Scalability with MariaDB and 
MaxScale 
Colin Charles, Team MariaDB, MariaDB Corporation 
colin@mariadb.org | http://mariadb.org/ 
http://bytebot.net/blog/ | @bytebot on Twitter 
db tech showcase, Tokyo, Japan 
11 November 2014
whoami 
• Work on MariaDB at MariaDB Corporation (SkySQL Ab) 
• Merged with Monty Program Ab, makers of MariaDB 
• Formerly MySQL AB (exit: Sun Microsystems) 
• Past lives include Fedora Project (FESCO), OpenOffice.org
Global Top 20 sites 
1.Google 
2.Facebook 
3.YouTube 
4.Yahoo! 
5.Baidu 
6.Wikipedia 
7.QQ 
8.Taobao 
9.Twitter 
10.Live 
11.LinkedIn 
12.Sina 
13.Amazon 
14.hao123.com 
15.google.co.in 
16.blogspot 
17.weibo.com 
18.wordpress.com 
19.360.cn 
20.yandex.ru
MariaDB Introduction 
• Drop-in compatible MySQL replacement 
Available! 
TODAY! 
• Community developed, Foundation & Corporation backed, feature enhanced, 
backwards compatible, GPLv2 licensed 
• Steady stream of releases in 4 years 9 months: 5.1, 5.2, 5.3, 5.5, 10.0, 
MariaDB Galera Cluster 5.5, MariaDB Galera Cluster 10.0, MariaDB with 
TokuDB 5.5 
• MySQL Enterprise features made open: PAM authentication plugin, 
threadpool, audit plugin 
• Default in Red Hat Enterprise Linux, Fedora, openSUSE, SUSE Enterprise, etc.
InfiniDB 
• MariaDB Corporation has inherited assets of InfiniDB Corporation 
• Full support for InfiniDB, continued consulting & engineering work 
• Looking into integrating it with MariaDB Enterprise
MariaDB 5.2+ 
Virtual Columns 
• A column in a table that has its value automatically calculated either 
with a pre-calculated/deterministic expression or values of other 
fields in the table 
• VIRTUAL - computed on the fly when data is queried (like a VIEW) 
• PERSISTENT - computed when data is inserted and stored in a table
MariaDB 10.0+ 
PCRE Regular Expressions 
• Powerful REGEXP/RLIKE operator 
• New operators: 
• REGEXP_REPLACE(sub,pattern,replace) 
• REGEXP_INSTR(sub,pattern) 
• REGEXP_SUBSTR(sub,pattern) 
• Works with multi-byte character sets that MariaDB supports, including 
East-Asian sets
GIS 
• MariaDB implements a subset of SQL with Geometry Types 
• No longer just minimum bounding rectangles (MBR) - shapes 
considered 
CREATE TABLE geom (g GEOMETRY NOT NULL, SPATIAL 
INDEX(g)) ENGINE=MyISAM; 
• ST_ prefix - as per OpenGIS requirements 
MariaDB 5.3+
MariaDB 5.3+ 
Dynamic columns 
• Allows you to create virtual columns with dynamic content for each row in 
table. Store different attributes for each item (like a web store). 
• Basically a BLOB with handling functions: COLUMN_CREATE, 
COLUMN_ADD, COLUMN_GET, COLUMN_DELETE, COLUMN_EXISTS, 
COLUMN_LIST, COLUMN_CHECK, COLUMN_JSON 
• In MariaDB 10.0: name support (instead of referring to columns by numbers, 
name it), convert all dynamic column content to JSON array, interface with 
Cassandra 
INSERT INTO tbl SET 
dyncol_blob=COLUMN_CREATE("column_name", "value");
MariaDB 5.2+ 
Full-text search via SphinxSE 
mysql> INSTALL PLUGIN sphinx SONAME 'ha_sphinx.so'; 
Query OK, 0 rows affected (0.01 sec)
What is SphinxSE? 
• SphinxSE is just the storage engine that still depends on the Sphinx 
daemon 
• It doesn’t store any data itself 
• Its just a built-in client to allow MariaDB to talk to Sphinx searchd, 
run queries, obtain results 
• Indexing, searching is performed on Sphinx
Sphinx search table 
CREATE TABLE t1 
( 
id INTEGER UNSIGNED NOT NULL, 
weight INTEGER NOT NULL, 
query VARCHAR(3072) NOT NULL, 
group_id INTEGER, 
INDEX(query) 
) ENGINE=SPHINX CONNECTION="sphinx://localhost:9312/test"; 
! 
