SlideShare a Scribd company logo
CURRICULUM VITAE
QMS/HRD-FORM/15 1 of 5
Evi Puspasari Nurfalah, B.Eng.
Position Assigned : Project Coordinator
Task Assigned : Geotechnical Engineer
Area of Expertise : Geotechnical, Geology, Civil Infrastructure
Citizenship : Indonesia
Employment Status : Permanent
Membership of Professional Society : - Indonesian Association of Geologist (IAGI)
- Masyarakat Geologi Ekonomi Indonesia (MGEI)
SUMMARY OF EXPERIENCES
Evi has been working as a Geotechnical Engineer for approximately two years. Previously she has
been working with PT Cokal and PT Sugico as Wellsite Geologist and Geotechnical Engineer for
approximately one year. She is capable working with Map-info, Geo-SlopeW and Slide software.
She has experienced in geotechnical, geology, drilling supervising; hydrogeological and geotechnical
drilling, civil infrastructure, and quality control for Feasibility Study Report. She has been involved in
numerous projects related to mining; coal and mineral; civil infrastructure, in Indonesia.
EDUCATION
2011 : Bachelor Degree, Geological Engineering, 2006
Padjajaran University
TECHNICAL SKILL
Geotechnical
Engineering
: - Doing SPT
- Rock and Soil Logging
- Sampling Disturbed and Undisturbed Sample
- Statistic Data
- Analysis Bearing Capacity and Ground Pressure
- Analysis Excavatability and Rippability
Geological
Engineering
: - Geological engineering mapping and skilled in utilizing GPS
- Wellsite
- Paleontology and Petrography
Computer Software : - MapInfo (intermediate)
- Geo-SlopeW (intermediate)
- Slide (Beginner)
- CAD (Beginner)
- MS office; Word, Excel, Power Point, Visio (advance)
- Adobe Photoshop; CorelDraw (intermediate)
CURRICULUM VITAE
QMS/HRD-FORM/15 2 of 5
TRAINING
2014 : Training In House - Minescape software
PT Quantus Consultants Indonesia - Jakarta, Indonesia
September, 2014 : Geotechnical Workshop
PERHAPI - Bandung, Indonesia
2014 : Training In House - Gencom Minex software
PT Quantus Consultants Indonesia - Jakarta, Indonesia
2012 : Training In House - Gencom Minex software
PT Cokal - Central Kalimantan, Indonesia
2011 : Geotechnical for Mining
Himpunan Mahasiswa Geologi (HMG) UNPAD with PT Aneka Tambang
West Java, Indonesia
2009 : Workshop “Applied Geotechnical Aspect for Open Pit Mine” and Training
Geo-SlopeW software
Himpunan Mahasiswa Geologi (HMG) UNPAD with PT Arutmin
West Java, Indonesia
2009 : Introduction Statistic for Mineral Deposits
Himpunan Mahasiswa Geologi (HMG) UNPAD
West Java, Indonesia
2008 : Porphyry Cu-Au Deposits
Society of Economic Geologist (SEG) of UNPAD and MGEI
West Java, Indonesia
2008 : The Discovery History of the Giant Oyu Tolgio Copper Gold Porphyry
Deposits
Society of Economic Geologist (SEG) of UNPAD and MGEI
West Java, indonesia
2008 : Magmatic to Hydrothermal Transition
Society of Economic Geologist (SEG) of UNPAD and MGEI
West Java, indonesia
2008 : Diatreme Breccias, Textures, Processes, and Mineralization
Society of Economic Geologist (SEG) of UNPAD and MGEI
West Java, indonesia
2007 : Sekuen Stratigrafi Pegunungan Selatan
Department of Energy and Mineral Resources, Central Survey Geology
West Java, Indonesia
EMPLOYMENT RECORD
March 2013 -
Present
: PT. Quantus Consultants Indonesia
Geotechnical Engineer
November 2011 -
2012
: PT. Cokal
