EARTHQUAKE DESIGN AND CONSTRUCTION OF TAL COMPOSITE BRIDGE
PIERS
T KATO1
And Y TAKAHASHI2
SUMMARY
The recent lessons of structural damages occurred to a number of bridges during 1995 Hyogo-ken
Nanbu Earthquake make a new bridge construction more expensive and time consuming because
of the high standard of earthquake resistant design. The new expressway construction (the 2nd
Tomei expressway) mainly crossing over deep valleys requires many tall bridge piers. Therefore it
is required to develop the new technology which takes place of the conventional RC hollow pier.
The new design concept of steel pipe-concrete composite bridge pier exhibits not only high
seismic resistance in effect of ductile steel pipe and spiral high strength strand, but also a rapid
construction method.
In this paper the earthquake design by the scaled model tests as well as the construction practice of
the tall composite bridge pier are described.
The results and conclusions are follows:
The experimental M-Φ relation of the composite piers showed higher deformation performance
than the conventional RC hollow bridge pier.
In pseudo dynamic tests the composite piers had a stable seismic behavior even after the ultimate
state. And although the deformation exceeded maximum peak, the residual displacement after the
earthquake was relatively small.
The analytical moment – curvature relationship of steel pipe – concrete composite piers showed
lower deformation performance than the experimental results. The main reason of the low
performance of the analytical models is due to the ductile steel pipe and high strength spiral strand,
which cannot be coped with in the model. The results show that the contribution of steel pipes to
concrete should be taken into account in order to improve the analytical methods for design.
The new construction method (namely Hybrid Slipform Method) on the composite bridge pier
provides an appropriate solution for rapid construction and reduction of the skilled labor.
INTRODUCTION
After Hyogo-ken Nanbu earthquake the conventional RC hollow high pier needs a large amount of
reinforcement because of high standard of seismic design. Consequently the construction cost as well as the
construction period are serious subjects. The steel pipe - concrete composite pier in Figure 1 exhibits not only
high seismic resistance in effect of ductile steel pipe and spiral high strength strand, but also an advanced
construction method.
The characteristics of the new composite pier are as follows.
a) The composite structure is consist of single vertical re-bars outside and large steel pipes inside.
b) High shear strength is provided by inner steel pipes and high strength strands as spiral hoop. c) High ductility
is provided by steel pipe as well as spiral hoop effect.
d) Concrete around steel pipes protect from buckling. In the case of buckling of outside re-bars at ultimate state,
the collapse would not occur.
e) Simple section makes a better manufacturing than conventional RC hollow section.
08992
Figure 1: Steel pipe-concrete composite pier
STATIC EXPERIMENTAL STUDY OF COMPOSITE PIER
Specimen (test piece)
In order to verify the inelastic behavior of composite piers under the combined loads, static loading tests and
pseudo dynamic tests were carried out. Five composite column models were tested, as shown Figure 2 - 4 and
Table 1. The each shear spans are 1200mm and 600mm, the each shear span ratios are 4.0 and 2.0. As shown
Figure 4, 4 pipes (diameter 76.3mm, thickness 2.8mm) and 8 re-bar (diameter 10mm) are installed in the section.
Table 1 : Test Specimens
No. Experiment
Shear span ratio
a/d
Axial load
(N/mm2
)
Steel pipe
ratio Pt (%)
Re-bar
Ratio Pr (%)
Spiral strand
ratio Peq (%)
P4-1 Static 4.0 3.5 2.53 0.56 0.18
P4-2 Pseudo dynamic 4.0 3.5 2.53 0.56 0.18
P4-3 Pseudo dynamic 4.0 3.5 2.53 0.56 0.18
P2-1 Static 2.0 3.5 2.53 0.56 0.18
P2-2 Static 2.0 3.5 2.53 0.56 0.18
Steel pipe
Spiral strand re-barre-bar
Concrete
08993
Figure 2: Section of Specimen
Figure 3: P4-1-3 Specimens Figure 4: P2-1-2 Specimens
Experimental system
Figure 5 shows the experimental system. Lateral load is given under the fixed axial load. At the loading point
lateral sift and rotation are free. The axial load is 3.5 N/mm2
.
Figure 5: Experimental system
08994
Static loading tests
1) Static loading tests for shear span ratio of 4.0(flexure failure test)
Figure 6 shows load - displacement relation. The relation curve is deteriorating from the maximum loading to the
ultimate state. Thus deteriorating mechanism a typical property of this composite structure by the effect of bond
slip between concrete and steel pipe. The maximum ductility factor is 7.5 superior to RC structure in general.
2) Static loading tests for shear span ratio of 2.0(shear failure test)
Figure 7 shows load - displacement relationship. The relation curve is gradually deteriorating like a flexure
failure in spite of shear failure test because of shear strength of steel pipe. This result shows that the tested
composite column has a high ductility and the shear strength of steel pipe should be taken account in structural
design.
Figure 6: Load-disp. Relation (P4-1) Figure 7: Load-disp. Relation (P2-1)
Pseudo dynamic tests
In static loading test, the structural the basic property as loading and deformation capacity can be estimate, but
the dynamic behavior of structures is not considered. Therefore the pseudo dynamic tests were carried out for the
purpose as follows,
a) to observe damage level and residual displacement of composite pier directly and to estimate seismic stability
b) to compare the M-Φ property of composite pier with analytical model directly
The experimental model has a single degree of freedom with natural period of 2.0s considering actual viaduct
with high pier. Moderate Kaihoku LG(Miyagi-ken Oki Earthquake 1978) and Kobe NS(Hyougo-ken Nanbu
Earthquake 1995) which were inputted as shown Figure 8 and Figure 9.
The result of experiment is shown in Table 2. Although the maximum ductility factor exceeded 9.0 for each
earthquake and then the covered concrete fell down, it was confirmed that the test piece of composite pier had
stable seismic behavior and never been collapsed by shear failure. In addition, the residual displacement after the
earthquake was relatively smaller than nonlinear analysis shown Figure 10 and 11. The experimental M-φ
relation of the composite piers showed higher deformation performance than the analytical results as shown
Figure 12 and 13. The main reason of the low performance of the analytical model is due to the property of the
ductile steel pipe and high strength spiral strand, which can not be coped with in the model. This result show that
