Everything you need to know about
cloud migration
200%
ADDITIONAL COST
Stakeholders frightened
of final cost
36M
FROM 9M PROGRAM
Lack of basic business
features
X1.5
OPERATIONAL COST
A part of subsystem still
running on-premises
Line of business applications used to manage and keep tracking of goods inside a warehouse.
Web interfaces used by different suppliers to order and check the current stock. Integrated with
3rd party solutions for optimization and cost tracking.
In total there are 3 warehouses within a radius of 10 kilometres, where 800 employees are
working 24/7, delivering 20.000 goods per day.
WAREHOUSE
MANAGEMENT
SYSTEM
Radu Vunvulea
Endava
Microsoft Regional Director
Microsoft Azure MPV
2010: 1st cloud commercial
cloud project
COST OPTIMIZATION IS THE PRIMARY REASON FOR 47% OF
ENTERPRISES’ CLOUD MIGRATION
90% OF COMPANIES ARE ON THE CLOUD
https://hostingtribunal.com/blog/cloud -computing-statistics/
Enterprises embrace multi-cloud
Public cloud adoption CONTINUES
TO ACCELERATE
Public cloud adoption is evolving
Use of public cloud PaaS
services is rising
Organizations STRUGGLE to get a
handle on growing cloud spend
https://www.flexera.com/blog/industry -trends/trend-of-cloud-computing-2020/
6
Agenda
1. WHY DOES A CLOUD MIGRATION FAILS
2. AZURE CLOUD ADOPTION FRAMEWORK OVERVIEW
3. MIGRATION TOOLS AND TEMPLATES
4. MIGRATION STRATEGIES
HOW A CLOUD MIGRATION CAN FAIL
Time, Budget, Scope, SLA, Quality Metrics, Skills, KPIS
8
Running in the same way as you would run them on-premises
Cloud is build in such a way to use resources only when you need them
On-premises are build with no orchestration or autonomy ability
Public cloud is metered and you pay for each for bit of it
Failure to adapt to the cloud
3 of 4 apps migrated
to cloud, moved back
to on-premises after
failing to achieve the
anticipated benefits
H T T P S : / / W W W . F O R T I N E T . C O M / C O N T E N T / D A M / F O R T I N E T / A S S E T S / A N A L Y S T - R E P O R T S / A R - 2 0 1 9 - I H S M - F O R T I N E T - W P - Q 2 . P D F
9
Projects are driven by IT departments
Key people invited to late
No business KPIs and full business commitment
Not bringing in the business stakeholders
3 of 4 apps migrated
to cloud, moved back
to on-premises after
failing to achieve the
anticipated benefits
H T T P S : / / W W W . F O R T I N E T . C O M / C O N T E N T / D A M / F O R T I N E T / A S S E T S / A N A L Y S T - R E P O R T S / A R - 2 0 1 9 - I H S M - F O R T I N E T - W P - Q 2 . P D F
10
Manage cloud in the same way as you would manage on-premises
solutions
Lack of procedures in the case of a failure
No tracking and logging capabilities
No optimization and cloud economics procedures
No Cloud Operating Model
3 of 4 apps migrated
to cloud, moved back
to on-premises after
failing to achieve the
anticipated benefits
H T T P S : / / W W W . F O R T I N E T . C O M / C O N T E N T / D A M / F O R T I N E T / A S S E T S / A N A L Y S T - R E P O R T S / A R - 2 0 1 9 - I H S M - F O R T I N E T - W P - Q 2 . P D F
11
LACK OF PLANNING
Migration are started without a well-
researched and clear definition. They lack
of a strategy from day 0
The migration approach is crucial for
success. Even so, organizations don’t
spend enough time to identify what
solution works best for their specific
applications
Lack of testing in each stage of the
migration journey hide issues that could
be spotted earliest in the process.
WRONG MIGRATION
APPROACH NO TESTING
GOVERNANCE
Starting from selecting the wrong cloud
provider to ignoring access management
and compliancy requirements.
No strategy related to integration with
existing systems and gaps of skills
required to ensure success of such
integrations
Deciding to use a specific cloud vendor or
partner without considering business
expectations and technical capabilities
INTEGRATION VENDOR SELECTING
LANDING ZONES
Metropolis
• Using an analogy, this is similar
to how city utilities such as
water, gas, and electricity are
accessible before new houses
are constructed. In this context,
the network, IAM, policies,
management, and monitoring
are shared 'utility' services that
must be readily available to
help streamline the application
migration process.
Landing Zone
• The principle purpose of the
“Landing Zone” is to ensure that
when a workload lands on
Azure, the required “plumbing”
is already in place, providing
greater agility and compliance
with enterprise security and
governance requirements
Test-driven development (TDD)
A simple agreement between the cloud
platform team and other affected
teams. It will outline expected value-
added features and will become
increasingly complex as additional
workloads and cloud features are
adopted.
WHY DO ENTERPRISES NEED CLOUD ADOPTION
Cost Avoidance
Staff Productivity
Customer Experience
Faster time to market
Build a NEW REVENUE STREAM
WHAT DOES CLOUD MIGRATION MEAN?