Wellsite - Geologist
August - November
2011
: PT. Sugico
Geotechnical Engineer
CURRICULUM VITAE
QMS/HRD-FORM/15 3 of 5
PROJECT EXPERIENCES – GEOTECHNICAL ENGINEERING
Tanah Bumbu
South Kalimantan,
Indonesia
2014
: Geotechnical Study of IUP PT. Sungai Danau Jaya. The objective was to
investigate how the safety slope stability for the pit design. My
responsibility is supervising geotechnical drilling including soil and rock
logging, core sampling, Undisturbed sampling, collect and input the field
data, analysis data and reporting. Such project, my responsibility also as
team leader and project coordinator.
PT PLN Batubara
Seko Besar, Pauh,
Jambi, Indonesia
2014
: Geotechnical and Hydrogeological Study of IUP PT. Mahakarya Abadi
Prima. The objective was to investigate how the safety slope stability for
the pit design. My responsibility is collecting and input the field data,
analysis data and quality control for reporting. In this project, my
responsibility also as project coordinator.
PT PLN Batubara
Lubuk Napal, Pauh,
Jambi, Indonesia
2014
: Geotechnical and Hydrogeological Study of IUP PT. Bangun Persada
Jambi Energi. The objective was to investigate how the safety slope
stability for the pit design. My responsibility is supervising geotechnical
drilling including soil and rock logging, core sampling, Undisturbed
sampling, doing SPT test, collect and input the field data, analysis data
and reporting. In this project, my responsibility also as team leader and
project coordinator.
PT PLN Batubara
Taman Bandung,
Jambi, Indonesia
2014
: Geotechnical and Hydrogeological Study of IUP PT. Andhika Yoga
Pratama. The objective was to investigate how the safety slope stability
for the pit design. My responsibility was to collect and input the field data,
analysis data and quality control for reporting. In this project, my
responsibility also as project coordinator.
PT PLN Batubara
Muara Enim,
Indonesia
2013 - 2014
: Geotechnical and Hydrogeological Study of IUP PT. Tansri Madjid
Energi. The objective was to investigate how the safety slope stability for
the pit design. My responsibility was to get all the geotechnical data from
site by describing core data, collecting core sample, doing SPT test,
analysis data and reporting. In this project, my responsibility also as team
leader.
PT PLN Batubara
Muara Enim,
Indonesia
2013 - 2014
: Geotechnical and Hydrogeological Study of IUP PT. Synfuel Indonesia.
The objective was to investigate how the safety slope stability for the pit
design. My responsibility was to get all the geotechnical data from site by
describing core data, collecting core sample, doing SPT test, analysis
data and reporting. In this project, my responsibility also as team leader.
Musi Rawas,
Indonesia
2014
: Geological Management of IUP PT. Triaryani. The objective was to
investigate how the safety slope stability for the pit design. My
responsibility was to collect and input the field data and support in the
reporting.
PT Kalimantan
Energi Lestari
South Kalimantan,
Indonesia
2013
: Geotechnical Study of IUP PT. Kalimantan Energi Lestari. My
responsibility was to collect and input the field data.
PT Cibaliung
Sumberdaya
Cibaliung, Banten,
Indonesia
2010
: The objective was to investigate how the supporting system for
