ASHISH ASHOK JARIWALA
E-mail:ashish.jariwala@gmail.com
(M):9712972779
Residential Address
B 1 -102 Shaligram Residency
Behind Air Force Colony
Makarpura-390010
Vadodara
POST APPLIED FOR : Deputy Manager QA
OBJECTIVE:
To increase customer satisfaction through technical expertise & proper implementation of TS-
16949 system
QUALIFICATION:
 S.S.C. from ICSE BOARD with FIRST CLASS (60.11%)
 DIPLOMA IN ELECTRICAL ENGINEERING from MSBTE – Mumbai with first class
(65.66%)
 Degree in Instrumentation Engineering from North Maharashtra
University with Distinction class (70.41%)
COMPUTER SKILLS
 MS-Word.
 MS-Excel.
 Power point .
PAST EMPLOYER
• 1. INDUSTRIAL VALVES MANUFACTURING PROCESS UNIT EXPOSURE AS PER
IS: 3224:2002 WITH PIONEER INSTITUTE LIKE KOSAN INDUSTRIES (1 YEAR).
DURATION OF EXPERIENCE: May 2006 to May 2007
*Development activities
a. Phosphate process
b. Hard-chrome plating (VENDOR)
c. polishing process
*Assign work & impart instructions to operators
*Taking set up approval of product as per control plan
* ensure process parameters are being maintained by operators
8Record the process parameters of acceptable process capability item- wise & M/C- wise & updated
control plan /work instructions when ever improvement is observed
* Getting the feedback about quality from quality dept.
*Implementation of SPC
* Collection & analysis of SPC
- M/C capability study
-preliminary process capability study
-On going process capability study
* maintaining tool change register
*preparing flow process chart & control plan for process & product characteristics
*Preparing bill of material & process requirements including tooling’s requirement
* Ensure work instructions at all appropriate locations & followed
*Time study
a. Reduction in cycle time
b. Reduction in set-up time
* 100 % on time delivery
* Checking the records of production & quality details of all shifts & ensuring the operators are segregating
& oiling/preserving the reworked items, rejected items & accepted items with proper identification
* planning for training hours. & conducting training
*Supplier development activities (QUALITY)
* Tooling development & management
*Analysis of CLD data
To iron out /reduce quality problems
Quality department:
*Checking metallurgical & chemical test report & accept bar /forging material as per control plan &
acceptance criteria
*Inspection of finished turned material as per control plan & accept material as per acceptance criteria.
*In-process & final inspection *filling the inspection report & giving feed back to production department.
*NC closing (with corrective & preventive actions)
* Records the inspection details & making Pareto analysis
* Supplier quality rating & delivery rating
*Final product audit & layout inspection
*Mistake proofing activities
* Desposition actions on non –conformity items.
* COPQ* OEE
*PFMEA**PPAP*PROCESS AUDIT&VALIDATION *INTERNAL AUDIT * MSA
PAST EMPLOYER
 2. INDUSTRIAL & DOMESTIC CYLINDER MANUFACTURING PROCESS UNIT
EXPOSURE AS PER IS: 3196 PART 1 WITH PIONEER INSTITUTE CONFIDENCE
PETROLEUM INDIA LIMITED (2 YEAR)
 LOOKING FOR TOTAL MANUFACTURING PROCESS OF DOMESTIC LPG CYLINDERS
OF IOCL; BPCL ; HPCL AND RELIANCE FROM RAW MATERIAL INSPECTION TO FINISH
GOODS ALSO BASIC ROLE INVOLVES HANDLING BIS AND BEING PART OF VARIOUS
INCLUSION LIKE 15 KG AND 21 KG FOR RELIANCE.
 Attending MRM meeting
 DURATION OF EXPERIENCE: JUNE 2007 – JULY 2009
APQP co-ordinator: Customer communication is the main base, where I used to understand
customer requirements, study technical feasibility, Project planning, project reviews, project
completion in target time
Filling engineering change note, checking & approving in house drawings
Submission of PPAP -MSA*SPC*PFMEA*PROCESS AUDIT to determine its effectiveness *
PROCESS VALIDATION & REVALIDATION of heat treatment
* Handle customer complaints & taking corrective and preventive action for the same at the stage
of development.
