Personal Information 
Knowledge Area: 
Page 1 of 3 
Sareah Magdy Mahmoud Lasheen 
Sr. Planning Engineer 
+966 563272610 - pmsarea@gmail.com 
Riyadh - KSA Date of Education: 2008 
Work Experience 
Planning & Project management: 
 Prepare project charter and project management plan (Scope, Time, Cost & Risk 
Plan) using MS project and Primavera P6. 
 Create WBS and WBS dictionary, activities and relation between activities, S-curve 
and cash flow and manpower Histogram. 
 Create the Daily, Weekly & Project Management Monthly report. 
 Coordinate with sites engineers to collect data to update the time and cost plan. 
 Monitor and control projects by using earned value analysis 
 Using crashing technique for critical activates to minimize the project time and 
project cost. 
 Create the EOT “Extension Of Time Claim”. 
 Preparing project status report and submit it to PMO / high management. 
Consulting: 
 Collect all client requirements. 
 Create the “AS IS” Study of the Organization. 
 Prepare organization structure, Job description, processes, flowcharts, Procedures 
and templates. 
 Developing key performance indicator according to EFOM methodology. 
 Manage the customer engagement during exciting the project. 
Supervision: 
 Supervise the whole production process integrated with the other manufacturing 
process. 
 Responsible for hiring, training, coaching and disciplining production workers as 
needed. 
 Maintain the records for production as well as all employee files. 
 Work with the sales, shipping, planning and maintenance departments to 
coordinate production activities with those of the entire production department. 
 Coordinate with quality control department to make measurement tests for raw 
materials and final product to guarantee that they match the quality standards. 
 Deal with customers in case there are problems in the product quality. 
 Participate in analyzing inventory levels and supply needs. 
 Give recommendations for the updating and replacing of equipment necessary for 
production. 
sales and installation: 
 Purchase electrical equipment. 
 Install electrical equipment and operate it after purchase 
Nationality: 
Egyptian 
Date of Birth: 
July, 1984 
Marital Status: 
Married 
Visa: 
Transferrable 
Graduation: 
2008 
Military Status: 
Exempted 
Driving License: 
Valid 
- Planning 
- Consulting 
- PMP 
- Primavera P6 
- MS project 
- SAP 
- Six Sigma 
- Feasibility 
Study 
- ISO 9001:2008 
- ICDL “MS 
office”
Page 2 of 3 
Companies & Projects 
3- Drake & Scull International – (KSA) Feb 2012 - present 
-KSU “hospital Extension” Beget:350,000,000 SR 
-ITCC “17-Parcels” Beget:550,000,000 SR 
-KSU Endowment “Towers of Hilton Hotel & Residential Suites” 
Beget:328,000,000 SR 
Sr. 
Planning 
Engineer 
Feb 2012 - present 
2- Hope Vision Consultant Foundation -(KSA) March 2009 to Jan 2012 
MOSA (Ministry of social affairs)-KSA 
(Founding and operating PMO -Budget 6,500,000 SR) 
The aim of the project is establish, prepare and operate project 
management office. 
Assistant 
Project 
Manager 
From 4/2011 – 1/2012 
SFDA (Saudi food and drug authority )-KSA 
(Structuring and Organizing Shared Service Sector –Budget 900,000 SR) 
The objective of the project is structuring and organizing common services 
sector for authority and rehabilitation sector to global and local quality 
awards. 
Assistant 
Project 
Manager 
From 1/2010 to 4-2011 
WATAN PAC (National Packing Product Co.)-KSA Production 
Supervisor 
From 3/2009 to 1-2010 
1- ACG (Arab Commercial Group)- Egypt From 9/2008 to 3-2009 
Sales Engineer 
Education 
 Bachelor of Electrical Engineering from Helwan University – EGYPT. 
 Graduation project is BMS “Building Management System” Using SCADA & PLC. 
The project objective is to control HVAC, Fire System, Lighting System and ATS. 
