1. The Weyer Group provides complete engineering support for clients during all project phases, from requirement development and design to ensuring regulatory compliance.
2. Their public authority management gives clients planning security by identifying costs from safety regulations early.
3. Important decisions made early in a project have a large impact on later costs, so involving Weyer Group assures optimal conditions.
Potted History of BIM from an MEP PerspectiveBe2camp Admin
Potted History of BIM from an MEP Perspective
Eddie Murphy, Technical Director, Mott MacDonald - Pecha Kucha presentation given at #GetBIM event, Leeds Metropolitan University, 14 December 2011.
Architectural Engineering Construction AEC ProjectsSunny Marks
Hi-Tech iSolutions LLP considers ourselves as a leading service provider and consultant of mechanical designs. We are an outsourcing firm passionate about the creation of all types of mechanical designs like machine designs and tools designs. We pride itself in combining innovation in AutoCAD technology to provide comprehensive, accurate and quality mechanical designs as per your requirements. for more information visit our website: www.hitechos.com
Potted History of BIM from an MEP PerspectiveBe2camp Admin
Potted History of BIM from an MEP Perspective
Eddie Murphy, Technical Director, Mott MacDonald - Pecha Kucha presentation given at #GetBIM event, Leeds Metropolitan University, 14 December 2011.
Architectural Engineering Construction AEC ProjectsSunny Marks
Hi-Tech iSolutions LLP considers ourselves as a leading service provider and consultant of mechanical designs. We are an outsourcing firm passionate about the creation of all types of mechanical designs like machine designs and tools designs. We pride itself in combining innovation in AutoCAD technology to provide comprehensive, accurate and quality mechanical designs as per your requirements. for more information visit our website: www.hitechos.com
AN understanding as to how the J2 UNiversal Tool-Kit can be used for the complete development of aircraft and provides more capability than just dynamic modelling
AN understanding as to how the J2 UNiversal Tool-Kit can be used for the complete development of aircraft and provides more capability than just dynamic modelling
Many groups can be difficult to locate in healthcare or slip between different parts of the system. This paper is about visuailsing absent groups for better care and interventions.
This is a public relations plan for the Halsey House Bed & Breakfast located in Trumansburg, NY. Jessica created content for the book and was in charge of the design and production of the book.
For our clients, engineering services from the weyer group mean complete support during all project phases, from requirement-
oriented process development and the design of machinery and apparatus, to ensuring fulfilment of the statutory
requirements in respect of the construction and operation of the plant.
In particular, the public-authority management offered by the weyer group gives our clients the necessary planning security,
since possible cost items, e.g., from the field of plant safety, can be detected at an early stage.
Particularly in the early phase of a project, important decisions have to be made which have a considerable impact on
both later investment and the operating expenses of a process plant. By including the weyer group in this phase, it is
assured that, not only in terms of costs, but also of the project schedule, optimum general conditions for the client will
be met...
Infosys Thought Leaders overviews how an Exploration Production Portal & e&p Solution approach enables information sharing among globally spread stakeholders.
FTC&H’s diverse staff of engineers, scientists, architects, and
construction professionals continually interact to benefit our
clients with a full-service approach to projects. Responsive
communication, budget and schedule sensitivity, and our constant
pursuit of technical excellence and innovation help us transform
ideas into reality. FTC&H values our clients and seeks to establish
long-term relationships. Our goal is to exceed your expectations
by providing extraordinary client service.
Learn why construction drawings are important for every building design.pptxiFieldsmart Technologies
Construction drawings or building drawings are created by Architects to showcase their ideas, project nuances, and other information required onsite for installation and record keeping after a handover. Construction drawings are a holistic term that structure a specific part of building data, that is enriched into crucial documentation and later on as agreement data sets for construction work. This means they hold law-driven importance and form between the general contractor and the client.
While the creation and use of construction drawings are important for construction activities, project stakeholders need to store these datasets in an organized and updated manner. A myriad of cloud-based construction management tools offer capabilities to store 2D deliverables, yet the design and construction teams fail to utilize an updated set of drawings. This leads to poor communication, collaboration, rework, and cost and time delays. Construction management apps from iFieldSmart Technologies understand design and construction pain points to store, download, and access 2D drawings.
QR code integration from iFieldSmart Technologies supports construction teams with new technology and solutions to access and use a fresh set of drawings that ensure time and cost savings and improved construction quality.
Conclusion
With years of expertise and experience in the field of construction management, iFieldSmart Technologies provides best-in-class cloud-based 2D storage and access for multiple teams. Keeping track of 2D deliverables promotes higher working productivity, time, and cost savings, reinforced by enhanced construction quality. Schedule a demo to unlock construction management capabilities and achieve a seamless 2D experience.
Visit Us - https://www.ifieldsmart.com/
Contact Us - +1 (987) 664-32-11
Blog_BIMe_iFiledSmart_Learn why construction drawings are important for every...iFieldsmart Technologies
Simple field management tools for construction professionals.
