Problems Faced by Ducati:
 Faced a drop in demand for their high performance
machines.
 Needed to increase sales with a machine appealing to
common masses.
 Wanted to design one bike with the flexibility of
entering any market.
Ducati Multistrada 1200
Our Project
 To design one machine(Ducati Multistrada 1200) that
changes on the riders’ wishes.
 To get this project to tackle the recession and increase
sales for Ducati.
 We will be working with a budget of 10.4 million Euros
and a duration of 2 years.
Organizational Structure
Project Manager
Design
Design Manager/
Systems Architect
Staff
Research &
Development
R & D
Manager
Staff
Engineering
Development
Engineer
Staff
Racing
Racing Head
Staff
Finance
CFO
Staff
Planning
Planning
Head
Staff
Purchasing
Purchase
Manager
Staff
Stores
Stores
manager
Staff
Assembly
Assembly
Engineer
Staff
QC/ Testing
Testing
Engineer
Staff
Top Management
Managerial Roles and Functions
 Top Management: Includes the CEO, Board of
Directors, the Ducati family, investors and
stakeholders.
 Project Manager: Manages the project according to the
project plan while supervising all the departments
with every department having a functional manager.
 Functional Manager: Responsible for deliverables from
each department and is assisted by the staff working
for each of the respected departments.
Work Breakdown Structure 1
Work Breakdown Structure 2
Work Breakdown Structure 3
Work Breakdown Structure 4
Budgeting and Cost Control
Success Measures
 Project efficiency
 Benefit to the customer
 Benefit to the organization
 Preparing for the future
Assumptions
 Project duration will be 2 years.
 The standard work week will be used (8:00-5:00,
Monday through Friday)
 The motorcycle will appeal to the common population.
 Ducati Multistrada will perform as per the
specifications provided.
 Project Managers will have full authority over the
project.
 This motorcycle will lead to improved sales.
Constraints
 The motorcycle must be finished under the allowed
budget of 10.4 million Euros.
 The motorcycle must be completed by a due date of 2
years.
 The project will have to work with the given resources.
 Technical constraints
 Project-based outsourcing constraint
 Quality
 Risk
Risk Management
PROBABILITY
H
I
G
H
M
E
D
I
U
M
L
O
W
LOW MEDIUM HIGH
1. New technology fails
2. Labor Strike
3. Equipment
Breakdown
4. Increase in raw
material cost
5.Outsouced
Job Failure
6.Market
Risk
Major Milestones
 Project Start: January 3, 2008
 Project Manager appointed: December 2, 2007
 Ducati Multistrada 1200 launch date: January 10, 2010
 First batch of motorcycles produced: November 18,
2010
Deliverables
 R&D work parameters finalized
 Design approved
 Budget estimation approved
 Tires outsourcing decision finalized
 Organizational blueprint established
 Assembly line plans set
 Manufacturing of parts completed
 Collaborative testing successfully performed
 Quality check performed
Execution
 R&D will be done along with the design.
 Pirelli and Ducati R&D teams will be working together.
 Budget of 10.4 million Euros with a duration of 2 years.
 The assembly line production will take 8 hours to
assemble one motorcycle manually.
 First batch of production will be delivering 8000
motorcycles.
Ducati multistrada project report

More Related Content

What's hot

Sports Marketing - integrated marketing and digital communications
Sports Marketing - integrated marketing and digital communicationsSports Marketing - integrated marketing and digital communications
Sports Marketing - integrated marketing and digital communications
Leanne Ross
 
Red stripe media measurment
Red stripe media measurmentRed stripe media measurment
Red stripe media measurment
Rob Noble
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
Mohamed Saeed
 
Social Media Business Case
Social Media Business Case Social Media Business Case
Social Media Business Case
Demand Metric
 
Brand Analysis: The North Face
Brand Analysis: The North FaceBrand Analysis: The North Face
Brand Analysis: The North Face
Grace Cheung
 