the contribution of steel pipes to concrete should be taken account in order to improve the analytical models for
rational design.
Figure 8: Earthquake acceleration of Kaihoku LG Figure 9: Earthquake acceleration of Kobe NS
08995
Table 2: Results of pseudo dynamic tests
Specimen
No.
Earthquake
Inputted
scale
Max.inputted
acc. (gal)
Max.response
acc. (gal)
Max.ductility
factor
Residual
Disp. (mm)
P4-3
Type-Ⅰ
Kaihoku
18 % 57.4 28.6 9.6 1.1
P4-2
Type-Ⅱ
Kobe
18 % 146.2 31.5 9.7 12.1
Figure 10: Comparison between pseudo dynamic test of P4-3
Figure 11: Comparison between pseudo dynamic test of P4-2
Figure 12: Load-disp. Relation of P4-3
Figure 13: Load-disp. Relation of P4-2
08996
TYPICAL CONSTRUCTION METHOD OF COMPOSITE PIER
The design of a conventional reinforced concrete pier may be an appropriate solution in terms of material
efficiency and cost, while the overall construction cost as well as the construction period may not be optimum.
The left hand side of Figure 14 shows a typical configuration of the conventional hollow type structure, which
have one- or two-boxes. The right hand side of Figure 14 illustrates a typical cross section of the composite
design, which is constructed by the steel pipes and the minimum amount of reinforcement.
A long term social trend in labor market is the shortage of skilled labor and the decrease of annual working
hours. This trend enhances the engineering development for a drastic improvement of construction time and
labor force required for the bridge construction. The goal of new construction method is one half in construction
time and one third in labor input compared to the conventional design and jump-form construction. Figure 15
illustrates the equipment and structural arrangements of the new method.
A. Conventional hollow B. Composite
Figure 14: Structural concept of conventional and composite alternative
Figure 15: Illustration of Structural system and equipment of Hybrid-slipform method
The construction sequence of the method in described in Figure 16. The first step of construction is the erection
of prefabricated segment of steel pipes, which length is about 10m each. Those erected steel pipes have the
08997
structural stability against the wind load till the concrete pour. At every 10m of the pipe segment erection, the
group of steel pipes is strengthened by bracing, connecting each pipe together. When the erection reached to the
pier top, a reaction frame is installed and fastened at the pipe head. The reaction frame supports the vertical
slipforming load transmitted through the vertical tension wires made of the standard strands.
The second step follows the assembly of slipform, working decks, scaffold and jacking system(8 center hole
jacks). The slipform system has four working decks. The top deck has a loop of rail track where the automated
pc strand feeder runs on the track. The main deck is used for the jobs of formwork, re-bar installation,
concerning and jack operation. The lower decks are for the removal of Sheet-in-Form and the work of concrete
curing. In stead of a sophisticated computer control for jacking system, the manual operation is used to lifts the
scaffold up 2.7m every day.
Once completed the slipform installation, the highlight of Hybrid-Slipform Method begins with the pier
construction by the daily repetition of jobs sequence. The cycle consists of the jack up of the slipform system,
the spiral strand installation, the placement of form, the concrete work. The height of concrete placed by each
daily cycle is planned to be 2.7m. (as shown Figure 17)
The old sheet-in-form persists its position and remained to the old position of concrete poured one day before.
As soon as the scaffold is settled to the new position, the new sheet-in-form is placed for the next concrete
pouring. The advantages of utilization of the sheet-in-form are significant : a smooth surface finish of concrete
as same as the fixed form, a drastic change of the slipforming procedure from continuous from lifting to at once
lifting at any time, a better curing protection to the concrete surface, and more easier positioning of the
slipform.(as shown Figure 18)
The horizontal reinforcement of spiral high strength strand is spiraled along the vertical reinforcement by using
the automated strand feeder. The placement takes one and half hours by a few workers, which is needed for
fastening the strands to the vertical re-bars. When the slipform reached to the fine elevation of pier structure, the
working decks and scaffolds are easily lifted down together to the ground by the reversal use of jacking system.
During the down ward process, any necessary finishing job for the concrete surface of pier can be done by using
the working decks. (as shown Figure 19)
Practical design and construction of the composite piers are now under construction in the 2nd Tomei Project and
so on. This area is mountainous and crossing deep valleys.
(1) Erection of steel pipe &
welding
(2) Set of slipform & spiral
strand feeder
(3) Concrete construction
by slipforming
(4) Lift-down of slipform
scaffold after completion
Figure 16: Construction Procedure of Hybrid-Slipform Method
08998
Figure 17: Hybird-Slipform method construction
Figure 18: Installation of sheet-in-form Figure 19: Automated sPIral strand feeder
CONCLUSIONS AND REMARKS
The steel pipe-concrete composite pier and its suitable construction method (namely Hybrid-slipform Method)
provides an appropriate solution not only for ductile structural performance, but also rapid construction suitable
for the tall bridge pier particularly in a highly seismic region.
In pseudo dynamic tests the composite piers had a stable seismic behavior even after the ultimate state. And
although the deformation exceeded maximum peak, the residual displacement after the earthquake was relatively
small.
ACKNOWLEDGEMENTS
The authors would like to express their deep appreciation to Japan Highway Public Corporation(Nihon Doro
Kodan).
REFERENCES
1. Iemura,H., Kato,T. and Kawatani,S.(1982):Hybrid Experiment on Earthquake Response of Original
and Repaired RC members, Proc. 6th Japan Earthquake Engineering Symposium, pp825-832
2. Iemura,H., Kato,T. and Takahashi,Y.(1998):Experimental Studies on Seismic Performance of Steel
pipe-concrete Composite Pier, Proc. 10th Japan Earthquake Engineering Symposium, pp2105-2110
3. Iemura,H.(1980):Failure Criteria of Deteriorating Hysteretic Structures,Proc. of The 7th World
Conference on Earthquake engineering ,PP.81-88
4. Iemura,H., Yamada,Y. and Tanzo,W. (1988):Testing R/C Specimens by a Substructure - Based Hybrid
Earthquake Loading System, Proc. of The 7th World Conference on Earthquake engineering