This project is divided into two main parts: 
1. Hardware construction to simulate an intelligent building using hardware as tanks, pipes, sensors, valves, 
pumps and electric wiring. 
2. Software to control the system using SCADA (Supervisory Control and Data Acquisition) in addition to PLC 
(programmable Logic Control) 
Training, Courses & Seminars 
Courses 
SAP – Production Planning “Self Study” July 2014 
Introduction to Six Sigma “Training course” Oct 2013 
Introduction to Feasibility Study “Training course” Oct 2013 
Primavera P6 Rel 8.2 “Certificate Of Completion from ORACLE Un.” April 2013 
PMP (project management professional) “Training course” 
(Preparing for the test -self-study) 
June 2012 
ISO 9001:2008 auditorlead auditor Training course March 2011 
Middle management methodology Training course March 2010 
SCADA “Supervisory Control And Data Acquisition” July 2007 
PLC “Automatic Control and Programmable Logic Control’ June 2006 
Competent: 
Traini 
ng 
 Primavera P6. Rel 8.2 
 MS Project. 
 ICDL "International Computer Driving License"
Page 3 of 3 
Training during university: 
The Arab Contractors Osman Ahmed Osman & CO J u ly 2 0 0 6 
Belayim Petroleum Company A u g u s t 2005 
Egyptian Electric Utility and Consumer Protection Regulatory 
Agency 
July 2005 
Gulf Of Suez Petroleum Company J u l y 2 0 04 
Seminars 
Attended seminars at The Institute of Integrated Electrical Engineers (IIEE): 
 SHORT-CIRCUIT CALCULATIONS “Doc Version” & LV Products Awareness 
 MV Switchgear Design 
 Medium Voltage Mobile Electric Center and Pre-fabricated Electric Center 
MV/LV Transformer Protection and Earthing Systems 
Languag 
e 
 Arabic: Fluent 
 English: Excellent 
Soft Skills 
 Good communication and presentation skills 
 Ambitious, active and able to work under tight deadline 
 Self-motivated and like taking responsibilities and challenges. 
 Strong interpersonal and communication skills 
 Ability to manage detected work team 
 Ability to cope with different situations and interact with different kinds of people. 
 Flexible to work in a group or individually according to the job demands. 
 Presentable and good analytical skills

ENG.Sarea Lasheen 2014

  • 1.
    Personal Information KnowledgeArea: Page 1 of 3 Sareah Magdy Mahmoud Lasheen Sr. Planning Engineer +966 563272610 - pmsarea@gmail.com Riyadh - KSA Date of Education: 2008 Work Experience Planning & Project management:  Prepare project charter and project management plan (Scope, Time, Cost & Risk Plan) using MS project and Primavera P6.  Create WBS and WBS dictionary, activities and relation between activities, S-curve and cash flow and manpower Histogram.  Create the Daily, Weekly & Project Management Monthly report.  Coordinate with sites engineers to collect data to update the time and cost plan.  Monitor and control projects by using earned value analysis  Using crashing technique for critical activates to minimize the project time and project cost.  Create the EOT “Extension Of Time Claim”.  Preparing project status report and submit it to PMO / high management. Consulting:  Collect all client requirements.  Create the “AS IS” Study of the Organization.  Prepare organization structure, Job description, processes, flowcharts, Procedures and templates.  Developing key performance indicator according to EFOM methodology.  Manage the customer engagement during exciting the project. Supervision:  Supervise the whole production process integrated with the other manufacturing process.  Responsible for hiring, training, coaching and disciplining production workers as needed.  Maintain the records for production as well as all employee files.  Work with the sales, shipping, planning and maintenance departments to coordinate production activities with those of the entire production department.  Coordinate with quality control department to make measurement tests for raw materials and final product to guarantee that they match the quality standards.  Deal with customers in case there are problems in the product quality.  Participate in analyzing inventory levels and supply needs.  Give recommendations for the updating and replacing of equipment necessary for production. sales and installation:  Purchase electrical equipment.  Install electrical equipment and operate it after purchase Nationality: Egyptian Date of Birth: July, 1984 Marital Status: Married Visa: Transferrable Graduation: 2008 Military Status: Exempted Driving License: Valid - Planning - Consulting - PMP - Primavera P6 - MS project - SAP - Six Sigma - Feasibility Study - ISO 9001:2008 - ICDL “MS office”
  • 2.
