1. Module 10 | Slide 1 of 26 2012
Basic Principles of GMP
Equipment
13
2. Module 10 | Slide 2 of 26 2012
Equipment
Objectives
To review the requirements for equipment
selection
design
use
maintenance
To discuss problems related to issues around selected items of
equipment
3. Module 10 | Slide 3 of 26 2012
Equipment
Principle
Equipment must be
located
designed
constructed
adapted
maintained
to suit the operations to be carried out
13.1
4. Module 10 | Slide 4 of 26 2012
Basic Principles of GMP
What does
location
design
construction
adaptation
maintenance
cleaning
calibration
… mean in practice?
5. Module 10 | Slide 5 of 26 2012
Equipment
Principles
Equipment layout and design must aim:
to minimize risks of error
to permit effective cleaning and maintenance
To avoid:
cross-contamination, dust and dirt build-up
any adverse effect on the quality of products
Equipment must be installed to:
minimize risks of error
minimize risks of contamination
13.1, 13.2
6. Module 10 | Slide 6 of 26 2012
13.3, 13.4
Equipment
Pipes
Fixed pipework
clearly labelled
indicate contents and direction of flow
Service pipings and devices
adequately marked
non-interchangeable connections or adaptors for
dangerous gases and liquids
7. Module 10 | Slide 7 of 26 2012
Basic Principles of GMP
Contents and direction of flow
indicated
e.g. water lines, equipment
components, air-handling
systems
8. Module 10 | Slide 8 of 26 2012
13.5
Equipment
Balances and Measuring Equipment
Appropriate range and precision available
In production and quality control
Calibrated
scheduled basis
checks
records maintained
9. Module 10 | Slide 9 of 26 2012
Equipment
Production equipment
Appropriate design
easily and thoroughly cleaned on a scheduled
basis
procedures and records
No hazard to the products
contact parts of suitable non-reactive materials
non additive and
not absorptive
13.9, 13.10
10. Module 10 | Slide 10 of 26 2012
13.11 – 13.13
Equipment
Production equipment
Closed equipment used when possible
Open equipment, or when equipment opened, precautions
taken to prevent contamination
Non-dedicated equipment cleaned according to validated
cleaning procedures between different products
Current drawings of critical equipment and support systems
maintained
11. Module 10 | Slide 11 of 26 2012
Basic Principles of GMP
Current drawings of critical
equipment
Verify against qualification
protocol and report, as well
as supplier's manual
Check if in accordance with
drawing, or changes (change
control)
Verify critical components
installed, e.g. filters, control
and monitoring devices
12. Module 10 | Slide 12 of 26 2012
Basic Principles of GMP
What are the questions you
can ask about this piece of
equipment?
13. Module 10 | Slide 13 of 26 2012
Basic Principles of GMP
And for this one?
14. Module 10 | Slide 14 of 26 2012
Basic Principles of GMP
What do these labels
indicate for this piece of
equipment?
Do you notice any GMP
non-compliances here?
15. Module 10 | Slide 15 of 26 2012
Basic Principles of GMP
16. Module 10 | Slide 16 of 26 2012
Basic Principles of GMP
What are some of the key
questions you can ask about
the blender?
17. Module 10 | Slide 17 of 26 2012
Basic Principles of GMP
Transfer of material to the
compression machine
through a closed system is
preferred to prevent possible
contamination
It also helps to contain dust
18. Module 10 | Slide 18 of 26 2012
Basic Principles of GMP
Remember to look at
punches and dies
Are there specifications for
these?
How are they cleaned,
stored, issued for use and
returned to storage?
Are they in a good
condition and checked at
regular intervals?
19. Module 10 | Slide 19 of 26 2012
Basic Principles of GMP
20. Module 10 | Slide 20 of 26 2012
Basic Principles of GMP
Coating of tablets
Is qualification of a coating
machine necessary?
If so, what has to be done?
What about maintenance?
And cleaning validation?
21. Module 10 | Slide 21 of 26 2012
Basic Principles of GMP
Don't forget the packaging
lines!
22. Module 10 | Slide 22 of 26 2012
Equipment
Quality control equipment and instruments
suitable for the tests to be performed
Defective equipment in production and quality control should be
Removed; or
Labelled (to prevent use)
13.7, 13.10
23. Module 10 | Slide 23 of 26 2012
13.6, 13.8
Equipment
Washing, cleaning and drying
Equipment used for washing and drying – not the source of
contamination
Equipment design should promote easy cleaning
Cleaning on scheduled basis, procedures and records
Washing and cleaning
manual
automated (Clean in place (CIP), Steam in place (SIP))
24. Module 10 | Slide 24 of 26 2012
Equipment
Group Session
For the given type of equipment
What would your concerns be in relation to the manufacture
of products, when inspecting this particular piece of
equipment?
What are the signs of poor practice in cleaning, operation
and maintenance?
25. Module 10 | Slide 25 of 26 2012
Basic Principles of GMP
26. Module 10 | Slide 26 of 26 2012
Equipment
Possible Issues
Poor design
Lack of safety
Poor quality finishes
Lack of cleaning
Lack of maintenance
No usage log or record
Use of inappropriate weighing equipment
Open-plan location of compressing machines
Editor's Notes
21 September, 2021
21 September, 2021
21 September, 2021
21 September, 2021
21 September, 2021
21 September, 2021
13.4 All service pipings and devices should be adequately marked and special attention paid to the provision of non-interchangeable connections or adaptors for dangerous gases and liquids.