Corey Harpe
Fossil Hydro Operations
Co-op Development Program
May 5th 2016
About Me
■ University of Florida
– Junior: Mechanical Engineering
– Graduation: May 2018
■ How many rotations with Duke Energy?
– Session 1: High Energy Piping at Crystal
River Steam Plant
■ Central Engineering – Inspection
Services
– Mentor: Chris Barbee
– Supervisor: Scott Bowes
– Director: Robert Hathorn
Today’s Discussion
• My Safety MomentI
• Responsibilities this RotationII
• Inspection Drawings Project
• Intro – Benefits – Moving ForwardIII
• Hanger Weight Analysis Project
• Intro – Benefits – Moving ForwardIV
• Tour of Crystal River Nuclear PlantV
• Looking AheadVI
My Safety Moment
Hard Hat Required
On my first day at Crystal River, Chris and I were
walking down the inspection locations with scaffolding
contractors. On top of the boiler I ran into a steel beam and it
knocked my hard hat off and smacked my forehead. Lesson
learned to carefully plan out walking paths and to take your
time.
Responsibilities this Rotation
■ Analyzed
– Flow Accelerated Corrosion at Anclote 1 and 2
– Loading on Hanger Support System at Crystal River 4
– Inspection history to predict equipment lifespans
■ Attended
– Inspection Services All Regions Staff Meeting
– Hines Mechanical Equipment Reliability Meeting (MERM)
– Asset Configuration Tracker Level II Training
■ Designed
– Inspection drawings and submitted piping isometrics through ACT
■ Researched
– Structural Integrity HEP Webinar Series
Inspection Drawings Project - Intro
Inspection Drawings Project - Benefits
■ Improving skill set
– Applied previous drafting table experience
■ Man hours saved
– Help Lead Engineer save time for future
inspections
– Precise drawings will help the drafting
team save time during Configuration
Changes
■ Dollars saved
– Scaffolding and insulation costs are
reduced when you have accurate weld
positions
Inspection Drawings Project – Moving Forward
■ Plans to submit these drawings through ACT next fall so they can
be uploaded in fusion
Hanger Weight Analysis Project - Intro
Hanger Calculated Load (lbs) Documented Load (lbs) Type Comparison Pipe Orientation Location
4H2-1 12,700 18,214 Constant 70% Horizontal Boiler Out S
4H2-2 19,099 23,154 Constant 82% Horizontal
4H2-3 19,919 21,785 Constant 91% Horizontal
4H2-4 26,448 19,660 Constant 135% Horizontal
4H2-5 44,572 56,139 Rigid 79% Vertical
4H2-7 30,867 31,391 Constant 98% Horizontal
4H2-8 20,180 19,204 Constant 105% Horizontal
4H2-9 15,908 21,247 Constant 75% Horizontal
4H2-11 49,392 53,992 Constant Clamp 91% Vertical
4H2-12 77,736 64,259 Rigid 121% Vertical
4H2-15 18,269 22,244 Constant Trapeze 82% Horizontal
4H2-17 21,230 19,168 Constant 111% Horizontal
4H2-18 24,328 22,328 Constant Trapeze 109% Horizontal Turbine
4H2-35 18,652 18,833 Constant 99% Horizontal Boiler Out N
4H2-34 24,801 28,862 Constant 86% Horizontal
4H2-33 26,859 22,585 Constant 119% Horizontal
4H2-32 48,557 60,368 Rigid 80% Vertical
4H2-30 36,586 29,550 Variable Spring 124% Horizontal
4H2-29 26,279 22,230 Constant 118% Horizontal
4H2-27 30,635 53,992 Constant Clamp 57% Vertical
4H2-26 86,333 66,925 Rigid 129% Vertical
4H2-23 27,222 23,710 Constant Trapeze 115% Horizontal
4H2-21 23,678 25,308 Constant 94% Horizontal
4H2-20 16,842 13,752 Constant 122% Horizontal
4H2-19 27,079 21,390 Constant Trapeze 127% Horizontal Turbine
4H2-16 26,079 34,272 Constant Clamp 76% Vertical Crossover
4H2-22 26,252 42,800 Constant Clamp 61% Vertical Crossover
Total: 861,419 857,362 100%
Hanger Project - Benefits
■ Learned valuable information
– Helped build understanding of the
system prior to using modeling programs
■ Training
– Shadowed Steve Grace, Hanger SME,
for walk downs at Crystal River, Hines,
and Tiger Bay
■ Testing
– Verified hangers are operating safely
Hanger Project - Moving Forward
■ Next fall I will be modeling piping systems in AutoPIPE to plot
stresses to optimize inspection locations
▲Available from: bentley.com
Tour of Crystal River 3 Nuclear Power Plant
▼Available from: tampabay.com
▲Available from: corporate.vattenfall.com
▼Available from: ansnuclearcafe.org
Looking Ahead
■ Returning this Fall to continue working with Chris Barbee and the
High Energy Piping & Welding team
Questions?
Available from: suncoastnews.com