Reinforcing global AEC teams with preemptive jobsite insights.
Visit Us -https://www.ifieldsmart.com/
Contact Us - +1 (987) 664-32-11
1. weyer special | engineering weyer group
allround. smart.
ENGINEERING www.weyer-group.com
2. weyer special | engineering
Engineering
For our clients, engineering services from the weyer group mean complete support during all project phases, from re-
quirement-oriented process development and the design of machinery and apparatus, to ensuring fulfilment of the statu-
tory requirements in respect of the construction and operation of the plant.
In particular, the public-authority management offered by the weyer group gives our clients the necessary planning secu-
rity, since possible cost items, e.g., from the field of plant safety, can be detected at an early stage.
Particularly in the early phase of a project, important decisions have to be made which have a considerable impact on
both later investment and the operating expenses of a process plant. By including the weyer group in this phase, it is
assured that, not only in terms of costs, but also of the project schedule, optimum general conditions for the client will
be met.
What we offer: 1 Conceptual design 2 Basic engineering
Already in the initial phase of a project, An important result of the basic engineer-
Conceptual design ing is a reliable determination of the in-
the weyer group can make important
Basic engineering contributions towards shortening the pro- vestment budget and preparation of the
cessing time. Project-parallel, orienting necessary permit application.
Detail engineering
cost determinations, the preparation of During process engineering, computer-
Public-authority man- sensitivity analyses and clarification of the aided tools to simulate the planned plant
agement approvability in the early phase, help you or plant parts are used. Based on the simu-
find the optimum process concept. lation, flowcharts are developed and the
individual design of the different equip-
ment parts is executed.
To complete the basic engineering, the
client receives a plant design with con-
struction planning, equipment lists and
permit application, as well as a cost esti-
mate for improving the investment
budget.
weyer special | engineering | page 2
3. weyer group
allround. smart.
3 Detail engineering ments can be minimized. This increases
����������������������������������
Use of planning tools for PI dia-
the reliability of the budget cost estimate grams and EMR planning
The weyer group is neither tied to a plant
considerably and contributes towards the
construction company nor a system or odelling in 3D CAD systems
M
client’s planning security.
equipment supplier. This ensures our in- reparation of isometric drawings
P
dependence and, upon completion of the
and structural engineering plans
detail engineering, gives the client the Our services: upply of complete tender docu-
assurance of awarding a really cost and S
benefit-optimized project.
Focus on the cost-determining plan- ments
ning step conceptual design onstruction engineering and permit
C
During detail engineering, the weyer application from a single source
group prepares the complete tender docu-
Requirement-oriented planning in all
project phases Procurement support
ments, both for the construction and the
process part. Depending on the client’s Use of modern process simulation roject management during execu-
P
or project requirements, the tender docu- tools tion
ments are detailed to a lesser or greater rovision of site manager and health
P
llround expert support
A
degree. Typically, 3D computer models
safety coordinator
of the planned plant are prepared. These
models form the basis for piping and hu-
man interface design.
The weyer group provides support from
procurement up to award of the contract. 100 %
During erection, our site managers super- Costs defined by conception
approx.
vise construction progress with respect to 80 %
the schedule and the quality requirements Fixed costs
to ensure a trouble-free commissioning.
Project costs
4 Public-authority man-
agement
Plant construction requires an intimate
knowledge of the legal requirements of 0% approx. 20 % 100 %
the most differing fields. The weyer group Conception Basic engineering Detail engineering Erection Commissioning
employs all the expert consultants needed
for the construction and operation of a Project progression
plant. Should the plant be subject to the
German Hazardous Incidents Ordinance,
recognized experts in accordance with
Your benefits:
§ 29a of the German Federal Immission
Control Act (BImSchG) can be provided by
Public-authority management for all Minimum number of interfaces
the weyer group. necessary building and operating
permits roject realization with competent
P
All expert opinions lead to the preparation partners
of a permit application, that is compiled evelopment of cost-effective,
D
by our personnel in close contact with the optimal solutions dherence to planned schedule
A
permit authorities. Due to the integral ap-
proach in the individual special fields, plan- Complete planning documents Short commissioning times
ning changes as a result of legal require-
weyer special | engineering | page 3
4. weyer group
allround. smart.
Your contact
www.weyer-group.com
The weyer group is a group-independent corporate association of engineering and con-
sulting companies in Germany, Austria and Switzerland.
Since its establishment over 30 years ago, the weyer group has developed a wide range of
expertise which has always been based on the expectations and wishes of our clients.
References:
Boehringer Ingelheim Pharma GmbH Co. KG
LORD Germany GmbH
Mineraloelraffinerie Oberrhein GmbH Co. KG
Oiltanking Deutschland GmbH Co. KG
RÜTGERS Germany GmbH
RWE Power AG
Vopak Dupeg Terminal Hamburg GmbH
www.weyer-group.com