7. Monolithic design and
construction effort
Typical large datacenter = 11 football fields
20 to 50 Megawatts
Huge $$$ Typical construction costs = $10M to $15M per Megawatt
Long lead time 18 to 24 months from design to online
8. Land
Core / Shell
Mech /Elec
Arch
Where the costs are:
>80% scale with power
<10% scale with space
20. Your mileage may vary!
3 Year TCO
Total Equipment Cost per server
Energy Usage Cost per server
Datacenter Capital Cost per server
Datacenter Operating Cost per server
21. $-
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
6 M$/MW 8 M$/MW 10 M$/MW 12 M$/MW 15M$/MW
AnnualCost
Capital Expenditure for Datacenter Capacity
Cap Ex Depreciation
&Energy @6c, PUE=1.2
&Energy @8c, PUE=1.5
&Energy @10c, PUE=1.8
Your mileage may vary!
22.
23.
24.
25. Strategic
Use of New
Technologies
Drive Higher
Efficiency
Remove unnecessary components
Limit the platform expandability: # Slots, CPU Power
Right-size the power supply
Optimize the
Configuration