Facility Name:
Facility Address:
Facility Tel:
Facility Contact:
Facility Email:
Customer Name:
Industry / Key Main
Product
Facility Fax:
Auditor(s):
Verification Date: 12-Dec-2013
TYPE OF ASSESSMENT:
Re-audit Annual Renewal Follow Up
AUDIT RESULTS COMMUNICATED WITH:
Name:
Title:
A closing meeting has been performed at the end of the verification process in which the listed exceptions were explained and accepted by company representative.
Signatures:
Auditor (s)
Date
Company Representative
Date
Continuous Improvement Report (CIR)
Initial
17-Dec-2013 17-Dec-2013
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Qingdao Pingdu Yongliang Arts & Crafts Factory
Dianzi Town
Pingdu
86(532)-85311438
Zhang Xiaodong
david@yongliang.biz
Dollar General Corporation
Kinds of plastic and paper storage facility
86(532)-84328592
gary zhang Zhang Yongliang
gary zhang
Continuous Improvement Report (CIR)
Opportunity for Improvement
Finding Category
CAP Review and Verification
By Factory
Proposed Corrective Action Plan
By Intertek
Verification Status
(Open/Closed)
ModerateManagement commitment and continual improvement
1
Findings
Management review does not include risk management.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The review of the management systems did not include
evaluation of risk management.
ModerateRisk Management
2
Findings
The company does not conduct process risk assessment of
hazards potentially introduced during the production,
packaging or storage processes for its products.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The factory did not conduct a process risk assessment of
hazards potentially introduced during the production,
packaging or storage processes.
ModerateRisk Management
3
Page 2 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Continuous Improvement Report (CIR)
Findings
The risk assessment is not regularly reviewed, at least
annually or when changes made to product design and
materials and/or key manufacturing processes.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The risk assessment was not regularly reviewed.
MajorRisk Management
4
Findings
The company did not implement risk management systems
based on a systematic risk assessment system to assure
product safety legality and quality.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The factory did not conduct a process risk assessment of
hazards potentially introduced during the production,
packaging or storage processes.
MinorQuality Management System
5
Findings
The company establishes a policy statment but it is not
understood by all staff involved with activities impacting
product safety, legality and quality.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The policy statement was found not effectively
communicated with all staffs.
ModerateQuality Management System
6
Page 3 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Continuous Improvement Report (CIR)
Findings
Technical dossier or package does not include risk
assessment.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The specification was not include the risk assessments.
MinorQuality Management System
7
Findings
The product withdrawal and recall procedure is not tested, at
least annually.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The product withdrawal and recall procedure was not tested
at all.
ModerateProcess Control
8
Findings
Work instructions are not available for operator as a
guideline at an accessible place or workstation.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
No work instruction was provided for employees onsite.
MinorProcess Control
9
Findings
Inspection records are not maintained for a few batch of raw
material / component.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
Some inspection records for packaging materials were not
kept well.
Page 4 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Continuous Improvement Report (CIR)
MajorProcess Control
10
Findings
Metal or foreign body detector is not in place.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
No suitable metal detector was used in the factory.
MinorProcess Control
11
Findings
There is no list to register the location of all glass, ceramic
and brittle-plastic material (except when used as part of the
product) in raw material handling, preparation, processing,
and packing and storage areas.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
No a relative list to register to the location of all glass,
brittle-plastic material in facility was available.
MinorProcess Control
12
Findings
The company does not protect the light-bulbs and strip lights
including those on electric fly-killer units when they constitute
a risk to the products.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The factory did not provide protective shield for lights onsite.
ModerateProcess Control
13
Page 5 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Continuous Improvement Report (CIR)
Findings
The identified measuring equipment are not calibrated to
appropriate accuracy and precision.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
All the measuring devices used in the factory were not
calibrated.
ModerateProcess Control
14
Findings
The identified measuring equipment are not calibrated before
use and then at defined frequency.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
All the measuring devices used in the factory were not
calibrated.
ModerateProcess Control
15
Findings
Procedure is not in place for actions to be taken if measuring
equipment is found not to be operating within specified
tolerances/limits.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
All the measuring devices used in the factory were not
calibrated.
MinorProcess Control
16
Page 6 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Continuous Improvement Report (CIR)
Findings
Production equipment and tooling are not properly specified
before commission.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The factory did not properly specify the production equipment
or tooling before commission.
MinorProcess Control
17
Findings
The company does not establish a system of planned
maintenance, covering all items of production equipment and
tooling.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
The factory did not have a system of planned maintenance
tools used onsite.
ModeratePersonnel Training and Competency
18
Findings
The effectiveness of trainings are not evaluated.
Expected Completion Date:
Verification Date:
dd/mm/yy
Responsible Personnel:
dd/mm/yy
No such records were kept inthe factory.
Additional Comment:
Page 7 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks
Continuous Improvement Report (CIR)
Recommendation for Improvement Plan Timeline
Minor
Major
Moderate Take action within 0~3 months to make necessary improvements
Take action within 0~6 months to make necessary improvements
Finding Rating Improvement Timeline
to make necessary improvements0~1 monthTake action within
DISCLAIMER:
"This report is just a preliminary result for Intertek’s reference only. Final official results which will be issued by Intertek are system generated in secured file. This report
shall not be reproduced in part or in full without the written approval from the Management of Intertek”
Page 8 of 8
The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your
company without the written consent of the Intertek Group other than to the extent necessary to view the material.
Copyright and Trademarks

