. Three combined committees socials were planned. Improvements were effected to the school coat-of-arms, which led to a neater, sharply de- fined badge. The Parow Teachers’Centre conducted a professional needs analysis at the school. The results of the surveys presented new challenges. This was the first survey conducted at the school. Others would follow. Other important events were: • the Panel Inspection in May • the fête and the Leap Year Dance • the arrival of the Fairmont bus • Arbor Day • the Big Swim • the production “Alice in Wonderland” • the Needlework Fashion Show • the official opening of the pool by the mayor, Councillor R Ciolli. This was a time of national service for both graduating pupils and for staff members, and was a matter of concern each year, affecting staffing and the lives of those involved. Conscription would continue until it finally ended in 1993.
  • 64.
    63 SCHOOL INFORMATION 1988 Numberof teaching staff 59 Promotability: number visited 1 Merit Awards: number visited 6 Number of beginner teachers 3 Number of Std 10 pupils 202 Approximate number of grade/subject changes 150 Number of applicants for teaching bursaries 7 The prefects revived the Boeresport Day, which proved to be one of the more successful events of the year. “In an effort to develop the school archives, numerous photographs were mounted and hung in the hall foyer, giving the area a sense of history and reminding us of those who have contributed to Fairmont’s past”. The intention was to add to and extend the display annually. Sporting achievements included: • Kim White was champion of her age group at the WP Junior Athletics meeting, and was placed eighteenth at the SA cross-country championship. • The most successful year to date of the Drum majorettes. The proud squad returned from the national championships in Durban, covered with glory and accolades, offi- cially acknowledged as one of the top squads in the country; and the winners of the shield for the Best Parade Team. The team was placed fourth in South Africa. Some Matrics of 1988 (Back) Stephanie Bickel, Heidi Stumpf, Rene Cloete, (Front)KristinaKratz,EwoldvanMechelen,AngelaCox (Back) Lynda van der Westhuizen, Nicole Lenz, Yvette Lombard (Front) Shirley Cannone, Jenean Whitmore, Carol Whitchurch Laureen Fraser, Gillian Wood, Chanelle van der Watt, Kathy van der Riet, Caronne Hughes, Julie Kearsey, Marielle Steeman, Janice Turner (Back) Ian Skeet, Jane Slabber, Graham Skelding (Front) Nicole Heidemann, Gero Aweh, Ena Venter, Jean-Pierre Craye
  • 65.
    64 • Quentin duToit and Bronwyn Hudson were selected for WP Hockey A teams. • Sean Bossenger reached a milestone when he played his fiftieth match for the first rugby team and played in the Craven Week trials. • “The First softball team must still be ranked as the number one school side in South Africa.” Eight girls were chosen for provincial teams - Laureen Fraser, Samantha Rose and Genevieve Steyn for the U19 team. Mr Long was selected as the WP U13 team coach. • “Fairmont was one of the strongest soccer-playing schools in the Peninsula.” • Steven Crooke was seeded sixth in South Africa in table tennis. ROLY POLY’S... Whether you are a roly-poly, obese midget, spaghetti giant or Fairmont Fairy, in the eyes of the PT teacher, handstands on beams are for all!!! Whether you’re dripping with rain or dripping with perspiration - IT’S PT - whether you like it or not! The PT lesson (of course) brings with it a sackful of letters from very worried mommies whose daughters are perhaps sufferers from claustrophobia and can’t bear the thought of crawling through tunnels under benches. Even if they are petrified of heights, they’re expected to shin up 10m high rope ladders and swing along ropes at 50km/h like Tarzan. Except that instead of brave war cries you hear petrified shrieks. Perhaps if the PT teachers did the backward rolls on slanting benches and ran around the field with the girls, they too would experience the pleasures of physical torture. Sometimes the beam wobbles so much under a poor shaking girl’s legs that it almost develops its natural frequency. Then there is the horse that nearly cracks under the weight of the girls that “plonk” heavily onto it! Whatsheermadnesstomakegirls(whohaven’texercisedstrenuouslyformonths)suddenlytake on a vicious aerobics class so that they suffer every time they creakily TRYto take a step. But take heart - PT isn’t all that bad. Some classes have started to have dancing lessons. Unfortunately not everyone is born with a sense of rhythm. I wonder how Mrs Nieuwoudt manages to keep a straight face while some girls plod around doing the “waltz”? But the sheer fun of it all certainly makes up for it. The Grapevine 2nd term 1988 Matric Dance Invitation - 1988
  • 66.
    65 In September thePTA conducted a survey of parents to obtain feedback on the popularity of a number of fund-raising schemes. 402 questionnaires were returned. The ratings were: 1. Dance 2. Fête 3. Pop Concert 4. Max Collie Hypnotist Show (or similar) 5. Big Walk / nationwide competition 6. Concert plus dinner / cheese and wine In November it was decided on: 1. A Valentine’s dance for pupils on 17 February 1989 2. A fête on 29 April. 3. A raffle. The chairman and vice-chairman would represent the committee at the luncheon for new teachers on 17 January 1989. Here are some of the Matrics’ responses to a survey about themselves and what they would remember about Fairmont (taken from the 1988 magazine): THE ACADEMICS • Glen Thomson, The School Dux and all-round A-aggregate pupil (who was confused about why he lost two marks in his Maths HG exam). • Paul Klaver and Reinhardt Rall (the Sharp Twins), who never went through a Maths lesson without whipping out their calculators. • The modest Gillian Human. • Greg Wilkinson (always stiff competition). • Colleen de Villiers and Lawrence Ireland (the academic pride and joy of IOC). • Konrad Herre (the silent one) THE “CHARACTERS” . . . • Janet Beverley and Caroline van Heerden - brought delight and laughter to many a boring occasion. • J.P “Loverboy” Gouws, who broke just too many hearts. • Nicola Prangley, who managed to maintain a tan throughout the year, while her friends worked hard at school. • Paul Prior, who split his pants just before the Matric Farewell. • Robert Northcote, Paul Prior and Alan Rees - unforgettable as the ultimate ugly sisters and fairy godmother in the Standard Nine production of “Hot Cinders”. • Lance Butler, the tap dancer, who also was capable of surprising everyone with his occasional earth-shattering intellectual comments. THE LASTING MEMORIES . . . OF FAIRMONT • Having breaks shortened because of someone else’s litter. • The Standard 6 camp. • Abortive Physics experiments. • “Bugsy Malone”, “Alice” and the other dramatic productions. • The teachers and pupils who tried to make us feel as if Fairmont had always been home. • Mr Frost and his “when the going gets tough, the tough get going” • Athletics Day. • Standard 6 plays. • The “brown-ness” of it all!
  • 67.
    66 OF THE MATRICYEAR • Homework ’till the early hours of the morning. • The thrill of our very first swim in the school pool (we thought it would never happen). • Cheerleading. • The prefects. • The braai with the teachers. • Valentine’s Day fun. • The Senior Citizens’ tea-party. • and - on ALL the lists - “Taking a Chance” at the MATRIC DANCE. WHAT WE’LL MISS • Bubbly Cathy Searle giving hugs to everyone. • The enjoyable hockey tours. • Mr Collier (“Have you started learning History yet?). • Drummie competitions. • Miss Coetzer’s motherly love for her Standard 10’s. • Just being able to see our friends every day. • The jokes. • Usually getting home at 2:45. • The drama functions. • Unbelievably, the teachers. • The annoying Standard 8’s. • Mr Clarke’s Biology worksheets. • Swimming during P.E. • FRIENDS. WHAT WE WILL NOT MISS • The early mornings (for a while anyway) • Homework. • Short hair. • Rules and uniform. • Work squad. • The commands being shouted at the drummies loudly enough for everyone to hear. • Lining up and walking in straight lines. • The pressure of matric. Five 1988 Matric pupils obtained A aggregates in the final examination, and a further 116 obtained matriculation exemption. Charleen Cannone, Nicolette Klose, Louise Hullock, Michelle Hauck
  • 68.
    67 1989 The 150th anniversaryof the Cape Education Department was celebrated. As part of this the Drama, Art, Cultural and Photographic Societies combined to present a Festival of the Arts from 17 to 21 April. The Fairmont revue “The Good, The Bad and The Ridiculous” high- lighted periods during the school life of the pupils. It was highly acclaimed. In addition to the other activities of the festival, a Standard 6 mural and plaque, donated by the 1989 prefect body, was unveiled. The mural portrayed that which the 1988 standard 6’s found most enjoy- able about the first year of high school. UNVEILING OF STD 6 ART MURAL • Music played while people arrive. • Items by Lelania Cromwell and Anya Haarhoff (Std 6 1988 pupils). • Unveiling of mural by Mr Wigg • Handing out of sweets and more music. Arbor Day Mr K Meiring (Administrator of the Cape) and Mr Fox (Chief Superintendent of Education) were honoured guests at a special Arbor Day assembly on 11 August, and afterwards partici- pated in a tree-planting ceremony. Tree-planting on Arbor Day was to become an annual event. Big Walk 11 August “will long be remembered as a day of great determination, perseverance and sur- vival of the fittest. The occasion was, of course, the infamous 10km ‘Big Walk’.” Cape Co-Educational Schools Sports Week Mr B van Wijk, deputy principal, reported on the Cape Co-Educational Schools’Winter Sports Week: “The first week of the June/July holidays saw Fairmont hosting the Cape Co-Educa- tional Schools’ Winter Sports Week. This week was introduced by Cambridge High School from East London in 1987 and is held every second year. The following schools participated: Cambridge High and Hudson Park High from East London, Westering High and Lawson Brown High from Port Elizabeth, Fish Hoek Senior High, Bergvliet High and Fairmont High from Cape Town. The schools participated in the following sports: rugby, netball and girls’hockey.” Despite the severe Cape winter, the week was an outstanding success. The melodrama “BeforeYour Very Eyes” was produced by Miss Bartels. The cast was “drawn from a wide spectrum of Fairmont personalities and included a number of teachers - reference was made to ‘Marnewick’s Belly Dance, Touzel’s Tutus and Marshall’s Injun’s”. First Matric Reunion The 10th Anniversary Reunion of the first matric class was the first such reunion and the forerunner of many similar functions. Carina (Norman) and Karen (Blake) initiated the reun- ion and Ilse (Landman) “had telephone lines red-hot over our country to ensure a good attend- ance. A number of previous staff members also attended a highly successful function.” 1989 also, sadly, saw the departure of two of the outstanding members of the founder staff - Mrs Yvonne van Wyk (secretary) and Mr Abe Viviers (accounting).
  • 69.
    68 The choir’s “Carolsby Candlelight” in December was another success. The cheerleaders for the Inter-Schools athletics meetings, chosen at the Inter-House meeting, were Angie Niedermeyer, Jayne Cohen, Brent Willet and Gavin Jacobs. Much of the work of the PTA concerned fund-raising, especially all aspects of the Big Walk, the Fête, the tuckshop, the clothing bank and the boerewors braai. A total of R29483 was raised. Other noteworthy events and achievements during the year were the traditional Boeresport Day, a girls’ rugby match during the fête, the Sports Awards Dinner, the drum majorettes’ outstanding success in being placed fourth at the national championship, the fashion show of matric dresses and, as always, the dance itself and the Standard Six Camp. Sport Carmen Truter captained the WP Schools’ Basketball team and Quentin du Toit captained the WP Boys’ Hockey team. The softball team was again exceptionally successful. Genevieve Steyn and Charmaine van der Walt were selected for the WP U19 team. Past pupils Tracy Turner and Carol Brown were selected to represent South Africa at senior level. Laureen Fraser and Genevieve Steyn were chosen as All-Stars (Junior SA team) and Genevieve subsequently represented Western Prov- ince at U21 level. Ben Naude was selected for the WP U19 Squash team. Simon Morton and Trevor Rolfe represented the Boland Schools’ team. Steve Crooke was graded seventh in the country in the U21 table tennis group, and Theresa Pitcher was the reserve for the team. Mr Dean Ashworth, Springbok basketball player, used the letters in the word FAIRMONT to convey a sense of sportsmanship and commitment when he addressed the Summer Sports Award Dinner: F - Fairness A - Positive Attitude I - Initiative R - Reasoning M - Mental preparation O - Objectives N - Nerve T - Temperament Simon Reeves was placed second in the SA Guild of Speech and Drama Teachers’ Public Speaking competition. Conscription was reduced from two years to one year, and South African troops left Namibia. Fairmont Poetry Lana Wasson was one of the young poets who attended the 1989 University of Cape Town Poetry Workshop. She was awarded Eisteddfod Honours for two of her poems.The following is an example of the many excellent poems by Fairmont pupils appearing in The Grapevine, the yearbooks and in publications in South Africa and overseas.
  • 70.
    69 THE SEA byLana Wasson Obscene skull-shells of a prophecy Rest on your beaches Patient, eternal waiting for the reader: Fingers reach to possess their secrets. Waves have sent whispers rippling Through time - Anger and power, and chains Murmur in the shells - Promises hung in the limitless skies of your wayward child allowed to burst from your blue embrace knowing nothing -little of why? But wondrously alive (the ant-people only a shrug on her huge back) and smiling - And still you slumber in wait For he who will be born from Africa’s womb To see the future in the bones. Tenth Anniversary Reunion of 1979 Class - 1989
  • 71.
    70 Standard Ten Boeresport- 1989 Arrival of the Administrator of the Cape: Mr K Meiring, E Kleyn, R Ross - 1989
  • 72.
    71 1990 The 1989 matricresults were excellent. Thirteen pupils obtainedAaggregates, and the subject averages were very good when compared with those of the province. The theme for the year was “Respect and Responsibility”. Founders’ Day was changed from the first Saturday in September annually, to the Friday closest to 1 March. Mr Fillmore re- ported in the school magazine: FOUNDERS’ DAY The start of the new year heralded many changes and innovations at Fairmont, not the least among these being the celebration of Founders’Day on 1 March and not on the first Saturday in September. The academic school-day ended at midday and was followed by an assembly. Guest speakers included the deputy mayor of Durbanville, Mr E. Fivaz, and Fairmont’s first head prefects, Torsten Moehl and Lesley Thompson. During the afternoon the school first teams played matches against the past pupils in the summer sport disciplines. The past pupils beat the school’s first cricket side convincingly, while at basketball the school’s boys’and girls’teams won their matches with ease. The day was combined with an open day at the school. All offices, classrooms and laborato- ries were opened for parents to visit. Various subject groups and societies exhibited relevant material to inform visitors about their activities. The drum majorette leader group provided a display of mace-twirling precision to start the evening’s activities. This was followed by the first-ever cadet flag parade at which the Stand- ard 9 and 10 cadets, accompanied by the JJ du Preez cadet band, paraded the national, school and house flags before the many visitors at the school. Parents were then invited to observe and participate in society meetings so that they might gain first-hand knowledge of the activities of the societies and how they were being run. At the same time, a reunion of the 1980 matric class was held in the Recreation Centre. These events were followed by a variety programme in the school hall in which various socie- ties and subject groups presented slide shows, skits and poems reflecting their individual inter- ests. In overview, the day’s activities united the school to present to the community Fairmont as it really is - a many-faceted and multi-talented institution. This day was the start of yet another fine tradition at Fairmont. An interesting article, “Population boom in ‘rustic town”, appeared in the Northern Argus of 30 May. Not only did this indicate future problems regarding school accommodation, but the words of the Mayor, Mr Frikkie van Zyl, were prophetic, “Durbanville is one of SouthAfrica’s fastest growing towns...” said the Mayor. “The council is continually requested to start new residential areas. Agrowth in the northern borders of Durbanville will shift the business centre from Bellville towards Durbanville, which I think will eventually become a major shopping area.”
  • 73.
    72 Prefects The prefects enjoyeda very active year. Among their many projects were repainting of the old tuckshop, the Std 6 Toilet Scheme (beautifying the toilets), the Supporters Club, matric boys’ netball, a matric café on the matric lawn, three dances, including a Sixties and a Halloween Dance, the presentation of an Inter-House singing trophy, refurbishment of the Prefects’room, the staff-matric braai, the teachers’ birthday tea each term, inter-class volleyball, teachers’ hockey and soccer matches, the senior citizens’ tea party and the Valentine’s Day postal serv- ice. “The Arts and Societies Week was a creative medley of bizarre ideas and activities con- jured up by the prefects’society portfolio and three other matrics. A matric picnic was held as well as a pavement art competition.” The Big Walk, originally planned for Arbor Day, was held on 17 August. It was again a well- organised, safely patrolled and successful function. The Arbor Day tree-planting was de- scribed by pupil C Dorrington, who ended with the words, “The entire school body is dedicated to preserving the rhythm of nature and this annual ritual is symbolic of our new awareness”. Sarah Oates One pupil who really stood out during the year was Sarah Oates. Her brilliant violin perform- ance at the assembly during the Settlers Contact Week led to her being asked to perform at Settlers as well. Sarah became the youngest member of the SA National Youth Orchestra and was the best overall string player at both the Tygerberg and Stellenbosch Eisteddfods. She won the Huguenot Festival competition and the gold medal for overall winner at the National High Schools’ competition. “In 1990 Cadets at Fairmont came of age. In addition to the first Parade, the band was formed, boys attended the first bivouac and cadets participated in the Inter-Schools Drill Com- petition.” In September the School Committee “agreed unanimously to erect a memorial in the quadran- gle to pupils of Fairmont who died while still scholars. It would include the names of those past pupils who gave their lives while doing military service.” “Grease”, produced by Miss E Kitshoff, ran to packed houses in October. The drum majorettes again performed with distinction. This was the first year the school entered the Indoor League as well. At the National Championships the team was placed fifth, while in the indoor competitions, Mandy Slabber (Individual Rifle) and Tanya van den Brandt (Individual Flag) were placed first. Not to be outdone by sport awards functions, the societies had their first ever awards function, at which Society and Merit Awards were presented. Three long-serving staff members, Alida Pool, Steve Wright and Rosemary van der Riet, were among those who left the school. The school was shaken by three tragic deaths. Charlotte Engel, an exceptionally talented Std 7 pupil, died tragically while on her way to school. Louise Bulman died on 27 October. Roland Cassels, a 1989 matric pupil, died in the same accident. Everyone was also saddened by the death of Leigh Duncan after a long illness.
  • 74.
    73 Founders’ Day CadetParade - 1990 Founders’Day Flag Procession - 1990 Arbour Day - 1990
  • 75.
    74 Past Pupils’Association The PastPupils held a Careers Braai for the matrics in August. Attendance was most encour- aging. It was hoped that this event would become a tradition. The Past Pupils’ Award was presented for the first time at Speech Night. Adult Education The introduction of an adult education programme was approved by the Department for com- mencement in January 1991. A letter from the Education Department, dated 16 May 1990, stipulated the procedures to be followed and the conditions to be met. A successful Golf Day was held in March as part of the fund-raising for the year. Mrs Jenny Holland convened the project, which was a team effort among parents, teachers and the Durbanville Golf Club. R5850 was raised. The meaning and the usage of the school diary was outlined by Mrs Müller at a PTA general meeting. In September Mr Wigg informed the PTA that the prize- giving would include prizes for diligence, perseverance and service. Honours blazers would be introduced. Successful matric students that year were to be listed alphabetically in the press and not under school headings. School Models On 23 May 1990 Mr PJ Clase, Minister of Education (Administration: House of Assembly) released a press statement about the draft models for the provision of schooling. These models were being considered in addition to the existing models, namely separate schools for whites and existing private schools. (Cape Education Department Circular 44/1990) Acircular explaining the proposed different models of schooling for the future was distributed. 245 parents indicated in their response to questions in a School Committee survey that they were not prepared to pay considerably higher school fees for the freedom to decide on admis- sion policy. However, 305 said that school fees should be made compulsory by legislation before a change was made to admission policy. First team top A new first team top, white with a broad brown band, applicable to all sports, was introduced. This was to ensure that first team players were easily recognisable wherever Fairmont par- ticipated. Other Pupil achievements included: • Justine Fowler and Karin de Beer-Smit were selected for the WP basketball team. • Charlaine Coetzee was the first girl to captain a school golf team in the province. • Teresa Pitcher won Junior Springbok colours for table tennis. • Paul Saman was selected for the WP Schools A tennis team. • The boys’ first tennis team performed exceptionally well at the schools tournament in Queenstown. • Charmaine van der Walt was selected for the SAAll-Stars softball team. Genevieve Steyn represented the WP U19 and senior sides.
  • 76.
    75 Buildings and Grounds Alterationsto the secretaries’ office were completed by the Works Department. A new store- room was constructed under the ramp. A small wooden hut was provided at the netball courts for serving refreshments. The Traffic Department provided a plan for a change to the existing traffic layout of the school. This would include an entrance to a parking area on the “Medway triangle”. The Cadet Band - 1990 The Ladies’Tea - 1990
  • 77.
    76 1991 Alternative models forschooling under the Department of Education and Culture (House of Assembly) were announced in September 1990. The focus of attention was on the admission policies of schools. Options were • Model A - private school - own admission policy. • Model B - state school - own admission policy. • Model C - state-aided school - own admission policy. “When schools commenced in January, 205 schools all over the country implemented Model B. The majority of schools are admitting only a limited number of pupils from other groups.” (Department of Education Newsletter March 1991). Legislation to make Model C possible had yet to be passed in parliament. At Fairmont the significant dates were: • 10 December 1990. The Department was requested to give approval for a poll. • 26 February 1991. Polling Day - the culmination of a period of voting starting on the 18 February. In a poll of 89.3%, 85.4% of parents voted in favour of a change to Model B status. 21 March 1991. Approval was granted by the Minister of Education. Management Council All school committees in the Cape were dissolved on 28 February 1991. The decision implied that management councils had to be elected. “In consequence of the implementation of the Education Affairs Act 1988, the election of man- agement councils (previously known as school committees) must in future be held in terms of the regulations...”. (Cape Education Department Circular C8/1991) The first meeting of the Fairmont Management Council was held on 5 March 1991. The principal became a member of the council, the majority of the members of which had to be parents of the school. School rules were approved by the Education Department in terms of the Education Act and gained legal standing. School Spirit The wonderful spirit prevailing during the year with its American theme is illustrated in these extracts from the school magazine:
  • 78.
    77 Prefects’Camp - the1991 prefects at Steenbras Dam “The Beeple” - 1991
  • 79.
    78 Every school hasspirit, but it may not always be as strong as it should be. This year has been one of remarkable spirit-building at Fairmont, as this magazine clearly shows. Traditions are a very special part of a school spirit. I am sure that Spirit Week, Home- coming Week and Polar Bear Day, to mention but a few, will in time become part of the tradition of the school. I congratulate everyone on a very successful year. May the spirit of 1991 be sustained, and the achievements lead to even greater efforts in 1992. Clive Wigg Dear Seniors Your Senior year will not be forgotten! Initiated by a spirited prefect body, the American theme took off and kept its momentum throughout the year. Mingled with proven Monties traditions you often had us guessing as to what would came up next...this Yearbook probably being the last piece of America Graffiti. The Senior-Staff braai (barbecue), Valentine’s week, Inter-Schools’Special boaters, Red Nose Day, Polar Bear Club, Homecoming Week, the Senior Prom...and the Senior (not you this time) Citizens Tea, all added to the thrill and character of a “colorful” year. Mastermind McKinley (Summer Cum Laude) had no match, but nor did Milne! For- eigners Hill and Asnal added “flavor” to an exciting year, as did all who made a mean- ingful contribution by giving of themselves. May the memories of this year live on as we remember you and bid you well. Hans van Stormbroek Few present in 1991 will forget, for example, the whole school participating in “Simon Says” in the quad, led by Simon Morton and Kaeli Albertyn from the roof, the assembly “in the round” in the hall with the prefects in the centre, and the principal as the Easter Rabbit and Father Christmas at spirit assemblies. New Traditions New traditions were established in keeping with the theme - inspired by the yearbook of Fairmont Senior High in Fairmont , West Virginia and by exchange student Elize Kleyn’s experience in Arizona. • The Monty Bear based on the American school’s mascot, a polar bear. • The Monty Bear banner held over teams as they ran onto the fields. • The “yearbook” instead of the magazine. • Pep rallies. • Spirit Week. • The Valentine’s Week, including the whole school forming a heart on the field. • Homecoming Week, in conjunction with the Settlers Contact. • The Polar Bear Club. • The Homecoming kings and queens. • The “Prom” instead of the Matric Farewell Dance. • The “Valedictorian” for the school dux. • The special matric awards - Most likely to succeed, Monty Bear, Friendliest, Spark Plug and Bright Spark.
  • 80.
    79 Cherie Werner -best actress, the school debutante The Big Knit - staff members in action - 1991
  • 81.
    80 The teachers became“mentors”, the matrics became seniors, the 9’s juniors, the 8’s senior sophomores, the 7’s sophomores and the 6’s freshmen. Achievements Outstanding pupil achievements were those of: • Karen de Beer-Smith (SA Schools Basketball). • Sarah Oates (co-leader World Youth Symphony Orchestra, USA). • Mandy Slabber and Tanya van den Brandt (SA Show Majorettes). • Robyn Dreijer (co-leader of National Youth Concert Orchestra). • Cherie Werner (highest sum for charity, R6550, in the Tygerberg Debutantes Competition). • The first senior homecoming king was Ben Naude and the first queen was Robyn Bruce. • Kaeli Albertyn and Rory McKinley were chosen by the seniors as “Most likely to succeed”. • Monty Bear awards were presented to Richard Friend and Mandy Slabber. • The “Friendliest” were Dion Pye, Lynn McGrath and Bradley Northcote. • Sonja Stumpf and Simon Morton won “Spark Plug” awards, and Rory McKinley and Lynn McGrath were the “Bright Sparks”. Civvies Days included Hat Day and Nerd Day. “The Beeple”, produced by Miss Bartels, enjoyed colourful and successful performances. PTA A Golf Day, organised by Mrs Jenny Holland, held on 17 March, was very successful, both socially and financially. The profit was R7839. Another successful fund-raising venture was The Big Knit, held on 31 July. R11624 was raised. The one-hour sponsored knit was followed by a Barn Dance and Disco. Further changes to the PTA constitution were circulated for ratification at the next AGM. Mrs Skeet and her helpers ran a very successful Adult Education Programme and donated R5500 to the school. Colleen Williams donated R3000 after her Ballet School performances. New Awards New Speech NightAwards were the FairmontAward, a service award, presented to adults who had served the school community for three or more years, Honours with distinction and Hon- ours summa cum laude. The first recipients of Fairmont Awards were Sheila Johnstone and Margaret Oosthuizen. Rory McKinley won the Honours summa cum laude award. The pre- fects’ executive were also presented with special awards. The principal was selected to be a member of the group which was taken on a three-day orien- tation tour of defence force bases in the Western Cape in July. Remembrance Day The inaugural Remembrance Day Assembly took place on 8 November. In future Remem- brance Day would always be on the Friday closest to 11 November. The assembly would be an occasion for the whole Fairmont community to remember loved ones who had passed away, especially those who died while on military service, pupils and staff members who died while still at the school, and those who experienced family bereavements during the year. The digni-
  • 82.
    81 fied ceremony inthe quadrangle included participation by the cadets and pupil leaders, and wreath-laying. Buildings and Grounds The parking area adjacent to Medway was completed and changes were made to provide for a better flow of traffic. The Chief Architect of the Works Department was consulted about the possibility of adding another floor to the Recreation Centre. The inspecting engineer reported that this was possible and that they would draw the plans if required. A letter from the Executive Director: Education, dated 19 September 1991 and entitled Fairmont High School: Extensions, included this paragraph, “Your request to provide lecture rooms and group study rooms instead of conventional classrooms can be considered on condition that the total area allowed...is not exceeded.” The memorial stone, with sundial, was unveiled by Mrs Lyn Wigg, the plaque bearing the words from the poem by Lawrence Binyon: “They shall not grow old, as we who are left behind grow old; Age shall not weary, nor the years condemn. At the going down of the sun, and in the morning We will remember them.” First Rugby Team 1991
  • 83.