More Related Content

What's hot

Experimental study on shear behavior of the interface between old and new dec...
Experimental study on shear behavior of the interface between old and new dec...Experimental study on shear behavior of the interface between old and new dec...
Experimental study on shear behavior of the interface between old and new dec...Fakhruddin Muchtar
 
Effect of depth to thickness ratio and length to depth ratio on hollow sectio...
Effect of depth to thickness ratio and length to depth ratio on hollow sectio...Effect of depth to thickness ratio and length to depth ratio on hollow sectio...
Effect of depth to thickness ratio and length to depth ratio on hollow sectio...
eSAT Publishing House
 
IRJET- A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...
IRJET-  	  A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...IRJET-  	  A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...
IRJET- A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...
IRJET Journal
 
Numerical modelling of concrete-filled steel tubular members in OpenSees
Numerical modelling of concrete-filled steel tubular members in OpenSeesNumerical modelling of concrete-filled steel tubular members in OpenSees
Numerical modelling of concrete-filled steel tubular members in OpenSees
openseesdays
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
IJERA Editor
 
comparative study of steel I - girder and prestressed steel I - girder as per...
comparative study of steel I - girder and prestressed steel I - girder as per...comparative study of steel I - girder and prestressed steel I - girder as per...
comparative study of steel I - girder and prestressed steel I - girder as per...
Dr. Dhara shah
 
Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...
Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...
Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...
IRJET Journal
 
IRJET- Behaviour of Concrete Columns by using Biaxial Geogrid Encasement
IRJET-  	  Behaviour of Concrete Columns by using Biaxial Geogrid EncasementIRJET-  	  Behaviour of Concrete Columns by using Biaxial Geogrid Encasement
IRJET- Behaviour of Concrete Columns by using Biaxial Geogrid Encasement
IRJET Journal
 