SELECT * FROM t1 WHERE query='test it;mode=any';
MariaDB 10.0+ 
Query Cassandra 
• Data is mapped: rowkey, static columns, dynamic columns 
• super columns aren’t supported 
• No 1-1 direct map for data types 
• Write to Cassandra from SQL (SELECT, INSERT, UPDATE, DELETE)
CONNECT 
• Target: ETL for BI or analytics 
• Import data from CSV, XML, ODBC, MS Access, etc. 
• WHERE conditions pushed to ODBC source 
• DROP TABLE just removes the stored definition, not data itself 
• “Virtual” tables cannot be indexed 
MariaDB 10.0+
SPIDER 
MariaDB 10.0+ 
• Horizontal partitioning, built on top of PARTITIONs 
• Associates a partition with a remote server 
• Transparent to user, easy to expand 
• Has index condition pushdown support enabled
TokuDB 
• Opensource - separate MariaDB 5.5+TokuDB/integrated in 10.0.5 
• Improved insert (10-20x faster) & query speed, compression (up to 
90% space reduction), replication performance and online schema 
flexibility 
• Uses Fractal Tree Indexes instead of B-Tree 
• Tests & builds of TokuDB on multiple platforms
Threadpool 
• Modified from 5.1 (libevent based), great for CPU bound 
loads and short running queries 
• Windows (threadpool), Linux (epoll), Solaris (event ports), 
FreeBSD/OSX (kevents) 
• No minimization of concurrent transactions with dynamic 
pool size 
• thread_handling=pool-of-threads 
• https://mariadb.com/kb/en/thread-pool-in-mariadb-55/ 
MariaDB 5.5+
PAM Authentication 
• Authentication using /etc/shadow 
• Authentication using LDAP, SSH pass phrases, password expiration, 
username mapping, logging every login attempt, etc. 
• INSTALL PLUGIN pam SONAME ‘auth_pam.so’; 
• CREATE USER foo@host IDENTIFIED via pam 
• Remember to configure PAM (/etc/pam.d or /etc/pam.conf) 
• http://www.mysqlperformanceblog.com/2013/02/24/using-two-factor-authentication- 
with-percona-server/ 
MariaDB 5.2+
MariaDB 5.5+ 
SQL Error Logging Plugin 
• Log errors sent to clients in a log file that can be analysed later. Log 
file can be rotated (recommended) 
• a MYSQL_AUDIT_PLUGIN 
install plugin SQL_ERROR_LOG soname 'sql_errlog.so';
Audit Plugin 
• Log server activity - who connects to the server, what queries run, 
what tables touched - rotating log file or syslogd 
• a MYSQL_AUDIT_PLUGIN 
INSTALL PLUGIN server_audit SONAME 
‘server_audit.so’; 
MariaDB 10.0+
Group commit in MariaDB 10 
• Remove commit in slow part of InnoDB commit (stage 4 - third 
fsync()) 
• Reduce cost of crash-safe binlog 
• A binlog checkpoint is a point in the binlog where no crash 
recovery is needed before it. In InnoDB you wait for flush + fsync 
its redo log for commit
crash-safe binlog 
• MariaDB 5.5 checkpoints after every commit —> quite expensive! 
• 5.5/5.6 stalls commits around binlog rotate, waiting for all prepared 
transactions to commit (since crash recovery can only scan latest 
binlog file)
crash-safe binlog 10.0 
• 10.0 makes binlog checkpoints asynchronous 
• A binlog can have no checkpoints at all 
• Ability to scan multiple binlogs during crash recovery 
• Remove stalls around binlog rotates
Slow fsync()
Fast fsync()
10.0 vs 5.6 group commit
Extensions to the SE API 
• prepare() - write prepared trx in parallel w/group commit 
• prepare_ordered() - called serially, in commit order 
• commit_ordered() - called serially, in commit order; fast commit 
to memory 
• commit() - commit to disk in parallel, w/group commit
group commit in 10.1 
• Tricky locking issues hard to change without getting deadlocks sometimes 
• mysql#68251, mysql#68569 
• New code? Binlog rotate in background thread (further reducing stalls). Split 
transactions across binlogs, so big transactions do not lead to big binlog files 
• Enhanced semi-sync replication (wait for slave before commit on the master 
rather than after commit)
START TRANSACTION WITH CONSISTENT SNAPSHOT 
• START TRANSACTION WITH CONSISTENT SNAPSHOT 
• mysqldump —single-transaction —master-data - full non-blocking 
backup 
• No need for FLUSH TABLES WITH READ LOCK 
• No stalls for long running queries 
• Consistent snapshot sees all of a transaction, or nothing, also for multi-engine 
transactions.