    82 1992-1996 EXTENSIONS AND VOLUNTARYSEVERANCE 1992 A discussion document on A Curriculum Model for Education in South Africa was made available in January for the information of staff members and the management council. The South African Teachers’Association’s newsletter No 1 of January 1992 included: “The major interest in the alternative models (of schooling) was the extent to which they could or could not achieve even an initial opening of the white state school system... It is becoming clear from the broader acceptance of Model B schools, pronouncements by the State President and various recommendations contained in the interim report on group and human rights that race will not be a basis for the development of a future system of education. Seen against this background, the models as determinants of admission policies can be noth- ing more than an interim measure... The models as models of school management will have to be re-assessed by many committees and by the teaching profession during 1992.” Model C However, the Minister, Mr Piet Marais, announced an abrupt switch to Model C in February, and the transformation began on 1 May. The next phase was on 1 August, when new staffing scales were introduced and teacher numbers cut. In an address to the Cape Province Parents’ Association, he acknowledged that the switch to Model C or state-aided schools had been done with “extreme haste”. Various newspaper articles described the implications of the decision, and other matters affect- ing education, for example, “Schools tax shocker”, “ Fees to rocket for Model C parents” , “Teacher terror” (Sunday Times 27 April 1992), “Model C- skole skarrel om geld in te samel “ (Die Burger 29 April 1992). The “Teacher Terror” headline referred to intimidation by pupils and militant unionists. Model C provided for greater autonomy for schools but required parents to pay for the cost of the premises and facilities. The government was responsible for the salaries of only a certain number of staff. The school changed from a state school to a state-aided school. This brought about consider- able confusion, misunderstanding and anxiety. The immediate reaction was to the increase in school fees. The reduction in the number of posts, retrenchments, information about voluntary early retire- ment, and the reduction in the number of promotion posts caused additional stress on teachers. In order to maintain standards, additional teachers were and would be appointed to positions financed by the school. School spirit, which reached a peak in 1991, was again evident when the athletes “took them by surprise” at the first ever quadrangular meeting, held at Green Point, against Table View, Milnerton and Settlers. “Dedication of our pupils and enthusiasm of our coaches paid off and at the end of the day the trophy was ours.” A long tradition ended when the final inter-schools meeting with Fairbairn took place. The staff editorial in the yearbook described “the best of times and the worst of times”.
  • 84.
    83 Shooting Range preparation- 1992 Victory at Inter-Schools Athletics - 1992
  • 85.
    84 STAFF EDITORIAL It wasthe best of times and the worst of times. 1992 saw many changes to the Fairmont family with ‘old’ favourites leaving the fold and many new additions arriving. Mr Duckitt ‘came of age’ and with his family emigrated to the greener pastures of Eng- land. We will miss his determination, his involvement and his friendly attitude in the classroom. At the same time Mrs Heyns decided that being a home executive was more attractive and she left to have baby Matthew. We miss her friendly smile and concern for everyone. The Physical Education Department, true to form, kept on the move. Mr Touzel left to enjoy employment in the private sector and Mr Saayman decided to leave the field of education to explore the other side of the fence. Mr Roux also decided that the time was right to leave. So he downed tools, removed his ear mufflers and retired. His quiet approach and often incisive comments will be con- spicuous by their absence. Mrs du Toit packed her books to move up in the world to the Education Department Library. We wish her every success in her new position. Teachers returning with renewed vigour and enthusiasm after brief periods of leave were: Mrs Maclachlan, Miss Elion, Mr Patterson, Mrs Weerts, Mr Dempers and Mr van Wijk. A tired Mrs Bassett left to give birth to her first child, a bouncing baby boy, Jarrard. With all these changes may we not forget the ‘old faithfuls’ who, day after day, continue to give of their best to improve standards at Fairmont High. The school was fortunate to acquire a car for driver education. Mr Frost led a group of staff instructors. The head prefects wore green blazers and ties - this, however, was not to become a tradition. Included in the results of a survey of matric favourites were: • Actress - Julia Roberts • Actor - Tom Cruise • Music group - U2, Guns ‘n Roses • Song - Please don’t go • Radio station - Radio 5 • Sweet - Bar One • Film - Pretty Woman • Singer - Bryan Adams • Teachers - Mr Duckitt, Mr Collier, Mr Vegter. At the Matric Farewell matrics went off to Greece. Most of the spirit activities of the year built on those of 1991. The Bard’s Birthday Bash An innovation of the English Department was “The Bard’s Birthday Bash” on Shakespeare’s birthday. Pupils dressed up as their favourite characters. On 14 and 15 October the school hall was “transformed into a magical setting” for Fairmont’s first ever Candlelight Dinner and Cabaret. The show, with a cast of forty-four, was produced by Mrs Colleen Newham. The programme consisted of songs and dances from famous shows.
  • 86.
    85 The original bear- Charlaine Coetzee at Fairmont Senior High, West Virginia - 1992 Founders’Day 1992 - Victor Hawken and Alison Nardone, the 1982 head prefects, with guest speaker Karen Davies
  • 87.
    86 Past Pupils’Association The 1992Past Pupils’Association committee hosted the 1982 matric class to a very enjoyable cheese and wine function. An extremely successful fund-raising fashion show was held on 20 August. Two guest models were British professional squash players Mark Allen and Matthew Rudd. The evening boosted the Foundation Fund by R1600. Pupil Matters Matters of importance to the pupils are shown in the agenda for the prefects’ meeting on 18 August. Items discussed were: • Team photographs - found and to be framed and displayed by the Traditions portfolio. • Letter to Fairmont, West Virginia. • Senior Citizens’ Tea Party. • Societies Week. • Spirit. • Boys’ netball and girls’ soccer. • Matric Tops Day (40 days). • Quotes for present - cabinet and sign. • Dance • Discipline in quadrangles. Achievements The girls’ basketball first team, unbeaten, won the league. Karen de Beer, who had been selected for the SASchools team in 1991, Claire Lotter and Estelle Visagie were chosen for the WP Schools team. The drum majorettes again performed with distinction, and were placed fifth at the SA Cham- pionships. The girls’ hockey team “played an incredibly high standard of hockey”. The team was placed second in the premier league. Twelve softball players were selected for WP teams during the 1991 - 1992 season. Tanya Price was chosen for the SA Schools team. The high- light of the squash season was the selection of Shelley Hopkins to the U19 WP Girls Team. Other provincial representatives were Michelle Dosson (WPswimming) and Leonhard Freidberg (captain), Elton Neething and Nicky Klip (Boland swimming). Jenny Kirkwood became the SA Junior Judo champion. The SCA experienced a particularly successful year. The dramatic recreation of CS Lewis’s The Screwtape Letters was highlighted. The cast of twenty-four performed during a Bible Education period and also at Edgemead and Settlers High Schools. The Drama Society mem- bers won Eisteddfod Highest Honours certificates. Buildings and Grounds Although a shooting range was provided by the Defence Force, the school had not yet been provided with an armoury, strongroom and rifles. The citizenship programme, which had replaced Youth Preparedness, led to the junior boys becoming involved in cadets, with the seniors as leaders, and the establishment of a girls’ platoon. The Medway triangle (Erf 300/8) was transferred to the State and would be transferred to the school on condition that it could not be used for any purpose other than parking. In an attempt to find a water source on the school grounds, a geological report was prepared. A
  • 88.
    87 water diviner wasasked to identify and possibly confirm the geologist’s report. Three boreholes were eventually drilled but without success. The original farm borehole had been next to the entrance to the school. In September the Cape Education Department described its Computers in Schools and Col- leges Project in a circular to schools. Improvements and alterations to the Media Centre (Li- brary) were proposed and eventually carried out. These included the creation of a teachers’ workroom/computer room in Room 3. The total number of teaching posts would be reduced from fifty-one to forty-eight in 1993 as a result of the changed staffing quotas. The Flag of Learning - the symbolism explained Past Pupils’ Reunion 1992 The committee consisted of Monique Bosman, Samantha Quinn, Christopher Lockett (Treasurer), Jacky Bartels (Teacher Rep.), and Gail Ross (Chairlady and Secretary)
  • 89.
    88 1993 Buildings At the beginningof the year, a start was made on the long awaited and much needed extensions to the main building. Ten years of applications, meetings and interviews had finally borne fruit. Occupation would be in 1994, when it would be possible to sell a number of the prefab- ricated (mobile) classrooms. The extension above the art and woodwork rooms, and enclosing the junior quadrangle, comprised a number of classrooms, a tuckshop, a computer room, vari- ous special classrooms, cloakrooms and storerooms. Provision was made for a double room to be used as a lecture theatre for large groups and team teaching. The original intention was to have the library relocated to this position and to have the lecture theatre and offices adjacent to it. Unfortunately, this was not accepted by the Department. The double garages near the hockey field had to be relocated and a new store for sports equip- ment and kit was constructed. The counselling department was relocated after new offices were provided by sub-dividing classroom 57. Two new parking areas were provided. A new burglar alarm system was installed. A link between the main building and the Recreation Centre was considered so as to make greater use of this facility. It was resolved at the Govern- ing Body meeting in November that plans be prepared. Finances The financial implications of becoming a state-aided school were being felt to a greater extent. “Model C caused considerable distress and confusion.” An article in the Financial Mail, dated 15 January 1993, elaborated on this. It described how Model C was always going to be a transitional arrangement, that the ANC rejected it as a perpetuation of white privilege and that much of the confusion and unhappiness had its source in the NP’s anxious policy reactions after the decision to abolish apartheid. “The system of ‘models’ available for white schools was instituted partly as a result of political pressure and partly to save money.” The article went on to state, “There is a fundamental tension in the proposition that education can be both compulsory and not free.” Academics Fortunately, there was very little staff movement. Academic excellence was identified as a priority and to that end a mentor system to improve communication between the school and parents, and an integrated day with a changed timetable and providing more time for subject and other groups to meet professionally, were investigated. The principal announced that a semester system would be introduced in 1994 with two major examinations and a regular test system for Standards 6 to 9. The school was selected as one of the thirty schools in the region to introduce the new Educa- tion for Living programme, comprising citizenship, personal and career education, physical education, arts education and Bible education. Attention would also be given to topics such as human rights and education for democracy. The results of an internal survey of fifty standard nines and fifty parents proved very interest- ing. One third of the pupils considered unemployment the greatest threat to the country, while another third were afraid of a possible civil war. 40% considered the greatest threat to pupils to be deterioration of values and morals.
  • 90.
    89 The Junior Quadranglebefore main building extensions Driver Education Societies Promotion Day
  • 91.
    90 The parents ratedthe most important tasks of the school to be the acquisition of basic skills - reading, writing, speaking, computing, and career planning and training in beginning occupa- tional skills. One highlight of the year was the first international pupil exchange undertaken by the school. The following extract is from the report in the 1993 school magazine. PUPIL EXCHANGE TO FAIRMONT SENIOR HIGH SCHOOL U.S.A. On 24 April 1993 three of our pupils - Catherine Broek (deputy head girl), Bradley Croucher (prefect) and Allison Wiehahn - embarked on the trip of a lifetime, a three- week international student exchange programme to Fairmont Senior High School in West Virginia U.S.A. They report. “After stopping over in London and Washington for two and three nights respectively, we headed off to Fairmont Senior in the American city of Fairmont - a school we’ve been twinning with for two years. We’ve been letter-writing and exchang- ing yearbooks, items of clothing and newspaper articles with them during that time. In 1992, a past pupil from our school, Charlaine Coetzee - currently studying on a golf scholarship in Virginia - visited the American school, where she met Amy Leinhardt, the Student Body President and Mrs Janet Satterfield, the Student Council Sponsor. They spoke about a possible student exchange, and this year the idea became reality. Through fundraising activities, such as the Big Walk, we managed to raise money to go towards the project. We were allowed to raise a maximum of half the travel costs and our parents made up the shortfall. In Fairmont we stayed with separate families and were made to feel at home from the first day in the city. At the school we were shown around by different pupils and were able to experience various classroom situations. The school was completely different to ours and we noticed that the pupils there had a lot more freedom! The classes were very easy and, although a relaxed atmosphere pre- vailed, the students honoured the name of their school. The students were very friendly, outspoken and very interested to hear about South Africa. In fact, they were shocked to see that we were actually just like them. They had actually imagined that South Africa was very primitive and “backward”. The Founders’ Day assembly was addressed by the 1983 Head Girl, Mrs J Thompson (Lam- bert) and many members of the 1983 matric class were present. Included in the activities of the day were displays of societies and practical subjects, and outdoor displays by the drum majorettes and the cadets, synchronised swimming and a dog display by the navy. That evening the class of 1983 had their 10-year reunion in the Recreation Centre. The writer of the maga- zine report added, “This is an occasion which has become a tradition at Fairmont, and serves to strengthen the ties between the school and all those who have passed through its doors”. Catherine Broek submitted a proposal for changes to the Valedictory Assembly based on her observations in West Virginia. Her proposal that “graduation certificates” be presented to all matrics during the assembly was accepted. This was to become a feature of all future Valedic- tory assemblies.
  • 92.
    91 Staff Assie van Aswegen,who had been at the school for thirteen years, left due to ill health. A tribute in the magazine included these words, “with his interest in and knowledge of the mod- ern media, he was often a sought-after friend. Assie’s positive attitude and sparkling enthusi- astic personality made him a favourite colleague. Very seldom did he betray the hardships he had to bear due to ill health”. There were concerns during the second term about the possible invasion and occupation of white schools, and contingency plans were prepared. The end of conscription was finally announced. Some of the pupils’ concerns are shown in the agenda for a typical prefects’ meeting (22 June): outfit for Polar Bear Club, shelter for first-aiders, debutante competition, Homecoming Dance (Cinderella Ball), election of king and queen (matric) and princesses (Standard’s 6 to 9), “Big Brag”, monitors, team photographs to be hung in passage, detention, banner for co-ed meet- ings, teachers’ tea, Saturday refreshments, Settlers Contact, La Rochelle visit and matric girls’ nails for the dance. Alterations to facilitate the better running of the library were completed. A new system of filing examination papers was introduced, and CNN was screened during second breaks in an attempt to improve pupils’ knowledge of current affairs. The extended learning programme, with Ms B Elion as co-ordinator, was very successful. The Adult Education programme continued to operate successfully. Many Olympiads and compe- titions were entered. Dr Grazioli addressed the parents and standard tens on various aspects of sex awareness, and cabaret evenings took place inAugust. Ronita Wilbert won the gold medal in the prose section of the Cape Town Eisteddfod for her contribution, entitled “Eclipse”. Achievements Claire Lotter was selected as a member of the SA Schools basketball team, the drum majorettes were placed first in the Western Province and eighth in South Africa, and Catherine Gould and Bronwen van Heerden were softball Junior Springboks. Others who achieved success in na- tional competitions were Rory Yorke in the Computer Olympiad and Vanessa Mayley, Simon Frouws and Kirsty Gilham in the Santam Art Competition. The Settlers Contact: Mr C Wigg and Mr T Webster - 1993
  • 93.
    92 1994 The country’s firstdemocratic election took place, and Nelson Mandela was sworn in as president. The effects on Fairmont can perhaps best be illustrated by these excerpts from the magazine messages of the principal and the chairman of the governing body: Change is the way of life in schools. A changing society requires changing schools. The public is likely to view those schools responsive to change as the most desirable ones. If change is going to be our way of life, then nurturing the change process is going to be an implicit part of every principal’s job. How true this has been of Fairmont this year. Not only have there been the dramatic changes in our country, but we have experienced change here too - the opening of new extensions, plans for further improvements, the expectations of a new Education Department, proposed changes to syllabuses, to staffing - the list is long and seemingly endless. In the face of all this change, we must focus on our strengths and develop strategies for im- provement. We must look at technological advances and see how they may assist us in working with pupils. We must improve communication, monitor progress, and consider ways to raise funds and consolidate assets. Clive Wigg Whilst the effect of the rapid metamorphosis of our country seemingly has everyone in a frenzy, it is perhaps a good time to pause for a moment’s reflection. There is no doubt that a certain amount of apprehension exists within most of us when we think of the immediate future of this beautiful, but ravaged land and our role in it. We can either adopt a pessimistic and gloomy “wait and see” attitude, or roll up our sleeves and take up the challenge to make this country into a peaceful land of opportunity and abundance for all its citizens. To achieve this Utopia will require a great deal of teamwork and co-operation and at the forefront will be the education of our children. Due to the uncertainty of the present education policy it is extremely difficult for any accurate medium to long term planning. It seems certain, however, that the face of education is going to experience some major changes, largely due to past imbalances which will exhaust the Education budget completely and thereby place a greater financial burden on an already overtaxed community. Larger classes with fewer teach- ers are fast becoming a reality and in anticipating this, the Governing Body has to a great degree been pro-active with the limited funds at its disposal. The parent body is going to have to play a far greater role by participating in the all-round education of their children. Let us therefore bring our priorities into focus and give wholehearted support to the Fairmont Family to help maintain it as a school which prepares young people of calibre ready to meet the challenges of the future. Leon Huisamen Chairman - Governing Body Buildings and Grounds There were obvious physical changes at the school. The extensions to the main building were opened on Founders’ Day, 25 February. Mr Wigg cut the ribbon across the passage near the new tuckshop in the presence of the special guests - officials from the Education and Works
  • 94.
    93 Cheerleaders at Inter-SchoolsAthletics - 1994 Main Building extension - completedin 1994
  • 95.
    94 Departments, representatives ofthe architects and the builders, and committee members. A number of prefabricated classrooms - the “prefabs” - were removed and the link between the main building and the Recreation Centre was constructed. Other matters handled by the Governing Body included protection for the windows in the new building, a proposed canopy for the junior quadrangle, a new tie, new tracksuit, seating for the lecture room, air-conditioning, changes to the old darkroom, vending machines, the textbook levy, a new kiosk at the field corner of the hall block, a staff benefits scheme and a marketing survey conducted by Mr Hilton Calder. It was proposed to halve the existing principal’s office and to extend it into the courtyard to compensate so as to provide another secretary’s office. The changes meant that Fairmont pupils could enjoy the best possible facilities. The constitution of the Governing Body had also to be finalised. Successes The 1993 examination results were excellent. Further study, and staff involvement as examin- ers and sub-examiners, led to a continual improvement in the quality of teaching. Pupils achieved great success in a number of fields and they and their coaches were congratu- lated on their fine successes. Nikki Klip became a full Springbok (for aerobics) and Schonette Coetzee (hockey), Steven Dosson (hockey) and J du Plooy (cycling) were selected for na- tional school teams. Vanessa Mayley and Stuart Teare achieved great success in international and other art competitions. Fairmont provided the greatest number of students (163) at the Cape Technikon in 1994. The 59% success rate of 1991 enrolments obtaining a National Diploma in 1993 was one of the highest. A building and grounds administrator (Mr B Gifford) was appointed, and he became responsi- ble for many tasks previously undertaken by teachers. Parents were exhorted to support the next major project - the construction of an Indoor Centre for various sports and other activities, including functions and examinations. Everywhere in the world pupils were becoming more involved in decision-making. Steps in this direction were taken at the school and two successful staff-student leader seminars were held. A peer-tutoring scheme was initiated, and consideration would also be given to the introduction of peer counselling. Although the process of appointing prefects varied from year to year, the basic approach was similar throughout. In 1994 the procedure was: 1. Completion of nomination forms - proposer and ten signatures. 2. Submission of CV’s with photographs. Pledge to be signed. 3. Interviews. 4. Short-list prepared. 5. Voting 6. Announcement on last day of third term.
  • 96.
    95 Valentine’s Day -1994 Past Pupils’Association - 1994 Back: Left to right, Wayne Rossouw, Tony Marshall, Steven Goodrich, Greg Hudson, Clive Wigg Front: Michelle Radford-Hayden, Martina Popkiss (Chair), Tracy Booysen
  • 97.
    96 The Flag ofLearning The principal, in his Speech Night address, made reference to the Flag of Learning. The flag, symbolising the link between education and a strong free nation, was first raised throughout the USA on July 4 1985. It was subsequently flown at schools and other institutions through- out the world. At Fairmont it was introduced in 1992 and was the symbol of the school’s pursuit of excellence, communicating the key foundations of quality education symbolised in the stylised flame on the flag: • High expectations for students and teachers. • Excellent teachers in the school • A community involved with the school. • Families willing to accept their responsibility for learning. The flag would later be used in the Valedictory Assembly, when the school flag was passed from outgoing head boy to new head boy, and the flag of learning from head girl to head girl. PTA The PTA had a busy and successful year. “The first and most profitable venture was the raffle for a prize of two years’school fees. This was followed by the Treasure Hunt, in which over a hundred prizes donated by local businesses were won. The Barn Dance....provided a wonder- ful opportunity for relaxation and fun. The premiere of ‘Nunsense’at the Theatre on the Bay provided scintillating entertainment and was the highlight of the functions for the year”. The Saturday morning tuckshop was reinstated and the tuckshop, the clothing bank and the Adult Education programme continued to provide excellent service. An air conditioner was finally installed in the staff room. Many staff members showed their versatility in the production of Snow White. Honours Dinner Dawn Durrbaum, convenor of the prefects’ academic portfolio, was responsible for the first Honours Dinner. This was to honour the top twenty students in each of standards eight to ten, and would become another Fairmont tradition. Existing traditions successfully observed included civvies days, Arbor Day tree-planting, Val- entine’s day - again the creation of a huge heart on the field - the Polar Bear Club, the matric- staff braai, the senior citizens’ tea-party and the boeresport competitions. A highlight of the year was the unique Matric Farewell Dance. Here is Andrew Wilkinson’s description included in his review of the Std 9 year: “The Matric Dance Committee had a mammoth task ahead of them when they were chosen earlier this year. They organised, painted and laboured away; and the result was an extremely successful Matric Dance. The theme was ‘A Day at the Races’ and saw the memorial quad being magically transformed into a marquee. The food was excellent and a Std 9 pupil gave a commentary on a horse race onto an audio cassette. After the matrics had placed their bets,
  • 98.
    97 the race was‘run’. Two lucky matrics won a gold watch and gold bracelet. The Matric Dance of this year was, in a nutshell, a ‘runaway success’!” Miss Basset’s outstanding organisation and Mrs Weerts’s professional catering ensured the resounding success of the dance. The United School Sports Association (USSASA) was introduced to WP school sport organi- sations for the first time in June. In October among the principles listed in the Declaration of Intent were: • The participation of all school children in sport on an equal basis. • School sport should not be politically aligned. At the meeting on 21 November, the Governing Body resolved to disband the cadet corps, approved the move of the library to the Recreation Centre and the extension to the principal’s office. The roller shutters at the old tuckshop were replaced with windows so that the room could be used as a centre for more advanced students. Valedictory Day - the last goodbye - 1994
  • 99.
    98 1995 The Acting Headof the Western Education Department wrote in a circular dated 1 January, “The establishing of the new education department of the Western Cape marks the beginning of a new chapter in education in South Africa”. Departmental Circular 1 of 1995 included these paragraphs: “New co-ordinated staff provision scales are still receiving attention. Attempts are being made to bring the teacher-pupil ratios of the ex-departments closer to each other. “As a result of budget cuts, new posts may no longer automatically be created according to the old scales. “Amendments to certain syllabuses have been approved for implementation in 1995. “A new system of inspection and subject advisory services is being planned.” From 1994 to 1997 the new government was faced with the problem of financing the imple- mentation of its new education policies. The first important step was the White Paper of February 1995. One of the proposals was the establishment of a National Qualifications Framework (NQF). Shortly afterwards, the Hunter Committee was established and recommended that there should be only two types of schools - independent and public. Each public school was to have a governing body. Mr Bob Williamson, chairman of the Fairmont governing body (known internally as the Board of Governors, or BOG), wrote in his magazine message, “It is essential that we, like every other South African institution, contribute in whatever way we can to the reconstruction and development of our country and it is the view of your Board of Governors that the community which Fairmont serves, takes full responsibility for the education of its young men and women, thereby maintaining its own independence and allowing national resources to be devoted to priority areas.” Team-building The governing body undertook a comprehensive survey during the year to determine the mar- keting needs of the school and a three-day team-building seminar for the staff leadership team (all in promotion posts) was held in January at Mont Fleur, near Stellenbosch, and was led by Mr Hilton Calder. The two events led to the school finalising its aims and objectives. The staff and the governing body visited the Education Department library and went on a boat trip at the Waterfront. The prospectus was re-designed and published in an attractive folder. The English Department also experienced a team development weekend seminar at Gordon’s Bay in October. School Mission The school mission statement - We of Fairmont strive for excellence by seeking opportunities for all to realise their unique potential through self-discipline in a trusting, enjoyable and caring atmosphere of mutual respect - was finalised after a series of meetings for staff, parent and pupil representatives and volunteers. The process was extremely beneficial and rewarding. Continual reference was made to the statement and its implications at assemblies and meetings.
  • 100.
    99 A Scene fromRomeo and Juliet - 1995 Staff Orchestra - 1995
  • 101.
    100 Media Centre At theend of 1994 and the beginning of 1995, the Recreation Centre was renovated and re- vamped upstairs as a spacious attractive Media Centre. The balcony was enclosed, and im- provements were effected to the storerooms, kitchen and office. A new carpet was laid and new curtains hung. Mr Gifford and Mr Engelbrecht organised the enormous task of disman- tling, moving and reassembling the shelves. The books and media equipment were moved during the December holiday. The enclosed balcony included a teachers’study and provided a venue for chess players, for quiet breaks and for a new photocopier. Two large work-stations were provided for computers and other audio-visual equipment. The new Media and Resource Centre became a very popular place for pupils. In the first quarter of 1995, issue statistics for books to pupils were twice as high as for the same period the previous year. Tour to Zimbabwe Another first for the school was the first sports tour out of the country - that of the girls’ hockey squad to Zimbabwe. The tour, organised by Ms Sue Cromhout, covered the whole country and included a series of matches and unforgettable experiences and visits. A highlight was the victory over Chisipite School in Harare, the current winners of the National Hockey Cham- pionship. The school hosted rugby teams from England - Colston’s School from Bristol and King Edward from Birmingham. The Past Pupil’s Reunion in March was a great success. All but nine members of the 1985 class were contacted, and approximately 120 people attended the braai. The Standard reports in the school magazine were of a high quality, amusing and informative. Here follow a series of extracts illustrating the wide range of activities and interests during the year: “In addition, we finally bagged the Spirit trophy and were awarded with a free civvies day (yay). “But the main attraction was definitely the staff doing their rendition of the YMCA (during the Founders’ Day Festival). “It was here that the birth of the dreaded Froggy Pond Gestapo took place, who wasted no time in securing their iron claw grip on the boys’ dorms, crushing all elements of revolution (referring to the Std 9 leaders at the Std 6 camp). Lee Herman and Stephen van der Merwe (Std 9) “The highlight of our English year was undoubtedly the ‘Bard’s Birthday Bash’. This is held every year, in commemoration of Shakespeare’s birthday. While watching... we held a typical Shakespearian banquet (chips and coke)! “The highlight of the third term was the ‘Big Knit’held to raise funds for a new Student Centre. This was held in the hall after the King Edward/Fairmont rugby match. (They beat us!). “In addition, the teachers staged an excellent production - ‘A Day in the Life of a Fairmont Pupil’.” Nicola Davenport (Std 8) “The return of the contentious Academic Reinforcement period from the mists of time was greeted with mixed feelings. For those not involved it meant an early afternoon off, but why on a Wednesday when a Friday would have given us an early start to our glorious weekends?
  • 102.
    101 Cheerleaders - 1995 TheFairmont Carnival - 1995
  • 103.
    102 “The biggest ‘sports’eventof the year turned out to be the Annual Durbanville Excursion. A conspiracy of teachers managed to organise this even during the worst Cape Winter storms”. Michelle Adams (Std 7) The Fireworks Carnival The first of a series of Fireworks/Carnivals organised under the leadership of Mr Michael Ettish took place on 27 October and was “a resounding success with positive feedback from all quarters”. The importance of the Carnival can be seen in this summary of 1995 fund-raising: Parent Association • Masked Dance R1 271.00 • Carnival R44 462.27 R45 733.27 Staff and Pupils • Victory Race R7 055.25 • Small change forms R13 637.76 • Big Knit R8 126.88 • Big Walk R6 843.11 R35 663.11 TOTAL R81 396.88 The Parents’Association also launched a 100 Club, an excellent means of creating spirit and raising funds for the school. During 1995 there was much controversy about school “right-sizing”, re-deployment of teach- ers and voluntary severance packages. This was to continue into 1996. Right-sizing came about as a result of agreements between education departments and teacher union representa- tives on a new set of student-teacher ratios, thus implementing equity. The national Minister said that the process was to effect equity in staff provisioning, not to decrease the number of teachers, but to redeploy them. The process was to lead to Fairmont losing the services of eighteen of the teachers by the end of 1996. A huge teachers’ protest meeting was held in the Parow Civic Centre on 18 May. Buildings and Grounds An area adjacent to the pool, together with a roadway to the double garages, was tarred. Steps were constructed on the field banks and the wooden huts were removed. Consideration was given to the acquisition of a railway carriage to serve as a cafeteria, similar to that at DF Malan High. The Governing Body, after much deliberation, withdrew an offer to purchase the house at the entrance to the school. The intention had been to provide a teaching venue, possibly for the Music Department, and accommodation for teachers and those accompanying touring teams. The first design for a proposed Sports Centre was considered. Security lights were installed and a grand piano was acquired. A tennis shelter and a tuckshop shelter were constructed. The Board also considered the possible acquisition of the piece of ground adjacent to the tennis courts. This could not be used for any purpose other than for sport. Provision was made for alterations to provide a new reception office, a door and steps from the ramp, and a stair- case to the Memorial Quadrangle. Pupils would no longer use the main entrance.