 Project on reasons for assembly line stoppage & taking corrective actions (special project given
by CEO )
 NC closing found during internal & external system audit (with corrective & preventive actions)
 Supplier quality -Incoming inspection (indirect activities) based on sampling plan i.e. centre bolt
core hardness ,
 Giving approval tool /die as per drawing
 In process quality – Hot work area & assembly line & heat treatment (Hardening - quenching
– tempered hardness) (indirect activity) & spray painting -maintaining viscosity & coating
thickness
 Final inspection report checking.
PAST EMPLOYER
• 3. ASSOCIATION WITH VIMAL FIRE CONTROLS P LTD TO HANDLE QUALITY AND
LIASONING PROCESS WITH BIS FOR LICENCE LIKE IS 8442: WATER MONITOR; 10658:-
MOBILE EXTINGUISHER 25; 50; 75 KG DCP AND 5290: LANDING VALVES; 903 COUPLING
(2 Year)
*Followed the standards of * SPC * *PPAP*APQP*PFMEA* PROCESS
VALIDATION * PROCESS/PRODUCT AUDIT * continual improvement project
DURATION OF EXPERIENCE: July 2011 to Feb 2012
Experience on the following activities
• In house calibration –Only thread ring gauges
• External calibration - checking calibration certificates & taking decision for ok &not ok gauges &
maintaining calibration history card in EMS SYSTEM
• Gauges & instruments management
• Vendor development
• Handling customer complaints
• NC closing (with corrective & preventive actions)
• Preparing inspection check sheet
• Preparing control plan
• Incoming material& inspection & testing
• Incoming components inspection(indirect activities)
• Approving GRNS after inspection in EMS system
• Decision for disposition actions
• Recording rejections& rework data & taking actions on them
• Controlling over vendors (indirect activities)
• In process inspection (indirect activities)
• Final inspection (indirect activities)
• Checking product & tooling drawing (APPROVAL)
• MSA (R&R)
• Layout inspection
• PFMEA
PRESENT EMPLOYER: I am working as Senior Engineer Q.A in Gunnebo India
Pvt.Ltd.Halol division. (SWEDEN MNC)
This company manufactures Sheet Metal Security division products for bank and Fire
extinguishers. Its customer is SBI, IDBI, TCS, INDUSLAND, HERO MOTO CORP, HONDA
Experience of the following activities:
• Preparing dimensional checklist ,PFD, Control plan, PFMEA,SPC,MSA(R&R)
• Reviewing drawing
• Receiving inspection & taking action on NC. Preparing 8D report for NC product
• Cost of poor quality
• Taking disposition action for NC. Products
• Customer support activities like containment , corrective action & filling PPSR & imparting
feedback about quality to the PDI department & assembly line
• Improving supplier performance (quality)
• In-process inspection (verification of stations)
• Handling customer complaint
• Handling QA team & setting target for each team member
• Conducting daily quality meeting on shop floor.
• Process audit
• Supplier process audit
DURATION OF EXPERIENCE: March 2012 to till date
SALARY: 6, 05,000(CTC) + other facilities.
EXPECTED SALARY: 8, 50,000 / ANNUM.
Experience of the following activities (Quality assurance)
• Directed the operations activities within a production area to achieve the production goals: cost,
quality, time and safety
• proper utilization of resources and ensured there is no wastage e.g. line balancing
• Prepared various training programs keeping in mind the complexity of the production process and
how skill engineers/ fitters/welders are
• Creating & maintaining spare parts list
• Error proofing control
• Quality & environment protection
• Perform P.M & implementation of improvement
• Produce sample parts
• Supervised and managed the staff and equipment/machine throughout the production
process
• Ensuring workplace ergonomics
• Undertaking root cause analysis of problems and developing effective counter
measures initiating improvement ideas generation & implementation.