    Page 2 of3 Companies & Projects 3- Drake & Scull International – (KSA) Feb 2012 - present -KSU “hospital Extension” Beget:350,000,000 SR -ITCC “17-Parcels” Beget:550,000,000 SR -KSU Endowment “Towers of Hilton Hotel & Residential Suites” Beget:328,000,000 SR Sr. Planning Engineer Feb 2012 - present 2- Hope Vision Consultant Foundation -(KSA) March 2009 to Jan 2012 MOSA (Ministry of social affairs)-KSA (Founding and operating PMO -Budget 6,500,000 SR) The aim of the project is establish, prepare and operate project management office. Assistant Project Manager From 4/2011 – 1/2012 SFDA (Saudi food and drug authority )-KSA (Structuring and Organizing Shared Service Sector –Budget 900,000 SR) The objective of the project is structuring and organizing common services sector for authority and rehabilitation sector to global and local quality awards. Assistant Project Manager From 1/2010 to 4-2011 WATAN PAC (National Packing Product Co.)-KSA Production Supervisor From 3/2009 to 1-2010 1- ACG (Arab Commercial Group)- Egypt From 9/2008 to 3-2009 Sales Engineer Education  Bachelor of Electrical Engineering from Helwan University – EGYPT.  Graduation project is BMS “Building Management System” Using SCADA & PLC. The project objective is to control HVAC, Fire System, Lighting System and ATS. This project is divided into two main parts: 1. Hardware construction to simulate an intelligent building using hardware as tanks, pipes, sensors, valves, pumps and electric wiring. 2. Software to control the system using SCADA (Supervisory Control and Data Acquisition) in addition to PLC (programmable Logic Control) Training, Courses & Seminars Courses SAP – Production Planning “Self Study” July 2014 Introduction to Six Sigma “Training course” Oct 2013 Introduction to Feasibility Study “Training course” Oct 2013 Primavera P6 Rel 8.2 “Certificate Of Completion from ORACLE Un.” April 2013 PMP (project management professional) “Training course” (Preparing for the test -self-study) June 2012 ISO 9001:2008 auditorlead auditor Training course March 2011 Middle management methodology Training course March 2010 SCADA “Supervisory Control And Data Acquisition” July 2007 PLC “Automatic Control and Programmable Logic Control’ June 2006 Competent: Traini ng  Primavera P6. Rel 8.2  MS Project.  ICDL "International Computer Driving License"
  • 3.
    Page 3 of3 Training during university: The Arab Contractors Osman Ahmed Osman & CO J u ly 2 0 0 6 Belayim Petroleum Company A u g u s t 2005 Egyptian Electric Utility and Consumer Protection Regulatory Agency July 2005 Gulf Of Suez Petroleum Company J u l y 2 0 04 Seminars Attended seminars at The Institute of Integrated Electrical Engineers (IIEE):  SHORT-CIRCUIT CALCULATIONS “Doc Version” & LV Products Awareness  MV Switchgear Design  Medium Voltage Mobile Electric Center and Pre-fabricated Electric Center MV/LV Transformer Protection and Earthing Systems Languag e  Arabic: Fluent  English: Excellent Soft Skills  Good communication and presentation skills  Ambitious, active and able to work under tight deadline  Self-motivated and like taking responsibilities and challenges.  Strong interpersonal and communication skills  Ability to manage detected work team  Ability to cope with different situations and interact with different kinds of people.  Flexible to work in a group or individually according to the job demands.  Presentable and good analytical skills