CREATE new business value
Enhance WITH modern features and capabilities
HOW WE DO A CLOD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
ALIGN STAKEHOLDERS
ALIGN PARTNER SUPPORT
BUSINESS JUSTIFICATION
BUSINESS KPIS
DOCUMENT STRATEGY TOOLS
CLOUD JOURNEY TRACKER
BUSINESS OUTCOME TEMPLATE
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
GATHER DATA AND ANALYZE ASSETS AND WORKLOADS
MAKE A BUSINESS CASE
CREATE MIGRATION PLAN
ASSESS DIGITAL ESTATE TOOLS
AZURE DEVOPS DEMO
GENERATOR
CLOUD ADOPTION PLAN
TEMPLATE
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
BUILD SKILLS READINESS PLAN
DEPLOY AN ALIGNED LANDING ZONE
EXPAND LANDING ZONE
SHARE PLANS WITH PEOPLE
REVIEW ORGANIZATION PROCESSES
TOOLS
AZURE SETUP GUIDE
READINESS CHECKLIST
NAMING AND TAGGING
TRACKING TEMPLATE
LANDING ZONE BLUEPRINTS
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
MIGRATE WORKLOADS
REVIEW LANDING ZONE
IMPLEMENT DESIRED CHANGES ACROSS IT
IMPLEMENT DESIRED CHANGES ACROSS PROCESSES
TRAIN PEOPLE
TOOLS
STRATEGIC MIGRATION
ASSESSMENT AND READINESS
TOOL (SMART)
AZURE MIGRATION GUIDE
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
DESIGN AND ENFORCE ACCESS CONTROL
REVIEW AND IMLEMENT COMPLIANCE REQUIRMENTS
DEPLOY INITIAL GOVERNANCE FOUNDATION
HAND-OFF PRODUCTION WORKLOADS TO CLOUD GOVERNANCE
TOOLS
GOVERNANCE BENCHMARK
GOVERNANCE PROCESS
TEMPLATE
COST MANAGEMENT PROCESS
TEMPLATE
DEPLOYMENT ACCELERATION
PROCESS TEMPLATE
IDENTITY PROCESS TEMPLATE
RESOURCE CONSISTENCY
PROCESS TEMPLATE
SECURITY BASELINE PROCESS
TEMPLATE
HOW WE DO A CLOUD MIGRATION?
Microsoft Cloud Adoption Framework for Azure
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
HAND-OFF PRODUCTION WORKLOADS TO CLOUD OPERATIONS
IMPLEMENT AN OPERATIONS BASELINE
OPTIMIZE RESOURCE TIER AND CONSUMTION
TOOLS
MICROSOFT AZURE WELL-
ARCHITECTED REVIEW
BEST PRACTICES SOURCE CODE
OPERATIONS MANAGEMENT
WORKBOOK
MIGRATION STRATEGY
25
Rehosting— Otherwise known as “lift-
and-shift.”
Replatforming— I sometimes call this
“lift-tinker-and-shift.”
Repurchasing— Moving to a different
product.
MIGRATION
STRATEGY
Refactoring / Re-architecting — Re-
imagining how the application is
architected and developed, typically
using cloud-native features.
Retire— Get rid of.
Retain— Usually this means “revisit”
or do nothing (for now).
H T T P S : / / A W S . A M A Z O N . C O M / B L O G S / E N T E R P R I S E - S T R A T E G Y / 6 - S T R A T E G I E S - F O R - M I G R A T I N G - A P P L I C A T I O N S - T O - T H E - C L O U D /
26
Rehosting— Otherwise known as “lift-
and-shift.”
Replatforming— I sometimes call this
“lift-tinker-and-shift.”
Repurchasing— Moving to a different
product.
MIGRATION
STRATEGY
Refactoring / Re-architecting — Re-
imagining how the application is
architected and developed, typically
using cloud-native features.
Retire— Get rid of.
Retain— Usually this means “revisit”
or do nothing (for now).
H T T P S : / / A W S . A M A Z O N . C O M / B L O G S / E N T E R P R I S E - S T R A T E G Y / 6 - S T R A T E G I E S - F O R - M I G R A T I N G - A P P L I C A T I O N S - T O - T H E - C L O U D /
27
When to use them
One important steps in the initial phase is to align the strategy with your
business goal. For each application you might have different migration
strategies.
REHOSTING
You need to move quickly to cloud. Migration
complexity is low and repetitive (e.g. 5k users, 12
apps). You don’t want to do any cleaning before the
migration.
REPLATFORMING
You want to upgrade the application from existing
platform to something new. The core application remain
the same and you just utilize the cloud infrastructure.
Good fit for non-critical application that are business
oriented.
REPURCHASING
You move to a SaaS, that it is fully maintained by a 3rd
party. You have zero costs on maintenance and
updates. In most of the cases the pricing model will
change to a subscription based.
REFACTORING
You end up with this approach when there is now other
way to achieve your business goals. You need fully or
partially to use a cloud-native approach. Using this
approach you improve agility, scalability, and
performance.