  • 104.
    103 The Governing Body- 1995 Speech Night 1995: Dr and Mrs I McCullum, Mr and Mrs R Williamson, Mr and Mrs C Wigg
  • 105.
    104 The Triple A(AAA) for success programme was initiated. This was to recognise pupils for outstanding attendance, attitude and achievement. The name FAIRMONT was added to all sports tops and additional signs for the building were provided. The new tie would be phased in from 1996. AWARDS The awards presented until 1994 were Honours/Merit/Team. These were shown on blazers as follows: Honours: Full school arms in cloth. Merit: School badge in wire, plus scroll. Team: Scroll. In 1995 Colours Awards were introduced to provide a new category between Merit and Honours. Sporting Achievements Danielle de Wet, in Std 9, as the top member of the Namibian rhythmic gymnastics team, performed with distinction at the African Games. Thirty-five pupils were selected for provin- cial teams, and Lee Russell was chosen for a SA Baseball team. Jason Wright and Alex Mion were placed second in SouthAfrica in the computer section of the National Expo Competition. Staff members, Mrs Feltoe and Mrs Crofton, were in charge of theAdult Education Programme. Saturday detention was introduced. Rules Representatives of teachers, prefects and matric council met on three occasions to propose changes to school rules, and agreed that rules should incorporate a code of conduct for pupils and that there should be a clear distinction between rules and procedures. A matter handled by the Board of Governors over a number of months was the creation of a system of staff awards, rewards and incentives. An extract from the President’s Column in SATAnewsletter number 5 of 1995 gives an indica- tion of the morale of teachers: “Over the past few months we have had to endure the debacle of the paltry salary increase, financed from pension contributions, the Labour Relations Bill and its implications for teach- ers, the Hunter report, and the lack of clarity with regard to new teacher-pupil ratios.” It was decided, after representation from those in charge of issuing textbooks, to stop the levy system, to sell the remaining textbooks and to require pupils to purchase books in future. The Board wrote to the Department about the possible introduction of a post-matric class at the school, up to three UNISA subjects being offered to pupils in addition to other subjects. The reply included these words: “the envisaged project is a bold and exciting venture”.
  • 106.
    105 Academic Aces -1995 Fairmont High School’s academics with their trophies for academic achievement: Nicholas Maunder, Carly Steyn, Lisa Stockland and Samora Adams. ( Photograph by Pieter Van Der Vyver: Northland News, November 1995) The stairway to the Memorial Quad was provided in 1995
  • 107.
    106 1996 In his firstcircular of the year to parents in January, the principal wrote, “1996 is going to be a year of great challenges. The uncertainty about the new dispensation and reports about im- pending regrading of posts and schools, retrenchments, early retirements and loss of promo- tion posts have led to a degree of despondency and loss of morale and motivation in the profes- sion. Already five of our teachers have accepted posts elsewhere.” In October he reported, “Today we are faced with the knowledge that at least a further eight- een of our staff will have left the school, and, in most cases, the profession, by 31 December.” The situation was brought about by the right-sizing, redeployment and voluntary severance process. Details of the Voluntary Severance Package were provided in the Department’s Cir- cular 51/1996. Any educator could volunteer for a severance package. The redeployment process did not function well in practice. There was at first an assumption that voluntary service packages would be offered only to teachers who had been declared redundant and for particular reasons could not be redeployed. The media and the ‘white’ teachers’ unions considered that the severance packages would be the main provision of right- sizing. The High Court would effectively declare the redeployment process null and void in a case brought by the Grove Primary governing body. The National Education Policy Act of 1996 provided for the determination of national policy for education; to amend the Act of 1984; to provide afresh for the determination of policy on salaries and conditions of employment of educators; and to provide for related matters. Education White Paper 2 on the ‘Organisation, governance and funding of schools’ was pub- lished in February. The Board, at a meeting in March, established strategic planning and redundancy committees. A meeting handling sections 13 - 17 of the Schools Bill was held at Totius Primary. Initially, there was a great deal of anger and confrontation. Aletter of protest was sent to the Ministry mainly about the Board’s powers to appoint educators and non-educators. A number of Fairmont teachers and pupils protested at the foot of Medway, displaying signs such as ‘No teachers, no future” and ‘Education abuse, we refuse’. The South African School Bill of August 1996 led to the South African Schools Act. This Act was to provide a uniform system for the organisation, governance and funding of schools. Model C schools, as such, were done away with and became Section 21 schools. The School Act covered the funding, organisation and governance of schools. It stipulated that governing bodies should be composed of representatives from the parents, the teaching staff, the student body and the non-teaching staff. The first election of the governing body in accordance with the Act would take place in July 1997, when the first Students’ Representative Council would also be elected. Examinations The 1995 examination results were excellent. Every matric passed, and there were some ex- ceptional subject averages, for example, 73% for History HG and 71% for Art HG. Three pupils obtained over 90% for History. Four obtained an A aggregate, and a further seventy- nine obtained matriculation exemption. Continuous assessment of pupils’ work became an important feature. This meant that there was less emphasis on formal examinations as the main means of evaluating pupils’ work.
  • 108.
    107 Sport A number ofpupils achieved with distinction in co-curricular activities. Those awarded colours for National junior teams were: Aniela Mojzis, ranked in the top five in the world in her age group fortennis,JamesPerryandShaunduPlooyforcycling,JonathanGreenfieldforsoccerandMichael Dockerill for ice hockey. Michelle Dosson was selected for the WP Senior Swimming team. Achievements Kristy Munro and Susan Gustafson were prizewinners in the Typing Olympiad and Martin Meyer received a bronze medal at the National Science Expo. Nicole Klassen, the Head Girl, was selected as an exchange student to Austria. Exchange students from Denmark, Switzer- land and Germany were welcomed. Another feature of the international connection was the increased number of touring teams from overseas - matches were played against teams from Taunton, Downside, Down and Arnold Schools from England. The draft constitution of the United School SportsAssociation (USSASA) was distributed in May. The production of “The Happiest Days of Your Life” in April showed how well pupils, parents and teachers could work together. A group of students and teachers worked together to plan the Twentieth Anniversary celebra- tions to take place in 1997. PTA The PTA launched its own newspaper, the Paperclip. The PTA dance, held in the school hall, was thoroughly enjoyed. The 100 Club, in its second year, continued to function very well. A Fun Walk/Ride on the 13 September was a great success. The Carnival, on 2 November, was again a huge success. “What a wonderful day this was for our school. The thousands who came to participate and help all experienced something which will live in the memory long after the event. There was excitement and a dazzling display, but there was also a shared recognition of how many different components can work together to form a great school.” Here follows a brief list of the other matters receiving attention during the year: • the shooting range site • vending machines • ramp surface • the school e-mail address • field names • stage catwalk • school scholarships • PTSA • prospectus cover photographs • cheerleaders • visit of Steve Hamilton (for a drugs presentation) • strategic planning commissioned by the Board of Governors • concept plans for a future Sports Centre • door canopies • possible roofing of a quadrangle • job-shadowing • Big Walk • matric exit survey • the AAA programme • the prefects’ executive breakfast • book sales.
  • 109.
    108 Protest - 1996 HillaryHall - “The Happiest Days of Your Life” - 1996
  • 110.
    109 Staff Matters The strategicplanning report was presented to the governing body in August and was pre- sented to the parents on 16 October. The title of the report was “Let the Teachers Teach”. The intention was to bring about a new structure in which teachers would be relieved of a number of their administrative duties so that they could concentrate more on academic and cocurricular activities. The position of estate manager was abolished and new positions, those of adminis- trative manager and co-curricular co-ordinator were created to commence in January 1997, with Mr M King and Mr U Horsthemke being appointed to these positions. Unfortunately, five outstanding members of the permanent staff left during 1996. Miss Leonie Coetzer was a founder member and had been a Deputy Principal since 1990. Mr Hans van Stormbroek, at the school since 1979, left as an internal Deputy and Head of Biology and Bible Education. Mr Dereck Marnewick, Head of Department, taught at the school from 1984 to 1987 and again from 1989. Mr Brian van Wijk was a Deputy Principal from 1989, and was Head of History. Mrs Nikki Smal, teacher-counsellor from 1989, was part of a very successful counselling team. The chairman presented the staffing structure proposal for 1997 at the meeting in October. This was accepted with the suggestion that seven additional teachers should be appointed. At the meeting in November, the Board again discussed staff incentive schemes and resolved to award a bonus to teachers remaining at the school for their loyalty and service. Revised implementation dates for the new national curriculum were announced in October. It would commence in Grades 8 and 10 in 1999. During 1995 continuous assessment was intro- duced. In February of 1996 a discussion document was distributed to schools. In circular 83/ 1996, dated 4 September, the Western Cape Education Department informed schools year marks would be used in the 1996 Senior Certificate Examination. The previous proposals regarding a post matric course were again considered at a meeting in November when a project to introduce an Accelerated Education Programme and A Levels was approved subject to Heads of Agreement being drafted, and the budget in detail to be approved. Top Five in Standard Ten: M Swart, A Lang, G Dreijer, J Brink, C Steyn - 1996
  • 111.
    110 SPEECH NIGHT &GUEST SPEAKERS 1987 - Mr J X (Puggy) Munnik 1988 -Justice EL King 1989 - Mr M Whetmore 1990 - MR CD Adams 1991 - Dr R Dickson 1992 - Mrs J Stern-Hardie 1993 - Mr R Taylor 1994 - Prof J Thomson 1995 - Dr I McCullum 1996 - Prof S Ridge DRAMATIC PRODUCTIONS 1988 - Alice in Wonderland 1989 - The Good, The Bad & The Ridiculous Before Your Very Eyes 1990 - Grease 1991 - The Beeple 1992 - Fairmont Cabaret 1993 - 1994 - 1995 - Romeo & Juliet 1996 - The Happiest Days of Your Life MATRIC FAREWELL THEMES 1988 - Moneytree Casino 1989 - Take a Chance 1990 - A Royal Ball 1991 - Some Enchanted Evening 1992 - Greece 1993 - Egyptian Splendour 1994 - Durbanville Derby 1995 - A Hobo’s Night in Paradise 1996 - A Night in Shining Armour FOUNDERS DAY GUEST SPEAKERS 1990 - Mr E Fivaz Mr T Moehl (HB 1979) Mrs L Thompson (Windell) (HG 1979) 1991 - Mr M Steyn (HB 1981) 1992 - Ms K Davies (GF 1982) 1993 - Mrs J Thompson (Lambert) (HG 1983) 1994 - Mr A Hudson (HB 1984) 1995 - Ms C MacLeod (HG 1985) 1996 - Mr C Mullet (HB 1986) *HB: Head Boy *HG: Head Girl * GF: Good Fellowship 1987 - 1996
  • 112.
    111 1997 - 2002 ANNIVERSARIES,A LEVELS AND OBE 1997 The Twentieth Anniversary Year was one of outstanding suc- cess. Highlights included the Anniversary celebration week, the school being listed as one of the Top 100 schools in South Africa, the introduction of A Levels, another wonderful car- nival, the election of the first governing body and the first Students’ Representative Council under the new dispensa- tion, and the first Matric Art Exhibition. At the inter-schools athletics meeting the girls won the trophy, three Fairmont athletes won individual trophies, and the school won the coveted Spirit Trophy. The description of the Twentieth Anniversary Celebrations was published in the 1997 school magazine. FAIRMONT’S 20TH ANNIVERSARY The highlight of the year must certainly be the celebration of Fairmont High’s 20thAnniver- sary. With the advent of 1997, Fairmont’s 20th year in existence, a committee of excited and rather anxious teachers and pupils, under the Chairmanship of Mr Wigg, were able to put their months of planning into action. The celebration week took place from 24 February to 1 March 1997 with the theme for the week being “Yesterday, Today and Tomorrow”. MONDAY 24 FEBRUARY: OPENING DAY Tracey Kairuz (Head Girl 1980) officially opened the week’s celebration at the Opening Ceremony, held on Hillcrest Field and she presented the 1997 Head Prefects with a time capsule containing 20th Anniversary memorabilia. All the Fairmont pupils formed an impressive “twenty” on the field and each pupil, armed with a helium-filled balloon, re- leased it into the sky, to establish whose balloon would travel the furthest. A“humungous” cake was baked for the occasion and each pupil received a piece of cake to share in the birthday celebration. In the evening, a superb formal dinner was held at La Verona Restaurant in Durbanville. The guest speaker was Mr Brian O’Connell (Head of WCED). The evening included an auction of selected artworks painted by Fairmont pupils, which were auctioned by the entertaining and professional auctioneer, Mr Julius Buchinsky. TUESDAY 25 FEBRUARY: The day was characterised by a “Civvies Day” with the pupils dressing up to the theme of “Yesterday”. The staff added to the spirit of the theme by dressing up as school pupils in uniform. The Inter-House Plays were staged during school hours and anxious moments awaited directors, Susan Gustafson (Innes), Jeanette Steynberg (Dale) and Claire O’Neill (Muir). Innes House dominated the awards, winning the award for “Best Play”. The other major awards were as follows: Best Director: Claire O’Neill Best Actor: Gary Rhoda Best Actress: Clare Vernalls The pupils enjoyed a picnic on the field during the extended break.
  • 113.
    112 A Proud Day- 1997 PTA Committee - 1997
  • 114.
    113 WEDNESDAY 26 FEBRUARY: Thetheme for the “Civvies Day” was “Tomorrow” with many pupils dressing up in some spectacular futuristic outfits. The day was characterised by the “Fun Olympics” com- mencing with the traditional inter-class “Boeresport” competition, which proved to be great fun. The highlight of the “Boeresport” was the Tug-O-War, with the staff team stamping its authority on the feverishly determined Standard 10 team. The “Fun Athletics Meeting” in the afternoon included some fun-filled and hilarious events. Another of the highlights of the day was the Inter-Schools “Fun Gala” which included a pool noodle relay race, a tube relay race and a piggy-back relay race. Needless to say Fairmont won the Inter-Schools “Fun Gala” showing our neighbouring schools that we know how to have fun. THURSDAY 27 FEBRUARY: One of the highlights of the week was certainly the Fairmont Fashion Show and the Mr and Miss Fairmont Competition held on the Thursday evening. The finalists, chosen from the Standard 8 to 10 pupils, were announced well in advance to enable sufficient practising and to ensure that the Fairmont models were able to “strut their stuff” on the catwalk. Modelling agencies assisted with the choreography, Mr Dill was the creator and designer of the splendid set, the stunning outfits worn by the finalists were provided by leading stores and the fabulous prizes “up for grabs”, all made this a spectacular occasion. The evening culminated with the crowning of James Espin and Tegan Swart as Mr and Miss Fairmont respectively. FRIDAY 28 FEBRUARY: The traditional Founders’ Day Assembly was held on Friday morning with Dr Clifton Woods (Head Boy in 1987) addressing the Assembly. A number of special guests, previ- ous head prefects and past pupils attended the Assembly, which was followed by a lunch for the invited guests. The 20th Anniversary Carnival commenced in the evening with a Fun Fair and a Pupils’ Dance. The Past Pupils’ Reunion was also held with many past pupils, particularly the 1987 Matrics, celebrating their 10th Reunion renewing old acquaintances in the beer tent and at the spit-braai. Each standard spent the afternoon and evening frantically building their respective floats, to the theme of “Yesterday, Today, Tomorrow” for the Float Proces- sion the next morning. SATURDAY 1 MARCH: The day started with the Float Procession through Durbanville led by the stunning “Drummies” and “Bummies”! The five floats, built by each standard, were most impres- sive, with the Standard 9 float judged as the “Best Float”. The Carnival atmosphere continued throughout the day with a number of Arena Events, including a karate demonstration, roller-blading, drum majorettes, a synchronised swim- ming display as well as folk-dancing. A “Gold Rush” was also held with many fabulous prizes being won. Awide variety of stalls, including food stalls, were in operation throughout the afternoon and evening. The evening’s entertainment included the Fun Fair for the kids and the beer tent, which included a number of oom-pah bands that kept the adults in a “swinging” mood. The celebrations came to a close with the Bandslam in the school hall in which a number of pupil bands provided some “head banging” entertainment. Finally, thank you to the 20thAnniversary committee for their commitment and hard work which made this event the success that it was.
  • 115.
    114 A scene from“Grease” - 1997 20th Anniversary - the balloons are released - 1997
  • 116.
    115 A Levels The ALevels programme was introduced after the Board of Governors agreed to an initiative of Ms Barbara Elion, a former English teacher at Fairmont and co-ordinator of the school’s GCE (Gifted Child Education) programme. Classrooms and an office on the top floor were made available for specialised tuition in six subjects by outside tutors leading to examinations under the auspices of the University of Cambridge’s Local Examinations Syndicate. The inde- pendent programme, with Ms Elion as co-ordinator, attracted enormous interest from the press and various radio stations. “Twenty-four excited and motivated Fairmont academic ‘guinea pigs’ enrolled for various combinations of A level subjects.” Top 100 Schools The Sunday Times presented its Top 100 Schools supplement on 14 September. The panelists had set out to look for schools that were making a difference in their context - schools that were exceptional, whatever their disadvantage or privilege and that were worthy of emulation. Three criteria were developed for identifying such schools: performance or achievement in academic and extra-curricular activities; the ways in which the schools prepared pupils and staff for a rapidly changing world, and the ways in which they adapted to increased autonomy; and the creation of opportunities and conditions for learning. It was with great pride that the Fairmont community heard that Fairmont had been listed as one of the Top 100 schools. PTA The PTA adopted a different approach for the quarterly meetings when it was decided “not to get speakers, but to do it ourselves!” Two successful meetings involving teachers and parents were “Air your views - share your feelings” in May, and “Working together works” in August. The PTADance was again a most enjoyable occasion with Fay Davids and Michelle Vorster in charge. The 100 Club continued to be a source of enrichment and social enjoyment. A report in the Paperclip included this paragraph: “An elated, although exhausted chairman of the PTA, Michael Ettish, reported that the 1997 Carnival and Fireworks Display netted the school a tidy sum of R175 000. A sincere thank you to all those parents who so tirelessly contributed their time, sweat, brain power, muscles, elbow grease and even their children and parents to make this year’s event the success that it was.” Pupil achievers deserving special mention included: • Shawn du Plooy (cycling), James Perry (cycling), Martin le Roux (baseball) and Aniela, Peter and Michelle Mojzis (tennis), who were selected for national teams. • Vanessa Mayley, who won a R10 000 scholarship as first prize in the national round of the United Nations Population Fund Art Competition. • Jonathan Greenfield represented South Africa as captain of the national U14 soccer team. • Melissa Leader, who was placed ninth out of 4500 candidates in the National English Olympiad and represented South Africa in a student exchange programme in Russia. • Martin Meyer, who was awarded a gold medal at the Expo-Science International ’97. • Kirstyn Harris, drum majorettes leader, won the SA title for mace duets with her partner at the SA Indoor Championship.
  • 117.
    116 20th Anniversary Celebration(aerial view) - 1997 A Levels: J Watson, L Kohler, Ms B Elion, M Johannes, V van Vuuren (photo: The Argus) - 1997
  • 118.
    117 The 1996 Matricresults were excellent: A aggregate 8 Matriculation exemption 97 Senior Certificate 69 Failures 0 Matters receiving attention during the year included a secondary staff room on the first floor, shade-ports and/or shelter for cars and in the Junior Quad, a store next to the drama room, a sign at the front entrance, a tour to Gauteng, the “Group of 80” contesting the Grove case, the introduction of girls’ trousers and planning for the proposed Indoor Centre. The production of ‘Grease’, which ran to packed houses for three nights, and the very success- ful Art Exhibition proved that there was tremendous talent and potential among the pupils. The staff enjoyed a weekend of team-building at the Tygerberg Nature Reserve. This was followed by a weekend at Mount Fleur for the senior staff and subject heads. This staff devel- opment exercise was conducted by Mr Hilton Calder, who also addressed the matrics later in the year. Proposed Indoor Centre Planning for the proposed Indoor Centre/Students’ Centre was initiated. There was a great deal of discussion as to siting. Various positions on the netball and basketball courts, the matric lawn in front of the hall, and the parking area adjacent to the pool were all considered. Plans were prepared by a number of construction companies, all to include spectator seating and other facilities. Budgetry constraints would eventually determine the size, position and nature of the multi-purpose building. Staff Tony Marshall left after almost nine years as Head of the English Department to take up the position of Deputy Principal at Strand High. Others who left were Kaeli Albertyn, a past pupil and previous Head Girl of the school, and Liezel Kühlcke, who had been a popular teacher- counsellor for five years and had been actively involved in many spheres of school life. Liz Müller was promoted to Deputy Principal after a number of years as Head of the Mathematics Department. Following an approach by an occupational therapist, Mrs E Bretteny, it was proposed that facilities be provided on the school premises so as to have a team approach to counselling, necessary after the demise of the school clinics. A new governing body was elected. This included two pupil representatives, who had “full voting rights except where contracts are concerned or in decisions which force a legal liability on a third party”. A “Conditions of Service Adjustment Package for Educators” was finally agreed to in August, but only by the State and the majority employee party, SADTU. It would, however, be ex- tended to all educators. The South African Teachers’Association announced this as “SALA- RIES - finality, but no victory”. The school, as a member of the “Group of 80 Schools”, joined those who “were committed to raising the necessary funds to finance opposition to the Minister’s Appeal against the Grove decision. (The Minister had been ordered to pay the costs of the High Court case). In October, the final draft of the marketing plan for the school was approved.
  • 119.
    118 Standards The changes tothe way in which marks were allocated and distinctions and symbols were awarded, especially in matric, led to much public comment and speculation in the press about lowering of standards. This led to the principal’s comment in his annual report that “I believe that if we fulfil our mission of striving for excellence, it will not be the A in the matric exam that becomes important but that the pupil who obtained the A did so at Fairmont. We can make of any syllabus what we will, and we should aim for the highest standard which we ourselves can set.” The Students’Representative Council - 1998 The Student Centre - building progress - 1998
  • 120.
    119 1998 The failure ofthe redeployment process had led to a huge budget crisis in 1997 as it became clear that Departments would have to spend far more on teachers’ salaries than anticipated. Thousands of new teachers had to be employed to fill new posts at understaffed schools. Teachers declared in excess remained at schools and many who had taken the severance package were still on the payroll. At the start of 1998, there was great tension as the National Department initially declared that approximately 20 000 temporary teachers would be re-hired. Following a three-day strike by thousands of teachers in mid-1998, a new agreement was reached. The national minister would set student-teacher ratios, and Provincial Departments could determine the number of teach- ers, according to their budgets. Curriculum The phasing in of the new curriculum started in January 1998. A six-day cycle timetable was introduced with school hours being 08:00 until 13:45. The reduction in staff unfortunately meant that physical education classes had to be discontin- ued. A number of teachers attended weekend training seminars, including one on Outcomes Based Education. Many staff members began experimenting with OBE. Mr Wigg attended the Convention of the National Association of Secondary School Principals of the USA in San Diego. He reported back at an open meeting in April on Changes in Education. The most important current topics were those which would also soon become the focus of attention in South African education: • The development of flexible timetabling. • The technological revolution - equal in effect and importance to the Industrial Revolution. • Assessment methods. • Student-centred learning, rather than teacher-based instruction. • Reality based, market related, career orientated curriculum. • Integrated curriculum. He suggested that the school give attention to, among other factors, training of teachers in the applied use of computers, additional computer facilities, rooms assigned for group work, a students’ centre with, if possible, a cafeteria, and various assessment and instructional methods. Buildings The staffing and strategic planning sub-committee proposed to the Board in June that the project having priority should be an “additional computer room, together with all extensions, furniture and equipment, the necessary teacher training, and including upgrading of the Lec- ture Theatre (sound system, acoustics, curtains, ventilation and seating)”. Fortunately, the chairman of the Board of Governors was in a position to report in October that “we have implemented two of our most ambitious projects to date by equipping two class- rooms with comprehensive computer equipment, which may become a model for the future. We also commenced with the construction of a Student Centre (due for completion in the first quarter of 1999) to accommodate indoor basketball, netball, five-a-side soccer, drum majorettes and a multitude of other sporting and cultural activities. A wonderful donation was received from a parent for a digital internet connection.
  • 121.
    120 Administrative Staff: MrM King (Administration Manager), Mr U Horsthemke (Co-curricular Co-odinator) - 1998 Administrative Staff: Mrs H Tatley, Mrs A Jacobs, Mrs J Moreland, Mrs P Retief - 1998
  • 122.
    121 PTA The PTA enjoyeda successful and productive year. The annual dance, with the theme “Afri- can”, was a resounding success as was the excellent Carnival and the 100 Club. Sub-commit- tees were - tuckshop under Mrs Gessner, the kiosk run by Mrs Page and Mrs Bosch, and the clothing bank run by Mrs Dijkshoorn. The proposal to change the name to PTSA could only be ratified at the 1999AGM, but pupils Lauren Young and Kim Brown joined the committee as observers. A cultural committee comprising staff, parents and pupils was formed. Another group bringing comfort and support to many was Mothers Who Care, a group of mothers who met regularly at the school. A new member of staff, Leigh-Ann Littleton, in a remarkably short time, produced Lust, De- ceit and Folly, which proved to be “undoubtedly a brilliant display of untapped talent”. An- other show which was very well received was the variety show Showbuzz. A group of “young, dynamic 1997 matriculants” reinstated the Past Pupils’Association at the initiative of Sean Loots. Building on the success of the 1997 Mr and Miss Fairmont pageant, they set about organising their first major event. Twenty finalists appeared before three pro- fessional judges modelling clothes from a number of stores. Included in the programme were other items including “the sensational voice of Tracey Murray”. Winners of the Mr and Miss Fairmont titles were Gary Swart and Samantha Jones. New developments were the changes to a fixed, timetabled Societies period for all, and the introduction of soccer for girls. The school hosted three exchange students - Laura Perichon from Belgium, Mette Jensen from Denmark and Camilo Benitez-Aldana from Paraguay. Matric Results The matric results of 1997 were again excellent: Matriculation Endorsement 94 Senior Certificate 68 Failures 0 Total 162 Twelve pupils obtained A aggregates. Grades 1998 marked a change from Standards to Grades. Pupils in all grades who obtained A aggre- gates in both December of the previous year and June of the current year were invited to the annual Honours Dinner, held at the Bloemhof restaurant. The guest speaker,Adv. Liesl Fichardt, had a powerful, motivating message for the top pupils. Another function enjoying wide support was the exhibition of work by the thirty-six matric art students. Sarah Goddard received international recognition when one of her works was cho- sen for the International Touring Exhibition. The SRC, under the direction of Mrs Esmeraldo, had a busy and successful year. Members attended a number of leadership seminars and represented the pupils on many committees and sub-committees. The success of the A levels programme was illustrated by the outstanding success of Neil Yorke. He wrote thirteen papers in Mathematics, Physics and Chemistry, this in addition to the normal school examinations! He passed all, obtaining an A for Mathematics (with 100% in Pure Mathematics) and a B in Physics.
  • 123.
    122 Achievements Other outstanding pupilachievements included those of Michelle Mojzis, the current SA U14 tennis champion, who represented SA in tournaments in a number of countries, Sharon Stanbridge, the first Fairmont drum majorette to be awarded SADMA (national) colours, Susan Gustafson, who won the typing speed, senior section of the Cape College Typing Olympiad and cyclist Shawn du Plooy, who was again selected for a national team. Renate van Dijk’s poem Release was published in an anthology entitled Mirror Images. Bereavements The school was saddened by the death of pupil Giselle Pappada and staff member Kallie du Plessis, who suffered a heart attack at the school. Kallie had been a loyal worker for twenty years. Staff Mr Chris Bester left the school and the country after nearly twelve years as Head of Geogra- phy, Head of Department and Grade Coordinator. Ms Elmarie Kitshoff left in June after being a member of the Afrikaans Department since 1981. Overseas Tour 1998 ended on a high note when the first historic overseas tour was undertaken, that of the rugby squad, which toured in the United Kingdom from 4 to 18 December. Mr Mike Rosewell, chairman of the fund-raising committee and his supporters, including Messrs Barry Evans, Russell Smedly and Louis van Schalkwyk, had worked wonders in order to make the tour a reality. The excellent tour booklet included messages from President Mandela, the British High Commissioner, Nick Mallet and Gary Teichmann. Mr S Engelbrecht (Caretaker) and general assistants - 1998
  • 124.
    123 Mr Steve Hamilton- drugs awareness presentation - 1998 Mr and Mrs Michael Ettish - 1998 Valedictory Day - the matric farewell song
  • 125.