Fitbit branding campaign
Fitbit branding campaignFitbit branding campaign
Fitbit branding campaign
Brianna Beitzel
 
PM process groups and processes
PM process groups and processesPM process groups and processes
PM process groups and processes
Hesham Abdalla هشام عبدالله
 
Ford - Analysis
Ford - AnalysisFord - Analysis
Ford - Analysis
Praful Anchaliya
 
Marketing Strategy of LEGO Company
Marketing Strategy of LEGO CompanyMarketing Strategy of LEGO Company
Marketing Strategy of LEGO Company
UmurMutlu
 
Decathlon - Oliver Wyman Iberia Case Competition
Decathlon - Oliver Wyman Iberia Case CompetitionDecathlon - Oliver Wyman Iberia Case Competition
Decathlon - Oliver Wyman Iberia Case Competition
Franziska Becker
 
Case study: Nike Digital Strategy
Case study: Nike Digital StrategyCase study: Nike Digital Strategy
Case study: Nike Digital Strategy
Rboua Digital services
 
Red Bull Case Study Final
Red Bull Case Study FinalRed Bull Case Study Final
Red Bull Case Study FinalDanielle Silva
 
AXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® PractitionerAXELOS - PRINCE2 Agile® Practitioner
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation SlidesProject Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
SlideTeam
 
Pestle analysis of Bulgaria
Pestle analysis of Bulgaria Pestle analysis of Bulgaria
Pestle analysis of Bulgaria
Sid Gham
 
brand management Assignment 1, PATAGONIA
brand management Assignment 1, PATAGONIAbrand management Assignment 1, PATAGONIA
brand management Assignment 1, PATAGONIAAmy Birkett
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systemsreeza fazily
 
A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)
A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)
A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)
Mohiur Rahman Adnan
 

What's hot (20)

Sports Marketing - integrated marketing and digital communications
Sports Marketing - integrated marketing and digital communicationsSports Marketing - integrated marketing and digital communications
Sports Marketing - integrated marketing and digital communications
 
Red stripe media measurment
Red stripe media measurmentRed stripe media measurment
Red stripe media measurment
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
Social Media Business Case
Social Media Business Case Social Media Business Case
Social Media Business Case
 
Brand Analysis: The North Face
Brand Analysis: The North FaceBrand Analysis: The North Face
Brand Analysis: The North Face
 
Fitbit branding campaign
Fitbit branding campaignFitbit branding campaign
Fitbit branding campaign
 
Nike's pricing strategies
Nike's pricing strategiesNike's pricing strategies
Nike's pricing strategies
 
Ford Analyst
Ford AnalystFord Analyst
Ford Analyst
 
PM process groups and processes
PM process groups and processesPM process groups and processes
PM process groups and processes
 
Ford - Analysis
Ford - AnalysisFord - Analysis
Ford - Analysis
 
Marketing Strategy of LEGO Company
Marketing Strategy of LEGO CompanyMarketing Strategy of LEGO Company
Marketing Strategy of LEGO Company
 
Decathlon - Oliver Wyman Iberia Case Competition
Decathlon - Oliver Wyman Iberia Case CompetitionDecathlon - Oliver Wyman Iberia Case Competition
Decathlon - Oliver Wyman Iberia Case Competition
 
Case study: Nike Digital Strategy
Case study: Nike Digital StrategyCase study: Nike Digital Strategy
Case study: Nike Digital Strategy
 
Red Bull Case Study Final
Red Bull Case Study FinalRed Bull Case Study Final
Red Bull Case Study Final
 
AXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® PractitionerAXELOS - PRINCE2 Agile® Practitioner
AXELOS - PRINCE2 Agile® Practitioner
 
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation SlidesProject Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
Project Portfolio Management Kpi And Dashboard PowerPoint Presentation Slides
 
Pestle analysis of Bulgaria
Pestle analysis of Bulgaria Pestle analysis of Bulgaria
Pestle analysis of Bulgaria
 
brand management Assignment 1, PATAGONIA
brand management Assignment 1, PATAGONIAbrand management Assignment 1, PATAGONIA
brand management Assignment 1, PATAGONIA
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systems
 
