Evaluating Vendor Risks
 Do you know if they have
        controls?
       May 5, 2010
Introductions

 • Relevant Participant Experiences
                   p       p
 • Participant Objectives for this class




                               Copyright 2010 Riebeeck Stevens Ltd

                                                             Page  2
Course Objective

 To educate participants regarding the nature 
 of vendor risks and the mechanisms to 
   f    d ik        d th      h i     t
 effectively assess, manage and control those 
 risks by providing a learning forum where 
 risks by providing a learning forum where
 individuals with greater audit and third party 
 assurance experience can share their 
 assurance experience can share their
 knowledge with peers who are interested in 
 learning about third party assurance and the 
 different mechanisms and standards available 
 to accomplish it.
                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                    Page  3
Today’s Discussion Topics
•   Overview of outsourcing arrangements
•   Rights to audit
    Ri h         di
•   Diversity of service organizations
•   Assessment mechanisms
    Assessment mechanisms
    o SAS 70
    o Shared Assessments
    o ISAE 3402
•   SAS 70 No More
•   Conducting an assessment engagement
    C d ti                    t       t
•   Using a third party assessment
•   Project management considerations
    Project management considerations
                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                     Page  4
Outsourcing Business Processes




                           Copyright 2010 Riebeeck Stevens Ltd

                                                         Page  5
Background

 •   Many entities use outside service organizations 
     to accomplish tasks that affect the entity’s 
                  li h k h      ff    h      i ’
     management and information system
 •   In recent years, there has been an increase in 
     I        t        th    h b          i        i
     the use of service organizations
 •   Why do you think BPO (business process 
     Why do you think BPO (business process
     outsourcing) has increased so much?
 •   “Practical IT Auditing” Checklist to evaluate 
       Practical IT Auditing Checklist to evaluate
     candidates for outsourcing

                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                         Page  6
Typical Service Organizations

  •   Fund accounting agents/Fund administrators
  •   Custodians/Trustees/Investment advisors
  •   Transfer agents/Retirement plan record keepers
  •   Claims processors
      Cl i
  •   ASPs
  •   ISPs
  •   Payroll processors
  •   Network/Security management
  •   Thoughts on Cloud Computing Providers?


                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                         Page  7
Outsourcing Arrangements

 • Total outsourcing – complete business or 
   business function
 • Production outsourcing – Call centers
 • Processing outsourcing – Payroll
 • Recordkeeping outsourcing – Transfer agent
 • Reporting outsourcing – FISERV and Crawford 
   Technologies
 • Physical Facilities outsourcing – Hosting/Co‐
   location
                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  8
Sample Outsourcing Agreements

 •   2002: $4 billion / 7‐year utility based deal between 
     American Express and IBM 
     American Express and IBM
 •   1998: $3 billion application development and 
     maintenance agreement between BellSouth and 
                     g
     Andersen Consulting 
 •   1998: $4 billion infrastructure outsourcing agreement 
     between BellSouth and EDS
     b t       B llS th d EDS
 •   1996: $4.5 billion / 10 year outsourcing and strategic 
     alliance agreements between Dupont and CSC and 
               g                         p
     Andersen Consulting 
 •   1994: $3 billion / 10‐year IT services between Xerox and 
     EDS 
     EDS
                                              Copyright 2010 Riebeeck Stevens Ltd

                                                                            Page  9
Classification of Vendor Risks

  •   Operational Risk
  •   Reputation Risk
  •   Strategic Risk
      Strategic Risk
  •   Compliance Risk
  •   Financial Risk
      Fi    i l Ri k
  •   Support Risk



                                 Copyright 2010 Riebeeck Stevens Ltd

                                                              Page  10
Classification of Vendor Risks

  • Operational Risk ‐ Operational risk not only 
    includes operations and transaction 
    processing, but also areas such as customer 
    service, Information Technology security and 
    the protection of non‐public data, systems 
    development and support programs, internal 
    control processes, and capacity and 
    contingency planning.


                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  11
Classification of Vendor Risks

  • Reputation Risk – Errors, delays, or omissions 
    in outsourced services that become public 
    i     t      d      i    th t b            bli
    knowledge or directly affect the company's 
    customers can significantly affect reputation. 
    customers can significantly affect reputation
    For example, a vendor's failure to maintain 
    adequate service levels and contingencies for 
    adequate service levels and contingencies for
    key items such as cash deliveries, network 
    hardware devices or ATM servicing could 
    disrupt the ability to deliver service to 
    customers.
                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  12
Classification of Vendor Risks

  • Strategic Risk – Inadequate management 
    experience and expertise can lead to a lack of 
    understanding of key risks facing the industry 
    today and into the future. Additionally, 
    inaccurate information from vendors can 
    cause the company's management and board 
    of directors to make poor strategic decisions.



                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  13
Classification of Vendor Risks

  • Compliance Risk – Outsourced activities that 
    fail to comply with legal or regulatory 
    requirements can subject the company to 
    legal sanctions. For example, inaccurate or 
    untimely consumer compliance disclosures 
    or unauthorized disclosure of confidential 
    customer information could expose the 
    company to civil money penalties or 
    litigation.
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  14
Classification of Vendor Risks

 • Financial Risk – financial strength of the 
   vendor, cash position, credit rating, 
   bankruptcy history, historical financial 
   performance indicators – return on equity, 
   return on investment, return on assets




                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  15
Classification of Vendor Risks

 • Support Risk – ability to perform according to 
   service level agreements, professional 
   diversity and capacity of staff, experienced of 
   workers, staff rotation policy, operational 
   performance in the market – are they losing 
   customers, is their quality falling




                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  16
Rights to Audit

 • Contract clause allowing the user 
   organization to audit or have access to audits 
         i ti t       dit h             t    dit
   of the services contracted
 • Sh ld b
   Should be a standard part of every 
                 t d d       t f
   outsourcing contract
 • U
   Use more frequently
              f       tl
 • Demanding specific types of audits
 • Make sure you are specific in terms of period 
   of audits

                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  17
Case Study
 New York ‐ 30 Dec 2002: J.P. Morgan Chase & Co. today finalized with IBM 
 a groundbreaking seven‐year outsourcing agreement, in excess of $5 
 billion, the largest of its kind. The agreement will enable JPMorgan Chase 
        ,        g                      g                         g
 to transform its technology infrastructure through absolute costs savings, 
 increased cost variability, access to the best research and innovation, and 
 improved service levels. By moving from a traditional fixed‐cost approach 
 to one with increased capacity and cost variability, JPMorgan Chase will be 
 able to respond more quickly to changing market conditions.

 JPMorgan Chase will outsource a significant portion of its data processing 
 technology infrastructure, including data centers, help desks, distributed 
 computing, data networks and voice networks. The agreement includes 
 the transfer of approximately 4,000 JPMorgan Chase employees and 
 contractors as well as selected resources and systems to IBM in the first 
 half of 2003. Application delivery and development, desktop support and 
 other core competencies will largely be retained inside JPMorgan Chase. 
                                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                                      Page  18
Case Study ‐ Instructions

 •   Study the JPM/IBM press release
 •   Identify the key risks faced by JPM when 
     transferring functions to IBM
 •   Discuss methods JPM can use to stay informed 
     of controls at IBM to address those risks
 •   Discuss impact to security, audit and compliance
 •   Should JPM require IBM to include a right to 
                     q                      g
     audit clause in their contract? Why?

                                        Copyright 2010 Riebeeck Stevens Ltd

                                                                     Page  19
Summary

 After completing this module, you should now:
 • Understand the business drivers behind the 
    outsourcing decision
 • Understand the various types of outsourcing 
    arrangements
 • Understand the key classes of vendor risk
 • Begin to understand the need to evaluate 
    controls at service organizations


                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  20
Assessment Mechanisms




                        Copyright 2010 Riebeeck Stevens Ltd

                                                     Page  21
Definition of Key Players

 Service Organization – The entity that provides 
 services to a user organization
     i    t              i ti
 Subservice Organization – An entity that is a 
 service organization of another service 
 service organization of another service
 organization
 Service Auditor – Reports on the processing of 
                      p            p        g
 transactions by a service organization
 User Organization – The entity that has engaged 
 a service organization
       i         i ti
 User Auditor – Auditor of a user organization

                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  22
Key Players


User Organization                          Service Auditor




                    Service Organization



                                           Subservice
 User Auditor                              Organization




                                                 Copyright 2010 Riebeeck Stevens Ltd

                                                                              Page  23
Evaluating Internal Control
at Service Organizations

  • How can a user of a service organization (and its 
    internal/external auditor) obtain a sufficient 
    i       l/       l di ) b i            ffi i
    level of comfort that there is an effective control 
    environment at the service organization?
    environment at the service organization?
  • How can user management ensure that 
    outsourced processes are managed following 
    outsourced processes are managed following
    policies, procedures and practices that are 
    aligned with those of his/her own company?



                                              Copyright 2010 Riebeeck Stevens Ltd

                                                                           Page  24
Assessment Mechanism: 
Traditional Approach

  • User management submits an internal 
    control questionnaire to service organization
  • Service organization provides a self‐
    assessment report to clients
  • User organization management (internal 
    audit) performs audit procedures at service 
    organization
  • User auditor performs audit procedures at 
    service organizations
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  25
Assessment Mechanisms:
Third Party Assurance Approach

 • One independent firm (third party) is 
   brought in to issue an opinion as to 
   whether management’s description of 
   the control environment is presented 
   fairly. 
 • In many cases, the independent firm is 
            g g     p                 p
   also engaged to perform tests of specific 
   controls and report on the result of 
   those tests.
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  26
Assessment Mechanisms:
Third Party Assurance Approach

 •   Agreed‐Upon Procedures
 •   Shared Assessments
 •   Standard Compliance Audit
     Standard Compliance Audit
 •   SAS 70
 •   Attestation
     Att t ti
 •   Who can issue reports using these 
     mechanisms?
         h i     ?


                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  27
Assessment Mechanisms:
Third Party Assurance Approach

 • Agreed‐Upon Procedures
    Issued by independent CPA
 • Shared Assessments
    Issued by independent  CPA or assessment firm
    Issued by independent CPA or assessment firm
 • Standard Compliance Audit
    Issued by certified party – i.e. PCI and ISO
            y           p y
 • SAS 70
    Issued by CPA or CA
 • Attestation
    Issued by CPA or CA

                                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                                Page  28
Module Summary

 After completing this module, you should now:
 • Understand the process to evaluate internal 
        d      d h                 l           l
    controls at Service Organizations
 • Understand the basic concepts of Third Party 
        d      d h b i                f hi d
    Assurance (TPA)
 • Identify different mechanisms for conducting 
     d if diff             h i     f       d i
    TPA engagements
 • U d
    Understand who can issue third party 
               d h        i     hi d
    assurance reports
                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  29
Agreed‐Upon Procedures




                         Copyright 2010 Riebeeck Stevens Ltd

                                                      Page  30
What are Agreed Upon Procedures

  •   Section 201 of the AICPA Statements on Standards 
      for Attestation Engagements (SSAE)
      f A         i E                (SSAE)
  •   An agreed‐upon procedures engagement is one in 
      which a practitioner is engaged by a Responsible 
      which a practitioner is engaged by a Responsible
      Party to issue a report of findings based on 
      specific procedures performed on subject matter. 
      specific procedures performed on subject matter
      The Responsible Party engages the practitioner to 
      assist Specified Parties in evaluating subject 
              p                            g    j
      matter or an assertion as a result of a need or 
      needs of the Specified Parties.
                                          Copyright 2010 Riebeeck Stevens Ltd

                                                                       Page  31
What is an AUP Report

 • An AUP Report is a report issued according to 
   SSAE 10 Section 201
 • An AUP Report contains the procedures 
   agreed‐upon by the parties and the findings 
   identified by the auditor
 • An AUP Report does not contain an opinion 
   from the auditor just the facts of the results
   from the auditor just the facts of the results


                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  32
Who Uses a AUP report

 • Agreed‐Upon procedures are used by the 
   service organization, user management, 
   external auditors and regulators
 • Internal users include senior management, 
   compliance, internal audit, security and risk 
   management
 • External users typically limited to external
   External users typically limited to external 
   auditors and regulators

                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  33
Distribution of the Report

 • As an Attestation report, AUP reports have 
   limited distribution
 • The Service Organization and the specified 
   parties can have access to the report
 • Other parties interested in the report need
   Other parties interested in the report need 
   to agree as to the sufficiency of the 
   procedures with respect to the subject 
   procedures with respect to the subject
   matter or assertion prior to receiving the 
   report
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  34
AUP Auditor’s Responsibilities

  • Carry out the procedures
  • Report the findings in accordance with the 
    professional standards (general, fieldwork 
    and reporting)
  • Adequately plan and supervise the audit and
    Adequately plan and supervise the audit and 
    exercise due professional care in performing 
    the procedures, determining the findings, 
    the procedures, determining the findings,
    and preparing the report

                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  35
AUP Auditor’s Responsibilities

  •   Risk that misapplication of the procedures may 
      result in inappropriate findings being reported
           l i i         i    fi di    b i          d
  •   Risk that appropriate findings may not be 
      reported or may be reported inaccurately
      reported or may be reported inaccurately
  •   These risks are reduced by becoming 
      knowledgeable about the subject matter and 
      knowledgeable about the subject matter and
      thoroughly planning and executing the work
  •   The AUP Auditor has no responsibility to 
                                   p        y
      determine completeness or adequacy of the 
      agreed‐upon procedures
                                          Copyright 2010 Riebeeck Stevens Ltd

                                                                       Page  36
Layout of a Typical AUP Report

  • A title that includes the word independent
  • Identification of the specified parties
  • Identification of the subject matter (or the
    Identification of the subject matter (or the 
    written assertion related thereto) and the 
    character of the engagement
    character of the engagement
  • Identification of the responsible party
  • A t t
    A statement that the subject matter is the 
                 t th t th   bj t     tt i th
    responsibility of the responsible party

                                                                         Copyright 2010 Riebeeck Stevens Ltd
              Extracted from “AICPA Attestation Standards Section 201”
                                                                                                      Page  37
Layout of a Typical AUP Report

