Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Ibrar Hussain CV

179 views

Published on

  • Be the first to comment

  • Be the first to like this

Ibrar Hussain CV

  1. 1. IBRAR HUSSAIN Contact Information Personal Information ibrar.hussain143@gmail.com Birth Date: 1 November 1988 +92331.8654667 Pakistan +966538934890 Saudi Arabia Gender: Male House No 361 Street No 9 Upper Colony CNIC NO: 33302-5263191-5 Pir Mahal (Punjab) Pakistan Passport No: GQ681912 Driving License, No: 2382402218 Issued From: Saudi Arabia Driving License: 28243 Driving License Issued From: Pakistan SEDER Telecom Saudi Arabia (Huawei Saudi Telecommunication company) operation and maintenance As a Field Maintenance Engineer (FME) 1st March 2015 to till now Managing and Supervising of O&M level-1 on Call and Preventive Maintenance / Corrective Maintenance activities and Environment related issues • Huawei BTS 3012, 3812 and 3900L maintenance and commission. • Working Huawei Microwave maintenance and commission. • Complete working ZTE Microwave maintenance and commission. • Complete working External alarm. • Complete working Huawei ATN 905 and 910 • Complete working Huawei 2G, 3G and LTE 4G Technology’s Field Responsibility Preventive Maintenance / Corrective Maintenance, Troubleshooting, commission and installation Huawei Microwave and BTS Egyptian Pakistan Telecommunications Service Company (ERICSSION) Project as Senior Team Lead 1st January 2014 to 25th August 2014 • Ericsson RBS 6000 Family O&M and installations • Ericsson RBS alarm O&M and installations • Ericsson power system O&M • Working and Troubleshooting NEC microwave • Re commission NEC Microwave • Re commission Alcatel BTS • Work experience on Motorola and Acatle Terminals and HUAWEI OFJAN NMS Cable laying & routing. Mobiserve Pakistan (Mobilink Project) as Senior Technician February 2013 December 2013 • Engineering staff in region, and responsible for Maintaining the Network availability targets, resolving complex hardware / software problems that affect the network performance. Handling microwave links related issues Involving Electrical issues and Grounding problems by using earth tester. Troubleshooting of down sites, MTL, XBL & ML outage of BSC & RXCDR. Repairing of site from one BSC another. Replacement
  2. 2. of
  3. 3. SUMA cards, combiner and TRE’s. Making all types of connector. Cut over of BSC and RXCDR. • Ericsson RBS 6101 Installation • Ericsson RBS alarm installation • Ericsson power system • Working and Troubleshooting NEC microwave • Re commission NEC Microwave • Re commission Alcatel BTS Tawoos Power and Telecommunications LLC Oman (As Team lead) April 2010 - December 2012 • Complete installation Huawei BTS 3900 2G, 3G and LTE • Huawei rectifier installation • Fiber trunk and cpri cable and patch panel • Install Remote Radio unit (RRU) • Working on huawei’s equipments for Masan and other indoor equipment. • Working on huawei IP core equipment for Oman mobile broad band network. • Leading the Huawei Node B BTS3900 Installation Team. • Performing the Acceptance Test (AT)/Power measurements and VSWR Check. • Indoor BTS cabling, RF caballing, Power connections, Battery Connection, Jumper connection, Grounding connection, & preparing Connectors. • Planning and supervision of site work which includes Shelter • Installation, DG foundation, BTS and Microwave Installation • WiMAX swap. General Systems (ZONG project) as Senior Team lead May 2009 - April 2010 • Complete working and Troubleshooting ZTE BTS ZX10 and SDR • ERICSSON microwave. Installs Power system ATS ACDB BOOX and Genset. Install and complete working ZTE Rectifier • Troubleshooting DG TELECOM MICROWAVE • Replace and Re Configuration DG TELECOM MICROWAVE Electronics Traders for (Mobilink Project) as Team Lead April 2004 - May 2009 • Engineering staff in region, and responsible for Maintaining the Network availability targets, resolving complex hardware / software problems that affect the network performance. Handling microwave links related issues Involving Electrical issues and Grounding problems by using earth tester. Troubleshooting of down sites, MTL, XBL & ML outage of BSC & RXCDR. Repairing of site from one BSC another. Replacement of SUMA cards, combiner and TRE’s. Making all types of connector. Cut over of BSC and RXCDR. • Working and Troubleshooting NEC microwave • Re commission NEC Microwave • seeing connectivity of site and BSC Ater Mux’s. Education Diploma, Electrical Diploma in Electrical Completion Date: June 2005 Metric At Govt High School Pir Mahal Completion Date: June 2002

×