More Related Content

What's hot

Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationApril Bright
 
Complete_outsourcing_solutions
Complete_outsourcing_solutionsComplete_outsourcing_solutions
Complete_outsourcing_solutionsTarek Kamal
 
Complete Outsourcing Solutions-ENG
Complete Outsourcing Solutions-ENGComplete Outsourcing Solutions-ENG
Complete Outsourcing Solutions-ENGAnna Assaf
 
Four steps to an audit proof measurement system by PQ Systems
Four steps to an audit proof measurement system by PQ SystemsFour steps to an audit proof measurement system by PQ Systems
Four steps to an audit proof measurement system by PQ SystemsBlackberry&Cross
 
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017April Bright
 
Brc unannounced audits bb
Brc unannounced audits bbBrc unannounced audits bb
Brc unannounced audits bbMaria Isabel
 
Design and development of medical device
Design and development of medical deviceDesign and development of medical device
Design and development of medical deviceMalesh M
 
Effective Use of CAPA in Remediating Quality Management Systems
Effective Use of CAPA in Remediating Quality Management SystemsEffective Use of CAPA in Remediating Quality Management Systems
Effective Use of CAPA in Remediating Quality Management SystemsMaetrics
 
What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...Greenlight Guru
 
Improving NDT Compliance: A New Approach in Software
Improving NDT Compliance: A New Approach in SoftwareImproving NDT Compliance: A New Approach in Software
Improving NDT Compliance: A New Approach in SoftwareSarah Kennedy
 
Productivity improvement in generation of so ps for oil & gas equipment manuf...
Productivity improvement in generation of so ps for oil & gas equipment manuf...Productivity improvement in generation of so ps for oil & gas equipment manuf...
Productivity improvement in generation of so ps for oil & gas equipment manuf...QuEST Global
 
5 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 134855 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 13485MedTech Review, LLC
 
Proposal for Salt Iodization
Proposal for Salt IodizationProposal for Salt Iodization
Proposal for Salt IodizationSohail Azeem
 

What's hot (18)

Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and Implementation
 
Complete_outsourcing_solutions
Complete_outsourcing_solutionsComplete_outsourcing_solutions
Complete_outsourcing_solutions
 
Complete Outsourcing Solutions-ENG
Complete Outsourcing Solutions-ENGComplete Outsourcing Solutions-ENG
Complete Outsourcing Solutions-ENG
 
Four steps to an audit proof measurement system by PQ Systems
Four steps to an audit proof measurement system by PQ SystemsFour steps to an audit proof measurement system by PQ Systems
Four steps to an audit proof measurement system by PQ Systems
 
Mithun Patil Ppt
Mithun Patil PptMithun Patil Ppt
Mithun Patil Ppt
 
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
 
Pai
PaiPai
Pai
 
Brc unannounced audits bb
Brc unannounced audits bbBrc unannounced audits bb
Brc unannounced audits bb
 
Design and development of medical device
Design and development of medical deviceDesign and development of medical device
Design and development of medical device
 
Effective Use of CAPA in Remediating Quality Management Systems
Effective Use of CAPA in Remediating Quality Management SystemsEffective Use of CAPA in Remediating Quality Management Systems
Effective Use of CAPA in Remediating Quality Management Systems
 
ODD Testing
ODD TestingODD Testing
ODD Testing
 
What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...What You Need to Know About Medical Electrical Standards Updates (and how the...
What You Need to Know About Medical Electrical Standards Updates (and how the...
 