  •   A statement that the procedures performed were 
      those agreed to by the specified parties identified 
       h           d b h            ifi d     i id ifi d
      in the report
  •   A statement that the agreed‐upon procedures 
      A statement that the agreed upon procedures
      engagement was conducted in accordance with 
      attestation standards established by the AICPA
      attestation standards established by the AICPA
  •   A statement that the sufficiency of the procedures 
      is solely the responsibility of the specified parties 
              y        p         y         p        p
      and a disclaimer of responsibility for the 
      sufficiency of those procedures
                                                                           Copyright 2010 Riebeeck Stevens Ltd
                Extracted from “AICPA Attestation Standards Section 201”
                                                                                                        Page  38
Layout of a Typical AUP Report

  •   A list of the procedures performed (or reference 
      thereto) and related findings (The practitioner 
      th t ) d l t d fi di          (Th      titi
      should not provide negative assurance
  •   Where applicable, a description of any agreed‐upon 
      Where applicable a description of any agreed‐upon
      materiality limits




                                                                          Copyright 2010 Riebeeck Stevens Ltd
               Extracted from “AICPA Attestation Standards Section 201”
                                                                                                       Page  39
Layout of a Typical AUP Report

  •   A statement that the practitioner was not engaged 
      to and did not conduct an examination of the 
      t    d did t       d t           i ti     f th
      subject matter, the objective of which would be the 
      expression of an opinion, a disclaimer of opinion on 
      expression of an opinion a disclaimer of opinion on
      the subject matter, and a statement that if the 
      p
      practitioner had performed additional procedures, 
                       p                     p           ,
      other matters might have come to his or her 
      attention that would have been reported



                                                                           Copyright 2010 Riebeeck Stevens Ltd
                Extracted from “AICPA Attestation Standards Section 201”
                                                                                                        Page  40
Layout of a Typical AUP Report

  •   A statement of restrictions on the use of the report 
      because it is intended to be used solely by the specified 
      because it is intended to be used solely by the specified
      parties
  •   Where applicable, reservations or restrictions 
               pp        ,
      concerning procedures or findings.
  •   For an agreed‐upon procedures engagement on 
      prospective financial information.
              ti fi        i li f   ti
  •   Where applicable, a description of the nature of the 
      assistance provided by a specialist.
                 p            y p
  •   The manual or printed signature of the practitioner's 
      firm
  •   The date of the report
      Th d       f h
                                                                            Copyright 2010 Riebeeck Stevens Ltd
                 Extracted from “AICPA Attestation Standards Section 201”
                                                                                                         Page  41
Procedures to be Performed

 •   Can be as limited or as extensive as the specified 
     parties desire
         ti d i
 •   Mere description of assertion or subject matter 
     does not constitute a valid procedure
     does not constitute a valid procedure
 •   There is flexibility in determining the procedures
 •   Changes to the procedures are acceptable as long 
           g           p                   p            g
     as the specified parties accept responsibility for the 
     sufficiency of the procedures
 •   Matters that need to be agreed upon include the 
     nature, timing and extent of the procedures

                                             Copyright 2010 Riebeeck Stevens Ltd

                                                                          Page  42
Procedures to be Performed

 • Procedures should not be subjective and 
   open to interpretations
 • Terms of uncertain meaning (such as general 
   review, limited review or check) should be 
   avoided
 • For each procedure, there should be 
   evidential matter supporting the finding or 
   evidential matter supporting the finding or
   findings
       Let s explore the Q‐Services report
       Let’s explore the Q‐Services report
                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  43
Project Management Considerations

•   Use Of a Specialist
•   Internal Auditors and Other Personnel
•   Findings
•   Working Papers




                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  44
AUP Sample Findings

 •   Procedure: Inspect the shipment dates for a 
     sample (agreed‐upon) of specified shipping 
     sample (agreed upon) of specified shipping
     documents, and determine whether any such 
     dates were subsequent to December 31, 20XX.
                      q                        ,
 •   Finding (Appropriate description): No shipment 
     dates shown on the sample of shipping 
     documents were subsequent to December 31, 
     doc ments ere s bseq ent to December 31
     20XX.
 •   Finding (Inappropriate description): Nothing came 
           g ( pp p                p    )         g
     to my attention as a result of applying that 
     procedure.
 •   Sample findings matrix from AT 201
     S    l fi di       ti f      AT 201
                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                      Page  45
AUP Auditor Considerations

 •   Validate that the Specified Parties have agree to the 
     procedures
           d
 •   Document the steps taken in performing the 
     procedures
 •   Obtain and maintain appropriate evidence of the 
     work conducted
 •   Ensure all changes to the procedures are approved 
     by the Specified Parties
 •   Obtain representations from management


                                            Copyright 2010 Riebeeck Stevens Ltd

                                                                         Page  46
Using a AUP Report

 • A AUP Report contains the results of applying 
   the procedures only – No Opinion
 • Each procedure and related result must be 
   evaluated by the user in the context of its 
   entity’s internal control
 • Be careful not to extrapolate the findings to 
   systems or dates not related to the AUPs
   systems or dates not related to the AUPs


                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  47
AUP Exercise

 •   With the JPM/IBM agreement, multiple systems are 
     being processed and supported at IBM
     being processed and supported at IBM
 •   You work for JPM and some of your clients (your team 
     members) want to audit the system at IBM to evaluate 
               )                    y
     the security controls at IBM
 •   Identify and describe 5 audit procedures and discuss 
     them in your group until everyone agrees they are 
     th     i               til                th
     sufficient to meet your objective
 •   Ensure the wording of the procedures is specific and 
                         g       p             p
     avoid vague terms
 •   Draft the result of applying the procedure and share 
     them with the group
      h       ih h
                                            Copyright 2010 Riebeeck Stevens Ltd

                                                                         Page  48
Module Summary

 After completing this module, you now have an 
    understanding of:
 • What Agreed‐Upon Procedures are
 • What an AUP Report is
 • The content of AUPs
 • The responsibilities of the AUP Auditor
 • Key considerations of managing an AUP 
    project
 • The usability of AUP reports
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  49
Shared Assessments




                     Copyright 2010 Riebeeck Stevens Ltd

                                                  Page  50
Shared Assessments

 • Special application of the AICPA AUP 
   standard
 • Shared Assessments is a program created by 
   BITS, a division of the Financial Services 
   Roundtable
 • Initially targeted the financial services 
   industry, it is quickly expanding to other 
   industry, it is quickly expanding to other
   industries such as health care
 • Program managed by the Santa Fe Group
   Program managed by the Santa Fe Group
                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  51
Shared Assessments

 • Standardized Information Gathering (SIG) 
   Questionnaire
 • Agreed‐Upon Procedures (AUP)
 • Created under the principle of getting 
   everyone involved
   everyone involved
 • Sort of like Skype and IP telephony, when 
   everyone is connected, there is no need to 
   everyone is connected there is no need to
   pay for phone service

                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  52
Who uses a Shared Assessments Report?


  • SIG is used by the Service Organization and 
    the Outsourcer
  • AUP report can be used by all related parties 
    who approved the procedures
  • Limited distribution report – others can use it
    Limited distribution report  others can use it 
    but need to agree to the sufficiency of the 
    procedures to evaluate the related controls
    procedures to evaluate the related controls


                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  53
Shared Assessments Risk Domains

  •   Information security policy
  •   Organization of information security
      Organization of information security
  •   Asset management
  •   Human resources security
  •   Physical and environmental security
  •   Communications and operations management
  •   Access control
      Access control
  •   Information systems acquisition, development and 
      maintenance
  •   Information security incident management
      I f     ti        it i id t              t
  •   Business continuity management
  •   Compliance
           p
  •   Privacy
                                               Copyright 2010 Riebeeck Stevens Ltd

                                                                            Page  54
Shared Assessments Project

 •   Scoping questions – determine:
 •   Service provider and its business model
     S i          id      d it b i           d l
 •   Target systems and processes
 •   Data that it collects, stores, uses, shares, transports, 
     Data that it collects stores uses shares transports
     retains, secures and/or deletes:
     o   Target Data
     o   Protected Target Data
     o   Privacy Target Data
     o   Protected Privacy Target Data
         Protected Privacy Target Data
 •   Based on this information, identify hardware, 
     software and procedures to be tested.
     software and procedures to be tested
                                              Copyright 2010 Riebeeck Stevens Ltd

                                                                           Page  55
Shared Assessments Lite

 •   SIG v5 Level 1
 •   Contains 91 questions
 •   Intended for low risk scenarios
     Intended for low risk scenarios
 •   Inquiry of Service Organization management
 •   No testing is involved
     N t ti i i l d

               SIG v5 L1 Questions

                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  56
Shared Assessments AUP

 •   Full SIG v5 and management tools
 •   AUP v5
     AUP v5
 •   12 Risk Domains
 •   Specific procedures to be executed by assessor
 •   Each AUP control area contains:
     E h AUP       t l         t i
     o Objective(s): Statement(s) describing the business interest 
       behind assessing the Domain
     o C t l( ) St t
       Control(s): Statement(s) about the controls service 
                           t( ) b t th        t l       i
       providers should have in place
     o Procedure(s): The action or actions a practitioner will 
       perform to test each control Area
       perform to test each control Area
     o Industry Relevance: Reference(s) to other standards that 
       apply to the same objective and control as the procedure

                                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                                Page  57
Shared Assessments Sample Procedure

  F.5 Secure Workspace Access Reporting
  Objective:
     An organization should maintain access and 
     An organization should maintain access and
     incident reports.
  Control:
        Access to Secure Workplace is logged and 
        incident reports are maintained.
        i id t         t       i t i d

                                                                                                        .


                                                                  Copyright 2010 Riebeeck Stevens Ltd
             Extracted from the Shared Assessments AUP document
                                                                                               Page  58
Shared Assessments Sample Procedure

Procedures:
a. Obtain the access and incident logs (physical or electronic) 
from the service provider for the Secure Workspace Perimeter, 
and inspect for evidence of the following attributes:
Access Logs (Staff):
    1. Name
    2. Date and time
    3. Point of access
    3 Point of access
    4. Date of last update
Access Logs (Visitor):
    1. Name
    2. Date and time
    3. Point of access
    3 Point of access
                                                                       Copyright 2010 Riebeeck Stevens Ltd
                  Extracted from the Shared Assessments AUP document
                                                                                                    Page  59
Shared Assessments Sample Procedure

    4. Company name
    5. Visiting
    6. Equipment
    7. Sign out and return of badge
    8. Date of last update
    8. Date of last update
Incident Logs:
    1. Name
    2. Date and time
    2 D t       d ti
    3. Company name
    4. Incident type
                  yp
    5. Date of last update
b. Report the attributes listed in step a not in evidence, the 
     date the access logs and incident log was last updated, or 
     date the access logs and incident log was last updated or
     the nonexistence of the access log or incident log.
                                                                       Copyright 2010 Riebeeck Stevens Ltd
                  Extracted from the Shared Assessments AUP document
                                                                                                    Page  60
Shared Assessments

 Exercise
 • Review the JPM/IBM outsourcing 
    arrangement and based on the limited 
    information provided, review the questions 
    on Section C2.2 of SIG v5 and the 
    corresponding procedures in Section C of 
    Shared Assessments AUP v5
 • Could this provide any comfort when 
    performed by a trusted party?
    performed by a trusted party?
                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  61
Shared Assessments Report Layout

  • The Shared Assessments report follows the 
    AUP standard of the AICPA
  • Description of scope
  • Domain area
  • Control objective
  • Control
  • Procedure
  • Results of applying the procedure


                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  62
Using a Shared Assessments Report

  •   The Shared Assessments report does not 
      provide assurance just attestation of the result
           d                                f h      l
  •   Each user of the report must evaluate the 
      results in the context of their own risk universe
          lt i th       t t f th i         ik i
  •   Some controls may be applicable others may 
      not
  •   The absence of certain controls may not be 
      relevant to the user s environment
      relevant to the user’s environment
  •   Do not extrapolate in time and space

                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  63
Using a Shared Assessments Report

  •   Limitations of the Shared Assessment Report
  •   Limited to Security, business continuity and 
             d              b                    d
      privacy
  •   No third party opinion
      N thi d      t    i i
  •   Can it be relied upon for purposes of an audit of 
      financial statements? Only if issued by CPA? 
      financial statements? Only if issued by CPA?
      What about internal audit of the user 
      organization?
         g
  •   What about sub‐service organizations? What 
      options are there to report on that relationship?
                                          Copyright 2010 Riebeeck Stevens Ltd

                                                                       Page  64
Module Summary

 After completing this module, you should now 
    understand:
       d t d
 • What are Shared Assessments
 • What is a Shared Assessments Report
    What is a Shared Assessments Report
 • The content of a Shared Assessments Report
 • The responsibilities of the Shared Assessments
    The responsibilities of the Shared Assessments 
    Auditor
 • Key considerations of managing a Shared 
       y                         g g
    Assessments project
 • The usability of Shared Assessments reports
                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  65
SAS 70 Audits




                Copyright 2010 Riebeeck Stevens Ltd

                                             Page  66
What is “SAS 70”?
•   Statement on Auditing Standards (SAS) No. 70, 
    Service Organizations, as amended
    S i O         i i              d d
•   Issued by the American Institute of Certified 
    Public Accountants (AICPA)
    P bli A       t t (AICPA)




                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                      Page  67
What is a “SAS 70” Report?
 A report containing:

 •   Description of the control environment
 •   Description of management’s control objectives
 •   Description of specific controls, policies and 
                   f      f        l     l        d
     procedures
 •   Description of tests of those specific controls, 
            p                       p
     policies and procedures
 •   Results of those tests
 •   Independent auditor s opinion
     Independent auditor’s opinion
 •   Supplemental information provided by the Service 
     Organization (optional)

                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                      Page  68
Who uses the SAS 70 report?

 Primary external users (outside of service organization)
 • Clients of service organizations and their auditors
 • Auditors of service organization
 • Prospective clients of service organizations




                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  69
Who uses the SAS 70 report?