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
Franco Bontempi
 
Vd tinhtoan cautreo
Vd tinhtoan cautreoVd tinhtoan cautreo
Vd tinhtoan cautreo
Tuấn Phạm Ngọc
 
The effect of varying span on Design of Medium span Reinforced Concrete T-bea...
The effect of varying span on Design of Medium span Reinforced Concrete T-bea...The effect of varying span on Design of Medium span Reinforced Concrete T-bea...
The effect of varying span on Design of Medium span Reinforced Concrete T-bea...
theijes
 
IRJET- Temperature Effect on Concrete Bridge
IRJET-  	  Temperature Effect on Concrete BridgeIRJET-  	  Temperature Effect on Concrete Bridge
IRJET- Temperature Effect on Concrete Bridge
IRJET Journal
 
Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...
Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...
Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...
IRJET Journal
 
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONSEXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
akhil madupalli
 
Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...
Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...
Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...
CSCJournals
 
D044032430
D044032430D044032430
D044032430
IJERA Editor
 
F1303063449
F1303063449F1303063449
F1303063449
IOSR Journals
 
IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...
IRJET Journal
 
15 experimental study for strengthening of rc rectangular columns with anchor...
15 experimental study for strengthening of rc rectangular columns with anchor...15 experimental study for strengthening of rc rectangular columns with anchor...
15 experimental study for strengthening of rc rectangular columns with anchor...
Ahmed Ebid
 
Finite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connectionFinite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connection
Quang Huy Nguyen
 

What's hot (20)

Experimental study on shear behavior of the interface between old and new dec...
Experimental study on shear behavior of the interface between old and new dec...Experimental study on shear behavior of the interface between old and new dec...
Experimental study on shear behavior of the interface between old and new dec...
 
Effect of depth to thickness ratio and length to depth ratio on hollow sectio...
Effect of depth to thickness ratio and length to depth ratio on hollow sectio...Effect of depth to thickness ratio and length to depth ratio on hollow sectio...
Effect of depth to thickness ratio and length to depth ratio on hollow sectio...
 
IRJET- A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...
IRJET-  	  A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...IRJET-  	  A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...
IRJET- A Study on Concrete Filled Steel Tubular Column Steel Beam Connect...
 
Numerical modelling of concrete-filled steel tubular members in OpenSees
Numerical modelling of concrete-filled steel tubular members in OpenSeesNumerical modelling of concrete-filled steel tubular members in OpenSees
Numerical modelling of concrete-filled steel tubular members in OpenSees
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
 
comparative study of steel I - girder and prestressed steel I - girder as per...
comparative study of steel I - girder and prestressed steel I - girder as per...comparative study of steel I - girder and prestressed steel I - girder as per...
comparative study of steel I - girder and prestressed steel I - girder as per...
 
Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...
Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...
Non-Linear Finite Elements Analysis of Infilled Concrete Columns with Steel a...
 
IRJET- Behaviour of Concrete Columns by using Biaxial Geogrid Encasement
IRJET-  	  Behaviour of Concrete Columns by using Biaxial Geogrid EncasementIRJET-  	  Behaviour of Concrete Columns by using Biaxial Geogrid Encasement
IRJET- Behaviour of Concrete Columns by using Biaxial Geogrid Encasement
 
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
 
Vd tinhtoan cautreo
Vd tinhtoan cautreoVd tinhtoan cautreo
Vd tinhtoan cautreo
 
The effect of varying span on Design of Medium span Reinforced Concrete T-bea...
The effect of varying span on Design of Medium span Reinforced Concrete T-bea...The effect of varying span on Design of Medium span Reinforced Concrete T-bea...
The effect of varying span on Design of Medium span Reinforced Concrete T-bea...
 
IRJET- Temperature Effect on Concrete Bridge
IRJET-  	  Temperature Effect on Concrete BridgeIRJET-  	  Temperature Effect on Concrete Bridge
IRJET- Temperature Effect on Concrete Bridge
 
Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...
Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...
Comparison of Seismic Behaviour of a Typical Multi-Storey Structure with CFRP...
 
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONSEXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
EXPERIMENTAL STUDIES ON THIN STEEL PLAIN AND SLOTTED CHANNEL SECTTONS
 
Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...
Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...
Reduction of Ultimate Strength due to Corrosion - A Finite Element Computatio...
 
D044032430
D044032430D044032430
D044032430
 
F1303063449
F1303063449F1303063449
F1303063449
 
IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures of Hexagon Configura...
 
15 experimental study for strengthening of rc rectangular columns with anchor...
15 experimental study for strengthening of rc rectangular columns with anchor...15 experimental study for strengthening of rc rectangular columns with anchor...
15 experimental study for strengthening of rc rectangular columns with anchor...
 
