Enchanted Objects

    @DavidRose
What’s next?
Disney
<shoes>
Enchantment
              creates the right
                affordances


Ambient Umbrella
So,which objects should we enchant?
Study the history of the future
Primal wishes are revealed
through narratives you know
   (it’s a psychology problem)
Enchanted Objects


    1                   2              3
Omniscience       Communication    Protection




    4                   5              6
  Health           Teleportation   Expression
Enchanted Objects



   1
Omniscience
The desire to know...
A single pixel browser
Orb
Knowing, without thinking about knowing

                Stage 1:               Stage 2:
         Pre-attentive               Late
          Processing              Processing
       • Rapid parallel       • Slower serial processing
       • Feature extraction   • Emphasis on symbols
       • Involuntary          • Volitional
Fishing
Fishing
Fishing
Fishing
Fishing
Enchanted Objects



         2
Communication
Bond’s Pen
Dick tracy’s watch
Presence objects: LumiTouch (from MIT) communicates via squeeze sensors and light
Enchanted Objects
Enchanted Objects



    3
Protection
Enchanted Objects



    4
  Health
Fountain of Youth
z




    Dramatically improving medication
    adherence through smart packaging,
    reminders, reports, and rewards.
40
Every month you and your physician receive a
printed progress report.
This is what poor-adherence looks like...
Each row is person, each column is a day. Red indicates a missed dose.




                     Control group=71% of doses taken
This is what adherence looks like with GlowCaps




     Over 98% of doses taken over 6 months
Vitality BlisterPack
Vitality Watch
Spirometer Kazoo
                   •   Makes spirometry fun using sound and
                       projection
                   •   Spirograph projection shows visual
                       feedback to anticipate an asthma attack
                   •   Wireless connection to the web permits
                       realtime data analysis and graphing on
                       smart phone.
Pepper projector




•   Dispenses salt and grinds pepper
•   360 degree camera uploads images
    to offshore nutritionist for realtime
    analysis
•   Mini-projector displays information
    adjacent to each item: calories
    against a budget, ecological footprint,
    transportation modality.
•   Press the “i” for more information.
Enchanted Objects



      5
Teleportation
Jetson
Ambient Bus Pole




                   ambient
Enchanted Objects



    6
Expression
Mindstorms
IO Brush
Guitar Hero
Enchanted Objects


    1                   2              3
Omniscience       Communication    Protection




    4                   5              6
  Health           Teleportation   Expression
Use Enchanted Objects for:
      * UX simplicity
      * glanceability
     * brand presence
Objects are avatars for services
levels of enchantment

                      story-ification
                 gamification
           socialization
   personalization
augmentation
So,which objects should we enchant?
Enchanted Objects

    @DavidRose

Enchanted Objects TEDx Berkeley 2.19