underground mine. My responsibility was to get all the geotechnical data
from site by describing parameter geomechanic at the opening stope,
collecting data, input data, define recommendation of supporting system
for underground mine.
CURRICULUM VITAE
QMS/HRD-FORM/15 4 of 5
PROJECT EXPERIENCES – GEOLOGICAL ENGINEERING
Purukcahu
Central Kalimantan,
Indonesia
2011 - 2012
: My responsibility as wellsite, determine lithology, coal sampling,
estimating the depth and thickness of coal, interpreting the geological and
geophysical data, entering the drilling data and daily activity.
Ciranjang
Cianjur, West Java,
Indonesia
May, 2011
: Input the field data; description the rock, geomorphology, geological
structure, and others related data. Then conduct fossil analysis and
define the age of rock units (lithostratygraphy).
Tunua
Nusa Tenggara
Timur, Indonesia
April, 2011
: Input the field data; description the rock, geomorphology, geological
structure, and others related data. Then conduct petrography analysis
and fossil analysis then define the age of rock units (lithostratygraphy).
Malingping
Lebak, Banten,
Indonesia
March, 2011
: Input the field data; description the rock, geomorphology, geological
structure, and others related data. Then conduct fossil analysis and
define the age of rock units (lithostratygraphy).
Ciseda
Lebak, Banten,
Indonesia
February, 2011
: Geological Engineering Mapping for total area 100 km2 (10 km x 10 km).
Collect and input the field data; including description the rock,
geomorphology, geological structure, and others related data. Then
conduct petrography analysis, fossil analysis, and studio analysis, to
reveal the geological history of the area.
Cikidang
Sukabumi, West
Java, Indonesia
January, 2011
: Input the field data; description the rock, geomorphology, geological
structure, and others related data. Then conduct fossil analysis and
define the age of rock units (lithostratygraphy).
Talaga Kulon
Majalengka, West
Java, Indonesia
2008
: Geological Engineering Mapping for total area 25 km2 (5 km x 5 km).
Collect and input the field data; including description the rock,
geomorphology, geological structure, and others related data. Then
conduct petrography analysis, fossil analysis, and studio analysis, to
reveal the geological history of the area.
PROJECT EXPERIENCES – CIVIL INFRASTRUCTURE
PT Triaryani
Tanjung Tiga,
Indonesia
2014
: My responsibility was to collect and input the field data, analysis and
reporting.
PT Sugico
Lebong, Indonesia
2011
: Civil infrastructure study of IUP PT. Tansri Madjid Energi. My
responsibility is supervising geotechnical drilling for tailing dump and
processing plant area.
PROJECT EXPERIENCES – QUALITY CONTROL
Jakarta,
2014
: Feasibility Study 300 K – PT. Freeport Indonesia
My responsibility as quality control in the reporting.
Jakarta
2014
: Social Baseline Study of PT Dairi Prima Mineral.
My responsibility as quality control in the reporting.
CURRICULUM VITAE
QMS/HRD-FORM/15 5 of 5
LANGUAGE ABILITY
Speak Read Write
English : Good Good Good
Indonesia : Mother Tongue
CERTIFICATION
I, the undersigned, certify to the best of my knowledge and belief, this resume correctly describes my
qualifications and my experiences.
Signature:
Date of signing 20/01/2015 (day/month/year)

