Gantt Diagram
CARE 6 & 10 implementations
Walk through our project
CARE 4 implementations
Project results
Introduction
Future proposals
Agenda
GANTT DIAGRAM
2
PERCENT
Week
COMPLETED 1 2 3 4 5 6 7 8 9
Time Studies CARE 6 100%
Time Studies CARE 10 100%
Time Studies CARE 4 100%
Pneumatic Gauge 100%
Autocontrol Modifications 100%
Time Studies line CP 100%
Layout Modifications 100%
Tests 100%
Reduction CARE 6 100%
Reduction CARE 10 100%
Reduction CARE 4 75%
ACTIVITY
Activities completed
Activities in process
PERCENT
Week
COMPLETED 1 2 3 4 5 6 7 8 9
Time Studies CARE 6 100%
Time Studies CARE 10 100%
Time Studies CARE 4 100%
Pneumatic Gauge 100%
Autocontrol Modifications 100%
Time Studies line CP 100%
Layout Modifications 100%
Tests 100%
Reduction CARE 6 100%
Reduction CARE 10 100%
Reduction CARE 4 75%
ACTIVITY
CENTRAL
PLATE
PP K2
HUB FLANGE ASSYDOUBLE CLUTCH
PP K2: CARE STATION 6
5
Time studies (CARE 6)
Process Capability analysis
(drilling stations)
Pneumatic gauge development
Autocontrol modification
Actualization of CARE visual aids
and control plan
6
CP: CARE STATION 10
Time studies (CARE 10, machining
area, balancing area=)
Process Capability analysis
(Driling machines)
Parallelism tables in line
Extra Plug inspection devices
Actualization of CARE visual aids and
control plans
Automatization of parallelism in line
7
120 °
WALK THROUGH OF OUR PROJECT
9
HUB FLANGE ASSY: CARE STATION 4
Time studies
Autocontrol modification
Layout modification
Runout analysis through process
WIP elimination
Automatizated Hub Flange
10
Broaching Station
Pieces from
riveting process
Pieces to runout
Inspection Station
DRY PROCESS
11
HOURS REDUCED
12
HOURS PER YEAR: 13,637
50% REDUCED: 6,818.5
HOURS PER YEAR: 6,940.6
TOTAL HOURS PER YEAR : 34,756.2
HOURS PER YEAR: 14,178.7
50% REDUCED: 7,089.3
CARE STATION 6
CARE STATION 10
CARE STATION 4
40%
REDUCTION
$ 728,249.17
13
Future proposals
Pneumatic PP K1 Pneumatic flywheel G81
14
ing good!!!

More Related Content

Viewers also liked

Viewers also liked (17)

Art Souq 2015 exhibition catalogue
Art Souq 2015 exhibition catalogueArt Souq 2015 exhibition catalogue
Art Souq 2015 exhibition catalogue
 
At project new
At project newAt project new
At project new
 
“43: A Tribute to the Union of the Emirates”
“43: A Tribute to the Union of the Emirates”“43: A Tribute to the Union of the Emirates”
“43: A Tribute to the Union of the Emirates”
 
театр
театртеатр
театр
 
Blugre Corporate Presentation
Blugre Corporate PresentationBlugre Corporate Presentation
Blugre Corporate Presentation
 
In this Place exhibition catalogue
In this Place exhibition catalogueIn this Place exhibition catalogue
In this Place exhibition catalogue
 
Pricopie victor
Pricopie victorPricopie victor
Pricopie victor
 
My CV
My CVMy CV
My CV
 
Sulci gyri
Sulci gyriSulci gyri
Sulci gyri
 
Meydan exhibition catalogue
Meydan exhibition catalogueMeydan exhibition catalogue
Meydan exhibition catalogue
 
The Future is in their Hands exhibition catalogue
The Future is in their Hands exhibition catalogueThe Future is in their Hands exhibition catalogue
The Future is in their Hands exhibition catalogue
 
BLACK SEA
BLACK SEA BLACK SEA
BLACK SEA
 
Presentation 1.2
Presentation 1.2Presentation 1.2
Presentation 1.2
 
Biotechnological production of natural products by Dr. Refaat Hamed
Biotechnological production of natural products by Dr. Refaat HamedBiotechnological production of natural products by Dr. Refaat Hamed
Biotechnological production of natural products by Dr. Refaat Hamed
 
Biosynthesis lectures by Dr. Refaat Hamed
Biosynthesis lectures by Dr. Refaat HamedBiosynthesis lectures by Dr. Refaat Hamed
Biosynthesis lectures by Dr. Refaat Hamed
 