A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)
A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)
A Study on Nike (Portfolio, SBU Analysis, Marketing Mix, Strategic Alliance)
 

Viewers also liked

Ducati, analisi di mercato, swot, Pestle, project work
Ducati, analisi di mercato, swot, Pestle, project work Ducati, analisi di mercato, swot, Pestle, project work
Ducati, analisi di mercato, swot, Pestle, project work
Pierluigi Bianchi
 
Ducati hbr case analysis
Ducati hbr  case analysisDucati hbr  case analysis
Ducati hbr case analysis
Sandeep_Srivastava
 

Viewers also liked (6)

PMP Final Version
PMP Final VersionPMP Final Version
PMP Final Version
 
Caso Ducati
Caso DucatiCaso Ducati
Caso Ducati
 
Ducati Case
Ducati CaseDucati Case
Ducati Case
 
Ducati, analisi di mercato, swot, Pestle, project work
Ducati, analisi di mercato, swot, Pestle, project work Ducati, analisi di mercato, swot, Pestle, project work
Ducati, analisi di mercato, swot, Pestle, project work
 
Ducati Case Study
Ducati Case StudyDucati Case Study
Ducati Case Study
 
Ducati hbr case analysis
Ducati hbr  case analysisDucati hbr  case analysis
Ducati hbr case analysis
 

Similar to Ducati multistrada project report

PM - EV Charging.pptx
PM - EV Charging.pptxPM - EV Charging.pptx
PM - EV Charging.pptx
NarmadhaMohan5
 
Delphi Noida PVT. LTD .Machine core bulder
Delphi Noida PVT. LTD .Machine core bulderDelphi Noida PVT. LTD .Machine core bulder
Delphi Noida PVT. LTD .Machine core bulder
Manoj Sharma
 
Coo projects operations
Coo projects  operationsCoo projects  operations
Coo projects operations
JAI DWIVEDI
 
"Supercharged Motorcycle" Pitch Deck
"Supercharged Motorcycle" Pitch Deck"Supercharged Motorcycle" Pitch Deck
"Supercharged Motorcycle" Pitch Deck
Konstantin Starodetko
 
Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...
Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...
Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...
Mobilis Conférence
 
20141125_KDE_Resume_Protetto
20141125_KDE_Resume_Protetto20141125_KDE_Resume_Protetto
20141125_KDE_Resume_ProtettoKatia Di Egidio
 
Aalogics
AalogicsAalogics
Aalogics
KayDrive
 
Study conducted at kinetic communication ltd, pune to analyze performance app...
Study conducted at kinetic communication ltd, pune to analyze performance app...Study conducted at kinetic communication ltd, pune to analyze performance app...
Study conducted at kinetic communication ltd, pune to analyze performance app...
Supa Buoy
 
New Product Lunched
New Product LunchedNew Product Lunched
New Product Lunched
Er Abhi Vashi
 
Mohit Sehgal_Resume
Mohit Sehgal_ResumeMohit Sehgal_Resume
Mohit Sehgal_ResumeMOHIT SEHGAL
 
Royal footwear ltd
Royal footwear ltdRoyal footwear ltd
Royal footwear ltd
TanvirBBcommercial
 
EVT Public Investor Deck July 2022
EVT Public Investor Deck July 2022EVT Public Investor Deck July 2022
EVT Public Investor Deck July 2022
RedChip Companies, Inc.
 