    124 1999 Familiar terms atthe start of 1999 were appraisal, quality assurance, multiple intelligences and the guardian system. In WCED circular 34/99 schools were informed that “The Minister of Education has...determined the date from which the governing bodies of ordinary public schools must function in terms of the above-mentioned Act (The South African Schools Act, 1996), as at 1 January 1999.” The Governing Body had visited indoor centres at Stellenberg, Settlers and the Edgemead Community Centre when finalising plans for the Students’ Centre. The floor of the Centre now received attention and Pinelands High was visited. Other matters discussed were the provision of chairs, access to the Centre, curtains, carpets, prospectus folders, school scholar- ships, parking for the Centre and computers for the Typing Room. One scholarship for tertiary study would be offered each year. A teaching position at Fairmont would be guaranteed. This would be available to current and past pupils. Examination Results Matric 1998 190 candidates - all passed 20 A aggregates 56 B aggregates 71% Matriculation exemption. (fourth consecutive year in which all passed) There were sweeping changes to the way in which matric results were announced. These included the announcement of the top three candidates in each subject, listing of schools with 100% pass rates and those which had improved, and indication of subject distinctions. The Matric class of 1998 presented the school with a hand-crafted replica of the school coat of arms, carved by Bellville artist Marie von Willich. This was hung in the school hall. Thirty-five Grade 11’s wrote the subject Small Business Management as a seventh subject. Twenty-seven obtained A’s. A brief list of staff meetings for the school term illustrates important issues of the time. 14 May: School Management Team (all in promotion posts) to meet. This group has previously been known as the Leadership Team. 17 May: Subject Groups. Staff Development Team (SDT) for appraisal to meet from 16:00 to 18:00. 24 May: SDT presentation to staff 14:30 TO 17:15. 25 May: PTSA Forum. All staff. 31 May: Reports on teachers’ union professional growth seminars. Anew official staff appraisal system was implemented, and the official Development Planning system started in July. The Head Prefects of 1989, Dr Elize Kleyn and Dr Roderick Ross, flew from England to attend the Founders’ Day celebrations in February.
  • 126.
    125 Opening of theStudents’ Centre The Students’ Centre was opened on 21 May - undoubtedly a highlight of the year. Here follow extracts from the report in the school magazine: “Nearly fifteen years after first considering the building of an indoor centre, we celebrated the official opening. The original initiative came from the school’s sports coaches. Over the years various schemes were considered, including a building on the old shooting range site and a hall (with seating in the length) and clubhouse in front of the existing school hall, but these were abandoned for the present site. “The first test holes were eventually dug on 9 October last year, and the building was com- pleted by Raciti Builders. “Funds were raised mainly through the annual Carnival. The main fund-raising...started about four years ago, and the building of the Centre can be attributed to the success of the Carnivals convened by Mike Ettish. Speaking at the opening ceremony, ex-mayor, school committee chairman and current chairman of the Tygerberg Sports Control Board, Eddie Fivaz, told pupils he was proud to see this ‘tremendous facility’.” Other highlights of 1999 were: • The Carnival on 29 and 30 October. • The production of “Midsummer Nights” on 13 to 16 April. • The Mr and Mrs Fairmont Fashion Show and Design Competition on 13 August. THE FAIRMONT CARNIVALS Mr Michael Ettish organised a series of remarkably successful carnivals from 1995 to 1999. His enthusiasm and drive ensured that substantial amounts were raised for the construc- tion of an indoor centre for sport, examinations and functions. Thousands attended the carnivals and the fireworks displays, which were the talk of the Tygerberg for this period. Other schools and organisations soon attempted to emulate the success of the Fairmont Carnivals. PTSA The AGM saw the adoption of the change from a Parent Teachers’ Association (PTA) to a Parent Teacher Students’Association (PTSA), thereby formalising the active involvement of students. Undoubtedly, the highlights of the year were the Bingo evening in May and the PTSA dance in September, both of which focused on ‘fun-raising’ as well as fund-raising. The Bingo evening was the first major function in the new Students’ Centre. 390 attended and R10000 was raised after a donation of R3000 to Mothers Who Care. The success was an indication that this would become an annual event. In December 1998 the rugby team experienced a most rewarding and worthwhile tour of the United Kingdom. One memorable occasion was the meeting with the Lord Mayor of Swan- sea, including a visit to St Helens Club.
  • 127.
    126 The cast ofMidsummer Nights - 1999 Mothers Who Care - 1999
  • 128.
    127 In addition tothe traditional Valentine’s Week, Settlers Contact, Derby Days, Homecoming Dance, the Polar Bears Club, Sports Awards Functions, civvies days, Honours Dinner, Inter- School Athletics, Matric Day and Matric Awards, prefects’ final assembly, Matric Farewell Dance and the Valedictory Assembly, there were memorable subject excursions, a group at- tended the Grahamstown Festival, the school participated in the Co-Ed Schools Tournament at Westering High in Port Elizabeth and two pupils,Andrew Wiley and Hayley Wren, travelled to Scotland on an exchange programme, together with the mayor of Cape Town. The girls’ basketball team received an invitation out of the blue to attend a schools’ tournament in Mexico. There was a flurry of excitement and fund-raising plans were made but, unfortu- nately, the trip did not prove feasible. Fifty-four pupils appeared in the photograph of the achievers of the year. They included nine- teen who had been selected for national teams or obtained national recognition, and thirty-five others who had been selected for Western Province teams. Girls’ trousers were introduced after long deliberation about style and fabric. For the first time every pupil would receive a copy of the school magazine. The Matric Farewell was held in the Students’ Centre for the first time. The Centre was trans- formed into a “warm, inviting Night on the Town, with beautiful skyscraper backdrops and a swinging band”. Mrs Kingwill and Mrs Aston, in charge, had worked wonders. Mrs Julie Moreland, a loyal and popular member of the administrative personnel, moved to Gauteng. Other popular members who left were Mrs Louise van Zyl, who had been at the school for eleven years, and Mr Stuart Collier, Head of Department and Head of History, who had been at the school for fourteen years. Staff Matters In 1999 the majority of Fairmont teachers were members of the National Union of Educators, affiliated to NAPTOSA. Acopy of a letter from the National President of the NUE was sent to all parents with school circular 14 of 1999. This explained the current situation relating to salaries and conditions of service in the profession. Parents were informed that Fairmont teachers would support the rejection of the State’s final offer in two ways - fourteen would participate in the solidarity march under one banner by all Public Service Unions in the centre of Cape Town, and a number of others would withdraw from cocurricular activities on the same day. National Qualifications Framework Information was also given on the phasing in of Curriculum 2005 and the General Education Band (for Grades 1 to 9). The following is an extract from Lindaba, a publication of the WCED, in April 1999: “The present Senior Certificate has been criticised as being too nar- row, abstract and ‘academic’ and not relevant enough to either further study or the world of work. Remedying these defects is one of the aims of South Africa’s new National Qualifica- tions Framework, in which the Further Education and Training Certificate (the FETC, replac- ing the Senior Certificate) will offer learners a wider range of more relevant options aimed at helping them find rewarding work and/or study further with success.” (The term “learners” was introduced in the SASchoolsAct, which subsequently also led to the official term for Students Representative Councils being changed to Representative Councils of Learners).
  • 129.
    128 The school was,unfortunately, compelled to cease responsibility for the A level programme after 1999, mainly because of financial constraints. Buildings Room 7 was converted to a laboratory. Two classrooms were combined to form a laboratory/ lecture area for biology and physiology classes, a room was furnished for Computyping and all the toilets were painted in colours chosen by the student body. A new clothing store was created on the top floor. PTSA - 1999 A Grade 8 Camp Scene - 1999
  • 130.
    129 Worthy gift: Fairmont HighSchool’s matric class of 1998 presented their alma mater with an exquisite gift - a hand-carved replica of the badge by Bellville artist Marie van Willich, second from left. At hand to receive the work of art were principal Clive Wigg, deputy principal (academic) Liz Müller and financial head, Mike King. (Courtesy: the Tygerburger 1998) Marita Engel with, from left, Joanne de la Cornillére, Ben van Stormbroek and Colleen Saunders
  • 131.
    130 2000 In the EducationDepartment newsletter in January, Minister Helen Zille listed the six priori- ties of the Department and the criteria by which all schools would be evaluated in 2000 stating “this blue sheet (the criteria) will be one of the most important documents of the next few years.” The school development plan, developed by staff, parents and pupils, had four main sections requiring appropriate action: • Attitudes • Leadership • Teamwork • Recognition The events of 2000 can be summarised by listing the highlights of the different groups - pupils, past pupils, staff and parents. The SRC programme included Valentine’s Week, with its ‘Tunnel of Love’, auction and dance, the Easter Egg tunnel, Duens collect-a-bag competition, teachers’ birthday teas, announcing pupils’ birthdays, announcing team of the week, visits to Green Pastures Old Age Home and the Stikland Kinderhuis, assistance at SANCCOB and collection of blankets, clothes and food for the homeless. The prefects organised civvies days, the honours dinner, assemblies, the Contact Week with Settlers, dances and Valentine’s Week jointly with the SRC. “During the first week in August, Fairmont was taken on a musical journey ‘Through the Decades’ by a stunning cabaret production including music, song, mime and dance”. This proved to be a resounding success. Past Pupils’Association The Past Pupils’Association had great fun “bringing back to life” the Past Pupils’ Sports Day in the third term. The annual Mr and Miss Fairmont Fashion Show organised by Sean Loots and fifteen students was again a great success. Over fifty designs were entered in The De- signer Competition, won by Clare Lyddon. Lee van der Bergh and Donné Pienaar were crowned Mr and Miss Fairmont.. The Matric Class of 1980 enjoyed a very successful twenty-year reunion, organised by Jacqui de Villiers and Barbara de Villiers. Nicola Meyer, Head Girl of 1990, “enchanted the audience with her inspiring and enlighten- ing speech on Founders’ Day”. Long-service awards were presented to nineteen staff mem- bers, four of whom - Mr Long, Mr Horsthemke, Mrs Arendse and Mr Engelbrecht - received gold awards for twenty years’ service to the school. Staff Six teachers attended National Union of Educators training seminars during the course of the year, and the principal attended a principals’convention in Texas. It was resolved by the Board that a Fairmont delegate should be sent to the NASSP Convention every second year. The teacher responsible for the academic portfolio should attend the convention inAtlanta in 2002. Teachers who left the school included Mr Peter-Jon Prince, Miss Joanna Rayner and Mrs Therese Roux, senior teacher-counsellor.
  • 132.
    131 Mrs Oosthuizen andfirst-aiders One Act plays - Best of the best - 2000
  • 133.
    132 Buildings The Board ofGovernors continued with the development of the campus, and the road at the rear of the school, next to the Students’ Centre, was completed in September. Construction of a storeroom for the Students’ Centre commenced. The formation of a user-friendly trust for the school was investigated. Marketing Strategy Parents were informed of the results of the 1999 Marketing Plan survey at an information meeting in April. Groups were formed to rectify shortcomings and to develop a marketing strategy for the school. PTSA PTSA highlights were the Bingo Evening, the Theatre Evening, the Dance and the Engen Fairmont Fun Ride in which almost a thousand cyclists participated. Three forums were held. Parents, teachers and students discussed matters of mutual interest. School circulars were added to the school website and subject reports were included in the school magazine for the first time. The magazine was prepared by a student staff with Shelley Manford as editor. Subjects Significant subject successes and developments included: • The twenty-seven A symbols in Afrikaans. • The Grade 9 “Multi-Experiential Camp”. • The first Grade 8 Market Day. • First Computer Studies SG Grade 12 examination. • First Computyping class. • Eleven A’s for Senior Certificate English. • The audio-visual presentation to matrics by the celebrated South African poet, Chris Mann. • The job-shadowing programme. • The Education Department Library Service selected Fairmont as a pilot school to run the PALS system. • The conversion of a classroom to a modern laboratory designed for group work, and the introduction of Somerset micro-chemistry kits and programmes. • The introduction of Xhosa. • Jennifer Poole and Fidelia van der Linde were chosen to attend a Gebruiksafrikaansweek in Pretoria. • Liza Stockland obtained the highest marks for History in the Western Cape in the 1999 Senior Certificate Examination. Jennifer Poole, in particular, achieved success in Olympiads, obtaining a gold award in the English Olympiad, and was placed joint sixth in the Gebruiksafrikaans Olimpiade. Matric Results 1999: A aggregates 12 B aggregates 41 VALEDICTORY DAY A day of tears, laughter and, above all, heartfelt good-byes to those people who have influ- enced our lives in countless way, our beloved Matrics.
  • 134.
    133 It was aculmination of all the hardships they’ve endured, the loves they’ve lost and the friendships they’ve shared and it was only fitting that they started it on a high note with the people who have guided them through all of these times, their teachers, at an early breakfast function. Suddenly, it was time for the Matric plays and, as usual, we shuffled into the Hall like sheep awaiting the slaughter. Boy, were we mistaken! The gymnastic dazzle of Steven Harmer, David-Jon’s gyrating hips, Mr Veldman’s hilarious antics and Michael Cannone’s interesting impression of Tom Cruise will never be forgotten, and Mia and Cherie’s rendition of “The Blair Witch Project” and Britney Spears will always live on as fond memories of Fairmont 2000. But all good things must come to an end, and we all left the Hall for break while the Matrics went to tea, complete with cakes and other delicacies provided by a handful of dedicated Grade 11’s. Then it was on to the Valedictory Assembly, highlighted by the presentation of certificates to the Matrics, the announcement of the 2001 Prefect Execu- tive and who can forget the Graduation Song, sung by Bridgette and Abigail, two of Fairmont’s very own, upcoming singing talents and the choir. It was finally time to say our last tearful good-byes, and the Matrics took their last jour- ney down the corridor, flanked by hordes of uniformed pupils. Forgotten friendships were rekindled, past acquaintances remembered and for just one, fleeting moment in time, we were all unified in the hope that their success in the future will be just as profound as the impact that they’ve had on us in the past. Leighann Nelson : Grade 11 SCHOOL CONTACTS 2000 marked the 20th anniversary of the first Settlers Contact Week. A highlight was the victory of the first rugby team - for the first time in fifteen years! The Derby Days against Bergvliet and Milnerton High Schools had also become impor- tant annual events. The previous inter-schools athletics rivalry with Fairbairn High had lasted from 1978 to 1992 Achievements Fourteen pupils were selected for SA teams. Tamaryn Schultz, especially, achieved great success in gymnastics at international and local competitions. Tarryn Bright represented Western Province at the SA Senior Athletics Championships, and was placed fifth in the javelin event. Michael Dunn was chosen for the WP U19A cricket team, a feat not equalled by a Fairmont player for a number of years. Indoor hockey was introduced. The first league match was played in the Students’ Centre in February. There was friendly rivalry between the “Bulldogs”, the first rugby team, and the “Wildcats”, the first soccer team. Four Fairmont rugby players joined the Tetbury Rugby Club in the UK at the end of the year, same of their players having being hosted at Fairmont. Nineteen societies functioned successfully throughout the year, ranging from Aviation to Wargaming. Co-curricular commitments were taken into account in a revised staff incentive and reward system. Honours badges and braid were introduced, but there was no response to an appeal for sponsorship of staff jackets and ties.
  • 135.
    134 Mr and MissFairmont Competition winners: A Mullins, L van der Berg, D Pienaar, B Theron, T Carlson, E Copley Congratulations and Happy Birthday - Happy Celebrations of Mr Wigg’s Sixtieth Birthday - 2000
  • 136.
    135 Students also tooka wonderful lead at various camps and excursions, and in preparation for such major events as the Face of Fairmont and Designer Competition and the Matric Farewell Dance, held away from the school for the first time. A cheerleading team of nineteen, led by Justine Vorster, added colour to sports events. Achievements Taryn Boonzaier (drum majorettes), Tarryn Bright (hockey), Tamaryn Schultz (gymnastics) and Blake Solomon (baseball) were selected for national teams. Past pupil Olivia Villet’s book Chester’s Big Surprise, was “snapped up by scores of book- stores in the United Kingdom alone”. USA Visit During the first term Steve Myers, principal, and a number of students from a school in Denver, USA visited Fairmont. This was to lead to a successful and enjoyable exchange visit when Mr Peter le Roux led a group of Fairmont pupils to Orlando and Amherst in the USA, Mr Steve Myers having moved as principal to Amherst. The Governing Body Foundation expressed disquiet about a number of clauses in the Educa- tion Laws Amendment Bill of 2001, especially “this council (the Representative Council of Learners) must be the only recognised student body at the school” and the exclusion, in Sec- tion 3, of school fund money from trusts and the prevention of governing bodies from collect- ing contributions from parents for trusts. There was concern about the position of prefects and other school groups. The question of trusts remained on the Board’s agenda. Unfortunately, for a second successive year, there were protracted negotiations about teachers’ salaries and the threat of a strike. In his report, Mr M Ettish, governing body chairman, wrote, “we...have had to weather an- other very trying year on the education front, due to policies and continuing changes taking place in education”. OBE Outcomes Based Education was finally introduced in Grade 8. In order to encourage more pupils to offer the matric exemption course, subjects in Grade 10 were offered on the Higher 2001 The theme for the year was “Dream it, Believe, Achieve it” - a challenge offered to students to accept more responsibility personally and to take a greater lead in the school. The Matric class of 2000 achieved excellent results. Candidates 179 A aggregates 18 Matriculation endorsement 100. Cherie Salomon (for Mathematics SG) and Michael Thacker (for Technical Drawing HG) were placed in the top three in the province. A special assembly was held in January to honour those who had performed with distinction in the examination. History was made when the annual dramatic production Wh@t was written and directed by Geri Olwagen, a matric student.
  • 137.
    136 Grade only, exceptfor Mathematics and subjects available only on the Standard Grade. A number of teachers attended professional growth seminars organised by the National Union of Educators. The staff were allocated to a number of commitees which included pupil repre- sentatives. The chairmen of these committees then formed the CC or committee of chairmen. This was to enable all to participate in decision-making and team-building. The staff incentive scheme was again revised to provide for academic performance, co-curricular involvement and administrative duties. Board of Governors A proposal to level the Fairview and Vineyard fields to make one field to accommodate a full- size cricket oval, two rugby fields and an athletics track was discussed by the Board of Gover- nors in March. It was decided that this project would become part of a five-year plan. In September the Board of Governors accepted a quotation for glass fibre coating of the Pool and approved the replacement of the filtration plant. Acapital projects survey was undertaken. The results were analysed and the following plan of action was proposed: Year 1 (2002): Access steps, caretaker’s room, staff toilets. Year 2 (2003): Security fencing. Year 3 (2004): Seating on banks, cafeteria. It was emphasised that this plan of action did not mean that the other projects would not be considered. It was felt that innovative funding would be a requirement of other projects. It was further agreed that a Clubhouse fund-raising committee be launched, but that this would be a separate project. (BOG Minutes 25 September 2001). In October the Board considered a proposal to enclose and heat the pool. The organisation concerned would have to provide a financial plan. The Amenities Committee was asked to investigate further. PTSA PTSA functions included a Barn Dance and the annual Bingo Evening - again very successful. The Drug Educational Council “delivered some hard hitting facts on teenage drug abuse” at a meeting in July. This was followed by a lively discussion in October amongst parents, teach- ers and students on the Fairmont Code of Conduct. The increase in the number of applications for admission to the school, especially from outside the natural feeder area, led to the Board decision in May to restrict the number admitted to Grade 8 to 200. This was to prevent future overcrowding in terms of the number which the building could officially accommodate. It was resolved that pupils purchase name tags and carry school identity cards. OFFICES By 2001 all original peg areas for blazers and bags had been converted into offices: for a clothing store and Standard Heads on the top floor, for Mrs Bretteny, the occupational therapist, prefects and Standard Heads on the middle floor, and for laboratory assist- ants, printer and, first for a Deputy Principal and then for the reception secretary on the ground floor. The original reception office became that of the financial assistant. The book room,
  • 138.
    137 Matric A students2000 Examination The Polar Bear Club - 2001
  • 139.
    138 opposite it, becamean office for a Deputy and one for interviews. The caretaker’s room was changed into a sick bay. The extension to the principal’s office, added in 1994 and known as the “fishbowl”, was changed into an office for the principal’s secretary. The original medical rooms were use as offices for the cocurricular co-ordinator and the administration manager. The caretaker occupied the original library office next to the Seminar Room (it being the original library). Classroom 57 had been changed into offices, reception area and store for the counsellors. Founders’ Day again took place in the third term. The assembly was preceded by a breakfast for invited guests and staff. Bonnie du Plessis (van der Walt), the winner of the Good Fellow- ship Prize in 1981, was the guest speaker. An excellent twentieth anniversary reunion of the 1981 class, organised by Noela Huysamen (Horn), Jeanette van Kraayenburg (McEvoy) and Antonio Texeira, followed on Saturday 1 September, when the traditional matches between past pupil and school teams were played. In November a police drugs search was undertaken. This was in line with the drugs policy of the school. Staff Sadly, two long-serving members of the administrative staff left the school. Mrs Liefie Jacobs was redeployed to Durbanville Primary School in March and Mrs Janet Hall, laboratory assist- ant and administrative assistant, resigned. Mrs Therese Roux, who had helped in a part-time capacity, left to further her studies, and Mrs Jenan Kingwill left after five years at Fairmont. Mrs D du Plessis was appointed as the principal’s secretary. The matrics ‘graduated’at the ValedictoryAssembly, meaningful words from the song “Gradu- ation” also appearing on their programmes: “As we go on, we remember All the times we had together. And as our lives change Come whatever, We will still be friends forever.” PUPIL LEADERSHIP 1979 - 1981: Prefects, plus Student Council (prefects and elected Std 7, 8 ad 9 representatives) and Std 9 monitors (each for one term). 1982 - Matric Representative Council, known later as the Matric Council. 1997 - Students’ Representative Council (elected in terms of the Schools Act). Prefects were appointed annually (with a voting component). The SRC was elected annually. The Matric Council had taken various forms. For example, in 2000, it was a prefect portfolio. The SRC matric members had also served as the executive of the Matric Council.
  • 140.
    139 2002 Best of theBest In January, the 25th Anniversary of the founding of the school was celebrated with the news that Fairmont had again been listed under the heading “The Best of the Best” based on the 2001 Western Cape Matric results. Thirty-four matrics obtainedAaggregates and the pass rate was again 100%. The top eight students obtained averages above 90%. Tamara Courchay was placed first in the province for French, and Dominique Oebell was placed second in Computer Studies SG. The Matric results over a number of years were a good indication of the excellent teaching in the school. Other excellent academic results in 2002 were those of Wendy Stone, Erin Smith and Clayton Heroldt, who were placed tenth, eleventh and thirteenth in the country in the Gebruiksafrikaans Olimpiade. Building and Grounds The Board of Governors continued with the development of the campus. The year saw major upgrading and redevelopment of the swimming pool, as well as extensive upgrading and de- velopment of the computer facilities. The process of extending the network to Subject Heads’ rooms was started, Planning for perimeter security fences and for security cameras was initiated. At the budget presentation meeting in October R5520 was accepted as the school fee for 2003. This would include funds to address the security plan of cameras and fencing. The Council was thanked for the provision of parking bays and the erection of retaining struc- tures in Reservoir Road, and bollards at the Oval. Further improvements were the erection of a new room for the caretaker and the start of con- versions to provide more cloakroom facilities for female staff. The parking area adjacent to Medway would finally be included in the school grounds after years of negotiation. In November the Board agreed to improvements and alterations to the Seminar Room. Re- moval of the ‘temporary’partition in the principal’s office would be delayed until the appoint- ment of the new principal. At a meeting on 2 December, a draft plan for a hall extension was tabled. It was reaffirmed that the PTSA Committee was the fund-raising co-ordination sub-committee. “It was decided that the Clubhouse Hall extension would be the project for which the Fund-raising Committee would raise funds. This would be a separate project over and above annual minor capital projects. The intention was to display the plan tabled at the start of 2003 so that everyone could be made aware of the nature of the project.” The appeal to past pupils for contributions to a Clubhouse Fund had been largely unsuccess- ful. There was a realisation that accurate records of and better communication with past pupils was essential. Mrs Caron Nightingale (Jackson - 1981) was appointed to trace past pupils and record their details. Staff Matters Terms which became familiar to staff were progressive discipline, appraisal and staff develop- ment. Thirty teachers experienced a Franklin Covey course on The Seven Habits of Highly Effective People in April. The intention was for the remainder to attend the course in 2003.
  • 141.
    140 Fairmont Idols -2002 Mark Shuttleworth presentation - 2002
  • 142.
    141 Mrs Müller attendedthe convention in Atlanta, as agreed in 2000. Mrs Hazel Tatley retired in June after twelve years as financial administrator. Mrs Tatley had been a staunch supporter of the school for many years - for the PTA and in the office. Mrs Marie-Louise Nel relocated to Gauteng after nearly ten years at Fairmont. Among other activities, Mrs Nel promoted the successful Grade 8 Market Days. The prefects and the SRC attended a combined leadership camp in the first term, and worked well together throughout the year. They claimed a world record for the biggest hug on Valen- tine’s Day. Everyone at the school participated. The SRC organised an Aids Week and also held a successful Band Evening. Spirit Week, including the Settlers Contact and the Home- coming Dance, organised by the prefects, was also a great success. The Mark Shuttleworth Road Show visited the school in September and the Hip2b2 banner presented to the school was hung with the House and Best School banners in the Students’ Centre. A giant chess board and set was used in the Memorial Quadrangle and the WP Chess trials were held in the Students’Centre in May. Funds were raised for the boys’hockey tour to Holland in 2003. A tour group from Wolverhampton was the biggest yet to visit the school. Fashion Week The Fashion Week, incorporating the Face of Fairmont and Student Fashion Designer Compe- titions was very successful and enjoyable. Professional judges and the presence of contestants from various schools contributed to the excellence of the occasion. Coralee Long won the Designer Competition. The Faces of Fairmont were Dan Kadima and Megan Lenz. Pop Idol Fairmont’s own Pop Idol competition added interest and enjoyment to a series of assemblies until Brigette Greybe was finally declared the winner. Grade 11 Camp A new innovation was the Grade 11 Achievers Camp for all Grade 11’s. This, like the Grade 8 and Grade 9 Camps and excursions, proved to me of significant benefit and value to those involved. The principal was informed that the school had been selected to participate in a South African/ French teacher and pupil exchange with Reunion. Two important productions were Get the Colour Right and Blithe Spirit. The former was a significant contribution to improving relationships. The Board declared in May that a copy of the drugs policy of the school should be sent to every family and should be given to newcomers. Founders’ Day The 25thAnniversary Founders’Day was celebrated on 30August. Anumber of past and present committee members and friends of the school joined the staff for breakfast in the Seminar Room, followed by the assembly, addressed by Lisa Arries (Luddit), deputy head girl of 1990. Drum Majorettes 25th Anniversary The drum majorettes celebrated their 25th Anniversary at a breakfast function in the school hall. Fairmont drum majorettes, perhaps more than any other group, had ensured that the name Fairmont was well known throughout the country. Their history and their outstanding suc-
  • 143.
    142 Civvies Day -Pyjama Day - 2002 Hockey players’vs Wolverhampton - 2002
  • 144.
    143 cesses were describedin a special pamphlet. The school qualified to compete in the SA Na- tional Championships for the first time in 1985, when Debbie Heyns was the trainer, and, apart from 1986, had qualified fifteen times until 2001, an achievement unequalled by any other Western Province team. The team was placed fourth in the country in 1989 and 1998. Indi- viduals were placed first in the competitions in 1991 and 1997. Three girls, Sharon Stanbridge (1998), Taryn Boonzaier (2001) and Lauren Nortje (2002) were selected for national teams. Achievements Pupils achieving national recognition in other sports, and whose successes were described in the yearbook were Leigh Bierman (hockey), Lauryn Fabian and Nici Gouws (aerobics), Lisa Loynes (pentathlon), Alexander Nikiforou (wrestling), Alida Schoonenberg (goju ryu) and Tamaryn Schultz (gymnastics). Retirements Mr Clive Wigg (principal) and Mr Alastair Frost (senior deputy) gave notice during the year that they would retire in December. Unfortunately, the Education Department delayed adver- tising the posts, which meant that the appointment of a new principal and deputy would be delayed until midway through 2003. The school bade farewell to Mr Wigg, the founder principal, and Mr Frost, who had been at the school since April 1985, at the final assembly of the year. A farewell function for parents, past pupils and friends of the school was held in the school hall on the preceding Friday. 1997 - 2002 SPEECH NIGHT GUEST SPEAKERS 1997 - Prof RL Christie 1998 - Mr P van Vuuren 1999 - Prof N Kok 2000 - Dr Pat Gorvalla 2001 - Dr L Vermaak 2002 - Mr N Andrews DRAMATIC PRODUCTIONS 1997 - Grease 1998 - Lust, Deceit and Folly 1999 - Midsummer Nights 2000 - Cabaret Through the Decades 2001 - Wh@t 2002 - Blithe Spirit FOUNDERS’ DAY GUEST SPEAKERS 1997 - Dr C Woods (HB 1987) 1998 - Ms C de Villiers (1988) 1999 - Dr R Ross (HB 1989) 2000 - Ms N Meyer (HG 1990) 2001 - Mrs B du Plessis (van der Walt) ( GF 1981) 2002 - Mrs L Arries (Luddit) (DHG 1990) HB: Head Boy HG: Head Girl GF: Good Fellowship Prize DHG: Deputy Head Girl MR AND MISS FAIRMONT 1997 - James Espin/Teegan Swart 1998 - Gary Swart/Samantha Jones 1999 - Dennis de Wet/Eula Boltman 2000 - Lee van der Berg/Donné Pienaar FACES OF FAIRMONT 2001 - Edward Copley/Laura D’Amore 2002 - Dan Kadima/Megan Lenz MATRIC FAREWELL THEMES 1997 - The Academy Awards 1998 - Ice Palace 1999 - Night on the Town 2000 - Cosmos 2001 - Reflections 2002 - Xanadu
  • 145.
