15. From/to, cable, wire, and part informationSolidWorks One Multi-View Project File Formboard
16. Case Study: Emergency One Critical Issues Lengthy electrical installation Delays to the completion of vehicles Causes The extent of customization in each vehicle No on screen test and verification low supply of specialist electrician installations Solution New tool must have minimum implementation time New tool must be easy to use and learn Design-out errors up front early in the product development process Deliver high quality detailed schematics that would take out the requirement for highly specialist vehicle electrical installers Quality and control through design, while delivering the flexibility to manage the customization process, was the driving force behind the move to E³ "Every fire and rescue service wants a highly customized vehicle - from individual features and functions down to the colour of the red used. Documentation wise, this was an absolute nightmare. We had to create a new schematic every time. We wanted to introduce a new design control system that would allow us to standardize harness set-up, and make the vehicles more plug and play to allow for future retro-fit upgrades.“ Graeme Shields, Design Manager
17. Case Study: A Landry Critical Issues Required more efficient ways of completing electrical design It was increasingly more difficult to maintain a high quality electrical drawing set Causes Rising demand from customers was hard to keep up with Designs are becoming increasingly more complex Cable management was a challenge Solution E3 Wiring software has reduced the design cycle by 50% Complemented SolidWorks design with cable routing “It would have taken A Landry twice the time to complete this design in other software”