• Improvement in OEE
• Improvement in COPQ
• Experience of the following activities(QA)
• Directing & controlling the quality assurance activities in entire plant.
(Receiving inspection, in process inspection, Final inspection & PDI)
Product audit, Process audit. & supplier process audit & System audit (ISO, BIS
&PESO)
• SPC, PFMEA, PPAP & 7QC tools.
• Customer support activities like containment, corrective action
• Handle customer complaints & taking corrective and preventive action for the same at the
stage of development &monitoring customer PPM
• Fast response to customer for improvement & conducting layer process audit & maintaining
FRTB
• Supplier chain management & calculating PPM & taking corrective actions
• Effective implementation of verification station &taking containment & corrective actions
immediately
PERSONAL DETAILS
Date of Birth : 24.04.1982
Marital Status : Married.
Mother Tongue : Gujarati.
Languages Known : Gujarati, Hindi & English.
• Produce sample parts
• Supervised and managed the staff and equipment/machine throughout the production
process
• Ensuring workplace ergonomics
• Undertaking root cause analysis of problems and developing effective counter
measures initiating improvement ideas generation & implementation.
• Improvement in OEE
• Improvement in COPQ
• Experience of the following activities(QA)
• Directing & controlling the quality assurance activities in entire plant.
(Receiving inspection, in process inspection, Final inspection & PDI)
Product audit, Process audit. & supplier process audit & System audit (ISO, BIS
&PESO)
• SPC, PFMEA, PPAP & 7QC tools.
• Customer support activities like containment, corrective action
• Handle customer complaints & taking corrective and preventive action for the same at the
stage of development &monitoring customer PPM
• Fast response to customer for improvement & conducting layer process audit & maintaining
FRTB
• Supplier chain management & calculating PPM & taking corrective actions
• Effective implementation of verification station &taking containment & corrective actions
immediately
PERSONAL DETAILS
Date of Birth : 24.04.1982
Marital Status : Married.
Mother Tongue : Gujarati.
Languages Known : Gujarati, Hindi & English.

Ashish jariwala -Resume

  • 1.
    ASHISH ASHOK JARIWALA E-mail:ashish.jariwala@gmail.com (M):9712972779 ResidentialAddress B 1 -102 Shaligram Residency Behind Air Force Colony Makarpura-390010 Vadodara POST APPLIED FOR : Deputy Manager QA OBJECTIVE: To increase customer satisfaction through technical expertise & proper implementation of TS- 16949 system QUALIFICATION:  S.S.C. from ICSE BOARD with FIRST CLASS (60.11%)  DIPLOMA IN ELECTRICAL ENGINEERING from MSBTE – Mumbai with first class (65.66%)  Degree in Instrumentation Engineering from North Maharashtra University with Distinction class (70.41%) COMPUTER SKILLS  MS-Word.  MS-Excel.  Power point . PAST EMPLOYER • 1. INDUSTRIAL VALVES MANUFACTURING PROCESS UNIT EXPOSURE AS PER IS: 3224:2002 WITH PIONEER INSTITUTE LIKE KOSAN INDUSTRIES (1 YEAR). DURATION OF EXPERIENCE: May 2006 to May 2007 *Development activities
  • 2.