RETIRE
You realize that the application it is not used anymore.
The system is part of your IT portfolio, but there is no
business justification to keep the application. By
deciding to retire the solution you simplify the workload
that needs to be migrated, allowing the team to focus
on more important parts.
RETAIN
You realize that there is no value to migrate the solution
to cloud. You keep the system running on the current
infrastructure and review the decision after a period of
time.
Marketing Tool CRM Auxiliary Services ERP BI Tool
ESB Service
Accounting System
ETL Service
Data Warehouse
Web Apps
1..n
VoIP Service Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Marketing Tool CRM Auxiliary Services ERP BI Tool
ESB Service
Accounting System
ETL Service
Data Warehouse
Web Apps
1..n
VoIP Service Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP BI Tool
Azure Service Bus
Accounting System
ETL Service
Data Warehouse
Web Apps
1..n
VoIP Service Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP BI Tool
Azure Service Bus
Accounting System
ETL Service
Data Warehouse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP BI Tool
Azure Service Bus
Accounting System
ETL Service
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP BI Tool
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP PowerBI
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP PowerBI
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool CRM Auxiliary Services ERP PowerBI
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool Dynamics 365 Auxiliary Services Dynamics 365 PowerBI
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool Dynamics 365 Auxiliary Services Dynamics 365 PowerBI
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
Email Server
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
Marketing Tool Dynamics 365 Auxiliary Services Dynamics 365 PowerBI
Azure Service Bus
Accounting System
Data Factory
Azure Synapse
Web Apps
1..n
VoIP
Service
O365
Web App
Payment
Payment
Processor
Document
Storage
eSign
Service
Rehosting Replatforming Repurchasing Refactoring Retire Retain
100% alignment
on the Azure
environment
First workload
First 10
workload
First prod
workloads
First 100
workloads
Common path – Common blocker
Acting too soon
First
workload
First 10
workload
First prod
workloads
First 100
workloads
Enterprise
Readiness
Common path – Common blocker
Acting too late
Landing zone Connected environments Secure landing zones Shared services model
CCoE and
operating
model
First
workload
First 10
workload
First prod
workloads
First 100
workloads
Cloud Adoption
(Migrate or Innovate)
Cloud Platform
(Refactoring landing zones)
Development approach
Landing zone
Connected
environments
Secure landing
zones
Shared
services model
CCoE and
operating
model
First
workload
First 10
workload
First prod
workloads
First 100
workloads
CLOUD
GOVERNA
NCE
CLOUD
OPERATIO
NS
REFACTOR TO
ENTERPRISE READINESS
DURING THIS PROCESS
Cloud Adoption
(Migrate or Innovate)
LANDING
ZONE
CONSIDERA
TIONS
Cloud Platform
(Refactoring landing zones)
CLOUD
SECURITY
MIGRATION TOOLS
MIGRATION TOOLS
ASSESS WORKLOADS
AZURE MIGRATE – ASSESS, SIZE, COST ESTIMATION
SERVICE MAP – DISCOVERY, COMMUNICATION MAP
DEPLOY WORKLOADS
AZURE MIGRATE – WORKLOAD MIGRATE, TRACK
AZURE DATABASE MIGRATION SERVICE
DATABASE MIGRATION ASSISTANT – DB UPGRADE
AZURE APP SERVICE MIGRATIO ASSISTANT – WEB SITES
SQL SERVER MIGRATION ASSITANT
AZURE COSMOS DB DATA MIGRATION TOOL
RELEASE WORKLOADS
RESIZE SERVICE INSTANCES
COST MANAGEMENT & BILLING
ADVISOR RECOMNDATIONS
DEPLOY WORKLOADS
AZURE DEVOPS
MICROSOFT PLANNER AND MICROSOFT PROJECT
MICROSOFT TEAM
DEPLOY WORKLOADS
COST MANAGEMENT & BILLING
ADVISOR RECOMNDATIONS
COST CONTROL
AZURE MIGRATE
AZURE PRICING CALCULATOR
AZURE TCO CALCULATOR
AZURE COST MANAGEMENT + BILLING
AZURE ADVISOR
FINAL THOUGHTS
DEFINE
STRATEGY
DEFINE BUSINESS
JUSTIFICATION
AND EXPECTED
OUTCOMES
PLAN
ALIGN
ACTIONABLE
CLOUD ADOPTION
PLAN TO
BUSINESS
OUTCOMES
READY
PREPARE PEOPLE,
PROCESS AND
ENVIRONMENT FOR
CHANGE
ADOPT
MIGRATE OR
INNOVATE
IMPLEMENT
DESIRED CHANGES
ACROSS IT AND
BUSINESS
PROCESSES
GOVERN
COMPLY,
CONTROL AND
SECURE
MANAGE
OPERATE AND
OPTIMIZE
MICROSOFT CLOUD ADOPTION FRAMEWORK
TOOLS TEMPLATES
BEST
PRACTICES
SKILLS
THANK YOU