 Benefits of the report to external users
 • Enhanced understanding of the control 
    environment
 • Additional level of comfort
 • Contained audit costs
    Contained audit costs
 • Ability to compare service organizations
 • Reliance on controls


                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  70
Who uses the SAS 70 report?

 Primary internal users (within service organization)
 • Management
 • Internal Audit
 • Legal and Compliance
 • Risk Management
 • Marketing




                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  71
Who uses the SAS 70 report?

 Benefits of the report to internal users
 •   Independent evaluation of processes and controls
 •   Standard documentation of processes and controls for 
     future evaluation of efficiencies
     f          l i     f ffi i i
 •   Improved risk management
 •   Potential reduction of coordination with your client’s 
     P t ti l d ti         f     di ti    ith       li t’
     auditors 
 •   Marketing



                                              Copyright 2010 Riebeeck Stevens Ltd

                                                                           Page  72
Distribution of the Report

 Controlled by service organization
 Generally limited to:
 • Service organization
 • Clients of service organization
 • Auditors of clients of service organization
 • Prospective clients of service organization




                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  73
Types of Reports

• Type I  – Report on Controls placed in 
           Operation as of a specified date

• Type II – Report on Controls placed in 
  Operation as of a specified date 
  Operation as of a specified date
                      AND
  Results of Tests of Operating Effectiveness 
  R lt f T t f O           ti Eff ti
  during a specified period 

                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                    Page  74
Service Auditor’s Responsibilities:
Type I  Engagement


 • Determine whether the description of controls
   Determine whether the description of controls 
   presents fairly the relevant aspects of the 
   controls placed in operation as of the date of 
   report

 • Determine whether the controls are suitably 
                h h h             l          bl
   designed to achieve the specified control 
   objectives


                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                   Page  75
Service Auditor’s Responsibilities :
Type II Engagement

  • Same as in Type I Engagement
                       AND
  • Determine whether the controls that were
    Determine whether the controls that were 
    tested were operating with sufficient 
    effectiveness to achieve control objectives 
    for the specified period of the report




                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                    Page  76
Sub‐Service Organizations: Carve‐out

•   Exclude sub‐service organization’s relevant controls and 
    control objectives from report and from auditor s scope
    control objectives from report and from auditor’s scope
•   If Carve‐Out sub‐servicer, then:
     Modify scope paragraph in the auditor’s report for the controls of 
       the sub service organization
       the sub‐service organization
       o Describe the functions and nature of processing performed by sub‐
         service organization
       o That the description of the controls includes only the controls and 
         related control objectives of the service organization
       o That our examination does not extend to the controls at the sub‐service organization
     Service Organization modifies description of controls to summarize 
       the functions and nature of the processing performed by the sub‐
        h f     i      d          f h          i     f     db h      b
       service organization that are omitted from the report
•   May be necessary to modify opinion paragraph in auditor’s 
    report
                                                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                                                    Page  77
Sub‐Service Organizations: Inclusive

 •   Include sub‐service organization’s relevant controls and 
     control objectives in report and in auditor’s scope
 •   Ensure description of controls and control objective 
     discussion in report clearly differentiates controls at service 
     organization and at sub‐service organization, but includes 
     both in reporting
 •   Modify auditor’s report throughout (scope, opinion, Company 
     references) to include sub‐service organization (and its 
     related controls, etc.)
 •   Perform procedures at the sub‐servicer to determine 
     whether:
      controls (functions/nature of processing and controls)  are fairly 
       presented
      controls are suitably designed to achieve the related control objectives
      controls are operating with sufficient effectiveness (For Type II
       controls are operating with sufficient effectiveness (For Type II 
       engagements)
                                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                                        Page  78
User Control Considerations


 • Complementary Controls that may be 
   required at the User Organization 
 • Include in report’s description of controls
 • Include in auditor’s report
   Include in auditor s report
 • Sample UCC: User Organization should 
   remove terminated employees when access 
           t    i t d        l        h
   no longer needed

                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  79
Service Auditor’s Responsibilities


  • Addressing the representations in the service 
    auditor’s report
                p
  • Adhere to the AICPA general standards and 
    with the relevant AICPA fieldwork and 
    with the relevant AICPA fieldwork and
    reporting standards 



                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  80
Layout of Typical SAS 70 Report

Opinion
Section I – Information provided by the Service Organization
Section I Information provided by the Service Organi ation
  Overview of the business
  Control Environment
  Applicability of Report
  Description of Controls
Section II  Information Provided by the Service Auditor
Section II – Information Provided by the Service Auditor
Section III – Controls, Control Objectives and Tests of 
   Operating Effectiveness
Section IV – Other information provided by the Service 
   Organization


                                                  Copyright 2010 Riebeeck Stevens Ltd

                                                                               Page  81
Module Summary

 After completing this module, you should now be 
 able to:
  bl
 • Understand the basic SAS 70‐related terms and 
     definitions
 • Understand the basic overview of SAS 70
 • Understand who uses SAS 70 reports and why




                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  82
Project Management: 
   j        g
Useful information for the 
Service Auditor Engagement Team
Service Auditor Engagement Team



                        Copyright 2010 Riebeeck Stevens Ltd

                                                     Page  83
Define and Understand
Engagement/Report Scope



  Collaborative process with the Client
      Scope should be driven by USER needs and 
       requirements
       o Include Core Areas
       o Include desired Locations




                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  84
Engagement Time Management

Time Management
  •   Activity Definition
  •   Activity Sequencing
  •   Activity Duration Estimating
  •   Schedule Development
  •   Schedule Control
      Schedule Control




                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  85
Service Organization Involvement


  • Project Sponsor (leader/owner) of the 
    Process
        j               ( y
  • Project Coordinator (daily task 
    management)
  • Internal Pre‐Assessment and Remediation
    Internal Pre Assessment and Remediation
  • “Buy‐In” of Senior Management within all 
    functional departments/areas
    functional departments/areas


                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  86
Senior Management Buy‐In

 • Assists in obtaining information timely
 • Ensures right personnel/contacts are met
 • Ensures personnel/contacts will provide all 
   necessary assistance 
 • Ensures personnel/contacts know the 
   importance of the project to their department 
   leaders



                                    Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  87
Responsibilities

May impact:
May impact:
•   Timing
•   Deadlines
•   Budgets/fees
•   Staffing mix
    Staffing mix
•   Expectations set by client or by auditor
•   Satisfaction with meeting expectations and 
    S ti f ti      ith    ti         t ti    d
•   The ability to manage expectations

                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                      Page  88
Reporting Responsibilities

 Generally, Client should draft most areas the Report
 •   Overview of Operations (Organization Definition)
 •   Description of Controls and Control Environment
 •   Control Objectives and Controls
     Control Objecti es and Controls
 •   Other Information provided by the Service Organization
 Generally, the Service Auditor should focus on:
 Generally the Service Auditor should focus on:
 •   Opinion
 •   Information Provided by Service Auditor
     Information Provided by Service Auditor
 •   Testing of Controls and Results of Testing


                                                  Copyright 2010 Riebeeck Stevens Ltd

                                                                               Page  89
Managing Expectations

 •   Expectations of Significant Changes During Report 
     Period (mid‐year significant changes in 
     controls/processes to consider)
 •   Presence of Exceptions in the Report
 •   Multi‐location Considerations
 •   Report is evolving
     R       i    l i
 •   Recommendations to be Provided to Client
 •   Regular Status Meetings with Project Champion and
     Day‐to‐Day Contact Person is important

                                        Copyright 2010 Riebeeck Stevens Ltd

                                                                     Page  90
Managing Expectations


•   Timeline/Deadline for Stages of Engagement
    Timeline/Deadline for Stages of Engagement
     Setting project milestones minimizes time overages
•   Detailed Project Plan by Control Objective
    Detailed Project Plan by Control Objective
     Breaking down project plan to task level increases 
      accuracy of cost estimation and subsequent budgeting
             y                             q        g    g
•   Monitor Timing/Fees (budget to actual)
     Enhanced cost control through frequent budget to actual 
                                 g     q        g
      monitoring


                                                 Copyright 2010 Riebeeck Stevens Ltd

                                                                              Page  91
Module Summary

 After completing this module, you should now:
 • Understand key aspects of managing a SAS 70 
    project effectively and efficiently.
 • Understand common pitfalls/challenges and 
    successes that we have encountered in our 
    experience with SAS 70 engagements. 




                                   Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  92
Service Auditor Considerations
Service Auditor Considerations




                            Copyright 2010 Riebeeck Stevens Ltd

                                                         Page  93
Service Auditor Considerations

  •   Workpaper documentation
  •   Design of Tests
  •   Types of tests
  •   Sampling
  •   Findings
  •   Testing strategies




                                 Copyright 2010 Riebeeck Stevens Ltd

                                                              Page  94
Design of Tests



 Control           Test
 Control           Test


                     Copyright 2010 Riebeeck Stevens Ltd

                                                  Page  95
Types of Tests

 •   Inquiry
 •   Inspection
 •   Observation
 •   Re‐performance of the control




                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  96
Sample Sizes

 • No definitive guidance
 • Driven by four variables
     Significance of control
        g
     Frequency
     Past experience
      Past experience
     Client expectation




                                Copyright 2010 Riebeeck Stevens Ltd

                                                             Page  97
Sample Sizes (continued)
 • Frequently used numbers (influenced 
   primarily by SOX developments):
   primarily by SOX developments):


                 Type of Control
         Primary   Secondary       Other



           25          15           5
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  98
Findings

 Findings should be classified into:
       g
 • Nominal
 • M
   Management Letter Comment (“MLC”)
              L      C       (“MLC”)
 • Exceptions
       p




                               Copyright 2010 Riebeeck Stevens Ltd

                                                            Page  99
Findings (continued)

 • Quantitative materiality thresholds do not 
   apply
 • How to deal with exceptions
     Identify compensating controls
     Redefine control objectives
                         j
     Timely validation




                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  100
Testing Strategies

 • Report must be applicable to internal 
   controls in place during the entire testing 
   period.
 • Narrative update can occur at six month 
   point
 • Controls can be tested at any time during the 
   testing period
   testing period


                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  101
Module Summary

 After completing this module, you should now:
 • Understand important items to consider when 
    performing a SAS 70 engagement including 
    sample sizes, testing strategies and addressing 
    findings.




                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  102
User Auditor Considerations:
User Auditor Considerations:
How to Use a SAS 70 Report



                               Copyright 2010 Riebeeck Stevens Ltd

                                                          Page  103
Is the SAS 70 Useful?

 •   Address the applications and/or locations used by 
     the Service Organization that are relevant to 
     the Service Organization that are relevant to
     financial statement assertions?
 •   Adequate to understand flow of transactions?
     Adequate to understand flow of transactions?
 •   Sufficient detail of controls that prevent or detect 
     possible errors?
 •   Are there findings within control tests?
 •   Does opinion address any exceptions?
 •   Are any areas being carved‐out?


                                             Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  104
Procedures when using a SAS 70 Report

•   Read report to:
    • U d t d th fl
      Understand the flow of transactions and the controls
                           ft       ti      d th      t l
    • Determine that controls were operating as intended
    • Determine whether significant control deficiencies
      Determine whether significant control deficiencies 
      were noted
•   Inquire of client as to changes since date of SAS 70
•   Consider whether additional procedures are 
    necessary



                                              Copyright 2010 Riebeeck Stevens Ltd

                                                                         Page  105
Assessing User Control Considerations

  • Read service auditor’s report to determine:
      Whether the considerations are relevant to your 
       client
       o If relevant, ensure during your planning that the 
         controls have been implemented by the client
      Nature of complementary controls that should
       Nature of complementary controls that should 
       be in place at our client




                                                 Copyright 2010 Riebeeck Stevens Ltd

                                                                            Page  106
Updating a SAS 70

 When date of SAS 70 report is within the client’s 
 fiscal year (and assessed controls as effective):
    • Update through client discussions 
 When date of SAS 70 is outside of our client’s 
        y    (          p            g
 fiscal year (and anticipate assessing controls as 
 effective):
    • Can use the report as a starting point in gaining 
                    p                gp         g     g
      an understanding of the control environment
             y       y           p
    • You may not rely on this report as audit evidence
                                           Copyright 2010 Riebeeck Stevens Ltd

                                                                      Page  107
Using a SAS 70 Report


READ IT!
READ IT!
READ IT!
READ IT!
       !
                        Copyright 2010 Riebeeck Stevens Ltd

                                                   Page  108
Using a SAS 70 Report

• Make sure you understand which significant 
  processes are covered
• Can you rely on the testing which was 
  performed?
• Determine the results of any testing that was
  Determine the results of any testing that was 
  performed




                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  109
Using a SAS 70 Report

• If the report does not cover the entire period 
  of the user organization’s fiscal year, gain an 
  understanding for the period not covered.




                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  110
Module Summary

 After completing this module, you should now:
 • Understand when you can rely on a SAS 70 
    report.
 • Understand the documentation requirements 
                g g             p
    when leveraging a SAS 70 report.
 • Understand how you can benefit from a SAS 
    70 report.
    70 report
 Discuss the SAS 70 Reliance Decision Tree

                                  Copyright 2010 Riebeeck Stevens Ltd

                                                             Page  111
Attest Engagement




                    Copyright 2010 Riebeeck Stevens Ltd

                                               Page  112
What is an Attest Engagement?

• Examination, audit or review of subject 
  matter or management assertion
• Higher level of assurance
• Generally includes an opinion of the auditor
• Follows the Statement on Standards for
  Follows the Statement on Standards for 
  Attestation Engagements of the AICPA



                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  113
Why Do We Need Attest Reports?

 • Many financial situations require an attest 
   report
 • In the controls space, they can cover areas 
   that are not possible to cover in SAS 70 or 
   other reports
 • An example is business continuity planning 
   and the availability principle
   and the availability principle


                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  114
Who uses Attest Reports?