    a. Phosphate process b.Hard-chrome plating (VENDOR) c. polishing process *Assign work & impart instructions to operators *Taking set up approval of product as per control plan * ensure process parameters are being maintained by operators 8Record the process parameters of acceptable process capability item- wise & M/C- wise & updated control plan /work instructions when ever improvement is observed * Getting the feedback about quality from quality dept. *Implementation of SPC * Collection & analysis of SPC - M/C capability study -preliminary process capability study -On going process capability study * maintaining tool change register *preparing flow process chart & control plan for process & product characteristics *Preparing bill of material & process requirements including tooling’s requirement * Ensure work instructions at all appropriate locations & followed *Time study a. Reduction in cycle time b. Reduction in set-up time * 100 % on time delivery * Checking the records of production & quality details of all shifts & ensuring the operators are segregating & oiling/preserving the reworked items, rejected items & accepted items with proper identification * planning for training hours. & conducting training *Supplier development activities (QUALITY) * Tooling development & management *Analysis of CLD data To iron out /reduce quality problems Quality department: *Checking metallurgical & chemical test report & accept bar /forging material as per control plan & acceptance criteria *Inspection of finished turned material as per control plan & accept material as per acceptance criteria. *In-process & final inspection *filling the inspection report & giving feed back to production department. *NC closing (with corrective & preventive actions) * Records the inspection details & making Pareto analysis * Supplier quality rating & delivery rating *Final product audit & layout inspection *Mistake proofing activities * Desposition actions on non –conformity items. * COPQ* OEE *PFMEA**PPAP*PROCESS AUDIT&VALIDATION *INTERNAL AUDIT * MSA PAST EMPLOYER  2. INDUSTRIAL & DOMESTIC CYLINDER MANUFACTURING PROCESS UNIT EXPOSURE AS PER IS: 3196 PART 1 WITH PIONEER INSTITUTE CONFIDENCE PETROLEUM INDIA LIMITED (2 YEAR)  LOOKING FOR TOTAL MANUFACTURING PROCESS OF DOMESTIC LPG CYLINDERS OF IOCL; BPCL ; HPCL AND RELIANCE FROM RAW MATERIAL INSPECTION TO FINISH GOODS ALSO BASIC ROLE INVOLVES HANDLING BIS AND BEING PART OF VARIOUS INCLUSION LIKE 15 KG AND 21 KG FOR RELIANCE.  Attending MRM meeting  DURATION OF EXPERIENCE: JUNE 2007 – JULY 2009
  • 3.
    APQP co-ordinator: Customercommunication is the main base, where I used to understand customer requirements, study technical feasibility, Project planning, project reviews, project completion in target time Filling engineering change note, checking & approving in house drawings Submission of PPAP -MSA*SPC*PFMEA*PROCESS AUDIT to determine its effectiveness * PROCESS VALIDATION & REVALIDATION of heat treatment * Handle customer complaints & taking corrective and preventive action for the same at the stage of development.  Project on reasons for assembly line stoppage & taking corrective actions (special project given by CEO )  NC closing found during internal & external system audit (with corrective & preventive actions)  Supplier quality -Incoming inspection (indirect activities) based on sampling plan i.e. centre bolt core hardness ,  Giving approval tool /die as per drawing  In process quality – Hot work area & assembly line & heat treatment (Hardening - quenching – tempered hardness) (indirect activity) & spray painting -maintaining viscosity & coating thickness  Final inspection report checking. PAST EMPLOYER • 3. ASSOCIATION WITH VIMAL FIRE CONTROLS P LTD TO HANDLE QUALITY AND LIASONING PROCESS WITH BIS FOR LICENCE LIKE IS 8442: WATER MONITOR; 10658:- MOBILE EXTINGUISHER 25; 50; 75 KG DCP AND 5290: LANDING VALVES; 903 COUPLING (2 Year) *Followed the standards of * SPC * *PPAP*APQP*PFMEA* PROCESS VALIDATION * PROCESS/PRODUCT AUDIT * continual improvement project DURATION OF EXPERIENCE: July 2011 to Feb 2012 Experience on the following activities • In house calibration –Only thread ring gauges • External calibration - checking calibration certificates & taking decision for ok &not ok gauges & maintaining calibration history card in EMS SYSTEM • Gauges & instruments management • Vendor development • Handling customer complaints • NC closing (with corrective & preventive actions) • Preparing inspection check sheet • Preparing control plan • Incoming material& inspection & testing • Incoming components inspection(indirect activities) • Approving GRNS after inspection in EMS system • Decision for disposition actions • Recording rejections& rework data & taking actions on them • Controlling over vendors (indirect activities) • In process inspection (indirect activities) • Final inspection (indirect activities) • Checking product & tooling drawing (APPROVAL) • MSA (R&R) • Layout inspection • PFMEA
  • 4.
