The document provides a schedule for signal strength verification (SSV) testing to be conducted before and after the installation of 3G antennas at several sites in Surabaya, Malang, and Jember. It assigns engineers to conduct mobile testing at each site and lists the site IDs, types, names, locations, and engineers responsible. It notes the tests will involve idle lock and dedicated normal modes only with no static testing. Contact information is provided for personnel who can help with any site issues. Transportation is also requested to be arranged for both today and tomorrow's rounds of testing.