 • Attest reports are limited distribution reports
 • Can be used by external auditors for 
   evaluating audit risk
 • Can be used by the service organization 
   management
 • Can be used by the user organization 
   management


                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  115
Attest Engagements

 Definition and Underlying Concepts
 •   Subject matter
 •   Assertion
 •   Responsible party




                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  116
Attest Engagements

 • Suitability of Criteria
     Objectivity
     Measurability
     Completeness
     Relevance
 • Availability of Criteria




                              Copyright 2010 Riebeeck Stevens Ltd

                                                         Page  117
Attest Auditor Responsibilities

  •   Training and proficiency
  •   Adequate knowledge of the subject matter
  •   Independence
  •   Due professional care
  •   If report issued according to the AICPA 
      If      ti     d      di t th AICPA
      standard then auditor should be a CPA



                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  118
Layout of Attest Report

 • Differences in content for an Examination 
   and a Review report
 • Considerations as to whether opining on 
   subject matter or management assertion
 • Statement that the work conducted supports
   Statement that the work conducted supports 
   the opinion provided
 • Compliance with AICPA standards
   Compliance with AICPA standards


                                  Copyright 2010 Riebeeck Stevens Ltd

                                                             Page  119
Project Management Considerations

  • Obtain clear management assertion
  • Ensure there are suitable criteria
  • Delineate an plan every activity
    Delineate an plan every activity
  • Discuss and walkthrough every risk and area 
    of control
    of control
  • Establish a clearly defined timeline
  • Obtain concurrence from management on all 
    identified findings
                                    Copyright 2010 Riebeeck Stevens Ltd

                                                               Page  120
Attest Auditor Considerations 

 •   Planning and supervision
 •   Obtaining sufficient evidence
 •   Management representations
     Management representations
 •   Reporting
 •   Analysis of other information presented by 
     A l i f th i f            ti        t db
     management



                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  121
Using an Attest Report

 • Ensure focus and scope are relevant
 • Review criteria
 • Evaluate findings
   Evaluate findings
 • Consider period of the attestation
 • Determine whether subsequent events 
   D t     i    h th       b       t      t
   occurred
 • Integrate controls in the report with risks in 
   your organization
                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  122
Module Summary

 After completing this module, you should now be 
    able to understand:
 • What are Attest engagements
 • What is an Attestation Report
 • The content of an Attestation Report
 • The responsibilities of the Attest Auditor
 • Key considerations of managing a Attest 
    project
 • The usability of Attest reports
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  123
Good Bye SAS 70




                  Copyright 2010 Riebeeck Stevens Ltd

                                             Page  124
SAS 70 No More

 • Recent Developments
 • International Demand
 • IFAC  ISAE 3402
   IFAC ‐ ISAE 3402
 • AICPA SSAE 16 – Reporting on Controls at a 
   Service Organization
   Service Organization
 • New SAS – Audit Considerations Relating to 
   an Entity Using a Service Organization
      E tit U i      S i O        i ti


                                    Copyright 2010 Riebeeck Stevens Ltd

                                                               Page  125
SAS 70 No More

 • New Standards do not affect inquiries of 
   management
 • New Standards do not affect AUP/Shared 
   Assessments
 • New Standards do not affect the Attest
   New Standards do not affect the Attest 
   Engagements




                                    Copyright 2010 Riebeeck Stevens Ltd

                                                               Page  126
AICPA SSAE 16

 • Separates Service Audit from existing SAS
 • Falls under different family of standards
 • Instead of an audit standard, it is an attest
   Instead of an audit standard, it is an attest 
   standard
 • Requires a written management assertion
   Requires a written management assertion
 • And suitable criteria
 • Does not consider the usability in a financial 
   statement audit ONLY
                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  127
SSAE 16 – Impact

 •    Management of the service organization required 
      to provide the service auditor with a written 
      t      id th       i     dit    ith     itt
      assertion about
     1. The fairness of the presentation of the description of 
     1 The fairness of the presentation of the description of
        the service organization’s system
     2. The suitability of the design of the controls to 
        achieve the related control objectives stated in the 
        description, and, in a type 2 engagement
     3. The operating effectiveness of those controls to 
     3 The operating effectiveness of those controls to
        achieve the related control objectives stated in the 
        description.

                                               Copyright 2010 Riebeeck Stevens Ltd

                                                                          Page  128
SSAE 16 – Impact

 • A service auditor is able to report on controls 
   at a service organization other than controls 
   that are relevant to user entities’ financial 
   reporting, for example, controls related to 
   user entities’ regulatory compliance, 
   production, or quality control.
 • This is probably the greatest benefit of all!



                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  129
SSAE 16 – Impact

 • In a type 2 report, the service auditor’s 
   opinion on the fairness of the presentation of 
   the description of the service organization’s 
   system and on the suitability of the design of 
   the controls is for a period of time rather 
   than as of a specified date, as is the case in 
   the current standard



                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  130
SSAE 16 – Impact

 • When obtaining an understanding of the 
   service organization‘s system, the service 
   auditor would be required to obtain 
   information to identify risks that the 
   description of the service organization’s 
   system is not fairly presented or that the 
   control objectives stated in the description 
   were not achieved due to intentional acts by 
   service organization personnel.
                                    Copyright 2010 Riebeeck Stevens Ltd

                                                               Page  131
SSAE 16 – Impact

 • Indicates that when assessing the operating 
   effectiveness of controls in a type 2 
   engagement, evidence obtained in prior 
   engagements about the satisfactory 
   operation of controls in prior periods does 
   not provide a basis for a reduction in testing, 
   even if supplemented with evidence 
   obtained during the current period.


                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  132
SSAE 16 – Impact

 • A service auditor’s type 2 report would 
   identify the customers to whom use of the 
   report is restricted as "customers of the 
   service organization’s system during some or 
   all of the period covered by the service 
   auditor’s report,"and in a service auditor’s 
   type 1 report, as, "customers as of the date 
   of the service organization’s description 
   covered by the report."
                                    Copyright 2010 Riebeeck Stevens Ltd

                                                               Page  133
SSAE 16 – Key Considerations

 • Effective date – the AICPA/ASB has proposed 
   making the SSAE effective concurrently with 
   the new ISAE 3402
 • Management assertion – An assertion‐based 
   engagement includes an explicit 
   acknowledgement by management of its 
   responsibility for the matters addressed in its 
   assertion
 • Convergence with International Standards
                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  134
IFAC – ISAE 3402

 • ISAE 3402 – Assurance Reports on Controls at 
   a Service Organization
 • Based on original structure of SAS 70 but very 
   similar to the New SSAE
       l       h
 • Applies to all countries where IFAC is 
   recognized
          i d
 • Scope – applies to engagements that convey 
   reasonable assurance when the service 
            bl              h th         i
   organization is responsible for the suitable 
   design of controls
   design of controls
                                     Copyright 2010 Riebeeck Stevens Ltd

                                                                Page  135
ISAE 3402

• The standard deals with assurance 
  engagements by professional accountants in 
  public practice to provide a report for use by 
  the user entities and their auditors on the 
  controls at a service organization that 
  provides a service to user entities that is 
  likely to be relevant to user entities’ internal 
  control, as it relates to financial reporting.


                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                    Page  136
ISAE 3402

 The standard does not deal with assurance 
 engagements:
 • To report on whether controls at a service 
    organization operated as described, or
 • To report ONLY on controls at a service
    To report ONLY on controls at a service 
    organization that are not related to a service 
    that is likely to be relevant to user entities
    that is likely to be relevant to user entities’ 
    internal controls as it relates to financial 
    reporting
                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  137
Why is ISAE 3402 Important

 •   Impact at domestic and international levels
 •   It updates/replaces (potentially)/complements:
     It d t / l          ( t ti ll )/      l     t
     • US ‐ Statement on Auditing Standards (SAS) No. 70
     • CA ‐ Canadian Institute of Chartered Accountants
       CA  Canadian Institute of Chartered Accountants 
       (CICA) 5970
     • UK ‐ Audit and Assurance Faculty Standard (AAF) 
       01/06
          /
     • AU ‐ Guidance Statement (GS) 007
     • HK ‐ HKSA Statements – Auditing Practice Note 860 2
       HK  HKSA Statements  Auditing Practice Note 860.2
     • JP ‐ Audit Standards Committee Report No. 18
     • DE (Germany) ‐ IDW PS 951

                                            Copyright 2010 Riebeeck Stevens Ltd

                                                                       Page  138
IFAC – ISAE 3402

 • Introduces the concept of materiality
 • Not with respect to the financial statements 
   but with respect to the system
     The concept of materiality takes into account that 
      the service auditor’s assurance report provides 
      information about the service organization s system 
      information about the service organization’s system
      to meet the common information needs of a broad 
      range of user entities and their auditors who have an 
      understanding of the manner in which that system 
      has been used. 

                                             Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  139
IFAC – ISAE 3402

 •   Materiality with respect to the fair presentation of 
     the service organization’s description of its system, 
     th       i         i ti ’ d     i ti     f it    t
     and with respect to the design of controls, includes 
     primarily the consideration of qualitative factors, 
     primarily the consideration of qualitative factors
     for example: whether the description includes the 
     significant aspects of processing significant 
       g           p        p        g g
     transactions; whether the description omits or 
     distorts relevant information; and the ability of 
     controls, as designed, to provide reasonable 
     assurance that control objectives would be 
     achieved. 
     achieved
                                             Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  140
IFAC – ISAE 3402

 • Materiality with respect to the service 
   auditor’s opinion on the operating 
   effectiveness of controls includes the 
   consideration of both quantitative and 
   qualitative factors, for example, the tolerable 
   rate and observed rate of deviation (a 
   quantitative matter), and the nature and 
   cause of any observed deviation (a 
   qualitative matter). 
                                      Copyright 2010 Riebeeck Stevens Ltd

                                                                 Page  141
Critical Steps in Assurance Reporting 
Under ISAE 3402

  • Assessing the Suitability of the Criteria
  • Obtaining an Understanding of the Service 
    Organization’s System
  • Obtaining Evidence Regarding the 
    Description
  • Obtaining Evidence Regarding Design of 
    Controls
  • Obtaining Evidence Regarding the Operating 
    Effectiveness of Controls

                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                    Page  142
Critical Steps in Assurance Reporting 
Under ISAE 3402

  • The Work of an Internal Audit Function
  • Other Information
  • Preparing the Service Auditor’s Assurance
    Preparing the Service Auditor s Assurance 
    Report
  • Other Communication Responsibilities
    Other Communication Responsibilities




                                         Copyright 2010 Riebeeck Stevens Ltd

                                                                    Page  143
Comparison of SAS 70 with ISAE/SSAE
   Topic       Existing SAS 70 Standard                                    ISAE 3402 / SSAE
Scope       SAS 70 is limited to controls Report can be extended
            over the processing of
                     p         g          beyond financial
                                            y
            financial transactions by a   reporting.
            service organization.

Opinion /   The auditor provides an                                   In addition to the
Assertion   opinion based directly on                                 auditor's opinion,
            the subject matter with no                                management of the
                                                                                      f
            formal management                                         service organization
            assertion.                                                p
                                                                      provides a formal
                                                                      assertion affirming its
                                                                      responsibilities for the
                                                                      controls in the report.
                                                                                      report
                                                                               Copyright 2010 Riebeeck Stevens Ltd
                   Extracted from “Good‐bye SAS 70” by Fiona Gaskin
                                                                                                          Page  144
Comparison of SAS 70 with ISAE/SSAE
     Topic          Existing SAS 70 Standard                                   ISAE 3402 / SSAE
Disclosure       Work performed by internal                           Work performed by internal audit
requirements     audit to support the service                         used in part to form the service
for
f use of IA
        f        auditor's opinion i not
                   di '      i i is                                   auditor’s opinion shall i l d a
                                                                         di ’     i i    h ll include
                 disclosed.                                           description of the internal
                                                                      auditor’s work and of the service
                                                                      auditor’s procedures with respect
                                                                      to that work.
Audit Guidance Guidance is provided in an                             Guidance for the service auditor
               annually updated Audit
                             d d d                                    will be solely contained in the
                                                                                              d
               Guide, which includes                                  ISAE itself and will not contain
               illustrative control objectives                        illustrative control objectives.
               for various types of service                           The US will continue to provide
               organizations.                                         audit guidance to support the
                                                                      SSAE/SAS 70
                                                                      standards.
                                                                      standards

                                                                                     Copyright 2010 Riebeeck Stevens Ltd
                          Extracted from “Good‐bye SAS 70” by Fiona Gaskin
                                                                                                                Page  145
Comparison of SAS 70 with ISAE/SSAE
    Topic      Existing SAS 70 Standard                                 ISAE 3402 / SSAE
Example of Type I - report on the                                Type 1 - report on the
Terminology fairness of the                                      fairness of the description
Differences description of controls                              of controls and whether
            and whether those                                    those controls were suitably
            controls were suitably                               designed.
            designed.


