1. Page 1 of 3
CURRICULUM VITAE
Name:
Surname:
Date/place of birth:
Citizenship:
Marital status:
Driver license:
Passport:
Address:
Phone:
E-mail:
Studies:
Position:
Foreign languages:
PC user:
Experience:
GHEORGHE
COANDA
1st
May 1952, Bucharest, Romania
Romanian
Married
Full and current.
No: 15426888
Patulului Street, No. 2A, Bl. 27, Apt. 29, Sector 3, Postal Code no. 032376,
Bucharest, Romania
Mobile: +40 74 522 4141
coanda_gheorghe@yahoo.com
1982 Engineer in electrical and automatization I&C systems.
Electrical Engineer, Supervisor.
English (written & spoken), Arabic ( spoken, conversation), Italian (conversation)
Word, Excel, AutoCAD, Microsoft Project, etc.
Working over 24 years mostly as Supervisor for electrical Power Stations.
Employment History
July 2015: I worked in Scotland, Shetland Island with Total and Petrofac in Gas Plant in position
Electrical Supervisor for main substation and substation, 11 KV and 0,4 KV.
January 2013: I worked in Jubail new Rafinery Saudi Arabia with SATORP and SPIE in position PMT-
PMC Electrical &Instrumentation Supervisor for Commissioning in new project of refinery in Jubail
package 2A conversion mild hydrocracker unit 41, 51,61,71,81. My responsibility is for commissioning
of Electric Substation HV/MV/LV ,Motors HV & LV , Power Transformer , Lighting system, DC
Battery & Battery charger ,Fire and gas system , HVAC ,Electrical panel distribution PMCC & MCC.
HV/MV/LV Breaker: SF6, VCB, OCB & ACB, VFD and VSD. Panel and Motor, Grounding system,
UPS&AMF Panels, System drives DCS, PLC & SCADA, Power & Distribution Transformers ,Cable
testing, Capacitors & APFC ,Instrumentation equipment process.
February 2012: I worked in Libia in Wafa Oil & Gas Plant with Dietsmann in position Electrical
Coordinator of Maintenance for Melita Oil & Gas Company. My responsibility in this project to
coordinate maintenance for motor LV/MV, Transformer, UPS, Charger battery, Lighting , Diesel
generator, Distribution panel LV/MV/HV ABB type and Schnaider.
July 2011 : I worked in IBESE NIGERIA in position BOP Electrical Engineer, project is Power
Plant 3x37 MW. GT for Cement Plant. I worked in this project with Santos Ireland and Siemens Nigeria
for Power Plant Commissioning of distribution panel and emergency diesel generator. My
responsibility in this project to coordinate maintenance for motor LV/MV, Transformer, UPS, Charger for
Battery, Lighting, Diesel generator, Distribution panel LV/MV /HV ABB type and Schnaider and
Siemens.
2. Page 2 of 3
2010-2011: I worked in a new project with Welco in position Electrical Supervisor of Electrical
Substation MV / LV at Refinery in Kazakhstan Karabatan (Kasagan) for Pre commissioning,
Commissioning of Electrical distribution panel and all motor, cable, HV/MV / LV. My responsibility in
this project to coordinate maintenance for motor LV/MV, Transformer, UPS, Charger battery, Lighting,
Diesel generator, Distribution panel LV/MV /HV ABB type and Schnaider.
2008-2009: I worked in a new project of Cement Plant in position Electrical Supervisor of Electrical
Substation HV/ MV / LV, Schneider Panels of this project with Santos and Lafarge FR for Lafarge South
Africa Lichtenburg. My responsibility in this project to coordinate maintenance and commissioning for
motor LV/MV, Transformer, UPS, Charger battery, Lighting, Diesel generator, Distribution panel LV
ABB type .
2007: Worked in Spania Escatron with ENEL POWER and ANSALDO ENERGIA in new POWER
PLANT in position Electrical Supervisor for Experience in Testing and Inspection of Plant Earthing
System, Plant Lighting System, Plant Lightening Protecting, Switchgear (HV, LV), MCC, Relay Panels,
Annunciation Panels, Local Control Stations, UPS and DC Batteries, Electrical Heat Tracing, Electrical
Cable Installation and Testing (IR test, Hi-pot test) and Electrical Motors, Installation/Torque testing and
Ductor testing on Bus-Bar joints, Power Distribution Boards installation & testing. Installation & quality
checking of BMS control panels (Digital & Analog Input/output signals) & HVAC panels. Installation of
various Substation Equipments, Transformers, Switchgears, MCC’s, PLC panels, Control Rooms,
Generators, Control Panels, Cables, Lighting, and Instruments etc.PLANT 800 MW as electrical
supervisor for commissioning and erection.