More Related Content

Viewers also liked

อาหารคาว 7 ชนิด
อาหารคาว 7 ชนิดอาหารคาว 7 ชนิด
อาหารคาว 7 ชนิด
ployoiljin
 
реклама учебника биологии. воронина к
реклама учебника биологии. воронина креклама учебника биологии. воронина к
реклама учебника биологии. воронина к
ANNA_SH77
 
Question 6
Question 6Question 6
Question 6
danwj
 
Shareholders are against ftil nsel merger
Shareholders are against ftil nsel mergerShareholders are against ftil nsel merger
Shareholders are against ftil nsel merger
Neel Kumar
 
Question 7
Question 7Question 7
Question 7
danwj
 
NSEL-FTIL merger is delayed
NSEL-FTIL merger is delayedNSEL-FTIL merger is delayed
NSEL-FTIL merger is delayed
Neel Kumar
 
Question 333
Question 333Question 333
Question 333
danwj
 
проект на тему мезозойская эра
проект на тему мезозойская эрапроект на тему мезозойская эра
проект на тему мезозойская эра
ANNA_SH77
 
researchbrief28-ccaps-web-f
researchbrief28-ccaps-web-fresearchbrief28-ccaps-web-f
researchbrief28-ccaps-web-fJesse Libra
 
кайнозойская эра
кайнозойская эракайнозойская эра
кайнозойская эраANNA_SH77
 
What I Learnt About Building Great Products - Founders Institute - May 2016
What I Learnt About Building Great Products - Founders Institute - May 2016What I Learnt About Building Great Products - Founders Institute - May 2016
What I Learnt About Building Great Products - Founders Institute - May 2016
Ilter Dumduz
 
Evaluation question 4
Evaluation question 4Evaluation question 4
Evaluation question 4
danwj
 
Numeros
NumerosNumeros
Numeros
Adauto Santos
 

Viewers also liked (19)

ReviewPreview No 5 interactive
ReviewPreview No 5 interactiveReviewPreview No 5 interactive
ReviewPreview No 5 interactive
 
อาหารคาว 7 ชนิด
อาหารคาว 7 ชนิดอาหารคาว 7 ชนิด
อาหารคาว 7 ชนิด
 
Intel_IoT_Munich
Intel_IoT_MunichIntel_IoT_Munich
Intel_IoT_Munich
 
реклама учебника биологии. воронина к
реклама учебника биологии. воронина креклама учебника биологии. воронина к
реклама учебника биологии. воронина к
 
Question 6
Question 6Question 6
Question 6
 
Shareholders are against ftil nsel merger
Shareholders are against ftil nsel mergerShareholders are against ftil nsel merger
Shareholders are against ftil nsel merger
 
Question 7
Question 7Question 7
Question 7
 
Unit27task2coachinglog
Unit27task2coachinglogUnit27task2coachinglog
Unit27task2coachinglog
 
Doing_business_with_BSTDB_2012
Doing_business_with_BSTDB_2012Doing_business_with_BSTDB_2012
Doing_business_with_BSTDB_2012
 
Wagner Desrosiers RESUME2
Wagner Desrosiers RESUME2Wagner Desrosiers RESUME2
Wagner Desrosiers RESUME2
 
NSEL-FTIL merger is delayed
NSEL-FTIL merger is delayedNSEL-FTIL merger is delayed
NSEL-FTIL merger is delayed
 
Question 333
Question 333Question 333
Question 333
 
проект на тему мезозойская эра
проект на тему мезозойская эрапроект на тему мезозойская эра
проект на тему мезозойская эра
 
OOW-IMC-final
OOW-IMC-finalOOW-IMC-final
OOW-IMC-final
 
researchbrief28-ccaps-web-f
researchbrief28-ccaps-web-fresearchbrief28-ccaps-web-f
researchbrief28-ccaps-web-f
 
кайнозойская эра
кайнозойская эракайнозойская эра
кайнозойская эра
 
What I Learnt About Building Great Products - Founders Institute - May 2016
What I Learnt About Building Great Products - Founders Institute - May 2016What I Learnt About Building Great Products - Founders Institute - May 2016
What I Learnt About Building Great Products - Founders Institute - May 2016
 
Evaluation question 4
Evaluation question 4Evaluation question 4
Evaluation question 4
 
Numeros
NumerosNumeros
Numeros
 

Similar to CV - Evi P. Nurfalah_ud0115

Resume (CV) Joel Goklasmartua Napitupulu
Resume (CV) Joel Goklasmartua NapitupuluResume (CV) Joel Goklasmartua Napitupulu
Resume (CV) Joel Goklasmartua NapitupuluJoel Napitupulu
 
Curriculum Vitae Haris - November 2016 & certificates (Geothermal)
Curriculum Vitae Haris - November 2016 & certificates (Geothermal)Curriculum Vitae Haris - November 2016 & certificates (Geothermal)
Curriculum Vitae Haris - November 2016 & certificates (Geothermal)Haris Siagian
 