Coffe 10
Coffe 10Coffe 10
Coffe 10
 
Alternative medicine lectures by Dr. Refaat Hamed
Alternative medicine lectures by Dr. Refaat HamedAlternative medicine lectures by Dr. Refaat Hamed
Alternative medicine lectures by Dr. Refaat Hamed
 

Similar to Presentación8888888_final

productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
mahendran mahendran.m
 
TL9000 and the Process Approach
TL9000 and the Process ApproachTL9000 and the Process Approach
TL9000 and the Process Approach
Jeff Bostow
 
INNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLS
INNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLSINNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLS
INNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLS
iQHub
 
M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016
Nerissa Delos Santos
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
Ameya Margaj
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)
thomas victor
 
Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1
Nicholas Renecle
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
sanjay_asati
 
Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar Resume
Bharath Kumar
 
IE431 Final Presentation
IE431 Final PresentationIE431 Final Presentation
IE431 Final Presentation
Arnaud Marquet
 

Similar to Presentación8888888_final (20)

productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Co Op End Of Term Presentation2
Co Op End Of Term Presentation2Co Op End Of Term Presentation2
Co Op End Of Term Presentation2
 
TL9000 and the Process Approach
TL9000 and the Process ApproachTL9000 and the Process Approach
TL9000 and the Process Approach
 
Test Metrics
Test MetricsTest Metrics
Test Metrics
 
Ch 7 qm
Ch 7 qmCh 7 qm
Ch 7 qm
 
Control Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous ControlControl Loop Foundation for Batch and Continuous Control
Control Loop Foundation for Batch and Continuous Control
 
INNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLS
INNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLSINNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLS
INNOVATIVE NATIONAL TECHNOLOGY FOR AUTOMATION OF GAS-PRODUCING WELLS
 
M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016M&E Key Performance Indicators 2016
M&E Key Performance Indicators 2016
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reduction
 
PID Tuning Rules
PID Tuning RulesPID Tuning Rules
PID Tuning Rules
 
Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Bharath Kumar Resume
Bharath Kumar ResumeBharath Kumar Resume
Bharath Kumar Resume
 
IE431 Final Presentation
IE431 Final PresentationIE431 Final Presentation
IE431 Final Presentation
 

Presentación8888888_final

  • 1.
  • 2. 1 1 2 3 4 5 6 7 Gantt Diagram CARE 6 & 10 implementations Walk through our project CARE 4 implementations Project results Introduction Future proposals Agenda
  • 3. GANTT DIAGRAM 2 PERCENT Week COMPLETED 1 2 3 4 5 6 7 8 9 Time Studies CARE 6 100% Time Studies CARE 10 100% Time Studies CARE 4 100% Pneumatic Gauge 100% Autocontrol Modifications 100% Time Studies line CP 100% Layout Modifications 100% Tests 100% Reduction CARE 6 100% Reduction CARE 10 100% Reduction CARE 4 75% ACTIVITY Activities completed Activities in process PERCENT Week COMPLETED 1 2 3 4 5 6 7 8 9 Time Studies CARE 6 100% Time Studies CARE 10 100% Time Studies CARE 4 100% Pneumatic Gauge 100% Autocontrol Modifications 100% Time Studies line CP 100% Layout Modifications 100% Tests 100% Reduction CARE 6 100% Reduction CARE 10 100% Reduction CARE 4 75% ACTIVITY
  • 4.
  • 5. CENTRAL PLATE PP K2 HUB FLANGE ASSYDOUBLE CLUTCH
  • 6. PP K2: CARE STATION 6 5 Time studies (CARE 6) Process Capability analysis (drilling stations) Pneumatic gauge development Autocontrol modification Actualization of CARE visual aids and control plan
  • 7. 6 CP: CARE STATION 10 Time studies (CARE 10, machining area, balancing area=) Process Capability analysis (Driling machines) Parallelism tables in line Extra Plug inspection devices Actualization of CARE visual aids and control plans
  • 8. Automatization of parallelism in line 7 120 °
  • 9. WALK THROUGH OF OUR PROJECT
  • 10. 9 HUB FLANGE ASSY: CARE STATION 4 Time studies Autocontrol modification Layout modification Runout analysis through process WIP elimination
  • 11. Automatizated Hub Flange 10 Broaching Station Pieces from riveting process Pieces to runout Inspection Station
  • 13. HOURS REDUCED 12 HOURS PER YEAR: 13,637 50% REDUCED: 6,818.5 HOURS PER YEAR: 6,940.6 TOTAL HOURS PER YEAR : 34,756.2 HOURS PER YEAR: 14,178.7 50% REDUCED: 7,089.3 CARE STATION 6 CARE STATION 10 CARE STATION 4 40% REDUCTION $ 728,249.17
  • 14. 13 Future proposals Pneumatic PP K1 Pneumatic flywheel G81