2006 Worked in Libia with G&P Company in Gialu with WAHA OIL & GAS new Gas Plant for
Commissioning Electrical, in position Electrical Supervisor. My responsibility is for energisation
electrical panel Schnaider and testing, energisation motor, lathing, UPS, Batery charger, Diesel generator,
Air compressor, Transformer.
2004-2005: Worked in Libya with SIRTE OIL COMPANY in new gas plant for electrical maintenance of
ABB panel; Attahaddi Gas Plant, my responsibilities for electrical substation ABB type for
commissioning operation and repairing panel.
2003: Worked in Qatar with ALSTOM Milano – ENELPOWER G. E. EUROPE in Ras-Lafan Power
Factory Project as electrical commissioning engineer. I had responsibilities in four- Electrical Substation
for Gas Turbine GE type 132 MW with full service and fire fighting system-Minimax type and put in
service for operation client.
2002: Worked in KAZAKHSTAN with DEUTAG & PIGOZZI IMPIANTI Company, in drilling island,
as I & C engineer, I had responsibilities commissioning for two fire fighting installation and electrical
distribution board.
2002: Worked in Bahrain Al-hidd II in Power Factory as electrical commissioning at Gas Turbine
Ventilation and E&I with ALSTOM Milano, I had responsibilities for ventilation for three ABB gas
turbine 132 MW and I&C interconnections between field and DCS.
2000-2001: Worked in SAUDI ARABIA SHOAIBA Power Plant with ALSTOM Milano as electrical
commissioning engineer LV-MV. Shoaiba Power Plant, I made commissioning for electrical panel ABB
type 6 kV and 0.4 kV with all motors and consumers for boiler and supply with sea water chlorination,
water treatments for common service, osmosis, boilers for 1050 t/h steam production, ID Fan, FD Fan,
water recirculation pumps (from drum to water wall), feed water pumps, oil and gas systems (only
electrical motors), training program by local people, hand over for different systems, turbine for 330MW
with steam extractions.
3. Page 3 of 3
1997-1998: Worked in IRAN BANDAR ABBAS Refinery as electrical supervisor for HV-MV-LV, with
SNAM PROJETTI. Bandar Abbas, Iran, I supervised work for erection commissioning and put in service
6 substations, 6 kV, 0.4 kV for refinery with all interconnection and put in service for the client in
operation. I made commissioning and put in service three gas power generators Nuovo Pignione type and
repairing of bridge crane Italcrane and commissioned.
1995-1996: Worked in United Arab Emirates at the Power Factory and Desalination Plant TAWEELAH
B Project and JABEL-ALI as commissioning engineer for LV-MV Switchboard (ABB Sace Switch type)
with ABB Sae-SADELMI. Taweelah and Jabel-Ali Power Plant, I made commissioning for electrical
panel ABB type 6 kV in SF6 and 0.4 kV, ID Fan motors, FD Fan, feed water pumps, oil and gas systems
(all the motors) training program with local people, hand over systems, boiler with drum, for 450 t/h
steam production, with oil and gas fuel firing, steam turbine for 150MW with steam extractions. I made
commissioning at motors of all type 6 kV, 0.4 kV Ansaldo type, existing in power factory. I made
commissioning at many type batteries of accumulator and put in service.
1992-1993: Worked in Kuwait whit ME&W in the Station Transformer 132/33/0.4 KV type Hitachi and
Toshiba, as Engineer for maintenance, commissioning and Cable Measurements (dry and in oil) from 0.4
KV to 132 KV in SF6. After the war with Iraq country, worked in electrical substation Hitachi and
Toshiba type. I changed the transformer, made tests and put in service many kind of these types, I made
tests for the cable HV 132 kV in oil with breaker in SF6 and 33 kV in SF6 and 11 kV in oil. I changed the
battery all types and put it in service, I made the assistance for trouble shouting for this type of substation.
I repaired breakers 11 kV in oil and put it in service.
1985-1987: Worked in the Cement Plant AL-QAIM and SINDJAR (IRAK) for Commissioning,
maintenance and repairs of electrical installations (Galileo Magrini Panel type). I responded for
interconnection, electrical panel in substation 04 KV- 6 kV-33 kV-132KV GALILEO MAGRINI type. I
drove the job for connection between substation, motors and another substation, also I had responsibilities
for mount many type of transformer connection, commissioning and put in service, I mounted battery
accumulator cadmium nickel and rectifiers, I made connections between electrical panel and control
room, I made commissioning at stations and put in functions operation and hand over client in service.
1979-1994: Worked with National Control Center (DEN) Metrology Laboratory as Engineer, for
repairing and testing for electrical equipment, power supply 380 V AC, DC battery and rectifier UPS
supply, inverter and telecommunications equipment emergency diesel generator.
1972-1978: Worked with National Institute for Metrology of Bucharest at the Model Laboratory for
Electrical Measurements. I made testing and calibration for electrical device for laboratory.