Arisona curriculum vitae ,kendari indonesia
Arisona curriculum vitae ,kendari indonesiaArisona curriculum vitae ,kendari indonesia
Arisona curriculum vitae ,kendari indonesia
ARISONA IBNU HADJAR ASWAD
 
CV - MOELYA BAYU BANGSAWAN NOHO.pdf
CV - MOELYA BAYU BANGSAWAN NOHO.pdfCV - MOELYA BAYU BANGSAWAN NOHO.pdf
CV - MOELYA BAYU BANGSAWAN NOHO.pdf
MoelyaBayuBangsawan
 
Profile CV ARISONA ARISONA (B.Sc, M.Eng.) kendari-indonesia
Profile CV   ARISONA  ARISONA (B.Sc, M.Eng.) kendari-indonesiaProfile CV   ARISONA  ARISONA (B.Sc, M.Eng.) kendari-indonesia
Profile CV ARISONA ARISONA (B.Sc, M.Eng.) kendari-indonesia
ARISONA IBNU HADJAR ASWAD
 
A. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesia
A. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesiaA. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesia
A. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesia
ARISONA IBNU HADJAR ASWAD
 
CV PUTRA ARDIANSYAH
CV PUTRA ARDIANSYAHCV PUTRA ARDIANSYAH
CV PUTRA ARDIANSYAH
Putra Ardiansyah
 
QCI's Capability Statement - Hydrology and Hydrogeology Engineering
QCI's Capability Statement - Hydrology and Hydrogeology EngineeringQCI's Capability Statement - Hydrology and Hydrogeology Engineering
QCI's Capability Statement - Hydrology and Hydrogeology Engineering
Maulana Ibrahim Rau
 
Nicholas Jenshak-Resume
Nicholas Jenshak-ResumeNicholas Jenshak-Resume
Nicholas Jenshak-ResumeNick Jenshak
 
Chris Curriculum Vitae 2015
Chris Curriculum Vitae 2015Chris Curriculum Vitae 2015
Chris Curriculum Vitae 2015Chris Allickson
 
Cv agus-2017 englis
Cv agus-2017 englisCv agus-2017 englis
Cv agus-2017 englis
Masaagus Budiharso
 
Personal details eko yulianto
Personal details eko yuliantoPersonal details eko yulianto
Personal details eko yuliantoEko Yulianto
 

Similar to CV - Evi P. Nurfalah_ud0115 (20)

CV_Stevanus
CV_StevanusCV_Stevanus
CV_Stevanus
 
Resume (CV) Joel Goklasmartua Napitupulu
Resume (CV) Joel Goklasmartua NapitupuluResume (CV) Joel Goklasmartua Napitupulu
Resume (CV) Joel Goklasmartua Napitupulu
 
Curriculum Vitae Haris - November 2016 & certificates (Geothermal)
Curriculum Vitae Haris - November 2016 & certificates (Geothermal)Curriculum Vitae Haris - November 2016 & certificates (Geothermal)
Curriculum Vitae Haris - November 2016 & certificates (Geothermal)
 
Arisona curriculum vitae ,kendari indonesia
Arisona curriculum vitae ,kendari indonesiaArisona curriculum vitae ,kendari indonesia
Arisona curriculum vitae ,kendari indonesia
 
CV - MOELYA BAYU BANGSAWAN NOHO.pdf
CV - MOELYA BAYU BANGSAWAN NOHO.pdfCV - MOELYA BAYU BANGSAWAN NOHO.pdf
CV - MOELYA BAYU BANGSAWAN NOHO.pdf
 
Profile CV ARISONA ARISONA (B.Sc, M.Eng.) kendari-indonesia
Profile CV   ARISONA  ARISONA (B.Sc, M.Eng.) kendari-indonesiaProfile CV   ARISONA  ARISONA (B.Sc, M.Eng.) kendari-indonesia
Profile CV ARISONA ARISONA (B.Sc, M.Eng.) kendari-indonesia
 
A. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesia
A. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesiaA. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesia
A. Arisona (arisona ibnu hadjar aswad) curriculum vitae ,kendari-indonesia
 
CV PUTRA ARDIANSYAH
CV PUTRA ARDIANSYAHCV PUTRA ARDIANSYAH
CV PUTRA ARDIANSYAH
 
CV-ARS-2015
CV-ARS-2015CV-ARS-2015
CV-ARS-2015
 
QCI's Capability Statement - Hydrology and Hydrogeology Engineering
QCI's Capability Statement - Hydrology and Hydrogeology EngineeringQCI's Capability Statement - Hydrology and Hydrogeology Engineering
QCI's Capability Statement - Hydrology and Hydrogeology Engineering
 
Nicholas Jenshak-Resume
Nicholas Jenshak-ResumeNicholas Jenshak-Resume
Nicholas Jenshak-Resume
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Chris Curriculum Vitae 2015
Chris Curriculum Vitae 2015Chris Curriculum Vitae 2015
Chris Curriculum Vitae 2015
 
CV
CVCV
CV
 
Saji_Sahadevan_WSG_CV
Saji_Sahadevan_WSG_CVSaji_Sahadevan_WSG_CV
Saji_Sahadevan_WSG_CV
 
CV_Octavianie
CV_OctavianieCV_Octavianie
CV_Octavianie
 
Cv agus-2017 englis
Cv agus-2017 englisCv agus-2017 englis
Cv agus-2017 englis
 
Personal details eko yulianto
Personal details eko yuliantoPersonal details eko yulianto
Personal details eko yulianto
 