Arif Rizwy Professional Portfolio
Arif Rizwy Professional Portfolio Arif Rizwy Professional Portfolio
Arif Rizwy Professional Portfolio
Arif Rizwy
 
sct_34_side_event_brochure (1)
sct_34_side_event_brochure (1)sct_34_side_event_brochure (1)
sct_34_side_event_brochure (1)Diego Domma
 
MARKETING & BUSINESS PLAN PRESENTATION.pptx
MARKETING & BUSINESS PLAN PRESENTATION.pptxMARKETING & BUSINESS PLAN PRESENTATION.pptx
MARKETING & BUSINESS PLAN PRESENTATION.pptx
Pankaj Rajput
 
презентация компании вальтер En rev 01
презентация компании вальтер En rev 01презентация компании вальтер En rev 01
презентация компании вальтер En rev 01
perewod
 

Similar to Ducati multistrada project report (20)

PM - EV Charging.pptx
PM - EV Charging.pptxPM - EV Charging.pptx
PM - EV Charging.pptx
 
manjit_ resume
manjit_ resumemanjit_ resume
manjit_ resume
 
Delphi Noida PVT. LTD .Machine core bulder
Delphi Noida PVT. LTD .Machine core bulderDelphi Noida PVT. LTD .Machine core bulder
Delphi Noida PVT. LTD .Machine core bulder
 
Coo projects operations
Coo projects  operationsCoo projects  operations
Coo projects operations
 
"Supercharged Motorcycle" Pitch Deck
"Supercharged Motorcycle" Pitch Deck"Supercharged Motorcycle" Pitch Deck
"Supercharged Motorcycle" Pitch Deck
 
Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...
Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...
Mobilis 2008 - TR2 : Innovative Eco-Technologies & Design in the Automotive ...
 
20141125_KDE_Resume_Protetto
20141125_KDE_Resume_Protetto20141125_KDE_Resume_Protetto
20141125_KDE_Resume_Protetto
 
Aalogics
AalogicsAalogics
Aalogics
 
TracyQuinnfinal
TracyQuinnfinalTracyQuinnfinal
TracyQuinnfinal
 
Dcp introduction1
Dcp introduction1Dcp introduction1
Dcp introduction1
 
Study conducted at kinetic communication ltd, pune to analyze performance app...
Study conducted at kinetic communication ltd, pune to analyze performance app...Study conducted at kinetic communication ltd, pune to analyze performance app...
Study conducted at kinetic communication ltd, pune to analyze performance app...
 
New Product Lunched
New Product LunchedNew Product Lunched
New Product Lunched
 
Mohit Sehgal_Resume
Mohit Sehgal_ResumeMohit Sehgal_Resume
Mohit Sehgal_Resume
 
Royal footwear ltd
Royal footwear ltdRoyal footwear ltd
Royal footwear ltd
 
Resume_Shakti
Resume_ShaktiResume_Shakti
Resume_Shakti
 
EVT Public Investor Deck July 2022
EVT Public Investor Deck July 2022EVT Public Investor Deck July 2022
EVT Public Investor Deck July 2022
 
Arif Rizwy Professional Portfolio
Arif Rizwy Professional Portfolio Arif Rizwy Professional Portfolio
Arif Rizwy Professional Portfolio
 
sct_34_side_event_brochure (1)
sct_34_side_event_brochure (1)sct_34_side_event_brochure (1)
sct_34_side_event_brochure (1)
 
MARKETING & BUSINESS PLAN PRESENTATION.pptx
MARKETING & BUSINESS PLAN PRESENTATION.pptxMARKETING & BUSINESS PLAN PRESENTATION.pptx
MARKETING & BUSINESS PLAN PRESENTATION.pptx
 
презентация компании вальтер En rev 01
презентация компании вальтер En rev 01презентация компании вальтер En rev 01
презентация компании вальтер En rev 01
 

Recently uploaded

PARTS MANUAL tackeuschi TL150 BT7Z011-2.pdf
PARTS MANUAL tackeuschi TL150 BT7Z011-2.pdfPARTS MANUAL tackeuschi TL150 BT7Z011-2.pdf
PARTS MANUAL tackeuschi TL150 BT7Z011-2.pdf
eduarddorda1010
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
Perth City Skoda
 
What Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingWhat Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop Working
Lancer Service
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
Strategic Management - Strategies of Rolls Royce
Strategic Management - Strategies of Rolls RoyceStrategic Management - Strategies of Rolls Royce
Strategic Management - Strategies of Rolls Royce
SadmanFuad1
 
Regeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in AutomobileRegeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in Automobile
AtanuGhosh62
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
One compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdfOne compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdf
RehanRustam2
 

Recently uploaded (20)

PARTS MANUAL tackeuschi TL150 BT7Z011-2.pdf
PARTS MANUAL tackeuschi TL150 BT7Z011-2.pdfPARTS MANUAL tackeuschi TL150 BT7Z011-2.pdf
PARTS MANUAL tackeuschi TL150 BT7Z011-2.pdf
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
 
What Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingWhat Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop Working
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
Strategic Management - Strategies of Rolls Royce
Strategic Management - Strategies of Rolls RoyceStrategic Management - Strategies of Rolls Royce
Strategic Management - Strategies of Rolls Royce
 
Regeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in AutomobileRegeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in Automobile
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
One compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdfOne compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdf
 

Ducati multistrada project report

  • 1. Team D Final Presentation Kanika Vij Madura Puri Nikhil Rao Rishab Kothari Rohan Koli
  • 2.
  • 4. Problems Faced by Ducati:  Faced a drop in demand for their high performance machines.  Needed to increase sales with a machine appealing to common masses.  Wanted to design one bike with the flexibility of entering any market.
  • 6. Our Project  To design one machine(Ducati Multistrada 1200) that changes on the riders’ wishes.  To get this project to tackle the recession and increase sales for Ducati.  We will be working with a budget of 10.4 million Euros and a duration of 2 years.
  • 7. Organizational Structure Project Manager Design Design Manager/ Systems Architect Staff Research & Development R & D Manager Staff Engineering Development Engineer Staff Racing Racing Head Staff Finance CFO Staff Planning Planning Head Staff Purchasing Purchase Manager Staff Stores Stores manager Staff Assembly Assembly Engineer Staff QC/ Testing Testing Engineer Staff Top Management
  • 8. Managerial Roles and Functions  Top Management: Includes the CEO, Board of Directors, the Ducati family, investors and stakeholders.  Project Manager: Manages the project according to the project plan while supervising all the departments with every department having a functional manager.  Functional Manager: Responsible for deliverables from each department and is assisted by the staff working for each of the respected departments.
  • 14. Success Measures  Project efficiency  Benefit to the customer  Benefit to the organization  Preparing for the future
  • 15. Assumptions  Project duration will be 2 years.  The standard work week will be used (8:00-5:00, Monday through Friday)  The motorcycle will appeal to the common population.  Ducati Multistrada will perform as per the specifications provided.  Project Managers will have full authority over the project.  This motorcycle will lead to improved sales.
  • 16. Constraints  The motorcycle must be finished under the allowed budget of 10.4 million Euros.  The motorcycle must be completed by a due date of 2 years.  The project will have to work with the given resources.  Technical constraints  Project-based outsourcing constraint  Quality  Risk
  • 17. Risk Management PROBABILITY H I G H M E D I U M L O W LOW MEDIUM HIGH 1. New technology fails 2. Labor Strike 3. Equipment Breakdown 4. Increase in raw material cost 5.Outsouced Job Failure 6.Market Risk
  • 18. Major Milestones  Project Start: January 3, 2008  Project Manager appointed: December 2, 2007  Ducati Multistrada 1200 launch date: January 10, 2010  First batch of motorcycles produced: November 18, 2010
  • 19. Deliverables  R&D work parameters finalized  Design approved  Budget estimation approved  Tires outsourcing decision finalized  Organizational blueprint established  Assembly line plans set  Manufacturing of parts completed  Collaborative testing successfully performed  Quality check performed
  • 20. Execution  R&D will be done along with the design.  Pirelli and Ducati R&D teams will be working together.  Budget of 10.4 million Euros with a duration of 2 years.  The assembly line production will take 8 hours to assemble one motorcycle manually.  First batch of production will be delivering 8000 motorcycles.