    144 Matric results happiness:Tarryn Tiedemann, Jackie Preston, Sharryn Zinn - 2002 In his address at this function, Mr Wigg said, “I thank you, all my present and past colleagues and members of various committees and groups for your friendship and support. I thank Lyn, my wife, and my family, for their support and loyalty. A number of people have made a difference in my life. Many are here today. I thank them for contributing in one way or another to my happiness and my career, and for sharing my joys and sorrows” In his last newsletter to parents, he wrote: “It has been a wonderful privilege to be principal of this fine school. I will always retain rich memories of the people and the events of the past twenty-six tears. I am particularly proud of the many excellent achievements of our past and present pupils. I hope that as the years go by they will become more and more involved in the life and the development of the School and their communities. As the School enters a new phase, may the staff be blessed with the wisdom and resilience, and may the students both present and future always maintain a spirit of honour and loyalty, mak- ing true integrity a very real feature of the fabric of their lives. My very best wishes go with you all.”
  • 146.
    145 Fairmont Scientists werefirst in South Africa in the 1981 solar energy competition of the SA Institute of Mechanical Engineers Mr Wigg flanked by the 1992 Head Prefects, S Ward and J Reeves, retired in 2002 Mr Alastair Frost, Senior Deputy Principal, retired in 2002 Mrs L Müller at Mont Fleur - 1995
  • 147.
    146 2003 - 2007 ANEW BEGINNING 2003 The motto for 2003 was A NEW BEGINNING, which was enthusiastically accepted by staff and pupils alike. Mrs Liz Müller requested that the staff work as a team and tighten up on aspects such as discipline. The year began with Liz Müller as acting principal from 1 January to 31 March and Mr B. Elgie and Mr R. Long acting deputies after bidding farewell to Mr Wigg and Mr Frost at the end of 2002. The school was informed by the Department that the number of staff had to be reduced from thirty-four to thirty-one and one post level 2 post would be lost. NEW BEGINNINGS “Begin to be now what you will be hereafter...” Saint Jerome (Latin Scholar) On 1 July Mrs Müller was officially appointed as Fairmont’s Principal. She had been Head of the Mathematics Department since 1985, was appointed Deputy Principal in 1999 and had initially taken over the Principal’s seat in an acting capacity. She was known as a perfectionist who, in spite of a hectic workload, found time to display a wicked sense of humour. “I have had several calls from prospective parents asking whether I was the secretary and telling me that they wanted to speak to the headmaster,” she said with a twinkle in her eye. “The seat as principal of a co-ed school has not been taken by a female too often in the past which makes the challenge so much bigger. It shows that Fairmont does not back off from change.” Mrs Müller managed to take over the reins of Fairmont in a firm yet compassionate manner and imparted a sense of unity, pride and enthusiasm and hard work to everyone within the Fairmont community. ANOTHER NEW BEGINNING Mr Ron Dingley, an ex-Durbanite, joined the staff in the third term when he accepted the post as Deputy Principal, bringing his own inimitable style of calm and respect. He graduated with a B.Sc, HED and B.Ed from Natal University and taught at Durban High School and Northwood in Durban for a total of twenty-five years. He is married to Marian and has two daughters, Sarah and Vanessa. Mr Dingley has travelled widely including Britain, various parts of Europe, Turkey, Hong Kong, Australia and New Zealand and South America. HATS OFF TO OUTGOING BOARD Mr Michael Ettish retired as Chairman of the Board of Governors since it was his last year as a parent of a learner at the school. He was responsible for organizing highly successful carni- vals, firstly as chairman of the PTSA and then as chairman of the Board of Governors. During his term of office the appearance of the entrance to the school was enhanced and the princi- pal’s office was upgraded.
  • 148.
    147 Mrs Liz Müller- Principal 2003 - 2006
  • 149.
    148 Many other projectswere undertaken. • The caretaker’s room was completed. • The existing staff toilets were upgraded. • Additional toilets for the female staff were built • The seminar room was re-carpeted • The previous caretaker’s room was incorporated into the seminar room as a serving area. Mr Niel Spheres was elected the new Chairman of the Governing Body. School fees were increased to accommodate a security fence and surveillance cameras to en- sure the safety of pupils and to curb vandalism. TheAmenities Committee addressed this issue and a palisade fence and an effective camera system were approved and installed. Mr Phillip Botha was elected chairman of the PTSA, the main objective of which was to improve the percentage of parent and pupil involvement in the extra-mural activities of the school. The increasing involvement in derby and contact days, the good turnout at the food festival and the successful post-matric dance held for the first time in three years were mainly owing to their efforts. The running of the tuckshop was taken over by Amanda de Reuck at the beginning of 2003 with great enthusiasm and the intent of offering pupils something different. There was a fund-raising drive to continue raising funds towards a clubhouse/ cafeteria at the school. R25 000 was raised. The prefect body had a training seminar and a three-day camp river-rafting on the Breede River at the beginning of the year. They organized Valentine’s Week and Spirit Week, and various other activities as well as Prefect Assemblies. Spirit Week included the highly antici- pated Fairmont/Settlers Contact. There were a number of prefect exchanges with The Settlers, Durbanville High, Belville High and Westerford. The SRC organized a number of activities, including a Grade 8 Bring and Braai, a Civvies Day Pyjama Day to donate funds to underprivileged schools and the Inter-Schools Cheerleaders Fund, a Chowdown Competition, “Make-Yourself- Noticed” Civvies Day, quick-selling hot cross buns scheme and encouraging the entire school to participate in the Easter Eggs Hunt. They also designed a new school cap and began the Team of the WeekAward. Various Student Exchanges took place with Stellenberg, The Settlers, Abbots and Guguhletu, and during Aids Week pamphlets were handed out and donations given to various Aid Organizations. A number of firsts in the academic field were: • the introduction of a mini-exam in the first term • the presentation of Art History in power-point format • simulated Business Enterprise based on real transactions • the first Grade 11 class taking Computer Studies HG as a 7th subject, previously taught only at Durbanville High School • GeographyexcursionsalongtheTableBaycoastline,andalongthecoastuptoKleinmond • Music excursions to Stellenbosch Conservatoire • Natasha Otero took part in the Johann Vos Piano Competition • Jane Lindhorst achieved as top Physiology student in the Western Cape • Technical Drawing had a project to draw a perspective view of the clubhouse. The annual production , “New Rock City”, was written by two of Fairmont’s English teachers and began a new cultural revival since Fairmont had its own stage crew, propmasters and make-up artists. The Designer and Face of Fairmont competition was organized by Sean Loots, a past pupil. A Chamber ensemble was established at the beginning of the third term and thirteen artworks were entered in an Eistedfodd. Eleven awards were received for these.
  • 150.
    149 A warm welcomefor Mrs Müller on the annoucement of her principalship - 2003 Jean-Pierre Catto - Special Award: Student Leader and Principal’s prize - 2003 Prefect Exectutive - J Clark (Deputy Head Girl) J Catto (Head Boy), Mrs E Müller (Principal), T Blackwood (Head Girl) and G Staffen (Deputy Head Boy) - 2003 Some Personalities of 2003 Claudia Cole - Good Fellowship Warren Kent - Past Pupils’ Award Ryan Hultzer - School Dux Geoffrey Schlee - 2nd in Class Stephanie Zietsman - 3rd in Class LisaLoynes-4thinClass AlexaHelm-5thinClass Walechia Vraagom - SA Swimming
  • 151.
    150 The Egyptology andClassical Civilization Society focused on Tutankhamen, Cleopatra and ancient mythology. A wargaming society was also an interesting club. 2003 was the year in which the saying “Innes House Rules” became a reality. Innes House won the Inter-House athletics and Spirit Trophies. It also won the swimming gala and the Inter-House competition. As far as sport was concerned, 2003 was the most successful year in the history of Fairmont rugby. Seven teams were fielded and all teams were undefeated for 75% of their matches. They proved Gary Player’s words: “The more you practise, the luckier you get.” The Player of the Year was Warren Kent. The girls’ badminton team beat The Settlers for the first time in five years and the netball team won their league. During the March holidays, Mr Elgie and Mr Horsthemke accompanied sixteen hockey play- ers on a successful tour to Belgium and Holland. In swimming, a new Grade 8 learner, Wilechia Vraagom, took part in the African Games held in Luanda in August and won five gold and two silver medals. She also represented South Africa in Brazil at the end of September. There were a number of sportsmen who received Western Province colours for various sports, namely Kyle Kokott, Joshua West, Jason Soloman and Bruce Mcmullen (hockey); Coralie Steenkamp (rhythmic gymnastics); Grant Snyman (baseball); ShamizAllen (rugby); Wilechia Vraagom (swimming); and Wietske Rubow (aerobics), At the annual speech night a Special Award for a True Gentleman, in the form of a painting of the school, was given to Mr Clive Wigg, former principal, for his contribution to the school facilities, the school song, motto, uniform, The Settlers Contact and various other events. The school obtained thirt-six A aggregates in the final examinations - the most ever at this stage at Fairmont! Ryan Hultzer, the school Dux, obtained 101,7%, having obtained 100% for Mathematics HG and being placed first in Computer Studies HG in the province. A photograph of the painting of the school presented to Mr Wigg.
  • 152.
    151 TOGETHER WE MAKEA DIFFERENCE 2004 In 2004 the Board of Governors decided to see the year as a consolidation year, concentrating on school matters, policies, staff selection, budget control, parent/pupil/teacher communica- tion and planning for the school’s future growth. The school had a staff of thirty state-employed teachers and a budget for twenty-seven addi- tional teachers. Five educators resigned, namely Mrs Te Roller (birth of child), Ms Cromhout and Mr Montague-Fryer (joined private sector), Mrs Greeff and Mrs Wilbraham (retired) and Mrs Tracey (husband relocated to Australia.) In the spirit of the theme “Together we make a difference”, parents, pupils and teachers partici- pated in a number of activities throughout the year. The Board of Governors authorized the purchase of fifty-five new computers, the upgrading of the electrical supply, lighting and the new school reception area, shade parking for the teach- ers’ as well as planning for the upgrade of the six prefabs, the creation of three additional classrooms and a lecture room from existing facilities. Approval of parents was obtained to plan for a multi-purpose facility with construction begin- ning in 2005. PTSA The PTSAtried to involve the parent body in their efforts of fundraising to contribute to school funds. • The tuckshop raised R25 000 under the leadership of Amanda de Reuck. • The Food Fair was predominantly a social event run by Ross Odendaal and team. • The raffle co-ordinated by Wendy Grimm raised R72 000. • A Valentine’s Dance was a social event which raised R5 800. The prefects and SRC truly succeeded in achieving new levels of co-operation. The prefects had a very successful Grade 8 orientation day and Grade 8 athletics meeting. They also had a team-building camp on the Breede River. The SRC organized a number of annual events such as the SRC Chowdown, assemblies, teachers’ teas and civvies days as well as a Fairmont Phat Jam, Valentine’s Week, Bands for Charity Campaign (which raised R 3 000 for the Guide Dog Association for the Blind), a mass visit to old age homes and shelters for abused women and children, Aids Week, and managed to pro- vide music at breaks. The Grade 8’s went to Simonsberg Christian Centre in Stellenbosch for their annual camp because of the large numbers of pupils, and had their first Grade 8 gala, initiated by Mr Dingley. On the cultural front the Interact Society organized an inter-class sandwich competition while the Debating Society, a choir of Thirty-six members, and the Egyptology and Classical Civili- zations Club were very active throughout the year. The annual dramatic production “Clue” was based on the Parker Brothers’ board game, Cluedo, and was greatly enjoyed by all whodunit fans. This very funny production takes place against
  • 153.
    152 Valedictory Ceremony -2004 Valedictory 2004 - Mrs Müller, Head Boy Jade Köhler, Head Girl Monique Huysamen, Deputy Head Boy Sean Hulley and Deputy Head Girl Lauren Hambides
  • 154.
    153 the backdrop of1950’s Washington D>C. and the MacCarthy Witch trials. Six unsuspecting people are invited by a mysterious Mr Boddy to Hill House, where the staff all seem to have hidden agendas. Add the arrival of a stranded motorist, an off-duty policeman and a singing telegram girl and you have a rollicking play. The Inter-House plays were very entertaining with productions by Dale (A Bed full of Foreign- ers), Muir (4 Shizzle Dizzle) and Innes (Word of Word). Innes was successful in winning the Best Play Award. Other winners were Dean van Heerden (Director and Best Actor), Fiona Tanner (Best Actress), Dean Louw (Best Supporting Actor), all from Innes, and Cara-Jean Petersen (Muir) and Tyren McNamara (Dale) as Best Supporting Actresses. The Face of Fairmont competition was organized by Past Pupils’Award Winner Claire Allen. The 6th Annual Fashion Week included The Student Designer and Face of Fairmont competi- tion. Leanne Williams performed “My Immortal”. The winners were Karryn Jones and Michael Williams (1st), Shannon Jones and Kerry Deaconas (2nd) and Rori Fortuin and Damian Whatley (3rd). Andrew Davenport and Lauren Ter Morshuizen were awarded the prize for most photo- genic male and female, respectively. The first prize-winner of the Student Designer Competition, which took place on the same evening, was Micah Chrisholm, while second prize went to Janet Phillips and Jenna Fowlie, and third to Samantha Murray. On the sporting front, Innes, under the leadership of Mr Piet Cronje, won the Inter-Schools athlet- ics and swimming gala again. The school decided on the theme “All that Jazz” from the current “Chicago” and won the Cheerleading Cup at the Annual Inter-Schools Athletics meeting. There were a number of sporting achievements throughout the year. • Fairmont was recognized as the top swimming school in the Northern Suburbs. • Kim Bonney (U 19) received W.P. USSASA Colours for swimming and captained the USSASA team. • Wilechia Vraagom, Lauren Vogel (U 16), and Caley van Hoeslin and Guinevere Rogers (U 14) also received swimming colours. • Caley and Guinevere were also selected for the W.P. Life-saving Team. • Wilechia Vraagom also obtained S.A. Colours and represented SouthAfrica in Brazil in September where she received three medals - two gold and one silver. • Our Softball team were runners-up in the A League. • Mr Long was selected as a Manager Coach of the W.P. U 16 Softball team which took part during December 2003 and was placed second in South Africa by the end of the tournament. • Steve Smith was officially ranked twentieth best U 18 tennis player. • The soccer first team won their final match against Milnerton, which made them the top team of the Atlantic Zone. • Bianca Smyth, Zikhana Jonas, Jody Hopley, Sue-Al Collins and Lizaan Brand formed part of the Regional Soccer team which went to Port Elizabeth in September. • Fairmont won a trophy at an Indoor Soccer Tournament arranged by the German School. • Leanne Beattie, Candice Johnson and Tarryn Mutch made the SA National Drum Majorettes team while Melissa De Lange, Angelique Mills and Julia Taylor were awarded WP colours. • Vaughan Wise was selected for the SA National U 19 team and the U 19 SA Volleyball team. • Coralie Steenkamp received WP colours for Rhythmic Gymnastics.
  • 155.
    154 The reception areawas upgraded - 2004 Fairmont Rugby Squads visit Argentina - 2004 The Annual Production “Clue” - 2004
  • 156.
    155 Fairmont Rugby wentLatino as thirt-one players and 3 staff members, Mr Cronje, Mr Free- man and Mr Dingley, together with Mr and Mrs Speres and Mrs Dingley, spent eleven days in Argentina. Warrick Wyngaard ended his report of the tour as follows: “All in all, it was a tour never to be forgotten. As they say “friends made on the sports field are friends for life and the memories you share with them will never be forgotten”... “Pro amore Ludi”: “for the love of the Game.” At a special Academic Achievement Assembly in the first term, the 36 A candidates of 2003 were honoured. The Dux of 2003, Ryan Hultzer, addressed the pupils. His speech was both relevant to the current pupils and future pupils. The following is an abridged version of that message: “I have been asked to speak to you this morning about achievements and how I achieved academically. Well firstly, you need to have some sort of goals. For me, it was ensuring that I set the highest possible standard of work. I set longer term goals, such as achieving a high final aggregate, but the only way to achieve this was to set smaller goals for each test, exam and project. And for certain tests and exams, my goal wasn’t just to get an “A”. I was aiming much higher. I think that as soon as you limit your goals, you are limiting your result. So, for your next test, don’t try to get only 10 or 20 percent more; try to get a superbly high result.” I suppose you want to know how to achieve the goals you set. Well, there is no guaranteed method of achieving extremely high results, but here’s what I think is needed to achieve your best results. 1. A comfortable studying environment. 2. Put lots of effort in all of your work. 3. Don’t be scared to ask for corrections. 4. Do subjects that interest you. 5. Be healthy - especially when studying. 6. Avoid missing lessons or not concentrating during lessons. 7. Don’t overwork yourself. But, what if you try all this and still can’t achieve? Well, don’t give up. You will later discover how important a good Matric pass is when you are looking for a job or planning to study further. To finish off, I must just say work hard this year and be proud of any achievements you make. Remember - it’s not the knowledge you gain at school that is important, but the way of thinking to which you become accustomed.” The final words of the Head prefect, Jade Kohler (who led the prefect body with Monique Huysamen) echoed the sentiments of many matrics as their year at Fairmont ended. “I’ll never forget Fairmont High School, my second home and family”. The matriculants of 2004 did not disappoint us and 27 A aggregates, 44 B and 59 C aggregates were obtained at the end of the year. Gannie Tzoneva achieved 106,1 %.
  • 157.
    156 Ferry crossing fromBuenos Aires to Montevideo - 2004 The Faces of Fairmont - 2004
  • 158.
    157 2005 The year startedwith 1200 pupils, thirty-one state-employed teachers and twenty-nine addi- tional teachers. There were eleven new teachers. Parents of Grade 9 pupils were informed of the new subjects at a special Grade 9 subject choice meeting since the new FET curriculum would begin in 2006. Teachers attended special courses in the July and September holidays. The Board of Governors under the chairmanship of Mr Mike de Villiers focused on maintain- ing the balance between academics, cultural and sporting activities. It attempted to spread the budget equitably across these disciplines. The following decisions were made: • four additional Board-appointed posts were created • substantial funds were to be allocated to upgrade the prefabs, corridors and lighting • the budget for outside coaches to assist coaching of sport was to be increased • the replacement of key equipment would take place • the facilitating of Fairmont being part of the new astro turf hockey field planning at the old stadium, alongside Voortrekker Road in Bellville would be a priority • the first impression of the proposed Multi-purpose Centre would be shown AMESSAGEFORTHEMATRICSWITHPERMISSIONFROMTHEAUTHOR,MR NORMAN NEL, FROM HIS BOOK, ‘WOULDYOU PLEASE SAYAFEWWORDS’. One of the members of the Board of Governors and a matric parent, Niel Speres, gave the following contribution on behalf of the all the matric parents representing the class of 2005. “ The chaplain’s advice to a matric pupil on graduation day: ‘I am giving you the ball, and naming you the scrum- half for your team in the game of life. I am your coach, so I’ll give it to you straight. “There is only one game to play. It lasts all your life, with no time out and no substitutions. You play the whole game all your life. You’ll have a great backline and full back. You are calling the signals, but the other six fel- lows in the backline with you have great reputations. They are named Faith, Hope, Charity, Love, Peace and Com- mitment. You’ll work behind a truly powerful pack of forwards. End to end they consist of Honesty, Loyalty, Devotion to Duty, Self Respect, Sturdy Cleanliness, Good Behaviour, Courage and Enthusiasm. The goal posts are the gates of Heaven. God is the referee and the sole official. He makes all the rules, and there is no appeal from them. There are ten rules. You know them as the Ten Commandments and you play them strictly in accordance with your own religion. There is only one important ground rule It is: ‘As ye would that men should do to you, do ye also to them likewise.’ Here is the ball. It is your immortal soul! Hold onto it.”
  • 159.
    158 Fairmont won theInter-Schools’ Cheerleading Trophy - 2005 The Fairmont Annual Production - “At The Hop” - 2005 Gina Louw and Lloyd Rhodes “At The Hop” - 2005
  • 160.
    159 PTSA The PTSA wassuccessful in contributing approximately R110 000 towards the Governing Body funds despite difficult times in respect of fund-raising. The tuckshop was open for extra-mural events at school, the raffle raised approximately R80 000 and it was decided to continue with the raffle as an annual event. The carnival on 29 October was successfully co-ordinated by Amanda de Reuck. As usual Fairmont made a number of contributions to the community, namely to the Reach for a Dream Organization and the SPCA. The school assisted Rotary in purchasing wheelchairs for the needy as well as donating school stationery for the needy in Lesotho. The matrics also treated the elderly to a Senior Citizens Tea Party. The prefects and the SRC had a very busy year. The prefects organized the Grade 8 orientation day and spent the day teaching the Grade 8’s what it meant to be a “Monty”, and held the traditional Grade 8 sports day. They organized a Song Competition and a number of Civvies Days. They spent a weekend away at High Africa Camping Resort with Mr Dill and Ms Piek rock-climbing, swimming, playing soccer and going for walks. In the second term a school dance was held, and there were prefect exchanges with Table View High School, Durbanville High and Stellenberg High School, while in the third term Spirit Week was celebrated with walls being decorated, motivational posters and baby photos being plastered everywhere and a Hug-a-Prefect competition being held. A themed Civvies Day “Monties on a Mission” was held for the upcoming Settlers Contact. The prefects and SRC’s from both schools met for discussion and dinner at The Settlers High School and both plays by the respective prefects dazzled the audience. The prefects also organized the annualAcademic Dinner held at Anica Restaurant in Durbanville. Theprefectsof2005provedtobeamulti-talentedgroup. TheyparticipatedintheInter-Houseplays,the Annual Production, FashionWeek, the Senior DebatingTeam, Monty Bears, Inter-School athletics and every imaginable sports team, and many achieved outstanding academic results. The SRC camped at Kleinbaai to put their plans into place for the busy year of planning assem- blies, choosing Team of the Month and Teacher of the Month Awards as well as for a student Dance - the SRC Shakedown - for which a guest DJ was hired. A Valentine’s Day celebration was organized - “A Tunnel of Lurv” - and the Animal Welfare Centre in Bellville was visited. A donation of R2500 was given from Civvies Day’s Funds. As far as the Houses were concerned, 2005 was a year which was good for every house. Innes House beat Muir by one point in the Inter-House athletics. Dale House won the Academic Shield and Muir won the co-curricular trophy, awarded at Speech Night. Innes did, however, win the swimming and one-act play competitions. Muir and Innes shared the spirit trophy. And,yet,anothertraditionwasstartedwiththeBarneysong“Iloveyou-youloveme”becom- ingapartofInnesHousewithMrPietCronjeinmind,who encouraged Innes House with the words: “To the world you might be one person, but to one person you might be the world!” Inter-Schools were held at the University of the Western Cape campus. Fairmont was to present the most complex cheer to date. The excitement had reached fever pitch at the Big Brag and the theme ‘Boogie Wonderland” would capture the imagination of all those present. The cheer- leaders spent the night before the big event at D’Aria guesthouse in Durbanville, waking up at 4.30 to eat a hurried breakfast before going to the stadium to prepare the finishing touches. Fairmont brought the spirit trophy home after four years, and we were placed second overall.
  • 161.
    160 The Annual TalentShow was introduced in 2004 Fairmont performed well at Inter-Schools 2004 and won the Spirit Trophy One-Act Play Winners - Alex de Villiers, Candice Harding, Gavin Cook and Fiona Tanner - 2005
  • 162.
    161 The Settlers Contactin July, the Bergvliet Derby in May and the Milnerton Derby in August were enjoyed by all. The rugby team was especially successful, winning all three derbies and against three touring sides. The girls’ hockey team went to Argentina. Fourteen girls, Mrs Jacobs and Miss Milne left on Easter Sunday from Cape Town. Nine hours later they landed at Ezeiza International. They experienced the sights of BuenosAires and the tango at the magical town La Bocca. They also met the world number one rated women’s hockey player. Then they travelled to Tandile, where they played their first game on a gravel pitch. They did a lot of shopping and exploring and met up with other SouthAfrican touring sides. They spent a night out in the trendy town of Ricoeletta and then visited the Fiesta Gaucha Ranch, which was one of the highlights of the tour. Here they experienced the cowboy way of life - horseriding and enjoying the local danc- ing. The team returned on 7 April with many memories of a very enjoyable tour. The school was also very honoured to have Shaun Pollock share breakfast with us as well as Mr P. Levi, who was the guest speaker at our sport awards evening in October. The top achiev- ers of our teams were congratulated on their achievements. Top achievers who represented South Africa were: •Samantha de Villiers and Colette Janssen (aerobics) at the Fisaf junior worldAerobics and Fitness Championships in Moscow, Russia in November 2005. Lauren Cannone was selected for the Rhapsody team to take part at the same venue. •Shannon Ekermans (baseball) was selected as a member of the S.A. u.18 Baseball Team. •Ciaran Liedeman (chess) won the Africa Amateur u.21 title in June 2005. •Kenneth Ketterer was awarded S.A. Team Colours for Track Cycling and Road Cycling. •Brendon High and Garth High received S.A. Junior Colours for (Bass) Angling. •Richard Murray was the u.17 All African Triathlon Champion for 2005 which qualified him to be a member of the S.A. Triathlon Team. On the cultural side events such as The Designer and Face of Fairmont (organized by Claire Allen), One-Act Plays (won by Innes House), the Talent Show (organized by Mrs Kurt) and the annual production (produced by Ms Bleeker) took place. About 500 pupils and parents attended the One-Act play competition to see Innes garner six of the awards. Fiona Tanner won the director, scriptwriter and lead actress prizes. Gavin Cook was the best actor. The annual production “At the Hop the heart and soul of rock ‘n’roll” had the oldies tapping their feet. It is the Summer of 1958 in Spartenburg, South Carolina. Four close friends have one last fling together before going to university and being married - a summer of adventure, romance and unlimited freedom. The local diner, The Hop, is the backdrop of their adventure. An heir to a hotel fortune, brings his friends to his family’s holiday home and so the two groups meet for an unforgettable summer of bobbysocks, ducktails and kiss curls, drive-ins and Elvis. A real trip down memory lane! Interact continued their contact with Rosehaven OldAge Home, the Children’s ward atTygerberg Hospital and provided sandwiches for the less fortunate. The concert band played at the annual Speech Night and the choir of thirty performed at the Ascension Day service and matric Valedictory Service.The Talent Show held with Idol con- testant Ezra Langeveldt as MC was a great success, ane the debating teams continued to repre- sent the school well in their league. As usual the matric farewell was an evening of sheer magic as the young gentlemen and ladies showed off their finery.
  • 163.
    162 A number ofacademic highlights can be mentioned. • four Grade 12’s, namely Zoe Blaauw, Yanni Yang, Jevan van Vuuren and Kyle Martin, participated in the Accounting Olympiad and they averaged highest out of the fourty-six schools taking part in the first round. • Pupils could now choose Art HG, Art SG, Graphics SG, Drawing SG, Painting SG, Sculpture SG or Design SG. • Biology had a number of excursions. The Grade 9 biology camp was at Mizpah while the Grade 10’s visited Dalebrook. The Grade 11’s visited the World of Birds at Hout Bay and made a trip to Seal Island. The Grade 12’s visited museums and the dissecting rooms of the University of Stellenbosch at Tygerberg Hospital. • English pupils attended a production of HAMLET at UCT. • The history pupils undertook excursions to Robben Island and the Holocaust Centre. • Home Economics prepared food for the Matric Farewell and the matric breakfast. • The Grade 9’s did a traffic study in Durbanville and the Grade 8’s went to Froggy Pond. • The annual excursion of Physiology pupils to the Tygerberg Hospital Anatomy Department was undertaken without anybody fainting at the sight of cadavers and “body bits” in jars. • 120 Grade 10’s visited the MTN Science Centre at Canal Walk to attend the show “Imaging Einstein” to commemorate the centenary of the birth of Albert Einstein. • The Grade 11’s spent an afternoon at “Phenomenal Physics” at UCT. • Pupils participated in the Equal Water Distribution System Competition. • Grade 8 learners made accessories in Technology classes to be sold during the SoccerWorld Cup. It should also be mentioned that Mr Elgie received a Long ServiceAward from the WCED for thirty years of service. At Speech Night special awards were given to Mrs A de Reuck, Mrs L. du Toit, Mrs A. Langeveldt, Mr N. Speres, Mrs A. Stone, Mr G. and Mrs J. Vlok. The Honours summa cum laude award was presented to Yanni Yang for the highest percent in all exams from Grade 10 to Grade 12. The Principal’s Award was presented to Michelle Kilfoil. The Dux of 2004 shared her tips on success as follows: • good self-discipline • good study methods • understanding your work • summarizing and testing yourself • regular breaks and being active • interests whether sport of cultural 23 pupils obtainedA aggregates, 44 obtained B’s and 53 obtained C’s, which meant that 119 of the 200 matrics that wrote had aggregates above 60% - a record to be very proud of indeed.