             Type II - report also                               Type 2 - report also includes
             includes an opinion on                              an opinion on the operating
             the operating                                       effectiveness of the controls.
             effectiveness of the
             controls.
                                                                              Copyright 2010 Riebeeck Stevens Ltd
                     Extracted from “Good‐bye SAS 70” by Fiona Gaskin
                                                                                                         Page  146
ISAE 3402 Report

 •   Internal control is a process designed to provide 
     reasonable assurance regarding the achievement of 
             bl                   di th        hi        t f
     objectives related to the reliability of financial 
     reporting, effectiveness and efficiency of operations 
     reporting, effectiveness and efficiency of operations
     and compliance with applicable laws and regulations. 
 •   Control objectives and controls at the User 
     Organizations
 •   Control objectives and controls at the Service 
     Organization
 •   Controls at the Service Organization that need to be 
     complemented at User Organizations
         p                      g
                                             Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  147
Module Summary

 After completing this module, you should now be 
 able to understand:
 able to understand:
 • The latest developments in Third Party Assurance 
     Sta da ds
     Standards
 • The impact of new Standards
 • The benefits of the new Standards
 • Key differences and similarities between domestic 
     and international standards
 • K Key considerations and responsibilities of a 
              id ti        d         ibiliti   f
     service auditor and the user of a third party 
     assurance report
                  p
                                       Copyright 2010 Riebeeck Stevens Ltd

                                                                  Page  148
Wrap-Up




Wrap Up and Summary
Wrap‐Up and Summary




                         Copyright 2010 Riebeeck Stevens Ltd

                                                    Page  149
Using Third Party Reports

•   A report is not relevant if it does not address your 
    company’s risks
              ’ ik
•   Prepare your own ICQ or use a standard one as a 
    pre‐audit tool
           di     l
•   Use your company’s risk and control matrices as 
    the basis to evaluate ICQ, AUP, SAS 70, ISAE and 
     h b i           l     ICQ AUP SAS 70 ISAE d
    SSAE findings
•   Starting point is your company’s risks not what is 
    St ti       i ti                 ’ ik      t h ti
    in the reports

                                             Copyright 2010 Riebeeck Stevens Ltd

                                                                        Page  150
Third Party Assurance – Final Comments

   •   Businesses will continue to look for opportunities 
       to increase efficiency and effectiveness of 
       to increase efficiency and effectiveness of
       business processes
   •   Globalization will not stop
       Globalization will not stop
   •   Cloud Computing will make this field more 
       interesting and complex
                 g          p
   •   Third party assurance practice will continue to 
       grow
   •   We will be either auditing or will be audited by a 
       service auditor … 

                                            Copyright 2010 Riebeeck Stevens Ltd

                                                                       Page  151
Contact


 Felix Ramirez
 (W) 646 290 8998
 (W) 646‐290‐8998
 (C)  908‐230‐4562
 (e) felix.ramirez@riebeeckstevens.com
 ( ) f li     i @i b kt