    PRESENT EMPLOYER: Iam working as Senior Engineer Q.A in Gunnebo India Pvt.Ltd.Halol division. (SWEDEN MNC) This company manufactures Sheet Metal Security division products for bank and Fire extinguishers. Its customer is SBI, IDBI, TCS, INDUSLAND, HERO MOTO CORP, HONDA Experience of the following activities: • Preparing dimensional checklist ,PFD, Control plan, PFMEA,SPC,MSA(R&R) • Reviewing drawing • Receiving inspection & taking action on NC. Preparing 8D report for NC product • Cost of poor quality • Taking disposition action for NC. Products • Customer support activities like containment , corrective action & filling PPSR & imparting feedback about quality to the PDI department & assembly line • Improving supplier performance (quality) • In-process inspection (verification of stations) • Handling customer complaint • Handling QA team & setting target for each team member • Conducting daily quality meeting on shop floor. • Process audit • Supplier process audit DURATION OF EXPERIENCE: March 2012 to till date SALARY: 6, 05,000(CTC) + other facilities.
  • 5.
    EXPECTED SALARY: 8,50,000 / ANNUM. Experience of the following activities (Quality assurance) • Directed the operations activities within a production area to achieve the production goals: cost, quality, time and safety • proper utilization of resources and ensured there is no wastage e.g. line balancing • Prepared various training programs keeping in mind the complexity of the production process and how skill engineers/ fitters/welders are • Creating & maintaining spare parts list • Error proofing control • Quality & environment protection • Perform P.M & implementation of improvement
  • 6.
    • Produce sampleparts • Supervised and managed the staff and equipment/machine throughout the production process • Ensuring workplace ergonomics • Undertaking root cause analysis of problems and developing effective counter measures initiating improvement ideas generation & implementation. • Improvement in OEE • Improvement in COPQ • Experience of the following activities(QA) • Directing & controlling the quality assurance activities in entire plant. (Receiving inspection, in process inspection, Final inspection & PDI) Product audit, Process audit. & supplier process audit & System audit (ISO, BIS &PESO) • SPC, PFMEA, PPAP & 7QC tools. • Customer support activities like containment, corrective action • Handle customer complaints & taking corrective and preventive action for the same at the stage of development &monitoring customer PPM • Fast response to customer for improvement & conducting layer process audit & maintaining FRTB • Supplier chain management & calculating PPM & taking corrective actions • Effective implementation of verification station &taking containment & corrective actions immediately PERSONAL DETAILS Date of Birth : 24.04.1982 Marital Status : Married. Mother Tongue : Gujarati. Languages Known : Gujarati, Hindi & English.
  • 7.
    • Produce sampleparts • Supervised and managed the staff and equipment/machine throughout the production process • Ensuring workplace ergonomics • Undertaking root cause analysis of problems and developing effective counter measures initiating improvement ideas generation & implementation. • Improvement in OEE • Improvement in COPQ • Experience of the following activities(QA) • Directing & controlling the quality assurance activities in entire plant. (Receiving inspection, in process inspection, Final inspection & PDI) Product audit, Process audit. & supplier process audit & System audit (ISO, BIS &PESO) • SPC, PFMEA, PPAP & 7QC tools. • Customer support activities like containment, corrective action • Handle customer complaints & taking corrective and preventive action for the same at the stage of development &monitoring customer PPM • Fast response to customer for improvement & conducting layer process audit & maintaining FRTB • Supplier chain management & calculating PPM & taking corrective actions • Effective implementation of verification station &taking containment & corrective actions immediately PERSONAL DETAILS Date of Birth : 24.04.1982 Marital Status : Married. Mother Tongue : Gujarati. Languages Known : Gujarati, Hindi & English.