  • 164.
    163 The school washonoured to have Shaun Pollock as guest at a special breakfast. Mr Du Toit of the Governing Body and Shaun pose for a photograph.. Fairmont pupil Edward Ndopu and spectators at the Gala - 2005
  • 165.
    164 A brief overviewof Mrs Müller’s role was given in the two services held at school to accom- modate both pupils and parents as well as the many people in the education field who wanted to pay respects. Elizabeth Irene Müller was born in Wellington, Cape and matriculated at Huguenot High School. She graduated with a BSc,HDE and BEd from the University of Stellenbosch and Unisa. In 1976 she married Helgard Müller and had two beautiful daughters, Nina and Bianca.She started her teaching career in 1977 at Ysterplaat High School. In 1985 Mrs Müller was appointed as Head of the Mathematics Department at Fairmont High School and subsequently became Deputy Principal in 1997. On 1 July 2003 she was officially appointed as the new principal of Fairmont High School and was warmly welcomed by the staff, pupils and community alike. She set out passionately to take over the reins at Fairmont in a firm yet compassionate manner. In no time, as principal, she made her mark. As an educator, Mrs Müller showed a keen interest in educational affairs by attending numer- ous conferences, seminars and workshops. Change was not something she backed off from but instead enthusiastically explored. She made many positive contributions towards educa- tion. Mrs Müller was a perfectionist in everything that she did and as a result consistently delivered work of a high quality. Her strength and the enthusiasm with which she tackled her day-to-day tasks were greatly admired by all. She managed to establish and maintain an amicable and respectful relationship with her staff, pupils and parents. All who knew her certainly appreci- ated her quick wit and sense of humour. Despite her outstanding achievements, she remained humble and grateful for the opportunities awarded her. Mrs Müller had a very heavy workload, yet insisted on teaching. She felt that it was necessary to be aware of the pupils’ needs first hand and so it was back to the classroom for her. Her extraordinary people skills and understanding of children allowed her to make a difference in the lives of many of the pupils. The pupils looked up to her as a role model because she always led by example. They were filled with great respect and admiration for Mrs Müller because as principal she had a vision for the school which was to strive for excellence by seeking oppor- tunities for all to realize their unique potential through self-discipline in a trusting, enjoyable and caring atmosphere of mutual respect. Mrs Müller fulfilled so many roles. She was not merely a principal and educator but to many she was a mentor and loyal friend, a mother-figure filled with compassion, a confidante and a motivator. Her door was always open and one was met by a woman who would listen. So A SORROWFUL YEAR - FAIRMONT SALUTES LIZ MÜLLER 2006 2006 was certainly a very sorrowful year for Fairmont with the death of the principal, Liz Mü ller as well as that of Mark Holroyd, a dedicated English teacher and much admired Head of Department. We also experienced the death of a young Grade 10 pupil, Graham Page.
  • 166.
    165 2006 was asorrowful year with the passing away of Principal Mrs L Müller Mr Mark Holroyd, a dedicated English teacher and much admired Head of Department, passed away in 2006 Mrs Müller placing the first brick of the Multipurpose Centre 2006 Mrs Müller in a light-hearted moment in 1994
  • 167.
    166 many have hadprecious moments shared with her in which she comforted, advised and sup- ported. A week before the June holidays, Mrs Müller was taken ill and after a battery of tests, diag- nosed with cancer. She remained positive. She underwent extensive surgeries and received therapy treatment for her condition. Though eventually frail in body, Mrs Muller was excep- tionally strong in spirit and it was the fighting spirit which inspired so many around her. On 10 August at 10:30, after a courageous battle, she sadly passed away. The Fairmont High School staff, pupils and parents will always remember her for the truly remarkable lady that she was. In her honour we shall continue to build on the very solid foundation that she lay and memory will be kept alive. Fairmont was also very saddened by the sudden death of Mark Holroyd, who was considered by many to be one of the best English teachers. InAugust he was diagnosed with an aggressive cancer of the liver, and after a short but noble battle, he sadly passed away on Thursday 21 August. The year had started with 1290 pupils, which was an increase of 109 pupils from 2005. The pupil/teacher ratio was still a priority so the staff consisted of thirty-one governing body posts and twenty-nine state-employed teachers.Twelve new teachers joined the staff. Construction of the multi-purpose centre began. There is a lovely photograph of Mrs Muller laying the first brick on 14 January. Two additional classrooms were made by sub-dividing the lecture room, and a fourth compu- ter room was commissioned to cope with the growing demand for the subject. Cricket nets were refurbished, a discus throwing circle was constructed and additional security fencing was installed around the tennis court areas. Power outages caused many problems for our server was damaged and the security gates did not work. There were also problems associated with not having a bell to indicate the end of breaks. The chairman of the PTSAJohn Lucas, recorded that the raffle raised R62 000. Other contribu- tions were from advertisements, the clothing bank and the tuckshop. The annual festival was held on 28 October. It was decided that once the Multi-purpose Centre was completed, the PTSAwould be tasked with raising funds to purchase all crockery, cutlery, multi-media equip- ment, stoves and fridges, unless willing parents are prepared to donate the funds to the school for the purchase of this equipment. The Board of Governors had a seminar on Good Governance in terms of Documents, Policies and Procedures, conducted by Mr Clive Roos, an educational policy advisor. As a result, the Board of Governors embarked on an audit of good governance practices as a Board of Governors in consultation with other schools and hope to have this on CD as well as on our website for the entire Fairmont Community. This will include all policies and proce- dures, which will allow parents and pupils to be aware of these, especially the code of conduct as the Board of Governors strive to uphold and improve upon the standards of Fairmont. In Mrs Müller’s first circular of the year, she stated: “ To make Fairmont a success and to ensure that we deliver the best, it takes all of us to be committed, and so the theme for 2006 is ‘Striving for excellence’.” In striving for excellence, therefore, Fairmont was once again very busy throughout the year. The prefect body was led by Jamie Rossouw and Jayde Dunlop, and had a team-building camp on the Breede River. The prefects and the SRC organized annual events such as the Grade 8
  • 168.
    167 The Governing Body- 2006: Seated, Mr M de Villiers (Chairman), Mrs A Lourens, Mrs L Fuller (Vice-Chairman), Ms L van Aswegen, Mrs M Kropman. Standing, Mrs B Norman, Mr R Dingley, Mr A Kokott, Mr A du Toit, Mr L Liederman. Absent, Mr B Dill and Mr P Lester The Governing Body Chairman, Mike de Villiers and Mrs Liz Müller - 2006
  • 169.
    168 orientation day, theGrade 8 athletics meeting, civvies days, and the chowdown competition. The first SRC Student Awards evening took place with entertainment provided in the form of singing, dancing and stand-up comedy. As usual, many donations were made to various charities such as the SPCA, Reach for a Dream, R5 000 to the Red Cross Children’s Hospital, the Safe House for orphans in Joostenberg, the Tygerberg hospital childrens’ward, as well as continuing to provide sandwiches for a local primary school. Fairmont participated in the Durbanville Bicentenary Celebrations by presenting a profile of the school for the Tygerburger newspaper, taking part in a street procession through Durbanville, attending a church service and witnessing the unveiling of a plaque at the Town Hall by the mayor of Cape Town, Mrs Helen Zille. On 1 May Sean Loots launched FRESH 2006, a designer competition. A donation was given from the proceeds to the Reach for a Dream Foundation and awards were given for Interior Design, 2D work and wearable art. On 5 May the Face of Fairmont, affectionately known as FOF, was held. Tickets were sold out a week before the event and it was a “talked-about-for-days-afterwards” event. Neil Sneyd and Jo-Dee Swart were announced the “Faces of Fairmont”. The Inter-House one act plays once more had a winning play by Innes. The best actress was Nicole Bosch and the best actor, Thomas Mitchell, both of Dale House. Other winners were Best supporting actor: Bruce McMullen of Innes House; Best Director: Robyn Rawlings and Tracy-Lee de Villiers, also of Dale House. Many of our children took part in the Tygerberg Eisteddfod and achieved very good results. Top achievers who received Highest Honours were Ondela Matsha (poetry), Diedre Ellis (crea- tive writing), You Na Park (piano), Ania Barma (creative writing), Juliana Nardone (dance), Emily Kempton-Jones and Juliana Nardone (ballet duet), Chane Bunning and Juliana Nardone (funk dance duet) and Emily Kempton-Jones (poetry). Other achievements were obtained by You Na Park who submitted an essay entitled “Is Rapid Urbanization the best Solution to Human Survival in Africa?” and was awarded a distinction and R1 500 in prize money. Nicole Janse van Rensburg played the Grade 5 Royal School’s oboe examination and received 87%. She was also rewarded with the first ever Liz Müller Music Trophy for the highest result in an external examination. The annual production “Fallen Angel” was exceptional. The school received many letters of congratulation from people who attended the show. It was a story of intrigue and pulsating rhythms which thrilled the audience with a soundtrack which contained songs from such greats as Kenny Loggins, Phil Collins, Elton John, Joan Jett and the Blackhearts, Status Quo, Starship, Huey Lewis and the News, Cher and the Eurythmics, with the title song “Fallen Angel” by Poison. 2006 also welcomed back the ever-popular Talent Show, which proved to be a great success. The evening was hosted by Big Brother South Africa’s very own Ferdinand Rabie, who kept everyone in high spirits. An exciting new event in the form of the Makeover Evening included learners as well as staff. All participants were magnificently transformed but prizes were finally awarded to Miss Kirby for the Best Teacher Makeover and Terri Evans for the Best Student Makeover. FIND was started to benefit not only the pupils but also the teachers. It was previously the
  • 170.
    169 Members of theCast of “Fallen Angel” - 2006 Prefects - 2006
  • 171.
    170 SCA of theschool, but it decided on this name because of the members’ wish that all people find God, find answers to their questions and find their purpose in life. They started with a membership of twenty, but this quickly increased to more than a 100 and have become a very active part of Fairmont. Other cultural societies such as the Debating Society and Interact continued with the excellent work and achievements of the past years. The highlight of the first term on the sporting front was definitely our performance on 10 February at the Bellville Stadium, where we lost by only eighteen points after losing by 183 points in 2005. Fairmont won the Spirit Trophy and the girls won the Best Girls’Team trophy. In the Inter-House competition, Dale House came first overall and Innes House second since the winter Inter-House sports were also included. The annual Bergvliet Derby, Milnerton Derby and Settlers Contact were enjoyed by all, and on 26 August a Past Pupils’ Sportsday was held. The school had a full sporting programme with learners achieving Western Province colours in Aerobatic Dance, angling, badminton, baseball, chess, cricket, cycling, drum-majorettes, gymnastics, hockey, Irish dancing, karate, netball, rugby, soccer, squash, swimming, Scouts Sport aerobics and fitness, and Tri- and Duathlon. Danielle van Niekerk was selected for the South African Girls u16 squash team to tour Scot- land and England in December. The Boys’Hockey team consisting of fifteen players and three staff members arrived at Heathrow Airport in London on 25 March on an overseas tour. They had many adventures and misadventures shopping in Picadilly, taking a bus tour of London, taking the barge down the Thames and walking to Greenwich as well as getting back to Barking. They drew one game 0 - 0 and won 4 - 1 against the Buckinghamshire champions. They then left for Holland, where they played against a men’s team and lost 1 - 3. All the games in Holland were played at night. They lost one game very badly, but then went on to win the next six games. The best game of the tour was played against the Dutch u18 team, which they lost 1 - 3. The tour of eleven days was filled with games and visits to many places. One of the highlights for the first rugby team was their tour to East London for the Cambridge Sport Festival held during the first weekend of the June school holidays. The first team also had the chance to play against three touring sides, namely Hilton College, Gelofte School and Whitgift School. The end of the year functions including Speech Night, the Matric Farewell and the Valedictory service were filled with a mixture of celebration and sadness since the loss of those dear to us during the year was felt most poignantly at these times. Special Awards were given to Rosalind Odendall, Jenny Martin and Marian Dingley; Honours summa cum laude to Laura van Laeren for the highest percentage from Grade 10 to Grade12; the Good Fellowship Prize to Sita Smit and the Principal’s Award to Janine Janssen. It only seems fitting to end the year of 2006 with an extract from the words of Mr N.Veldman, said at the annual Remembrance Day Service, which was held on 23 November at the Memorial Stone. “The way you live today will determine how you will be rememberd by others and how you will be judged by God. What you do now does matter. Every act of our lives strikes some chord that will vibrate in eternity.” Those we had lost in 2006 certainly will always be remembered as an integral part of the history of Fairmont.
  • 172.
    171 The Fairmont community- pupils, staff and parents - united in their sorrow would echo the words of the chairman of the Board of Governors when he quoted from James1 verse 1:4. “My brothers and sisters, consider yourselves fortunate when all kinds of trials come your way, for you know that when your faith succeeds in facing such trials, the result is the ability to endure. Make sure your endurance carries you all the way without failing, so that you may be perfect and complete, lacking nothing.” Fairmont endured a difficult year, but remained united and strengthened. Cheerleaders - 2006
  • 173.
    172 SOMETHING TO CELEBRATE:30 YEARS! 2007 The year started with the report of the academic results of 2006, which were most pleasing. The top candidate, Laura van Laeren, had obtained an aggregate of 102,67%. There were 24A aggregates, 33 B aggregates, and 46 C aggregates. Mr Ron Dingley was Acting-Principal and Mrs A. Lourens Acting Deputy . Mr Dingley was later promoted to the post of Principal of Fairmont High School. Seven new teachers were welcomed and certain changes were made concerning school times. A Tuesday test timetable was introduced. The first term had a number of events such as the Grade 8 Orientation day, the Grade 8 Fun Day, a Parents’Welcome Evening, a blood donation day, InterHouse athletics, a matric theme day, the Inter-House gala, the English Olympiad, the Mr and Miss Fairmont competition and the Summer Sports Awards. The Grade 8 camps with the Prefects and SRC also took place. Parents were informed of the new cell phone policy which restricted the use of cell phones and explained clearly the consequences: first offence - the cell phone would be confiscated and parents would be required to retrieve it from school; second offence - cell phone would be confiscated and parents would be required to retrieve if from the school after paying a fine of R200, and third offence - cell phone would be confiscated and pupil would be required to attend a disciplinary hearing. Parents were invited to form a Garden Club voluntarily to meet once a week to further enhance and beautify the surroundings of the school. The new parents were addressed by various role-players where a number of key issues were discussed such as the focus on academics, the Tuesday test series, the discipline system, the role of the PTSA and the Board of Governors. They were also addressed by the Mothers Who Care, and the Head Boy and Head Girl. The Fairmont Inter-House athletics competition was held for the first time at the Bellville Velodrome and was a great success. Innes won the trophy for Cheerleaders, Muir won the Spirit Trophy and Dale was the winning House. ATHLETICS; INTER-SCHOOLS WIN FOR FAIRMONT! We could not have asked for a better start to celebrate our thirtieth anniversary. It was indeed a proud moment for the school when our athletics captains, Guinevere Rogers and Lucienne Vogel, raised the trophy at the announcement of Fairmont’s win. The Inter- Schools meeting was dedicated to the memory of Mrs Liz Müller, and her husband, Mr Helgard Müller, was present to hand out the trophies. The theme of “Swinging Sophiatown” was once again a hit with wonderful rhythms and music such as Meadowlands and Pata Pata. As a reward, pupils were given a shortened day on 8 February. The Inter-House one act plays took place in the school hall and a number of pupils and parents attended. Muir was the winning House. Best actor was Lucienne Vogel and best actress was Colette Janssen. Guinivere Rogers and Andrzej Lipowski were selected for the W.P. Life-saving team to com- pete at the SA National Championship in Pretoria in March. Lynette Morgan and Siobhan Loots, two athletes, obtained their WP colours and competed at the Belville Velodrome, where Lynette received a bronze medal in the 400m and Siobhan received a gold medal in the 100m
  • 174.
    173 Mr Ron Dingley- Current Principal 2007
  • 175.
    174 and bronze inthe 200m. They later competed in the National Championships in Port Eliza- beth. Bradley Barnes (cricket) was selected to represent WP in his age group at the Western Cape Games at the Tygerberg Cricket Club. Melanie von Gunten took part in the SAAction Netball Championships in Johannesburg. Her team won a silver medal. Bruce McMullen was selected as one of the eight members of the u18 WP golf team The Mr and Miss Fairmont 2007 replaced the Face of Fairmont function this year in celebra- tion of Fairmont’s 30th Anniversary. Twelve Matric finalists displayed their talents to an enthusiastic audience. Mr Fairmont was Lucienne Vogel and Coralie Valentyn was chosen as Miss Fairmont. Neil Vermeulen was chosen as Mr Personality and Danielle Waugh as Miss Personality. The summer sports awards ceremony took place with guest speaker, Bruce McClelland, giving an inspirational talk on how to focus on achieving in sport. Two publications by pupils were revived, namely the Grapevine and the Quarter Pounder. The Multi-purpose Centre was officially opened in the second term by Mr Barry Volschenk, director of the EMDC North, Western Cape Education Department. This coincided with the Art Festival with many artworks on view and a coffee shop for visitors. The highlight of this festival was the celebration music concert with guest guitarist and past pupil, James Grace, and Myles Roberts. Some of Fairmont’s pupils also performed as well as other invited artists. On 26 April a special 30thAnniversary Assembly was held as part of celebrating the history of the school. Reverend Brent Russell, a past pupil, prayed for the school at the assembly and each pupil received a piece of cake and a colddrink after the assembly. A brief history of the school was given by the Head Boy, JJ Odendaal, followed by a musical item by Jonathan Otero. Mr Horsthemke reminisced about the early years at Fairmont as well. A Grade 8 forum evening was held for the first time in the hall. It was a fun evening and an opportunity for pupils to voice their opinions and show their speaking talents. There were twelve teams and a best speaker was chosen in each team. Abest chairman award was given to Michelle van Sittert to be shared with Siviwe Dlikilili. AToastmasters’Course was also started and was hosted by Mr Lionel Bourtious of the Bellville Toastmasters. The pupils who at- tended enjoyed it immensely and will continue the course in the third term. The Fabulous Fairmont Show was one of the highlights of this year. Pupils, staff and parents participated to make this a truly memorable evening. Edward Ndopu, one of our Grade 10 pupils, opened the show with a poem written by him. This is the poem: FABULOUS FAIRMONT We’ve laughed with her We’ve cried with her We’ve triumphed with her We’ve shared with her Her spirited active life Her path to glory is still a strife Her change is constant Her excellence is potent
  • 176.
    175 Richard Murray Matric2007, became World Champion in his Duathlon U19 event in Hungary Birthday cake for all - Kelly Mealor handing out cake at our Anniversary assembly
  • 177.
    176 Her vision forgreatness Her efforts inspire togetherness At times we go by and not notice what An intricate part she plays in our lives She’s been around for quite some time... Oh yes! Indeed you know who she is; we all do She has for long been succeeding. She’s perfected the art of leading She’s thirty, flirty and outright fun She’s left her mark but she’s not quite done We are therefore certain and can emphatically Say that ‘she’ is, Fabulous Fairmont. Edward Ndopu 2007 witnessed a dispute between the State and the Public Service Unions, which culminated in strike action. The school was not affected by this action although a number of staff did exercise their right to strike. Mrs Esmeraldo was promoted to the post of HOD at Fairmont and Ms Barnardt joined the school as HOD in the IT department. Millicent Gulwa of grade twelve was selected as a presenter for the Kfm Youth Day Experi- ence on 16 June and we ended the term with the good news that Shameegh Allen of Grade 12 had been selected for the Western Province Schools rugby team. He was congratulated on this achievement by being the first Fairmont player in the history of Fairmont Rugby to be selected for the Western Province Craven Team. After saying a sad farewell to Miss Shirly Milne, a Fairmont past pupiI, teacher and special member of our staff who left to travel overseas, we welcomed in the third term four teachers to our staff: Mr Edwards, Mrs Friedenthal, Mrs Hansen and our HOD Mrs Barnardt. The Drummies returned from the National competition in Durban with some very good results . It was with heavy hearts that we said farewell to one of Fairmont’s leading citizens, Mr Brian Dill, who left Fairmont at the end of July to enter the private sector. We thank him for the many years he enriched our school. The third term highlight on our calendar, the Settlers Derby, was held at The Settlers School. We thank them for their hospitality and friendship. The Milnerton Derby was interrupted by rain, but we managed to complete most of our fix- tures by organizing mid-week games. Lynette Morgan represented the Western Cape Youth team at the SouthAfrican Youth games in Bloemfontein. Adrean Rebelo achieved world champion status by coming first in the continu- ous fighting division at the international karate event in Orlando USA. Our 1st Badminton team was selected to participate in the National School Competition in Durban. Mrs Vermeulen and the cast of “A Celebration of Music and Dance” put on a wonderful an- nual production show, and we were again amazed at the talent of the school.
  • 178.
    177 Mr and MissFHS Winners, Seated: Lucien Vogel (Mr FHS) Coralie Valentyn (Miss FHS). Standing: Neil Vermeulen (Mr Personality) and Danielle Waugh (Miss Personality) James Grace, pupil at Fairmont in 1992, stud- ied guitar with Carlos Bonell at the Royal Col- lege of Music in London and became the first guitarist in the history of the College to receive the Tagore Gold Medal. James has recorded his first solo CD and is currently Head of Clas- sical Guitar at the University of Cape Town. James appeared at the Fairmont Music Con- cert Celebration in April 2007 The Tuckshop was upgraded in 2007 Bruce McMullen represented the U18 WP golf team
  • 179.
    178 We acknowledged ouracademic honours achievers at a special dinner at the Piatto Restaurant, where Eric Symons gave our pupils a special message on achieving in life. Miss Pienaar, one of our Fairmont staff members was congratulated on her selection to the WP Peninsula Hockey team. Our PTSA was very active during the year and one of the many events on their calendar was the Andy Marinos Breakfast, a successful and informative event enjoyed by 100 guests. Other events hosted and organised by the PTSA were the successful 30th Anniversary Dance Bash, a fun evening of dance to the live music of Back on Track, and the Annual Fairmont Community Festival which raised R80 000.00. The Past Pupils’ Sports Day took place on 1 September and the Matric Class of 1987 held a well supported reunion. They donated R5 500 towards the furnishing of the boardroom, an addition to the donation of a boardroom table and chairs from the Teare family. Twelve of our girls qualified to represent SA in the 2007 senior and junior World Fitness Aerobics Championships held in Serbia during October. Toks van der Linde was the guest speaker at the Winter SportsAwards. His message was that one should believe in one’s own abilities, have passion for what one does and do it with determination. On Friday 22 September, the big event of the year, the Matric Farewell Dance, with the theme, Atlantis, took place. The new library is established and will be commissioned in the first part of 2008. Plans for a technology centre were tabled. Parents at the annual budget meeting voted in favour of a R50.00 per month levy towards a sport project fund to improve the sport facilities at the school. The first project to be tackled is the construction of an Astroturf hockey field, which should be constructed in the first part of 2008. Other projects on the list include a gym, improved cricket facilities, rugby terraces and deepening the pool for water polo, to mention but a few. How rewarding it was to receive the Matric results of 2007 and witness the best academic performance in the history of the school. Well done to the Class of 2007 on their outstanding results and for making us all proud to be part of the Fairmont academic institution. A summary of the results is as follows: Number of candidates: 219 AAggregates: 47 B Aggregates: 39 C Aggregates: 58 D Aggregates: 55 E Aggregates: 15 Total scoring above 60%: 143 Total number of subject distinctions: 212 Total number of subject ‘B’s’; 217 Total number of subject ‘C’s’: 311 We congratulated Mrs M Esmeraldo and Mrs M Schnehage, who were both nominated as acting deputy principals at Fairmont in 2007.
  • 180.
    179 SPEECH NIGHT GUESTSPEAKERS 2003 Mr C Roos 2004 Ds J van Rensburg 2005 Mrs M du Preez 2006 Rev. B Russell 2007 Mr C Wigg DRAMATIC PRODUCTIONS 2003 New Rock City 2004 Clue 2005 At the Hop 2006 Fallen Angel 2007 30 Years of Fairmont: A Celebration of Music and Dance MR AND MISS FAIRMONT 2006 Neil Sneyd and Jo-Lee Swart 2007 Lucien Vogel and Coralee Valentyn FACE OF FAIRMONT 2003 Nici Gouws and Robert Starke 2004 Kerryn Jones and Michael Williams 2005 Bianca Rudman and Luke Bunding MATRIC FAREWELL THEMES 2003 Eastern Mosaic 2004 Moonstruck 2005 A Night at the Opera 2006 Chicago 2007 Atlantis 2003 - 2007 Cast members of ‘At the Hop’
  • 181.
    180 Mr Barry Volschenk,Director of the EMDC North, Western Cape Education Department, cuts the ribbon at the opening ceremony of the Multi-purpose Centre, Wednesday 18 April 2007 The PTSA of 2007. Back: Mrs J Hoenck, Mrs H Kempton-Jones, Mrs F Higgins, Mrs J Hunt, Mrs J Martin, Mrs M Janssen, Mrs A Dolpire, Mrs R Odendaal, Mrs S de Villiers. Seated: Mr P Cronje, Mrs C Robinson, Mr B Pearce, mrs J Cooper, Mrs M Hlozek, Mr R Dingley Absent Mrs A de Reuck
  • 182.
    181 A celebration of Musicand Dance Fairmont 30 years Cast members during a lighter moment at the school production “A celebration of Music and Dance” Mr Schalk Engelbrecht, caretaker at Fairmont High School, retired in 2007 after 30 years service to the school.
  • 183.
    182 Reflecting back onwhat has been written in this publication fills one with pride to be associ- ated with such a unique school, - a school with a personality of its own, a place where young people can develop in the security of an enriched academic environment. The school continues to receive accolades from the top Cape Town universities, singing the praises of our pupils who go on to study at these tertiary institutions, for their ability to cope and achieve in de- manding academic circumstances. It is our vision to continue to make Fairmont a place for all to flourish as individuals in a safe and caring environment based on a sound code of good behaviour where we all respect one another’s rights to be happy at school and grow in a responsible way as individuals and good citizens. Fairmont owes a deep gratitude to all the teachers over the past thirty years who have given unselfishly to the school to develop that special “Monty” spirit and to parents alike who have made it possible through their financial contributions and moral support to make the school the great institution it is today. In a nutshell, the six key words in the mission statement are central to the continuation of the reality of Fairmont: Excellence, Opportunity, Uniqueness, Self-discipline, Trust and Respect. May Fairmont grow from strength to strength - at thirty years of age we salute all the pupils who have gone through the Fairmont ranks in the knowledge that it is all about them and what they have achieved these three decades. Fairmont we are proud of you! A number of our Fairmont Girls participated at the World Fitness and Aerobic event. Back row: Tarryn Willemse, Jade Levy, Manya Schut, Niki Gartrell, Colette Janssen and Chané Bunning front row; Samantha De Villiers, Liezel Killian, Jessica Keytel, Amber Carstens, Nicole Peper and Natalie Teuchert
  • 184.
    183 The new librarywill be commissioned in 2008 The new Multi-purpose centre
  • 185.
    184 APPENDICES 1. Reflections 2. Documents 3.Governing Body Chairmen 4. PTA/PTSA Chairmen 5. Head Prefects 6. SRC Chairmen 7. Honours Summa Cum Laude 8. School Dux 9. ‘A’Aggregates 10. Good Fellowship Prize 11. Principal’s Prize 12. Past Pupils’Award 13. Fairmont Awards 14. First Team Captains 15. Personalia 16 Staff Present during Anniversary year 17. References
  • 186.