Multi-source replication 
• Multi-source replication - (real-time) analytics, shard provisioning, 
backups, etc. 
• @@default_master_connection contains current connection 
name (used if connection name is not given) 
• All master/slave commands take a connection name now (like 
CHANGE MASTER “connection_name”, SHOW SLAVE 
“connection_name” STATUS, etc.)
Global Transaction ID (GTID) 
• Supports multi-source replication 
• GTID can be enabled or disabled independently and online for masters or slaves 
• Slaves using GTID do not have to have binary logging enabled. 
• Supports multiple replication domains (independent binlog streams) 
• Queries in different domains can be run in parallel on the slave. 
• Simpler, more robust design compared to MySQL 5.6
Automatic binlog position for master failover 
• On Server2: CHANGE MASTER TO master_host=’server2’, master_use_gtid=1;
Why different GTID compared to 5.6? 
• MySQL 5.6 GTID does not support multi-source replication 
• Supports —log-slave-updates=0 for efficiency 
• Enabled by default, with self-healing capabilities
Binlog (size matters!) 
• Example query: INSERT INTO t1 VALUES (10, “foo”); 
• MySQL 5.6… 265 bytes 
• MariaDB 10.0… 161 bytes 
• Do you want a 60% larger binlog size?
Crash-safe slave (w/InnoDB DML) 
• Replace non-transactional file relay_log.info with transactional 
mysql.rpl_slave_state 
• Changes to rpl_slave_state are transactionally recovered after 
crash along with user data.
Replication domains 
• Keep central concept that replication is just applying events in-order from a 
serial binlog stream. 
• Allow multi-source replication with multiple active masters 
• Let’s the DBA configure multiple independent binlog streams (one per active 
master: mysqld --git-domain-id=#) 
• Events within one stream are ordered the same across entire replication topology 
• Events between different streams can be in different order on different servers 
• Binlog position is one ID per replication domain
Parallel replication 
• Multi-source replication from different masters executed in parallel 
• Queries from different domains are executed in parallel 
• Queries that are run in parallel on the master are run in parallel on 
the slave (based on group commit). 
• Transactions modifying the same table can be updated in parallel 
on the slave! 
• Supports both statement based and row based replication.
MariaDB 5.3+ 
New KILL syntax 
• HARD | SOFT & USER USERNAME are MariaDB-specific (5.3.2) 
• KILL QUERY ID query_id (10.0.5) - kill by query id, rather than thread id 
• SOFT ensures things that may leave a table in an inconsistent state 
aren’t interrupted (like REPAIR or INDEX creation for MyISAM or Aria) 
KILL [HARD | SOFT] [CONNECTION | QUERY] [thread_id | 
USER user_name]
Statistics 
MariaDB 5.2+ 
• Understand server activity better to understand database loads 
• SET GLOBAL userstat=1; 
• SHOW CLIENT_STATISTICS; SHOW USER_STATISTICS; 
• # of connections, CPU usage, bytes received/sent, row statistics 
• SHOW INDEX_STATISTICS; SHOW TABLE_STATISTICS; 
• # rows read, changed, indexes 
MariaDB 10.0+ 
• INFORMATION_SCHEMA.PROCESSLIST has MEMORY_USAGE, EXAMINED_ROWS 
(similar with SHOW STATUS output)
MariaDB 10.0+ 
EXPLAIN enhanced 
• Explain analyser: https://mariadb.org/explain_analyzer/analyze/ 
• SHOW EXPLAIN for <thread_id> 
• EXPLAIN output in the slow query log 
• EXPLAIN not just for SELECT but INSERT/UPDATE/DELETE
Roles 
MariaDB 10.0+ 
• Bundles users together, with similar privileges - follows the SQL 
standard 
CREATE ROLE audit_bean_counters; 
GRANT SELECT ON accounts.* to audit_bean_counters; 
GRANT audit_bean_counters to ceo;
FusionIO 
MariaDB 10.0+ 
• If you have nvmfs (formerly DirectFS), you can disable the 
innodb_doublewrite buffer 
• page level compression in background threads (reduces I/O, saves 
the life of your device)
What else is there 
• Engines: Aria, OQGRAPH, FederatedX 
• Segmented MyISAM keycaches 
• Progress reporting for ALTER/LOAD DATA INFILE 
• Table Elimination 
• HandlerSocket 
• SHUTDOWN functionality 
• And a lot more….
