XYZ Future Energies is an Indian renewable energy company. It previously used a paper-based quality control process which caused delays and lack of real-time monitoring. The process was replaced with digital checklists and photos using digiQC software. This allowed for instant approvals, remote monitoring, and automated logs to improve quality oversight and reduce delays by 25% while increasing transparency.
Case Study: How The Home Depot Built Quality Into Software DevelopmentCA Technologies
This session will cover how The Home Depot built quality into its software development as it migrated from waterfall to agile delivery.
For more information on DevOps: Continuous Delivery, please visit: http://ow.ly/hAXz50g62ZM
Case Study: How The Home Depot Built Quality Into Software DevelopmentCA Technologies
This session will cover how The Home Depot built quality into its software development as it migrated from waterfall to agile delivery.
For more information on DevOps: Continuous Delivery, please visit: http://cainc.to/CAW17-CD
iTransform Mobile App - Powered by Mobiquest Solutions Pte. Ltd Rakesh Sabharwal
iTransform is targeted to cater for various enterprise processes such as
- Plant Operations & Maintenance
- Safety Checks
- Inspection Routines
- Field Operations and Service
iTransform Mobile App enables your business to paperless operations.itransform enables the plant operations or maintenance team to be more efficient in executing schedules and adhoc tasks or jobs. Key innovation is to enable the user the ability to adjust, fine tune and even create new electronic forms, so that the operations team will continuously improve without the need to have IT support. iTransform allows dynamic design of checklists and forms to be used as part of the planning, scheduling and execution of tasks. Dynamic Forms Module allows user to create forms, checklists and templates such as survey, check lists, Inspection routine, Safety Checks, Service Reports etc. iTransform mobile client application enhances operations with in-building maps to be used by the operators to navigate in tunnels, enclosed places, Underground Facilities and production plants without public communications infrastructure.
To “Ask for quote” or “Request for Proposal” to get this Gold Award winning app, click here:
http://www.mobiquest.net/itransformproposal.html
2012 URISA Track, How to Conduct Geographic Information Systems (GIS) Work wi...GIS in the Rockies
Quality Assurance / Quality Control (QA/QC) programs are implemented to ensure that project work is performed in a controlled manner and that reports and data products are high quality, documented, and accurate. Conducting work in a Geographic Information System (GIS) within a QA/QC framework of guidelines can be challenging as a result of the many strict requirements inherent to the QA/QC process. All aspects of creating, managing, editing, and analyzing geospatial databases can become more rigorous and nuanced. To perform GIS work effectively under QA/QC requires a clear understanding of the overall requirements, a plan to execute the work, a documentation process, and a high level of organization. This discussion will review lessons learned from performing GIS work, within a QA/QC program, for the nuclear power industry, and it will include information about implementing a QA/QC program for GIS, workflow considerations and documentation requirements, data organization, finding and obtaining data, and other key aspects.
A leading manufacturer of golf equipment selects MetricStream to strengthen supplier quality compliance through real-time monitoring of inspections and process capability.
Micro Focus DevOps Drive-in with Gary Gruver - Starting and Scaling DevOps in...Serena Software
In this o-demand webcast Gary presents his recommendations from his new book “Starting and Scaling DevOps in the Enterprise”. Don't miss this Q&A section with Gary where he answers questions about how to implement his pragmatic ideas and techniques in your organization's DevOps Journey.
"Shift Left" is a DevOps practice that provides an effective means to perform testing with or in parallel to development activities.
When shifting left, development, test and operations work together to plan, manage and execute automated and continuous testing to accelerate feedback to developers and improve the quality of changes early in the life-cycle. The rate of the accelerated feedback is determined by an organization’s desired outcomes for velocity of changes and capacity for feedback.
Case Study: How The Home Depot Built Quality Into Software DevelopmentCA Technologies
This session will cover how The Home Depot built quality into its software development as it migrated from waterfall to agile delivery.
For more information on DevOps: Continuous Delivery, please visit: http://ow.ly/hAXz50g62ZM
Case Study: How The Home Depot Built Quality Into Software DevelopmentCA Technologies
This session will cover how The Home Depot built quality into its software development as it migrated from waterfall to agile delivery.
For more information on DevOps: Continuous Delivery, please visit: http://cainc.to/CAW17-CD
iTransform Mobile App - Powered by Mobiquest Solutions Pte. Ltd Rakesh Sabharwal
iTransform is targeted to cater for various enterprise processes such as
- Plant Operations & Maintenance
- Safety Checks
- Inspection Routines
- Field Operations and Service
iTransform Mobile App enables your business to paperless operations.itransform enables the plant operations or maintenance team to be more efficient in executing schedules and adhoc tasks or jobs. Key innovation is to enable the user the ability to adjust, fine tune and even create new electronic forms, so that the operations team will continuously improve without the need to have IT support. iTransform allows dynamic design of checklists and forms to be used as part of the planning, scheduling and execution of tasks. Dynamic Forms Module allows user to create forms, checklists and templates such as survey, check lists, Inspection routine, Safety Checks, Service Reports etc. iTransform mobile client application enhances operations with in-building maps to be used by the operators to navigate in tunnels, enclosed places, Underground Facilities and production plants without public communications infrastructure.