                                    Copyright 2010 Riebeeck Stevens Ltd

                                                               Page  152

Evaluating Vendor Risks - Presentation

  • 1.
    Evaluating Vendor Risks Do you know if they have controls? May 5, 2010
  • 2.
    Introductions • Relevant Participant Experiences p p • Participant Objectives for this class Copyright 2010 Riebeeck Stevens Ltd Page  2
  • 3.
    Course Objective To educate participants regarding the nature  of vendor risks and the mechanisms to  f d ik d th h i t effectively assess, manage and control those  risks by providing a learning forum where  risks by providing a learning forum where individuals with greater audit and third party  assurance experience can share their  assurance experience can share their knowledge with peers who are interested in  learning about third party assurance and the  different mechanisms and standards available  to accomplish it. Copyright 2010 Riebeeck Stevens Ltd Page  3
  • 4.
    Today’s Discussion Topics • Overview of outsourcing arrangements • Rights to audit Ri h di • Diversity of service organizations • Assessment mechanisms Assessment mechanisms o SAS 70 o Shared Assessments o ISAE 3402 • SAS 70 No More • Conducting an assessment engagement C d ti t t • Using a third party assessment • Project management considerations Project management considerations Copyright 2010 Riebeeck Stevens Ltd Page  4
  • 5.
    Outsourcing Business Processes Copyright 2010 Riebeeck Stevens Ltd Page  5
  • 6.
    Background • Many entities use outside service organizations  to accomplish tasks that affect the entity’s  li h k h ff h i ’ management and information system • In recent years, there has been an increase in  I t th h b i i the use of service organizations • Why do you think BPO (business process  Why do you think BPO (business process outsourcing) has increased so much? • “Practical IT Auditing” Checklist to evaluate  Practical IT Auditing Checklist to evaluate candidates for outsourcing Copyright 2010 Riebeeck Stevens Ltd Page  6
  • 7.
    Typical Service Organizations • Fund accounting agents/Fund administrators • Custodians/Trustees/Investment advisors • Transfer agents/Retirement plan record keepers • Claims processors Cl i • ASPs • ISPs • Payroll processors • Network/Security management • Thoughts on Cloud Computing Providers? Copyright 2010 Riebeeck Stevens Ltd Page  7
  • 8.
    Outsourcing Arrangements • Total outsourcing –complete business or  business function • Production outsourcing – Call centers • Processing outsourcing – Payroll • Recordkeeping outsourcing – Transfer agent • Reporting outsourcing – FISERV and Crawford  Technologies • Physical Facilities outsourcing – Hosting/Co‐ location Copyright 2010 Riebeeck Stevens Ltd Page  8
  • 9.
    Sample Outsourcing Agreements • 2002: $4 billion / 7‐year utility based deal between  American Express and IBM  American Express and IBM • 1998: $3 billion application development and  maintenance agreement between BellSouth and  g Andersen Consulting  • 1998: $4 billion infrastructure outsourcing agreement  between BellSouth and EDS b t B llS th d EDS • 1996: $4.5 billion / 10 year outsourcing and strategic  alliance agreements between Dupont and CSC and  g p Andersen Consulting  • 1994: $3 billion / 10‐year IT services between Xerox and  EDS  EDS Copyright 2010 Riebeeck Stevens Ltd Page  9
  • 10.
    Classification of Vendor Risks • Operational Risk • Reputation Risk • Strategic Risk Strategic Risk • Compliance Risk • Financial Risk Fi i l Ri k • Support Risk Copyright 2010 Riebeeck Stevens Ltd Page  10
  • 11.
    Classification of Vendor Risks •Operational Risk ‐ Operational risk not only  includes operations and transaction  processing, but also areas such as customer  service, Information Technology security and  the protection of non‐public data, systems  development and support programs, internal  control processes, and capacity and  contingency planning. Copyright 2010 Riebeeck Stevens Ltd Page  11
  • 12.
    Classification of Vendor Risks •Reputation Risk – Errors, delays, or omissions  in outsourced services that become public  i t d i th t b bli knowledge or directly affect the company's  customers can significantly affect reputation.  customers can significantly affect reputation For example, a vendor's failure to maintain  adequate service levels and contingencies for  adequate service levels and contingencies for key items such as cash deliveries, network  hardware devices or ATM servicing could  disrupt the ability to deliver service to  customers. Copyright 2010 Riebeeck Stevens Ltd Page  12
  • 13.
    Classification of Vendor Risks • Strategic Risk – Inadequate management  experience and expertise can lead to a lack of  understanding of key risks facing the industry  today and into the future. Additionally,  inaccurate information from vendors can  cause the company's management and board  of directors to make poor strategic decisions. Copyright 2010 Riebeeck Stevens Ltd Page  13
  • 14.
    Classification of Vendor Risks •Compliance Risk – Outsourced activities that  fail to comply with legal or regulatory  requirements can subject the company to  legal sanctions. For example, inaccurate or  untimely consumer compliance disclosures  or unauthorized disclosure of confidential  customer information could expose the  company to civil money penalties or  litigation. Copyright 2010 Riebeeck Stevens Ltd Page  14
  • 15.
    Classification of Vendor Risks • Financial Risk –financial strength of the  vendor, cash position, credit rating,  bankruptcy history, historical financial  performance indicators – return on equity,  return on investment, return on assets Copyright 2010 Riebeeck Stevens Ltd Page  15
  • 16.
    Classification of Vendor Risks • Support Risk –ability to perform according to  service level agreements, professional  diversity and capacity of staff, experienced of  workers, staff rotation policy, operational  performance in the market – are they losing  customers, is their quality falling Copyright 2010 Riebeeck Stevens Ltd Page  16
  • 17.
    Rights to Audit • Contract clause allowing the user  organization to audit or have access to audits  i ti t dit h t dit of the services contracted • Sh ld b Should be a standard part of every  t d d t f outsourcing contract • U Use more frequently f tl • Demanding specific types of audits • Make sure you are specific in terms of period  of audits Copyright 2010 Riebeeck Stevens Ltd Page  17
  • 18.
    Case Study New York ‐ 30 Dec 2002: J.P. Morgan Chase & Co. today finalized with IBM  a groundbreaking seven‐year outsourcing agreement, in excess of $5  billion, the largest of its kind. The agreement will enable JPMorgan Chase  , g g g to transform its technology infrastructure through absolute costs savings,  increased cost variability, access to the best research and innovation, and  improved service levels. By moving from a traditional fixed‐cost approach  to one with increased capacity and cost variability, JPMorgan Chase will be  able to respond more quickly to changing market conditions. JPMorgan Chase will outsource a significant portion of its data processing  technology infrastructure, including data centers, help desks, distributed  computing, data networks and voice networks. The agreement includes  the transfer of approximately 4,000 JPMorgan Chase employees and  contractors as well as selected resources and systems to IBM in the first  half of 2003. Application delivery and development, desktop support and  other core competencies will largely be retained inside JPMorgan Chase.  Copyright 2010 Riebeeck Stevens Ltd Page  18
  • 19.
    Case Study ‐ Instructions • Study the JPM/IBM press release • Identify the key risks faced by JPM when  transferring functions to IBM • Discuss methods JPM can use to stay informed  of controls at IBM to address those risks • Discuss impact to security, audit and compliance • Should JPM require IBM to include a right to  q g audit clause in their contract? Why? Copyright 2010 Riebeeck Stevens Ltd Page  19
  • 20.
    Summary After completing this module, you should now: •Understand the business drivers behind the  outsourcing decision • Understand the various types of outsourcing  arrangements • Understand the key classes of vendor risk • Begin to understand the need to evaluate  controls at service organizations Copyright 2010 Riebeeck Stevens Ltd Page  20
  • 21.
    Assessment Mechanisms Copyright 2010 Riebeeck Stevens Ltd Page  21
  • 22.
    Definition of Key Players Service Organization – The entity that provides  services to a user organization i t i ti Subservice Organization – An entity that is a  service organization of another service  service organization of another service organization Service Auditor – Reports on the processing of  p p g transactions by a service organization User Organization – The entity that has engaged  a service organization i i ti User Auditor – Auditor of a user organization Copyright 2010 Riebeeck Stevens Ltd Page  22
  • 23.
    Key Players User Organization Service Auditor Service Organization Subservice User Auditor Organization Copyright 2010 Riebeeck Stevens Ltd Page  23
  • 24.
    Evaluating Internal Control at Service Organizations •How can a user of a service organization (and its  internal/external auditor) obtain a sufficient  i l/ l di ) b i ffi i level of comfort that there is an effective control  environment at the service organization? environment at the service organization? • How can user management ensure that  outsourced processes are managed following  outsourced processes are managed following policies, procedures and practices that are  aligned with those of his/her own company? Copyright 2010 Riebeeck Stevens Ltd Page  24
  • 25.
    Assessment Mechanism:  Traditional Approach •User management submits an internal  control questionnaire to service organization • Service organization provides a self‐ assessment report to clients • User organization management (internal  audit) performs audit procedures at service  organization • User auditor performs audit procedures at  service organizations Copyright 2010 Riebeeck Stevens Ltd Page  25
  • 26.
    Assessment Mechanisms: Third Party Assurance Approach • One independent firm (third party) is  brought in to issue an opinion as to  whether management’s description of  the control environment is presented  fairly.  • In many cases, the independent firm is  g g p p also engaged to perform tests of specific  controls and report on the result of  those tests. Copyright 2010 Riebeeck Stevens Ltd Page  26
  • 27.
    Assessment Mechanisms: Third Party Assurance Approach • Agreed‐Upon Procedures • Shared Assessments • Standard Compliance Audit Standard Compliance Audit • SAS 70 • Attestation Att t ti • Who can issue reports using these  mechanisms? h i ? Copyright 2010 Riebeeck Stevens Ltd Page  27
  • 28.
    Assessment Mechanisms: Third Party Assurance Approach • Agreed‐Upon Procedures Issued by independent CPA • Shared Assessments Issued by independent  CPA or assessment firm Issued by independent CPA or assessment firm • Standard Compliance Audit Issued by certified party – i.e. PCI and ISO y p y • SAS 70 Issued by CPA or CA • Attestation Issued by CPA or CA Copyright 2010 Riebeeck Stevens Ltd Page  28
  • 29.
    Module Summary After completing this module, you should now: •Understand the process to evaluate internal  d d h l l controls at Service Organizations • Understand the basic concepts of Third Party  d d h b i f hi d Assurance (TPA) • Identify different mechanisms for conducting  d if diff h i f d i TPA engagements • U d Understand who can issue third party  d h i hi d assurance reports Copyright 2010 Riebeeck Stevens Ltd Page  29
  • 30.
    Agreed‐Upon Procedures Copyright 2010 Riebeeck Stevens Ltd Page  30
  • 31.
    What are Agreed Upon Procedures • Section 201 of the AICPA Statements on Standards  for Attestation Engagements (SSAE) f A i E (SSAE) • An agreed‐upon procedures engagement is one in  which a practitioner is engaged by a Responsible  which a practitioner is engaged by a Responsible Party to issue a report of findings based on  specific procedures performed on subject matter.  specific procedures performed on subject matter The Responsible Party engages the practitioner to  assist Specified Parties in evaluating subject  p g j matter or an assertion as a result of a need or  needs of the Specified Parties. Copyright 2010 Riebeeck Stevens Ltd Page  31
  • 32.
    What is an AUP Report • An AUP Report is a report issued according to  SSAE 10 Section 201 • An AUP Report contains the procedures  agreed‐upon by the parties and the findings  identified by the auditor • An AUP Report does not contain an opinion  from the auditor just the facts of the results from the auditor just the facts of the results Copyright 2010 Riebeeck Stevens Ltd Page  32
  • 33.
    Who Uses a AUP report • Agreed‐Upon procedures are used by the  service organization, user management,  external auditors and regulators • Internal users include senior management,  compliance, internal audit, security and risk  management • External users typically limited to external External users typically limited to external  auditors and regulators Copyright 2010 Riebeeck Stevens Ltd Page  33
  • 34.
    Distribution of the Report • As an Attestation report, AUP reports have  limited distribution • The Service Organization and the specified  parties can have access to the report • Other parties interested in the report need Other parties interested in the report need  to agree as to the sufficiency of the  procedures with respect to the subject  procedures with respect to the subject matter or assertion prior to receiving the  report Copyright 2010 Riebeeck Stevens Ltd Page  34
  • 35.
    AUP Auditor’s Responsibilities •Carry out the procedures • Report the findings in accordance with the  professional standards (general, fieldwork  and reporting) • Adequately plan and supervise the audit and Adequately plan and supervise the audit and  exercise due professional care in performing  the procedures, determining the findings,  the procedures, determining the findings, and preparing the report Copyright 2010 Riebeeck Stevens Ltd Page  35
  • 36.
    AUP Auditor’s Responsibilities • Risk that misapplication of the procedures may  result in inappropriate findings being reported l i i i fi di b i d • Risk that appropriate findings may not be  reported or may be reported inaccurately reported or may be reported inaccurately • These risks are reduced by becoming  knowledgeable about the subject matter and  knowledgeable about the subject matter and thoroughly planning and executing the work • The AUP Auditor has no responsibility to  p y determine completeness or adequacy of the  agreed‐upon procedures Copyright 2010 Riebeeck Stevens Ltd Page  36
  • 37.
    Layout of a Typical AUP Report •A title that includes the word independent • Identification of the specified parties • Identification of the subject matter (or the Identification of the subject matter (or the  written assertion related thereto) and the  character of the engagement character of the engagement • Identification of the responsible party • A t t A statement that the subject matter is the  t th t th bj t tt i th responsibility of the responsible party Copyright 2010 Riebeeck Stevens Ltd Extracted from “AICPA Attestation Standards Section 201” Page  37
  • 38.
    Layout of a Typical AUP Report • A statement that the procedures performed were  those agreed to by the specified parties identified  h d b h ifi d i id ifi d in the report • A statement that the agreed‐upon procedures  A statement that the agreed upon procedures engagement was conducted in accordance with  attestation standards established by the AICPA attestation standards established by the AICPA • A statement that the sufficiency of the procedures  is solely the responsibility of the specified parties  y p y p p and a disclaimer of responsibility for the  sufficiency of those procedures Copyright 2010 Riebeeck Stevens Ltd Extracted from “AICPA Attestation Standards Section 201” Page  38
  • 39.
    Layout of a Typical AUP Report • A list of the procedures performed (or reference  thereto) and related findings (The practitioner  th t ) d l t d fi di (Th titi should not provide negative assurance • Where applicable, a description of any agreed‐upon  Where applicable a description of any agreed‐upon materiality limits Copyright 2010 Riebeeck Stevens Ltd Extracted from “AICPA Attestation Standards Section 201” Page  39
  • 40.
    Layout of a Typical AUP Report • A statement that the practitioner was not engaged  to and did not conduct an examination of the  t d did t d t i ti f th subject matter, the objective of which would be the  expression of an opinion, a disclaimer of opinion on  expression of an opinion a disclaimer of opinion on the subject matter, and a statement that if the  p practitioner had performed additional procedures,  p p , other matters might have come to his or her  attention that would have been reported Copyright 2010 Riebeeck Stevens Ltd Extracted from “AICPA Attestation Standards Section 201” Page  40
  • 41.
    Layout of a Typical AUP Report • A statement of restrictions on the use of the report  because it is intended to be used solely by the specified  because it is intended to be used solely by the specified parties • Where applicable, reservations or restrictions  pp , concerning procedures or findings. • For an agreed‐upon procedures engagement on  prospective financial information. ti fi i li f ti • Where applicable, a description of the nature of the  assistance provided by a specialist. p y p • The manual or printed signature of the practitioner's  firm • The date of the report Th d f h Copyright 2010 Riebeeck Stevens Ltd Extracted from “AICPA Attestation Standards Section 201” Page  41
  • 42.
    Procedures to be Performed • Can be as limited or as extensive as the specified  parties desire ti d i • Mere description of assertion or subject matter  does not constitute a valid procedure does not constitute a valid procedure • There is flexibility in determining the procedures • Changes to the procedures are acceptable as long  g p p g as the specified parties accept responsibility for the  sufficiency of the procedures • Matters that need to be agreed upon include the  nature, timing and extent of the procedures Copyright 2010 Riebeeck Stevens Ltd Page  42
  • 43.
    Procedures to be Performed • Procedures should not be subjective and  open to interpretations • Terms of uncertain meaning (such as general  review, limited review or check) should be  avoided • For each procedure, there should be  evidential matter supporting the finding or  evidential matter supporting the finding or findings Let s explore the Q‐Services report Let’s explore the Q‐Services report Copyright 2010 Riebeeck Stevens Ltd Page  43
  • 44.
    Project Management Considerations • Use Of a Specialist • Internal Auditors and Other Personnel • Findings • Working Papers Copyright 2010 Riebeeck Stevens Ltd Page  44
  • 45.
    AUP Sample Findings • Procedure: Inspect the shipment dates for a  sample (agreed‐upon) of specified shipping  sample (agreed upon) of specified shipping documents, and determine whether any such  dates were subsequent to December 31, 20XX. q , • Finding (Appropriate description): No shipment  dates shown on the sample of shipping  documents were subsequent to December 31,  doc ments ere s bseq ent to December 31 20XX. • Finding (Inappropriate description): Nothing came  g ( pp p p ) g to my attention as a result of applying that  procedure. • Sample findings matrix from AT 201 S l fi di ti f AT 201 Copyright 2010 Riebeeck Stevens Ltd Page  45
  • 46.
    AUP Auditor Considerations • Validate that the Specified Parties have agree to the  procedures d • Document the steps taken in performing the  procedures • Obtain and maintain appropriate evidence of the  work conducted • Ensure all changes to the procedures are approved  by the Specified Parties • Obtain representations from management Copyright 2010 Riebeeck Stevens Ltd Page  46
  • 47.