    185 APPENDIX 1 REFLECTIONS Memories ofa “Montie” In 1976 I was in Std 5 at Durbanville Primary School, and had always presumed that I would be going to Durbanville High School, until we heard that they were building a new English- medium high school. I lived down the road from the new school site, which was a vineyard at the time, and I remember watching the building process of my “new school”. In 1977 Fairmont High School (first called Eversdal High English Medium) opened its doors for the first time to Std 6’s, 7’s and 8’s. I started in Std 6 and I recall feeling both overwhelmed and excited. Coming from a primary school atmosphere that was old, dark and dismal, I recall walking into this brand new beautiful building and thinking “wow”! The builders were still in the process of construction and the smell of new paint greeted me. Everything was brand new. New classrooms, desks, books, and new science/home economics equipment - everything was shiny and modern. But best of all - we had no school uniform! For the first year of high school, we could wear civvies! Emotions were divided. I felt very grown up and excited going to high school for the first time, but at the same time I was scared - as I think we all were. After being the top dogs in Primary School, our bubble burst when we got to Std 6 and realised we were once again at the bottom of the food chain. But there was an upside to being in high school - the older boys looked very attractive to us girls - we were at school with men! It was strange being in a different school with new teachers - most of whom were younger than we are now; and after having predominantly women as school principals, we now had a male, by the name of Mr Wigg. We were frightened out of our wits by this man who said he had a cane in his office! We all vowed never to visit his side of the school building (of course most of us ended up having a meeting with him at some time or another). That first year went by in haze of new activities. We had no school hall or sports fields, but we played at other venues, and slowly the school spirit grew. We acquired a school flag, a school motto “Stand Fast”, and a school song. Then the dreaded school uniform arrived in 1978. It was inspired by a classmate, who one day wore a brown and white checked dress. Most of us hated brown - what an “uncool” colour! For the next four years this poor classmate (who was very dear to us) was not very popular! But, eventually we accepted the uniform and became proud to wear it. We now had an identity, we were a group, and we were a school that people now recognised - we were “Monties”. A school magazine, “The Grapevine” was started. It was first published by the pupils them- selves. I remember spending hours typing my fingers to the bone and then hours stapling the pages together. We charged 5c a copy. In 1979, the first official Fairmont High School Year- book was published. Various clubs and societies were started, e.g. choir, drum majorettes, photographic, drama, debating, etc, which were all fun. Mr Wigg also introduced “The Gardening Club”. This was our detention activity, usually held on a Friday afternoon. Many of us spent hours digging, weeding, planting and cleaning the school’s garden. I now often drive past the school and look at the fruits of our labours of so many years ago. New sports fields were eventually built, which were sometimes used at break times for a quick “puff”. Pupils who came to school early in the mornings always met on the front steps of the hall and had sandwiches and chats, and quickly completed unfinished homework (sometimes
  • 187.
    186 copying from ourfriends). During breaks the girls used the quad areas to tan our legs, much to the consternation of Miss Coetzer whose repeated “put your socks and shoes on girls” always went unheard. Noticeably, “The Gardening Club” had many more members in the summer months. The tuckshop was also a novelty, as the moms served hot soup during winter. Queues were always long, with pupils buying sweets and chips to munch on later in class, also leading to another get-together with the “Gardening Club”. Inter-House (Dale, Innes and Muir) and inter-school sports days were a favourite amongst the pupils. It meant a day away from the school books and the confines of the classroom. Inter- House gave us the chance to watch the teachers’ races, which were always hilarious. For the inter-schools meet, we were bussed to Bellville Athletics Club and screamed and sang our lungs out, only to come home hot, tired and hoarse, but oh so proud! The first matric class graduated in 1979, which was a very proud first milestone in Fairmont’s history. I graduated in 1981 and I remember the Valedictory Service that last day of school. Where had the five years gone? I was now leaving the comfort of familiarity and facing a new chapter of my life. We all cried many tears that day. Tears of sadness for leaving our friends mixed with tears of happiness at the thought of being “free”. In 2001 I was fortunate enough to help organise our 20th Reunion, and was invited to attend a school assembly the day before. I remember walking through the school gates and entering the school. I took a walk through the school. What a nostalgic moment. So much had changed and yet it was still the same. All the memories came flooding back. Good memories, but at the same time I felt infinitely sad. Sad, because on a day twenty years ago I wanted to be free of the constraints of school, and now as an adult, I wanted to recapture that innocence of youth. I realised then that I was actually “free” at school, but because life is what it is, we never appre- ciate something until we don’t have it anymore. I then ventured into the school hall for the assembly and sat at the back gazing across at the field of brown school uniforms. I hoped fervently that these pupils would one day look back and be proud of the fact that they had attended a remarkable school. I stood and sang the school song with the rest of the school. The words came back instinctively and a lump formed in my throat. I was and always will be a “Montie” Jeanette van Kraayenburg (McEvoy, 1981) 1976 - My first impressions of the unfinished building before I applied for the post - beautiful location and structure with magnificent view. The first year the pupils had no uniform. Everybody had to wear something blue to create a form of similarity. As the Senior Lady Teacher, I was involved with much of the planning, together with Clive Wigg and Don Gibbon. One of our missions was to visit many of the uniform outlets. We were very proud of the brown colour, which was different from the nor- mal greens and blues of the time. The colour also matched the building. The seventeen staff members in 1977 were lost in the huge staff room. During breaks we all sat together in the corner closest to the staff kitchen, on pupils’ chairs. Everybody knew where the Bookroom was. From here not only were textbooks issued, but it served as an office too. The star of the bookroom was Anne-Marie Hettasch, who assisted from her Std 6 to her Std 10 year. (She did not only assist with the books, but organized my life too - nog steeds dankieAnne-Marie) For many years the Prize-giving function was my responsibility. The main fear was that some- body would juggle the books, diplomas, trophies etc. after they had been set out for the evening - and what about the evening when the main speaker asked for water and none was available!
  • 188.
    187 As a teambuilding exercise for staff, we tried a golf outing. After only five holes played and darkness having descended, we moved to the 19th hole. Bowls became the better option, and once a year the teachers showed a variety of skills regarding this game. Some of you will remember the socials at homes on a Friday afternoon. (That was before the staff meetings on a Friday afternoon started). What an experience it was to strike in 19??. Not only did teachers march, but parents also joined in. The train trip into Cape Town was part of the excitement. With tired bodies and feet we returned, not knowing if it was worth our while. In 1996 I decided to call it a day, and applied for the Voluntary Severance package. At this stage I was a Deputy Principal. I had given to Fairmont of my best, and for 19+ years it was my heart and soul. Leonie Coetzer (ex-teacher January 1977 - September 1996). We arrived on that first day, wearing the school uniform of the school that we had attended previously, although some of the boys had had to buy just grey trousers and white shirts to start with. Our standard was told, very often, that we were the seniors and as such had to remember to set an example always, a sentence we came to hate, as we could never just be ourselves. The hall had not been built and there was only one sports field. The rest was still untouched farmland. By the middle of the year, if I remember correctly, a uniform had been decided on: a brown and white checked dress for the summer term for girls and a pinafore (beige-brown in colour) and white shirt for winter, oh and a tie. At all times, white ankle socks! After hefty protest, we were allowed to wear ordinary stockings as well! A brown jersey and, compulsory in winter, a brown blazer. We were pleased with the uniform as it was very different from the many shades of blue that were prevalent at the time. We did lots of fund-raising to build tennis courts, netball courts and playing fields throughout the three years I was there. The school aimed for high scholastic standards, so we sat exams in June, September and No- vember/December. I was lucky that I did not find exams too hard. A system of monitors was introduced when we were halfway through Std 8, and it ran until the first prefects were announced at the end of Std 9. When the first prefects were an- nounced, we threw them into the showers, just as we’d seen our peers do at the schools we came from! Boy, did we get into trouble!!! We were all called into the hall and given such a scolding by Mr Gibbon, calling us all kinds of names! We were told that that kind of behaviour would not be tolerated - ever!!! On our last day of school in Std. 10, we wore civvies! What a novelty! I believe it went on to become a tradition that the leaving Matrics did. We started with a breakfast before going to class and then followed assembly where we performed a song for the school, singing Goodbye to the Beatles melody of Girl! I don’t know who cried more, the teachers and other pupils or us! Merete Hipp (Hansen - 1979) I am one of the first groups of students who traipsed through the doors in 1977. We were in a sparkling new school, with everything from desks to doorframes unmarked, unblemished and, with the colour coding, even quite cheerful (for a school, that is!) It was a privilege and a challenge to be able to lay foundations and traditions starting way back in 1977.
  • 189.
    188 That’s the beautyof school years - a group of diverse personalities with different ambitions, talents and desires, many of which are still in formative stages, but who don’t even realise it at the time. We had a wonderful group of teachers with the principal, Mr Wigg, encouraging new ideas. He even agreed that the proposed winter uniform for girls really did not look very good without socks (try it girls - those pink tunics with plain stockings and brown shoes...!) It is sad to know that some of our classmates from those early years are no longer with us in this world. Their contributions to the memories of our school days are still clear in our minds. To those who now live far away from the green sports fields and facebrick buildings of Fairmont High, this opportunity of getting in touch with ‘old mates’is great! We are part of a school that has sent many a young person out into the world equipped with enough knowledge and atti- tude to more than ‘get by’. For me it was also having been part of something new. To all those who were there with us in those early days - I hope life has been good to you. For those who came after us, I hope you enjoyed your time at Fairmont as much as we early ‘pioneers’ did. For those currently at Fairmont, and for those who will come in the future, “Stand Fast”. For it is only with roots that we learn to grow. Tracy Kairuz (McCarthy - 1980) In 1977 South Africa was in a different world. The townships were in turmoil, the Berlin Wall still stood and the rand was worth more than the dollar. I had just entered my third year of Primary School in Kenridge when Fairmont High School opened. On moving up to Fairmont in 1982, I was excited for the new challenges ahead, but nervous about being just another kid at the entry level of a larger school. Fairmont turned out to be a great life-changing experience, and in my case this was due to the freedom to take responsibility. I was amazed at how initiative was encouraged and rewarded at the school. We frequently pushed the boundaries of what academic freedoms were possible (with each edition of the Grapevine being censored while I was editor), and thrived in the doing of new things. We launched a radio station and changed school rules in my Matric year, which had a fantastic class with a great group of prefects. Since I matriculated from Fairmont in 1986, the world and especially South Africa has changed again. I certainly hope that the education and values provided by Fairmont will continue to inspire its students into the world of the future. Craig Mullet (1986) It’s an honour for me to be asked to write an article for the history of the school I went to for one year (1993-1994) as a Rotary Exchange Student. When my friends ask me to tell them something about my time in South Africa, particularly at Fairmont, I always think of the school uniform (it still hangs in my cupboard). The school uniform was a big issue for me, because I wasn’t used to wearing uniform in school, especially not in those colours! (Excuse me for mentioning that, but at that time I was 16 and a girl!!!!) I also remember several meetings with the Principal Mr Wigg, who patiently listened to me but made me understand that girls had to wear skirts and not trousers. Together with the uniform and other experiences, I learned that one has to fit in, may it be in a class, school, town or country. What I also remember are friendly pupils who made one feel welcome from the very first day, patient teachers who supported me and made me face chal- lenges and my host families who tried very hard to make me feel at home. What impressed me enormously was the fact that the pupils had the opportunity to participate in school life: the prefects and the council, sports activities and matches - to mention only a
  • 190.
    189 few. But eventhough school in Durbanville was different from my school in Wolfsburg, some things were the same: teachers who “tor- tured” us with “stuff’we didn’t want to know, pupils and their behaviour and the breaks - the most important platform for a teenager! That was long time ago.... ... and still I don’t seem to get enough of school. After I finished school I first went toAthens for a year to learn Greek (and to make up my mind whether I wanted to become a den- tist or a goldsmith). Finally I stud- ied German and English philology and became a...teacher. I started last summer to teach 11-17 year old teen- agers - who may feel somehow simi- lar to the way I did then... My best wishes go to Fairmont’s pupils and all the people who make it possible that the youngsters can learn! Christine Adamis Upon receiving the request for sub- missions for the Fairmont history, I began thinking about my years at Fairmont and realised just how many fond memories I actually have. I re- member many times getting up for school and not wanting to go and my mom telling me that I should appreciate those years as they would be my best. At the time I did not believe her but I now realise just how right she was. In retrospect those really were great years. So, what things do I particularly remember? It is the people I remember more than anything else, and I made some of my closest friends in the time that I was at Fairmont. In particular, I think of my good friend Charlene Williams (now Lopes). I think we have had the biggest impact on each other’s lives to this day. While in high school she introduced me to my husband. And from that introduction we introduced her to my husband’s best friend - who is now her husband! And they now have a beautiful little daughter together ... a very special person in my life! I also remember the privilege I was given to be made a prefect at the school - something which resulted in a keen sense of camaraderie and belonging to a great group of people. We worked hard but also had great fun - our Prefects’ Camp in Saldanha springs to mind. In general, I will never forget the Fairmont traditions ... inter-house sports day; inter-schools ... and who could forget the Polar Bear Club! I will also never forget the play which I was a part of in 1996, “The Happiest Days of our Lives”, I think it was called. Also hard work but great fun...and good to get to know our teachers better! Christine Adamis
  • 191.
    190 Academically I believethat Fairmont prepared me for my future. Going to university was made easier by a solid academic base. I am most grateful for this as it has led to a relatively successful career to date, as well as venturing into the entrepreneurial world as a business owner. What else? Mr Le Roux’s antelope horn springs to mind; the prefects sleeping over at school one night and ending up very afraid of ghosts (!); squashed, hot assemblies; school dances ... there are too many things to count. In short, Fairmont was a great school to have attended and there are so many wonderful memo- ries for me. Wow ... 30 years! And I am proud to have been part of five of those! Caroline Simoes (Thickett - 1997) I arrived at Fairmont in 1996. Everything about the school seemed so large. The prefects looked as if they were about thirty years old and the building was so big and confusing, I was con- vinced that it would take me all five years at the school to figure out where my Maths class was.As a Std 6 (Grade 8) student, you learned to work from one central point, the Junior Quad. This is where you spend your breaks and have the Matrics looking at you through the windows as if you were fish in a fish bowl. Very quickly I learned to love my school. It was still so young when I arrived, but had already so many lovely traditions. The thing that makes a school is not the buildings or facilities, the tradi- tions or even the classrooms. Even though Fairmont has all of those, what makes a great school in my eyes are the teachers. For the first time in my life I learned that teachers were also people. In 1997, the teachers went on a march through Cape Town to hand over a document in parlia- ment. I asked my step-dad if he would take me as I felt that what was happening to my teachers was unfair. A teacher has the most important job in the world. They spend more time with a child than their parents and I wanted to know that one day when my children go to school, they have the best possible people teaching them. It was supposed to be a very sombre day but I had the greatest time. I walked in my school uniform with my teachers and Principal and had a real sense of achievement when I went home. Fairmont always had something exciting happening. My favourite time of the year was the annual Carnival and Fireworks display. To have rides and fireworks and stalls on our school fields was great; to have people come from all over the Western Cape to YOUR school made you proud. There were many times I was so proud of my school. When Fairmont had its 25th birthday, when it was named one of the top 100 schools in South Africa and when many of the students from Fairmont excelled in sport. My favourite time at my school must have been in my Matric year. The year went so fast, but was action-packed with activities. These would include diving into the pool on the coldest day of the year dressed up in a silly outfit, 40 days, matric dance, tea parties etc. One of my favourite memories of Mr Wigg was on 40 days, his 60th birthday. We organized a civvies day and told him that the theme was “Wigg day”. He arrived at assembly wearing a purple wig and everyone else had dressed up to the real theme: “red, white and blue”. Mr Wigg loved to dress up. I have personally seen him in a bunny suit at Easter and a Father Christmas suit at Christmas. I left school six years ago. I studied accounting at Stellenbosch University and run a newspa- per and have a promotions company in Stellenbosch. Every time I meet someone and they ask me what school I went to, I feel proud to tell them I was at Fairmont. Lauren Young
  • 192.
    191 I look backupon my years at Fairmont High School with many fond memories. The opportu- nities we had to excel at sport and to be involved on every different level were countless. For this alone I owe the school a great deal. When I was at Fairmont I involved myself in everything that the school had to offer. One of the first memories I have of high school, was winning the Inter-Schools Spirit Trophy in Std 6. This paved the way for what was to be an adventurous five years, with many ups and downs, and culminating in a fitting farewell for our class of 2001, when we once again re- claimed the Spirit Trophy in our matric year. I was part of Muir House in school, which leads me to one of the personal highlights of my school career. We were normally the whipping boys of Dale and Innes, but in our matric year we walked away with not only the Inter-House Plays for the third year in a row, but also the Inter-House Athletics (last won ±12 years before) and the Inter-House Swimming (last won ± 17 years before). I still look back upon ‘the good old days’ and find it hard to believe that almost five years have gone by. Many of my good school friends have become life-long friends, and therein lies my wish for current and future pupils of Fairmont High School. Take advantage of the many great oppor- tunities that the school has to offer, and may the friends that you make here, be friends for life. Gavin Meinking (2001) My eighteen years at Fairmont, culminating in retirement, were among the most enjoyable of my forty-one years in teaching. Arriving at Fairmont was something of a shock - over 1100 pupils, more than twice as numer- ous as any other school that I had experienced. Getting to know pupils by name and personal- ity was a very big challenge, and here I failed as I could never say that I knew all the pupils. I would be reluctant to put a percentage to the number I knew! But I found that if I tried to be fair and firm there was generally a positive response from even those I hardly knew. I am reluctant to name any pupils that I remember clearly as either first class contributors to the school (inevitably some would be ‘missed’), or to name some of the pupils who took up much time because of negative behaviour... some may be in significant positions today! Happy memories of time on the cricket field, of batting feats and bowling achievements and brilliant fielding exploits come to mind, and time spent with parents who came to support the game. Teaching Geography was, for me, more than a subject. It was an opportunity to talk about real issues and developing life values. I always appreciated the notes/letters received from pupils. Yes, many happy memories and appreciation for the positive interactions that took place with so many colleagues, pupils and parents. May God Bless Fairmont High Alastair Frost Remember when - Medway was just gravel - and some students were not quite togged out in full uniform. New school - new order - what a nightmare. Just a few unfinished buildings to accommodate the students. But dreams of a school with a great future did not deter those who had faith in Fairmont. Still they attended Fairmont - despite the lack of luxuries. I have watched Fairmont grow. I have watched Fairmont students over the years walk past my parents’ house - in Medway. Never once did I notice a student that was not proud to be a Fairmont pupil. Over the years I have observed Fairmont grow from strength to strength, never losing faith in Fairmont - and watching the school grow from strength to strength. Fairmont’s values are also of the highest standard. Granted, some teachers are tested by pu-
  • 193.
    192 pils. What woulda school be without these challenging pupils? This is what makes a school. Just think how boring school would be if all the pupils were all the same. I remember standing in my parents’ kitchen in Medway - heavily pregnant with my first child - “my children will attend this school - I have good faith in Fairmont”. So they did. Megan matriculated in 1999 and Andrew in 2000. Today they both speak highly of Fairmont. Just a few words from a Mom that is always proud to tell parents that her children attended Fairmont. Maryanne Whiley Congratulations to Fairmont High School on your 30th Anniversary. We were privileged to teach Karate-Do at your school shortly after the school was founded. Mr Keith Milford was a class teacher there. He was also one of our Black Belts at Kushido Karate-Do and organized that Hanshi Denis St John Thomson (the chief Instructor of Karate- Do) taught classes on Monday and Wednesday afternoons. We started training in the quadrangle of the school. This proved too difficult (working on tar or concrete) and so we were allowed to use the school hall. The classes proved very popular and the student numbers grew to approximately 100 students. The Karate-Do training devel- ops attributes of confidence, respect and increased learning capacity and of course the ability to protect themselves. The teachers were impressed with the general improvement in the students’ school work and their discipline. On behalf of Kushido Karate Do we wish the school continuing success in all your endeavours in the future. Merelle Thomson (Secretary) On behalf of the Kenridge dojo of Kushido Karate-Do, we congratulate Fairmont High School on its 30th Anniversary. The essence of a good school lies within the solid foundations of positive traditions. It is tradition that upholds positive core values and Fairmont’s traditions have maintained the school’s pride over the years up until present times, and we see the school excelling in both academic and extra-mural pursuits. Indeed, our local karate school is also built on traditions that span decades in the same neighbourhood, and our results mirror those of Fairmont. From a karate perspective, Fairmont has produced many champions. Two recent examples are ex-Fairmont student, Brian Jooste, who earned the title of National Grand Champion in 2004, and new Black Belt Michael Woodland, who at eighteen years, was the youngest Black Belt in our school. May your school continue to excel in all honourable endeavours, and may your students stand tall when they proudly say, “I am/was a Fairmont student.” Brian Woodland
  • 194.
    193 APPENDIX 2 DOCUMENTS ANDPHOTOGRAPHS 1. Page 1 of first circular to parents. 2. First page of 1977 admissions register 3. First page of first School Committee minutes. 4. Attendance register - first PTA Committee meeting. 5. Official Opening programme. 6. Sports Complex appeal. 7. Recreation Centre opening. 8. 10th Anniversary Dinner 1987. 9. Academic Honours Dinner 2000 10. Students’ Centre opening 1999. 11. Carnival flyer/pamphlet. 12. Grapevine cover 13. Drama programme 14. The site of the Multipurpose Centre and Architect’s impression 15. Letter of congratulations from the Circuit Manager Mr AAppel 16. The 30th Anniversary Staff - 2007
  • 195.
    194 Page 1 offirst circular to parents - 1976
  • 196.
    195 First page of1977 admissions register
  • 197.
    196 First page offirst School Committee minutes
  • 198.
    197 Attendance reister -first PTA Committee meeting - 1977
  • 199.
  • 200.
  • 201.
    200 Official Opening ofRecreation Centre
  • 202.
  • 203.
    202 Academic Honours Dinner2000 Jennifer Poole - School Dux 2000 Susan Wood - Honours Summa Cum Laude 2000
  • 204.
    203 Opening of theStudents’Centre - 21 May 1999
  • 205.
  • 206.
  • 207.
  • 208.
    207 The site wherethe Multi-purpose Centre is constructed - originally known as the “Matric lawn” Architect’s inpression of the Multi-purpose centre
  • 209.
    208 Letter of congratulationsfrom the Circuit Manager - Mr A Appel
  • 210.
  • 211.
    210 APPENDIX 3 GOVERNING BODYCHAIRMEN 1977 - 1985 Mr E Fivaz 1985 - 1988 Mr A Truter 1989 - 1991 Mr S Robinson 1992 - 1993 Mr R. Nelson 1990 - 1993 Mr S Robinson 1994 Mr L Huisamen 1995 - 1999 Mr R Williamson 2000 - 2003 Mr M Ettish 2003 - 2004 Mr N Speres 2005 - 2007 Mr M de Villiers APPENDIX 4 PTA/PTSA CHAIRMAN 1977 - 1979 Mr D Stewart 1979 - 1980 Mr D Klazinga 1980 - 1981 Mr D Stewart 1981 - 1983 Mr B Isgar 1983 - 1984 Mr J Cammidge 1985 Mr A Truter 1986 Mr A Neumann 1987 Mr E Brymer 1988 Mr D Insley 1989 Mr A Young 1989 - 1990 Mrs S Visagie 1991 - 1993 Mr G Warburton 1994 Mrs D Robinson 1995 - 1997 Mr M Ettish 1999 - 2001 Mr R Crow 2002 - 2003 Mr P Botha 2004 - 2006 Mr J Lucas 2007 Mrs J Cooper APPENDIX 5 HEAD PREFECTS 1979 Torsten Moehl Lesley Windell 1980 John Cranke Tracy McCarthy 1981 Mark Steyn Dorin Neckel 1982 Victor Hawken Alison Nardone 1983 Kevin Hawkins Janine Lambert
  • 212.
    211 1984 Anthony HudsonKaren van Niekerk 1985 Graham Morton Carole MacLeod 1986 Craig Mullet Norma Oosthuizen 1987 Clifton Woods Vanda Fernandes 1988 Lawrence Ireland Roslin McComb 1989 Roderick Ross Elize Kleyn 1990 Trevor Rolfe Nichola Meyer 1991 Simon Morton Kaeli Albertyn 1992 Simon Ward Jacqui Reeves 1993 Steven Schmutz Bonny Robb 1994 Mark Maritz Natasha Bauermeister 1995 Brian Coldrey Nina Dewey 1996 Morné Swart Nicole Klassen 1997 Nicholas Higham Carrie-Anne Kropman 1998 Robert Gessner Sandra Mansell 1999 Ben van Stormbroek Joanne de la Cornillere 2000 Michael Dunn Lauren Young 2001 Shawn Thompson Kirsty van Stormbroek 2002 Mark Phillips Candice Lyons 2003 Jean-Pierre Catto Tarryn Blackwood 2004 Jade Köhler Monique Huysamen 2005 Lloyd Rhodes Michelle Kilfoil 2006 Jamie Roussouw Jayde Dunlop 2007 Jacques-Johann Odendaal Jaclyn van Greunen APPENDIX 6 SRC CHAIRMEN 1997 Nicholas Higham 1998 Ben van Stormbroek 1999 Diane-Maree D’Aguiar 2000 David-Jon Friederichs 2001 Tanzi Davies 2002 Tarryn Blackwood 2003 Claudia Cole 2004 Warrick Wyngaard 2005 Tarryn Petersen 2006 Julia Taylor 2007 Coralie Valentyn APPENDIX 7 HONOURS - SUMMA CUM LAUDE 1991 Rory McKinley 1992 Nicole Kok 1993 Steven Schmutz 1994 Dawn Durrbaum 1995 Lorna Maneveld
  • 213.
    212 1996 Annette Lang 1997Carrie-Anne Kropman 1998 Neil Yorke 1999 Lisa Stockland 2000 Susan Wood 2001 Tamsin Adams 2002 Jane Lindhorst 2003 Ryan Hultzer 2004 Gannie Tzoneva 2005 Yanni Yang 2006 Laura van Laeren 2007 Wietske Rubow APPENDIX 8 SCHOOL DUX 1979 Roderick Leerkamp 1980 Tracy McCarthy 1981 Clem van der Riet 1982 Noel de Villiers 1983 Noel Gillespie 1984 Jimmy Donaldson 1985 Heather McGregor 1986 Craig Mullet 1987 Chantal Jeannot 1988 Glen Thomson 1989 Roderick Ross 1990 Nichola Meyer 1991 Rory McKinley 1992 Nicole Kok 1993 Steven Schmutz 1994 Rory Yorke 1995 Lorna Maneveld 1996 Annette Lang 1997 Carrie-Anne Kropman 1998 Neil Yorke 1999 Lisa Stockland 2000 Jennifer Poole 2001 Tamsin Adams 2002 Jane Lindhorst 2003 Ryan Hultzer 2004 Gannie Tzoneva 2005 Yanni Yang 2006 Laura van Laeren 2007 Wietske Rubow
  • 214.
    213 APPENDIX 9 ‘A’AGGREGATES 1980 19881993 1998 J. de Villiers C. de Villiers A. Afonso M. Adam T. McCarthy K. Hare C. Broek S. Allison L. Ireland R. Human M. de Bruyn G. Thomson A. Kropman K-M. Elgie 1981 G. Wilkinson D. Maritz J. Hirschi - G. O’Conner M-A. Johannes 1989 A. Rabe C. Kirby 1982 S. Schmutz S. Mansell M. Butler E. Visagie N. Maunder J. Andreas L. Gray G. Rodrigues N. de Villiers P. Jacoby 1994 C. Roux J. Marais E. Kleyn T. Sickel A. Nardine C. Lockett E. de Villiers J. Smit D. Wilkinson H. Pitcher R. Dreijer J. Steynberg N. Puttergill D. Durrbaum D. Thomas 1983 S. Quinn R. Durrbaum R. van Dijk G. Rose J. Knowles V. van Vuuren N. Gillespie R. Ross M. Maritz M. West J. Quine L. Wasson R. Yorke T-L. Williams C. Rabe K. Webb N. Yorke J. Woods 1995 1984 1999 1990 K. Bell J. Donaldson N. Dewey L-A. Bingham S. Kluyts J. Calefato L. Maneveld C. Cawood G. Tredoux H. Hettasch A. Taylor C. Fourie N. Meyer S. Giles 1985 R. Oates 1996 C. Goodwin T. Rolfe J. McMillan H. McGregor J. Brink K. Muirhead 1991 M. Butterly G. Muller 1986 M. Kilian M. Oudejans K. Albertyn A. Lang L. Stockland S McCall B. Eastes S. Mullett B. Taylor C. Menck R. Heideman S. Sickel L. van der Merwe C. Mullet (10th ) N. Lockett M. Swart B. van Stormbroek N. Oosthuizen R. McKinley S. van der Merwe E. Starke J. Turner A. Tomkyns 1997 1992 1987 S. Adams N. Kok S. Birch C. Jeannot S. Lourens A. Bokelman J. Judelsohn C. Murphy N. Crowley J. le Roux A. Robinson M. Danielsen D. O’Conner N. Higham G. Robertson C-A. Kropman A. Sturdon M. Leader M. Meyer D. Mottershead N. Taylor C-L. Vermoter
  • 215.