Fda Inspection
Fda InspectionFda Inspection
Fda Inspection
 
Improving NDT Compliance: A New Approach in Software
Improving NDT Compliance: A New Approach in SoftwareImproving NDT Compliance: A New Approach in Software
Improving NDT Compliance: A New Approach in Software
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Productivity improvement in generation of so ps for oil & gas equipment manuf...
Productivity improvement in generation of so ps for oil & gas equipment manuf...Productivity improvement in generation of so ps for oil & gas equipment manuf...
Productivity improvement in generation of so ps for oil & gas equipment manuf...
 
5 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 134855 Errors To Avoid When Implementing Iso 13485
5 Errors To Avoid When Implementing Iso 13485
 
Proposal for Salt Iodization
Proposal for Salt IodizationProposal for Salt Iodization
Proposal for Salt Iodization
 

Viewers also liked (7)

Leader in you
Leader in youLeader in you
Leader in you
 
BONUS: John Rudrud Be the Match Strategy Overview Slides
BONUS: John Rudrud Be the Match Strategy Overview SlidesBONUS: John Rudrud Be the Match Strategy Overview Slides
BONUS: John Rudrud Be the Match Strategy Overview Slides
 
Rick Roberts: DoD Healthy Base Initiative
Rick Roberts: DoD Healthy Base InitiativeRick Roberts: DoD Healthy Base Initiative
Rick Roberts: DoD Healthy Base Initiative
 
Lecture Qual. and Quant. tools - EFSS 2015
Lecture Qual. and Quant. tools - EFSS 2015Lecture Qual. and Quant. tools - EFSS 2015
Lecture Qual. and Quant. tools - EFSS 2015
 
Margot Lester Communicating for Change
Margot Lester Communicating for ChangeMargot Lester Communicating for Change
Margot Lester Communicating for Change
 
9 rzeczy, których nauczył mnie start-up | Mateusz Muryjas
9 rzeczy, których nauczył mnie start-up | Mateusz Muryjas9 rzeczy, których nauczył mnie start-up | Mateusz Muryjas
9 rzeczy, których nauczył mnie start-up | Mateusz Muryjas
 
Career Planning and Succession Planning - Principles of Human Resource Manage...
Career Planning and Succession Planning - Principles of Human Resource Manage...Career Planning and Succession Planning - Principles of Human Resource Manage...
Career Planning and Succession Planning - Principles of Human Resource Manage...
 

Similar to Dollar General

Bsci summary auditreport
Bsci summary auditreportBsci summary auditreport
Bsci summary auditreportCandy Li
 
UXStrat 2019 - System Design by Nur Karadeniz
UXStrat 2019 - System Design by Nur KaradenizUXStrat 2019 - System Design by Nur Karadeniz
UXStrat 2019 - System Design by Nur KaradenizNur Karadeniz
 
UX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, FjordUX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, FjordUX STRAT
 
Supplier Assessment Sample Report: What You Can Expect
Supplier Assessment Sample Report: What You Can ExpectSupplier Assessment Sample Report: What You Can Expect
Supplier Assessment Sample Report: What You Can ExpectInsight Solutions Global
 
Maintenance management...
Maintenance management...Maintenance management...
Maintenance management...regaassaakoo
 
Kitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--AshleyKitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--AshleyAshleyLiKITSEN
 
Inssan ppt Paperless Office.pptx
Inssan ppt Paperless Office.pptxInssan ppt Paperless Office.pptx
Inssan ppt Paperless Office.pptxAkashDogra11
 
Escrow Presentation2010
Escrow Presentation2010Escrow Presentation2010
Escrow Presentation2010simongreaves
 
Escrow Presentation
Escrow PresentationEscrow Presentation
Escrow Presentationlucydavidson
 
AppAA_ProjectQualityPlan_Ausenco.pdf
AppAA_ProjectQualityPlan_Ausenco.pdfAppAA_ProjectQualityPlan_Ausenco.pdf
AppAA_ProjectQualityPlan_Ausenco.pdfLuisMogrovejo3
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationSanchit Jain
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Manoj Dnyanmothe
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Manoj Dnyanmothe
 
Product reengineering solution for a global web services enterprise.
Product reengineering solution for a global web services enterprise.Product reengineering solution for a global web services enterprise.
Product reengineering solution for a global web services enterprise.Mindtree Ltd.
 