    Using a AUP Report • A AUP Report contains the results of applying  the procedures only – No Opinion • Each procedure and related result must be  evaluated by the user in the context of its  entity’s internal control • Be careful not to extrapolate the findings to  systems or dates not related to the AUPs systems or dates not related to the AUPs Copyright 2010 Riebeeck Stevens Ltd Page  47
  • 48.
    AUP Exercise • With the JPM/IBM agreement, multiple systems are  being processed and supported at IBM being processed and supported at IBM • You work for JPM and some of your clients (your team  members) want to audit the system at IBM to evaluate  ) y the security controls at IBM • Identify and describe 5 audit procedures and discuss  them in your group until everyone agrees they are  th i til th sufficient to meet your objective • Ensure the wording of the procedures is specific and  g p p avoid vague terms • Draft the result of applying the procedure and share  them with the group h ih h Copyright 2010 Riebeeck Stevens Ltd Page  48
  • 49.
    Module Summary After completing this module, you now have an  understanding of: • What Agreed‐Upon Procedures are • What an AUP Report is • The content of AUPs • The responsibilities of the AUP Auditor • Key considerations of managing an AUP  project • The usability of AUP reports Copyright 2010 Riebeeck Stevens Ltd Page  49
  • 50.
    Shared Assessments Copyright 2010 Riebeeck Stevens Ltd Page  50
  • 51.
    Shared Assessments • Special application of the AICPA AUP  standard • Shared Assessments is a program created by  BITS, a division of the Financial Services  Roundtable • Initially targeted the financial services  industry, it is quickly expanding to other  industry, it is quickly expanding to other industries such as health care • Program managed by the Santa Fe Group Program managed by the Santa Fe Group Copyright 2010 Riebeeck Stevens Ltd Page  51
  • 52.
    Shared Assessments • Standardized Information Gathering (SIG)  Questionnaire • Agreed‐Upon Procedures (AUP) • Created under the principle of getting  everyone involved everyone involved • Sort of like Skype and IP telephony, when  everyone is connected, there is no need to  everyone is connected there is no need to pay for phone service Copyright 2010 Riebeeck Stevens Ltd Page  52
  • 53.
    Who uses a Shared Assessments Report? •SIG is used by the Service Organization and  the Outsourcer • AUP report can be used by all related parties  who approved the procedures • Limited distribution report – others can use it Limited distribution report  others can use it  but need to agree to the sufficiency of the  procedures to evaluate the related controls procedures to evaluate the related controls Copyright 2010 Riebeeck Stevens Ltd Page  53
  • 54.
    Shared Assessments Risk Domains • Information security policy • Organization of information security Organization of information security • Asset management • Human resources security • Physical and environmental security • Communications and operations management • Access control Access control • Information systems acquisition, development and  maintenance • Information security incident management I f ti it i id t t • Business continuity management • Compliance p • Privacy Copyright 2010 Riebeeck Stevens Ltd Page  54
  • 55.
    Shared Assessments Project • Scoping questions – determine: • Service provider and its business model S i id d it b i d l • Target systems and processes • Data that it collects, stores, uses, shares, transports,  Data that it collects stores uses shares transports retains, secures and/or deletes: o Target Data o Protected Target Data o Privacy Target Data o Protected Privacy Target Data Protected Privacy Target Data • Based on this information, identify hardware,  software and procedures to be tested. software and procedures to be tested Copyright 2010 Riebeeck Stevens Ltd Page  55
  • 56.
    Shared Assessments Lite • SIG v5 Level 1 • Contains 91 questions • Intended for low risk scenarios Intended for low risk scenarios • Inquiry of Service Organization management • No testing is involved N t ti i i l d SIG v5 L1 Questions Copyright 2010 Riebeeck Stevens Ltd Page  56
  • 57.
    Shared Assessments AUP • Full SIG v5 and management tools • AUP v5 AUP v5 • 12 Risk Domains • Specific procedures to be executed by assessor • Each AUP control area contains: E h AUP t l t i o Objective(s): Statement(s) describing the business interest  behind assessing the Domain o C t l( ) St t Control(s): Statement(s) about the controls service  t( ) b t th t l i providers should have in place o Procedure(s): The action or actions a practitioner will  perform to test each control Area perform to test each control Area o Industry Relevance: Reference(s) to other standards that  apply to the same objective and control as the procedure Copyright 2010 Riebeeck Stevens Ltd Page  57
  • 58.
    Shared Assessments Sample Procedure F.5 Secure Workspace Access Reporting Objective: An organization should maintain access and  An organization should maintain access and incident reports. Control: Access to Secure Workplace is logged and  incident reports are maintained. i id t t i t i d . Copyright 2010 Riebeeck Stevens Ltd Extracted from the Shared Assessments AUP document Page  58
  • 59.
    Shared Assessments Sample Procedure Procedures: a. Obtain the access and incident logs (physical or electronic)  from the service provider for the Secure Workspace Perimeter,  and inspect for evidence of the following attributes: Access Logs (Staff): 1. Name 2. Date and time 3. Point of access 3 Point of access 4. Date of last update Access Logs (Visitor): 1. Name 2. Date and time 3. Point of access 3 Point of access Copyright 2010 Riebeeck Stevens Ltd Extracted from the Shared Assessments AUP document Page  59
  • 60.
    Shared Assessments Sample Procedure 4. Company name 5. Visiting 6. Equipment 7. Sign out and return of badge 8. Date of last update 8. Date of last update Incident Logs: 1. Name 2. Date and time 2 D t d ti 3. Company name 4. Incident type yp 5. Date of last update b. Report the attributes listed in step a not in evidence, the  date the access logs and incident log was last updated, or  date the access logs and incident log was last updated or the nonexistence of the access log or incident log. Copyright 2010 Riebeeck Stevens Ltd Extracted from the Shared Assessments AUP document Page  60
  • 61.
    Shared Assessments Exercise •Review the JPM/IBM outsourcing  arrangement and based on the limited  information provided, review the questions  on Section C2.2 of SIG v5 and the  corresponding procedures in Section C of  Shared Assessments AUP v5 • Could this provide any comfort when  performed by a trusted party? performed by a trusted party? Copyright 2010 Riebeeck Stevens Ltd Page  61
  • 62.
    Shared Assessments Report Layout •The Shared Assessments report follows the  AUP standard of the AICPA • Description of scope • Domain area • Control objective • Control • Procedure • Results of applying the procedure Copyright 2010 Riebeeck Stevens Ltd Page  62
  • 63.
    Using a Shared Assessments Report • The Shared Assessments report does not  provide assurance just attestation of the result d f h l • Each user of the report must evaluate the  results in the context of their own risk universe lt i th t t f th i ik i • Some controls may be applicable others may  not • The absence of certain controls may not be  relevant to the user s environment relevant to the user’s environment • Do not extrapolate in time and space Copyright 2010 Riebeeck Stevens Ltd Page  63
  • 64.
    Using a Shared Assessments Report • Limitations of the Shared Assessment Report • Limited to Security, business continuity and  d b d privacy • No third party opinion N thi d t i i • Can it be relied upon for purposes of an audit of  financial statements? Only if issued by CPA?  financial statements? Only if issued by CPA? What about internal audit of the user  organization? g • What about sub‐service organizations? What  options are there to report on that relationship? Copyright 2010 Riebeeck Stevens Ltd Page  64
  • 65.
    Module Summary After completing this module, you should now  understand: d t d • What are Shared Assessments • What is a Shared Assessments Report What is a Shared Assessments Report • The content of a Shared Assessments Report • The responsibilities of the Shared Assessments The responsibilities of the Shared Assessments  Auditor • Key considerations of managing a Shared  y g g Assessments project • The usability of Shared Assessments reports Copyright 2010 Riebeeck Stevens Ltd Page  65
  • 66.
    SAS 70 Audits Copyright 2010 Riebeeck Stevens Ltd Page  66
  • 67.
    What is “SAS 70”? • Statement on Auditing Standards (SAS) No. 70,  Service Organizations, as amended S i O i i d d • Issued by the American Institute of Certified  Public Accountants (AICPA) P bli A t t (AICPA) Copyright 2010 Riebeeck Stevens Ltd Page  67
  • 68.
    What is a “SAS 70” Report? A report containing: • Description of the control environment • Description of management’s control objectives • Description of specific controls, policies and  f f l l d procedures • Description of tests of those specific controls,  p p policies and procedures • Results of those tests • Independent auditor s opinion Independent auditor’s opinion • Supplemental information provided by the Service  Organization (optional) Copyright 2010 Riebeeck Stevens Ltd Page  68
  • 69.
    Who uses the SAS 70 report? Primary external users (outside of service organization) •Clients of service organizations and their auditors • Auditors of service organization • Prospective clients of service organizations Copyright 2010 Riebeeck Stevens Ltd Page  69
  • 70.
    Who uses the SAS 70 report? Benefits of the report to external users •Enhanced understanding of the control  environment • Additional level of comfort • Contained audit costs Contained audit costs • Ability to compare service organizations • Reliance on controls Copyright 2010 Riebeeck Stevens Ltd Page  70
  • 71.
    Who uses the SAS 70 report? Primary internal users (within service organization) •Management • Internal Audit • Legal and Compliance • Risk Management • Marketing Copyright 2010 Riebeeck Stevens Ltd Page  71
  • 72.
    Who uses the SAS 70 report? Benefits of the report to internal users • Independent evaluation of processes and controls • Standard documentation of processes and controls for  future evaluation of efficiencies f l i f ffi i i • Improved risk management • Potential reduction of coordination with your client’s  P t ti l d ti f di ti ith li t’ auditors  • Marketing Copyright 2010 Riebeeck Stevens Ltd Page  72
  • 73.
    Distribution of the Report Controlled by service organization Generally limited to: • Service organization • Clients of service organization • Auditors of clients of service organization • Prospective clients of service organization Copyright 2010 Riebeeck Stevens Ltd Page  73
  • 74.
    Types of Reports • Type I  – Report on Controls placed in  Operation as of a specified date • Type II – Report on Controls placed in  Operation as of a specified date  Operation as of a specified date AND Results of Tests of Operating Effectiveness  R lt f T t f O ti Eff ti during a specified period  Copyright 2010 Riebeeck Stevens Ltd Page  74
  • 75.
    Service Auditor’s Responsibilities: Type I  Engagement • Determinewhether the description of controls Determine whether the description of controls  presents fairly the relevant aspects of the  controls placed in operation as of the date of  report • Determine whether the controls are suitably  h h h l bl designed to achieve the specified control  objectives Copyright 2010 Riebeeck Stevens Ltd Page  75
  • 76.
    Service Auditor’s Responsibilities : Type II Engagement •Same as in Type I Engagement AND • Determine whether the controls that were Determine whether the controls that were  tested were operating with sufficient  effectiveness to achieve control objectives  for the specified period of the report Copyright 2010 Riebeeck Stevens Ltd Page  76
  • 77.
    Sub‐Service Organizations: Carve‐out • Exclude sub‐service organization’s relevant controls and  control objectives from report and from auditor s scope control objectives from report and from auditor’s scope • If Carve‐Out sub‐servicer, then:  Modify scope paragraph in the auditor’s report for the controls of  the sub service organization the sub‐service organization o Describe the functions and nature of processing performed by sub‐ service organization o That the description of the controls includes only the controls and  related control objectives of the service organization o That our examination does not extend to the controls at the sub‐service organization  Service Organization modifies description of controls to summarize  the functions and nature of the processing performed by the sub‐ h f i d f h i f db h b service organization that are omitted from the report • May be necessary to modify opinion paragraph in auditor’s  report Copyright 2010 Riebeeck Stevens Ltd Page  77
  • 78.
    Sub‐Service Organizations: Inclusive • Include sub‐service organization’s relevant controls and  control objectives in report and in auditor’s scope • Ensure description of controls and control objective  discussion in report clearly differentiates controls at service  organization and at sub‐service organization, but includes  both in reporting • Modify auditor’s report throughout (scope, opinion, Company  references) to include sub‐service organization (and its  related controls, etc.) • Perform procedures at the sub‐servicer to determine  whether:  controls (functions/nature of processing and controls)  are fairly  presented  controls are suitably designed to achieve the related control objectives  controls are operating with sufficient effectiveness (For Type II controls are operating with sufficient effectiveness (For Type II  engagements) Copyright 2010 Riebeeck Stevens Ltd Page  78
  • 79.
    User Control Considerations • Complementary Controls that may be  required at the User Organization  • Include in report’s description of controls • Include in auditor’s report Include in auditor s report • Sample UCC: User Organization should  remove terminated employees when access  t i t d l h no longer needed Copyright 2010 Riebeeck Stevens Ltd Page  79
  • 80.
    Service Auditor’s Responsibilities •Addressing the representations in the service  auditor’s report p • Adhere to the AICPA general standards and  with the relevant AICPA fieldwork and  with the relevant AICPA fieldwork and reporting standards  Copyright 2010 Riebeeck Stevens Ltd Page  80
  • 81.
    Layout of Typical SAS 70 Report Opinion Section I – Information provided by the Service Organization Section IInformation provided by the Service Organi ation  Overview of the business  Control Environment  Applicability of Report  Description of Controls Section II  Information Provided by the Service Auditor Section II – Information Provided by the Service Auditor Section III – Controls, Control Objectives and Tests of  Operating Effectiveness Section IV – Other information provided by the Service  Organization Copyright 2010 Riebeeck Stevens Ltd Page  81
  • 82.
    Module Summary After completing this module, you should now be  able to: bl • Understand the basic SAS 70‐related terms and  definitions • Understand the basic overview of SAS 70 • Understand who uses SAS 70 reports and why Copyright 2010 Riebeeck Stevens Ltd Page  82
  • 83.
    Project Management:  j g Useful information for the  Service Auditor Engagement Team Service Auditor Engagement Team Copyright 2010 Riebeeck Stevens Ltd Page  83
  • 84.
    Define and Understand Engagement/Report Scope Collaborative process with the Client  Scope should be driven by USER needs and  requirements o Include Core Areas o Include desired Locations Copyright 2010 Riebeeck Stevens Ltd Page  84
  • 85.
    Engagement Time Management Time Management • Activity Definition • Activity Sequencing • Activity Duration Estimating • Schedule Development • Schedule Control Schedule Control Copyright 2010 Riebeeck Stevens Ltd Page  85
  • 86.
    Service Organization Involvement •Project Sponsor (leader/owner) of the  Process j ( y • Project Coordinator (daily task  management) • Internal Pre‐Assessment and Remediation Internal Pre Assessment and Remediation • “Buy‐In” of Senior Management within all  functional departments/areas functional departments/areas Copyright 2010 Riebeeck Stevens Ltd Page  86
  • 87.
    Senior Management Buy‐In • Assists in obtaining information timely • Ensures right personnel/contacts are met • Ensures personnel/contacts will provide all  necessary assistance  • Ensures personnel/contacts know the  importance of the project to their department  leaders Copyright 2010 Riebeeck Stevens Ltd Page  87
  • 88.
    Responsibilities May impact: May impact: • Timing • Deadlines • Budgets/fees • Staffing mix Staffing mix • Expectations set by client or by auditor • Satisfaction with meeting expectations and  S ti f ti ith ti t ti d • The ability to manage expectations Copyright 2010 Riebeeck Stevens Ltd Page  88
  • 89.
    Reporting Responsibilities Generally, Client should draft most areas the Report • Overview of Operations (Organization Definition) • Description of Controls and Control Environment • Control Objectives and Controls Control Objecti es and Controls • Other Information provided by the Service Organization Generally, the Service Auditor should focus on: Generally the Service Auditor should focus on: • Opinion • Information Provided by Service Auditor Information Provided by Service Auditor • Testing of Controls and Results of Testing Copyright 2010 Riebeeck Stevens Ltd Page  89
  • 90.
    Managing Expectations • Expectations of Significant Changes During Report  Period (mid‐year significant changes in  controls/processes to consider) • Presence of Exceptions in the Report • Multi‐location Considerations • Report is evolving R i l i • Recommendations to be Provided to Client • Regular Status Meetings with Project Champion and Day‐to‐Day Contact Person is important Copyright 2010 Riebeeck Stevens Ltd Page  90
  • 91.
    Managing Expectations • Timeline/Deadline for Stages of Engagement Timeline/Deadline for Stages of Engagement  Setting project milestones minimizes time overages • Detailed Project Plan by Control Objective Detailed Project Plan by Control Objective  Breaking down project plan to task level increases  accuracy of cost estimation and subsequent budgeting y q g g • Monitor Timing/Fees (budget to actual)  Enhanced cost control through frequent budget to actual  g q g monitoring Copyright 2010 Riebeeck Stevens Ltd Page  91
  • 92.
    Module Summary After completing this module, you should now: •Understand key aspects of managing a SAS 70  project effectively and efficiently. • Understand common pitfalls/challenges and  successes that we have encountered in our  experience with SAS 70 engagements.  Copyright 2010 Riebeeck Stevens Ltd Page  92
  • 93.
    Service Auditor Considerations Service Auditor Considerations Copyright 2010 Riebeeck Stevens Ltd Page  93
  • 94.
    Service Auditor Considerations • Workpaper documentation • Design of Tests • Types of tests • Sampling • Findings • Testing strategies Copyright 2010 Riebeeck Stevens Ltd Page  94
  • 95.
    Design of Tests Control           Test Control Test Copyright 2010 Riebeeck Stevens Ltd Page  95
  • 96.
    Types of Tests • Inquiry • Inspection • Observation • Re‐performance of the control Copyright 2010 Riebeeck Stevens Ltd Page  96
  • 97.
    Sample Sizes • No definitive guidance • Driven by four variables  Significance of control g  Frequency  Past experience Past experience  Client expectation Copyright 2010 Riebeeck Stevens Ltd Page  97
  • 98.
    Sample Sizes (continued) • Frequently used numbers (influenced  primarily by SOX developments): primarily by SOX developments): Type of Control Primary Secondary Other 25 15 5 Copyright 2010 Riebeeck Stevens Ltd Page  98
  • 99.
    Findings Findings should be classified into: g • Nominal • M Management Letter Comment (“MLC”) L C (“MLC”) • Exceptions p Copyright 2010 Riebeeck Stevens Ltd Page  99
  • 100.
    Findings (continued) • Quantitative materiality thresholds do not  apply • How to deal with exceptions  Identify compensating controls  Redefine control objectives j  Timely validation Copyright 2010 Riebeeck Stevens Ltd Page  100
  • 101.