Finite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connectionFinite Element analysis of a hybrid RCS beam-column connection
Finite Element analysis of a hybrid RCS beam-column connection
 

Similar to Earthquake considiration on pier design

The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
IJERA Editor
 
Comparative Analysis between Tube in Tube Structure and Conventional Moment R...
Comparative Analysis between Tube in Tube Structure and Conventional Moment R...Comparative Analysis between Tube in Tube Structure and Conventional Moment R...
Comparative Analysis between Tube in Tube Structure and Conventional Moment R...
IRJET Journal
 
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET Journal
 
Shear connector jakarta 081281000409
Shear connector jakarta 081281000409Shear connector jakarta 081281000409
Shear connector jakarta 081281000409
shear connector
 
IRJET- Study on the Structural Behavior of Concrete Encased Steel Composi...
IRJET-  	  Study on the Structural Behavior of Concrete Encased Steel Composi...IRJET-  	  Study on the Structural Behavior of Concrete Encased Steel Composi...
IRJET- Study on the Structural Behavior of Concrete Encased Steel Composi...
IRJET Journal
 
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
International Journal of Engineering Inventions www.ijeijournal.com
 
Experimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam ColumnsExperimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam Columns
IJERA Editor
 
Experimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam ColumnsExperimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam Columns
IJERA Editor
 
IRJET- Seismic Retrofitting
IRJET- Seismic RetrofittingIRJET- Seismic Retrofitting
IRJET- Seismic Retrofitting
IRJET Journal
 
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET Journal
 
IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...
IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...
IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...
IRJET Journal
 
NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...
NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...
NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...
IRJET Journal
 
IRJET- Experimental Investigation on Bond Strength in Self-Compacting Con...
IRJET-  	  Experimental Investigation on Bond Strength in Self-Compacting Con...IRJET-  	  Experimental Investigation on Bond Strength in Self-Compacting Con...
IRJET- Experimental Investigation on Bond Strength in Self-Compacting Con...
IRJET Journal
 
Stress ribbon bridges stiffened by arches or cables
Stress ribbon bridges stiffened by arches or cablesStress ribbon bridges stiffened by arches or cables
Stress ribbon bridges stiffened by arches or cablesMasum Majid
 
IRJET- Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...
IRJET-  	  Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...IRJET-  	  Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...
IRJET- Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...
IRJET Journal
 
IRJET- Review on Steel Concrete Composite Column
IRJET-  	  Review on Steel Concrete Composite ColumnIRJET-  	  Review on Steel Concrete Composite Column
IRJET- Review on Steel Concrete Composite Column
IRJET Journal
 
Experimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short ColumnsExperimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short Columns
IRJET Journal
 
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET Journal
 
Analytical Study on Concrete Filled Elliptical Steel Tubular Column
Analytical Study on Concrete Filled Elliptical Steel Tubular ColumnAnalytical Study on Concrete Filled Elliptical Steel Tubular Column
Analytical Study on Concrete Filled Elliptical Steel Tubular Column
IRJET Journal
 
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
IJERDJOURNAL
 

Similar to Earthquake considiration on pier design (20)

The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
 
Comparative Analysis between Tube in Tube Structure and Conventional Moment R...
Comparative Analysis between Tube in Tube Structure and Conventional Moment R...Comparative Analysis between Tube in Tube Structure and Conventional Moment R...
Comparative Analysis between Tube in Tube Structure and Conventional Moment R...
 
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...IRJET- 	 Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
IRJET- Study on Effect of Column Shape on Fire Resistance of CFST Column wi...
 
Shear connector jakarta 081281000409
Shear connector jakarta 081281000409Shear connector jakarta 081281000409
Shear connector jakarta 081281000409
 
IRJET- Study on the Structural Behavior of Concrete Encased Steel Composi...
IRJET-  	  Study on the Structural Behavior of Concrete Encased Steel Composi...IRJET-  	  Study on the Structural Behavior of Concrete Encased Steel Composi...
IRJET- Study on the Structural Behavior of Concrete Encased Steel Composi...
 
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
 
Experimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam ColumnsExperimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam Columns
 
Experimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam ColumnsExperimental Testing Of Partially Encased Composite Beam Columns
Experimental Testing Of Partially Encased Composite Beam Columns
 
IRJET- Seismic Retrofitting
IRJET- Seismic RetrofittingIRJET- Seismic Retrofitting
IRJET- Seismic Retrofitting
 
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
IRJET- Comparative Analysis of Concrete Filled Steel Tubular Truss Bridge wit...
 
IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...
IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...
IRJET- Study and Buckling Analysis of Concrete Filled Steel Tubes Columns usi...
 
NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...
NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...
NUMERICAL INVESTIGATION ON THE PERFORMANCE OF REINFORCED CONCRETE T-BEAMS USI...
 
IRJET- Experimental Investigation on Bond Strength in Self-Compacting Con...
IRJET-  	  Experimental Investigation on Bond Strength in Self-Compacting Con...IRJET-  	  Experimental Investigation on Bond Strength in Self-Compacting Con...
IRJET- Experimental Investigation on Bond Strength in Self-Compacting Con...
 
Stress ribbon bridges stiffened by arches or cables
Stress ribbon bridges stiffened by arches or cablesStress ribbon bridges stiffened by arches or cables
Stress ribbon bridges stiffened by arches or cables
 
IRJET- Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...
IRJET-  	  Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...IRJET-  	  Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...
IRJET- Experimental Study on Bond Behavior of Steel Fiber Reinforced Self...
 
IRJET- Review on Steel Concrete Composite Column
IRJET-  	  Review on Steel Concrete Composite ColumnIRJET-  	  Review on Steel Concrete Composite Column
IRJET- Review on Steel Concrete Composite Column
 
Experimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short ColumnsExperimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short Columns
 
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
IRJET- Comparative Study on the Seismic Behaviour of RCC and Steel-Concrete C...
 
Analytical Study on Concrete Filled Elliptical Steel Tubular Column
Analytical Study on Concrete Filled Elliptical Steel Tubular ColumnAnalytical Study on Concrete Filled Elliptical Steel Tubular Column
Analytical Study on Concrete Filled Elliptical Steel Tubular Column
 
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
Experimental Evaluation of Fatigue Performance of Steel Grid Composite Deck J...
 

Recently uploaded

ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 

Recently uploaded (20)

ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 

Earthquake considiration on pier design

  • 1. 0899 1 Civil Engineering Technology Division of Obayashi Corporation, Tokyo, Japan Email: kato@o-net.obayashi.co.jp 2 Department of Civil Engineering Systems, Kyoto University, Kyoto, Japan EARTHQUAKE DESIGN AND CONSTRUCTION OF TAL COMPOSITE BRIDGE PIERS T KATO1 And Y TAKAHASHI2 SUMMARY The recent lessons of structural damages occurred to a number of bridges during 1995 Hyogo-ken Nanbu Earthquake make a new bridge construction more expensive and time consuming because of the high standard of earthquake resistant design. The new expressway construction (the 2nd Tomei expressway) mainly crossing over deep valleys requires many tall bridge piers. Therefore it is required to develop the new technology which takes place of the conventional RC hollow pier. The new design concept of steel pipe-concrete composite bridge pier exhibits not only high seismic resistance in effect of ductile steel pipe and spiral high strength strand, but also a rapid construction method. In this paper the earthquake design by the scaled model tests as well as the construction practice of the tall composite bridge pier are described. The results and conclusions are follows: The experimental M-Φ relation of the composite piers showed higher deformation performance than the conventional RC hollow bridge pier. In pseudo dynamic tests the composite piers had a stable seismic behavior even after the ultimate state. And although the deformation exceeded maximum peak, the residual displacement after the earthquake was relatively small. The analytical moment – curvature relationship of steel pipe – concrete composite piers showed lower deformation performance than the experimental results. The main reason of the low performance of the analytical models is due to the ductile steel pipe and high strength spiral strand, which cannot be coped with in the model. The results show that the contribution of steel pipes to concrete should be taken into account in order to improve the analytical methods for design. The new construction method (namely Hybrid Slipform Method) on the composite bridge pier provides an appropriate solution for rapid construction and reduction of the skilled labor. INTRODUCTION After Hyogo-ken Nanbu earthquake the conventional RC hollow high pier needs a large amount of reinforcement because of high standard of seismic design. Consequently the construction cost as well as the construction period are serious subjects. The steel pipe - concrete composite pier in Figure 1 exhibits not only high seismic resistance in effect of ductile steel pipe and spiral high strength strand, but also an advanced construction method. The characteristics of the new composite pier are as follows. a) The composite structure is consist of single vertical re-bars outside and large steel pipes inside. b) High shear strength is provided by inner steel pipes and high strength strands as spiral hoop. c) High ductility is provided by steel pipe as well as spiral hoop effect. d) Concrete around steel pipes protect from buckling. In the case of buckling of outside re-bars at ultimate state, the collapse would not occur. e) Simple section makes a better manufacturing than conventional RC hollow section.
  • 2. 08992 Figure 1: Steel pipe-concrete composite pier STATIC EXPERIMENTAL STUDY OF COMPOSITE PIER Specimen (test piece) In order to verify the inelastic behavior of composite piers under the combined loads, static loading tests and pseudo dynamic tests were carried out. Five composite column models were tested, as shown Figure 2 - 4 and Table 1. The each shear spans are 1200mm and 600mm, the each shear span ratios are 4.0 and 2.0. As shown Figure 4, 4 pipes (diameter 76.3mm, thickness 2.8mm) and 8 re-bar (diameter 10mm) are installed in the section. Table 1 : Test Specimens No. Experiment Shear span ratio a/d Axial load (N/mm2 ) Steel pipe ratio Pt (%) Re-bar Ratio Pr (%) Spiral strand ratio Peq (%) P4-1 Static 4.0 3.5 2.53 0.56 0.18 P4-2 Pseudo dynamic 4.0 3.5 2.53 0.56 0.18 P4-3 Pseudo dynamic 4.0 3.5 2.53 0.56 0.18 P2-1 Static 2.0 3.5 2.53 0.56 0.18 P2-2 Static 2.0 3.5 2.53 0.56 0.18 Steel pipe Spiral strand re-barre-bar Concrete
  • 3. 08993 Figure 2: Section of Specimen Figure 3: P4-1-3 Specimens Figure 4: P2-1-2 Specimens Experimental system Figure 5 shows the experimental system. Lateral load is given under the fixed axial load. At the loading point lateral sift and rotation are free. The axial load is 3.5 N/mm2 . Figure 5: Experimental system
  • 4. 08994 Static loading tests 1) Static loading tests for shear span ratio of 4.0(flexure failure test) Figure 6 shows load - displacement relation. The relation curve is deteriorating from the maximum loading to the ultimate state. Thus deteriorating mechanism a typical property of this composite structure by the effect of bond slip between concrete and steel pipe. The maximum ductility factor is 7.5 superior to RC structure in general. 2) Static loading tests for shear span ratio of 2.0(shear failure test) Figure 7 shows load - displacement relationship. The relation curve is gradually deteriorating like a flexure failure in spite of shear failure test because of shear strength of steel pipe. This result shows that the tested composite column has a high ductility and the shear strength of steel pipe should be taken account in structural design. Figure 6: Load-disp. Relation (P4-1) Figure 7: Load-disp. Relation (P2-1) Pseudo dynamic tests In static loading test, the structural the basic property as loading and deformation capacity can be estimate, but the dynamic behavior of structures is not considered. Therefore the pseudo dynamic tests were carried out for the purpose as follows, a) to observe damage level and residual displacement of composite pier directly and to estimate seismic stability b) to compare the M-Φ property of composite pier with analytical model directly The experimental model has a single degree of freedom with natural period of 2.0s considering actual viaduct with high pier. Moderate Kaihoku LG(Miyagi-ken Oki Earthquake 1978) and Kobe NS(Hyougo-ken Nanbu Earthquake 1995) which were inputted as shown Figure 8 and Figure 9. The result of experiment is shown in Table 2. Although the maximum ductility factor exceeded 9.0 for each earthquake and then the covered concrete fell down, it was confirmed that the test piece of composite pier had stable seismic behavior and never been collapsed by shear failure. In addition, the residual displacement after the earthquake was relatively smaller than nonlinear analysis shown Figure 10 and 11. The experimental M-φ relation of the composite piers showed higher deformation performance than the analytical results as shown Figure 12 and 13. The main reason of the low performance of the analytical model is due to the property of the ductile steel pipe and high strength spiral strand, which can not be coped with in the model. This result show that the contribution of steel pipes to concrete should be taken account in order to improve the analytical models for rational design. Figure 8: Earthquake acceleration of Kaihoku LG Figure 9: Earthquake acceleration of Kobe NS