Astonish Expediting managed by professionals
Astonish Expediting managed by professionalsAstonish Expediting managed by professionals
Astonish Expediting managed by professionalsNitin Thakurta
 
Continous Audit and Controls with Brainwave GRC
Continous Audit and Controls with Brainwave GRCContinous Audit and Controls with Brainwave GRC
Continous Audit and Controls with Brainwave GRCGraeme Hein
 

Similar to Dollar General (20)

Bsci summary auditreport
Bsci summary auditreportBsci summary auditreport
Bsci summary auditreport
 
UXStrat 2019 - System Design by Nur Karadeniz
UXStrat 2019 - System Design by Nur KaradenizUXStrat 2019 - System Design by Nur Karadeniz
UXStrat 2019 - System Design by Nur Karadeniz
 
UX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, FjordUX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, Fjord
 
Supplier Assessment Sample Report: What You Can Expect
Supplier Assessment Sample Report: What You Can ExpectSupplier Assessment Sample Report: What You Can Expect
Supplier Assessment Sample Report: What You Can Expect
 
Maintenance management...
Maintenance management...Maintenance management...
Maintenance management...
 
Project report disa course
Project report disa courseProject report disa course
Project report disa course
 
Kitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--AshleyKitsen Audit Report By SGS--Ashley
Kitsen Audit Report By SGS--Ashley
 
Inssan ppt Paperless Office.pptx
Inssan ppt Paperless Office.pptxInssan ppt Paperless Office.pptx
Inssan ppt Paperless Office.pptx
 
Escrow Presentation2010
Escrow Presentation2010Escrow Presentation2010
Escrow Presentation2010
 
Escrow Presentation
Escrow PresentationEscrow Presentation
Escrow Presentation
 
AppAA_ProjectQualityPlan_Ausenco.pdf
AppAA_ProjectQualityPlan_Ausenco.pdfAppAA_ProjectQualityPlan_Ausenco.pdf
AppAA_ProjectQualityPlan_Ausenco.pdf
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
 
Starting an-enterprise
Starting an-enterpriseStarting an-enterprise
Starting an-enterprise
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015
 
SRED Overview
SRED OverviewSRED Overview
SRED Overview
 
SRED Program Overview
SRED Program OverviewSRED Program Overview
SRED Program Overview
 
Product reengineering solution for a global web services enterprise.
Product reengineering solution for a global web services enterprise.Product reengineering solution for a global web services enterprise.
Product reengineering solution for a global web services enterprise.
 
Astonish Expediting managed by professionals
Astonish Expediting managed by professionalsAstonish Expediting managed by professionals
Astonish Expediting managed by professionals
 
Continous Audit and Controls with Brainwave GRC
Continous Audit and Controls with Brainwave GRCContinous Audit and Controls with Brainwave GRC
Continous Audit and Controls with Brainwave GRC
 