Connectors 
• The MariaDB project provides LGPL connectors (client libraries) for: 
• C 
• Java 
• ODBC 
• Embedding a connector? Makes sense to use these LGPL licensed 
ones…
MariaDB Galera Cluster 
• MariaDB Galera Cluster is made for today’s cloud based 
environments. It is fully read-write scalable, comes with synchronous 
replication, allows multi-master topologies, and guarantees no lag or 
lost transactions. 
• 5.5 or 10.0 based 
• We’ve seen migrations from Oracle RAC to MariaDB Galera Cluster 
— look for a case study by Greetz as an example
MariaDB MaxScale 
• “Pluggable router” that offers connection & statement based routing 
for load balancing, query rewriting, filtering, etc. (full regex support) 
• Simplifies complex replication schemes for massive scale, high 
availability, manages performance with logging, safeguards data 
through firewall filtering, connects diverse clients and databases 
with multiple protocols, query transformations. 
• MaxScale as binlog server @ Booking - to replace intermediate 
masters (downloads binlog from master, saves to disk, serves to 
slave as if served from master)
MariaDB MaxScale 
• Extensible thru filters (which you can write) 
• Current admin interface: CLI-based 
• Release Candidate now, expected to go GA 
by January 2015 
• Binlog Streaming Server — register for the 
special build! 
Routing 
Filter/Log 
Client Protocol 
Message Core 
& 
State 
Machine 
Server Protocol 
.log
Trusted by many 
• Google 
• Wikipedia 
• Tumblr 
• SpamExperts 
• Limelight Networks 
• KakaoTalk 
• Paybox Services
Quality matters 
• security@mariadb.org is now commonly on CC when it comes to 
MySQL bugs 
• Selective (not blind) merging 
• Tests (mysql-test/) 
• MySQL 5.5: 2,466 
• MySQL 5.6: 3,603 
• MariaDB 10.0: 3,812
Well supported 
• Everyone whom supports MySQL tends to support MariaDB 
• MariaDB Corporation, Percona, FromDual, etc. 
• Some PaaS services (like Jelastic) support it 
• Many web hosting companies 
• Rackspace Cloud 
• Oracle Enterprise Linux 7 
• All GA releases supported for 5 years from release
Going forward 
• column level & block level encryption (Eperi, Google - InnoDB, Aria) 
• Kerberos authentication plugin 
• Full 5.6 compatibility + 5.7 features (so syntax will match for 
duplicated functionality) 
• Integrate mroonga 
• More work on POWER8 (with IBM)
https://mariadb.com/kb/en/
Resources 
• We moved to github! https://github.com/MariaDB/server 
• We’re still on launchpad for older branches: https://launchpad.net/maria 
• maria-discuss@lists.launchpad.net 
• maria-developers@lists.launchpad.net 
• #maria on freenode 
• facebook.com/MariaDB.dbms 
• @mariadb / +MariaDB
Books! 
1. MariaDB Crash Course, Ben Forta (September 2011) 
2. Getting Started with MariaDB, Daniel Bartholomew (October 2013) 
3. MariaDB Cookbook, Daniel Bartholomew (March 2014) 
4. Building a Web Application with PHP & MariaDB: A Reference Guide, Sai Srinivas 
Sriparasa (June 2014) 
5. MariaDB: Beginners Guide, Rodrigo Ribeiro (August 2014) 
6. Mastering MariaDB, Federico Razzioli (September 2014) 
7. MariaDB High Performance, Pierre Mavro (September 2014)
Q&A 
colin@mariadb.org | byte@bytebot.net 
http://skysql.com/ | http://mariadb.org/ 
twitter: @bytebot | url: http://bytebot.net/blog/

[db tech showcase Tokyo 2014] B15: Scalability with MariaDB and MaxScale by MariaDB Corporation Colin Charles

  • 1.