    Testing Strategies • Report must be applicable to internal  controls in place during the entire testing  period. • Narrative update can occur at six month  point • Controls can be tested at any time during the  testing period testing period Copyright 2010 Riebeeck Stevens Ltd Page  101
  • 102.
    Module Summary After completing this module, you should now: •Understand important items to consider when  performing a SAS 70 engagement including  sample sizes, testing strategies and addressing  findings. Copyright 2010 Riebeeck Stevens Ltd Page  102
  • 103.
  • 104.
    Is the SAS 70 Useful? • Address the applications and/or locations used by  the Service Organization that are relevant to  the Service Organization that are relevant to financial statement assertions? • Adequate to understand flow of transactions? Adequate to understand flow of transactions? • Sufficient detail of controls that prevent or detect  possible errors? • Are there findings within control tests? • Does opinion address any exceptions? • Are any areas being carved‐out? Copyright 2010 Riebeeck Stevens Ltd Page  104
  • 105.
    Procedures when using a SAS 70 Report • Read report to: • U d t d th fl Understand the flow of transactions and the controls ft ti d th t l • Determine that controls were operating as intended • Determine whether significant control deficiencies Determine whether significant control deficiencies  were noted • Inquire of client as to changes since date of SAS 70 • Consider whether additional procedures are  necessary Copyright 2010 Riebeeck Stevens Ltd Page  105
  • 106.
    Assessing User Control Considerations •Read service auditor’s report to determine:  Whether the considerations are relevant to your  client o If relevant, ensure during your planning that the  controls have been implemented by the client  Nature of complementary controls that should Nature of complementary controls that should  be in place at our client Copyright 2010 Riebeeck Stevens Ltd Page  106
  • 107.
    Updating a SAS 70 When date of SAS 70 report is within the client’s  fiscal year (and assessed controls as effective): • Update through client discussions  When date of SAS 70 is outside of our client’s  y ( p g fiscal year (and anticipate assessing controls as  effective): • Can use the report as a starting point in gaining  p gp g g an understanding of the control environment y y p • You may not rely on this report as audit evidence Copyright 2010 Riebeeck Stevens Ltd Page  107
  • 108.
    Using a SAS 70 Report READ IT! READ IT! READ IT! READ IT! ! Copyright 2010 Riebeeck Stevens Ltd Page  108
  • 109.
    Using a SAS 70 Report • Make sure you understand which significant  processes are covered • Can you rely on the testing which was  performed? • Determine the results of any testing that was Determine the results of any testing that was  performed Copyright 2010 Riebeeck Stevens Ltd Page  109
  • 110.
    Using a SAS 70 Report • If the report does not cover the entire period  of the user organization’s fiscal year, gain an  understanding for the period not covered. Copyright 2010 Riebeeck Stevens Ltd Page  110
  • 111.
    Module Summary After completing this module, you should now: •Understand when you can rely on a SAS 70  report. • Understand the documentation requirements  g g p when leveraging a SAS 70 report. • Understand how you can benefit from a SAS  70 report. 70 report Discuss the SAS 70 Reliance Decision Tree Copyright 2010 Riebeeck Stevens Ltd Page  111
  • 112.
    Attest Engagement Copyright 2010 Riebeeck Stevens Ltd Page  112
  • 113.
    What is an Attest Engagement? • Examination, audit or review of subject  matter or management assertion • Higher level of assurance • Generally includes an opinion of the auditor • Follows the Statement on Standards for Follows the Statement on Standards for  Attestation Engagements of the AICPA Copyright 2010 Riebeeck Stevens Ltd Page  113
  • 114.
    Why Do We Need Attest Reports? • Many financial situations require an attest  report • In the controls space, they can cover areas  that are not possible to cover in SAS 70 or  other reports • An example is business continuity planning  and the availability principle and the availability principle Copyright 2010 Riebeeck Stevens Ltd Page  114
  • 115.
    Who uses Attest Reports? • Attest reports are limited distribution reports • Can be used by external auditors for  evaluating audit risk • Can be used by the service organization  management • Can be used by the user organization  management Copyright 2010 Riebeeck Stevens Ltd Page  115
  • 116.
    Attest Engagements Definition and Underlying Concepts • Subject matter • Assertion • Responsible party Copyright 2010 Riebeeck Stevens Ltd Page  116
  • 117.
    Attest Engagements • Suitability of Criteria  Objectivity  Measurability  Completeness  Relevance • Availability of Criteria Copyright 2010 Riebeeck Stevens Ltd Page  117
  • 118.
    Attest Auditor Responsibilities • Training and proficiency • Adequate knowledge of the subject matter • Independence • Due professional care • If report issued according to the AICPA  If ti d di t th AICPA standard then auditor should be a CPA Copyright 2010 Riebeeck Stevens Ltd Page  118
  • 119.
    Layout of Attest Report • Differences in content for an Examination  and a Review report • Considerations as to whether opining on  subject matter or management assertion • Statement that the work conducted supports Statement that the work conducted supports  the opinion provided • Compliance with AICPA standards Compliance with AICPA standards Copyright 2010 Riebeeck Stevens Ltd Page  119
  • 120.
    Project Management Considerations •Obtain clear management assertion • Ensure there are suitable criteria • Delineate an plan every activity Delineate an plan every activity • Discuss and walkthrough every risk and area  of control of control • Establish a clearly defined timeline • Obtain concurrence from management on all  identified findings Copyright 2010 Riebeeck Stevens Ltd Page  120
  • 121.
    Attest Auditor Considerations  • Planning and supervision • Obtaining sufficient evidence • Management representations Management representations • Reporting • Analysis of other information presented by  A l i f th i f ti t db management Copyright 2010 Riebeeck Stevens Ltd Page  121
  • 122.
    Using an Attest Report • Ensure focus and scope are relevant • Review criteria • Evaluate findings Evaluate findings • Consider period of the attestation • Determine whether subsequent events  D t i h th b t t occurred • Integrate controls in the report with risks in  your organization Copyright 2010 Riebeeck Stevens Ltd Page  122
  • 123.
    Module Summary After completing this module, you should now be  able to understand: • What are Attest engagements • What is an Attestation Report • The content of an Attestation Report • The responsibilities of the Attest Auditor • Key considerations of managing a Attest  project • The usability of Attest reports Copyright 2010 Riebeeck Stevens Ltd Page  123
  • 124.
    Good Bye SAS 70 Copyright 2010 Riebeeck Stevens Ltd Page  124
  • 125.
    SAS 70 No More • Recent Developments • International Demand • IFAC  ISAE 3402 IFAC ‐ ISAE 3402 • AICPA SSAE 16 – Reporting on Controls at a  Service Organization Service Organization • New SAS – Audit Considerations Relating to  an Entity Using a Service Organization E tit U i S i O i ti Copyright 2010 Riebeeck Stevens Ltd Page  125
  • 126.
    SAS 70 No More • New Standards do not affect inquiries of  management • New Standards do not affect AUP/Shared  Assessments • New Standards do not affect the Attest New Standards do not affect the Attest  Engagements Copyright 2010 Riebeeck Stevens Ltd Page  126
  • 127.
    AICPA SSAE 16 • Separates Service Audit from existing SAS • Falls under different family of standards • Instead of an audit standard, it is an attest Instead of an audit standard, it is an attest  standard • Requires a written management assertion Requires a written management assertion • And suitable criteria • Does not consider the usability in a financial  statement audit ONLY Copyright 2010 Riebeeck Stevens Ltd Page  127
  • 128.
    SSAE 16 – Impact • Management of the service organization required  to provide the service auditor with a written  t id th i dit ith itt assertion about 1. The fairness of the presentation of the description of  1 The fairness of the presentation of the description of the service organization’s system 2. The suitability of the design of the controls to  achieve the related control objectives stated in the  description, and, in a type 2 engagement 3. The operating effectiveness of those controls to  3 The operating effectiveness of those controls to achieve the related control objectives stated in the  description. Copyright 2010 Riebeeck Stevens Ltd Page  128
  • 129.
    SSAE 16 – Impact •A service auditor is able to report on controls  at a service organization other than controls  that are relevant to user entities’ financial  reporting, for example, controls related to  user entities’ regulatory compliance,  production, or quality control. • This is probably the greatest benefit of all! Copyright 2010 Riebeeck Stevens Ltd Page  129
  • 130.
    SSAE 16 – Impact •In a type 2 report, the service auditor’s  opinion on the fairness of the presentation of  the description of the service organization’s  system and on the suitability of the design of  the controls is for a period of time rather  than as of a specified date, as is the case in  the current standard Copyright 2010 Riebeeck Stevens Ltd Page  130
  • 131.
    SSAE 16 – Impact •When obtaining an understanding of the  service organization‘s system, the service  auditor would be required to obtain  information to identify risks that the  description of the service organization’s  system is not fairly presented or that the  control objectives stated in the description  were not achieved due to intentional acts by  service organization personnel. Copyright 2010 Riebeeck Stevens Ltd Page  131
  • 132.
    SSAE 16 – Impact •Indicates that when assessing the operating  effectiveness of controls in a type 2  engagement, evidence obtained in prior  engagements about the satisfactory  operation of controls in prior periods does  not provide a basis for a reduction in testing,  even if supplemented with evidence  obtained during the current period. Copyright 2010 Riebeeck Stevens Ltd Page  132
  • 133.
    SSAE 16 – Impact •A service auditor’s type 2 report would  identify the customers to whom use of the  report is restricted as "customers of the  service organization’s system during some or  all of the period covered by the service  auditor’s report,"and in a service auditor’s  type 1 report, as, "customers as of the date  of the service organization’s description  covered by the report." Copyright 2010 Riebeeck Stevens Ltd Page  133
  • 134.
    SSAE 16 – Key Considerations •Effective date – the AICPA/ASB has proposed  making the SSAE effective concurrently with  the new ISAE 3402 • Management assertion – An assertion‐based  engagement includes an explicit  acknowledgement by management of its  responsibility for the matters addressed in its  assertion • Convergence with International Standards Copyright 2010 Riebeeck Stevens Ltd Page  134
  • 135.
    IFAC – ISAE 3402 •ISAE 3402 – Assurance Reports on Controls at  a Service Organization • Based on original structure of SAS 70 but very  similar to the New SSAE l h • Applies to all countries where IFAC is  recognized i d • Scope – applies to engagements that convey  reasonable assurance when the service  bl h th i organization is responsible for the suitable  design of controls design of controls Copyright 2010 Riebeeck Stevens Ltd Page  135
  • 136.
    ISAE 3402 • The standard deals with assurance  engagements by professional accountants in  public practice to provide a report for use by  the user entities and their auditors on the  controls at a service organization that  provides a service to user entities that is  likely to be relevant to user entities’ internal  control, as it relates to financial reporting. Copyright 2010 Riebeeck Stevens Ltd Page  136
  • 137.
    ISAE 3402 The standard does not deal with assurance  engagements: • To report on whether controls at a service  organization operated as described, or • To report ONLY on controls at a service To report ONLY on controls at a service  organization that are not related to a service  that is likely to be relevant to user entities that is likely to be relevant to user entities’  internal controls as it relates to financial  reporting Copyright 2010 Riebeeck Stevens Ltd Page  137
  • 138.
    Why is ISAE 3402 Important • Impact at domestic and international levels • It updates/replaces (potentially)/complements: It d t / l ( t ti ll )/ l t • US ‐ Statement on Auditing Standards (SAS) No. 70 • CA ‐ Canadian Institute of Chartered Accountants CA  Canadian Institute of Chartered Accountants  (CICA) 5970 • UK ‐ Audit and Assurance Faculty Standard (AAF)  01/06 / • AU ‐ Guidance Statement (GS) 007 • HK ‐ HKSA Statements – Auditing Practice Note 860 2 HK  HKSA Statements  Auditing Practice Note 860.2 • JP ‐ Audit Standards Committee Report No. 18 • DE (Germany) ‐ IDW PS 951 Copyright 2010 Riebeeck Stevens Ltd Page  138
  • 139.
    IFAC – ISAE 3402 •Introduces the concept of materiality • Not with respect to the financial statements  but with respect to the system  The concept of materiality takes into account that  the service auditor’s assurance report provides  information about the service organization s system  information about the service organization’s system to meet the common information needs of a broad  range of user entities and their auditors who have an  understanding of the manner in which that system  has been used.  Copyright 2010 Riebeeck Stevens Ltd Page  139
  • 140.
    IFAC – ISAE 3402 • Materiality with respect to the fair presentation of  the service organization’s description of its system,  th i i ti ’ d i ti f it t and with respect to the design of controls, includes  primarily the consideration of qualitative factors,  primarily the consideration of qualitative factors for example: whether the description includes the  significant aspects of processing significant  g p p g g transactions; whether the description omits or  distorts relevant information; and the ability of  controls, as designed, to provide reasonable  assurance that control objectives would be  achieved.  achieved Copyright 2010 Riebeeck Stevens Ltd Page  140
  • 141.
    IFAC – ISAE 3402 •Materiality with respect to the service  auditor’s opinion on the operating  effectiveness of controls includes the  consideration of both quantitative and  qualitative factors, for example, the tolerable  rate and observed rate of deviation (a  quantitative matter), and the nature and  cause of any observed deviation (a  qualitative matter).  Copyright 2010 Riebeeck Stevens Ltd Page  141
  • 142.
    Critical Steps in Assurance Reporting  Under ISAE 3402 •Assessing the Suitability of the Criteria • Obtaining an Understanding of the Service  Organization’s System • Obtaining Evidence Regarding the  Description • Obtaining Evidence Regarding Design of  Controls • Obtaining Evidence Regarding the Operating  Effectiveness of Controls Copyright 2010 Riebeeck Stevens Ltd Page  142
  • 143.
    Critical Steps in Assurance Reporting  Under ISAE 3402 •The Work of an Internal Audit Function • Other Information • Preparing the Service Auditor’s Assurance Preparing the Service Auditor s Assurance  Report • Other Communication Responsibilities Other Communication Responsibilities Copyright 2010 Riebeeck Stevens Ltd Page  143
  • 144.
    Comparison of SAS 70 with ISAE/SSAE Topic Existing SAS 70 Standard ISAE 3402 / SSAE Scope SAS 70 is limited to controls Report can be extended over the processing of p g beyond financial y financial transactions by a reporting. service organization. Opinion / The auditor provides an In addition to the Assertion opinion based directly on auditor's opinion, the subject matter with no management of the f formal management service organization assertion. p provides a formal assertion affirming its responsibilities for the controls in the report. report Copyright 2010 Riebeeck Stevens Ltd Extracted from “Good‐bye SAS 70” by Fiona Gaskin Page  144
  • 145.
    Comparison of SAS 70 with ISAE/SSAE Topic Existing SAS 70 Standard ISAE 3402 / SSAE Disclosure Work performed by internal Work performed by internal audit requirements audit to support the service used in part to form the service for f use of IA f auditor's opinion i not di ' i i is auditor’s opinion shall i l d a di ’ i i h ll include disclosed. description of the internal auditor’s work and of the service auditor’s procedures with respect to that work. Audit Guidance Guidance is provided in an Guidance for the service auditor annually updated Audit d d d will be solely contained in the d Guide, which includes ISAE itself and will not contain illustrative control objectives illustrative control objectives. for various types of service The US will continue to provide organizations. audit guidance to support the SSAE/SAS 70 standards. standards Copyright 2010 Riebeeck Stevens Ltd Extracted from “Good‐bye SAS 70” by Fiona Gaskin Page  145
  • 146.
    Comparison of SAS 70 with ISAE/SSAE Topic Existing SAS 70 Standard ISAE 3402 / SSAE Example of Type I - report on the Type 1 - report on the Terminology fairness of the fairness of the description Differences description of controls of controls and whether and whether those those controls were suitably controls were suitably designed. designed. Type II - report also Type 2 - report also includes includes an opinion on an opinion on the operating the operating effectiveness of the controls. effectiveness of the controls. Copyright 2010 Riebeeck Stevens Ltd Extracted from “Good‐bye SAS 70” by Fiona Gaskin Page  146
  • 147.
    ISAE 3402 Report • Internal control is a process designed to provide  reasonable assurance regarding the achievement of  bl di th hi t f objectives related to the reliability of financial  reporting, effectiveness and efficiency of operations  reporting, effectiveness and efficiency of operations and compliance with applicable laws and regulations.  • Control objectives and controls at the User  Organizations • Control objectives and controls at the Service  Organization • Controls at the Service Organization that need to be  complemented at User Organizations p g Copyright 2010 Riebeeck Stevens Ltd Page  147
  • 148.
    Module Summary After completing this module, you should now be  able to understand: able to understand: • The latest developments in Third Party Assurance  Sta da ds Standards • The impact of new Standards • The benefits of the new Standards • Key differences and similarities between domestic  and international standards • K Key considerations and responsibilities of a  id ti d ibiliti f service auditor and the user of a third party  assurance report p Copyright 2010 Riebeeck Stevens Ltd Page  148
  • 149.
    Wrap-Up Wrap Up and Summary Wrap‐Up andSummary Copyright 2010 Riebeeck Stevens Ltd Page  149
  • 150.
    Using Third Party Reports • A report is not relevant if it does not address your  company’s risks ’ ik • Prepare your own ICQ or use a standard one as a  pre‐audit tool di l • Use your company’s risk and control matrices as  the basis to evaluate ICQ, AUP, SAS 70, ISAE and  h b i l ICQ AUP SAS 70 ISAE d SSAE findings • Starting point is your company’s risks not what is  St ti i ti ’ ik t h ti in the reports Copyright 2010 Riebeeck Stevens Ltd Page  150
  • 151.
    Third Party Assurance – Final Comments • Businesses will continue to look for opportunities  to increase efficiency and effectiveness of  to increase efficiency and effectiveness of business processes • Globalization will not stop Globalization will not stop • Cloud Computing will make this field more  interesting and complex g p • Third party assurance practice will continue to  grow • We will be either auditing or will be audited by a  service auditor …  Copyright 2010 Riebeeck Stevens Ltd Page  151
  • 152.
    Contact Felix Ramirez (W) 646290 8998 (W) 646‐290‐8998 (C)  908‐230‐4562 (e) felix.ramirez@riebeeckstevens.com ( ) f li i @i b kt Copyright 2010 Riebeeck Stevens Ltd Page  152