Dollar General

  • 1. Facility Name: Facility Address: Facility Tel: Facility Contact: Facility Email: Customer Name: Industry / Key Main Product Facility Fax: Auditor(s): Verification Date: 12-Dec-2013 TYPE OF ASSESSMENT: Re-audit Annual Renewal Follow Up AUDIT RESULTS COMMUNICATED WITH: Name: Title: A closing meeting has been performed at the end of the verification process in which the listed exceptions were explained and accepted by company representative. Signatures: Auditor (s) Date Company Representative Date Continuous Improvement Report (CIR) Initial 17-Dec-2013 17-Dec-2013 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks Qingdao Pingdu Yongliang Arts & Crafts Factory Dianzi Town Pingdu 86(532)-85311438 Zhang Xiaodong david@yongliang.biz Dollar General Corporation Kinds of plastic and paper storage facility 86(532)-84328592 gary zhang Zhang Yongliang gary zhang
  • 2. Continuous Improvement Report (CIR) Opportunity for Improvement Finding Category CAP Review and Verification By Factory Proposed Corrective Action Plan By Intertek Verification Status (Open/Closed) ModerateManagement commitment and continual improvement 1 Findings Management review does not include risk management. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The review of the management systems did not include evaluation of risk management. ModerateRisk Management 2 Findings The company does not conduct process risk assessment of hazards potentially introduced during the production, packaging or storage processes for its products. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The factory did not conduct a process risk assessment of hazards potentially introduced during the production, packaging or storage processes. ModerateRisk Management 3 Page 2 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks
  • 3. Continuous Improvement Report (CIR) Findings The risk assessment is not regularly reviewed, at least annually or when changes made to product design and materials and/or key manufacturing processes. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The risk assessment was not regularly reviewed. MajorRisk Management 4 Findings The company did not implement risk management systems based on a systematic risk assessment system to assure product safety legality and quality. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The factory did not conduct a process risk assessment of hazards potentially introduced during the production, packaging or storage processes. MinorQuality Management System 5 Findings The company establishes a policy statment but it is not understood by all staff involved with activities impacting product safety, legality and quality. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The policy statement was found not effectively communicated with all staffs. ModerateQuality Management System 6 Page 3 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks
  • 4. Continuous Improvement Report (CIR) Findings Technical dossier or package does not include risk assessment. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The specification was not include the risk assessments. MinorQuality Management System 7 Findings The product withdrawal and recall procedure is not tested, at least annually. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The product withdrawal and recall procedure was not tested at all. ModerateProcess Control 8 Findings Work instructions are not available for operator as a guideline at an accessible place or workstation. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy No work instruction was provided for employees onsite. MinorProcess Control 9 Findings Inspection records are not maintained for a few batch of raw material / component. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy Some inspection records for packaging materials were not kept well. Page 4 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks
  • 5. Continuous Improvement Report (CIR) MajorProcess Control 10 Findings Metal or foreign body detector is not in place. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy No suitable metal detector was used in the factory. MinorProcess Control 11 Findings There is no list to register the location of all glass, ceramic and brittle-plastic material (except when used as part of the product) in raw material handling, preparation, processing, and packing and storage areas. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy No a relative list to register to the location of all glass, brittle-plastic material in facility was available. MinorProcess Control 12 Findings The company does not protect the light-bulbs and strip lights including those on electric fly-killer units when they constitute a risk to the products. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The factory did not provide protective shield for lights onsite. ModerateProcess Control 13 Page 5 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks
  • 6. Continuous Improvement Report (CIR) Findings The identified measuring equipment are not calibrated to appropriate accuracy and precision. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy All the measuring devices used in the factory were not calibrated. ModerateProcess Control 14 Findings The identified measuring equipment are not calibrated before use and then at defined frequency. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy All the measuring devices used in the factory were not calibrated. ModerateProcess Control 15 Findings Procedure is not in place for actions to be taken if measuring equipment is found not to be operating within specified tolerances/limits. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy All the measuring devices used in the factory were not calibrated. MinorProcess Control 16 Page 6 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks
  • 7. Continuous Improvement Report (CIR) Findings Production equipment and tooling are not properly specified before commission. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The factory did not properly specify the production equipment or tooling before commission. MinorProcess Control 17 Findings The company does not establish a system of planned maintenance, covering all items of production equipment and tooling. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy The factory did not have a system of planned maintenance tools used onsite. ModeratePersonnel Training and Competency 18 Findings The effectiveness of trainings are not evaluated. Expected Completion Date: Verification Date: dd/mm/yy Responsible Personnel: dd/mm/yy No such records were kept inthe factory. Additional Comment: Page 7 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks
  • 8. Continuous Improvement Report (CIR) Recommendation for Improvement Plan Timeline Minor Major Moderate Take action within 0~3 months to make necessary improvements Take action within 0~6 months to make necessary improvements Finding Rating Improvement Timeline to make necessary improvements0~1 monthTake action within DISCLAIMER: "This report is just a preliminary result for Intertek’s reference only. Final official results which will be issued by Intertek are system generated in secured file. This report shall not be reproduced in part or in full without the written approval from the Management of Intertek” Page 8 of 8 The Intertek Group is the owner of the copyright in the material and intellectual know-how presented. No parts in this material may be reproduced, adapted or distributed outside of your company without the written consent of the Intertek Group other than to the extent necessary to view the material. Copyright and Trademarks