More Related Content

What's hot (9)

Plant & Machinery Training
Plant & Machinery TrainingPlant & Machinery Training
Plant & Machinery Training
 
KAVI JOSHI PRESENTATION
KAVI JOSHI PRESENTATIONKAVI JOSHI PRESENTATION
KAVI JOSHI PRESENTATION
 
Trend analysis 2016 17
Trend analysis 2016 17Trend analysis 2016 17
Trend analysis 2016 17
 
Deformation effects
Deformation effects Deformation effects
Deformation effects
 
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
 
2015 Training Calendar
2015 Training Calendar2015 Training Calendar
2015 Training Calendar
 
Current Responsibility
Current ResponsibilityCurrent Responsibility
Current Responsibility
 
NMSU F Transcript
NMSU F Transcript NMSU F Transcript
NMSU F Transcript
 
PCAPP Update 25 June 2014
PCAPP Update 25 June 2014PCAPP Update 25 June 2014
PCAPP Update 25 June 2014
 

Similar to End of Session 1 Presentation 5-5-16 Corey Harpe EXTERNAL

A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
ArcelorMittal Co-op Presentation - David Pearson
ArcelorMittal Co-op Presentation - David PearsonArcelorMittal Co-op Presentation - David Pearson
ArcelorMittal Co-op Presentation - David PearsonDavid Pearson
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_trainingmelanie_bissonnette
 
Sparrows Corporate Presentation
Sparrows Corporate PresentationSparrows Corporate Presentation
Sparrows Corporate PresentationBenji George
 
Rice Co-Op Presentation
Rice Co-Op PresentationRice Co-Op Presentation
Rice Co-Op PresentationScott Rice
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxParabakaranBalasubra1
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel Paul
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel Paul
 
Resume David Young
Resume David YoungResume David Young
Resume David YoungDavid Young
 
ALLENERGY2015_6515
ALLENERGY2015_6515ALLENERGY2015_6515
ALLENERGY2015_6515Peter Bruce
 
Drew Whitney Final Presentation
Drew Whitney Final PresentationDrew Whitney Final Presentation
Drew Whitney Final PresentationDrew Whitney
 
Improving Rotorcraft Drivetrain Life
Improving Rotorcraft Drivetrain LifeImproving Rotorcraft Drivetrain Life
Improving Rotorcraft Drivetrain LifeSentient Science
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety projectNikoZurabishvili
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptxDILIP KUMAR M.Tech (ACT)
 
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...BuiltEnvironmentUBM
 

Similar to End of Session 1 Presentation 5-5-16 Corey Harpe EXTERNAL (20)

A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
ArcelorMittal Co-op Presentation - David Pearson
ArcelorMittal Co-op Presentation - David PearsonArcelorMittal Co-op Presentation - David Pearson
ArcelorMittal Co-op Presentation - David Pearson
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
 
Sparrows Corporate Presentation
Sparrows Corporate PresentationSparrows Corporate Presentation
Sparrows Corporate Presentation
 
MIS External
MIS ExternalMIS External
MIS External
 
Rice Co-Op Presentation
Rice Co-Op PresentationRice Co-Op Presentation
Rice Co-Op Presentation
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptx
 
Project review
Project reviewProject review
Project review
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Resume David Young
Resume David YoungResume David Young
Resume David Young
 
ALLENERGY2015_6515
ALLENERGY2015_6515ALLENERGY2015_6515
ALLENERGY2015_6515
 
Drew Whitney Final Presentation
Drew Whitney Final PresentationDrew Whitney Final Presentation
Drew Whitney Final Presentation
 
KCI Company Presenation Oil & Gas
KCI Company Presenation Oil & GasKCI Company Presenation Oil & Gas
KCI Company Presenation Oil & Gas
 
Improving Rotorcraft Drivetrain Life
Improving Rotorcraft Drivetrain LifeImproving Rotorcraft Drivetrain Life
Improving Rotorcraft Drivetrain Life
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety project
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptx
 
Local Agency Asphalt Specification
Local Agency Asphalt SpecificationLocal Agency Asphalt Specification
Local Agency Asphalt Specification
 