  • 5. 08995 Table 2: Results of pseudo dynamic tests Specimen No. Earthquake Inputted scale Max.inputted acc. (gal) Max.response acc. (gal) Max.ductility factor Residual Disp. (mm) P4-3 Type-Ⅰ Kaihoku 18 % 57.4 28.6 9.6 1.1 P4-2 Type-Ⅱ Kobe 18 % 146.2 31.5 9.7 12.1 Figure 10: Comparison between pseudo dynamic test of P4-3 Figure 11: Comparison between pseudo dynamic test of P4-2 Figure 12: Load-disp. Relation of P4-3 Figure 13: Load-disp. Relation of P4-2
  • 6. 08996 TYPICAL CONSTRUCTION METHOD OF COMPOSITE PIER The design of a conventional reinforced concrete pier may be an appropriate solution in terms of material efficiency and cost, while the overall construction cost as well as the construction period may not be optimum. The left hand side of Figure 14 shows a typical configuration of the conventional hollow type structure, which have one- or two-boxes. The right hand side of Figure 14 illustrates a typical cross section of the composite design, which is constructed by the steel pipes and the minimum amount of reinforcement. A long term social trend in labor market is the shortage of skilled labor and the decrease of annual working hours. This trend enhances the engineering development for a drastic improvement of construction time and labor force required for the bridge construction. The goal of new construction method is one half in construction time and one third in labor input compared to the conventional design and jump-form construction. Figure 15 illustrates the equipment and structural arrangements of the new method. A. Conventional hollow B. Composite Figure 14: Structural concept of conventional and composite alternative Figure 15: Illustration of Structural system and equipment of Hybrid-slipform method The construction sequence of the method in described in Figure 16. The first step of construction is the erection of prefabricated segment of steel pipes, which length is about 10m each. Those erected steel pipes have the
  • 7. 08997 structural stability against the wind load till the concrete pour. At every 10m of the pipe segment erection, the group of steel pipes is strengthened by bracing, connecting each pipe together. When the erection reached to the pier top, a reaction frame is installed and fastened at the pipe head. The reaction frame supports the vertical slipforming load transmitted through the vertical tension wires made of the standard strands. The second step follows the assembly of slipform, working decks, scaffold and jacking system(8 center hole jacks). The slipform system has four working decks. The top deck has a loop of rail track where the automated pc strand feeder runs on the track. The main deck is used for the jobs of formwork, re-bar installation, concerning and jack operation. The lower decks are for the removal of Sheet-in-Form and the work of concrete curing. In stead of a sophisticated computer control for jacking system, the manual operation is used to lifts the scaffold up 2.7m every day. Once completed the slipform installation, the highlight of Hybrid-Slipform Method begins with the pier construction by the daily repetition of jobs sequence. The cycle consists of the jack up of the slipform system, the spiral strand installation, the placement of form, the concrete work. The height of concrete placed by each daily cycle is planned to be 2.7m. (as shown Figure 17) The old sheet-in-form persists its position and remained to the old position of concrete poured one day before. As soon as the scaffold is settled to the new position, the new sheet-in-form is placed for the next concrete pouring. The advantages of utilization of the sheet-in-form are significant : a smooth surface finish of concrete as same as the fixed form, a drastic change of the slipforming procedure from continuous from lifting to at once lifting at any time, a better curing protection to the concrete surface, and more easier positioning of the slipform.(as shown Figure 18) The horizontal reinforcement of spiral high strength strand is spiraled along the vertical reinforcement by using the automated strand feeder. The placement takes one and half hours by a few workers, which is needed for fastening the strands to the vertical re-bars. When the slipform reached to the fine elevation of pier structure, the working decks and scaffolds are easily lifted down together to the ground by the reversal use of jacking system. During the down ward process, any necessary finishing job for the concrete surface of pier can be done by using the working decks. (as shown Figure 19) Practical design and construction of the composite piers are now under construction in the 2nd Tomei Project and so on. This area is mountainous and crossing deep valleys. (1) Erection of steel pipe & welding (2) Set of slipform & spiral strand feeder (3) Concrete construction by slipforming (4) Lift-down of slipform scaffold after completion Figure 16: Construction Procedure of Hybrid-Slipform Method
  • 8. 08998 Figure 17: Hybird-Slipform method construction Figure 18: Installation of sheet-in-form Figure 19: Automated sPIral strand feeder CONCLUSIONS AND REMARKS The steel pipe-concrete composite pier and its suitable construction method (namely Hybrid-slipform Method) provides an appropriate solution not only for ductile structural performance, but also rapid construction suitable for the tall bridge pier particularly in a highly seismic region. In pseudo dynamic tests the composite piers had a stable seismic behavior even after the ultimate state. And although the deformation exceeded maximum peak, the residual displacement after the earthquake was relatively small. ACKNOWLEDGEMENTS The authors would like to express their deep appreciation to Japan Highway Public Corporation(Nihon Doro Kodan). REFERENCES 1. Iemura,H., Kato,T. and Kawatani,S.(1982):Hybrid Experiment on Earthquake Response of Original and Repaired RC members, Proc. 6th Japan Earthquake Engineering Symposium, pp825-832 2. Iemura,H., Kato,T. and Takahashi,Y.(1998):Experimental Studies on Seismic Performance of Steel pipe-concrete Composite Pier, Proc. 10th Japan Earthquake Engineering Symposium, pp2105-2110 3. Iemura,H.(1980):Failure Criteria of Deteriorating Hysteretic Structures,Proc. of The 7th World Conference on Earthquake engineering ,PP.81-88 4. Iemura,H., Yamada,Y. and Tanzo,W. (1988):Testing R/C Specimens by a Substructure - Based Hybrid Earthquake Loading System, Proc. of The 7th World Conference on Earthquake engineering