CV
CVCV
CV
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 

CV - Evi P. Nurfalah_ud0115

  • 1. CURRICULUM VITAE QMS/HRD-FORM/15 1 of 5 Evi Puspasari Nurfalah, B.Eng. Position Assigned : Project Coordinator Task Assigned : Geotechnical Engineer Area of Expertise : Geotechnical, Geology, Civil Infrastructure Citizenship : Indonesia Employment Status : Permanent Membership of Professional Society : - Indonesian Association of Geologist (IAGI) - Masyarakat Geologi Ekonomi Indonesia (MGEI) SUMMARY OF EXPERIENCES Evi has been working as a Geotechnical Engineer for approximately two years. Previously she has been working with PT Cokal and PT Sugico as Wellsite Geologist and Geotechnical Engineer for approximately one year. She is capable working with Map-info, Geo-SlopeW and Slide software. She has experienced in geotechnical, geology, drilling supervising; hydrogeological and geotechnical drilling, civil infrastructure, and quality control for Feasibility Study Report. She has been involved in numerous projects related to mining; coal and mineral; civil infrastructure, in Indonesia. EDUCATION 2011 : Bachelor Degree, Geological Engineering, 2006 Padjajaran University TECHNICAL SKILL Geotechnical Engineering : - Doing SPT - Rock and Soil Logging - Sampling Disturbed and Undisturbed Sample - Statistic Data - Analysis Bearing Capacity and Ground Pressure - Analysis Excavatability and Rippability Geological Engineering : - Geological engineering mapping and skilled in utilizing GPS - Wellsite - Paleontology and Petrography Computer Software : - MapInfo (intermediate) - Geo-SlopeW (intermediate) - Slide (Beginner) - CAD (Beginner) - MS office; Word, Excel, Power Point, Visio (advance) - Adobe Photoshop; CorelDraw (intermediate)
  • 2. CURRICULUM VITAE QMS/HRD-FORM/15 2 of 5 TRAINING 2014 : Training In House - Minescape software PT Quantus Consultants Indonesia - Jakarta, Indonesia September, 2014 : Geotechnical Workshop PERHAPI - Bandung, Indonesia 2014 : Training In House - Gencom Minex software PT Quantus Consultants Indonesia - Jakarta, Indonesia 2012 : Training In House - Gencom Minex software PT Cokal - Central Kalimantan, Indonesia 2011 : Geotechnical for Mining Himpunan Mahasiswa Geologi (HMG) UNPAD with PT Aneka Tambang West Java, Indonesia 2009 : Workshop “Applied Geotechnical Aspect for Open Pit Mine” and Training Geo-SlopeW software Himpunan Mahasiswa Geologi (HMG) UNPAD with PT Arutmin West Java, Indonesia 2009 : Introduction Statistic for Mineral Deposits Himpunan Mahasiswa Geologi (HMG) UNPAD West Java, Indonesia 2008 : Porphyry Cu-Au Deposits Society of Economic Geologist (SEG) of UNPAD and MGEI West Java, Indonesia 2008 : The Discovery History of the Giant Oyu Tolgio Copper Gold Porphyry Deposits Society of Economic Geologist (SEG) of UNPAD and MGEI West Java, indonesia 2008 : Magmatic to Hydrothermal Transition Society of Economic Geologist (SEG) of UNPAD and MGEI West Java, indonesia 2008 : Diatreme Breccias, Textures, Processes, and Mineralization Society of Economic Geologist (SEG) of UNPAD and MGEI West Java, indonesia 2007 : Sekuen Stratigrafi Pegunungan Selatan Department of Energy and Mineral Resources, Central Survey Geology West Java, Indonesia EMPLOYMENT RECORD March 2013 - Present : PT. Quantus Consultants Indonesia Geotechnical Engineer November 2011 - 2012 : PT. Cokal Wellsite - Geologist August - November 2011 : PT. Sugico Geotechnical Engineer
  • 3. CURRICULUM VITAE QMS/HRD-FORM/15 3 of 5 PROJECT EXPERIENCES – GEOTECHNICAL ENGINEERING Tanah Bumbu South Kalimantan, Indonesia 2014 : Geotechnical Study of IUP PT. Sungai Danau Jaya. The objective was to investigate how the safety slope stability for the pit design. My responsibility is supervising geotechnical drilling including soil and rock logging, core sampling, Undisturbed sampling, collect and input the field data, analysis data and reporting. Such project, my responsibility also as team leader and project coordinator. PT PLN Batubara Seko Besar, Pauh, Jambi, Indonesia 2014 : Geotechnical and Hydrogeological Study of IUP PT. Mahakarya Abadi Prima. The objective was to investigate how the safety slope stability for the pit design. My responsibility is collecting and input the field data, analysis data and quality control for reporting. In this project, my responsibility also as project coordinator. PT PLN Batubara Lubuk Napal, Pauh, Jambi, Indonesia 2014 : Geotechnical and Hydrogeological Study of IUP PT. Bangun Persada Jambi Energi. The objective was to investigate how the safety slope stability for the pit design. My responsibility is supervising geotechnical drilling including soil and rock logging, core sampling, Undisturbed sampling, doing SPT test, collect and input the field data, analysis data and reporting. In this project, my responsibility also as team leader and project coordinator. PT PLN Batubara Taman Bandung, Jambi, Indonesia 2014 : Geotechnical and Hydrogeological Study of IUP