    Scalability with MariaDBand MaxScale Colin Charles, Team MariaDB, MariaDB Corporation colin@mariadb.org | http://mariadb.org/ http://bytebot.net/blog/ | @bytebot on Twitter db tech showcase, Tokyo, Japan 11 November 2014
  • 2.
    whoami • Workon MariaDB at MariaDB Corporation (SkySQL Ab) • Merged with Monty Program Ab, makers of MariaDB • Formerly MySQL AB (exit: Sun Microsystems) • Past lives include Fedora Project (FESCO), OpenOffice.org
  • 3.
    Global Top 20sites 1.Google 2.Facebook 3.YouTube 4.Yahoo! 5.Baidu 6.Wikipedia 7.QQ 8.Taobao 9.Twitter 10.Live 11.LinkedIn 12.Sina 13.Amazon 14.hao123.com 15.google.co.in 16.blogspot 17.weibo.com 18.wordpress.com 19.360.cn 20.yandex.ru
  • 4.
    MariaDB Introduction •Drop-in compatible MySQL replacement Available! TODAY! • Community developed, Foundation & Corporation backed, feature enhanced, backwards compatible, GPLv2 licensed • Steady stream of releases in 4 years 9 months: 5.1, 5.2, 5.3, 5.5, 10.0, MariaDB Galera Cluster 5.5, MariaDB Galera Cluster 10.0, MariaDB with TokuDB 5.5 • MySQL Enterprise features made open: PAM authentication plugin, threadpool, audit plugin • Default in Red Hat Enterprise Linux, Fedora, openSUSE, SUSE Enterprise, etc.
  • 5.
    InfiniDB • MariaDBCorporation has inherited assets of InfiniDB Corporation • Full support for InfiniDB, continued consulting & engineering work • Looking into integrating it with MariaDB Enterprise
  • 8.
    MariaDB 5.2+ VirtualColumns • A column in a table that has its value automatically calculated either with a pre-calculated/deterministic expression or values of other fields in the table • VIRTUAL - computed on the fly when data is queried (like a VIEW) • PERSISTENT - computed when data is inserted and stored in a table
  • 9.
    MariaDB 10.0+ PCRERegular Expressions • Powerful REGEXP/RLIKE operator • New operators: • REGEXP_REPLACE(sub,pattern,replace) • REGEXP_INSTR(sub,pattern) • REGEXP_SUBSTR(sub,pattern) • Works with multi-byte character sets that MariaDB supports, including East-Asian sets
  • 10.
    GIS • MariaDBimplements a subset of SQL with Geometry Types • No longer just minimum bounding rectangles (MBR) - shapes considered CREATE TABLE geom (g GEOMETRY NOT NULL, SPATIAL INDEX(g)) ENGINE=MyISAM; • ST_ prefix - as per OpenGIS requirements MariaDB 5.3+
  • 11.
    MariaDB 5.3+ Dynamiccolumns • Allows you to create virtual columns with dynamic content for each row in table. Store different attributes for each item (like a web store). • Basically a BLOB with handling functions: COLUMN_CREATE, COLUMN_ADD, COLUMN_GET, COLUMN_DELETE, COLUMN_EXISTS, COLUMN_LIST, COLUMN_CHECK, COLUMN_JSON • In MariaDB 10.0: name support (instead of referring to columns by numbers, name it), convert all dynamic column content to JSON array, interface with Cassandra INSERT INTO tbl SET dyncol_blob=COLUMN_CREATE("column_name", "value");
  • 12.
    MariaDB 5.2+ Full-textsearch via SphinxSE mysql> INSTALL PLUGIN sphinx SONAME 'ha_sphinx.so'; Query OK, 0 rows affected (0.01 sec)
  • 13.