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
 
SPN_Profile-161006
SPN_Profile-161006SPN_Profile-161006
SPN_Profile-161006
 

End of Session 1 Presentation 5-5-16 Corey Harpe EXTERNAL

  • 1. Corey Harpe Fossil Hydro Operations Co-op Development Program May 5th 2016
  • 2. About Me ■ University of Florida – Junior: Mechanical Engineering – Graduation: May 2018 ■ How many rotations with Duke Energy? – Session 1: High Energy Piping at Crystal River Steam Plant ■ Central Engineering – Inspection Services – Mentor: Chris Barbee – Supervisor: Scott Bowes – Director: Robert Hathorn
  • 3. Today’s Discussion • My Safety MomentI • Responsibilities this RotationII • Inspection Drawings Project • Intro – Benefits – Moving ForwardIII • Hanger Weight Analysis Project • Intro – Benefits – Moving ForwardIV • Tour of Crystal River Nuclear PlantV • Looking AheadVI
  • 4. My Safety Moment Hard Hat Required On my first day at Crystal River, Chris and I were walking down the inspection locations with scaffolding contractors. On top of the boiler I ran into a steel beam and it knocked my hard hat off and smacked my forehead. Lesson learned to carefully plan out walking paths and to take your time.
  • 5. Responsibilities this Rotation ■ Analyzed – Flow Accelerated Corrosion at Anclote 1 and 2 – Loading on Hanger Support System at Crystal River 4 – Inspection history to predict equipment lifespans ■ Attended – Inspection Services All Regions Staff Meeting – Hines Mechanical Equipment Reliability Meeting (MERM) – Asset Configuration Tracker Level II Training ■ Designed – Inspection drawings and submitted piping isometrics through ACT ■ Researched – Structural Integrity HEP Webinar Series
  • 7. Inspection Drawings Project - Benefits ■ Improving skill set – Applied previous drafting table experience ■ Man hours saved – Help Lead Engineer save time for future inspections – Precise drawings will help the drafting team save time during Configuration Changes ■ Dollars saved – Scaffolding and insulation costs are reduced when you have accurate weld positions
  • 8. Inspection Drawings Project – Moving Forward ■ Plans to submit these drawings through ACT next fall so they can be uploaded in fusion
  • 9. Hanger Weight Analysis Project - Intro Hanger Calculated Load (lbs) Documented Load (lbs) Type Comparison Pipe Orientation Location 4H2-1 12,700 18,214 Constant 70% Horizontal Boiler Out S 4H2-2 19,099 23,154 Constant 82% Horizontal 4H2-3 19,919 21,785 Constant 91% Horizontal 4H2-4 26,448 19,660 Constant 135% Horizontal 4H2-5 44,572 56,139 Rigid 79% Vertical 4H2-7 30,867 31,391 Constant 98% Horizontal 4H2-8 20,180 19,204 Constant 105% Horizontal 4H2-9 15,908 21,247 Constant 75% Horizontal 4H2-11 49,392 53,992 Constant Clamp 91% Vertical 4H2-12 77,736 64,259 Rigid 121% Vertical 4H2-15 18,269 22,244 Constant Trapeze 82% Horizontal 4H2-17 21,230 19,168 Constant 111% Horizontal 4H2-18 24,328 22,328 Constant Trapeze 109% Horizontal Turbine 4H2-35 18,652 18,833 Constant 99% Horizontal Boiler Out N 4H2-34 24,801 28,862 Constant 86% Horizontal 4H2-33 26,859 22,585 Constant 119% Horizontal 4H2-32 48,557 60,368 Rigid 80% Vertical 4H2-30 36,586 29,550 Variable Spring 124% Horizontal 4H2-29 26,279 22,230 Constant 118% Horizontal 4H2-27 30,635 53,992 Constant Clamp 57% Vertical 4H2-26 86,333 66,925 Rigid 129% Vertical 4H2-23 27,222 23,710 Constant Trapeze 115% Horizontal 4H2-21 23,678 25,308 Constant 94% Horizontal 4H2-20 16,842 13,752 Constant 122% Horizontal 4H2-19 27,079 21,390 Constant Trapeze 127% Horizontal Turbine 4H2-16 26,079 34,272 Constant Clamp 76% Vertical Crossover 4H2-22 26,252 42,800 Constant Clamp 61% Vertical Crossover Total: 861,419 857,362 100%
  • 10. Hanger Project - Benefits ■ Learned valuable information – Helped build understanding of the system prior to using modeling programs ■ Training – Shadowed Steve Grace, Hanger SME, for walk downs at Crystal River, Hines, and Tiger Bay ■ Testing – Verified hangers are operating safely
  • 11. Hanger Project - Moving Forward ■ Next fall I will be modeling piping systems in AutoPIPE to plot stresses to optimize inspection locations ▲Available from: bentley.com
  • 12. Tour of Crystal River 3 Nuclear Power Plant ▼Available from: tampabay.com ▲Available from: corporate.vattenfall.com ▼Available from: ansnuclearcafe.org
  • 13. Looking Ahead ■ Returning this Fall to continue working with Chris Barbee and the High Energy Piping & Welding team