To “Ask for quote” or “Request for Proposal” to get this Gold Award winning app, click here:
http://www.mobiquest.net/itransformproposal.html
2012 URISA Track, How to Conduct Geographic Information Systems (GIS) Work wi...GIS in the Rockies
Quality Assurance / Quality Control (QA/QC) programs are implemented to ensure that project work is performed in a controlled manner and that reports and data products are high quality, documented, and accurate. Conducting work in a Geographic Information System (GIS) within a QA/QC framework of guidelines can be challenging as a result of the many strict requirements inherent to the QA/QC process. All aspects of creating, managing, editing, and analyzing geospatial databases can become more rigorous and nuanced. To perform GIS work effectively under QA/QC requires a clear understanding of the overall requirements, a plan to execute the work, a documentation process, and a high level of organization. This discussion will review lessons learned from performing GIS work, within a QA/QC program, for the nuclear power industry, and it will include information about implementing a QA/QC program for GIS, workflow considerations and documentation requirements, data organization, finding and obtaining data, and other key aspects.
A leading manufacturer of golf equipment selects MetricStream to strengthen supplier quality compliance through real-time monitoring of inspections and process capability.
Micro Focus DevOps Drive-in with Gary Gruver - Starting and Scaling DevOps in...Serena Software
In this o-demand webcast Gary presents his recommendations from his new book “Starting and Scaling DevOps in the Enterprise”. Don't miss this Q&A section with Gary where he answers questions about how to implement his pragmatic ideas and techniques in your organization's DevOps Journey.
"Shift Left" is a DevOps practice that provides an effective means to perform testing with or in parallel to development activities.
When shifting left, development, test and operations work together to plan, manage and execute automated and continuous testing to accelerate feedback to developers and improve the quality of changes early in the life-cycle. The rate of the accelerated feedback is determined by an organization’s desired outcomes for velocity of changes and capacity for feedback.
Similar to digiQC testimonial of solar companies (20)
1. About Company
XYZ Future Energies (XFE)
is part of XYZ Group and is
one of India's leading
Independent Power
Producer (IPP) with
operating plants in wind,
grid-connected solar, and
rooftop solar. XFE provides
clean power to industries,
businesses, educational
institutes, non-profits, and
governmental organizations. Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
2. Past Approach
Used Paper-based checklist
format for Quality control
conducted on site, these
checklists where scan on sent
and were sent to central quality
monitoring team for approval at
regular interval. This affected
the Project schedule and
sometimes can cause delay in
approval due to the process.
Also, the Paper based process
of quality control was not
environmentally friendly to
generate renewable energy.
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
3. Quality control conducted
through paper-based format on
site were require scanning and
sent to Quality control team for
approval.
This scanning of documents
takes engineer's valuable
productive time.
Also, the data was not sent
immediately as it sent at
regular interval and real time
monitoring was not possible.
Challenges
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
4. Quality procedure was
taking more time and was
affecting project schedule.
Maintaining hard copies on
site was difficult and it also
created issue to retrieve
quality data in case it was
required for quality analysis
and process improvement
No assurance of quality
control on-site as
documents do not have any
photographic proof of
actual inspection done on-
site.
Challenges
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
5. Spreadsheets were made
manually to maintain a
quality log on site which was
time-consuming
Quality teams were not able
to have full control of the
quality process as there
were multiple sites.
Challenges
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
6. After understanding the
process all the paper-
based checklists were
implemented in digiQC
through their easy
checklist upload process.
The contractor used a
request for information
(RFI) checklist with an
approval feature to inform
the site quality control
team for inspection.
digiQC Way
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
7. To ensure quality team visit
site checklists were set with
mandatory photograph
feature which was to be
taken from phone camera
only.
Quality control checklists
were configured with
approvers. As soon as
checklists are completed,
instant notification mail
were received. This reduced
time require for scanning
and delay in reporting.
digiQC Way
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
8. This approval mail has all the
details of quality control on site
with actual site photograph.
Once Approved or Redo,
instant notification is sent to
site team which again reduce
communication time require.
Due to Compulsory
photographs in checklists,
defect on-site was drastically
reduced & made inspector
conscious that they are being
watched remotely.
digiQC Way
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
9. Quality control data that was
captured on-site can also be
viewed on the digiQC web
module in form of a
dashboard, logs, and detail
report for deep analysis.
Due to the availability of data,
process improvement was
possible which further
increase the site workmanship
quality.
digiQC Way
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
10. Logs were automatically
created which eliminated
extra processes for site
engineers.
Smooth communication was
done between the site and
office team due to
transparency in quality data.
digiQC Way
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
11. Example
Our project mostly involve
installation of fabrication part
after civil work, this makes civil
work crucial and any deviation
from drawing will make
installation difficult. After
implementation of digiQC the
deviation was minimal, and
failure were eliminated. Also, the
schedule was achieved as plan
due to faster communication.
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality
12. Communication was faster
with increase in data
transparency
Process improvement made
it easier to handle multiple
projects remotely.
Quality failure reduce by
90%.
Time require to complete
the process reduced by
75%
Project delivery became
faster by 25%
Results
1.
2.
3.
4.
5.
Name - Mr. Saurabh Dubey
Designation - Deputy
Manager – Quality