    What is SphinxSE? • SphinxSE is just the storage engine that still depends on the Sphinx daemon • It doesn’t store any data itself • Its just a built-in client to allow MariaDB to talk to Sphinx searchd, run queries, obtain results • Indexing, searching is performed on Sphinx
  • 14.
    Sphinx search table CREATE TABLE t1 ( id INTEGER UNSIGNED NOT NULL, weight INTEGER NOT NULL, query VARCHAR(3072) NOT NULL, group_id INTEGER, INDEX(query) ) ENGINE=SPHINX CONNECTION="sphinx://localhost:9312/test"; ! SELECT * FROM t1 WHERE query='test it;mode=any';
  • 15.
    MariaDB 10.0+ QueryCassandra • Data is mapped: rowkey, static columns, dynamic columns • super columns aren’t supported • No 1-1 direct map for data types • Write to Cassandra from SQL (SELECT, INSERT, UPDATE, DELETE)
  • 16.
    CONNECT • Target:ETL for BI or analytics • Import data from CSV, XML, ODBC, MS Access, etc. • WHERE conditions pushed to ODBC source • DROP TABLE just removes the stored definition, not data itself • “Virtual” tables cannot be indexed MariaDB 10.0+
  • 17.
    SPIDER MariaDB 10.0+ • Horizontal partitioning, built on top of PARTITIONs • Associates a partition with a remote server • Transparent to user, easy to expand • Has index condition pushdown support enabled
  • 18.
    TokuDB • Opensource- separate MariaDB 5.5+TokuDB/integrated in 10.0.5 • Improved insert (10-20x faster) & query speed, compression (up to 90% space reduction), replication performance and online schema flexibility • Uses Fractal Tree Indexes instead of B-Tree • Tests & builds of TokuDB on multiple platforms
  • 19.
    Threadpool • Modifiedfrom 5.1 (libevent based), great for CPU bound loads and short running queries • Windows (threadpool), Linux (epoll), Solaris (event ports), FreeBSD/OSX (kevents) • No minimization of concurrent transactions with dynamic pool size • thread_handling=pool-of-threads • https://mariadb.com/kb/en/thread-pool-in-mariadb-55/ MariaDB 5.5+
  • 20.
    PAM Authentication •Authentication using /etc/shadow • Authentication using LDAP, SSH pass phrases, password expiration, username mapping, logging every login attempt, etc. • INSTALL PLUGIN pam SONAME ‘auth_pam.so’; • CREATE USER foo@host IDENTIFIED via pam • Remember to configure PAM (/etc/pam.d or /etc/pam.conf) • http://www.mysqlperformanceblog.com/2013/02/24/using-two-factor-authentication- with-percona-server/ MariaDB 5.2+
  • 21.
    MariaDB 5.5+ SQLError Logging Plugin • Log errors sent to clients in a log file that can be analysed later. Log file can be rotated (recommended) • a MYSQL_AUDIT_PLUGIN install plugin SQL_ERROR_LOG soname 'sql_errlog.so';
  • 22.
    Audit Plugin •Log server activity - who connects to the server, what queries run, what tables touched - rotating log file or syslogd • a MYSQL_AUDIT_PLUGIN INSTALL PLUGIN server_audit SONAME ‘server_audit.so’; MariaDB 10.0+
  • 23.
    Group commit inMariaDB 10 • Remove commit in slow part of InnoDB commit (stage 4 - third fsync()) • Reduce cost of crash-safe binlog • A binlog checkpoint is a point in the binlog where no crash recovery is needed before it. In InnoDB you wait for flush + fsync its redo log for commit
  • 24.
    crash-safe binlog •MariaDB 5.5 checkpoints after every commit —> quite expensive! • 5.5/5.6 stalls commits around binlog rotate, waiting for all prepared transactions to commit (since crash recovery can only scan latest binlog file)
  • 25.
    crash-safe binlog 10.0 • 10.0 makes binlog checkpoints asynchronous • A binlog can have no checkpoints at all • Ability to scan multiple binlogs during crash recovery • Remove stalls around binlog rotates
  • 26.
  • 27.
  • 28.
    10.0 vs 5.6group commit
  • 29.