    214 2000 2002 20032005 B. Bester L. Bartsch C. Raad C. Lesch L. Bokelman C. Batchelor S. Redivo G. Louw C. Crosswell K. Bird J. Roberts L. Malander D-M. D’Aguiar J. Danielsen G. Schlee Z. Malinga S. du Toit A. de Beer T. Schultz C. Martin C. Fischer R. de Villiers S. Sickel K. Martin A. Foxcroft Tanya Dennis C. Thomson B. McMillan N. Hayward Tracey Dennis L. Trollope A. Muller L. Jack M. Enslin A. Verkhovsky K. Mwaba M. Kossmann C. Frey L-M. West N. Sobotker A. Lehner C. Gessner S. Zietsman J. van Vuuren J. Main R. Guise Y. Yang A. Maunder A. Hsu 2004 A. Miller J. Lindhorst 2006 A Nicol S. Links L. Basson J. Poole C. Lyons K. Bonney S. Batchelor S. Wood A. Main W. de Wit B. Beecroft C. Zietsman R. Marthinussen T. Eberhard N. Conradie D. Moodley S. Evans G. Deacon 2001 D. Mpye N. Gous M. de Lange M. Niemand M. Grapendaal T-L. de Villiers B. Adams L. Philips A. Grimm N. Eberhard T. Adams J. Rodriques L. Hambides L. Foxcroft W. Botha M. Stockland K. Kelly S. Francis K. Calitz K. Sunkel T-M Kingwill L. Hanekom C. Chowles R. Topp J. Kopec K. Helm L. Coetzee K. van der Merwe C. Long G. Janse van Veuren K. Collier C. Meissenheimer J. Janssen K. Coupar 2003 B. Miller F. Löndt M. de Groot J. Muirhead A. Mills C. Ebden A. Aldridge T. Purnell Y-N. Park M. Fredericks R. Barlow E. Smith P. Rokita M. Grapendaal T. Blackwood V. Snyman S. Smit A. Hambides J-P. Catto R. Stemmett J-P. Steyn V. Hsu J. Clark W. Stone L. van Laeren J. Kingwill C. Cole G. Tzoneva T-L. Vos J. Klink A. Colyn L. Upsher A. Ward T. Kretschmer C. Cookson L. van der Linde Z. Withers M. le Grange D-L. D’Aguiar D. van Heerden H. Woodhead L. Loots T. Foxcroft A. Verreynne J. Macfarlane A. Gartrell L-A. Wood-Pottle S. Manford A. Helm L. Mattheyse R. Hultzer 2005 M. Mayley E. Khan G. Meinking G. Kiewitz J. Berry L. Nelson K. Lancaster Z. Blaauw D. Oebell N. Louw N. Davies D. Pienaar J. Louwrens G. Flynn L. Robertson L. Loynes R. Gartrell G. Rulfo S. Lubeck C. Harding T. Smith L. Malan M. Hirst E. van der Linde L. Mallon M. Kilfoil K. van Stormbroek A. Mohamed A. Lampard G. Willow E. Mugabo L. Langeveldt M. Yiannakis L. Noach S-J. Laten
  • 216.
    215 A fitting endto the 30th year celebrations were the Matric results of 2007, the best recorded at Fairmont. Seen here are some of the 47 ‘A’candidates celebrating their academic achievement. 2007 A. Afonso A. Barma B. Botha L. Butler N. Christy A. Couchay D. Croucher M. Davidson K. Emma-Iwuoha M. Golden A. Greyling S. Harding L. Horstmann K. Jarvis R. Kerr R. Kotze J. Krige F. L’Abbate H. Lee C. Lombard S. Matsolo L. McGeorge K. McKinley K. Mealor K. Morrissey K. Mwaba J. November JJ. Odendaal C. Petersen K. Poovan J. Rom W. Rubow E. Rusconi R. Scott N. Sneyd N. Swanepoel E. Taylor A. Teare B. Teare R. Teuchert N. Van der Touw N. Van Rensburg B. Van Sittert W. Vraagom J. West S. Yang Y. Yiannakis
  • 217.
    216 APPENDIX 10 GOOD FELLOWSHIPPRIZE * 1979 Lesley Windell 1980 Tracy McCarthy 1981 Bonnie van der Walt 1982 Karen Davies 1983 Sanette van der Mescht 1984 Darlene Mynhardt / Ian Cloete 1985 Jane Hulatt 1986 Craig Cloete 1987 Jean-Pierre Rossouw 1988 Robyn Ferguson 1989 Judy Newham 1990 Martin Meyer 1991 Richard Friend 1992 Elton Neethling 1993 Catherine Broek 1994 Kym Pope-Ellis 1995 Lawrence Higham 1996 Gavin Hauck 1997 Sean Loots 1998 Keri-Lyn Dick 1999 Leanne Saffrey 2000 - 2001 Gavin Jones 2002 Kirstin van der Merwe 2003 Claudia Cole 2004 Wouter de Wit 2005 Warrick Wyngaard 2006 Sita Smit 2007 Robert Kotze * 1979, 1980 chosen by staff, 1981 - 2007 chosen by matrics APPENDIX 11 PRINCIPAL’S PRIZE 1981 Vanessa Radford-Hayden 1982 Derek Klazinga 1983 Bruce Low 1984 Glen McNair 1985 Heather McGregor 1986 John Money 1987 Diane O’Connor 1988 Terry Fowler
  • 218.
    217 1989 Bryan Kelly 1990Charlaine Coetzee 1991 Carel Theron 1992 Tanya Price 1993 Catherine Broek 1994 Dawn Durrbaum 1995 Nina Dewey 1996 Vaughn Jensen 1997 Carolyn Holland 1998 Sandra Mansell 1999 Leanne Saffrey 2000 David-Jon Friedrichs 2001 Taryn Boonzaaier / Tarryn Bright 2002 Carla Ancillotti 2003 Jean-Pierre Catto 2004 Xavier Millar 2005 Michelle Kilfoil 2006 Janine Janssen 2007 Jacques-Johann Odendaal APPENDIX 12 PAST PUPILS’AWARD 1990 Jeannine Herrington 1991 Sharon Roux 1992 Samantha Saunders 1993 Annemarie Kropman 1994 Schonette Coetzee 1995 Rene Fourie 1996 Antony Tolfts 1997 Nicola Taylor 1998 Samantha Jones 1999 Brynn Taylor 2000 Samantha Stampe 2001 Linda Mattheyse 2002 Andy Hsu 2003 Warren Kent 2004 Claire Allen 2005 Michelle Pheiffer 2006 Jaco Venter 2007 Nadine Swanepoel
  • 219.
    218 APPENDIX 13 FAIRMONT AWARDS TheFairmont Award was introduced in 1991. In addition to the many who have served on committees and sub-committees, others who will always be remembered for their special contribution to the school before 1991 include: * Mrs Craddock, first PTA secretary and fête convener. * Tuckshop convenors Mrs Windell, Mrs McCarthy, Mrs Keohane, Mrs Bosken, Mrs Gouws. * Mrs Woodhead, Mrs Howard and Mrs Crighton - clothing bank. * Mrs Fivaz and Mrs Williams - fêtes and fund-raising. * Mr Hardy and the matric examination invigilators. * Mrs Duckitt, Mr Steynberg, Mr Collins, Mr De Vries, Mr Dewey, Mr Kingwill and Mr Leader, who were responsible for school finances. * Mrs M Wulfse and all who assisted with magazine advertisements. * Mrs Ludditt and those who coached or assisted school teams. * Mrs Lyn Wigg, who helped in so many ways throughout, but especially during the founder years, in the clothing bank, with the provision of curtains in the hall, the offices, staff room, library and Recreation Centre, and who organised the Valedictory Day teas for a number of years. * Mrs Yvonne van Wyk, first school secretary. * Magazine editors. * Dance convenors and organisers. * Printers, laboratory assistants. * Mr Engelbrecht, caretaker, and general assistants. * Mr Frank Choice. * MrClivePeckwho,apartfrombeingacommitteemember,randancingclassesfor manyyears * Drum majorette mothers. 1991 Mrs S Johnston 1992 Mrs P Koning Mrs V Helders Mrs A Jones Mr G Willet 1993 Mrs G Bull Mrs J Davis Mr B Machrell Mr B Merryweather 1994 Mrs P Chapman Mrs B Sheet Mrs E Donachie Mrs B Vermoter Mr D Meyer 1995 Mrs J Brink Mrs V Crighton Mrs A Loynes 1996 Mrs A Bosch Mrs L Coetzer Mrs C Cowley Mr F Ershine 1997 Mr M Ettish 1998 Mrs F Harvey Mrs H Smit 1999 Mr R Aitken Mrs H Isgar Mrs M Oosthuizen Mrs D Smedley Mrs M Vorster Mr B Williamson 2000 - 2001 - 2002 Mrs G Aldridge Mr G Gatenby Mrs C Schwartz 2003 - 2004 Mrs T Boonzaaier Mrs R Killassy 2005 Mrs A de Reuck Mrs L du Toit Mrs A Langeveldt Mr N Speres Mrs A Stone Mr G and Mrs J Vock 2006 Mrs R Odendaal Mrs J Martin Mrs M Dingley 2007 Mrs A Dolpire Mr N Donachie Mrs J Hunt Mr A Kokott Mrs M Kropman
  • 220.
    219 1979 Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming DrumMajorettes 1980 Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes 1981 Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Robin Craddock Gavin Howard Colleen Egan Carol Partridge Mark Radford-Hayden Paul Bidder Fern Hemy Craig Paine, Tammy Watermeyer Fern Hemy Gary le Seur Grant Morton Susan Bremner Celeste Taylor Mark Radford-Hayden Derek Klazinga Karen Axon Tammy Watermeyer Debby Coltman Derek Klazinga Justin Johnstone Gillian Hand Celeste Taylor Norman Woods Derek Klazinga Cheryl Martin Mark Hershaw Melinda Wulfse APPENDIX 14 FIRST TEAM CAPTAINS (We apologise to those captains whose names are not listed. Every effort was made to trace them) 1982 Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes 1983 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes 1984 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball Derek Klazinga Victor Hawken Gillian Hand Michele Viljoen Benjamin Cranke Stefan Janser Michelle Botes Benjamin Cranke Melinda Wulfse Dan Truter, Ruth Grieve André Swart Shaun Bougard Susan Hynes Karen Thompson Bruce Low Roel Veenstra Tracy Turner M Nortje, Janine Horne Tracy Fraenkel Patrick Day, Gail Grobbelaar Anthony Batchelor Shaun Bougard Rhondda Davies Karen Thompson John Dixon Derek Hershaw Tracy Turner René Burbidge Samantha Kotze
  • 221.
    220 1985 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming DrumMajorettes Boys’ Basketball Girls’ Basketball 1986 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1987 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1988 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1989 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1990 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball Patrick Day, Janine Quine Craig Cloete Andrew Donnelly Dominique Veldhuis Janice Röbeck Craig Cloete Douglas Thomson Dominique Veldhuis G King, Sandy Puttergill René Burbidge René Lotz Craig Cloete Barry Chadburn Penny Neumann Terry Fowler Craig Cloete Allan Beverley Judy Hynes Carol-Anne Heibner Haig Greenwood Pamela Woolliscroft James Fraser, Bridget Laughton Barry Chedburn Barry Chedburn Natalie Lloyd Terry Fowler Paul Prior Allan Beverly Laureen Fraser Angus Gray, Heike Longwitz Carol-Anne Heibner Billy Bishop Terry Fowler Graham Skelding, Terry Fowler Paul Prior Quentin du Toit Bronwyn Hudson Terry Fowler Paul Prior Robert Northcote Laureen Fraser Jayne Cohen Paul Prior Janet Beverly Roderick Ross, Kim White Morné de Wet Quentin du Toit Christine Forbes Lisa Ludditt Bruce Fairhurst Michael White Genevieve Steyn Nikki Puttergill Tania Hobbs Wayne Parker Carmen Truter Neil Slabbert, Jeannine Herrington Brendan de Wet Richard Friend Charlaine Coetzee Leanne Crooke Benjamin Naude Michael White Bronwyn van Heerden Trevor Rolfe, Irene Ackermann Tracy Stebbing Martin Meyer Justine Fowler
  • 222.
    221 1991 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming DrumMajorettes Boys’ Basketball Girls’ Basketball 1992 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1993 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1994 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Girls’ Basketball 1995 Athletics Badminton Cricket Cycling Chess Boys’CrossCountry Girls’CrossCountry Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Table Tennis Tennis and Golf Girls’ Tennis Drum Majorettes Girls’ Basketball 1996 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming Drum Majorettes Girls’ Basketball Dino Steele Schonette Coetzer Claire Davis Mark Maritz Mark Koppel Schonette Coetzer Jason Render Kelly Steenkamp Nicole Luis Michelle Uys Greg Marshall, Cara Kilgour Scott O’Conner Bernard Nel Shaun du Plooy David Smith Antony Tolfts Diane Thomas P-J Loynes Debbie Friend Charlene Bronkhorst Angus Tanner Grant Croeser Julie Hauck Derrick Heiberg, Kim Chambers Peter Prinsloo Sven Petersen Diti Blias Melanie Selman Liezel Hackart Heinrich Wicht, Kerry Compton Julian Calefato Craig Baxter Michelle Roux Janine Wordon Gavin Hauck Grant Croeser Leonard Beyers, Michelle Dosson Kirstyn Harris Liezel Hackart Neil Slabbert, Elise de Vries Richard Friend Richard Friend Bronwyn van Heerden Lynn McGrath Benjamin Naude Simon Ward Bronwyn van Heerden Simon Morton, Michelle v.d Meulen Mandy Slabber Kevin Dentener Karen de Beer Smit André Theron, Elise de Vries Gary Wallace Darryl Muldoon Theresa Pitcher Tanya Price Stuart Tanner Simon Ward Bronwyn van Heerden Elton Neethling Michelle Ladewig Kevin Dentener Karen de Beer Smit Andre Theron Louise Robinson Gary Wallace Darryl Muldoon Bronwyn van Heerden Claire Davies Sheldon Smorenburg Cowan Johnstone Bronwyn van Heerden Ryan Bidgood Annemarie Kropman Nicole Luis Robert Chin Claire Lotter Adrian Wiehahn Glen Seiler
  • 223.
    222 1997 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Softball Swimming DrumMajorettes Boys’ Basketball Girls’ Basketball 1998 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Girls Soccer Boys Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 1999 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Girls Soccer Boys Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball Angus Tanner, Diane Thomas Julian Calefato Craig Turnbull Pamela Johnston Celeste Sameuls James Espin Dean Jardine Natalie Ryke Sean Loots, Carrie-Anne Kropman Kirstyn Harris Sean Pye Carolyn Holland Diane Thomas Justin v.d Merwe Craig Turnbull Heather Gauld Celeste Sameuls Luke Keyser Tenille Jurd Leigh Köhler Natalie Ryke André Montauban, Diane Thomas Lee-Ann Harvey Garth Howell Celeste Sameuls Dennis de Wet, Laurien Allison Edward Knowles Ben van Stormbroek Michelle Moore Nadia Smit Luke Keyser Amanda Denys Ryan Lea Linzi-Jane Kingwill Mark Lambson, Sarah O’Hanlon Chantelle Ackerman Marco Nucci Jenny Mayley 2000 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Girls Soccer Boys Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 2001 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Girls Soccer Boys Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball 2002 Athletics Cricket Boys’ Hockey Girls’ Hockey Netball Rugby Soccer Girls Soccer Boys Softball Swimming Drum Majorettes Boys’ Basketball Girls’ Basketball Henry Thomas, Tarryn West Michael Dunn Rhyno Swart Lauren Mitchell Samantha Stampe Lee v d Berg Joanne Merry David-Jon Friedrichs Lauren Mitchell Jason Vorster, Lauren Allison Erin Killassy David Chiang Michelle Mayley Stuart Klaassen, Marika Yiannakis Shawn Thompson Lawrence Romburgh Marika Yiannakis Candice Henry Wandile Nkula Joanne Merry Gavin Meinking Benjamin vd Merwe, Leigh-Anne Loots Tarryn Boonzaaier Bjorn Groenewald Michelle Mayley Troy Siebert, Sarah Pope L Brown Mark Phillips Leigh Bierman Christina Gessner Ryan Haste Nicole Davies Justin Davids C Keyser Benjamin vd Merwe, Lisa Loynes Daphne Storey Bjorn Groenewald L Booysen
  • 224.
    223 2003 Athletics Jason Annandale LisaLoynes Cricket Greg Staffen Boys’ Hockey Jean-Pierre Catto Girls’ Hockey Leigh Bierman Netball Jannice Annandale Rugby Arthur Hewitt Soccer Girls Tracey Robertson Soccer Boys Justin Davids Softball Ashleigh Haste Swimming Leigh Bierman Drum Majorettes Chloë Lyth Boys’ Basketball Xavier Millar Girls’ Basketball Michelle Hopley Badminton Boys Wouter de Wit Badminton Girls Sylcke Lübeck Chess Martin Skeens Cross Country Wouter de Wit Squash Boys Aran Gatenby Squash Girls Debbie McAlistair Table Tennis Darren-Lee Dorman Boys’ Tennis Girls’ Tennis Shelly Crowther Indoor Hockey Leigh Bierman 2004 Athletics Xavier Millar Rori Fortuin Cricket Sean Hulley Boys’ Hockey Richrd Sclanders Girls’ Hockey Leanne Langeveldt Netball Cherise Griffin Rugby Gareth Jones Soccer Girls Kay Norton Soccer Boys Damian Whatley Softball Kay Norton Swimming Stacey-Lee la Bella Tyron McNamara Drum Majorettes Leanne Beattie Boys’ Basketball Xavier Miller Girls’ Basketball Alyssa Cookson Badminton Boys Wouter de Wit Badminton Girls Ania Barma Chess Yun-Kuang Cheng Golf Neil Whitehorn Squash Boys Aran Gatenby Squash Girls Jayde Dunlop Table Tennis Darren-Lee Dorman Boys’ Tennis Lloyd Rhodes Girls’ Tennis Lisa Upsher Indoor Hockey Leanne Langeveldt 2005 Athletics Matthew Speres Rori Fortuin Cricket Cheslin Tremble Boys’ Hockey Lloyd Rhodes Girls’ Hockey Leanne Langeveldt Netball Rori Fortuin Rugby Matthew Speres Soccer Girls Taryn Vos Soccer Boys Dean Gabriels Softball Swimming Jayde Dunlop Sean Hunt Drum Majorettes Candice Johnson Boys’ Basketball Matthew Speres Girls’ Basketball Alyssa Cookson Badminton Boys Adrian de Vries Badminton Girls Ania Barma Chess Yun-Kuang Cheng Golf Bruce McMullen Squash Boys Tarquin Stapa Squash Girls Jayde Dunlop Table Tennis Cheslin Tremble Boys’ Tennis Lloyd Rhodes Girls’ Tennis Ingrid Crowther Indoor Hockey Leanne Langeveldt 2006 Athletics Ashley Smit Jaclyn van Greunen Cricket Nathan Kolbe Boys’ Hockey Jamie Rossouw Girls’ Hockey Sita Smit Netball Janine Janssen Rugby Ashley Smit Soccer Girls Taryn Vos Soccer Boys Yorgo Yiannakis Softball Swimming Jayde Dunlop Sean Hunt Drum Majorettes Andrea Stewart Boys’ Basketball Michael Holliday Girls’ Basketball Janine Janssen Badminton Boys Adrian de Vries Badminton Girls Kalyn de Vries Chess Ciaran Liederman Golf Hansol Lee Squash Boys Marc Rafael Squash Girls Nicole Bosch Table Tennis Wesley van Huyssteen
  • 225.
    224 Boys’ Tennis NielVermeulen Girls’ Tennis Linda Jooste Indoor Hockey Aimee Hill 2007 Athletics Lucien Vogel Guinivere Rogers Cricket Steven Dembitzer Boys’ Hockey Bruce McMullen Girls’ Hockey Jaclyn van Greunen Netball Chanel Neethling Rugby Jarred le Roux Soccer Girls Auberi Courchay Soccer Boys Yorgo Yiannakis Softball Chanel Neethling Swimming Ettiene Rusconi Marisia Lipowski Drum Majorettes Ashton Warrington Boys’ Basketball Michael Holliday Girls’ Basketball Dominique Du Plooy Badminton Boys Adrian de Vries Badminton Girls Kalyn de Vries Chess RyanJansevanRensburg Golf Bruce McMullen Squash Boys Thomas Ibbotsen Squash Girls Nicole Bosch Table Tennis Craig Bauer Boys’ Tennis Luke Thorrold Indoor Hockey Paula Lotter APPENDIX 15 PERSONALIA Mrs Maria Kropman - Longest serving member of the Governing Body Mrs Maria Kropman has been associated with Fairmont as a mother for nineteen continuous years. From January 1989 to the end of 2007 she has been parent to six children who have passed through the corridors of our school. She was a member of the old parent association from 1993 to 1997 and a member of the School Governing Body since 1997. She held the office of Vice Chairperson from 2000 to 2006 serving on four main committees namely: Discipline, Interviews, Uniform and Academic. She has served under the chairmanship of: Rob Williamson, Mike Ettish, Neil Speres, Mike de Villiers and Andre du Toit as well as all three principals of Fairmont. Maria Kropman’s input, interest and unselfish contributions throughout these years is nothing short of outstanding. As a longstanding member of the parent body, she provided a system of continuity in policy and decision making. Mrs Kropman continues to serve the school as a co-opted member of the Governing Body.
  • 226.
    225 Mr Udo Horsthemke- Longest serving member of the Fairmont Staff As Co-curricular Co-ordinator Udo Horsthemke is almost synonymous with Fairmont High School. Ask anyone about any sport event involving Fairmont High School and Udo will be mentioned. If the staff need to organize transport, Udo is the person to call. But, even more significant is Udo’s loyalty to the school as one of the first staff members of the school - a 30 years’ bond which makes him a true blue Monty. Udo, a UCT graduate, taught for 6 years in three different Namibian schools before applying for the post of German and Afrikaans teacher at the then one year old Fairmont. (Udo laughingly says that one can easily say that he has grown “older” with Fairmont.) Udo’s relationship with Fairmont began with the teaching of German (Standard 6 to Matric), Afrikaans (Standard 6 and 7) and History (Std 6). He was asked to teach Bible Education, Youth Preparedness, Music Appreciation and Geography also at various times before he left teaching in 1996. One can see clearly why Udo is so respected as Co-curricular Co-ordinator since he has always been totally involved and interested in school activities. The fact that extra-mural involvement was compulsory during his teaching years was certainly not a hardship for him. He started a German Society in 1979 and kept it going until he retired. He was in charge and coached Soccer for most of his teaching career and also enjoyed being in charge of Athletics for three years, as well as managing tennis and cricket teams at various times. During the first years of Fairmont High School, all teachers were asked to contribute to the administrative duties and Udo was appointed Head of Stationery, Inventory, ordering and control of school books (which was a huge ongoing task) and for sometime he was Head of Acquisitions. He was also Standard Head (now Grade Head) of all standards at various stages. He greatly enjoyed the opportunity to work with some of the most enthusiastic pupils when he was in charge of the matric farewell for four years. Other duties that he performed most efficiently were: Matric Valedictory Services, School Drivers’Education Programme ( which he claims to have given him grey hair prematurely), the control and hiring of school lockers and transport arrangements for staff and pupils. Certainly an illustrious teaching career. In 1997, Udo was appointed Co-Curricular Co-ordinator. He still taught German privately to pupils who were still interested to write the subject until the end of 2007. In his capacity of Co-Curricular Co-ordinator, he is an integral part in the running of the school’s extra-mural programme and is respected as someone who is always amiable and courteous, highly organized and a true ambassador for the school. Udo declares that although many may feel that thirty years at the same school may sound boring, it has been thirty years of experiencing every day as different and working with great people which has made this position a pleasure.
  • 227.
    226 APPENDIX 17 REFERENCES 1. TheMaking of Education Policies in South Africa - Ken Hartshorne Oxford 1999. 2. Managing Educational Change - Brahm D Fleisch Heinemann 2002 Academic Staff Mrs Juanita Aggenbach Mrs Carol Aston Mrs Marcel Badenhorst-Nieuwoudt Mrs M Barnardt Mrs Alta Behrendt Ms Nicolette Bleeker Mrs Estelle Brettenny Mrs Heather Bruce Mr Pieter Cronje Mr Johann Dempers Mr Ron Dingley Mr Willie Dowd Ms Karien Bredenkamp Mr Justin Edwards Mr Brian Elgie Mrs Morna Esmeraldo Mr Hendry Freeman Mrs Anne Friedenthal Ms Jessica Hancock Mrs Rinnie Hansen Ms Ingrid Hodge Mr Udo Horsthemke Mrs Maria Jacobs Mrs Tanya Janse van Rensburg Mr Lance Job Mr Gerhard Jordaan Ms Liska Kassier Mrs Jenan Kingwill Ms Nicola Kirby Mrs Carla Kurt Mrs Sandra Lamprecht Mr Michael Leibbrandt Mrs Antoinette Lourens Mr Stevan Marais Mrs Barbara McMillan Mrs Clare Murphy Mrs Portia Naidoo Mrs Lorraine Neethling Mrs Beatrix Nel Mrs Jeanne Oosthuizen Ms Oreada Piek Ms L’nanda Pienaar Mrs Arlene Pietersen Mrs Linette Rousseau Mrs Mari Schnehage Ms Lynelle Smitsdorff Mrs Janice Solomons Mrs Eleanor Splinter Mrs Gillian Stemmett Mrs Shilo Swanepoel Mrs Mattie Uys Ms Jeanette v.d. Merwe Ms Wendy van der Merwe Ms Verena van Niekerk Ms Sunelle van Wyk Mrs Elsabé van Zyl Mr Paul Vegter Mr Neville Veldman Mrs Christa Vermeulen Mrs Brenda Vermoter Mrs Beulah Vezasie Mrs Shirley Visser Mrs Betsie Vorster Mrs Christine Weerts Administrative Staff Mrs Bronwen Bradshaw Mrs Lola De Clercq Mrs Amanda de Reuck Mrs Gonnie Dijkshoorn Mrs René Finlay Mrs Hildegard Homewood Mrs Liefie Jacobs Mrs Shelagh Johnston Mrs Nelly Pool Ms Lesley van Aswegen Support Staff Mr Abraham Muller (Chucky) Mr Moses Allens (Pikkie) Mr John Apies Mrs Ann Bonthuys Mr Elario Geldenhuys Mr Klaas Jordaan Mr Alfred Maxongo Mr Andries Mekriega APPENDIX 16 STAFF PRESENT DURING ANNIVERSARY YEAR - 2007
  • 228.
    Fairmont High School PrivateBag X11 Durbanville 7551 Medway Durbell Durbanville Tel: (021) 976-1147 Fax: (021) 976-8735 e-mail: postmaster@fairmont.co.za www.fairmont.co.za Fairmont High School, originally known as The Eversdal English Medium School, opened its doors in January 1977. The first Principal, Mr Clive Wigg, started the school with a staffing complement of seventeen teachers and three hundred and thirty pupils in a three-storey building which was far too big for the first intake. There were no sports fields, no memorial quad, the hall was still under construction and the pupils had no prescribed uniform.At the end of the first year, the school was renamed Fairmont High School. At that stage, the school was equipped with two tennis courts, two netball courts, two cricket nets, and a turf wicket in the centre of the only field. The pupils proudly wore their brown uniform – very different from all the surrounding schools. In 1979 there were six hundred and sixty pupils. Three additional fields were completed and the first official cricket match took place against Bergvliet. In 1983 the state provided forty-eight staff members and in 1986 there were fift-nine state-employed educators. By 2006, the state employed only thirty-three educators, while the Board of Governors of Fairmont employed thirty additional teachers. It became apparent that the school built for 720 pupils, was far too small for the 1200 pupils it had to accommodate. Extensions to the main building were completed in 1994. In December 2002 Mr Wigg retired from teaching, leaving behind a vibrant active school. Mrs Liz Müller, who had been teaching at Fairmont since 1985, took over as acting Principal in January 2003 and in July 2003 was appointed as Principal. The theme “ANew Beginning” seemed to be most appropriate for 2003 and gave everyone something new to strive for. Sadly, Mrs Müller, after a brief illness, passed away in 2006. Today the school continues to grow on the foundations built by Mr Wigg and Mrs Müller. The Principal of Fairmont is Mr Ron Dingley. There is a staff contingent of seventy teachers, twenty administrative and support staff and one thousand two hundred and fifty pupils. Fairmont is the only English medium school between Durbanville and Stellenbosch. This document is an account of the years 1977 to 2007.