PT. Andhika Yoga Pratama. The objective was to investigate how the safety slope stability for the pit design. My responsibility was to collect and input the field data, analysis data and quality control for reporting. In this project, my responsibility also as project coordinator. PT PLN Batubara Muara Enim, Indonesia 2013 - 2014 : Geotechnical and Hydrogeological Study of IUP PT. Tansri Madjid Energi. The objective was to investigate how the safety slope stability for the pit design. My responsibility was to get all the geotechnical data from site by describing core data, collecting core sample, doing SPT test, analysis data and reporting. In this project, my responsibility also as team leader. PT PLN Batubara Muara Enim, Indonesia 2013 - 2014 : Geotechnical and Hydrogeological Study of IUP PT. Synfuel Indonesia. The objective was to investigate how the safety slope stability for the pit design. My responsibility was to get all the geotechnical data from site by describing core data, collecting core sample, doing SPT test, analysis data and reporting. In this project, my responsibility also as team leader. Musi Rawas, Indonesia 2014 : Geological Management of IUP PT. Triaryani. The objective was to investigate how the safety slope stability for the pit design. My responsibility was to collect and input the field data and support in the reporting. PT Kalimantan Energi Lestari South Kalimantan, Indonesia 2013 : Geotechnical Study of IUP PT. Kalimantan Energi Lestari. My responsibility was to collect and input the field data. PT Cibaliung Sumberdaya Cibaliung, Banten, Indonesia 2010 : The objective was to investigate how the supporting system for underground mine. My responsibility was to get all the geotechnical data from site by describing parameter geomechanic at the opening stope, collecting data, input data, define recommendation of supporting system for underground mine.
  • 4. CURRICULUM VITAE QMS/HRD-FORM/15 4 of 5 PROJECT EXPERIENCES – GEOLOGICAL ENGINEERING Purukcahu Central Kalimantan, Indonesia 2011 - 2012 : My responsibility as wellsite, determine lithology, coal sampling, estimating the depth and thickness of coal, interpreting the geological and geophysical data, entering the drilling data and daily activity. Ciranjang Cianjur, West Java, Indonesia May, 2011 : Input the field data; description the rock, geomorphology, geological structure, and others related data. Then conduct fossil analysis and define the age of rock units (lithostratygraphy). Tunua Nusa Tenggara Timur, Indonesia April, 2011 : Input the field data; description the rock, geomorphology, geological structure, and others related data. Then conduct petrography analysis and fossil analysis then define the age of rock units (lithostratygraphy). Malingping Lebak, Banten, Indonesia March, 2011 : Input the field data; description the rock, geomorphology, geological structure, and others related data. Then conduct fossil analysis and define the age of rock units (lithostratygraphy). Ciseda Lebak, Banten, Indonesia February, 2011 : Geological Engineering Mapping for total area 100 km2 (10 km x 10 km). Collect and input the field data; including description the rock, geomorphology, geological structure, and others related data. Then conduct petrography analysis, fossil analysis, and studio analysis, to reveal the geological history of the area. Cikidang Sukabumi, West Java, Indonesia January, 2011 : Input the field data; description the rock, geomorphology, geological structure, and others related data. Then conduct fossil analysis and define the age of rock units (lithostratygraphy). Talaga Kulon Majalengka, West Java, Indonesia 2008 : Geological Engineering Mapping for total area 25 km2 (5 km x 5 km). Collect and input the field data; including description the rock, geomorphology, geological structure, and others related data. Then conduct petrography analysis, fossil analysis, and studio analysis, to reveal the geological history of the area. PROJECT EXPERIENCES – CIVIL INFRASTRUCTURE PT Triaryani Tanjung Tiga, Indonesia 2014 : My responsibility was to collect and input the field data, analysis and reporting. PT Sugico Lebong, Indonesia 2011 : Civil infrastructure study of IUP PT. Tansri Madjid Energi. My responsibility is supervising geotechnical drilling for tailing dump and processing plant area. PROJECT EXPERIENCES – QUALITY CONTROL Jakarta, 2014 : Feasibility Study 300 K – PT. Freeport Indonesia My responsibility as quality control in the reporting. Jakarta 2014 : Social Baseline Study of PT Dairi Prima Mineral. My responsibility as quality control in the reporting.
  • 5. CURRICULUM VITAE QMS/HRD-FORM/15 5 of 5 LANGUAGE ABILITY Speak Read Write English : Good Good Good Indonesia : Mother Tongue CERTIFICATION I, the undersigned, certify to the best of my knowledge and belief, this resume correctly describes my qualifications and my experiences. Signature: Date of signing 20/01/2015 (day/month/year)