    Extensions to theSE API • prepare() - write prepared trx in parallel w/group commit • prepare_ordered() - called serially, in commit order • commit_ordered() - called serially, in commit order; fast commit to memory • commit() - commit to disk in parallel, w/group commit
  • 30.
    group commit in10.1 • Tricky locking issues hard to change without getting deadlocks sometimes • mysql#68251, mysql#68569 • New code? Binlog rotate in background thread (further reducing stalls). Split transactions across binlogs, so big transactions do not lead to big binlog files • Enhanced semi-sync replication (wait for slave before commit on the master rather than after commit)
  • 31.
    START TRANSACTION WITHCONSISTENT SNAPSHOT • START TRANSACTION WITH CONSISTENT SNAPSHOT • mysqldump —single-transaction —master-data - full non-blocking backup • No need for FLUSH TABLES WITH READ LOCK • No stalls for long running queries • Consistent snapshot sees all of a transaction, or nothing, also for multi-engine transactions.
  • 32.
    Multi-source replication •Multi-source replication - (real-time) analytics, shard provisioning, backups, etc. • @@default_master_connection contains current connection name (used if connection name is not given) • All master/slave commands take a connection name now (like CHANGE MASTER “connection_name”, SHOW SLAVE “connection_name” STATUS, etc.)
  • 33.
    Global Transaction ID(GTID) • Supports multi-source replication • GTID can be enabled or disabled independently and online for masters or slaves • Slaves using GTID do not have to have binary logging enabled. • Supports multiple replication domains (independent binlog streams) • Queries in different domains can be run in parallel on the slave. • Simpler, more robust design compared to MySQL 5.6
  • 34.
    Automatic binlog positionfor master failover • On Server2: CHANGE MASTER TO master_host=’server2’, master_use_gtid=1;
  • 35.
    Why different GTIDcompared to 5.6? • MySQL 5.6 GTID does not support multi-source replication • Supports —log-slave-updates=0 for efficiency • Enabled by default, with self-healing capabilities
  • 36.
    Binlog (size matters!) • Example query: INSERT INTO t1 VALUES (10, “foo”); • MySQL 5.6… 265 bytes • MariaDB 10.0… 161 bytes • Do you want a 60% larger binlog size?
  • 37.
    Crash-safe slave (w/InnoDBDML) • Replace non-transactional file relay_log.info with transactional mysql.rpl_slave_state • Changes to rpl_slave_state are transactionally recovered after crash along with user data.
  • 38.
    Replication domains •Keep central concept that replication is just applying events in-order from a serial binlog stream. • Allow multi-source replication with multiple active masters • Let’s the DBA configure multiple independent binlog streams (one per active master: mysqld --git-domain-id=#) • Events within one stream are ordered the same across entire replication topology • Events between different streams can be in different order on different servers • Binlog position is one ID per replication domain
  • 40.
    Parallel replication •Multi-source replication from different masters executed in parallel • Queries from different domains are executed in parallel • Queries that are run in parallel on the master are run in parallel on the slave (based on group commit). • Transactions modifying the same table can be updated in parallel on the slave! • Supports both statement based and row based replication.
  • 41.
    MariaDB 5.3+ NewKILL syntax • HARD | SOFT & USER USERNAME are MariaDB-specific (5.3.2) • KILL QUERY ID query_id (10.0.5) - kill by query id, rather than thread id • SOFT ensures things that may leave a table in an inconsistent state aren’t interrupted (like REPAIR or INDEX creation for MyISAM or Aria) KILL [HARD | SOFT] [CONNECTION | QUERY] [thread_id | USER user_name]
  • 42.
    Statistics MariaDB 5.2+ • Understand server activity better to understand database loads • SET GLOBAL userstat=1; • SHOW CLIENT_STATISTICS; SHOW USER_STATISTICS; • # of connections, CPU usage, bytes received/sent, row statistics • SHOW INDEX_STATISTICS; SHOW TABLE_STATISTICS; • # rows read, changed, indexes MariaDB 10.0+ • INFORMATION_SCHEMA.PROCESSLIST has MEMORY_USAGE, EXAMINED_ROWS (similar with SHOW STATUS output)
  • 43.
    MariaDB 10.0+ EXPLAINenhanced • Explain analyser: https://mariadb.org/explain_analyzer/analyze/ • SHOW EXPLAIN for <thread_id> • EXPLAIN output in the slow query log • EXPLAIN not just for SELECT but INSERT/UPDATE/DELETE
  • 44.
    Roles MariaDB 10.0+ • Bundles users together, with similar privileges - follows the SQL standard CREATE ROLE audit_bean_counters; GRANT SELECT ON accounts.* to audit_bean_counters; GRANT audit_bean_counters to ceo;
  • 45.
    FusionIO MariaDB 10.0+ • If you have nvmfs (formerly DirectFS), you can disable the innodb_doublewrite buffer • page level compression in background threads (reduces I/O, saves the life of your device)
  • 46.
    What else isthere • Engines: Aria, OQGRAPH, FederatedX • Segmented MyISAM keycaches • Progress reporting for ALTER/LOAD DATA INFILE • Table Elimination • HandlerSocket • SHUTDOWN functionality • And a lot more….
  • 47.
    Connectors • TheMariaDB project provides LGPL connectors (client libraries) for: • C • Java • ODBC • Embedding a connector? Makes sense to use these LGPL licensed ones…
  • 48.
    MariaDB Galera Cluster • MariaDB Galera Cluster is made for today’s cloud based environments. It is fully read-write scalable, comes with synchronous replication, allows multi-master topologies, and guarantees no lag or lost transactions. • 5.5 or 10.0 based • We’ve seen migrations from Oracle RAC to MariaDB Galera Cluster — look for a case study by Greetz as an example
  • 49.
    MariaDB MaxScale •“Pluggable router” that offers connection & statement based routing for load balancing, query rewriting, filtering, etc. (full regex support) • Simplifies complex replication schemes for massive scale, high availability, manages performance with logging, safeguards data through firewall filtering, connects diverse clients and databases with multiple protocols, query transformations. • MaxScale as binlog server @ Booking - to replace intermediate masters (downloads binlog from master, saves to disk, serves to slave as if served from master)
  • 50.
    MariaDB MaxScale •Extensible thru filters (which you can write) • Current admin interface: CLI-based • Release Candidate now, expected to go GA by January 2015 • Binlog Streaming Server — register for the special build! Routing Filter/Log Client Protocol Message Core & State Machine Server Protocol .log
  • 51.
    Trusted by many • Google • Wikipedia • Tumblr • SpamExperts • Limelight Networks • KakaoTalk • Paybox Services
  • 52.
    Quality matters •security@mariadb.org is now commonly on CC when it comes to MySQL bugs • Selective (not blind) merging • Tests (mysql-test/) • MySQL 5.5: 2,466 • MySQL 5.6: 3,603 • MariaDB 10.0: 3,812
  • 53.
    Well supported •Everyone whom supports MySQL tends to support MariaDB • MariaDB Corporation, Percona, FromDual, etc. • Some PaaS services (like Jelastic) support it • Many web hosting companies • Rackspace Cloud • Oracle Enterprise Linux 7 • All GA releases supported for 5 years from release
  • 54.
    Going forward •column level & block level encryption (Eperi, Google - InnoDB, Aria) • Kerberos authentication plugin • Full 5.6 compatibility + 5.7 features (so syntax will match for duplicated functionality) • Integrate mroonga • More work on POWER8 (with IBM)
  • 55.
  • 56.
    Resources • Wemoved to github! https://github.com/MariaDB/server • We’re still on launchpad for older branches: https://launchpad.net/maria • maria-discuss@lists.launchpad.net • maria-developers@lists.launchpad.net • #maria on freenode • facebook.com/MariaDB.dbms • @mariadb / +MariaDB
  • 57.
    Books! 1. MariaDBCrash Course, Ben Forta (September 2011) 2. Getting Started with MariaDB, Daniel Bartholomew (October 2013) 3. MariaDB Cookbook, Daniel Bartholomew (March 2014) 4. Building a Web Application with PHP & MariaDB: A Reference Guide, Sai Srinivas Sriparasa (June 2014) 5. MariaDB: Beginners Guide, Rodrigo Ribeiro (August 2014) 6. Mastering MariaDB, Federico Razzioli (September 2014) 7. MariaDB High Performance, Pierre Mavro (September 2014)
  • 58.
    Q&A colin@mariadb.org |byte@bytebot.net http://skysql.com/ | http://mariadb.org/ twitter: @bytebot | url: http://bytebot.net/blog/